EP2009181A1 - Soil compacting device and a foundation soil provided with a technogenic frame - Google Patents

Soil compacting device and a foundation soil provided with a technogenic frame Download PDF

Info

Publication number
EP2009181A1
EP2009181A1 EP06812890A EP06812890A EP2009181A1 EP 2009181 A1 EP2009181 A1 EP 2009181A1 EP 06812890 A EP06812890 A EP 06812890A EP 06812890 A EP06812890 A EP 06812890A EP 2009181 A1 EP2009181 A1 EP 2009181A1
Authority
EP
European Patent Office
Prior art keywords
injectors
soil
compacting device
foundation
cement mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP06812890A
Other languages
German (de)
French (fr)
Inventor
Viktor Ivanovich Osipov
Sergei Dmitrievich Filimonov
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP2009181A1 publication Critical patent/EP2009181A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil

Definitions

  • the invention relates to a soil compacting device with perforated pipes as injectors for receiving cement mortar and a foundation foundation with artificial structure.
  • This soil foundation and soil compaction equipment is suitable for loose (loose) bound or unbound soil, as well as for landfilled (anthropogenic) soils and flowing slopes.
  • the known devices closest to the invention are those for compacting the bonded disperse soils. These facilities are used to create building and building foundations by supplying the hardening mortar in the form of sand-cement mixture. The mortar is in this case under a pressure of 2 - 10 atm. introduced into the so-called injectors (ejection devices). The injectors are placed at a distance of 2 to 3 m between each other and are formed as perforated pipes. These tubes are laid deeply in the effective zone. This forms a compacted soil foundation ( RU No. 2059044 C1 , E 02D 3/12, 1996).
  • the soil compacting device is designed in the form of injector tubes for pressing in the cement mortar.
  • the injector pipes are arranged at a distance of 2.0 - 4.0 m in the ground mass by or under additional load (ballast body).
  • the additional load is designed as a concrete slab with perforated side surface. It is placed on the disperse soil.
  • the holes of this plate are covered by blind plugs, which in hydraulic soil breaking under a pressure of 3.0 - 20.0 atm. destroyed at the same time.
  • the dummy plugs are designed as a band covering the perforation.
  • the band is arranged spirally or annularly. It is provided with an adhesive layer which is turned to the perforated tube.
  • the blind plugs consist of several band layers, the number of which is determined by the predetermined pressure value during hydraulic soil breaking.
  • the perforated tube is provided with a lower end plug, which is not destroyed under the pressure of hydraulic fracturing.
  • a foundation with artificial skeleton is achieved as follows.
  • the framework is designed using the soil compaction device described above.
  • This framework represents a solid ground, which is carried out under an additional load in the form of a concrete slab.
  • the soil mass is penetrated by injectors in the form of pipes and forms an artificial skeleton of hardened cement mortar, which has penetrated into the cracks after the hydraulic ground breaking.
  • the hardened cement mortar lies around the injectors in the plane of the plane, with mutual penetration into the concentric areas around the adjacent injectors.
  • the soil compaction apparatus includes injectors 1 for injecting the cement mortar in the form of perforated pipes 2.
  • the holes are formed on the side surface of the pipes 2.
  • the holes of the tubes 2 are covered with destructible blind plug 3.
  • the hydraulic soil breaking is carried out at a pressure of 3.0 - 20.0 atm. ensured. This pressure value is determined according to the extended soil categories and the peculiarities of the soil attachment on its slopes. The decrease in pressure does not cause any hydraulic breakage.
  • the higher pressure on the other hand, affects the economic characteristics by requiring higher equipment characteristics and increasing mortar consumption.
  • the cement mortar feed for widening the crevices of the hydraulic soil breaking can be made continuously in the pulsating state.
  • the injectors 1 When erecting the injectors 1, the distances between their longitudinal axes in the range of 2.0 - 4.0 m are selected. This is due to working with different soil categories at an injection depth of 3.0 - 8.0 m, which in some cases requires the extension of the injector 1.
  • the injectors 1 are arranged in rows in the plane plan, for example.
  • the cement mortar feed in these rows takes place from the center to the peripheral areas, preferably in a spiral plane plane.
  • the mortar is fed sequentially into each injector 1 or with a grid of 1 to 3 injectors 1.
  • the injectors 1 can be arranged in rows in the plane Plane.
  • the injectors 1 are preferably in Radial direction of the plane Plane arranged.
  • the mortar is sequentially fed into each injector 1 or in all injectors 1 in increments of 1 to 3 radially or alternately between the adjacent injectors 1 in the adjacent radial directions.
  • the destruction of the blind plugs 3 ensures the formation of the hydraulic soil breaking in all directions of the bottom circumference.
  • the blind plugs 3 are designed as a band which covers the holes in the tubes 2 of the band perforation.
  • the band is spiraling ( Fig. 1 ) or arranged in a ring.
  • the band of the dummy plug 3 is formed with an adhesive layer which is turned to the hole tube.
  • the blind plug 3 usually consists of several band layers. The number of layers is determined by the predetermined pressure value during hydraulic soil breaking.
  • a lower end plug 4 In the lower part of the tube 2 is a lower end plug 4, which remains indestructible under the pressure effect of the hydraulic soil breaking.
  • the cement mortar around the injectors 1 is arranged in plan view as a skeleton 5 with mutual penetration into the concentric areas around the adjacent injectors 1 ( Fig. 2 ).
  • the field of application now includes such types of soils as sand and artificial soils. This is possible thanks to the formation of gaps during hydraulic soil breaking. If there are no gaps in the hydraulic soil breaking, the cement mortar penetrates into the sand pores without compacting this soil. The injection takes place in the presence of a base plate and some (2 to 3) building floors above the fixed ground massif. The base plate serves as a shield which prevents mortar leakage from the ground mass. The existing floors create the additional load, which ensures the pressure build-up. If there were no base plate and no additional load, injection of the compaction mortar could cause the build up (swelling) of the soil layer above the point of injection and sometimes even the penetration of the cement mortar onto the surface.
  • the injectors 1 are sometimes wrapped with several layers of adhesive tape.
  • the number of tape windings depends on the required pressure which triggers the formation of cracks in the hydraulic soil breaking.
  • the pressure in the hoses and injectors 1 is increased until it equals the pressure of the hydraulic soil breaking in this type of soil.
  • the mortar comes abruptly into the ground mass and forms the cracks of the hydraulic soil breaking up.
  • the distance and depth of the injector assembly depends on the properties of the soil layer, the building loads and the performance of the compressed layer. The injection quantities depend on the porosity of these soils and the load of the particular structure.
  • the formed system of piles and skeletons in the compacted soil mass acts as a unitary whole and substantially increases the carrying capacity and reliability of the entire foundation.
  • Mortar was made through the 160 injectors 1 under the pressure typical for such types of soil (12 atm.) Of hydraulic soil breaking. As a result, the columns of hydraulic soil breaking were formed. Upon further injection, the crevices were widened even more, and the soft-plastic loamy soil was compacted. The hardened cement mortar thus formed the reinforcing artificial skeleton in the compacted and improved soil massif.
  • the injectors 1 were sunk on a slip-off slope.
  • the slope consisted of soils and the viscous plastic toughened of natural origin.
  • the sinking of the injectors 1 was carried out at a distance of 4 x 4 m and the depth of 3 to 8 meters.
  • the injection of the low-viscosity cement mortar was carried out under a hydraulic soil breaking pressure of 7 atm. Further injection of cement mortar over cracks of hydraulic soil breaking causes soil consolidation and formation of the uniform reinforcing framework. The presence of the skeleton makes it possible to completely avoid possible slipping.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

Die Erfindung bezieht sich auf eine Bodenverdichtungsvorrichtung mit gelochten Rohren als Injektoren zur Aufnahme von Zementmörtel. Eine erweiterte Funktionsmöglichkeit wird dadurch erreicht, dass die Injektoren in einem Abstand von 2,0 bis 4,0 m im Bodenmassiv unter Zwecklast (Ballastkörper) angeordnet sind, dass die Zusatzlast als Betonplatte mit gelochter Seitenfläche ausgebildet und auf dem dispersen Boden aufgelegt ist und dass die Löcher der Injektoren und diese Betonplatte durch Blindstopfen abgedeckt sind, welche beim hydraulischen Bodenaufbrechen unter einem Druck von 3,0 bis 20 atm gleichzeitig zerstörbar sind. Eine Bodengründung wird unter Einsatz einer derartigen Bodenverdichtungsvorrichtung geschaffen.The invention relates to a soil compacting device with perforated pipes as injectors for receiving cement mortar. An extended function possibility is achieved in that the injectors are arranged at a distance of 2.0 to 4.0 m in the ground mass under purpose load (ballast body) that the additional load is formed as a concrete slab with perforated side surface and placed on the disperse floor and that the holes of the injectors and this concrete slab are covered by blind plugs, which are simultaneously destructible during hydraulic soil breaking under a pressure of 3.0 to 20 atm. Land foundation is provided using such a soil compacting device.

Description

Die Erfindung betrifft eine Bodenverdichtungsvorrichtung mit gelochten Rohren als Injektoren zur Aufnahme von Zementmörtel und eine Bodengründung mit künstlichem Tragwerk.The invention relates to a soil compacting device with perforated pipes as injectors for receiving cement mortar and a foundation foundation with artificial structure.

Sie betrifft den Bereich des Bauwesens und dort die Konstruktion einer verdichteten Bodengründung sowie Vorrichtungen zur Bodenverdichtung, welche beim Herstellen der Bodengründung während der Errichtung von Gebäuden und Bauwerken oder bei der Renovierung und dem Umbau von bereits bestehenden Gebäuden und Bauten eingesetzt werden. Diese Bodengründung sowie die Vorrichtungen zur Bodenverdichtung sind für disperse (lockere) gebundene oder ungebundene Böden sowie für angeschüttete (anthropogene) Böden und Fließhänge geeignet.It relates to the field of construction and there the construction of a compacted foundation and soil compaction devices, which are used in the establishment of land foundations during the construction of buildings and structures or in the renovation and remodeling of existing buildings and buildings. This soil foundation and soil compaction equipment is suitable for loose (loose) bound or unbound soil, as well as for landfilled (anthropogenic) soils and flowing slopes.

Die der Erfindung am nächsten kommenden bekannten Einrichtungen sind solche zur Verdichtung der gebundenen dispersen Böden. Diese Einrichtungen werden zur Schaffung von Gebäude- und Bauwerksgründungen mittels Zufuhr des hart werdenden Mörtels in Form von Sand-Zement-Gemisch eingesetzt. Der Mörtel wird in diesem Fall unter einem Druck von 2 - 10 atm. in die so genannten Injektoren (Auspressgeräte) eingeführt. Die Injektoren werden in einem Abstand von 2 bis 3 m zwischen einander angeordnet und sind als gelochte Rohre ausgebildet. Diese Rohre werden in der wirksamen Zone tief verlegt. Dadurch wird eine verdichtete Bodengründung gebildet ( RU Nr. 2059044 C1 , E 02D 3/12, 1996).The known devices closest to the invention are those for compacting the bonded disperse soils. These facilities are used to create building and building foundations by supplying the hardening mortar in the form of sand-cement mixture. The mortar is in this case under a pressure of 2 - 10 atm. introduced into the so-called injectors (ejection devices). The injectors are placed at a distance of 2 to 3 m between each other and are formed as perforated pipes. These tubes are laid deeply in the effective zone. This forms a compacted soil foundation ( RU No. 2059044 C1 , E 02D 3/12, 1996).

Die bekannten technischen Lösungen stellen die Bodenverdichtung nur bei dispersen gebundenen Böden sicher. Das begrenzt ihr Anwendungsgebiet. Der Einsatz von Zementformsand mindert die Durchdringungsfähigkeit des Mörtels, was die Tragfähigkeit der verdichteten Bodengründung wesentlich vermindert.The known technical solutions ensure soil compaction only in disperse bonded soils. This limits their field of application. The use of cementitious molding sand reduces the permeability of the mortar, which substantially reduces the load-bearing capacity of the compacted foundation.

Es ist Aufgabe der Erfindung, eine Bodenverdichtungsvorrichtung der eingangs erwähnten Art zu schaffen, die eine erweiterte Funktionsmöglichkeit besitzt.It is an object of the invention to provide a soil compaction device of the type mentioned above, which has an extended functionality.

Die gestellte Aufgabe wird durch die Merkmale des Anspruchs 1 gelöst.The stated object is solved by the features of claim 1.

Dies erfolgt dank der Verdichtung von nicht nur dispersen gebundenen Böden, z. B. Lehmen, Leichtlehmen, lehmigen Feinsanden, sondern auch von ungebundenen dispersen Böden, z. B. Sanden sowie Aufschüttböden (künstlichen Böden). Diese Böden werden durch Mörteleinpressung in den Boden verdichtet. Dabei muss ein solches Qualitätsmerkmal des Mörtels ausgewählt werden, welches seine hohe Durchdringungsfähigkeit sicherstellt. Die Verdichtung dieser Böden wird auch durch den Einsatz von bestimmten Mitteln erreicht, welche die Ausbildung eines Bodenmassivs sicherstellen. Dieses Bodenmassiv wird durch ein einheitliches Gerippe aus dem erhärteten Mörtel armiert. Die Erhöhung der Tragfähigkeit des Bodens, eine wirksame Befestigung der Fließhänge im einheitlichen Bodenmassiv (wobei darin ein Gerippe gebildet wird), die Senkung der Materialintensität im Zusammenhang mit dem verfahrenstechnischen Ablauf und die Erhöhung des Arbeitsausführungstempos wird durch die neue Bodenverdichtungsvorrichtung sichergestellt. Die Bodenverdichtungsvorrichtung ist in Form von Injektor-Rohren zum Einpressen des Zementmörtels ausgeführt. Die Injektor-Rohre werden in einem Abstand von 2,0 - 4,0 m im Bodenmassiv durch oder unter Zusatzlast (Ballastkörper) angeordnet. Die Zusatzlast ist als eine Betonplatte mit gelochter Seitenfläche ausgeführt. Sie wird auf den dispersen Boden aufgelegt. Die Löcher dieser Platte werden durch Blindstopfen abgedeckt, welche beim hydraulischen Bodenaufbrechen unter einem Druck von 3,0 - 20,0 atm. gleichzeitig zerstört werden. Die Blindstopfen sind als ein Band ausgeführt, welches die Lochung abdeckt. Das Band wird spiralförmig oder ringförmig angeordnet. Es ist mit einer Klebeschicht versehen, die zu dem gelochten Rohr gewendet ist. Die Blindstopfen bestehen aus mehreren Bandschichten, deren Anzahl durch den vorgegebenen Druckwert beim hydraulischen Bodenaufbrechen festgelegt ist. Das gelochte Rohr ist mit einem unteren Endstopfen versehen, welcher unter dem Druck des hydraulischen Aufbrechens nicht zerstört wird.This is thanks to the compression of not only disperse bonded bottoms, z. As loess, Leichtlehmen, loamy fine sands, but also of unbound disperse soils, eg. As sands and Aufschüttböden (artificial soils). These soils are compacted by mortar injection into the soil. In this case, such a quality feature of the mortar must be selected, which ensures its high penetration capacity. The compaction of these soils is also achieved through the use of certain means, which ensure the formation of a massif. This soil massif is reinforced by a uniform framework of hardened mortar. Increasing the load-bearing capacity of the soil, effectively fixing the flow slopes in the uniform soil mass (forming a framework in it), reducing the material intensity in connection with the procedural process and the increase of Arbeitsausführungstempos is ensured by the new soil compacting device. The soil compacting device is designed in the form of injector tubes for pressing in the cement mortar. The injector pipes are arranged at a distance of 2.0 - 4.0 m in the ground mass by or under additional load (ballast body). The additional load is designed as a concrete slab with perforated side surface. It is placed on the disperse soil. The holes of this plate are covered by blind plugs, which in hydraulic soil breaking under a pressure of 3.0 - 20.0 atm. destroyed at the same time. The dummy plugs are designed as a band covering the perforation. The band is arranged spirally or annularly. It is provided with an adhesive layer which is turned to the perforated tube. The blind plugs consist of several band layers, the number of which is determined by the predetermined pressure value during hydraulic soil breaking. The perforated tube is provided with a lower end plug, which is not destroyed under the pressure of hydraulic fracturing.

Eine Bodengründung mit künstlichem Gerippe wird wie folgt erreicht. Das Gerippe ist unter Einsatz der oben beschriebenen Einrichtung zur Bodenverdichtung ausgeführt. Dieses Gerippe stellt ein Bodenmassiv dar, welches unter einer Zusatzlast in Form einer Betonplatte ausgeführt ist. Das Bodenmassiv ist mit Injektoren in Form von Rohren durchdrungen und bildet ein künstliches Gerippe von erhärtetem Zementmörtel, welcher in die Spalten nach dem hydraulischen Bodenaufbrechen eingedrungen ist. Der erhärtete Zementmörtel liegt rings um die Injektoren in der Planebene und zwar mit gegenseitigem Eindringen in die konzentrischen Bereiche rings um die benachbarten Injektoren.A foundation with artificial skeleton is achieved as follows. The framework is designed using the soil compaction device described above. This framework represents a solid ground, which is carried out under an additional load in the form of a concrete slab. The soil mass is penetrated by injectors in the form of pipes and forms an artificial skeleton of hardened cement mortar, which has penetrated into the cracks after the hydraulic ground breaking. The hardened cement mortar lies around the injectors in the plane of the plane, with mutual penetration into the concentric areas around the adjacent injectors.

Die Erfindung wird anhand der in den Zeichnungen dargestellten Ausführungsbeispiele näher erläutert. Es zeigen:

Fig. 1
einen Injektor mit gelochter Seitenoberfläche, wobei die Löcher mit zerstörbaren Blindstopfen abgedeckt sind (Ausführung mit spiral-förmiger Bandanordnung im oberen Teil und Ausführung mit ring-förmiger Bandanordnung im unteren Teil) und
Fig. 2
eine Planansicht des Anordnungsplans der Injektoren mit Überdeckung der konzentrischen Bereiche rings um die Injektoren.
The invention will be explained in more detail with reference to the embodiments illustrated in the drawings. Show it:
Fig. 1
an injector with perforated side surface, the holes are covered with destructible blind plug (execution with spiral-shaped Band arrangement in the upper part and version with ring-shaped band arrangement in the lower part) and
Fig. 2
a plan view of the layout of the injectors with coverage of the concentric areas around the injectors.

Wie Fig. 1 zeigt, umfasst die Bodenverdichtungsvorrichtung Injektoren 1 zum Einpressen des Zementmörtels in Form von gelochten Rohren 2. Die Löcher sind an der Seitenfläche der Rohre 2 ausgeführt. Die Löcher der Rohre 2 sind mit zerstörbaren Blindstopfen 3 abgedeckt. Das hydraulische Bodenaufbrechen wird bei einem Druck von 3,0 - 20,0 atm. sichergestellt. Dieser Druckwert wird gemäß den erweiterten Bodenkategorien und den Besonderheiten der Bodenbefestigung an seinen Abhängen festgelegt. Die Druckabnahme verursacht kein hydraulisches Aufbrechen. Der höhere Druck dagegen beeinträchtigt die wirtschaftlichen Kennwerte, indem er höhere Ausrüstungskenndaten voraussetzt und den Mörtelverbrauch steigert. Die Zementmörtelzufuhr zur Erweiterung der Spalten des hydraulischen Bodenaufbrechens kann ununterbrochen im pulsierenden Zustand vorgenommen werden. Beim Aufrichten der Injektoren 1 werden die Abstände zwischen ihren Längsachsen aus dem Bereich von 2,0 - 4,0 m gewählt. Das ist durch die Arbeit mit verschiedenen Bodenkategorien bei einer Injektionstiefe von 3,0 - 8,0 m bedingt, was in manchen Fällen die Verlängerung des Injektors 1 erfordert. Bei der Verdichtung der bewässerten Tonböden oder wassergesättigten Lehmböden und Leimsande werden das Abdrücken und die Ableitung des darin enthaltenen Wassers vorgenommen. Bei einer solchen Bodenverdichtung werden die Injektoren 1 in der Planebene zum Beispiel reihenweise angeordnet. Die Zementmörtelzufuhr in diesen Reihen erfolgt vom Zentrum aus an die Peripheriebereiche, vorzugsweise spiralartig in der Planebene. Der Mörtel wird aufeinander folgend in jeden Injektor 1 oder mit einem Raster von1 bis 3 Injektoren 1 zugeführt.As Fig. 1 1, the soil compaction apparatus includes injectors 1 for injecting the cement mortar in the form of perforated pipes 2. The holes are formed on the side surface of the pipes 2. The holes of the tubes 2 are covered with destructible blind plug 3. The hydraulic soil breaking is carried out at a pressure of 3.0 - 20.0 atm. ensured. This pressure value is determined according to the extended soil categories and the peculiarities of the soil attachment on its slopes. The decrease in pressure does not cause any hydraulic breakage. The higher pressure, on the other hand, affects the economic characteristics by requiring higher equipment characteristics and increasing mortar consumption. The cement mortar feed for widening the crevices of the hydraulic soil breaking can be made continuously in the pulsating state. When erecting the injectors 1, the distances between their longitudinal axes in the range of 2.0 - 4.0 m are selected. This is due to working with different soil categories at an injection depth of 3.0 - 8.0 m, which in some cases requires the extension of the injector 1. During the compaction of the irrigated clay soils or water-saturated loamy soils and glue sands, the squeezing and the discharge of the water contained therein are carried out. In such a soil compaction, the injectors 1 are arranged in rows in the plane plan, for example. The cement mortar feed in these rows takes place from the center to the peripheral areas, preferably in a spiral plane plane. The mortar is fed sequentially into each injector 1 or with a grid of 1 to 3 injectors 1.

Alternativ können die Injektoren 1 in der Planebene reihenweise angeordnet werden. Wenn die Zuführung des Zementmörtels in diesen Reihen aufeinander folgend vom Zentrum zum Peripheriebereich hin erfolgt, werden die Injektoren 1 vorzugsweise in Radialrichtung der Planebene angeordnet. Dann wird der Mörtel aufeinander folgend in jeden Injektor 1 oder in alle Injektoren 1 in Rastern zu je 1 bis 3 radial oder abwechselnd zwischen den benachbarten Injektoren 1 in den benachbarten Radialrichtungen zugeführt. Gleichzeitig stellt die Zerstörung der Blindstopfen 3 die Bildung des hydraulischen Bodenaufbrechens in allen Richtungen des Bodenumfangs sicher. Die Blindstopfen 3 sind als ein Band ausgeführt, welches die Löcher in den Rohren 2 der Bandlochung abdeckt. Das Band wird spiralartig (Fig. 1) oder ringförmig angeordnet. Das Band des Blindstopfens 3 ist mit einer Klebeschicht ausgebildet, welche zum Lochrohr gewendet ist. Der Blindstopfen 3 besteht in der Regel aus mehreren Bandschichten. Die Anzahl der Schichten wird durch den vorgegebenen Druckwert beim hydraulischen Bodenaufbrechen festgelegt. Im unteren Teil des Rohrs 2 befindet sich ein unterer Endstopfen 4, welcher unter der Druckwirkung des hydraulischen Bodenaufbrechens unzerstörbar bleibt. Der Zementmörtel rings um die Injektoren 1 wird in der Draufsicht als Gerippe 5 mit gegenseitigem Eindringen in die konzentrischen Bereiche rings um die benachbarten Injektoren 1 angeordnet (Fig. 2).Alternatively, the injectors 1 can be arranged in rows in the plane Plane. When the supply of the cement mortar in these rows is successively from the center to the peripheral area, the injectors 1 are preferably in Radial direction of the plane Plane arranged. Then, the mortar is sequentially fed into each injector 1 or in all injectors 1 in increments of 1 to 3 radially or alternately between the adjacent injectors 1 in the adjacent radial directions. At the same time, the destruction of the blind plugs 3 ensures the formation of the hydraulic soil breaking in all directions of the bottom circumference. The blind plugs 3 are designed as a band which covers the holes in the tubes 2 of the band perforation. The band is spiraling ( Fig. 1 ) or arranged in a ring. The band of the dummy plug 3 is formed with an adhesive layer which is turned to the hole tube. The blind plug 3 usually consists of several band layers. The number of layers is determined by the predetermined pressure value during hydraulic soil breaking. In the lower part of the tube 2 is a lower end plug 4, which remains indestructible under the pressure effect of the hydraulic soil breaking. The cement mortar around the injectors 1 is arranged in plan view as a skeleton 5 with mutual penetration into the concentric areas around the adjacent injectors 1 ( Fig. 2 ).

Das Anwendungsgebiet umfasst nun solche Arten von Böden wie Sand und künstliche Böden. Das wird dank der Spaltenbildung beim hydraulischen Bodenaufbrechen möglich. Wenn keine Spalten des hydraulischen Bodenaufbrechens vorhanden sind, dringt der Zementmörtel in die Sandporen ein, ohne diesen Boden zu verdichten. Die Injektion erfolgt beim Vorhandensein einer Grundplatte und einigen (2 bis 3) Gebäudestockwerken über dem befestigten Bodenmassiv. Die Grundplatte dient als eine Abschirmung, welche den Mörtelaustritt aus dem Bodenmassiv verhindert. Die vorhandenen Stockwerke schaffen die Zusatzlast, welche den Druckaufbau sicherstellt. Wären keine Grundplatte und keine Zusatzlast vorhanden, so könnte die Injektion des Verdichtungsmörtels die Aufrichtung (die Schwellung) der Bodenschicht über dem Injektionspunkt und manchmal sogar den Durchbruch des Zementmörtels auf die Oberfläche verursachen.The field of application now includes such types of soils as sand and artificial soils. This is possible thanks to the formation of gaps during hydraulic soil breaking. If there are no gaps in the hydraulic soil breaking, the cement mortar penetrates into the sand pores without compacting this soil. The injection takes place in the presence of a base plate and some (2 to 3) building floors above the fixed ground massif. The base plate serves as a shield which prevents mortar leakage from the ground mass. The existing floors create the additional load, which ensures the pressure build-up. If there were no base plate and no additional load, injection of the compaction mortar could cause the build up (swelling) of the soil layer above the point of injection and sometimes even the penetration of the cement mortar onto the surface.

Um die Spaltenbildung beim hydraulischen Bodenaufbrechen sicherzustellen, werden die Injektoren 1 manchmal mit mehreren Schichten Klebeband umwickelt. Die Anzahl der Klebebandwicklungen hängt von dem erforderlichen Druck ab, welcher die Bildung von Spalten des hydraulischen Bodenaufbrechens auslöst. Infolge der Injektion wird der Druck in den Schläuchen und Injektoren 1 so lange erhöht, bis er gleich dem Druck des hydraulischen Bodenaufbrechens bei dieser Art des Bodens ist. Nach dem Klebebandreißen kommt der Mörtel schlagartig ins Bodenmassiv und bildet die Spalten des hydraulischen Bodenaufbrechens aus. Abstand und Tiefe der Injektorenanordnung sind von den Eigenschaften der Bodenschicht, den Gebäudebelastungen und von der Leistungsfähigkeit der zusammengepressten Schicht abhängig. Die Injektionsmengen hängen von der Porosität dieser Böden und der Belastung des jeweiligen Bauwerks ab. Ist der feindisperse Zementmörtel zu flüssig, so werden in den Sandböden keine Spalten des hydraulischen Bodenaufbrechens gebildet. Dagegen füllt die Zementmilch die Poren des Bodens nach dem klassischen Zementationsprinzip aus. Ist der Mörtel zu viskös, so werden überhaupt keine Spalten des hydraulischen Bodenaufbrechens gebildet. Es kommt zu einer Erweiterung der Lochwände und einer Verdichtung des Bodens rings um das Loch. Dabei wird wie folgt vorgegangen:In order to ensure the fracturing during hydraulic soil breaking, the injectors 1 are sometimes wrapped with several layers of adhesive tape. The The number of tape windings depends on the required pressure which triggers the formation of cracks in the hydraulic soil breaking. As a result of the injection, the pressure in the hoses and injectors 1 is increased until it equals the pressure of the hydraulic soil breaking in this type of soil. After rupture of the adhesive tape, the mortar comes abruptly into the ground mass and forms the cracks of the hydraulic soil breaking up. The distance and depth of the injector assembly depends on the properties of the soil layer, the building loads and the performance of the compressed layer. The injection quantities depend on the porosity of these soils and the load of the particular structure. If the finely dispersed cement mortar is too fluid, no gaps in the hydraulic soil breaking up will be formed in the sandy soils. In contrast, cementmilk fills the pores of the soil according to the classical cementation principle. If the mortar is too viscous, no gaps of the hydraulic soil breaking are formed at all. It comes to an expansion of the perforated walls and a compaction of the soil around the hole. The procedure is as follows:

Die Baugrube wird auf dem Gründungsniveau der Grundplatte geöffnet. Es wird ein normgerechtes Betonunterbrett eingerichtet. Nach der Erhärtung des Betonunterbretts wird von diesem aus die Bohrung der Führungslöcher vorgenommen. Die Injektoren 1 (das Lochrohr) mit einem Durchmesser von 30 - 50 mm und mit einem Abstand von 2,5 x 2,5 - 3,0 x 3,0 m werden in die Führungslöcher in die Tiefe der Ausbreitung der losen (druckhaften) Böden innerhalb der komprimierbaren Zone abgesenkt. Die Verbindung des Injektors 1 und des Betonunterbrettes wird mit einem speziellen Zementmörtel gepackt. Der Injektoraustritt über der Grundplatte beträgt 5 - 10 cm. Danach wird das Bewehrungsgerippe gemäß dem Einrichtungsprojekt der Grundplatte abgebunden. Nach der Einrichtung der Grundplatte über dem Bewehrungsgerippe werden die Injektoren 1 als Blindrohre so aufgepfropft, dass die Injektoren 1 10 - 20 cm über die zukünftige Grundplatte hinaus stehen. Die Grundplatte wird mit Beton ausgegossen. Vor dem Versenken werden die Injektoren 1 mit Klebeband umwickelt, um den Druck des hydraulischen Bodenaufbrechens aufzubauen. Durch das hydraulische Bodenaufbrechen wird eine Spaltenbildung sichergestellt. Nach der Einrichtung der Grundplatte wird der Tonmörtel in die Injektoren 1 eingegossen, um das Eindringen der losen Lehmböden in die Injektoren zu vermeiden. Nachdem die Einrichtung der Grundplatte abgeschlossen ist, werden 2 bis 3 Stockwerke des Gebäudes errichtet, um die erforderliche Zusatzlast zu schaffen, da sonst die Injektion des Verdichtungsmörtels keine Bodenverdichtung sondern eine Gebäudehebung verursacht. Die Injektion des Verdichtungszementmörtels erfolgt unter einem solchen Druck des hydraulischen Bodenaufbrechens, welcher dieser Bodenart eigen ist. Dadurch werden 2 bis 3 Meter lange Spalten des hydraulischen Bodenaufbrechens gebildet, welche in den am meisten gelockerten Zonen des Bodenmassivs verlaufen. Durch das weitere Eindringen des Verdichtungsmörtels in die Spalten des hydraulischen Bodenaufbrechens, werden diese erweitert. Die Erweiterungsspalte beginnt, als Innenmassiv-Winde zu wirken. Dadurch verdichtet sie das Bodenmassiv rings um sich. Bei der Verdichtung der tonartigen bewässerten und wassergesättigten Lehmböden und Lehmsande erfolgt ein Abdrücken des Wassers und dementsprechend die Änderung der Bodenkonsistenz. Die Konsistenz der tonartigen Böden wechselt in 2 Kategorien. Das heißt, wenn die Böden fließend und plastisch sind, dann werden sie zäh plastisch. Wenn sie dagegen weich und plastisch sind, werden sie halbhart. Die Spalten des hydraulischen Bodenaufbrechens werden untereinander verbunden. Der erhärtete Verdichtungsmörtel in diesen Spalten bildet ein einheitliches armiertes Gerippe. Nachdem der Injektionsvorgang abgeschlossen ist, wird der im Injektor 1 eingebaute Hahn abgesperrt, da sonst die elastischen Deformationen des Bodenmassivs den Verdichtungsmörtel über die Spalten des hydraulischen Bodenaufbrechens sowie den Injektor 1 selbst zurückdrücken und die Verdichtung nur teilweise erledigt würde. Der Hahn bleibt abgesperrt bis zur Abbindung des Verdichtungsmörtels. Nach der Erhärtung des Verdichtungsmörtels wird der Injektor 1 flächenbündig mit der Grundplatte abgeschnitten. Diese ausgeführten Handlungen bewirken folgende Vorgänge:

1
Die dispersen Böden werden verdichtet. Die dispersen Tonböden ändern dabei ihre Konsistenz und wechseln zu härteren Kategorien. Dadurch werden alle Festigkeitseigenschaften um das 1,5 bis 2-fache verbessert.
2
Das Bodenmassiv enthält den erhärteten Verdichtungsmörtel, der ein einheitlich armiertes Gerippe ausbildet. Das Gerippe erhöht die Kennwerte der mechanischen und physikalischen Eigenschaften (Festigkeitseigenschaften) noch um das 1,3 bis 1,5-fache (dank der vorhandenen Harteinschlüsse).
3
Die Injektoren 1 werden in der Grundplatte ausbetoniert. Die Harteinschlüsse des in den Spalten des hydraulischen Bodenaufbrechens erhärteten Verdichtungsmörtels treten aus. Dabei verwandeln sich die Injektoren 1 in "Wurzelpfähle", die einen Teil der Belastung übernehmen. Es wurden Versuche zwecks Einschätzung der Tragfähigkeit der wurzelförmigen Pfähle durchgeführt, die ergaben, dass die Tragfähigkeit dieser Pfähle mindestens 7 bis 8 Tonnen beträgt.
The excavation is opened at the foundation level of the base plate. A standardized concrete sub-board will be set up. After the hardening of the concrete base, the bore of the guide holes is made from this. The injectors 1 (the perforated tube) with a diameter of 30 - 50 mm and with a distance of 2.5 x 2.5 - 3.0 x 3.0 m are inserted into the guide holes in the depth of the spread of the loose (pressurized) Soils lowered within the compressible zone. The connection of the injector 1 and the concrete sub-board is packed with a special cement mortar. The injector outlet above the base plate is 5 - 10 cm. Thereafter, the reinforcement skeleton is tied according to the setup project of the base plate. After setting up the base plate above the reinforcing frame, the injectors 1 are grafted as dummy tubes so that the injectors 1 are 10-20 cm beyond the future base plate. The base plate is poured with concrete. Before sinking, the injectors 1 are taped to build up the pressure of the hydraulic soil breaking. By the hydraulic soil breaking ensures a gap formation. After the baseplate has been installed, the clay mortar is poured into the injectors 1 to prevent the loose clay soils from entering the injectors. After completing the baseplate setup, 2 to 3 floors of the building will be erected to provide the required additional load, otherwise injection of the compaction mortar will not cause any soil compaction but a building uplift. The injection of the compaction cement mortar is carried out under such pressure of the hydraulic soil breaking, which is inherent to this type of soil. As a result, 2 to 3 meter long columns of hydraulic soil breaking are formed, which run in the most loosened zones of the soil massif. Due to the further penetration of the compaction mortar in the columns of the hydraulic soil breaking, they are extended. The extension column begins to act as an interior massive winch. As a result, it compacts the soil massif all around. When compacting the clay-like irrigated and water-saturated loamy soils and loam sands, the water is pressed off and, accordingly, the soil consistency is changed. The consistency of clayey soils changes into 2 categories. That is, if the floors are fluid and plastic, then they become tough plastic. On the other hand, when they are soft and plastic, they become semi-hard. The columns of the hydraulic soil breaking are interconnected. The hardened compaction mortar in these gaps forms a uniform armored framework. After the injection process is completed, the built-in injector 1 cock is shut off, otherwise the elastic deformations of the ground mass will push back the compaction mortar on the columns of hydraulic soil breaking and the injector 1 itself and the compression would be done only partially. The tap remains shut off until the compaction mortar sets. After hardening of the compaction mortar, the injector 1 is cut flush with the base plate. These actions perform the following actions:
1
The disperse soils are compacted. The disperse clay soils change their consistency and switch to harder categories. This will all Strength properties improved by 1.5 to 2 times.
2
The soil mass contains the hardened compaction mortar, which forms a uniformly reinforced framework. The skeleton increases the characteristics of the mechanical and physical properties (strength properties) by 1.3 to 1.5 times (thanks to the existing hard inclusions).
3
The injectors 1 are concreted in the base plate. The hard inclusions of compaction mortar hardened in the columns of hydraulic soil breaking emerge. The injectors 1 are transformed into "root piles" which take over part of the load. Attempts were made to estimate the bearing capacity of the root-shaped piles, which showed that the carrying capacity of these piles is at least 7 to 8 tonnes.

Somit wirkt das ausgebildete System aus Pfählen und Gerippe im verdichteten Bodenmassiv als ein einheitliches Ganzes und erhöht die Tragfähigkeit und die Zuverlässigkeit der gesamten Gründung wesentlich.Thus, the formed system of piles and skeletons in the compacted soil mass acts as a unitary whole and substantially increases the carrying capacity and reliability of the entire foundation.

Die Anwendung ausgerechnet dieses Systems aus Pfählen und Gerippe im verdichteten Bodenmassiv ermöglicht es, bei geringerem Materialaufwand eine zuverlässigere und wirksame Gründung zu bekommen. Die Einsparung wird dank der Vergrößerung des Abstands bei der Injektoranordnung sowie durch die Verringerung der Injektionsmenge erreicht. Die Zuverlässigkeit und die Effizienz werden durch die Leistung der wurzelförmigen Pfähle erhöht.The application of just this system of piles and frameworks in compacted ground mass allows to get a more reliable and effective foundation with less material expenditure. The saving is achieved thanks to the increase in the distance in the injector arrangement and by reducing the injection quantity. Reliability and efficiency are enhanced by the performance of the root-shaped piles.

Beispiel 1example 1

Der Boden unter den Gründungen des errichteten Wohngebäudes wurde im Massiv der losen weichplastischen Lehmböden mit einem Rasterabstand von 3,5 m x 3,5 m in der Tiefe von 5 Metern verfestigt. Die Injektion des wenig zähflüssigen (flüssigen)The ground under the foundations of the constructed residential building was solidified in the mass of loose soft-plastic clay soils with a grid spacing of 3.5 mx 3.5 m at a depth of 5 meters. The injection of the little viscous (liquid)

Mörtels wurde durch die 160 Injektoren 1 unter dem für solche Bodenarten typischen Druck (12 atm.) des hydraulischen Bodenaufbrechens vorgenommen. Als Ergebnis davon wurden die Spalten des hydraulischen Bodenaufbrechens gebildet. Bei weiterer Injektion wurden die Spalten noch mehr erweitert, und die weichplastischen Lehmböden wurden verdichtet. Der erhärtete Zementmörtel bildete somit das armierende künstliche Gerippe im verdichteten und verbesserten Bodenmassiv aus.Mortar was made through the 160 injectors 1 under the pressure typical for such types of soil (12 atm.) Of hydraulic soil breaking. As a result, the columns of hydraulic soil breaking were formed. Upon further injection, the crevices were widened even more, and the soft-plastic loamy soil was compacted. The hardened cement mortar thus formed the reinforcing artificial skeleton in the compacted and improved soil massif.

Beispiel 2Example 2

Die Injektoren 1 wurden auf einem abrutschgefährdeten Abhang versenkt. Der Abhang bestand aus Aufschüttböden und den zäh plastischen Zähböden natürlicher Herkunft. Die Versenkung der Injektoren 1 erfolgte im Abstand von 4 x 4 m und der Tiefe von 3 bis 8 Metern. Durch diese Injektoren 1 erfolgte die Injektion des wenig zähflüssigen Zementmörtels unter einem Druck des hydraulischen Bodenaufbrechens von 7 atm. Die weitere Injektion des Zementmörtels über die Spalten des hydraulischen Bodenaufbrechens verursacht die Bodenverdichtung und die Bildung des einheitlichen armierenden Gerippes. Das Vorhandensein des Gerippes ermöglicht es, das eventuelle Abrutschen völlig zu vermeiden.The injectors 1 were sunk on a slip-off slope. The slope consisted of soils and the viscous plastic toughened of natural origin. The sinking of the injectors 1 was carried out at a distance of 4 x 4 m and the depth of 3 to 8 meters. Through these injectors 1, the injection of the low-viscosity cement mortar was carried out under a hydraulic soil breaking pressure of 7 atm. Further injection of cement mortar over cracks of hydraulic soil breaking causes soil consolidation and formation of the uniform reinforcing framework. The presence of the skeleton makes it possible to completely avoid possible slipping.

Claims (7)

Bodenverdichtungsvorrichtung mit gelochten Rohren (2) als Injektoren (1) zur Aufnahme von Zementmörtel,
dadurch gekennzeichnet,
dass die Injektoren (1) in einem Abstand von 2,0 bis 4,0 m im Bodenmassiv unter Zwecklast (Ballastkörper) angeordnet sind,
dass die Zusatzlast als Betonplatte mit gelochter Seitenfläche ausgebildet und auf dem dispersen Boden aufgelegt ist und
dass die Löcher der Injektoren (1) und diese Betonplatte durch Blindstopfen (3) abgedeckt sind, welche beim hydraulischen Bodenaufbrechen unter einem Druck von 3,0 bis 20 atm gleichzeitig zerstörbar sind.
Soil compacting device with perforated pipes (2) as injectors (1) for receiving cement mortar,
characterized,
that the injectors (1) are arranged at a distance of 2.0 to 4.0 m in the base under solid purpose load (ballast body),
that the additional load is designed as a concrete slab with perforated side surface and placed on the disperse floor and
that the holes of the injectors (1) and this concrete slab are covered by blind plugs (3), which are simultaneously destructible during hydraulic soil breaking under a pressure of 3.0 to 20 atm.
Bodenverdichtungsvorrichtung nach Anspruch 1,
dadurch gekennzeichnet,
dass die Blindstopfen (3, 4) als Band ausgeführt sind, das die Lochung abdeckt und
dass das Band spiralförmig und/oder ringförmig angeordnet ist.
Ground compacting device according to claim 1,
characterized,
that the dummy plugs (3, 4) are designed as a band covering the perforation and
that the band is arranged spirally and / or annularly.
Bodenverdichtungsvorrichtung nach Anspruch 1 oder 2,
dadurch gekennzeichnet,
dass das Band mit einer Klebeschicht versehen ist, wobei die Klebeschicht zum gelochten Rohr (2) gerichtet auf die Injektoren (1) aufgewickelt ist.
Ground compacting device according to claim 1 or 2,
characterized,
that the tape is provided with an adhesive layer, wherein the adhesive layer to the perforated tube (2) is wound wound on the injectors (1).
Bodenverdichtungsvorrichtung nach Anspruch 1 oder 2,
dadurch gekennzeichnet,
dass die Blindstopfen (3) aus mehreren Bandschichten bestehen, deren Anzahl durch den vorgegebenen Druckwert beim hydraulischen Bodenaufbrechen festgelegt ist.
Ground compacting device according to claim 1 or 2,
characterized,
in that the blind stoppers (3) consist of a plurality of band layers, the number of which is determined by the predetermined pressure value during hydraulic soil breaking.
Bodenverdichtungsvorrichtung nach Anspruch 1 und 2,
dadurch gekennzeichnet,
dass das gelochte Rohr (2) mit einem unteren Endstopfen (4) versehen ist, der unter dem Druck des hydraulischen Bodenaufbrechens nicht zerstörbar ist.
Ground compacting device according to claims 1 and 2,
characterized,
in that the perforated pipe (2) is provided with a lower end plug (4) which is not destructible under the pressure of hydraulic soil breaking.
Bodengründung mit künstlichem Tragwerk, die unter Einsatz der Bodenverdichtungsvorrichtung nach einem der Ansprüche 1 bis 5 ausgeführt ist,
dadurch gekennzeichnet,
dass die Bodengründung durch das unter der Zusatzlast in Form einer Betonplatte angeordnete Bodenmassiv dargestellt ist, welches mit den Injektoren (1) in Form von Rohren (2) durchdrungen ist und ein künstliches Gerippe bildet und
dass das Gerippe in den Spalten des hydraulischen Bodenaufbrechens durch den erhärteten Zementmörtel gebildet ist.
Artificial foundation foundation foundation constructed using the soil compaction apparatus according to any one of claims 1 to 5,
characterized,
that the bottom foundation is represented by the arranged under the additional load in the form of a concrete slab ground mass, which is penetrated by the injectors (1) in the form of tubes (2) and forms an artificial skeleton and
that the framework is formed in the columns of the hydraulic soil breaking through the hardened cement mortar.
Bodengründung mit künstlichen Tragwerk nach Anspruch 6,
dadurch gekennzeichnet,
dass der erhärtete Zementmörtel rings um die Injektoren (1) in der Planebene liegt und zwar mit gegenseitigem Eindringen in die konzentrierten Bereiche um die benachbarten Injektoren (1).
Land foundation with artificial structure according to claim 6,
characterized,
that the hardened cement mortar lies around the injectors (1) in the plane of the plane with mutual penetration into the concentrated areas around the adjacent injectors (1).
EP06812890A 2006-04-05 2006-04-12 Soil compacting device and a foundation soil provided with a technogenic frame Withdrawn EP2009181A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
RU2006110993 2006-04-05
PCT/RU2006/000182 WO2007114728A1 (en) 2006-04-05 2006-04-12 Soil compacting device and a foundation soil provided with a technogenic frame

Publications (1)

Publication Number Publication Date
EP2009181A1 true EP2009181A1 (en) 2008-12-31

Family

ID=38563916

Family Applications (1)

Application Number Title Priority Date Filing Date
EP06812890A Withdrawn EP2009181A1 (en) 2006-04-05 2006-04-12 Soil compacting device and a foundation soil provided with a technogenic frame

Country Status (2)

Country Link
EP (1) EP2009181A1 (en)
WO (1) WO2007114728A1 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1294910A1 (en) * 1985-01-08 1987-03-07 МГУ им.М.В.Ломоносова Method of refining a body of sagging loess soil in foundation of buildings or structures
US5005649A (en) * 1990-02-28 1991-04-09 Union Oil Company Of California Multiple fracture production device and method
RU2059044C1 (en) * 1991-12-27 1996-04-27 Осипов Виктор Иванович Method for compacting dispersed soils
RU2015247C1 (en) * 1991-12-27 1994-06-30 Осипов Виктор Иванович Method for compaction of loessial soils in bases of buildings and structures

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2007114728A1 *

Also Published As

Publication number Publication date
WO2007114728A1 (en) 2007-10-11

Similar Documents

Publication Publication Date Title
DE2651023C2 (en) Method for producing an in-situ concrete pile with a foot extension and device for carrying out the method
DE202022104117U1 (en) An underground mine support structure combined with piles and pipes, which can take into account the treatment of voids
DE3036762C2 (en)
DE3445965A1 (en) COMPACTING DEPTH, METHOD AND DEVICE FOR PRODUCING THE SAME
DE3416679C2 (en)
DE2823950C2 (en) Shaft construction, especially for the construction of deep shafts in unstable, water-bearing mountains
DE4005032A1 (en) Foundation pile supporting load in loose soil - has device to apply force between baseplate and pile
EP1267035A1 (en) Method for constructing underground waterproof tunnels with a concrete inner shell
EP0788572B1 (en) Building underpinning process
RU2324788C2 (en) Method of compressing soil and device for its implementation
DE3838880C1 (en) Method of producing a grouted anchor, and grouted anchor for carrying out the method
EP0109397B1 (en) Hollow foundation element and manufacturing method thereof
EP2009181A1 (en) Soil compacting device and a foundation soil provided with a technogenic frame
DE683407C (en) Procedure for the foundation of concrete piles
EP1108855B1 (en) Self-supporting waterproof vault for tunnel lining
DE69304971T2 (en) Process for realizing a water-impermeable underground layer and layer produced with it
DE3512709A1 (en) Method of producing and sealing a well, apparatus for carrying out the method, and well
DE3521434A1 (en) Injection method and apparatus for soil stabilisation
DE3543059C2 (en)
CH406274A (en) Method of making a tunnel
DE3033715A1 (en) Pile for reinforcing sub-soil - formed of coarse aggregate and binder hardening to open-pore cellular structure
DE19960023A1 (en) Active foundation
DD270332A5 (en) METHOD FOR RESTORING A FOUNTAIN
EP3656926B1 (en) Method for stabilizing and lifting building structures
DE102021116487B3 (en) Geotextile covered liquid soil columns

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20081105

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK YU

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20091103