EP1774418A2 - Procede et dispositif pour verifier de maniere fonctionnelle un appareil de champ avant sa mise en marche - Google Patents

Procede et dispositif pour verifier de maniere fonctionnelle un appareil de champ avant sa mise en marche

Info

Publication number
EP1774418A2
EP1774418A2 EP05768124A EP05768124A EP1774418A2 EP 1774418 A2 EP1774418 A2 EP 1774418A2 EP 05768124 A EP05768124 A EP 05768124A EP 05768124 A EP05768124 A EP 05768124A EP 1774418 A2 EP1774418 A2 EP 1774418A2
Authority
EP
European Patent Office
Prior art keywords
field device
functional
functional testing
testing according
connection parameters
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP05768124A
Other languages
German (de)
English (en)
Inventor
Dieter Keese
Harry Plotzki
Frank Buhl
Karl-Heinz Rackebrandt
Andreas Thöne
Jörg Herwig
Rolf Merte
Peter Riegler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ABB Patent GmbH
Original Assignee
ABB Patent GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ABB Patent GmbH filed Critical ABB Patent GmbH
Publication of EP1774418A2 publication Critical patent/EP1774418A2/fr
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/23Pc programming
    • G05B2219/23165Display of parameter plus permissable, allowable range
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/24Pc safety
    • G05B2219/24054Self diagnostic
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/25Pc structure of the system
    • G05B2219/25428Field device

Definitions

  • the present invention relates to a method and a device for
  • the invention relates to a related software program product and a field device, comprising the said device for functional testing.
  • field devices which serve to detect or influence process variables.
  • field devices are level gauges, flow meters, pressure gauges, temperature meters and the like, which detect the corresponding process variables mass flow, level, pressure or temperature.
  • actuators which control, for example, as valves, the flow of a liquid in a pipe section.
  • the field devices are usually connected via a data bus with a control system that controls the entire process flow or allows direct access to the operation, parameterization or configuration to the individual field devices.
  • the direct access allows parameters to be changed on the field device or special diagnostic functions can be called up during operation.
  • a temporary access for example via a portable handheld device or the like is possible.
  • the control system the measured values of the various process variables are evaluated or monitored and the corresponding actuators are activated.
  • the data transmission between the field device and the control system takes place according to the well-known international standard for field buses, in particular Hart Foundation Fieldbus, Profibus, CAN. In addition to a cable connection, a radio connection between field device and control system is conceivable.
  • Another typical mistake is also called improper installation, that is - taking the example of the flow meter - that this is wrong - so not in the intended orientation - has been installed.
  • the effects of all these and similar errors range from unreliability of the measured value to irreparable damage to the field device itself.
  • connection parameters - such as
  • Pipe diameter or flow rate - to determine the appropriate field device (flowmeter) from the range of available field devices.
  • the person skilled in the art Before the initial startup of the field device, ie in the course of installation, the person skilled in the art also has the option of ascertaining the requirements of the field device on the basis of the manual of the field device and of carrying out a corresponding check. However, the actual performance of this verification and the detection of errors shall be left to the skilled person skilled in the art.
  • the object is achieved on the basis of a method according to the preamble of claim 1 in conjunction with its characterizing features.
  • the object is achieved by claim 11.
  • the object is achieved according to claim 19.
  • the Claim 20 is finally devoted to a software program product for solving the problem underlying the invention.
  • the invention includes the procedural doctrine that after installation and connection of the field device, an implementedmets phenomenonsalgorhythmus is executed regarding compliance with relevant connection parameters, a startup of the field device is only released when all the parameters to be checked by thejansutzsalgorhythmus connection parameters are within allowable ranges.
  • connection parameters can not be put into operation without checking typical errors caused by the relevant connection parameters after their installation. This avoids the costly subsequent shutdown of equipment to repair or replace the field devices integrated therein.
  • the function check for correctness of the connection parameters is not carried out before or during the assembly of the field device, but after its assembly, ie at a time at which the connection parameters are already applied to the field device.
  • connection parameter in the sense of the present invention can in the case of
  • Flow meter for example, the correct inlet and outlet side installation by checking whether there is a galvanic contact here. Furthermore, the connection parameter of a sufficiently long flow in a flowmeter can be detected by unacceptable turbulence and flow velocities are determined by means of appropriate sensors.
  • Connection parameters in the sense of the present invention are therefore all those values which characterize the correct dimensioning and the correct installation of the field device.
  • an electronic functional test unit placed in the field device for carrying out the functional test algorithm should transmit at the beginning of the functional test algorithm whether the field device is installed at all and correctly connected and ready for operation. This measure allows a higher level of reliability of the function check according to the invention, since this is the function check underlying starting condition is also determined in the context offorensics phenomenonsalgorhythmus.
  • the function check algorithm then checks the other relevant connection parameters.
  • connection parameters defined as permissible are already stored as set values in the context of the manufacturing process of the field device within a memory unit assigned to the electronic function test unit. It is not necessary in this case that the required connection parameters are stored changeable, since they are firmly connected to the field device io and can not change in this respect.
  • the electronic functional test unit likewise stores the result of the functional test algorithm in the memory unit of the field device.
  • the electronic function check unit informs the user via the faulty connection parameters, which led to the failure of the release of the field device, via corresponding display means.
  • the display means may be in the form of binary indicator lights.
  • an alphanumeric should be used to obtain rich information
  • the display means thus formed can also output additional help information for correcting the faulty connection parameters, in order to facilitate the user's interpretation of the results of the functional check algorithm and to provide concrete indications about a targeted correction of the errors.
  • the electronic functional testing unit be manually operated by the user operable input means is connected, the operation cause in the case of a negative result ofjans phenomenonsalgorhythmus a manual release of the field device to take them still in operation.
  • Such an input means can be designed, for example, in the form of a menu item that can be acknowledged on a graphical user interface.
  • the electronic functional testing unit can, for example, have menu-controlled dialog means for querying the prevailing connection parameters from the user in order to perform the function check algorithm user-dependent.
  • the electronic functional test unit can ascertain connection parameters prevailing via an integrated sensor system-which can be detected by sensor technology-in order to carry out the functional test algorithm in this case independently of the user.
  • FIG. 1 shows the basic structure of a fieldbus system with a plurality of field devices included in the device according to the invention
  • Figure 2 is a schematic representation of the basic structure of an electronic
  • FIG. 3 shows a flowchart for illustrating the method for functional testing.
  • a fieldbus system 2 is coupled to a system bus 1 of an automated system.
  • the coupling of the fieldbus system 2 am Higher-level system bus 1 via an input / output unit 3.
  • the field bus system 2 comprises in addition to the input / output unit 3 a field bus 4, via which the egg ⁇ / output unit 3 communicates with a plurality of field devices coupled to the field 4 a to 5 c.
  • each field device 5 connected to the field bus 4 comprises, in addition to the electronic functional units known per se, an electronic functional testing unit 6 for functional testing of the field device 5 prior to its initial startup.
  • the electronic functional test unit 6 carries out a functional test algorithm with regard to compliance with relevant connection parameters.
  • the field device 5 is a flow meter whosejansinevitablysalgorhythmus the connection parameters "flow path", "flow rate range", "installation position” and the like checks. In this case, 5 determines the electronic functional test unit 6 at the beginning of the
  • the electronic function test unit 6 only enables a startup of the field device 5 o if all the connection parameters to be checked by the function test algorithm lie within permissible ranges.
  • the areas of the connection parameters defined as permissible are stored within the field device 5 in a memory unit 7 assigned to the electronic functional testing unit 6.
  • the memory unit 7 also serves to store the result of the function check algorithm performed by the electronic function test unit 6 in a retrievable manner herein. In that regard, the memory unit 7 communicates bidirectionally with the electronic functional testing unit 6.
  • the field device 5 is equipped with display means 8 in the form of an LCD display, about which the electronic function test unit 6 in the case of a negative result ofgnacs phenomenonsalgorhythmus informed the user about the relevant faulty connection parameters, which may Failure of the release of the field device 5 have led.
  • the display means 8 also inform about measures to correct the error.
  • the field device 5 is equipped with input means 9 in the form of a keyboard.
  • the prevailing connection parameters are interrogated by the user, including the display means 8, which serve as the input data for the functional check algorithm of the function test unit 6.
  • the display means 8 include menu-driven dialogue means 10, which are designed in the manner of a graphical user interface and are displayed on the LCD display.
  • this user-dependent acquisition of input data for thejansutzsalgorhythmus connection parameters can also be determined via a sensor 11 here to perform a part of criminalsprüfunsgalgorhythmus user-independent. For example, the flow velocity of the medium flowing through the flow meter is detected by the sensor 11.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Small-Scale Networks (AREA)
  • Bus Control (AREA)

Abstract

L'invention concerne un procédé pour la vérification d'un dispositif de champ dans un système de bus de champ, avant sa première mise en marche, après l'installation et la liaison du dispositif de champ, un algorithme de vérification fonctionnelle est effectué par rapport à des paramètres de connexion concernant le croisement, la mise en service du dispositif à champ étant réalisée lorsque tous les paramètres de connexion, vérifiés par l'algorithme de vérification fonctionnelle, sont compris dans les différentes gammes.
EP05768124A 2004-07-30 2005-07-22 Procede et dispositif pour verifier de maniere fonctionnelle un appareil de champ avant sa mise en marche Withdrawn EP1774418A2 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102004037064A DE102004037064A1 (de) 2004-07-30 2004-07-30 Verfahren und Einrichtung zur Funktionsprüfung eines Feldgerätes vor dessen Erstinbetriebnahme
PCT/EP2005/007997 WO2006013021A2 (fr) 2004-07-30 2005-07-22 Procede et dispositif pour verifier de maniere fonctionnelle un appareil de champ avant sa mise en marche

Publications (1)

Publication Number Publication Date
EP1774418A2 true EP1774418A2 (fr) 2007-04-18

Family

ID=35559463

Family Applications (1)

Application Number Title Priority Date Filing Date
EP05768124A Withdrawn EP1774418A2 (fr) 2004-07-30 2005-07-22 Procede et dispositif pour verifier de maniere fonctionnelle un appareil de champ avant sa mise en marche

Country Status (4)

Country Link
US (1) US20080312877A1 (fr)
EP (1) EP1774418A2 (fr)
DE (1) DE102004037064A1 (fr)
WO (1) WO2006013021A2 (fr)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008039696A1 (de) 2008-08-26 2010-03-04 Endress + Hauser Wetzer Gmbh + Co. Kg Verfahren zum Betreiben eines Systems von Feldgeräten
SE533454C2 (sv) * 2008-12-18 2010-10-05 Portendo Ab Detektion av små mängder av ämnen
DE102010029954A1 (de) * 2010-06-10 2011-12-15 Endress + Hauser Conducta Gesellschaft für Mess- und Regeltechnik mbH + Co. KG Verfahren zur sicheren Durchführung einer Kalibrierung und/oder einer Justierung einer Messgröße eines Messgerätes in der Automatisierungstechnik, insbesondere der Prozessanalysetechnik
DE102010062908B4 (de) 2010-12-13 2012-10-31 Siemens Aktiengesellschaft Verfahren zum Parametrisieren eines Gerätes, parametrisierbares Gerät und Parametrisierungsvorrlchtung
CN103748524A (zh) * 2011-03-31 2014-04-23 Abb技术有限公司 工程设计并诊断现场装置的方法及其系统
EP2711797A1 (fr) * 2012-09-21 2014-03-26 ABB Research Ltd. Fonctionnement d'un contrôleur logique programmable
US10203706B2 (en) * 2013-06-03 2019-02-12 Tescom Corporation Method and apparatus for conditional control of an electronic pressure regulator
US20150142498A1 (en) * 2013-11-18 2015-05-21 Latista Technologies, Inc. Commissioning system and workflow management
DE102014111758A1 (de) * 2014-08-18 2016-02-18 Endress + Hauser Gmbh + Co. Kg Verfahren zum Überprüfen eines Feldgerätes
US9830216B2 (en) * 2014-12-10 2017-11-28 Yokogawa Electric Corporation Device management system and method for commissioning field devices with error resolution
JP6477178B2 (ja) * 2015-04-06 2019-03-06 オムロン株式会社 Plc制御データ生成装置、plc制御データ生成方法、及び、plc制御データ生成プログラム
DE102017205832A1 (de) * 2017-04-05 2018-10-11 Siemens Aktiengesellschaft Verfahren zum Parametrieren eines Feldgeräts sowie parametrierbares Feldgerät
US11334050B2 (en) 2018-12-19 2022-05-17 Francotyp-Postalia Gmbh Authentication system and authentication method for executing a work process on an object

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5980078A (en) * 1997-02-14 1999-11-09 Fisher-Rosemount Systems, Inc. Process control system including automatic sensing and automatic configuration of devices
US7562135B2 (en) * 2000-05-23 2009-07-14 Fisher-Rosemount Systems, Inc. Enhanced fieldbus device alerts in a process control system
EP1108984B1 (fr) * 1999-10-18 2019-08-14 Endress + Hauser Flowtec AG Appareil mobile programmable
EP1211582B1 (fr) * 2000-11-30 2003-05-21 Siemens Building Technologies AG Dispositif de surveillance, de commande et de régulation d'une installation technique de système d'automation de bâtiments
WO2002061512A2 (fr) * 2001-01-30 2002-08-08 Endress + Hauser Process Solutions Ag Procede d'entretien et de gestion d'une installation de fabrication
DE10136732A1 (de) * 2001-07-25 2003-02-13 Endress & Hauser Gmbh & Co Kg Verfahren zum Datenaustausch zwischen einem Bedien-und Beobachtungsprogramm und einem Feldgerät
DE10141331B4 (de) * 2001-08-28 2004-11-18 Zentrum Mikroelektronik Dresden Ag Verfahren zur Offsetkalibrierung eines Sensorsignals und Sensoranordnung zur Durchführung des Verfahrens
EP1293853A1 (fr) * 2001-09-12 2003-03-19 ENDRESS + HAUSER WETZER GmbH + Co. KG Module transmetteur pour un dispositif sur site
DE10157323A1 (de) * 2001-11-23 2003-06-18 Endress & Hauser Process Solut Verfahren zum Bedienen eines Feldgerätes
US7460865B2 (en) * 2003-06-18 2008-12-02 Fisher-Rosemount Systems, Inc. Self-configuring communication networks for use with process control systems
DE10344088B4 (de) * 2003-09-23 2012-08-02 Samson Aktiengesellschaft Funktionsprüfvorrichtung für ein Feldgerät und Verfahren zur Funktionsprüfung eines Feldgeräts und Feldgerät
JP2007536634A (ja) * 2004-05-04 2007-12-13 フィッシャー−ローズマウント・システムズ・インコーポレーテッド プロセス制御システムのためのサービス指向型アーキテクチャ

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2006013021A2 *

Also Published As

Publication number Publication date
WO2006013021A2 (fr) 2006-02-09
US20080312877A1 (en) 2008-12-18
DE102004037064A1 (de) 2006-02-16
WO2006013021A3 (fr) 2006-04-20

Similar Documents

Publication Publication Date Title
EP1774418A2 (fr) Procede et dispositif pour verifier de maniere fonctionnelle un appareil de champ avant sa mise en marche
DE60121530T2 (de) Wartungseinrichtung und -methode einer Klimaanlage
EP3279756B1 (fr) Dispositif de diagnostic et procédé de surveillance du fonctionnement d'une installation technique
DE69922520T2 (de) Verfahren und vorrichtung zur betriebsueberwachung eines industriellen prozesses
EP2047117B1 (fr) Procédé de localisation de défaut et de diagnostic d'une installation fluidique
WO2009033904A2 (fr) Procédé de surveillance d'une installation de processus au moyen d'un bus de champ d'automatisation des processus
EP3232282B1 (fr) Dispositif de diagnostic et procede de surveillance du fonctionnement d'une installation technique
EP3591482B1 (fr) Surveillance d'une installation technique
DE102006022852A1 (de) Störungsüberwachungssystem und Störungsüberwachungsverfahren
EP2183670A1 (fr) Procédé d'amélioration d'une fonction diagnostic d'un appareil de terrain
EP2020560A1 (fr) Capteur de débit électronique
DE102016123338A1 (de) Verfahren zur vorausschauenden Wartung von Feldgeräten der Automatisierungstechnik
EP1481479B1 (fr) Procede et dispositif permettant de reduire une quantite de donnees de traitement a transmettre
WO2009068228A1 (fr) Système et procédé d'acquisition d'informations combiné pour applications de scada et de simulation ou d'estimation de réseaux
EP2622417B1 (fr) Procédé de récupération destiné à un appareil comportant une sortie de courant analogique pour l'émission d'une valeur de mesure ou d'une valeur de réglage
EP2971769B1 (fr) Entrée de schéma r&i pour un procédé de contrôle et/ou de surveillance d'un système de compresseurs
EP1598717B1 (fr) Procédé de surveillance d'une pluralité des installations de gaz
EP3881143B1 (fr) Procédé permettant d'améliorer la performance de mesure d'un appareil de terrain à configurer dans le domaine technique de l'automatisation
WO2013104419A1 (fr) Aide à la prévention d'incidents dans une installation industrielle au moyen d'un modèle de défaillance
DE102015111316B4 (de) Hydraulikaggregat zur Schraubprozesssteuerung
DE102020204817B4 (de) Verfahren zur automatisierten Demontage und Montage eines Fahrzeugrads an einem Radflansch und Vorrichtung hierfür
DE102007005683B3 (de) Verfahren und Vorrichtung zum Abspeichern eines Fehlercodes
EP3084359B1 (fr) Procédé et ensemble de mesure de pression différentielle avec compensation à zéro
EP1958101B1 (fr) Systeme et procede de verification automatique de resultats de conception
DE10115897C2 (de) Verfahren und Vorrichtung zur Bereitstellung von Informationen für die Analyse von Fehlern bei einer technischen Anlage

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20070228

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): CH DE GB LI NL

R17P Request for examination filed (corrected)

Effective date: 20070228

RIN1 Information on inventor provided before grant (corrected)

Inventor name: RACKEBRANDT, KARL-HEINZ

Inventor name: THOENE, ANDREAS

Inventor name: RIEGLER, PETER

Inventor name: KEESE, DIETER

Inventor name: MERTE, ROLF

Inventor name: HERWIG, JOERG

Inventor name: PLOTZKI, HARRY

Inventor name: BUHL, FRANK

DAX Request for extension of the european patent (deleted)
RBV Designated contracting states (corrected)

Designated state(s): CH DE GB LI NL

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20080201