EP2216230A1 - Verfahren zur Freigabe einer Fahrstrasse nach Rücknahme einer Fahrstrasse durch ein Stellwerk - Google Patents

Verfahren zur Freigabe einer Fahrstrasse nach Rücknahme einer Fahrstrasse durch ein Stellwerk Download PDF

Info

Publication number
EP2216230A1
EP2216230A1 EP09001487A EP09001487A EP2216230A1 EP 2216230 A1 EP2216230 A1 EP 2216230A1 EP 09001487 A EP09001487 A EP 09001487A EP 09001487 A EP09001487 A EP 09001487A EP 2216230 A1 EP2216230 A1 EP 2216230A1
Authority
EP
European Patent Office
Prior art keywords
route
rbc
train
interlocking
cancellation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP09001487A
Other languages
English (en)
French (fr)
Inventor
Marina Kresse
Nader Nayeri
Karl Schnabl
Georg Hemzal
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GTS Deutschland GmbH
Original Assignee
Thales Deutschland GmbH
Thales Deutschland Holding GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Thales Deutschland GmbH, Thales Deutschland Holding GmbH filed Critical Thales Deutschland GmbH
Priority to EP09001487A priority Critical patent/EP2216230A1/de
Publication of EP2216230A1 publication Critical patent/EP2216230A1/de
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L21/00Station blocking between signal boxes in one yard
    • B61L21/04Electrical locking and release of the route; Electrical repeat locks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/20Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/20Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation
    • B61L2027/202Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation using European Train Control System [ETCS]

Definitions

  • the invention relates to a method for releasing a route after cancellation of the route by an interlocking, and a computer product comprising code means adapted for performing all steps of this method.
  • the interlocking system allows the route release after the cancellation:
  • the measures a) and b) do not solve the hazard completely and systematically.
  • the hazard can still occur with a remaining probability, in case of
  • the first confirmation message indicates, if a train under RBC responsibility is affected. (A train is under RBC responsibility, if the train follows a movement authority or has stored a movement authority which will be used after switching under responsibility of the continuous train protection system). If yes, the IL has to wait until a second confirmation. If no train with cab signalling is affected, the IL can continue with the same measures as for other train protection systems (e.g. timer has expired). In case of disturbance of the interface between RBC and IL a timer-based solution can be applied, which ensures that the train comes to standstill before the route is released.
  • the second confirmation message indicates that the movement authority is successfully shortened on-board, after an acknowledgement from on-board is received by RBC. The IL is not allowed to release the route before the two confirmation messages are received from RBC.
  • the invention is applicable not only to ETCS L2&L3, but to all systems using a continuous train protection with cab signalling.
  • the second confirmation message is sent from the RBC to the interlocking not until the RBC has received a standstill message from the OBU of the affected train, i.e. not until standstill of the train.
  • the invention relates to a computer product which comprises code means adapted for performing all steps of the above method.
  • Fig. 1 shows schematically a "European Train Control System” (ETCS) 1 comprising at the trackside an interlocking IL, balises or loops (not shown) laid in the track 2 and a RBC ("radio block center") connected to the interlocking IL.
  • ECS European Train Control System
  • a train 3 under RBC responsibility comprises an ETCS on-board unit OBU for communicating with the RBC via GSM-R (Global System for Mobile Communications - Rail).
  • GSM-R Global System for Mobile Communications - Rail
  • a train is under RBC responsibility, if the train follows a movement authority (MA) or has stored a movement authority which will be used after switching under responsibility of the continuous train protection system.
  • MA movement authority
  • Fig. 1 the train 3 is on the route from A over B to C. If the route B to C is to be canceled and then released by the interlocking IL e.g. for another train, the following steps shown in Fig. 2 are carried out.
  • a cancellation message 10 is sent from the interlocking IL to the RBC for cancelling the route B to C (step S1 ).
  • the RBC checks whether or not a train under RBC responsibility is affected by the route cancellation (step S2) and, if yes like in the case under consideration, sends a first confirmation message 11 to the interlocking IL indicating that a train under RBC responsibility, i.e. train 3, is affected by the route cancellation (step S3).
  • the RBC sends a command 12 to the OBU of the train 3 for shortening a "Movement Authority", MA, of the OBU (step S4 ), in order to bring the train 3 to a standstill (emergency stop).
  • the OBU acknowledges the reception of the command 12 by sending an acknowledgement message 13 to the RBC (step S5 ).
  • the RBC sends a second confirmation message 14 to the interlocking IL for allowing the route release (step S6 ).
  • the interlocking IL has received both the first and second confirmation messages 11, 14 (YES in step S7 )
  • the interlocking IL is allowed to release the route B-C e.g. for another train (step S8 ).
  • the second confirmation message 14 is sent from the RBC to the interlocking IL not until the RBC has received a standstill message 15 from the OBU of the affected train 3, i.e. not until standstill of the train 3 at time t2.
  • step S9 the interlocking IL can continue with the same measures (step S9 ) as for other train protection systems (e.g. timer has expired).
  • a timer-based solution can be applied, which ensures that a train comes to standstill before the route is released.
EP09001487A 2009-02-04 2009-02-04 Verfahren zur Freigabe einer Fahrstrasse nach Rücknahme einer Fahrstrasse durch ein Stellwerk Withdrawn EP2216230A1 (de)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP09001487A EP2216230A1 (de) 2009-02-04 2009-02-04 Verfahren zur Freigabe einer Fahrstrasse nach Rücknahme einer Fahrstrasse durch ein Stellwerk

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP09001487A EP2216230A1 (de) 2009-02-04 2009-02-04 Verfahren zur Freigabe einer Fahrstrasse nach Rücknahme einer Fahrstrasse durch ein Stellwerk

Publications (1)

Publication Number Publication Date
EP2216230A1 true EP2216230A1 (de) 2010-08-11

Family

ID=40872332

Family Applications (1)

Application Number Title Priority Date Filing Date
EP09001487A Withdrawn EP2216230A1 (de) 2009-02-04 2009-02-04 Verfahren zur Freigabe einer Fahrstrasse nach Rücknahme einer Fahrstrasse durch ein Stellwerk

Country Status (1)

Country Link
EP (1) EP2216230A1 (de)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101164767B1 (ko) 2011-08-25 2012-07-12 한국철도공사 철도의 연동장치와 무선폐색장치간 통신 인터페이스 시스템 및 그 운용방법
US20130218375A1 (en) * 2010-08-24 2013-08-22 Beijing Jiaotong University Method of movement authority calculation for communications-based train control system
GB2512901A (en) * 2013-04-10 2014-10-15 Siemens Rail Automation Holdings Ltd Method for releasing overlaps
WO2014114485A3 (de) * 2013-01-25 2014-12-18 Siemens Aktiengesellschaft Verfahren und vorrichtung zur etcs -l1 - und/oder -l2 - zugbeeinflussung
JP2015024714A (ja) * 2013-07-25 2015-02-05 日本電気株式会社 移動局、列車通信システム、および防護受報送信方法
CN105599786A (zh) * 2015-12-18 2016-05-25 潘小胜 一种铁路联锁系统协同控制装置
EP3109127A1 (de) * 2015-06-23 2016-12-28 Siemens Schweiz AG Verfahren zur meldung einer ausdehnung einer movement authority von einer streckenzentrale an ein stellwerk
CN106553665A (zh) * 2016-11-29 2017-04-05 湖南中车时代通信信号有限公司 区域控制器兼容办理/不办理进路的方法
CN108189863A (zh) * 2017-12-22 2018-06-22 合肥工大高科信息科技股份有限公司 一种列车自动监控系统安全命令控制方法
CN108683634A (zh) * 2018-04-10 2018-10-19 北京全路通信信号研究设计院集团有限公司 一种ctc与rbc之间的接口系统及控制装置
CN109278805A (zh) * 2018-09-28 2019-01-29 湖南中车时代通信信号有限公司 一种针对地面有条件紧急消息的安全处理方法
CN113830139A (zh) * 2021-07-28 2021-12-24 交控科技股份有限公司 一种列车信息交互方法及系统
CN114379621A (zh) * 2022-01-04 2022-04-22 北京全路通信信号研究设计院集团有限公司 一种确报信息处理方法、系统、装置、设备及介质

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1752355A2 (de) * 2005-08-13 2007-02-14 Westinghouse Brake and Signal Holdings Limited Zugsicherungssystem

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1752355A2 (de) * 2005-08-13 2007-02-14 Westinghouse Brake and Signal Holdings Limited Zugsicherungssystem

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
"ETCS - System Requirements Specification (SRS) - Chapter 2 General Description", UIC/ETCS SPECIFICATION, UIC/A200, vol. Version 03.01, 9 August 1996 (1996-08-09), XP002276769 *
"ETCS - System Requirements Specification (SRS) - Chapter 6: Radio Block Centre", UIC/ETCS SPECIFICATION, UIC/A200, vol. Version 03.01, 9 August 1996 (1996-08-09), pages 6 - 1, XP009120697 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130218375A1 (en) * 2010-08-24 2013-08-22 Beijing Jiaotong University Method of movement authority calculation for communications-based train control system
US9139210B2 (en) * 2010-08-24 2015-09-22 Beijing Jiaotong University Method of movement authority calculation for communications-based train control system
KR101164767B1 (ko) 2011-08-25 2012-07-12 한국철도공사 철도의 연동장치와 무선폐색장치간 통신 인터페이스 시스템 및 그 운용방법
WO2014114485A3 (de) * 2013-01-25 2014-12-18 Siemens Aktiengesellschaft Verfahren und vorrichtung zur etcs -l1 - und/oder -l2 - zugbeeinflussung
AU2014253069B2 (en) * 2013-04-10 2019-05-02 Siemens Mobility Limited Method for releasing overlaps in a railway signalling system
GB2512901A (en) * 2013-04-10 2014-10-15 Siemens Rail Automation Holdings Ltd Method for releasing overlaps
WO2014167067A2 (en) * 2013-04-10 2014-10-16 Siemens Rail Automation Holdings Limited Method for releasing overlaps in a railway signalling system
WO2014167067A3 (en) * 2013-04-10 2015-04-09 Siemens Rail Automation Holdings Limited Method for releasing overlaps in a railway signalling system
EP2983960B1 (de) 2013-04-10 2021-02-24 Siemens Mobility Limited Verfahren zur freigabe von überlappungen in einer eisenbahnsignalanlage
JP2015024714A (ja) * 2013-07-25 2015-02-05 日本電気株式会社 移動局、列車通信システム、および防護受報送信方法
EP3109127A1 (de) * 2015-06-23 2016-12-28 Siemens Schweiz AG Verfahren zur meldung einer ausdehnung einer movement authority von einer streckenzentrale an ein stellwerk
CN105599786A (zh) * 2015-12-18 2016-05-25 潘小胜 一种铁路联锁系统协同控制装置
CN106553665A (zh) * 2016-11-29 2017-04-05 湖南中车时代通信信号有限公司 区域控制器兼容办理/不办理进路的方法
CN108189863A (zh) * 2017-12-22 2018-06-22 合肥工大高科信息科技股份有限公司 一种列车自动监控系统安全命令控制方法
CN108683634A (zh) * 2018-04-10 2018-10-19 北京全路通信信号研究设计院集团有限公司 一种ctc与rbc之间的接口系统及控制装置
CN109278805A (zh) * 2018-09-28 2019-01-29 湖南中车时代通信信号有限公司 一种针对地面有条件紧急消息的安全处理方法
CN109278805B (zh) * 2018-09-28 2020-03-20 湖南中车时代通信信号有限公司 一种针对地面有条件紧急消息的安全处理方法
CN113830139A (zh) * 2021-07-28 2021-12-24 交控科技股份有限公司 一种列车信息交互方法及系统
CN114379621A (zh) * 2022-01-04 2022-04-22 北京全路通信信号研究设计院集团有限公司 一种确报信息处理方法、系统、装置、设备及介质
CN114379621B (zh) * 2022-01-04 2023-06-27 北京全路通信信号研究设计院集团有限公司 一种确报信息处理方法、系统、装置、设备及介质

Similar Documents

Publication Publication Date Title
EP2216230A1 (de) Verfahren zur Freigabe einer Fahrstrasse nach Rücknahme einer Fahrstrasse durch ein Stellwerk
EP2746131B1 (de) Verfahren zur sicherheitsüberwachung und -verarbeitung eines eisenbahnzuges auf basis eines funkblockzentrums
US7756613B2 (en) Signaling system
KR101351508B1 (ko) Ertms 발리스의 고장 표시시스템 및 방법
JP5171712B2 (ja) 踏切制御装置
US20150225003A1 (en) Control of a rail vehicle
EP2983960B1 (de) Verfahren zur freigabe von überlappungen in einer eisenbahnsignalanlage
US20220185350A1 (en) Quasi-moving block system of train control
US11124213B2 (en) Method for securing a level crossing, and stationary control device for a train control system
AU2020201872B2 (en) Method for mixed operation of a section of railroad line with switch, and section of line and switch
CA3003260A1 (en) Override systems and methods
WO2020112165A1 (en) Method and apparatus for vehicle-based switch locking in a rail network
EP2836412B1 (de) Methode für Stellwerkslogik und Stellwerk
CN114261432B (zh) 全自动无人驾驶远程反向运行的实现方法、设备及介质
Hann Incremental train control system
JP2017019381A (ja) 列車および信号保安システム
JP2007161253A (ja) 列車運行管理方法および列車運行管理システム
JP2006137337A (ja) 列車制御システム、及び列車制御方法
EP3222490B1 (de) System und verfahren zur verwaltung der bewegungsauthorität eines geführten fahrzeugs
ES2662610T3 (es) Procedimiento para controlar un vehículo ferroviario conectado con un sistema CBTC y sistema CBTC con al menos un vehículo ferroviario
HIRAGURI et al. Train control system for secondary lines using radio communications in specific area
Kertis et al. Impacts of lacks in design of control systems in rail transportation
DK2804798T3 (en) A method for controlling, securing and / or monitor the rail-traffic and operations management
CN114312927B (zh) 一种基于辅助定位的全自动运行列车区间穿梭方法
CN116946223A (zh) 列车脱轨的防护方法及装置、存储介质

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA RS

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: THALES DEUTSCHLAND GMBH

RAP3 Party data changed (applicant data changed or rights of an application transferred)

Owner name: THALES DEUTSCHLAND GMBH

17P Request for examination filed

Effective date: 20110111

17Q First examination report despatched

Effective date: 20110131

AKX Designation fees paid

Designated state(s): AT DE FR GB IT

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20110611