EP2220328B1 - Dispositif de protection comprenant une pièce de fixation et procédé de montage de ce dispositif de protection - Google Patents

Dispositif de protection comprenant une pièce de fixation et procédé de montage de ce dispositif de protection Download PDF

Info

Publication number
EP2220328B1
EP2220328B1 EP07817955A EP07817955A EP2220328B1 EP 2220328 B1 EP2220328 B1 EP 2220328B1 EP 07817955 A EP07817955 A EP 07817955A EP 07817955 A EP07817955 A EP 07817955A EP 2220328 B1 EP2220328 B1 EP 2220328B1
Authority
EP
European Patent Office
Prior art keywords
screening arrangement
fitting
screening
bottom element
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP07817955A
Other languages
German (de)
English (en)
Other versions
EP2220328A1 (fr
Inventor
Peder Solsø THOMSEN
Henning Ebbesen
Hans Gram Andersen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
VKR Holding AS
Original Assignee
VKR Holding AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by VKR Holding AS filed Critical VKR Holding AS
Priority to EP11177062.4A priority Critical patent/EP2412916B1/fr
Priority to PL07817955T priority patent/PL2220328T3/pl
Priority to PL11177062T priority patent/PL2412916T3/pl
Publication of EP2220328A1 publication Critical patent/EP2220328A1/fr
Application granted granted Critical
Publication of EP2220328B1 publication Critical patent/EP2220328B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B9/00Screening or protective devices for wall or similar openings, with or without operating or securing mechanisms; Closures of similar construction
    • E06B9/24Screens or other constructions affording protection against light, especially against sunshine; Similar screens for privacy or appearance; Slat blinds
    • E06B9/40Roller blinds
    • E06B9/42Parts or details of roller blinds, e.g. suspension devices, blind boxes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/03Sky-lights; Domes; Ventilating sky-lights
    • E04D13/033Sky-lights; Domes; Ventilating sky-lights provided with means for controlling the light-transmission or the heat-reflection, (e.g. shields, reflectors, cleaning devices)
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B9/00Screening or protective devices for wall or similar openings, with or without operating or securing mechanisms; Closures of similar construction
    • E06B9/56Operating, guiding or securing devices or arrangements for roll-type closures; Spring drums; Tape drums; Counterweighting arrangements therefor

Definitions

  • the present invention relates to a screening arrangement having a supply condition and a condition of use, comprising: a top element including a top rail extending in a first longitudinal direction defining, in the condition of use, a width direction, said first longitudinal direction being substantially perpendicular to a second longitudinal direction, a bottom element, a screening body, said screening body including a first end edge and a second end edge, said first end edge being accommodated in the top element and the second end edge fastened to the bottom element, and two side rails, each side rail extending, in the condition of use, in the second longitudinal direction defining a height direction.
  • Such screening arrangements are retailed through a variety of channels including DIY stores.
  • the screening arrangement most often arrives at a customer in the supply condition and, traditionally, the consumer himself carries out the installation or mounting to bring the screening arrangement from the supply condition to the condition of use.
  • the customer or another person mounting the screening arrangement may experience difficulties when mounting the side rails.
  • Other factors resulting in incorrect mounting include that the bottom element is not properly introduced into the side rails, whereby it is not possible to obtain correct guiding of the bottom elements in the side rails, leading in turn to problems during operation.
  • the screening arrangement includes a parallel guidance cord system
  • the cords may complicate the mounting procedure.
  • It is a further object of the invention to display of the screening body may be achieved in a simple and reliable manner.
  • a screening arrangement of the kind mentioned in the introduction which is furthermore characterized in that in said supply condition, at least one fitting is releasably connected with the top element and the bottom element to provide a predefined distance in the second longitudinal direction between the bottom element and the top element, that the bottom element comprises side guidance means, and that the screening arrangement furthermore includes a set of angular brackets, each angular bracket having a first leg being accommodated in reception means in the back side of the top rail, and each angular bracket having a second leg cooperating with the side guidance means of the bottom element in the supply condition.
  • connection may involve any kind of contact or other cooperation between the fitting and the top element and bottom element, respectively, which fulfils this function.
  • the fitting or fitting need(s) only to be positively secured to one of the top and bottom elements.
  • the releasable connection between the fitting or fittings and the other element may then for instance be performed by a fitting part that abuts on the other element.
  • the term should be interpreted as including any connection that is possible to release without damage to at least the elements of the screening arrangement.
  • the predetermined distance defined by the connection between the fitting or fittings and the top element and the bottom element, respectively makes it possible for the potential buyer to easily determine the nature of the screening body.
  • the side guidance means comprise a side guidance element connected to each longitudinal end of the bottom element.
  • each guidance element is located on the back side of the respective angular bracket with a slight overlap in the second longitudinal direction between the lower edge of the angular bracket and the upper edge of the side guidance element.
  • the angular bracket and the side guidance element in the first longitudinal direction.
  • the mounting is made particularly secure, as the risk of non-correct mounting is almost eliminated. That is, it is made certain in a simple manner that the side rails are mounted correctly on the angular brackets such that the top rail and the respective side rail abut correctly on each other to obtain an inconspicuous joint. Simultaneously, the bottom element is inserted correctly into the side rails.
  • a method of mounting a screening arrangement comprises the steps of providing a top element with a top rail, a bottom element wigh side guidance means and a screening body, providing the top element with two angular brackets connected to the top rail, providing two side rails, bringing the screening arrangement to a supply condition by connecting at least one fitting releasably with the top element and the bottom element to provide a predefined distance between the bottom element and the top element, and bringing the screening arrangement from said supply condition to a condition of use.
  • Figs 1 and 6 show an embodiment of a screening arrangement generally designated 1.
  • the screening arrangement is adapted to be mounted on a frame constituted by a sash 2 representing a window.
  • the sash 2 in turn, is adapted to be connected with a stationary frame (not shown), which in a mounted position of the window lines an opening in a building.
  • frame is to be understood as incorporating any substantially rectangular structure positioned in any opening in a building, whether in a wall or the roof, and surrounding an aperture to be screened.
  • a screening arrangement according to the invention may just as well be mounted on the stationary frame instead of the sash and may also be utilized in connection with e.g. windows having a frame only, or in doors.
  • the sash 2 has a top piece 21, a bottom piece 22 and two side pieces 23 and 24 surrounding an aperture, which is covered by a suitable panel element such as a glazing in the form of an insulating pane (not shown).
  • the screening arrangement 1 comprises a top element 4 adapted to be positioned at the sash top piece 21, a screening body 6 and a bottom element 7. At its upper end edge, the screening body 6 is accommodated in the top element 4 and its opposed, lower end edge is fastened to the bottom element 7.
  • the bottom element 7 is adapted to act as a handle during operation of the screening arrangement 1, i.e. when moving the bottom element 7 and hence the screening body 6 between the non-screening position and a screening position, in which the screening body 6 covers the sash aperture partly or fully.
  • the screening arrangement may be operated by other means, e.g. by electrical operating means.
  • the top element 4 has a left-hand end piece 410 and a right-hand end piece (not shown).
  • the terms “left-hand” and “right-hand” refer to the orientation shown in for instance Figs 1 and 6 and are utilized for reasons of convenience only.
  • the terms “front” and “back” are utilized to denote the sides of the screening arrangement, "front” being the side intended to face inwards into the room of the building, and “back” the outwards facing side.
  • a number of further functions may be built into the end pieces, however, they will not be described in further detail in the present application.
  • One of the most important of these functions is that the end piece 410 comprises portions constituting coupling means for cooperation with bracket members positioned on the side piece 23 of the window sash 2.
  • the top element 4 comprises a cover 430 extending almost throughout the entire length of the top element 4 from the left-hand end piece 410 to the right-hand end piece, the end pieces thus constituting the end faces of the top element 4.
  • the cover 430 is connected to a top rail 440.
  • the top rail 440 defines a first longitudinal direction, which in the condition of use corresponds to the width direction of the frame to be screened.
  • the connection between the top rail 440 and the remaining portion of the top element, i.e. the cover 430 is made integral, e.g. by extruding the top element as a profile including the cover 430 as well as the top rail 440.
  • the end piece 410 is fastened to the cover 430 by means of e.g. a screw.
  • the top rail 440 has a slightly longer extension in the longitudinal direction than the cover portion 430.
  • the top element 4 accommodates a guide bar and a roller bar (not visible).
  • the screening body 6 is fastened to the roller bar along its upper end edge in any suitable manner known per se.
  • the guide bar guides the screening body 6 onto the roller bar, which serves to collect and store the screening body 6 in the non-screening and partially screened positions of the screening arrangement, or even in the fully screened position, in case the screening body contains surplus material.
  • the screening body is wound in mutually opposite directions on the roller bar and the guide bar.
  • the side of the screening body 6 facing inwards in the screening positions i.e. the front side facing towards the room in the position of use of the screening arrangement, faces inwards when stored on the roller bar and, hence, the back side faces outwards on the roller bar.
  • the bottom element 7 has a general U-shape, the legs of the U extending integrally into the top and bottom edges 71 and 72, respectively, a finger grip 73 being provided by said U-shape.
  • a non-screening position in which the U-shape is situated immediately below the guide bar and immediately in front of the front portion of the screening body 6 stored on the roller bar.
  • a slight overlap between the lower edge of the top rail 440 and the top edge 71 occurs, for instance in the interval 1-10 mm.
  • the ends of the bottom element 7 are advantageously guided in the side rails as well, preferably by means of side guidance elements 700 to be described in further detail below.
  • the top rail 440 is joined to side rails 8, 9 in joints by means of angular brackets 85.
  • the top rail 440 has two ends, which in the embodiment shown are mitred, and of which one mitred end 445 is indicated in Fig. 1 to be joined to a respective mitred end of the side rails.
  • the screening arrangement comprises a roller blind having as its screening body 6 a cloth or fabric, and of which the top element 4 includes a spring-biased roller bar.
  • the side edges of the screening body 6 are guided in the side rails 8, 9 in a manner known per se , for instance by means of a number of guide beads mounted at a distance from each other along each side edge.
  • the side rails 8, 9 serve the purpose of improving the light-proofing properties of the screening arrangement, as they overlap the side edges of the screening body in the mounted position of the screening arrangement.
  • the side rails may contribute to holding the screening body in position.
  • the bottom edge of the screening body 6 is connected with the bottom element 7 in any suitable manner, and the ends of the bottom element 7 are guided in the side rails as well, by means of side guidance element 700.
  • the screening arrangement comprises a parallel guidance cord system comprising two cords, of which one cord 91 (cf. Fig. 6 ) being adapted to extend from the right-hand lower corner of the sash, up through or along the bottom element 7 and further up to the top element 4.
  • the other cord 92 (cf. Figs 17 and 18 ) is routed in a mirror-inverted manner.
  • each cord is connected with a respective pre-tensioning device adapted to be connected with the top element 4 in a track and/or to press against the top cover portion of the cover 430.
  • the pre-tensioning devices entail that the cords are held at a suitable tension all of the time, thereby ensuring that the bottom element 7 is at all times kept substantially in parallel with the top and bottom pieces 21, 22 of the sash 2 during operation of the screening arrangement. In the mounted position, the cords are hidden behind the side rails.
  • Fig. 1 the screening arrangement 1 is shown in a supply condition attained at the manufacturer and indicating the condition or state, in which the screening arrangement is supplied and delivered.
  • a set of angular brackets 85 is connected to the top rail 440 of the top element 4. This operation is advantageously carried out by a suitable tool to secure that the angular brackets assume correct positions.
  • the bottom element 7 is fixed in a predetermined distance from the top element 4 by means of two fittings 10 (cf. the mounted position of Fig. 6 ).
  • the fittings are identical to each other, and reference will only be made to the left-hand fitting 10 in Fig. 1 .
  • the cords 91, 92 of the guidance cord system are tightened and secured in the fittings 10 as will be described further below.
  • the fitting 10 is releasably connected to the top element 4 and the bottom element 7, respectively, to define the predefined distance between the top edge 71 of the bottom element 7 and the bottom edge 444 of the top rail 440.
  • the fitting 10 comprises means for releasable connection, in the embodiment shown carried out as snap engagement means for cooperating with the top element 4 and the bottom element 7, respectively, to provide positive engagement with the top element as well as the bottom element, The snap engagement will be described in further detail below with reference to Figs 2 to 5 . Other means for releasable connection are conceivable as well.
  • the releasable connection means of the fitting may provide positive engagement, for instance by the described snap lock, with the bottom element only, whereas the fitting abuts on but does not engage positively with the top element.
  • the fitting needs only to be withdrawn from the top element, possibly overcoming any friction present, without disengaging any parts of the fitting from the positive engagement.
  • the bottom element is biased to move towards the top element, for instance in roller blinds.
  • Other conceivable means for releasable connection includes the use of adhesive, interlocking elements of for instance the VELCRO® type etc.
  • the predetermined distance may for instance lie in the interval 0.5 to 10 cm, preferably 1 to 5 cm, most preferably 2 to 4 cm, and can correspond to the repeat of the pattern of the screening body 6.
  • the chosen value depends on for instance the colour variation of the cloth of the screening body, the pattern itself and the repeat of the pattern. In the embodiment shown, the distance is approximately 2 cm. For instance, in case the range of colours available includes closely related nuances such as dark blue and black, a larger distance may be required.
  • the fitting 10 is a two-part fitting comprising a base part 101 and an insert part 102.
  • the insert part 102 is designed as a mainly cylindrical element, and the base part 101 has a cylindrical aperture formed by wall portions 103a and 103b protruding from a bottom portion 104 adapted to cooperate with the insert part 102.
  • the snap engagement means of the fitting 10 adapted to cooperate with the top rail 440 of the top element are formed by a U-shaped portion 105 protruding from the wall portion 103a and a hook portion 107 protruding from the bottom portion 104.
  • the U-shaped portion 105 abuts on the front side of the top rail 440 and the hook portion 107 is clicked into a track (not shown) on the back side of the top rail 440.
  • the snap engagement means for cooperating with the bottom element 7 comprise a first portion 108 protruding from a U-shaped portion 106 and a second portion 109 protruding from the bottom portion 104 of the fitting.
  • the second portion 109 is introduced into the finger grip 73 and the first portion 108 below lower edge 72 of the bottom element 7.
  • the mainly cylindrical insert part 102 is formed by two plate portions 110 and 111 defining an annular groove 112 adapted to receive one of the cords of the cord systems.
  • the plate portions 110 and 111 are held together by a bridge 113 defining the bottom of the groove 112.
  • the bottom plate portion 111 includes a slit 114 for allowing passage of the cord.
  • a throughgoing T-shaped slit 115 is shown, the T-shaped slit 115 being intended for receiving an end portion of the cord.
  • the respective cord end is first accommodated in the T-shaped slit 115, following which the cord is rolled up, for instance automatically, on the insert part 102, the cord is passed through the slit 114 and the cord end is connected with the T-shaped slit 115. Subsequently, the insert part 102 with the cord is connected to the base part 101.
  • the indicated cord 91 for connection to the right-hand side piece 24 is connected to the right-hand fitting 10, and vice versa.
  • the plate portion 110 may be provided with a suitable removable cover, for instance carrying an advertisement in the form of a logo, a voucher or similar.
  • the base portion and the insert portion have mating circular shapes and rotation of the insert part in the base part is in principle feasible, this feature is most often not used in the supply condition. Consequently, the shapes of the base part and insert part may be oval, rectangular, any other polygonal shape etc.
  • each fitting 210 includes a cover portion 2116 covering at least a part of the joint between the top rail 440 and the side rail 8. This provides for additional protection during transportation and mounting. Furthermore, the cover portion 2116 secures that the fitting 210 is held at a predefined distance from the end of the screening arrangement 1. This is advantageous in that the position of the fitting also in the first longitudinal direction is fixed. In the case the screening arrangement comprises a cord system, the cords are held tight. Furthermore, it has an aesthetical value, as the consumer will experience a harmonic appearance of the screening arrangement in the supply condition. This is particularly the case when the screening arrangement is accommodated in a package having a display window at a certain position.
  • the fitting 210 comprises a base part 2101 and an insert part 2102, the insert part 2102 being adapted for receiving a respective cord of the guidance cord system.
  • the insert part 2102 is designed as a mainly cylindrical element having an annular groove adapted to receive the cord.
  • the insert part 2102 is formed by two plate portions 2110 and 2111 defining an annular groove 2112 adapted to receive one of the cords of the cord system.
  • the plate portions 2110 and 2111 are held together by a bridge 2113 defining the bottom of the groove 2112 and forming an aperture.
  • the top plate portion 2110 includes a slit 2114 for fixing the cord temporarily, and the top plate portion 2110 is provided with a T-shaped slit 2115 for receiving an end portion of the cord.
  • the base part 2101 has a pin 2117 adapted to cooperate with the corresponding aperture in the insert part 2102.
  • the snap engagement means of the fitting 210 adapted to cooperate with the top rail 440 of the top element are formed by a stepped portion 2105 protruding from the bottom portion 2104 and two hook portions 2107 protruding from the stepped portion 2105.
  • the stepped portion 2105 abuts on the front side of the top rail 440 and the hook portions 2107 are clicked onto the bottom edge 444 of the top rail 440.
  • the snap engagement means for cooperating with the bottom element 7 comprise a portion 2108 protruding from the bottom portion 2104. In the supply condition, the protruding portion 2108 is introduced behind the upper edge 71 of the bottom element 7.
  • FIG. 7a the screening arrangement 1 is in its supply condition, i.e. when the consumer or a craftsman is ready to install the screening arrangement in the frame to be screened.
  • the cover portion 2116 is located at the corner of the top rail end.
  • the screening arrangement 1 is mounted on fittings on the frame by guiding the left-hand end piece 410 and the right-hand end piece over bracket members positioned on the frame, e.g. in the embodiment shown in the above at the upper ends of each sash side piece.
  • the cover portions 2116 are pushed outwards and into the room towards the installer. This results in the position of the cover portion 2116 shown in Fig. 7b , i.e. slightly angled with respect to the top rail 440.
  • a fitting 510 is releasably connected to the top element 4 and the bottom element 7 as described in the above description of fittings 10 and 210, respectively.
  • Another fitting may be provided near the opposite longitudinal end of the screening arrangement 1. Only differences with respect to these embodiments will be described in detail.
  • Each fitting 510 includes a cover portion 5116 covering at least a part of the joint between the top rail 440 and the side rail 8 in the mounted position.
  • the cover portion 5116 is provided with a flange portion 5116a. This provides for additional protection during transportation and mounting.
  • the position of the fitting also in the first longitudinal direction is fixed.
  • the fitting 510 has a protruding leg 5120 ending in a flange 5121, which in the supply condition lies behind the side guidance element 700 in abutment with the back side thereof.
  • a further flange 5122 is provided, which in the embodiment shown abuts on the front side of the bottom element 7. This is advantageous in that the cord of the cord system (not shown in Fig. 12 ) may be guided from the side guidance element 700 to the fitting 510 without any risk of coming into contact with the edges of the bottom element, which could potentially damage the cord.
  • An obvious alternative to this embodiment is to have only the protruding leg 5120 to define the predetermined distance in the first longitudinal direction and thus not the cover portion 5116.
  • the predetermined distance between the the top element 4 and the bottom element 7 in the supply condition has the further consequence that the angular bracket 85 is able to cooperate with a respective side guidance element 7000 connected to the bottom element 7.
  • the cooperation entails providing an overlap denoted d between the second leg 860 of the angular bracket 85 and the side guidance element 700.
  • the cooperation entails that the side guidance element 700 is substantially aligned with the second leg 860 of the angular bracket 85 in a direction parallel to the longitudinal direction of the side rail 8.
  • the longitudinal direction of the side rail constitutes a second longitudinal direction and defines a height direction in the condition of use of the screening arrangement in the frame to be screened.
  • the first and second longitudinal directions are substantially perpendicular.
  • the side guidance element 700 is able to form part of the guide when mounting the side rail 8 onto the angular bracket 85.
  • a first leg 850 of the angular bracket 85 is inserted into a track 447 in the back side of the top rail 440 (cf. Fig. 16 ) .
  • the angular bracket 85 has arresting means preventing the angular bracket 85 to be extracted from the track.
  • the second leg 860 of the angular bracket is adapted to be inserted into a track in the back side of the side rail 8 during mounting of the screening arrangement.
  • the fitting 10 hence has at least two primary purposes:
  • the top element 4 may be connected with the frame without interfering with the cords as these are at all times kept tight by the fitting or fittings.
  • the side guide rails may be joined properly with the top rail 440 without the risk of entangling of the cords or that the side guidance element 700 and hence the entire bottom element 7 are displaced and not introduced correctly into the side rail.
  • the configuration of the side guidance element 700 and its relation to the angular bracket 85 appear more clearly from Figs 17 and 18 .
  • the overlap d between the lower edge of the angular bracket 85 and the upper edge 701 of the side guidance element 700 should of course be chosen such that a secure overlap is ensured.
  • the overlap should only provide the initial guide for the side rails when joining the side rails to the top rail, the overlap needs not be too large.
  • it may be seen, in particular from the front view of Fig. 15 that in addition to the overlap d in the second longitudinal direction, i.e. the height direction, there is alignment between the angular bracket 85 and the side guidance element 700 in the first longitudinal direction, i.e. the width direction, as well.
  • FIGs 17 and 18 the side guidance element 700 is shown in more detail. Other features visible in Figs 17 and 18 include cords 91, 92 guided through the side guidance element 700 connected to the bottom element 7, namely cord 91 through opening 702 near the upper edge 701, and cord 92 through opening 703. At the opposite end of the bottom element 7 the cords are guided reversely.
  • a further feature of the side guidance element 700 appears from Fig. 18 , viz. upstanding portion 704 which is able to at least guide the cord 92 onto the fitting 10, but could also hold the cord 92 temporarily in the supply condition of the screening arrangement 1.
  • the engagement between the cord 92 and the upstanding portion 704 may be supplemented by a knob (not shown).
  • the engagement between the cord 92 and the upstanding portion 704 and possibly the knob is easily overcome when the cord 92 is released from the fitting 10 during mounting.
  • a supplemental fitting separate from the distance keeping fitting 10; 210; 510.
  • a supplemental fitting may be designed more or less exclusively for holding the cord, and may be quite simple.
  • the cords could be attached temporarily to e.g. the bottom element by adhesion.
  • the screening arrangement 1 is provided in its supply condition shown in Fig. 1 .
  • the top element 4 is connected to the frame, i.e. for example the sash 2.
  • this is thus carried out by guiding the coupling members on the outer side of each end piece 410 over bracket members positioned at the upper ends of each sash side piece.
  • a bracket is fastened to the each of the side pieces 23, 24, near the bottom piece 22.
  • the bracket 93 of the right-hand side piece 24 is shown.
  • the side rails 8, 9 are joined to the top rail 440 at the mitred ends by means of the angular brackets 85.
  • each side rail is brought from a position, in which the side rail is out of alignment with the second longitudinal direction, to a position, in which the side rails is in alignment with the second longitudinal direction, during the step of connecting the side rails to the top rail.
  • the bottom element 7 and consequently the side guidance element 700 are kept substantially stationary by means of the fittings 10.
  • the side guidance element 700 thus abuts slightly on the back side of the angular bracket 85.
  • the second leg 860 of the angular bracket is thus inserted into the track in the back side of the side rail 8 while the side guidance element 700 acts as a guide to the angular bracket.
  • fittings 10 hold the bottom element 7 stationary at its predetermined distance from the top rail 440 of the top element 4, thus ensuring the overlap d between the side guidance element 700 and the angular bracket 85.
  • the cords of the cord system are also kept tight on the fittings 10.
  • each fitting 10 Only when the side rails 8 and 9 have been secured to their respective side piece, the insert part 102 of each fitting 10 is released from engagement with the base part 101 and the cord is let loose. This is carried out by first removing any cover member on the insert part 102, then withdrawing the end of the cord from the T-shaped slit 115. The free end of the cord is connected to the bracket 93 near the sash bottom piece. Eventually, the engagement between the fitting 10 and the bottom element 7 is released by pulling the U-shaped portion 106 to move the portions 108 and 109 out of engagement with the bottom edge 72 of the bottom element 7. The bottom element 7 may be moved and the intermediate mounted condition shown in Fig. 6 is attained.

Claims (16)

  1. Dispositif de protection (1) présentant un état de livraison et un état de fonctionnement, comprenant :
    un élément supérieur (4) comportant un rail supérieur (440) s'étendant dans une première direction longitudinale définissant, dans l'état de fonctionnement, la direction de la largeur, ladite première direction longitudinale étant essentiellement perpendiculaire à une seconde direction longitudinale,
    un élément inférieur (7),
    un corps de protection (6), ledit corps de protection comportant un premier bord d'extrémité et un second bord d'extrémité, ledit premier bord d'extrémité étant logé dans l'élément supérieur et le second bord d'extrémité étant fixé à l'élément inférieur, et
    deux rails latéraux (8, 9), chaque rail latéral s'étendant, dans l'état de fonctionnement, dans la seconde direction longitudinale définissant la direction de la hauteur,
    caractérisé en ce que
    dans ledit état de livraison, au moins une pièce de fixation (10 ; 210 ; 510) est raccordée de façon libérable à l'élément supérieur (4) et à l'élément inférieur (7) afin de fournir une distance prédéfinie dans la seconde direction longitudinale entre l'élément inférieur (7) et l'élément supérieur (4), en ce que l'élément inférieur (7) comporte des moyens latéraux de guidage et en ce que le dispositif de protection comprend, de plus, un ensemble de supports angulaires (85), chaque support angulaire comportant une première branche (850) logée dans des moyens de réception situés dans le côté arrière du rail supérieur (440), et chaque support angulaire comprenant une seconde branche (860) coopérant avec les moyens latéraux de guidage de l'élément inférieur (7) dans l'état de livraison.
  2. Dispositif de protection selon la revendication 1, dans lequel lesdits moyens latéraux de guidage comportent un élément latéral de guidage (700) raccordé à chaque extrémité longitudinale de l'élément inférieur (7).
  3. Dispositif de protection selon la revendication 2, dans lequel chaque élément latéral de guidage (700) est placé sur le côté arrière du support angulaire respectif (85) avec une légère superposition (d) dans la seconde direction longitudinale entre le bord inférieur de la seconde branche (860) du support angulaire et le bord supérieur de l'élément latéral de guidage (700).
  4. Dispositif de protection selon la revendication 2 ou 3, dans lequel il existe un alignement entre la seconde branche (860) du support angulaire (85) et l'élément latéral de guidage (700) dans la première direction longitudinale.
  5. Dispositif de protection selon l'une quelconque des revendications précédentes, dans lequel ladite, au moins une, pièce de fixation (10 ; 210 ; 510) comporte une partie de base (101 ; 2101) et une partie d'insertion (102 ; 2102), ladite partie d'insertion (102 ; 2102) étant, de préférence, adaptée pour recevoir ledit, au moins un, cordon (91), ou conçue comme un élément principalement cylindrique présentant une gorge annulaire (112 ; 2112) adaptée pour recevoir le cordon (91).
  6. Dispositif de protection selon la revendication 5, dans lequel la partie d'insertion (102 ; 2102) est dotée d'une ouverture (115 ; 2115) destinée à recevoir une partie d'extrémité du cordon.
  7. Dispositif de protection selon l'une quelconque des revendications 5 à 6, dans lequel la partie de base (101) présente une ouverture cylindrique adaptée pour coopérer avec la partie d'insertion (102), ou bien la partie de base (2101) comporte une broche (2117) adaptée pour coopérer avec une ouverture correspondante dans la partie d'insertion (2102).
  8. Dispositif de protection selon l'une quelconque des revendications précédentes, dans lequel chaque pièce de fixation (210 ; 510) comporte de moyens (2116 ; 5120) permettant de fournir une distance prédéfinie dans la première direction longitudinale à l'extrémité de l'élément supérieur.
  9. Dispositif de protection selon l'une quelconque des revendications précédentes, dans lequel chacun desdits rails latéraux (8, 9) comportant une première extrémité et une seconde extrémité, la seconde extrémité de chaque rail latéral (8, 9) étant adaptée pour être reliée, respectivement, à une première et à une seconde extrémité dudit rail supérieur (440), chaque pièce de fixation (210; 510) comportant, de préférence, une partie (2116 ; 5116) recouvrant au moins l'extrémité du rail supérieur dans l'état de livraison.
  10. Dispositif de protection selon l'une quelconque des revendications précédentes, dans lequel chaque pièce de fixation (10 ; 210) comprend des moyens d'engagement par encliquetage permettant un raccordement à l'élément supérieur (4) et/ou à l'élément inférieur (7), respectivement.
  11. Dispositif de protection selon l'une quelconque des revendications précédentes, dans lequel l'élément supérieur (4) comporte un rail supérieur (440) et l'élément inférieur (7) comporte un bord supérieur (71) et un bord inférieur (72), une zone de prise pour les doigts (73) étant définie entre les bords inférieur et supérieur (71, 72), ledit élément inférieur étant amovible manuellement dans ledit état de fonctionnement entre une position de non protection, dans laquelle le bord supérieur (71) de l'élément inférieur (7) est placé à proximité de l'élément supérieur, et une position de protection dans laquelle le bord supérieur est placé à une certaine distance de l'élément supérieur en vue de protéger une ouverture d'un bâti, la distance prédéfinie étant déterminée entre le bord supérieur (71) de l'élément inférieur (7) et un bord inférieur du rail supérieur (440), ladite distance prédéterminée se trouvant, de préférence, dans l'intervalle de 0,5 à 10 cm, avec plus de préférence de 1 à 5 cm, et de la façon qui a le plus de préférence, de 2 à 4 cm.
  12. Dispositif de protection selon la revendication 11, dans lequel ladite distance prédéterminée correspond à la répétition de la configuration du corps de protection (6).
  13. Dispositif de protection selon l'une quelconque des revendications précédentes, dans lequel deux pièces de fixation (10 ; 210) sont raccordées de façon libérable à l'élément supérieur (4) et à l'élément inférieur (7).
  14. Procédé de montage d'un dispositif de protection, comprenant les étapes comprenant le fait de :
    doter un élément supérieur d'un rail supérieur, un élément inférieur de moyens de guidage latéraux et d'un corps de protection,
    doter l'élément supérieur de deux supports angulaires raccordés au rail supérieur,
    fournir deux rails latéraux,
    amener le dispositif de protection à un état de livraison en raccordant, de façon libérable, au moins une pièce de fixation avec l'élément supérieur et l'élément inférieur afin de fournir une distance prédéfinie entre l'élément inférieur et l'élément supérieur, et
    amener le dispositif de protection de l'état de livraison à l'état de fonctionnement.
  15. Procédé selon la revendication 14, dans lequel l'étape consistant à amener le dispositif de protection à partir dudit état de livraison comprend de :
    raccorder l'élément supérieur à un bâti ;
    raccorder les rails latéraux au rail supérieur ;
    raccorder les rails latéraux au bâti ;
    libérer l'engagement entre chaque pièce de fixation et l'élément inférieur ;
    libérer l'engagement entre chaque pièce de fixation et l'élément supérieur.
  16. Procédé selon la revendication 14 ou 15, par lequel chaque pièce de fixation est pourvue d'une portion (2116; 5116) recouvrant au moins une partie de l'extrémité du rail supérieur dans l'état de livraison et par lequel ladite pièce de fixation (2116 ; 5116) est libérée de l'élément supérieur pendant l'étape de raccordement de l'élément supérieur au bâti.
EP07817955A 2007-10-26 2007-10-26 Dispositif de protection comprenant une pièce de fixation et procédé de montage de ce dispositif de protection Active EP2220328B1 (fr)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP11177062.4A EP2412916B1 (fr) 2007-10-26 2007-10-26 Agencement d'écran incluant un accessoire de fixation et procédé de montage d'un tel agencement d'écran
PL07817955T PL2220328T3 (pl) 2007-10-26 2007-10-26 Zespół osłaniający zawierający łącznik służący do mocowania i sposób montowania takiego zespołu osłaniającego
PL11177062T PL2412916T3 (pl) 2007-10-26 2007-10-26 Układ zasłaniający mający łącznik do mocowania i sposób montażu takiego układu zasłaniającego

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/DK2007/050157 WO2009052822A1 (fr) 2007-10-26 2007-10-26 Dispositif de protection comprenant une pièce de fixation et procédé de montage de ce dispositif de protection

Publications (2)

Publication Number Publication Date
EP2220328A1 EP2220328A1 (fr) 2010-08-25
EP2220328B1 true EP2220328B1 (fr) 2011-08-17

Family

ID=39591891

Family Applications (2)

Application Number Title Priority Date Filing Date
EP11177062.4A Active EP2412916B1 (fr) 2007-10-26 2007-10-26 Agencement d'écran incluant un accessoire de fixation et procédé de montage d'un tel agencement d'écran
EP07817955A Active EP2220328B1 (fr) 2007-10-26 2007-10-26 Dispositif de protection comprenant une pièce de fixation et procédé de montage de ce dispositif de protection

Family Applications Before (1)

Application Number Title Priority Date Filing Date
EP11177062.4A Active EP2412916B1 (fr) 2007-10-26 2007-10-26 Agencement d'écran incluant un accessoire de fixation et procédé de montage d'un tel agencement d'écran

Country Status (6)

Country Link
EP (2) EP2412916B1 (fr)
CN (1) CN101874145B (fr)
AT (1) ATE520855T1 (fr)
DK (1) DK2220328T3 (fr)
PL (2) PL2412916T3 (fr)
WO (1) WO2009052822A1 (fr)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PL2476858T3 (pl) 2011-01-13 2018-10-31 Vkr Holding A/S Układ zasłaniający z bocznymi środkami prowadzącymi
EP2738343B1 (fr) 2012-12-03 2015-09-30 VKR Holding A/S Dispositif de criblage pour fenêtre
EP2738344B1 (fr) 2012-12-03 2015-09-30 VKR Holding A/S Dispositif de criblage pour fenêtre
EP2963228B1 (fr) * 2014-06-02 2017-08-30 VKR Holding A/S Dispositif d'écran comportant des moyens perfectionnés de montage
EP2987944B1 (fr) * 2014-08-18 2018-05-02 VKR Holding A/S Dispositif de volet comprenant un système de cordon et un moyen de réglage de la longueur du cordon

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DK149292A (da) * 1992-12-11 1994-06-12 Fabers Fab As C Rullegardin
DK9097A (da) 1997-01-24 1998-07-25 Rasmussen Kann Ind As Universal monterings- og parallelføringsarrangement for en vinduesafskærmningsindretning
CN1242466A (zh) * 1999-06-04 2000-01-26 周哲文 一种垂直式百叶窗及卷帘的轴承结构
EP1500775A1 (fr) * 2003-07-21 2005-01-26 VKR Holding A/S Dispositif de support et agencement d'écran à utiliser avec un tel dispositif
NL1025225C2 (nl) * 2004-01-13 2005-07-14 C T R Trading B V Inrichting voor het ophalen en het laten zakken van een raambekleding.

Also Published As

Publication number Publication date
CN101874145A (zh) 2010-10-27
WO2009052822A1 (fr) 2009-04-30
EP2412916A2 (fr) 2012-02-01
ATE520855T1 (de) 2011-09-15
EP2412916A3 (fr) 2012-02-29
DK2220328T3 (da) 2011-11-14
PL2220328T3 (pl) 2012-01-31
EP2220328A1 (fr) 2010-08-25
PL2412916T3 (pl) 2014-03-31
EP2412916B1 (fr) 2013-09-25
CN101874145B (zh) 2012-07-04

Similar Documents

Publication Publication Date Title
EP2220328B1 (fr) Dispositif de protection comprenant une pièce de fixation et procédé de montage de ce dispositif de protection
US20210025218A1 (en) Window reveal systems and methods
SK286426B6 (sk) Podperné prostriedky na tieniace zariadenie
EP3529448B1 (fr) Ensemble de support
US9217280B2 (en) Screening arrangement comprising means for mounting side rails and method of mounting such a screening arrangement
EP2982827B1 (fr) Store à rouleau
EP2220327B1 (fr) Dispositif de protection comprenant une description facilitant le montage du corps de protection, et combinaison d'un dispositif de protection et d'une présentation améliorant l'emballage du dispositif de protection
EP2231986B1 (fr) Dispositif écran destiné à faire partie d'un ensemble écran
EP2215322B1 (fr) Ensemble store d'intérieur comportant un corps de store librement mobile
EP2476858B1 (fr) Dispositif d'écran avec supports de guidage latéral
EP2963228B1 (fr) Dispositif d'écran comportant des moyens perfectionnés de montage
EP2455578B1 (fr) Système de cordon d'orientation parallèle
EP3472418B1 (fr) Fixateur pour une couverture de fenêtre et procédé de fixation d'une couverture de fenêtre à un élément de feuille
CN114829733B (zh) 用于安装卷帘、特别是防虫网的方法及这种卷帘
EP2690246B1 (fr) Dispositif de criblage comprenant des moyens pour monter des rails latéraux et procédé de montage d'un tel dispositif de criblage
EP2011951B1 (fr) Support avec un dispositif de couverture
KR20110000875U (ko) 아치형 커버를 가진 블라인드용 체결금구
CA2652511A1 (fr) Cadre de fenetre avec crochets d'installation
AU2020440680A1 (en) Method and apparatus for retrofitting improvements to roller blinds and the like
US20050082451A1 (en) Combined curtail rod and shade assembly
JP2002129850A (ja) 建築物の連窓シャッター装置
EP2966253B1 (fr) Dispositif d'écran avec un organe de raccordement amélioré pour éléments transversaux sur un rail latéral
EP2140148B1 (fr) Procédé pour fixer un corps de criblage à un élément inférieur dans un dispositif de criblage

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20100521

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK RS

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

DAX Request for extension of the european patent (deleted)
GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

RIN2 Information on inventor provided after grant (corrected)

Inventor name: ANDERSEN, HANS GRAM

Inventor name: THOMSEN, PEDER SOLSO

Inventor name: EBBESEN, HENNING

REG Reference to a national code

Ref country code: NL

Ref legal event code: T3

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602007016622

Country of ref document: DE

Effective date: 20111117

LTIE Lt: invalidation of european patent or patent extension

Effective date: 20110817

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111217

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111219

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

REG Reference to a national code

Ref country code: PL

Ref legal event code: T3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111118

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111031

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20120521

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111031

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111031

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602007016622

Country of ref document: DE

Effective date: 20120521

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111128

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111026

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111117

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110817

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 10

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20170926

Year of fee payment: 11

Ref country code: IT

Payment date: 20171024

Year of fee payment: 11

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 12

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 520855

Country of ref document: AT

Kind code of ref document: T

Effective date: 20181026

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181026

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181026

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20190918

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CZ

Payment date: 20190930

Year of fee payment: 13

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20191031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191026

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20201015

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DK

Payment date: 20201012

Year of fee payment: 14

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201026

REG Reference to a national code

Ref country code: DK

Ref legal event code: EBP

Effective date: 20211031

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20211101

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211101

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201026

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20230907

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20230921

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20230906

Year of fee payment: 17