EP1827727B1 - Method for the production of a multi-layer pipe - Google Patents

Method for the production of a multi-layer pipe Download PDF

Info

Publication number
EP1827727B1
EP1827727B1 EP05819971A EP05819971A EP1827727B1 EP 1827727 B1 EP1827727 B1 EP 1827727B1 EP 05819971 A EP05819971 A EP 05819971A EP 05819971 A EP05819971 A EP 05819971A EP 1827727 B1 EP1827727 B1 EP 1827727B1
Authority
EP
European Patent Office
Prior art keywords
pipe
layer
material layers
bending roller
manufacture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP05819971A
Other languages
German (de)
French (fr)
Other versions
EP1827727A1 (en
EP1827727B9 (en
Inventor
Bernd Berg
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bergrohr GmbH Siegen
Original Assignee
Bergrohr GmbH Siegen
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bergrohr GmbH Siegen filed Critical Bergrohr GmbH Siegen
Priority to DK07016706.9T priority Critical patent/DK1857194T3/en
Priority to EP07016706.9A priority patent/EP1857194B3/en
Publication of EP1827727A1 publication Critical patent/EP1827727A1/en
Publication of EP1827727B1 publication Critical patent/EP1827727B1/en
Application granted granted Critical
Publication of EP1827727B9 publication Critical patent/EP1827727B9/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/08Making tubes with welded or soldered seams
    • B21C37/0815Making tubes with welded or soldered seams without continuous longitudinal movement of the sheet during the bending operation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/08Making tubes with welded or soldered seams
    • B21C37/09Making tubes with welded or soldered seams of coated strip material ; Making multi-wall tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/08Making tubes with welded or soldered seams

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)
  • Bending Of Plates, Rods, And Pipes (AREA)
  • Pressure Welding/Diffusion-Bonding (AREA)
  • Blow-Moulding Or Thermoforming Of Plastics Or The Like (AREA)
  • Extrusion Moulding Of Plastics Or The Like (AREA)
  • Superconductors And Manufacturing Methods Therefor (AREA)
  • Laminated Bodies (AREA)

Abstract

Production of a multilayer pipe (5) from sheet steel by a bending roller involving laying individual layers (1,2) on top of each other to form the multilayer material which is then shaped to form the multilayer pipe. During the final phase of pipe shaping by the bending roller and/or a bending machine a material layer which acts as an internal pipe (1) is pressed with a force fit into layer (2) which acts as the external pipe. A INDEPENDENT CLAIM is included for a mulilayer pipe obtained by the above process.

Description

Die vorliegende Erfindung betrifft ein Verfahren zur Herstellung eines Mehrlagenrohres. Mehrlagen-Rohre werden vorzugsweise bei hohen Anforderungen gegen Korrosion oder Abrasion verwendet.The present invention relates to a method for producing a multilayer pipe. Multilayer pipes are preferably used in case of high requirements against corrosion or abrasion.

Korrosionsbeständige Druckbehälter oder Druckleitungen können durch Anwendung von Mehrlagen-Rohren kostengünstiger hergestellt werden als Massivausführungen aus entsprechenden Werkstoffen. Dies wird erreicht durch die Lastenteilung auf eine dünne, korrosionsbeständige Innenlage (z.B. rost- und säurebeständiger Stahl) und eine hochfeste, druckbeständige Außenlage (z. B. Feinkombaustahl). Dadurch kann der Stahlverbrauch insgesamt erheblich gesenkt und ein Großteil des verbleibenden Strahlverbrauchs auf kostengünstige Werkstoffe verlagert werden.Corrosion-resistant pressure vessels or pressure lines can be produced more cost-effectively by using multilayer pipes than solid versions made of appropriate materials. This is achieved by the load sharing on a thin, corrosion-resistant inner layer (e.g., stainless and acid resistant steel) and a high strength, pressure resistant outer layer (eg, fine-block steel). As a result, overall steel consumption can be significantly reduced and a large part of the remaining blast consumption can be shifted to low-cost materials.

Abrasionsbeständige Rohrleitungen werden durch die Ausführung als Mehrlagen-Rohr (etwa mit mechanischer Bindung, s.u.) in bestimmten Güteklasen überhaupt erst ermöglicht da Werkstoffe (z.B. hochfeste Stähle mit hohen Härten) als Innenlage eingesetzt werden können, die für sich alleine nicht oder nur sehr schwierig zu Rohren verarbeitet werden können.Abrasion-resistant pipelines are made possible by the design as a multilayer pipe (such as mechanical bond, see below) in certain grades because materials (eg high-strength steels with high hardness) can be used as the inner layer, not alone or very difficult to Pipes can be processed.

Andere Werkstoffkombinationen sind in großer Vielfalt möglich, prinzipiell begrenzt sich die Kombinierbarkeit von Werkstoffen dabei nur durch die jeweilig infrage kommenden Verarbeitungstechniken.Other material combinations are possible in a great variety, in principle, the combinability of materials is limited only by the applicable processing techniques.

Beim Aufbau des Rohrmantels wird unterschieden zwischen

  • vollflächiger metallurgischer Bindung (diese erfordert plattiertes Blech als Ausgangshalbzeug), und
  • rein mechanischer Bindung (etwa einer Reibbindung) zwischen Innen- und Außenrohr - vorzugsweise Innen- und Außenblech und ihrer Verschweißung an den Blechkanten-.
When constructing the pipe jacket, a distinction is made between
  • full-surface metallurgical bond (this requires plated sheet metal as a starting semi-finished product), and
  • purely mechanical bond (such as a friction bond) between inner and outer tube - preferably inner and outer plate and their welding to the Blechkanten-.

Die Herstellung solcher Mehrlagenrohre erfolgt dabei nach dem Stand der Technik wie folgt.The production of such multi-layer pipes is carried out according to the prior art as follows.

Ein solches Verfahren ist durch JP-A-60111791 bekannt geworden.Such a procedure is through JP-A-60111791 known.

Bei Mehrlagenrohren mit metallurgischer Bindung zwischen den Lagen - etwa Mehrlagenrohren aus Metallblechen, vorzugsweise Stahlblechen - findet als Ausgangshalbzeug ein plattiertes Verbundblech aus zwei verschiedenen (Stahl-)Werkstoffen Verwendung. Das Mehrlagenrohr wird dann wie folgt hergestellt:

  • Zunächst erfolgt die Herstellung eines Verbund-Bleches durch Walz- oder Sprengplattieren,
  • dann die Rohrformung nach üblichen Verfahren,etwa vermittels einer Biegewalze oder Biegeprese und
  • hernach die Schweißung, wobei die Außenwand des Mehlagenrohres nach den üblichen Verfahren zur Rohrschweißung entsprechend dem verwendeten Werkstoff und die Schweißung der Innenwand als Auftragsschweißung, ebenfalls passend zum Werkstoff erfolgt
For multi-layer pipes with metallurgical bond between the layers - such as multi-layer pipes made of metal sheets, preferably steel sheets - is used as a starting semi-finished a clad composite sheet of two different (steel) materials use. The multilayer pipe is then produced as follows:
  • First, the production of a composite sheet by roll or explosive plating,
  • then tube forming by conventional methods, such as by means of a bending roll or bending press and
  • thereafter, the welding, wherein the outer wall of the Mehlagenrohres according to the usual method of pipe welding according to the material used and the welding of the inner wall as build-up welding, also fits the material

Der Nachteil dieses Verfahrens nach dem Stand der Technik liegt zum einen in den hohen Kosten des Ausgangshalbzeuges und damit auch des Endproduktes, zum anderen aber auch in einer mangelnden ausreichenden Verfügbarkeit des Ausgangshalbzeuges, aufgrund äußerst beschränkter Produktionskapazitäten hierfür in der Welt So gibt es nach Kenntnis der Anmeldean und des Erfinders nur einige wenige Anlagen zur Herstellung walzplattierter mehrlagiger Bleche, etwa in Österreich und in Japan, jedoch beispielsweise keine einzige Anlage in der Bundesrepublik Deutschland hierfür. Auch Anlagen für das Sprengplattieren sind nach Kenntnis des Erfinders und der Anmelderin kaum vorhanden. So existiert etwa bei Dynamit Nobel in Burbach, Bundesrepublik Deutschland eine der wenigen solchen Anlagen. Auch ist die hierbei verwendete Fertigungstechnik sehr und entsprechend aufwendig und teuer, wobei zusätzlich zu bemerken ist, daß sie auch nur für sehr kleine Fertigungslose überhaupt zur Verfügung steht.The disadvantage of this method according to the prior art, on the one hand in the high cost of the starting semi-finished product and thus of the final product, on the other hand, in a lack of sufficient availability of the starting semi-finished, due to extremely limited production capacity for this purpose in the world So there is to the knowledge of Anmeldean and the inventor only a few plants for the production of roll-laminated multilayer sheets, such as in Austria and Japan, but for example not a single plant in the Federal Republic of Germany for this. Even systems for explosive cladding are hardly available to the knowledge of the inventor and the applicant. For example, at Dynamit Nobel in Burbach, Germany, one of the few such facilities exists. Also, the manufacturing technique used here is very and correspondingly expensive and expensive, and it should be noted in addition that it is available even for very small production lots at all.

Weiterhin ist die Anzahl der Werkstoffe, die sich auf diese Weise verarbeiten lassen, begrenzt. So lassen sich etwa bestimmte abrasionsbeständige Stähle als Innenlage dann nicht verwenden, wenn sie sich aufgrund ihres hohen Kohlenstoffanteils nicht oder nur schlecht schweißen lassen.Furthermore, the number of materials that can be processed in this way, limited. For example, certain abrasion-resistant steels can not be used as the inner layer if they are difficult or impossible to weld because of their high carbon content.

Bei Mehrlagenrohren mit mechanischer Bindung finden als Ausgangshalbzeug mehrere - vorzugsweise zwei - fertige Rohre Verwendung. Das Verfahren soll dabei im folgenden anhand des Beispiels zweier Rohre erläutert werden (im Falle weiterer Lagen sind die Auführungen entsprechend zu verstehen):

  • Zwei fertige Rohre werden aus den zu kombinierenden Werkstoffen passgenau gefertigt und ohne Reibung ineinander geschoben, wobei das äußere Rohr eine höhere Streckgrenze aufweisen muß als das innere.
  • Durch Expandieren (mechanisch - etwa vermittels eines Expansionsstempels - oder durch Flüssigkeitsdruck, wobei die ineinander liegenden Rohre in ein das Außenrohr umfassendes Gesenk gepreßt werden) wird das Innenrohr unter elastischer Aufweitung des Außenrohrs in das Außenrohr gedrückt. Nach Wegfallen der Expansionskräfte legt sich das Außenrohr wegen der höheren elastischen Rückfederung kraftschlüssig um das Innenrohr.
  • Abschließend werden die beiden Werkstoffe an den Stirnseiten verschweißt.
In multi-layer pipes with mechanical binding find as a starting semi-finished more - preferably two - finished pipes use. The method will be explained below with reference to the example of two tubes (in the case of further layers, the leads are to be understood accordingly):
  • Two finished tubes are made of the materials to be combined accurately and pushed into each other without friction, the outer tube must have a higher yield strength than the inner.
  • By expanding (mechanically - such as by means of an expansion punch - or by fluid pressure, wherein the nested tubes are pressed into a die comprising the outer tube), the inner tube is pressed into the outer tube with elastic expansion of the outer tube. After elimination of the expansion forces, the outer tube sets because of the higher elastic resilience frictionally around the inner tube.
  • Finally, the two materials are welded at the ends.

Der Nachteil dieses Verfahrens nach dem Stand der Technik liegt darin begründer, daß das äußere Rohr eine höhere Streckgrenze aufweisen muß als das innere, da ansonsten die den Kraftschluß mit dem Innenrohr hervorrufende und daher erforderliche elastische Rückfederung des Außenrohres fehlt Dies ist insbesondere deshalb nachteilig, weil hochfeste Wertstoffe - etwa besonders hochfeste Stähle -, wie sie vorzugsweise für abrasionsbeständige Rohrleitungen im Inneren des Rohres besonders vorteilhaft sind, hohe oder sogar sehr hohe Streckgrenzen aufweisen und sich damit für dieses Huswlkmgsnm&b= nicht eignen.The disadvantage of this method according to the prior art is due to the fact that the outer tube must have a higher yield strength than the inner, since otherwise the adhesion to the inner tube causing and therefore required elastic resilience of the outer tube is missing This is particularly disadvantageous because High-strength valuable materials - such as particularly high-strength steels - as they are preferably particularly advantageous for abrasion-resistant piping inside the tube, have high or even very high yield strengths and thus are not suitable for this Huswlkmgsnm & b =.

Daher ist es Aufgabe des vorliegenden Erfindung ausgehend vom Stand der Technik ein Verfahren zu Herstellung eines Mehrlagenrohres anzugeben, das einerseits die vorgenannten Nachteile zu vermeiden sucht, mithin ohne walz- und/oder sprengplattiertes Halbzeug auskommt, andererseits aber auch nicht den Beschränkungen unterliegt, die die Herstellung mehrlagiges Rohre nach dem Stand der Technik mit teibschlüssiger mechanischer Bindung von Lagen untereinander mit sich bringt.It is therefore an object of the present invention starting from the prior art to provide a method for producing a multi-layer pipe, on the one hand seeks to avoid the aforementioned disadvantages, thus does not require roll and / or blast-plated semi-finished, but on the other hand is not subject to the restrictions that the manufacturing Multi-layer pipes according to the prior art with teibschlüssiger mechanical bonding of layers with each other brings.

Diese Aufgabe wird durch ein Verfahren zur Herstellung eines Merhrlagenrohres nach Anspruch 1 gelöst. Weitere zweckmäßige Ausführungsformen ergeben sich aus den Unteransprüchen.This object is achieved by a method for producing a Merhrlagenrohres according to claim 1. Further expedient embodiments emerge from the subclaims.

Nach der vorliegenden Erfindung kann die Verwendung walz- und/oder sprengplattierten Halbzeugs dadurch vermieden werden, daß die jeweilige als Innenrohr fungierende Weckstofflage schon während der Rohrformung in der Biegewalze und/oder der zur Endformung in der Regel notwendigen Anbiegemuchine kraftschlüssig in die jeweilig als Außenrohr fungierende Werkstofflage gepresst und so im jeweiligen Außenrohr reibschlüssig gehalten wird und zwar ohne das Mehrlagenrohr aufweiten zu müssen und damit die bereits angeführten Nachteile einzugehen. Es sei darauf hingewiesen, daß in einigen Fallen aber auch eine Endformung in der Biegewalze allein möglich ist, etwa bei kürzeren Biegewalzen, die die Funktion der Endformung des Rohres mit zu leisten vermögen. In diesen Fällen nimmt eine Anbiegemaschine nicht am erfindungsgemäßen Verfahren teilAccording to the present invention, the use of rolled and / or blast-plated semifinished product can be avoided in that the respective Weckstofflage functioning as an inner tube already during the tube forming in the bending roll and / or the usually necessary for final forming Anbiegemuchine acting in the respective outer tube Material layer pressed and so frictionally held in the respective outer tube and without having to expand the multi-layer pipe and thus to address the disadvantages already mentioned. It should be noted that in some cases, however, a final forming in the bending roll alone is possible, such as shorter bending rolls, which can perform the function of the final shaping of the pipe with. In these cases, a bending machine does not participate in the method according to the invention

Wenn in diesem Text hier von einer Verbindung entlang einer Kante oder entlang einer (vorzugsweise nur gedachten) Linie die Rede ist, so ist damit jede Art von Verbindung entlang der Kante oder Linie gemeint, gleich, ob diese Verbindung entlang der gesamten Kante oder Linie oder nur abschnittsweise entlang der Kante oder Linie oder auch nur in einzelnen Punkten (wie etwa Punktschweißungen), etwa in zwei Punkten - vorzugsweise an den Endpunkten der Kante oder Linie - oder gar nur in einem einzelnen Punkt an der Kante oder auf der Linie bestehtAs used herein, when referring to a compound along an edge or along a (preferably imaginary) line, it refers to any type of connection along the edge or line, whether that connection is along the entire edge or line or only in sections along the edge or line, or even in single points (such as spot welds), approximately at two points - preferably at the end points of the edge or line - or even at a single point on the edge or on the line

In einer bevorzugten Ausführungsform des Verfahrens zur Herstellung eines Mehrlagenrohres mit Hilfe einer Biegewalze nach der vorliegenden Erfindung,

  • wird die erste Verbindung zwischen den Werlatofflagen dadurch geschaffen, daß diese entlang einer der Längs- oder Querkanten der aufliegenden Werkstofflage miteinander verbunden werden, und
  • es erfolgt die mindestens eine weitere Verbindung zwischen den Werkstofflagen nach einem bestimmtem Verformungsfortschritt entlang der zweiten Längs- oder Querkante der aufliegenden Werkstofflage,
In a preferred embodiment of the method for producing a multilayer pipe with the aid of a bending roll according to the present invention,
  • the first connection between the Werlatofflagen is created by that they are connected along one of the longitudinal or transverse edges of the overlying material layer, and
  • there is the at least one further connection between the material layers after a certain deformation progress along the second longitudinal or transverse edge of the overlying material layer,

Die mindestens eine weitete Verbindung zwischen den Werkstofflagen kann etwa nach einem Verformungsfortschritt zwischen 50% und weniger als 100 % geschaffen werden.The at least one wide connection between the material layers can be created approximately after a deformation progress between 50% and less than 100%.

In einer weiteren besonders bevorzugten Ausführungsform des Verfahrens zur Herstellung eines Doppellagenrohres als Mehrlagerohr mit einem Außenrohr und einem Innenrohr mit Hilfe einer Biegewalze nach der vorliegenden Blendung ergibt sich der Verformungsfortschritt nach dem die mindestens eine weitere Verbindung zwischen den Werkstofflagen erfolg, - hier Ffor genannt und in Teilen von Hundert angegeben, - vorzugsweise in etwa - wie folgt F for = 1 - σ I E ( DA - 2 SA - SI ) π Z s + 1 ( DA - SA ) π - ( DA - 2 SA - SI ) π 100

Figure imgb0001

  • mit DA als Außendurchmesser des Außenrohres in mm,
  • SA als Wanddicke des Außenrohres in mm,
  • SI als Wanddicke des Innenrohres in mm,
  • σI als Streckgrenze des Innenrohres in N/mm2,
  • Z s als Stauchungszuschlag angegeben in Teilen von Hundert und
  • E als Elastizitätsmodul (E-Modul) in N/mm2.
In a further particularly preferred embodiment of the method for producing a double-layer tube as a multi-bearing tube with an outer tube and an inner tube by means of a bending roll after the present glare results in the deformation progress after which the at least one further connection between the material layers success, - here called F for and in parts of a hundred, preferably approximately as follows F for = 1 - σ I e ( THERE - 2 SA - SI ) π Z s + 1 ( THERE - SA ) π - ( THERE - 2 SA - SI ) π 100
Figure imgb0001
  • with DA as the outer diameter of the outer tube in mm,
  • SA as the wall thickness of the outer tube in mm,
  • SI as the wall thickness of the inner tube in mm,
  • σ I as the yield strength of the inner tube in N / mm2,
  • Z s as upset specified in parts of hundred and
  • E as elastic modulus (modulus of elasticity) in N / mm2.

Der vorstehende Ausdruck ergibt sich dabei aus folgenden Beziehungen:The above expression results from the following relationships:

Die Länge der neutralen Faser des Außenrohres-hier Lnfa , gennant-beträgt L nfa = ( DA - SA ) π

Figure imgb0002
The length of the neutral fiber of the outer tube - here L nfa , gennant-amounts L nfa = ( THERE - SA ) π
Figure imgb0002

Die Länge der neutralen Faser des Innenrohres - hier Lafi genannt - beträgt: L nfi = DA - 2 SA - SI π

Figure imgb0003
The length of the neutral fiber of the inner tube - here called L afi - is: L nfi = THERE - 2 SA - SI π
Figure imgb0003

Die Verschiebung der freien Blechkante bei 100 % Verformungsgrad des Rohres - hier Lfr genannt - beträgt dann: L fv = L nfa - L nfi

Figure imgb0004
The displacement of the free sheet edge at 100% degree of deformation of the tube - here L fr called - is then: L fv = L nfa - L nfi
Figure imgb0004

Der Stauchumgsgrad des Innenrohres zum Erreichen der Stauchgrenze - hier εSt genannt - ergibt sich zu: ε St = σ I E

Figure imgb0005
und die Stauchungslänge zum erreichen der Stauchgrenze zur L st = ε St L nfi Z s + 1
Figure imgb0006
The Stauchumgsgrad the inner tube to reach the compression limit - here ε St called - results in: ε St = σ I e
Figure imgb0005
and the compression length to reach the compression limit to L st = ε St L nfi Z s + 1
Figure imgb0006

Der Verformungsfortschritt, bei dem die weitere Verbindung zwischen den Werkstofflagen erfolgt, - hier Ffor genannt - beträgt dann (als Wert zwischen 0 und 1 angegeben) etwa: F for = 1 - L st L fv

Figure imgb0007
und in Teilen von Hundert- angegeben: F for = 1 - L st L fv 100.
Figure imgb0008
The deformation progress, in which the further connection between the material layers takes place - here called F for - amounts then (as value between 0 and 1 indicated) approximately: F for = 1 - L st L fv
Figure imgb0007
and in parts of hundreds: F for = 1 - L st L fv 100th
Figure imgb0008

Löst man diesen Ausdruck mit

DA
als Außendurchmesser des Außenrohres in mm,
SA
als Wanddicke des Außenrohres in mm,
SI
als Wanddicke des Innenrohres in mm,
σI
als Streckgrenze des Innenrohres in N/mm2,
Z s
als Stauchungszuschlag angegeben in Teilen von Hundert und
E
als Elastizitätsmodul (E-Modul) in N/mm2
auf, so erhält man den eingangs für den Verformungsfortschritt, bei dem die weitere Verbindung zwischen den Werkstofflagen erfolgt, - hier F for genannt und in Teilen von Hundert angegeben - den eingangs bereits angeführten Ausdruck. Der Stauchungszuschlag berücksichtigt dabei die Fertigungsungenauigkeit in der Fixierung der zumindest einen weiteren Werkstofflagenverbindung, und kompensiert dies so, daß die angestrebte Pießkraft des Innenrohres gegen das Außenrohr mindestens erreicht wird.If you solve this expression
THERE
as the outer diameter of the outer tube in mm,
SA
as the wall thickness of the outer tube in mm,
SI
as the wall thickness of the inner tube in mm,
σ I
as yield strength of the inner tube in N / mm 2 ,
Z s
as a compression surcharge given in parts of hundred and
e
as elastic modulus ( modulus of elasticity ) in N / mm 2
on, the result is the beginning of the shaping progress, in which the further connection between the material layers takes place - here called F for and indicated in parts percent - the initially cited above expression. The compression allowance takes into account the manufacturing inaccuracy in fixing the at least one further material layer connection, and compensates for this so that the desired Pießkraft of the inner tube is at least achieved against the outer tube.

Einige Beispiele mögen dies veranschaulichen, wobei sich das Minimum und Maximum, wie auch das typische Beispiel sich auf den prozentualen Verformungsgrad beziehen, zu dem die zumindest eine weitere Verbindung zwischen den Werkstofflagen erfolgt: Tabelle 1: Beispiele zur Ermittlung des Verformungsfortschrittes für eine weitere Verbindung der Werkstofflagen Gegeben seien: Etwaiges Minimum Typisches Bsp. Etwaiges Maximum Einheit Bsp.1 Bsp. 2 Bsp. 3 DA (Durchmesser des Außenrohres) mm 406 762 2500 SA (Wanddicke des Außenrohres) mm 25 20 12 SI (Wanddicke des Innenrohres) mm 10 3 1 σI (Streckgrenze des Innenrohres) N/mm2 100 350 480 Zs(Stauchungszuschlag) (%) 0% 50% 15% E (Elastizitäsmodul oder E-Modul) N/mm2 210.000 210.000 210.000 Some examples may illustrate this, with the minimum and maximum, as well as the typical example, relating to the percentage of deformation at which the at least one further bond between the material layers occurs: Table 1: Examples for determining the deformation progress for a further connection of the material layers Given are: Possible minimum Typical example Possible maximum unit Ex.1 Ex. 2 Example 3 DA (diameter of outer tube) mm 406 762 2500 SA (wall thickness of the outer tube) mm 25 20 12 SI (wall thickness of the inner tube) mm 10 3 1 σ I (yield strength of the inner tube) N / mm 2 100 350 480 Z s (compression surcharge) (%) 0% 50% 15% E (elastic modulus or modulus of elasticity) N / mm 2 210000 210000 210000

Die gesuchten Großen ergeben sich dann wie folgt Tabelle 2: Gesuchte Größen zu den Beispielen zur Ermittlung des Verformungsfortschrittes für eine weitere Verbindung der Werkstofflagen aus Tabelle 1 Für die Beispiele nach Tab. 1 ergeben sich sodann für die gesuchten Größen: Etwaiges Minimum Typisches Bsp. Etwaiges Maximum Einheit Bsp.1 Bsp. 2 Bsp. 3 Länge der neutralen Faser des Außenrohres: Lnfs=(DA-SA)*π mm 1.196,9 2.331,1 7.816,3 Länge der neutralen Faser des Innenrohres: Lnfi = (DA - 2*SA - SI* π mm 1.087,0 2.258,8 7.775,4 Verschiebung der freien Blechkante bei 100% Formung: Lfv=Lnfa-LOnfi mm 110,0 72,3 40,8 Stauchungsgrad des Innenrohres zum Erreichen der Stauchgrenze: Est1/(E (%) 0,05% 0.17% 0,23% Stauchungslänge zum Erreichen der Stauchgrenze: Lst=Est · Lnfi · Zs mm 0.52 5,65 20,44 Erforderlicher Verformungsgrand für die zumindest eine weitere Verbindung, etwa zur Fixierung der 2. Blechkante: Ffor=1-Lst/Lfe (%) 99,5% 92,2% 50,0% The sought-after greats are then as follows Table 2: Desired sizes for the examples for determining the deformation progress for a further connection of the material layers from Table 1 For the examples according to Tab. 1, the following quantities are then obtained: Possible minimum Typical example Possible maximum unit Ex.1 Ex. 2 Example 3 Length of the neutral fiber of the outer tube: L nfs = (DA-SA) * π mm 1,196.9 2,331.1 7,816.3 Length of the neutral fiber of the inner tube: L nfi = (DA - 2 * SA - SI * π mm 1,087.0 2,258.8 7,775.4 Displacement of the free sheet edge at 100% forming: L fv = L nfa -LO nfi mm 110.0 72.3 40.8 Degree of compression of the inner tube to reach the compression limit: E st = σ 1 / (E (%) 0.05% 0.17% to 0.23% Compression length to reach the compression limit: L st = E st · L nfi · Z s mm 12:52 5.65 20.44 Required deformation factor for the at least one further connection, for example for fixing the second sheet metal edge: F for = 1-L st / L fe (%) 99.5% 92.2% 50.0%

Eine weitere bevorzugte Ausführungsform des Verfahrens zur Herstellung eines Mehrlagenrohres mit Hilfe einer Biegewalze nach der vorliegenden Erfindung ist dadurch gekennzeichnet, daß zumindest eine der Werkstofflagen aus mehr als einem aufgelegten Element, vorzugsweise mehr als einem Blech besteht. Die aufgelegten Elemente können dabei mit wer Längskante parallel zur Längskante der unterliegenden Werkstofflage liegen, müssen dies aber nicht So ist es auch möglich, daß sie mit ihrer Längskante quer hierzu zu liegen kommen.A further preferred embodiment of the method for producing a multilayer pipe by means of a bending roll according to the present invention is characterized in that at least one of the material layers consists of more than one applied element, preferably more than one sheet. The launched elements can be with who longitudinal edge parallel to the longitudinal edge of the underlying material layer, but they do not have to. So it is also possible that they come to rest with their longitudinal edge transverse thereto.

Liegen die Elemente dabei mit ihrer Längskante parallel - vorzugsweise in etwa parallel - zur Längskante der unterliegenden Werkstofflage so wird die erste Verbindung zwischen den Werkstofflagen vorzugsweise dadurch geschaffen, daß die Elemente, vorzugsweise Bleche, nach dem Auflegen entlang ihrer Stoßstelle, die zugleich jeweils eine Längskante der Elemente, vorzugsweise Bleche, der aufliegenden Werkstofflage bildet, mit der darunterliegenden Werkstofflage, vorzugsweise dem darunterliegenden Blech, verbunden werden.If the elements are parallel with their longitudinal edge-preferably approximately parallel-to the longitudinal edge of the underlying material layer, the first connection between the material layers is preferably created by the elements, preferably sheets, after being placed along their joint, which at the same time each have a longitudinal edge the elements, preferably sheets, forms the resting material layer, with the underlying material layer, preferably the underlying sheet metal, are connected.

Dieses Verfahren eignet sich besonders zur Herstellung von erfindungsgemäßen Mehrlagenrohren mit großen Durchmessern, vorzugsweise mit solchen größer als 610 mm (24"), wo oftmals die Breite verfügbarer Innenlagenmaterialbänder, vorzugsweise von Stahlbändern (Stahlblechen), nicht ausreicht, um eine vollständige Innenlage für solch große Rohre abzugeben. Reichen auch zwei Bänder nicht aus, so kann das Verfahren beliebig fortgesetzt werden: Es werden dann drei oder auch mehr Elemente, vorzugsweise Bleche aufgelegt.This method is particularly suitable for making large diameter, preferably larger than 610 mm (24 ") multilayer pipes of the invention where often the width of available inner layer material strips, preferably steel strips, is insufficient to provide a complete inner layer for such large If two tapes are not sufficient, the process can be continued as desired: three or more elements, preferably metal sheets, are then placed on top.

Vorzugsweise wird bei dem Verfahren zur Herstellung eines Mehrlagenrohres mit Hilfe einer Biegewalze nach der vorliegenden Erfindung das Mehrlagenrohr durch eine Schweißung des Außenrohres entlang der Rorhmaht und eine Auftragsschweißung des Innenrohres geschlossen, um so den Mehrlagenrohrkörper zu fertigen.Preferably, in the method for producing a multilayer pipe by means of a bending roll according to the present invention, the multilayer pipe is closed by welding the outer pipe along the Rorhmaht and build-up welding of the inner pipe so as to manufacture the multilayer pipe body.

Auch können die Werkstofflagen an den Stirnseiten des Rohres verbunden werden, etwa um dort das Eindringen von Feuchtigkeit zwischen die metallurgisch ja nicht vollflächig verbundenen Werkstorfflagen zu verhindern.Also, the material layers can be connected to the front sides of the tube, about to prevent the ingress of moisture between the metallurgically yes not fully connected Werkstorfflagen.

Einen bevorzugten Anwendungsfall des Verfahrens nach der vorliegenden Erfindung stellt die Herstellung von erfindungsgemäßen Doppellagenrohren dar, gleichwohl beschränkr sich die Erfindung nicht hierauf, auch drei-, vier- und noch mehrlagigere erfindungsgemäße Rohre sind hiermit grundsätzlich herstellbar, was nach dem Stand der Technik zumindest weitaus schwieriger, wenn nicht sogar überhaupt unmöglich istA preferred application of the method according to the present invention is the production of double-layer tubes according to the invention, however, the invention is not limited thereto, also three-, four- and more multi-layer pipes of the invention are hereby basically produced, which is far more difficult according to the prior art if not impossible at all

In einer weiteren besonders bevorzugten Ausführungsform der vorliegenden Erfindung finden Bleche, vorzugsweise Metallbleche und besonders bevorzugterweise Stahlbleche, als Werkstofflage oder Elemente der Werkstofflage Verwendung.In a further particularly preferred embodiment of the present invention find sheets, preferably metal sheets and more preferably steel sheets, as a material layer or elements of the material layer use.

Auch erfolgt in dem Verfahren zur Herstellung eines Mehrlagenrohres mit Hilfe einer Biegewalze nach der vorliegenden Erfindung vorzugsweise zumindest eine der Verbindungen der Werkstofflagen als Schweißung, was sich vor allem für die zuvor erwähnten Metallbleche, vorzugsweise Stahlbleche eignet.Also, in the method for producing a multilayer pipe by means of a bending roll according to the present invention, at least one of the compounds of the Material layers as a weld, which is particularly suitable for the aforementioned metal sheets, preferably steel sheets.

Das nach dem vorliegenden erfindungemäßen Verfahren erhaltene Mehrlagenrohr kann insbesondere so ausgestaltet sein, daß eine jeweilig innen liegende Werkstofflage gegenüber der jeweils außen liegenden Werkstofflage eine höhere Streckgrenze oder Dehngrenze (siehe hierzu unten) als diese aufweist wobei zumindest eine Werkstofflager vorzugsweise aus Metallblech, besonders bevorzugterweise aus Stahlblech besteht.The multilayer pipe obtained by the present erfindungemäßen method may in particular be designed so that a respective inner material layer relative to the respective outer material layer has a higher yield strength or yield strength (see below) than this wherein at least one material bearing preferably made of sheet metal, particularly preferably from Sheet steel exists.

Eine besonders bevorzugte Ausführungsform eines nach dem erfindunsgemäßen Verfahren erhaltenen Mehrlagenrohres ist dadurch gekennzeichnet, daß das Mehnagenrohr als Doppellagenrohr ausgebildet ist, welches zwei Werkstofflagen Stahlblech aufweist, wobei die als Innenrohr fungierende Lage Stahlblech einen hohen bis sehr hohen Koblenstoffantell aufweist und somit zuminest nicht mehr unbedingt schweißbar ist.A particularly preferred embodiment of a multi-layer tube obtained by the method according to the invention is characterized in that the multi-layer tube is formed as a double-layer tube, which has two layers of steel sheet, wherein the sheet acting as an inner tube sheet has a high to very high Koblenstoffantell and thus at least not necessarily weldable is.

Die so erfindungsgemäß erhaltenen Mehrlagenrohre sind zu solchen nach dem Stand der Technik in vielfältiger Weise unterschiedlich, jedoch ohne, daß sich diese Unterschiede alle zugleich in einem erfindungemägeßen Mehrlagenrohr zeigen müssen und es demnach kennzeichnen könnten. Vielmehr können diese Unterschiede auch in verschiedener Kombination untereinander auftreten müssen dies aber gleichwohl nicht.The multi-layer pipes thus obtained according to the invention are different from those of the prior art in many ways, but without that these differences must all at the same time show up in a multi-ply pipe according to the invention and thus be able to characterize it. Rather, these differences may occur in different combinations with each other, but this does not yet.

So ist es nach der vorliegenden Erfindung einerseits nicht erforderlich, plattierte Bleche (mit den bereits eingangs erörterten Nachteilen langer Lieferzeit und begrenzter Verfügbarkeit, sowie hohem Preis) zu verwenden, andererseits können trotzdem Mehrlagenrohre - insbesondere Doppellagenrohre aus Stahlblechwerkstofflagen- mit hoher Streckgrenze des Werkstoffes des jeweiligen Innenrohres bei gleichzeitig niedrigerer Streckgrenze des Werkstoffes des demgegenüber jeweiligen äußeren Rohres hergestellt werden, was etwa für solche Verwendungen von Mehrlagenrohren erforderlich ist, für die es auf eine möglichst hohe Abrasionsbeständigkeit des Innenrohres ankommt, da eine hohe Abrasionsbeständigkeit i.d.R. auch mit einer hohen Härte und diese wiederum mit einer hohen Streckgrenze einhergeht Derartige Mehrlagenrohre, die ein innen liegendes Rohr aus einem Material mit höherer als oder gleicher Streckgrenze ein hierzu außen angeordnetes Rohr aufweisen, aber trotzdem keine vollflächige metallurgische Verbindung benachbarter Lagen zeigen, können bislang nach dem Stand der Technik nicht hergestellt werden; es gibt sie bisher nicht Hingegen weiden sie durch die vorliegende Erfindung möglich. Hinzuweisen ist darauf, daß im Falle einer nicht ausgeprägten Streckgrenze - etwa in Fa!len nur verstärkt plastischer Verformung - anstelle der Streckgrenze dann die Dehngrenze als Betrag der Spannung einer plastischen bleibenden Dehnung unter einer bestimmten Krafteinwirkung tritt.Thus, according to the present invention, on the one hand, it is not necessary to use clad sheets (with the disadvantages discussed above of long delivery times and limited availability, as well as high price), but on the other hand multi-layer pipes - in particular double-layer pipes made of sheet steel with high yield strength of the respective material Inner tube are produced at the same time lower yield strength of the material of contrast, the respective outer tube, which is required for such uses of multi-layer pipes, for which it has the highest possible abrasion resistance of the Inner tube arrives, since a high abrasion resistance usually synonymous with a high hardness and this in turn is accompanied by a high yield strength Such multilayer tubes having an inner tube made of a material with higher than or equal yield strength a pipe arranged outside this, but still no full metallurgical Connection of adjacent layers show, can not be produced so far in the prior art; On the other hand, they do not graze possible by the present invention. It should be pointed out that in the case of a non-pronounced yield strength - for example in cases only increased plastic deformation - instead of the yield strength, the yield strength as the amount of stress of a plastic permanent strain under a certain force occurs.

Unabhängig hiervon können mit dem erfindungsgemäßen Verfahren auch Mehrlagenrohre ohne Verwendung teurer und schlecht lieferbarer plattierter (vollflächig metallurgisch verbundener) Bleche in nahezu beliebig großen Durchmessern hergestellt werden, was nach dem Stand der Technik bislang nicht möglich ist, da hier die notwendige Expansion durch die Abmessungen der verwendeten Expansionsstempel oder durch ein, im Falle hydraulischer Expansions-Krafteinwirkung für die gleichmäßige Ausformung notwendiges Gesenk, welches das zu fertigende Mehrlagenrohr umschließt, begrenzt ist. Demgegenüber ermöglicht das erfindungsgemäße Biegewalzenverfahren Mehrlagenrohre, die solchen vorgegebenen Grenzen nicht unterliegen, da die Biegewalze, die ja immer nur an einer Stelle des Krümmungszadius des Rohres formend angreift, solchermaßen den Durchmesser des erfindungsgemäßen Mehrlagenrohres nicht begrenzt. Damit sind insbesondere auch Mehrlagenrohre ohne plattierte Bleche herstellbar, die die nach dem derzeitigen Stand der Technik gegebene Grenze, von ca. 610 mm (24") Durchmesses - vorzugsweise weit - überschreiten.Regardless of this, with the inventive method and multilayer pipes without the use of expensive and poorly available plated (full metallurgically bonded) sheets in almost any large diameters can be produced, which is not yet possible in the prior art, since the necessary expansion by the Dimensions of the expansion punches used or by a necessary in the case of hydraulic expansion force for the uniform molding die enclosing the multi-layer tube to be produced, is limited. In contrast, the bending roll method according to the invention allows multilayer pipes which are not subject to such predetermined limits, since the bending roll, which indeed always forms a shaping only at one point of the radius of curvature of the pipe, thus does not limit the diameter of the multilayer pipe according to the invention. This makes it possible, in particular, to produce multilayer pipes without plated metal sheets which exceed the limit given by the current state of the art of approximately 610 mm (24 ") diameter, preferably far.

Auch ermöglicht die vorliegende Erfindung erst die Herstellung von Mehrlagenrohren mit partieller Innenlage, d.h. ein im Querschnitt nur einen Teilkreis bildend Innenrohr, etwa in Form einer Rinneneinlage am Rohrfuß, was nach dem Stand der Technik bislang ebenfalls nicht möglich istAlso, the present invention first enables the production of multilayer tubes with partial inner layer, i. a cross-section only a partial circle inner tube forming, for example in the form of a gutter insert on the pipe base, which is also not possible according to the prior art

In diesem Zusammenhang ist erwähnenswert, daß nach dem Verfahren der vorliegenden Erfindung selbstverständlich auch Rohre in nur ganz geringen Stückzahlen, insbesondere auch Einzelstrücke wirtschaftlich herstellbar sind, was nach dem Stand der Technik in einem Falle durch das aufwendige Plattieren und die hierfür notwendigen Mindestfertigungslose und im anderen Falle durch die für das Expandieren notwendigen hierfür speziell eingerichteten Werkzeuge und Vorrichtungen gehindert istIn this context, it is worth noting that, of course, according to the method of the present invention, pipes in only very small numbers, especially individual pieces are economically produced, which in a case by the prior art in one case by the costly plating and the minimum required production lots and in the other Trap is prevented by the necessary for expanding this purpose specially designed tools and devices

Im folgenden werden nicht einschränkend zu verstehende Ausführungbeispiele anhand der Zeichnung besprochen. In dieser zeigt

Fig. 1
eine perspektivisch skizzierte Aufsicht auf zwei aufeinandergelegte, zum Mehrlagenrohr zu kombinierende Werkstofflagen,
Fig. 2
eine perspektivisch skizzierte Aufsicht auf zwei aufeinandergelegte, zum Mehrlagenrohr zu kombinierende Werkstofflagen mit einer ersten Verbindung, vorzugsweise Schweißung zwischen den Werkstofflagen in etwa entlang einer (gedachten) Linie parallel zu einer Längskante der aufliegenden Werkstofflage,
Fig. 3
eine perspektivisch skizzierte Aufsicht auf zwei aufeinandergelegte zum Mehrlagenrohr zu kombinierende Werkstofflagen, wobei hier eine der Werkstofflagen aus zwei in Rohrlängsrichtung aufgelegten Elementen - vorzugsweise Blechen - besteht,
Fig. 3a
zeigt eine weitere perspektivisch skizzierte Aufsicht auf zwei aufeinandergelegte zum Mehrlagenrohr zu kombinierende Werkstofflagen, wobei hier eine der Werkstofflagen, nämlich die aufgelegte Werkstofflage aus mehreren, nämlich einer Vielzahl in Rohrumfangsrichtung aufgelegten Elementen- vorzugsweise Blechen - besteht,
Fig. 4
eine perspektivisch skizzierte Aufsicht auf zwei aufeinandergelegte, zum Mehrlagenzohr zu kombinierende Werkstofflagen, wobei eine der Werkstofflagen aus mehr als einem, nämlich hier zwei aufgelegten Elementen - vorzugsweise Blechen - besteht und hier eine erste Verbindung zwischen den Werkstofflagen dadurch geschaffen wurde, daß die Elemente nach dem Auflegen entlang ihrer Stoßstelle, die zugleich jeweils eine Längskante der Elemente der aufliegenden Wezkstofflage bildet mit der darunterliegenden Werkstofflage verbunden, vorzugsweise verschweißt wurden,
Fig. 5
eine perspektivisch skizzierte Sicht in ein erfindungsgemäßes Mehrlagenrohr von einer Stirnseite her während des erfindungsgemäßen Herstellverfahrens, nämlich in dem Verfahrensschritt, wo der hierbei gebildete Mehrlagen-Werkstoff mit Hilfe der Biegewalze (Die Biegewalze selbst ist hier ausgeblendet und daher nicht zu sehenl) zum Rohr geformt wird, wobei durch den Druck der Walzen von oben und unten ständig ein Reibschluss zwischen den Werkstofflagen erzeugt wird und bei der Verformung die noch frei gegeneinander verschiebbaren Teile der Werkstofflagen aufgrund der unterschiedlichen Biegeradien von Innenrohr und Außenrohr sich entsprechend dem Verformungsfortschritt frei zueinander verschieben,
Fig. 6
eine perspektivisch skizzierte Sicht in ein erfindungsgemäßes Mehrlagenrohr von einer Stirnseite her während des erfindungsgemäßen Herstellverfahrens, nämlich in dem Verfahrensschritt, wo nach einem bestimmten Verformungfortschritt mindestens eine weitere Verbindung zwischen den Werkstofflagen dadurch geschaffen wurde, daß die aufliegende Werkstofflage an zumindest einer weiteren Position miteinander verbunden wurden,
Fig. 7
einen perspektivischen Querschnitt durch ein fertiggestelltes erfindungsgemäßes Mehrlagenrohr mit Innen- und Außenlage,
Fig. 8
einen perspektivischen Querschnitt durch ein Mehrlagenrohr mit Innen- und Außenlage in Detailansicht im Bereich der Schweißnaht
In the following non-limiting examples of execution to be understood with reference to the drawing. In this shows
Fig. 1
a perspective sketch outlined on two superimposed, to be combined multi-layer pipe material layers,
Fig. 2
a perspectively outlined top view of two superimposed, to multilayer tube to be combined material layers with a first connection, preferably welding between the material layers approximately along a (imaginary) line parallel to a longitudinal edge of the overlying material layer,
Fig. 3
a perspective outlined top view of two superimposed to multilayer pipe material layers to be combined, in which case one of the material layers of two launched in the tube longitudinal direction elements - preferably sheets - is,
Fig. 3a
shows a further perspective sketched plan view of two superimposed to multilayer pipe to be combined material layers, in which case one of the material layers, namely the applied material layer of several, namely a plurality in the tube circumferential direction launched elements - preferably sheets - is,
Fig. 4
a perspectively outlined top view of two superimposed, to multi-layer pipe to be combined material layers, one of the material layers of more than one, namely here two applied elements - preferably sheets - and here a first connection between the material layers was created by the elements according to Laying along its joint, which at the same time each forms a longitudinal edge of the elements of the overlying plastic material layer connected to the underlying material layer, preferably welded,
Fig. 5
a perspective outlined view into an inventive multilayer pipe from one end face during the manufacturing process according to the invention, namely in the process step where the resulting multilayer material using the bending roll (The bending roll itself is hidden here and therefore not seenl) is formed to the tube , wherein by the pressure of the rollers from above and below constantly a frictional engagement between the material layers is generated and in the deformation, the still freely mutually displaceable parts of the material layers due to the different bending radii of inner tube and outer tube move freely according to the deformation progress,
Fig. 6
a perspectively outlined view into an inventive multi-layer pipe from one end side during the manufacturing process according to the invention, namely in the process step, where after a certain deformation progress at least one further connection between the material layers was created by the fact that the overlying material layer were connected to at least one other position .
Fig. 7
a perspective cross section through a finished inventive multilayer pipe with inner and outer layer,
Fig. 8
a perspective cross section through a multi-layer pipe with inner and outer layer in detail in the weld area

Fig. 1 zeigt eine perspektivisch skizzierte Aufsicht auf zwei aufeinandergelegte, zum Mehrlagenrohr zu kombinierende Werkstofflagen 1, 2. Fig. 1 shows a perspective sketch outlined on two superimposed, to be combined multi-layer pipe material layers 1, 2nd

Fig. 2 zeigt eine perspektivisch skizzierte Aufsicht auf zwei aufeinandergelegte, zum Mehrlagenrohr zu kombinierende Werkstofflagen mit einer ersten Verbindung 3a und 3b - vorzugsweise Schweißung (nämlich an den Punkten 3a, 3b) - zwischen den Werkstofflagen 1, 2 in etwa entlang einer (gedachten) Linie parallel zu einer Längskante 4 der aufliegenden Werkstofflage 1. Fig. 2 shows a perspective sketch outlined on two superposed, to be combined multilayer pipe material layers with a first compound 3a and 3b - preferably welding (namely at the points 3a, 3b) - between the material layers 1, 2 approximately along a (imaginary) line parallel to a longitudinal edge 4 of the overlying material layer. 1

Fig. 3 zeigt eine perspektivisch skizzierte Aufsicht auf zwei aufeinandergelegte zum Mehrlagenrohr zu kombininierende Werkstofflagen 1a, 1b, 2, wobei hier eine der Werkstofflagen, nämlich die aufgelegte Werkstofflage aus zwei in Rohrlängsrichtung aufgelegten Elementen 1a, 1b - vorzugsweise Blechen - besteht Fig. 3 shows a perspective sketch outlined on two superposed to multilayer pipe to be combined material layers 1a, 1b, 2, in which case one of the material layers, namely the applied material layer of two launched in the tube longitudinal direction elements 1a, 1b - preferably sheets - consists

Fig. 3a zeigt eine weitere perspektivisch skizzierte Aufsicht auf zwei aufeinandergelegte zum Mehdagenrohr zu kombinierende Werkstofflagen 1a, 1b, ..., 1n, 2, wobei hier eine der Werkstofflagen, nämlich die aufgelegte Werkstofflage aus einer Vielzahl, nämlich einer endlichen Anzahl - hier n genannt - von in Rohrumfangsrichtung aufgelegten Elementen 1a, 1b, .... 1n - vorzugsweise Blechen - besteht Daß es sich um eine beliebige Anzahl von n abgelegten Elementen 1a, 1b, ..., 1n handeln kann, wird dabei in der Zeichnung durch eine gepunktete Linie 11 angedeutet. Fig. 3a shows a further perspective sketch outlined on two superposed to Mehdagenrohr to be combined material layers 1a, 1b, ..., 1n, 2, in which case one of the material layers, namely the applied material layer of a variety, namely a finite number - here called n - of 1a, 1b,... 1n, preferably sheet metal, are made up of elements 1a, 1b,..., 1n deposited in the circumferential direction of the pipe. In the drawing, this is indicated by a dotted line 11 indicated.

Die aufgelegten Elemente 1a, 1b..... 1n liegen dabei hier mit ihrer Längskante 4 quer zur Längskante der unterliegenden (=unten liegenden) Werkstofflage 2, wohingegen sie hier mit ihrer jeweiligen Querkante 4a parallel zur Längskante der unterliegenden (=unten liegenden) Werkstofflage 2 liegen. Auch sind die bei dieser Anordnung vorgesehenen jeweiligen ersten Verbindungen 3a1, 3a2, 3b1, 3b2, 3n1, 3n2 der auf die Werkstofflage 2 aufgelegten Elemente 1a, 1b. .... 1n hier zu sehen.The applied elements 1a, 1b ..... 1n lie here with their longitudinal edge 4 transversely to the longitudinal edge of the underlying (= lying down) material layer 2, whereas here with their respective transverse edge 4a parallel to the longitudinal edge of the underlying (= underlying) Material layer 2 lie. Also provided with this arrangement are respective first connections 3a 1 , 3a 2 , 3b 1 , 3b 2 , 3n 1 , 3n 2 of the elements 2 a , 1 b placed on the material layer 2 . .... to see 1n here.

Fig. 4 zeigt eine perspektivisch skizzierte Aufsicht auf zwei aufeinandergelegte, zum Mehrlagenrohr zu kombinierende Werkstofflagen 1a, 1b, 2, wobei eine der Werkstofflagen aus mehr als einem, nämlich hier zwei aufgelegten Elementen 1a, 1b - vorzugsweise Blechen - besteht und hier eine Verbindung 3 zwischen den Werkstofflagen dadurch geschaffen wurde, daß die Elemente 1a, 1b nach dem Auflegen entlang ihrer Stoßstelle, die zugleich jeweils eine Längskante der Elemente 1a, 1b der aufliegenden Werkstofflage bildet, mit der darunterliegenden Werkstofflage 2 verbunden, vorzugsweise verschweißt wurden. Hier erfolgte diese Verbindung 3 entlang der Stoßstelle und zugleich Längskante durch eine sich über die gesamte Lange der Stoßstelle und zugleich Längskante erstreckende geschlossene Verbindung 3, vorzugsweise Schweißung. Insbesondere ist dabei eine abschnittsweise Verbindung, vorzugsweise Verschweißung möglich. Fig. 4 shows a perspective sketch outlined on two superposed, multi-layer tube to be combined material layers 1a, 1b, 2, wherein one of the material layers of more than one, namely here two launched elements 1a, 1b - preferably sheets - and here a compound 3 between the material layers was created by the elements 1a, 1b after laying along its joint, which also forms a respective longitudinal edge of the elements 1a, 1b of the overlying material layer, connected to the underlying material layer 2, preferably welded. Here was this compound 3 along the joint and at the same time longitudinal edge by extending over the entire length of the joint and at the same time longitudinal edge extending closed connection 3, preferably welding. In particular, a partial connection, preferably welding is possible.

Fig. 5 zeigt eine perspektivisch skizzierte Sicht in ein erfindungsgemäßes Mehrlagenrohr 5 von einer Stirnseite her während des erfindungsgemäßen Herstellverfahrens, nämlich in dem Verfahrensschritt, wo der hierbei gebildete Mehrlagen-Werkstoff mit Hilfe der Biegewalze (Die Biegewalze selbst ist hier ausgeblendet und daher nicht zu sehen) zum Rohr 5 geformt wird, wobei durch den Druck der Walzen von oben und unten ständig ein Reibschluss zwischen den Werkstofflagen 1, 2 erzeugt wird und bei der Verformung die noch frei gegeneinander verschiebbaren Teile 1c gegen 2a, sowie 1d gegen 2b der Werkstofflagen aufgrund der unterschiedlichen Biegeradien von Innenrohr 1 und AuBeorohr 2 sich entsprechend dem Verformungsfortschritt frei zueinander verschieben. Die ente Verbindung 3a und 3b zwischen den beiden Werstofflagen 1, 2 erfolgte hier bereits an zwei Punkten 3a, 3b, die entlang einer (gedachten) Linie parallel zu einer Längskante des sich bildenden Innenrohres 2 - nämlich an den dortigen Endpunkten - liegen. Im Bereich dieser ersten Verbindung 3a und 3b der WedEstoiBagen 1, 2 aber, können sich diese aufgrund ihrer Verbindung 3a und 3b zueinander nun nicht mehr gegeneinander verschieben, sondern bleiben hier gegeneinander fixiert. Fig. 5 shows a perspective sketched view into an inventive multi-layer pipe 5 from one end side during the manufacturing process according to the invention, namely in the process step where the resulting multilayer material using the bending roll (the bending roll itself is hidden here and therefore not visible) to the pipe 5 is formed, whereby by the pressure of the rollers from top and bottom constantly a frictional engagement between the material layers 1, 2 is generated and during deformation the still freely mutually displaceable parts 1c against 2a, and 1d against 2b of the material layers due to the different bending radii of Inner tube 1 and outer tube 2 move freely according to the deformation progress. The duck connection 3a and 3b between the two fabric layers 1, 2 took place here already at two points 3a, 3b which lie along a (imaginary) line parallel to a longitudinal edge of the forming inner tube 2 - namely at the local end points. In the area of this first connection 3a and 3b of the WedEstoiBagen 1, 2, however, they can no longer move against each other due to their connection 3a and 3b to each other, but remain fixed here against each other.

Fig. 6 zeigt eine perspektivisch skizzierte Sicht in ein erfindungsgemäßes Mehrlagenrohr 5 von einer Stirnseite her während des erfindungsgemäßen Heisteltver&hrens, nämlich in dem Verfahrensschritt, wo nach einem bestimmten Verformungsfortschritt mindestens eine weitere Verbindung - hier zwei weitere Verbindungen - 6a und 6b, hier jeweils als durchgehende oder partiell ansgefühzte Schweißnaht ausgeführt, zwischen den Werkstofflagen 1, 2 dadurch geschaffen wurde, daß die aufliegende Werkstofflage 1 an zumindest einer weiteren Position - hier an zwei weiteren Positionen - miteinander verbunden wurden. Hierauf folgend kann sodann das Mehrlagenrohr 5 mit Hilfe der Biegewalze und/oder Anbiegemaschine zu Ende geformt werden (nicht mehr zu sehen), wobei sich nun während dieser Endformung die Werkstofflagen aufgrund der weiteren Verbindungen 6a und 6b nun nicht mehr weiter gegeneinander verschieben, wodurch die jeweilige als Innenrohr fungierende Werkstofflage 1, 1c, 1d kraftschlüssig in die jeweilig als Außenrohr fungierende Werkstofflage 2, 2a, 2b gepresst wird Fig. 6 shows a perspective sketched perspective view of an inventive multi-layer tube 5 from one end side during the invention Heisteltver, namely in the process step, where after a certain deformation progress at least one other compound - here two other compounds - 6a and 6b, here as a continuous or partially ansühhzte Welded executed between the material layers 1, 2 was created by the fact that the overlying material layer 1 at least one other position - were connected to each other - here at two other positions. Following this, then, the multi-layer tube 5 can be formed using the bending roller and / or bending machine to the end (no longer visible), which now no longer move against each other during this final shaping the material layers due to the further connections 6a and 6b, causing the respective material layer 1, 1c, 1d acting as an inner tube is non-positively pressed into the respective material layer 2, 2a, 2b acting as an outer tube

Fig. 7 zeigt sodann einen perspektivischen Querschnitt durch ein fertiggestelltes erfindungsgemäßes Mehrlagenrohr 5 mit Innenlage (auch Im1.emohr. Innenrohrleitung, Innenblech etc. genannt) 1 und Außenlage (auch Außenrohr, Außenrohleirung, Grundblech etc. genannt) 2, wobei das Mehrlagenrohr 5 durch eine Schweißung 7 des Außenrohres 2 entlang einer Rorhrnaht 8 und eine Auftragsschweißung 9 des Innenrohres 1 geschlossen wurde. Fig. 7 2 shows a perspective cross section through a finished multilayer pipe 5 according to the invention with inner layer (also referred to as inner pipe, inner sheet, etc.) 1 and outer layer (also called outer pipe, outer blank, base sheet, etc.) 2, wherein the multilayer pipe 5 is welded by a weld 7 of the outer tube 2 along a Rorhrnaht 8 and an overlay weld 9 of the inner tube 1 has been closed.

Fig. 8 zeigt einen perspektivischen Querschnitt durch ein Mehdagenroht nach Fig. 7 mit Innenlage 1 und Außenlage 2 in Detailansicht im Bereich der beiden Schweißnähte 7, 9. Fig. 8 shows a perspective cross section through a Mehdagenroht after Fig. 7 with inner layer 1 and outer layer 2 in a detailed view in the region of the two weld seams 7, 9.

Claims (15)

  1. A method for manufacture of a multi-layer pipe (5) by means of a bending roller, where
    - individual material layers (1, 2) to be combined into the multi-layer pipe (5) are put onto each other,
    - subsequently a first connection (3, 3a and 3b, 3a1 and 3a2, 3b1 and 3b2, 3n1 and 3n2) between the material layers (1, 2) is created by connecting them to each other,
    characterised in that
    - the thus formed multi-layer material is shaped into a pipe (5) by means of the bending roller with a constant friction-tight connection being created between the material layers (1, 2) as a result of the pressure of the rollers from the top and from the bottom, and during shaping, the portions (1c, 1d, 2a, 2b) of the material layers (1, 2), which can still shift freely against other, shifting freely to each other in accordance with the shaping progress due to the different bend radii of internal pipe (1) and external pipe (2)
    - after a definite shaping progress at least one other connection (6a, 6b) is created between the material layers (1, 2) by connecting them to each other in at least one other position, and
    - the multi-layer pipe (5) is then finish-shaped by means of the bending roller and/or bending machine, with the material layers (1, 2) shifting no more against each other now during this finish-shaping, so that as a result, the material layer (1) acting as an internal pipe is pressed non-positively into the material layer (2) acting as an external pipe.
  2. A method for manufacture of a multi-layer pipe (5) by means of a bending roller according to claim 1, characterised in that the material layer (1) acting as an internal pipe constitutes a graduated circle in cross-section in the finished multi-layer pipe (5).
  3. A method for manufacture of a multi-layer pipe (5) by means of a bending roller according to claim 2, characterised in that the material layer (1) acting as an internal pipe that constitutes a graduated circle in cross-section in the finished multi-layer pipe (5) forms a channel at the base of the multi-layer pipe.
  4. A method for manufacture of a multi-layer pipe (5) by means of a bending roller according to claim 1, 2 or 3, characterised in that first connection between the material layers (1, 2) is created by connecting them to each other approximately alongside a longitudinal edge (4) or transverse edge (4a) of the material layer positioned above (1), or approximately alongside a line parallel to it.
  5. A method for manufacture of a multi-layer pipe (5) by means of a bending roller according to claim 1 - 4, characterised in that the at least one other connection (6a, 6b) between the material layers (1, 2) occurs after a definite shaping progress approximately alongside a second longitudinal edge (4) or transverse edge (4a) of the material layer above (1, 1a, 1b, 1n), or approximately alongside a line parallel to it.
  6. A method for manufacture of a multi-layer pipe (5) by means of a bending roller according to claim 1 - 5, characterised in that
    - the first connection between the material layers (1, 2) is created by connecting them to each other alongside one of the longitudinal edges (4) or transverse edges (4a) of the material layer (1) above, and
    - the at least one other connection (6a, 6b) occurs between the material layers (1, 2) after a definite shaping progress alongside the second longitudinal edge or transverse edge of the material layer (1) above.
  7. A method for manufacture of a multi-layer pipe (5) by means of a bending roller according to one of the claims 1-6, characterised in that the at least one other connection (6a, 6b) between the material layers (1, 2) is created after a shaping progress between 50 % and less than 100 %.
  8. A method for manufacture of a double-layer pipe (5) as a multi-layer pipe with an external pipe (2) and an internal pipe (1) by means of a bending roller according to one of the claims 1 - 6, characterised in that the at least one other connection (6a, 6b) between the material layers (1, 2) is created after a shaping progress of approximately Ffor (indicated in parts per cent) with Ffor resulting as follows : F for = 1 - σ I E ( DA - 2 SA - SI ) π Z s + 1 ( DA - SA ) π - ( DA - 2 SA - SI ) π 100
    Figure imgb0010
    with
    DA being the external diameter of the external pipe in mm,
    SA being the wall thickness of the external pipe in mm,
    SI being the wall thickness of the internal pipe in mm,
    σI being the yield point of the internal pipe in N/mm2,
    Zs being the upsetting allowance indicated in parts per cent and
    E the Young's modulus in N/mm2.
  9. A method for manufacture of a multi-layer pipe (5) by means of a bending roller according to one of the claims 1 - 8, characterised in that at least one of the material layers (1, 2) comprises more than one element (1a, 1b, 1n) positioned above
  10. A method for manufacture of a multi-layer pipe (5) by means of a bending roller according to claim 9, characterised in that the elements are placed with their longitudinal edge approximately parallel to the longitudinal edge of the material layer below, and the first connection (3) between the material layers (1,2) is created by the elements (1a, 1b) after their positioning on top alongside their joining location, which at the same time constitutes each a longitudinal edge of the elements of the material layer (1a, 1b) on top, being connected with the material layer below.
  11. A method for manufacture of a multi-layer pipe (5) by means of a bending roller according to one of the claims 1 to 10, characterised in that the multi-layer pipe (5) is closed by means of welding (7) of the external pipe (2) alongside the pipe seam (8) and deposition welding (9) of the internal pipe (1).
  12. A method for manufacture of a multi-layer pipe (5) by means of a bending roller according to one of the preceding claims 1-11, characterised in that the material layers (1, 2) are connected at the pipe front (5).
  13. A method for manufacture of a multi-layer pipe (5) by means of a bending roller according to one of the preceding claims 1-12, characterised in that as a multi-layer pipe (5) a double-layer pipe is manufactured.
  14. A method for manufacture of a multi-layer pipe (5) by means of a bending roller according to one of the preceding claims 1 - 13, characterised in that plates are used as a material layer (1, 2) or elements (1a, 1b, 1n) of the material layer (1).
  15. A method for manufacture of a multi-layer pipe (5) by means of a bending roller according to one to of the preceding claims 1 - 14, characterised in that at least one of the connections (3, 3a and 3b, 3a 1 and 3a2, 3b1 and 3b2, 3n1 and 3n2, 6a, 6b) of the material layers (1, 2) is performed as a welding.
EP05819971A 2004-12-21 2005-12-16 Method for the production of a multi-layer pipe Not-in-force EP1827727B9 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DK07016706.9T DK1857194T3 (en) 2004-12-21 2005-12-16 Multilayer tubes and processes for making them
EP07016706.9A EP1857194B3 (en) 2004-12-21 2005-12-16 Multi-layer pipe and method for its manufacture

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102004062697 2004-12-21
PCT/EP2005/013569 WO2006066814A1 (en) 2004-12-21 2005-12-16 Multi-layer pipe and method for its production

Related Child Applications (1)

Application Number Title Priority Date Filing Date
EP07016706.9A Division EP1857194B3 (en) 2004-12-21 2005-12-16 Multi-layer pipe and method for its manufacture

Publications (3)

Publication Number Publication Date
EP1827727A1 EP1827727A1 (en) 2007-09-05
EP1827727B1 true EP1827727B1 (en) 2008-05-14
EP1827727B9 EP1827727B9 (en) 2008-11-05

Family

ID=35841667

Family Applications (2)

Application Number Title Priority Date Filing Date
EP05819971A Not-in-force EP1827727B9 (en) 2004-12-21 2005-12-16 Method for the production of a multi-layer pipe
EP07016706.9A Not-in-force EP1857194B3 (en) 2004-12-21 2005-12-16 Multi-layer pipe and method for its manufacture

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP07016706.9A Not-in-force EP1857194B3 (en) 2004-12-21 2005-12-16 Multi-layer pipe and method for its manufacture

Country Status (15)

Country Link
US (2) US8117882B2 (en)
EP (2) EP1827727B9 (en)
JP (2) JP4546543B2 (en)
KR (2) KR101281417B1 (en)
CN (2) CN101934303B (en)
AT (2) ATE517703T1 (en)
AU (2) AU2005318485B2 (en)
BR (1) BRPI0519169A2 (en)
CA (2) CA2592003C (en)
DE (1) DE502005004156D1 (en)
DK (2) DK1827727T3 (en)
ES (1) ES2308586T3 (en)
MY (1) MY140142A (en)
SG (1) SG155259A1 (en)
WO (1) WO2006066814A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101281417B1 (en) * 2004-12-21 2013-07-02 버그로 게엠베하 씨겐 Method for producing multi-layer pipe
DE102013103811B3 (en) * 2013-04-16 2014-03-20 EISENBAU KRäMER GMBH Method for producing a multi-layered large pipe

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008024009A1 (en) 2008-05-16 2009-12-03 Erndtebrücker Eisenwerk GmbH & Co. KG Longitudinally welded multilayer pipe for use in oil industry, particularly petrochemical industry and for constructing large buildings, has fixed, pressure-resistant top layer and thin, corrosion resistant inner layer
DE102008024011A1 (en) 2008-05-16 2009-12-17 Erndtebrücker Eisenwerk GmbH & Co. KG Longitudinal seam-welded multilayered tube for use in petrochemical industry, particularly for oil pipes, gas pipes and process pipes, has external layer and internal layer, where internal layer is firmly connected with external layer
IT1395349B1 (en) * 2009-05-29 2012-09-14 Sitindustrie Tubes & Pipes Spa METHOD FOR THE REALIZATION OF A BIMETALLIC TUBE AND ITS RELATED BIMETAL TUBE
IT1394410B1 (en) * 2009-05-29 2012-06-15 Sitindustrie Tubes & Pipes Spa METHOD FOR THE IMPLEMENTATION OF BIMETALLIC TUBE AND BIMETALLIC TUBE SOON OBTAINED
ATE520479T1 (en) * 2009-06-19 2011-09-15 Bergrohr Gmbh Siegen PRODUCTION-OPTIMIZED PROCESS FOR PRODUCING A MULTI-LAYER TUBE
KR100923841B1 (en) * 2009-07-11 2009-10-27 주식회사 일성 Structure and method to join corrosion resistant member to the inside of tube type member
US8931323B2 (en) * 2010-01-22 2015-01-13 Exxonmobil Upstream Research Company Multi-layered pipes for use in the hydrocarbon industry, methods of forming the same, and machines for forming the same
WO2011110195A1 (en) 2010-03-11 2011-09-15 Bergrohr Gmbh Siegen Forming line and method for producing a multi-layer pipe
CN102847744A (en) * 2012-09-20 2013-01-02 上海和达汽车配件有限公司 Manufacture method for opening pieces of tubes in different wall thicknesses
DE102012019315A1 (en) 2012-10-02 2014-04-03 Bergrohr Gmbh Siegen Process for the rapid production of a multilayer pipe
JP5579910B1 (en) * 2013-09-30 2014-08-27 株式会社日立パワーソリューションズ Temperature reducing tube
CN103612020B (en) * 2013-12-10 2015-12-30 北京隆盛泰科石油管科技有限公司 Clad steel plate is adopted to be added the composite tube production method of built-up welding mode by electric resistance welding
CN106140922A (en) * 2015-04-10 2016-11-23 上海丁柯机械有限公司 A kind of drawing process of laminated multi-layer workpiece
JP5871417B1 (en) 2015-12-04 2016-03-01 中川産業株式会社 Manufacturing method of double pipe
DE102015122296A1 (en) * 2015-12-18 2017-06-22 Sandvik Materials Technology Deutschland Gmbh Sensor for a high-pressure line and method for its production
DE102016208690A1 (en) * 2016-05-20 2017-11-23 Bayerische Motoren Werke Aktiengesellschaft Vibration-damped tube
EP3501702A1 (en) * 2017-12-21 2019-06-26 HILTI Aktiengesellschaft Method for producing a cutting section for a core bit
EP3501705A1 (en) * 2017-12-21 2019-06-26 HILTI Aktiengesellschaft Method for producing a cutting section for a core bit
WO2020150720A1 (en) * 2019-01-20 2020-07-23 Techreo Llc Elongate tubular structures
WO2020150710A1 (en) 2019-01-20 2020-07-23 Techreo Llc Methods for making layered tubular structures
KR102483274B1 (en) 2020-06-05 2023-01-02 엄지은 Billet for extrusion of multi-layer pipes and manufacturing method of multi-layer pipes using the same

Family Cites Families (66)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA261429A (en) 1926-06-08 W. Bundy Harry Tubing
DE582387C (en) * 1933-08-14 Kurt Ruppin Process for the production of double-walled tubes or similar hollow bodies
US1712090A (en) 1924-03-22 1929-05-07 George F Murphy Method of making lined piping
DE520305C (en) 1927-10-08 1931-03-09 Bundy Tubing Co Process for the production of a two-layer composite pipe
US2263714A (en) * 1940-04-01 1941-11-25 Bloomfield Samuel Method of making two ply tubing
US2489802A (en) * 1945-04-02 1949-11-29 Smith Corp A O Method of constructing multilayer cylinders
US2430273A (en) * 1945-11-14 1947-11-04 Du Pont Tool for lining pipe
DE864689C (en) 1949-03-16 1953-01-26 Fritz Dipl-Ing Stiehl Process for the production of two-layer composite pipes from two metal strips
US2754784A (en) * 1951-02-19 1956-07-17 British Insulated Callenders Manufacture of a metal tube which may form part of an electric cable
AT254791B (en) 1961-05-19 1967-06-12 Sulzer Ag Pressure pipeline for hydropower plants
US3220602A (en) 1961-09-21 1965-11-30 United States Steel Corp Container and method of making it
US3327383A (en) 1963-01-03 1967-06-27 Walter C Reed Method of making clad pipe
US3610290A (en) 1968-10-22 1971-10-05 Texas Instruments Inc Metal laminates and tubing embodying such laminates
US3863327A (en) * 1972-12-27 1975-02-04 Roland Arthur Legate Method of lining metal pipes
JPS5113361A (en) * 1974-07-25 1976-02-02 Nippon Steel Corp TAIMAMOKOKANOYOBISONO SEIZOHO
JPS5388651A (en) 1977-01-17 1978-08-04 Nippon Steel Corp Pipe forming stand line
US4122696A (en) 1976-12-13 1978-10-31 Nippon Steel Corporation Method and apparatus for manufacturing metallic pipe
GB2057313A (en) 1979-09-06 1981-04-01 Fulton Ti Ltd Composite tube
FR2477962A1 (en) * 1980-03-11 1981-09-18 Sireix Georges METHOD OF FORMING PROFILES ESPECIALLY OF TUBULAR PROFILES
JPS5750211A (en) * 1980-09-11 1982-03-24 Kawasaki Heavy Ind Ltd Manufacture of composite pipe
JPS5815448A (en) 1981-07-17 1983-01-28 Hitachi Ltd Clutch motor
US4449281A (en) * 1982-03-16 1984-05-22 Kawasaki Jukogyo Kabushiki Kaisha Method of producing multiple-wall, composite tubular structures
SE447804B (en) 1983-04-20 1986-12-15 Kuroki Kogyosho Kk PROCEDURE FOR MANUFACTURING COMPOSITE STALLS
DE3331144A1 (en) * 1983-08-30 1985-03-14 Hoesch Ag, 4600 Dortmund METHOD FOR PRODUCING MULTI-LAYERED SCREW SEAM PIPES AND DEVICE FOR IMPLEMENTING THE METHOD
JPS60111791A (en) * 1983-11-21 1985-06-18 Kawasaki Steel Corp Production of multi-layered uoe pipe
JPH07115073B2 (en) 1984-03-15 1995-12-13 日下部電機株式会社 Continuous production equipment for steel pipes
CH655986A5 (en) 1984-03-16 1986-05-30 Pabreco Sa METHOD FOR MANUFACTURING A COMPOSITE TUBE.
JPS6142427A (en) 1984-08-07 1986-02-28 Kawasaki Steel Corp Equipment for forming electric welded pipe
JPS6142428A (en) 1984-08-07 1986-02-28 Ishikawajima Harima Heavy Ind Co Ltd Method and device for forming pipe
US5011064A (en) 1985-10-19 1991-04-30 Heinrich Fuss Method of manufacturing a double-walled tube
US4980961A (en) 1989-07-14 1991-01-01 Caterpillar Inc. Method of forming a double upset tube assembly
US5097585A (en) * 1989-07-31 1992-03-24 Construction Forms, Inc. Method of forming a composite tubular unit by expanding, low-frequency induction heating and successively quenching
JP2747610B2 (en) * 1989-08-17 1998-05-06 臼井国際産業株式会社 Manufacturing method of high pressure fluid supply pipe
DE3927989C2 (en) 1989-08-24 1994-04-07 Wacker Chemie Gmbh Process for the production of pipe sections each having a liner and a curved shape
JPH0790268B2 (en) * 1990-02-09 1995-10-04 新日本製鐵株式会社 Double tube manufacturing method
US5447179A (en) 1990-05-18 1995-09-05 Itt Corporation Non-corrosive double-walled steel tube characterized in that the steel has a face-centered cubic grain structure
JP2648791B2 (en) * 1992-10-26 1997-09-03 アイエヌジ商事株式会社 Wear resistant welded steel pipe
US5361618A (en) 1993-04-01 1994-11-08 Italimpianti Of America, Inc. Method and apparatus for adjusting bending rolls
JPH07214144A (en) * 1994-01-28 1995-08-15 Meiji Ishikawa Production of multiple pipe with different kinds of metals
JP2884321B2 (en) 1994-07-12 1999-04-19 住友金属工業株式会社 Manufacturing method of dissimilar pipe joint
IT1288990B1 (en) 1996-09-26 1998-09-25 Danieli Off Mecc COILS FORMING PIPE COATED FOR SPIRAL MACHINES AND RELATED RESTORATION PROCEDURE
US6028975A (en) * 1998-01-13 2000-02-22 Sun Microsystems, Inc. Low thermal skew fiber optic cable
DE19826290B4 (en) 1998-02-25 2005-09-01 Salzgitter Ag Process for producing partial double sheet or multiple sheet metal structures
JPH11290939A (en) 1998-04-08 1999-10-26 Daido Steel Co Ltd Manufacture of long double metallic tube
GB9818757D0 (en) 1998-08-27 1998-10-21 Forth Tool And Valve Limited Process for manufacturing pipes
DE10019384B4 (en) 2000-04-19 2005-11-17 Karl Hamacher Gmbh Method for producing a composite pipe and a composite pipe for transporting fluid media
US6238806B1 (en) 2000-05-09 2001-05-29 The Japan Steel Works, Ltd. Clad steel pipe
DE10022823A1 (en) 2000-05-10 2001-11-22 Unicor Extrusionstechnik Gmbh Multi-layer metal composite tube manufacture, involving lining formed metal tube with plastic and extruding plastic cover onto the tube exterior
JP2001353519A (en) * 2000-06-14 2001-12-25 Suncall Corp Dual structured clad tube and its manufacturing method
DE20016937U1 (en) 2000-09-30 2002-02-07 Butting H Gmbh & Co Kg Bimetallic tube
CN2493327Y (en) * 2001-04-23 2002-05-29 李铁顺 Welding stainless steel composite pipe
CN1189259C (en) * 2002-04-11 2005-02-16 中国石化集团洛阳石油化工工程公司 Manufacture of bimetallic composite pipe
AU2003902440A0 (en) 2003-05-20 2003-06-05 Cladtek International Pty Ltd Production of clad pipes
US20050006900A1 (en) 2003-07-09 2005-01-13 Lewis John K. System and method for coupling conduit
DE102004028020A1 (en) 2004-06-08 2005-12-29 ITT Manufacturing Enterprises, Inc., Wilmington Multi-walled pipe and process for its production
JP4546543B2 (en) 2004-12-21 2010-09-15 ベルクローア・ゲゼルシャフト・ミット・ベシュレンクテル・ハフツング・ジーゲン Multi-layer pipe manufacturing method
DE102005028444B4 (en) 2005-06-17 2008-04-03 EISENBAU KRäMER GMBH pipe
CN101675285B (en) 2007-05-04 2012-12-05 国际壳牌研究有限公司 Method for manufacturing elongated multi-layer Tubular body
CN101835547A (en) 2007-09-13 2010-09-15 国际壳牌研究有限公司 Mobile unit for the construction of elongated tubular bodies
DE102007045855A1 (en) 2007-09-26 2009-04-09 Eisenbau Krämer mbH Method of making pipe-in-pipe systems
US7934304B2 (en) * 2007-10-02 2011-05-03 Tenaris Coiled Tubes, Llc Method of manufacturing lined tubing
DE102008055780A1 (en) 2007-11-05 2009-05-07 Bergrohr Gmbh Siegen Bending machine for metal sheets
DE102008024011A1 (en) 2008-05-16 2009-12-17 Erndtebrücker Eisenwerk GmbH & Co. KG Longitudinal seam-welded multilayered tube for use in petrochemical industry, particularly for oil pipes, gas pipes and process pipes, has external layer and internal layer, where internal layer is firmly connected with external layer
DE102008024009A1 (en) 2008-05-16 2009-12-03 Erndtebrücker Eisenwerk GmbH & Co. KG Longitudinally welded multilayer pipe for use in oil industry, particularly petrochemical industry and for constructing large buildings, has fixed, pressure-resistant top layer and thin, corrosion resistant inner layer
GB2476457B (en) * 2009-12-22 2011-11-09 Technip France Method of manufacturing a mechanically lined pipe
DE102009060594A1 (en) 2009-12-23 2011-06-30 Eisenbau Krämer GmbH, 57223 pipe

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101281417B1 (en) * 2004-12-21 2013-07-02 버그로 게엠베하 씨겐 Method for producing multi-layer pipe
DE102013103811B3 (en) * 2013-04-16 2014-03-20 EISENBAU KRäMER GMBH Method for producing a multi-layered large pipe
WO2014170106A1 (en) 2013-04-16 2014-10-23 EISENBAU KRäMER GMBH Method for producing a multi-layer large pipe
US10183320B2 (en) 2013-04-16 2019-01-22 Eisenbau Kramer Gmbh Method for producing a multi-layer large pipe

Also Published As

Publication number Publication date
US20090288467A1 (en) 2009-11-26
MY140142A (en) 2009-11-30
EP1827727A1 (en) 2007-09-05
US20090293981A1 (en) 2009-12-03
CN101087665A (en) 2007-12-12
CA2592003C (en) 2014-05-06
US8117882B2 (en) 2012-02-21
KR20070101864A (en) 2007-10-17
KR20090043616A (en) 2009-05-06
JP2008523996A (en) 2008-07-10
EP1857194A1 (en) 2007-11-21
DK1857194T3 (en) 2011-11-21
AU2009201144B2 (en) 2012-02-23
BRPI0519169A2 (en) 2008-12-30
ES2308586T3 (en) 2008-12-01
AU2005318485B2 (en) 2011-07-28
JP2009220182A (en) 2009-10-01
AU2005318485A1 (en) 2006-06-29
AU2009201144A1 (en) 2009-04-09
SG155259A1 (en) 2009-09-30
CA2658859A1 (en) 2006-06-29
KR101281417B1 (en) 2013-07-02
EP1857194B1 (en) 2011-07-27
CA2592003A1 (en) 2006-06-29
EP1827727B9 (en) 2008-11-05
DE502005004156D1 (en) 2008-06-26
EP1857194B3 (en) 2013-09-04
WO2006066814A1 (en) 2006-06-29
CN101087665B (en) 2010-07-28
ATE395150T1 (en) 2008-05-15
CN101934303B (en) 2013-05-08
KR101281321B1 (en) 2013-07-03
DK1827727T3 (en) 2008-09-15
ATE517703T1 (en) 2011-08-15
JP4546543B2 (en) 2010-09-15
CN101934303A (en) 2011-01-05
JP5166366B2 (en) 2013-03-21

Similar Documents

Publication Publication Date Title
EP1827727B1 (en) Method for the production of a multi-layer pipe
EP0788849B1 (en) Method of manufacturing a pipe with sections of differing wall thickness and a pipe with sections of differing wall thicknesses
EP2986402B1 (en) Method for producing a multi-layer large pipe
EP1954420B1 (en) Method and device for the coreless forming of hollow profiles
EP2720813B1 (en) Method for producing slit hollow profiles
EP2285508B1 (en) Production-optimized method for producing a multilayered tube
EP2602032B1 (en) Method for producing a multilayer metal tube
DE7935982U1 (en) Rolling bearing cage
DE102005053347B4 (en) Method and plant for producing a multilayer composite pipe
EP2903757B1 (en) Method for the high-speed production of a multi-layered tube
WO2011110195A1 (en) Forming line and method for producing a multi-layer pipe
DE102007010117A1 (en) Structural component of sheet-metal material and apparatus and method for joining a structural component of sheet-metal material
DE102006031503B4 (en) Method and device for bending hollow sections with minimal bending radius
DE102021110492A1 (en) Device and method for manufacturing a double-walled tube
WO2011131432A1 (en) Production of an angular-contact roller-bearing cage
EP2205370B1 (en) Process and apparatus for producing a hollow body, and hollow body
DE102009007701B4 (en) Method for producing a closed profile from a flat strip of material by roll forming
DE102010050237A1 (en) Method for manufacturing seat rail profiles for vehicle seats, involves reshaping base plate in rolling profiling process, where metal strip is connected to base plate during rolling profiling process
DE102005049542B3 (en) Roll shaping process for producing rolled stock involves forming apertures at one position in strip at which it is cut on dividing lines
EP1631398A1 (en) Method for curving weblike profiles having two opposite flanges
DE102004038856A1 (en) Method for rolling metal parts

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20070621

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RTI1 Title (correction)

Free format text: METHOD FOR THE PRODUCTION OF A MULTI-LAYER PIPE

DAX Request for extension of the european patent (deleted)
GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REF Corresponds to:

Ref document number: 502005004156

Country of ref document: DE

Date of ref document: 20080626

Kind code of ref document: P

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

REG Reference to a national code

Ref country code: GR

Ref legal event code: EP

Ref document number: 20080402150

Country of ref document: GR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080514

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080514

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080514

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2308586

Country of ref document: ES

Kind code of ref document: T3

REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080514

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080514

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080514

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080514

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080514

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20081014

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20090217

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080814

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080514

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20081115

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080514

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20091231

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20091231

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20101220

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: TR

Payment date: 20121207

Year of fee payment: 8

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 395150

Country of ref document: AT

Kind code of ref document: T

Effective date: 20121216

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20121216

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IS

Payment date: 20131219

Year of fee payment: 9

Ref country code: DK

Payment date: 20131219

Year of fee payment: 9

Ref country code: SE

Payment date: 20131217

Year of fee payment: 9

Ref country code: GB

Payment date: 20131217

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20131216

Year of fee payment: 9

Ref country code: GR

Payment date: 20131231

Year of fee payment: 9

Ref country code: FI

Payment date: 20131216

Year of fee payment: 9

Ref country code: LU

Payment date: 20131230

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20131230

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20131231

Year of fee payment: 9

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141231

REG Reference to a national code

Ref country code: DK

Ref legal event code: EBP

Effective date: 20141231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141217

Ref country code: FI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141216

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141216

REG Reference to a national code

Ref country code: SE

Ref legal event code: EUG

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 502005004156

Country of ref document: DE

Representative=s name: KIANI & SPRINGORUM PATENT- U. RECHTSANWAELTE, DE

Ref country code: DE

Ref legal event code: R081

Ref document number: 502005004156

Country of ref document: DE

Owner name: FIRST TUBE INTELLECTUAL PROPERTY MANAGEMENT CO, LU

Free format text: FORMER OWNER: BERGROHR GMBH SIEGEN, 57076 SIEGEN, DE

Ref country code: DE

Ref legal event code: R082

Ref document number: 502005004156

Country of ref document: DE

Representative=s name: KIANI & SPRINGORUM PATENT- UND RECHTSANWAELTE, DE

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20141216

REG Reference to a national code

Ref country code: GR

Ref legal event code: ML

Ref document number: 20080402150

Country of ref document: GR

Effective date: 20150722

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20150831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141216

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141231

Ref country code: GR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150722

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150701

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20160126

REG Reference to a national code

Ref country code: NL

Ref legal event code: PD

Owner name: FIRST TUBE INTELLECTUAL PROPERTY MANAGEMENT COMPA

Free format text: DETAILS ASSIGNMENT: VERANDERING VAN EIGENAAR(S), OVERDRACHT; FORMER OWNER NAME: BERGROHR GMBH SIEGEN

Effective date: 20151006

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141231

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20151221

Year of fee payment: 11

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141217

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20170101

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141216

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170101

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20191125

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20191216

Year of fee payment: 15

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 502005004156

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201216

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210701