EP2218830A2 - Manhole repairs - Google Patents

Manhole repairs Download PDF

Info

Publication number
EP2218830A2
EP2218830A2 EP10250273A EP10250273A EP2218830A2 EP 2218830 A2 EP2218830 A2 EP 2218830A2 EP 10250273 A EP10250273 A EP 10250273A EP 10250273 A EP10250273 A EP 10250273A EP 2218830 A2 EP2218830 A2 EP 2218830A2
Authority
EP
European Patent Office
Prior art keywords
liner
plates
side plates
manhole
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP10250273A
Other languages
German (de)
French (fr)
Other versions
EP2218830A3 (en
Inventor
Paul Harvey
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harvey Paul
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP2218830A2 publication Critical patent/EP2218830A2/en
Publication of EP2218830A3 publication Critical patent/EP2218830A3/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/125Manhole shafts; Other inspection or access chambers; Accessories therefor characterised by the lining of the shaft
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/128Repairs of manhole shafts
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • E03F5/025Manhole shafts or other inspection chambers; Snow-filling openings; accessories provided with a liner
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Architecture (AREA)
  • Hydrology & Water Resources (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Mechanical Engineering (AREA)
  • Electrochemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Chemical & Material Sciences (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Sewage (AREA)

Abstract

A liner for use in repairing brick work holes, comprising a plurality of side plates (1) and an equal number of connector plates (2). The connector plates (2) are adjustably engageable with respect to the side plates (1), so that the outer perimeter of the liner can be adjusted after insertion into the brick work hole. The liner also has one or more support flanges (3) to facilitate fitting. The invention also comprises a method of repairing man holes using a liner.

Description

  • The present invention relates to linings for repairing manholes or similar holes for example, access or inspection chambers, and methods of repairing manholes using such linings.
  • Heavy vehicles driving over and around manholes can cause substantial damage and cause them to collapse. Manholes are usually constructed in brickwork and the damage is usually limited to the upper courses of brickwork. Manholes that have collapsed due to vehicles usually are located in roads, loading bays, parking lots, etc. The unuseable areas around such damaged manholes cause traffic jams, delays and general inconvenience, as well as presenting a safety hazard.
  • Conventionally, collapsed manholes are repaired by cutting out the damaged bricks and mortar, removing dust and debris and rebuilding the brickwork using new bricks and fresh mortar followed by repositioning a manhole cover and frame and repairing the surrounding road surface as necessary, for example by levelling and making good the surrounding, followed by re-covering with tarmac. Brickwork repairs require a considerable amount of curing time to achieve sufficient strength to support vehicles. If the manhole area is reopened to traffic or otherwise stressed too soon after the brickwork repairs, the manhole may collapse again. Sometimes a high standard of repair is not achieved due to lack of skills or pressure to complete the works too quickly.
  • Collapsed manholes can be very costly to business and the economy. The longer the time that the area around the manhole is out of use, the higher the cost. The need to use skilled labour for the brickwork repairs also increases the high repair costs. Weather conditions can also delay brickwork repairs.
  • It is therefore an object of the present invention to provide improvements in the repair of manholes, in order to reduce the repair times, costs and improve reliability of repairs.
  • According to a first aspect of the invention, there is provided a liner for use in repairing brickwork holes, comprising a plurality of side plates and an equal number of connector plates, wherein the connector plates are adjustably engageable with respect to the side plates thereby allowing adjustment of the outer perimeter of the liner, the liner further comprising one or more support flanges. The adjustability of the outer perimeter of the liner has the advantage that the liner can be inserted into a manhole and then expanded to the right size to line the manhole walls as appropriate.
  • In one embodiment, the connector plates are slideably engagable with the side plates, thereby allowing initial assembly of the liner, and adjustment of the outer perimeter of the liner. For example, the connector plates may be formed so as to be capable of sliding in and out of guide channels of the side plates, or vice versa. Such guide channels can be of any kind capable of allowing sliding engagement between the plates, and may for example be formed by bending back all or part of an edge of a plate to form a narrow channel. Alternatively, a plate may be formed with an elongated slot or slots, to which another plate is attachable by means of a shouldered pin or similar, thereby allowing slideable engagement between plates.
  • Alternatively, the connector plates and side plates may be enageable by any other means permitting adjustment of the outer perimeter of the layer, for example hinges allowing relative movement between plates, moveable bolts, etc.
  • In one embodiment, the liner is rectangular and comprises four flat rectangular side plates, connected by four right-angled connector plates, wherein the side plates comprise flat rectangular plates and the connector plates comprise right-angled corner plates, thereby forming a rectangular outer perimeter of the liner.
  • After the manhole walls are lined, concrete, e.g. quick-setting concrete, can be poured behind the liner, into the void or voids above the remaining sound brickwork, in order to replace the defective masonry removed previously. If the liner is to be used with concrete, the side plates and connector plates must be suitable to retain concrete behind the liner and prevent leaks into the chamber. Gaps at edges or joints of the liner can be sealed, e.g. with foam tape, before the concrete is applied.
  • The liner has facilities to attach support jacks, as required, to act as adjustable support flanges and thereby facilitate levelling of the lining and to give sufficient strength to support the manhole cover and frame prior to the concrete setting. The liner plates may also have integral support flanges, for example, lip flanges at an edge.
  • The liner of the present invention has sufficient strength to support a repositioned manhole cover and frame and thus allow finish tarmac to be applied before the concrete is fully set. This reduces the length of time for which traffic must be stopped and consequently reduces costs. The material costs and labour costs may also be reduced, compared to the cost of repairing the brickwork itself.
  • A further advantage is that the repair can be carried out by semi-skilled operatives as a bricklayer is no longer required. There is also less likelihood of poor workmanship and premature re-collapse of the manhole, when using the liner according to the present invention.
  • The invention also comprises a method of repairing manholes comprising, inserting a liner as described above into the manhole, adjusting the liner to fit the manhole, optionally fitting and adjusting one or more jacks to rest on existing brickwork, and pouring concrete behind the liner into voids above the existing brickwork.
  • The present invention may be put into practice in a number of ways and some of these will be described here in further detail with reference to the following figures, in which:
    • Figure 1 shows an isometric view of a liner according to the present invention, before insertion into a partially collapsed manhole.
    • Figure 2 shows a plan view (i.e. a view of a plane perpendicular to the axis of the manhole) of a liner according to the present invention, after insertion into a manhole, secured temporarily by diagonal struts.
    • Figure 3 shows an isometric view of one side plate and one connector plate, before engagement.
  • Referring to figure 1, the liner consists of four preformed side plates (1) and four preformed connector plates (2) having lip flanges (3) to support the manhole cover and frame (not shown). The connector plates are provided with rows of holes (4) adjacent to the bend for securing screw jacks (5) in various positions. Simple screw jacks (5) are proposed to support the liner and could be metal angles with a threaded hole to take an adjusting screw as shown. The side plates and connector plates are shown with lip flanges (3) which can support the liner by resting on the top of sound brickwork.
  • The holes (4) could be square holes to allow the jacks to be secured with coach screws and wing nuts which removes the need for spanners on site. The holes could be pre-covered with tape to prevent concrete leaking from the redundant holes and only the holes used for securing bolts opened out.
  • Side plates would be manufactured in various lengths to suit various manhole sizes. They are formed in such a way as to allow the connector plates to slide horizontally when fitted to cater for various sizes of manhole i.e. fine adjustments as indicated by arrows in Figure 1. It is proposed that all corner sections are identical to reduce inventories, but need not be so.
  • The side plates and connector plates should be rust proof and could be made of stainless steel, although any rigid material suitable for use in the environment of the manhole could be used, for example, other metals, or plastics, etc. If screw jack supports are to be encased in concrete they do not need to be rust proof.
  • Figure 2 shows a plan view of the liner of Figure 1 directly after fitting into a manhole. Reusable adjustable struts (11) can be used to secure the lining in place directly after fitting, and could be removed after concrete has set sufficiently. Struts having wedge shaped heads which can be applied diagonally across the manhole, as shown in Figure 2, are desirable if the manhole is rectangular, but any strut arrangement which secures the lining in place against the remaining walls of the manhole would be suitable.
  • Figure 3 shows one example of a side plate (1) which is slideably engageable with connector plate (2), by means of guide channels of the side plate (21). The guide channels are formed by bending back the top and bottom edged of the side plate to form narrow channels, into which the connector plates can slide.
  • The method for fitting a liner may comprise the following steps:
    1. 1) Prepare manhole - inspect cover and frame. If satisfactory, set aside for reuse. Remove loose bricks and debris etc and clean up manhole.
    2. 2) Assemble the liner as figure 1. Adjust length and width to suit. Fit screw jack supports in suitable positions. Fit foam strips to top of flanges and around sides/ends of shutters to prevent concrete leaks. Place in position and adjust for levels. Fit diagonal struts to secure. Fit a cover and frame, which may be either new or salvaged from (1) above. Secure with clips/ties.
    3. 3) Infill void with rapid set concrete (either mixed on site or from premixed bags). Allow to set for the minimum required time, which may be as little as 20 minutes, depending on the type of concrete used.
    4. 4) Remove struts, re-tarmac road surface.
  • The liner of the invention can have different shapes and sizes when assembled, to fit different shapes and sizes of manholes or other utility access holes which may suffer from the problems mentioned above. For example, the liner may consist of four straight side plates and four right-angled connector plates, the assembled liner thereby being rectangular or square in plan view, as shown in figure 1. Alternatively, the liner may consist of three straight side plates and three connector plates, the assembled liner thereby being triangular in plan view. In a further alternative arrangement, the liner may consist of curved side plates and connector plates of a suitable shape (for example, short and straight, or short and angled, or curved) to enable the liner to fit holes which are circular or otherwise curved in plan view.
  • The liner of the present invention can be easily used in manholes or access holes of any size. For example, an assembled liner may be of a size suitable for use in a 150mm by 150mm inspection chamber. Alternatively, an assembled liner may be of a size suitable for use in a manhole. Some standard manhole sizes are 450mm by 450mm, 1200mm by 600mm and 4000mm by 4000mm. An assembled liner may alternatively be of a size suitable for use in inspection chambers, manholes, etc, which are larger or smaller than any of these example sizes. Due to the adjustability of the outer perimeter of the liner according to the invention, any one liner may be suitable for use in a range of manhole sizes, including non-standard sizes.
  • Large numbers of identical right-angled connector plates and side plates suitable for standard manhole side lengths can be manufactured and stored until required for use. The cost per plate can thereby be minimised. When a manhole requires lining, side plates of approximately suitable length can be selected, and the liner can be assembled on site and then adjusted to fit the manhole. A kit comprising additional items (screw jacks, bags of ready-mixed concrete, etc) and tools (struts, etc) can be stored until required for use.
  • The liner of the invention can also be used to repair any collapsed hole, for example, drainage or inspection chambers. The liner of the invention is particularly useful for repairing collapsed brickwork, but can also be used for collapsed holes lined with other materials.

Claims (8)

  1. A liner for use in repairing brickwork holes, comprising a plurality of side plates and an equal number of connector plates;
    wherein the connector plates are adjustably engageable with respect to the side plates thereby allowing adjustment of the outer perimeter of the liner;
    the liner further comprising one or more support flanges.
  2. A liner according to claim 1, wherein the connector plates are slideably engageable with respect to the side plates.
  3. A liner according to claim 1 or 2 wherein one or more of the support flanges are movable in relation to the liner.
  4. A liner according to any preceding claim, wherein the one or more support flanges comprise a lip flange on the perimeter of the liner.
  5. A liner according to any preceding claim, having four side plates and four connector plates, wherein the side plates comprise flat rectangular plates and the connector plates comprise right-angled corner plates, thereby forming a rectangular outer perimeter of the liner.
  6. A liner according to any preceding claim, wherein the side plates and connector plates comprise metal, for example iron or steel.
  7. A liner according to any preceding claim, wherein the side plates and connector plates comprise plastic or fibre glass.
  8. A method of repairing manholes comprising;
    inserting a liner according to any preceding claim into the manhole;
    adjusting the liner to fit the manhole;
    optionally moving one or more support flange to rest on existing brickwork; and
    pouring concrete behind the liner into voids above the existing brickwork.
EP10250273A 2009-02-17 2010-02-17 Manhole repairs Withdrawn EP2218830A3 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB0902642A GB2467798A (en) 2009-02-17 2009-02-17 Manhole repair liner

Publications (2)

Publication Number Publication Date
EP2218830A2 true EP2218830A2 (en) 2010-08-18
EP2218830A3 EP2218830A3 (en) 2013-03-13

Family

ID=40548330

Family Applications (1)

Application Number Title Priority Date Filing Date
EP10250273A Withdrawn EP2218830A3 (en) 2009-02-17 2010-02-17 Manhole repairs

Country Status (3)

Country Link
US (1) US20100209196A1 (en)
EP (1) EP2218830A3 (en)
GB (1) GB2467798A (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9631339B2 (en) * 2010-09-24 2017-04-25 Geneva Polymer Products, Llc Rehabilitation of deteriorated manhole and other sewer structures
US9567760B2 (en) 2010-09-24 2017-02-14 Geneva Polymer Products, Llc System and method for making polymer concrete
JP6378662B2 (en) * 2015-04-30 2018-08-22 株式会社サンリツ Manhole levitation prevention device
JP7032646B2 (en) * 2018-04-13 2022-03-09 日本電信電話株式会社 Construction method
CN113356333B (en) * 2021-06-17 2022-10-11 广州市城市规划勘测设计研究院 Method for manufacturing sewage inspection well with mixed structure

Family Cites Families (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1307486A (en) * 1919-06-24 Ments
BE436000A (en) *
US1216225A (en) * 1915-04-26 1917-02-13 John B Goldsborough Horizontal sheeting.
US1246135A (en) * 1915-09-21 1917-11-13 Frederick L Cranford Sectional sheathing.
US1374864A (en) * 1920-01-20 1921-04-12 Metalform Construction Corp Adjustable form for concrete structures
US1361516A (en) * 1920-06-02 1920-12-07 Us Portable Cribbing Company Knockdown cribbing
US1768146A (en) * 1928-11-22 1930-06-24 Ramey Winfield Scott Retaining device or form when excavating
US1948931A (en) * 1931-11-07 1934-02-27 Charles J Mears Form for concrete catch basins or the like
US3750410A (en) * 1970-02-17 1973-08-07 H Converse Simple shoring to form ditches-canals-pillars and posts
CA977563A (en) * 1974-02-08 1975-11-11 Radovan Preradovich Shaft liner assembly
US4121804A (en) * 1977-07-15 1978-10-24 Leary Thomas J O Adjustable concrete form
US4270876A (en) * 1979-12-27 1981-06-02 The United States Of America As Represented By The United States Department Of Energy Method of lining a vertical mine shaft with concrete
US4261541A (en) * 1980-03-03 1981-04-14 Morrow Otis L Manhole sewer pipe opening blockout member
US4520989A (en) * 1984-04-23 1985-06-04 Harsco Corporation Concrete core-wall form and stripping assembly therefor
US4685837A (en) * 1986-06-09 1987-08-11 Cicanese William C Portable safety trench and pit form system
US4867600A (en) * 1987-07-23 1989-09-19 Bowman Harold M Polygonal manhole cover support
US4997602A (en) * 1988-09-02 1991-03-05 Action Products Marketing Corporation Cast-in-place manhole liner method
US5017313A (en) * 1988-09-02 1991-05-21 Action Products Marketing Corporation Method and means for repairing existing manhole
US5032197A (en) * 1988-09-02 1991-07-16 Action Products Marketing Corporation Cast-in-place manhole liner method
AU622718B2 (en) * 1988-09-02 1992-04-16 Action Products Marketing Corporation Cast-in-place manhole liner apparatus and method
US5401122A (en) * 1993-04-29 1995-03-28 Gwinnett Enterprises, Limited Excavation shield apparatus and method
US5608998A (en) * 1995-03-08 1997-03-11 Hume; James M. Panel for lining manholes and the like
EP0849404A1 (en) * 1996-12-20 1998-06-24 Tokai Rubber Industries, Ltd. Manhole surface repairing method
US5979128A (en) * 1998-07-30 1999-11-09 Parsons; Jack L. Wind shelter and method of installation
GB2343686B (en) * 1998-09-29 2002-12-11 Polypipe Civils Ltd A set of parts
US20040094689A1 (en) * 2002-11-18 2004-05-20 Robert Rose Adjustable form holder system and method
JP4515806B2 (en) * 2004-04-22 2010-08-04 株式会社湘南合成樹脂製作所 Rehabilitation of existing pipes

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None

Also Published As

Publication number Publication date
GB0902642D0 (en) 2009-04-01
EP2218830A3 (en) 2013-03-13
GB2467798A (en) 2010-08-18
US20100209196A1 (en) 2010-08-19

Similar Documents

Publication Publication Date Title
CN110565900B (en) Construction process of wear-resistant terrace
EP2218830A2 (en) Manhole repairs
CA2720188C (en) Method and system for forming vertical pre-cast concrete structures
US8720160B1 (en) Process for forming concrete walls and other vertically positioned shapes
KR100869969B1 (en) Manhole repair method
US4536103A (en) Adjustable manhole frame and method of construction and installation
PL195927B1 (en) Method of and apparatus for manufacturing panels and structural members
US5318376A (en) Manhole frame
JP4758639B2 (en) Manhole repair method and filler outflow prevention member fixture used therefor
CN111058631B (en) Concrete construction method for large-gradient inclined roof
US7467776B2 (en) Pre-fabricated warped pavement slab, forming and pavement systems, and methods for installing and making same
AU2010214742B2 (en) Expansion joints
CA2984925A1 (en) Floor levelling arrangement and method therefor
KR101126165B1 (en) Construction method of trench type cable trough
EP0726361B1 (en) Method of forming pavement on automobile test road and pavement member for automobile test road
CN113802418A (en) Construction method of ballastless track
CN211113161U (en) Connecting mechanism of telescopic device
US20020122697A1 (en) Metal curb installation system and method
CN113338993B (en) Connecting channel reinforcing ring beam structure and construction method thereof
CN209741907U (en) Utility tunnel sump pit steel grating mounting structure
CN113846858A (en) Protection system for horizontal hole in building construction process and construction method
CN113833033A (en) Anti-seepage anti-floating dismantling-free construction process for building in area close to water area
KR20010000375A (en) Method of Manhole Repair and Used the Method of Equipment
CN109681239A (en) A kind of unearthed tunnel mould bases construction method of shield
CN110725197A (en) Beam end or bridge head concrete structure with embedded part embedded specially for expansion joint and its application

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

AX Request for extension of the european patent

Extension state: AL BA RS

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: HARVEY, PAUL

RIN1 Information on inventor provided before grant (corrected)

Inventor name: HARVEY, PAUL

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

AX Request for extension of the european patent

Extension state: AL BA RS

RIC1 Information provided on ipc code assigned before grant

Ipc: E02D 29/12 20060101AFI20130201BHEP

Ipc: E21D 5/08 20060101ALI20130201BHEP

Ipc: E03F 5/02 20060101ALI20130201BHEP

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20130903