EP1681396A2 - Bridge the upper slab of which comprises ears - Google Patents

Bridge the upper slab of which comprises ears Download PDF

Info

Publication number
EP1681396A2
EP1681396A2 EP06290069A EP06290069A EP1681396A2 EP 1681396 A2 EP1681396 A2 EP 1681396A2 EP 06290069 A EP06290069 A EP 06290069A EP 06290069 A EP06290069 A EP 06290069A EP 1681396 A2 EP1681396 A2 EP 1681396A2
Authority
EP
European Patent Office
Prior art keywords
lugs
bridge
upper slab
bridge according
lateral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP06290069A
Other languages
German (de)
French (fr)
Other versions
EP1681396B1 (en
EP1681396A3 (en
Inventor
Jean-Marie Beauthier
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Soletanche Freyssinet SA
Original Assignee
Freyssinet SAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Freyssinet SAS filed Critical Freyssinet SAS
Publication of EP1681396A2 publication Critical patent/EP1681396A2/en
Publication of EP1681396A3 publication Critical patent/EP1681396A3/en
Application granted granted Critical
Publication of EP1681396B1 publication Critical patent/EP1681396B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Road Paving Structures (AREA)
  • Control And Other Processes For Unpacking Of Materials (AREA)
  • Finger-Pressure Massage (AREA)
  • Respiratory Apparatuses And Protective Means (AREA)

Abstract

The bridge has a bottom slab (4) supporting two side walls (5) connected by an upper paving slab (6). The paving slab includes two side sections (7) whose free ends are connected to the bottom slab by an inclined wall. Each side section extends beyond its junction with inclined wall and has two ears (12, 12`) that are articulated between a vertical position and a permanent position in the extension of the side sections.

Description

La présente invention concerne un pont destiné à ménager un passage sous une voie de circulation ferroviaire, routière ou autoroutière disposée en position surélevée sur un talus, et plus particulièrement un pont qui est construit d'un côté du talus, avant la réalisation d'une brèche dans celui-ci, et qui est conçu pour être déplacé par ripage jusqu'à sa mise en place dans la brèche, avant la remise en service de la voie de circulation qui n'est ainsi interrompue que pendant un laps de temps relativement court.The present invention relates to a bridge intended to provide a passage under a rail, road or motorway traffic lane arranged in an elevated position on an embankment, and more particularly a bridge which is built on one side of the embankment, before the realization of a a breach in the latter, which is designed to be moved by shifting until it is put in place in the breach, before the return to service of the lane which is thus interrupted only for a relatively short period of time .

Un tel pont, qui est connu d'après le brevet français No. 96 06819 du même déposant, comprend un radier supportant deux parois latérales verticales reliées par une dalle supérieure, celle-ci comportant deux tronçons latéraux qui la prolongent au-delà des parois latérales. L'extrémité libre de chaque tronçon latéral est reliée au radier de support par une paroi de liaison inclinée qui retient les terres du talus.Such a bridge, which is known from French Patent No. 96 06819 of the same applicant, comprises a raft supporting two vertical side walls connected by an upper slab, the latter comprising two lateral sections which extend beyond the walls side. The free end of each lateral section is connected to the supporting base by an inclined connecting wall which retains the lands of the slope.

Dans ce pont connu, la hauteur des parois latérales et la longueur des tronçons latéraux ont sensiblement la même valeur, de sorte que les parois de liaison inclinées, qui retiennent le talus sur la largeur du pont, font un angle de l'ordre de 45° avec un plan horizontal.In this known bridge, the height of the side walls and the length of the lateral sections have substantially the same value, so that the inclined connecting walls, which retain the slope over the width of the bridge, make an angle of the order of 45 ° with a horizontal plane.

Toutefois, comme une inclinaison de 45° du talus sur les côtés des parois de liaison inclinées risque d'entraîner un éboulement des terres, il convient, pour des raisons de stabilité, que le talus définitif fasse avec un plan horizontal un angle ne dépassant pas environ 33°.However, since an inclination of 45 ° of the slope on the sides of the inclined connecting walls may result in landslide, it is appropriate, for reasons of stability, that the final slope makes with a horizontal plane an angle not exceeding about 33 °.

A cet effet, il a été proposé de réaliser aux quatre coins du pont des premiers murets portés par les parois de liaison inclinées et se raccordant à la paroi verticale correspondante selon un angle par rapport à l'horizontale proche de 33°, et des seconds murets prolongeant les parois verticales du pont. On peut alors recharger, selon l'angle d'inclinaison désiré de 33°, les parties en forme de quart de cône constituant les arrondis du talus, la terre se trouvant ainsi maintenue par l'angle formé par deux murets adjacents.For this purpose, it has been proposed to make at the four corners of the bridge first walls carried by the inclined connecting walls and connected to the corresponding vertical wall at an angle relative to the horizontal close to 33 °, and second walls extending the vertical walls of the bridge. Depending on the desired angle of inclination of 33 °, the quarter-cone-shaped parts of the bank of the slope can be reloaded, the earth thus being held by the angle formed by two adjacent walls.

La solution ainsi proposée, si elle a prouvé son efficacité, présente cependant l'inconvénient de nécessiter des travaux supplémentaires de maçonnerie pour la réalisation des murets ainsi que des travaux de terrassement.The solution thus proposed, if it has proved its effectiveness, however, has the disadvantage of requiring additional work masonry for the realization of low walls and earthworks.

Pour remédier à cet inconvénient, la présente invention propose de prolonger chaque tronçon latéral de la dalle supérieure du pont, au-delà de sa jonction avec la paroi de liaison inclinée, de manière que le rapport de la longueur du tronçon latéral ainsi prolongé sur la hauteur de la paroi verticale soit de l'ordre de 3 sur 2. Dans ce cas, le talus, qui démarre à l'extrémité ainsi prolongée du tronçon latéral, présente en effet l'inclinaison désirée d'environ 33° permettant la tenue des terres.To remedy this drawback, the present invention proposes to extend each lateral section of the upper slab of the bridge, beyond its junction with the inclined connecting wall, so that the ratio of the length of the lateral section thus extended over the height of the vertical wall is of the order of 3 out of 2. In this case, the slope, which starts at the extended end of the lateral section, indeed has the desired inclination of about 33 ° for holding the land.

De préférence, les tronçons latéraux de la dalle supérieure comportent chacun deux oreilles parallèles s'étendant dans leur prolongement.Preferably, the lateral sections of the upper slab each comprise two parallel ears extending in their extension.

Avantageusement, les oreilles des deux tronçons latéraux de la dalle supérieure sont respectivement alignées les unes avec les autres.Advantageously, the ears of the two lateral sections of the upper slab are respectively aligned with each other.

Cette structure à oreilles permet ainsi d'augmenter la distance entre l'extrémité des tronçons latéraux ainsi prolongés et les parois verticales du pont, de façon à faire arriver le pied du talus, incliné à 33°, à l'intersection de chaque paroi verticale et du radier de support. Les premiers murets portés par les parois de liaison inclinées du pont connu peuvent donc être supprimés.This wing structure thus makes it possible to increase the distance between the end of the lateral sections thus extended and the vertical walls of the bridge, so as to arrive at the foot of the slope, inclined at 33 °, at the intersection of each vertical wall. and the support raft. The first walls carried by the inclined connecting walls of the known bridge can be deleted.

La structure à oreilles proposée ci-dessus nécessite toutefois la réalisation de terrassements dans les bords supérieurs ouverts du talus, pour le passage des oreilles lors du ripage du pont, puis l'exécution d'un remblaiement soigneux une fois l'ouvrage en place pour éviter les tassements ultérieurs.The above proposed wing structure requires, however, earthworks in the open upper edges of the slope, for the passage of the ears during the shifting of the bridge, then the execution of a thorough backfilling once the structure in place for avoid subsequent settlements.

Pour éviter ces terrassements et ce remblaiement, il est souhaitable que l'une des oreilles de chaque tronçon latéral soit apte à pivoter entre une position d'attente dans laquelle elle est relevée et une position définitive dans laquelle elle est dans le prolongement du tronçon latéral correspondant, les oreilles pivotantes étant situées dans le prolongement du côté longitudinal de la dalle supérieure qui est situé vers l'avant en considérant le sens de ripage.To avoid these earthworks and this embankment, it is desirable for one of the ears of each lateral section to be able to pivot between a waiting position in which it is raised and a final position in which it is in the extension of the lateral section. corresponding, the pivoting lugs being located in the extension of the longitudinal side of the upper slab which is located forward considering the direction of shifting.

De préférence, les oreilles pivotantes sont articulées sur les tronçons latéraux de la dalle supérieure, au niveau d'une charnière parallèle aux parois latérales du pont, des moyens de commande tels que des vérins hydrauliques ou pneumatiques, des moufles ou des treuils étant interposés entre les oreilles pivotantes et les tronçons latéraux correspondants pour déplacer lesdites oreilles pivotantes entre leur position d'attente et leur position définitive.Preferably, the pivoting lugs are articulated on the lateral sections of the upper slab, at a hinge parallel to the side walls of the bridge, control means such as hydraulic or pneumatic cylinders, mittens or winches being interposed between the pivoting lugs and the corresponding lateral sections for moving said pivoting lugs between their waiting position and their final position.

Ainsi, après la réalisation du pont, les deux oreilles articulées, c'est-à-dire celles disposées vers l'avant dans le sens du ripage, seront relevées pendant le déplacement du pont, rabattues en fin de déplacement dans des logements appropriés ménagés dans les bords supérieurs avant du talus, et fixées dans cette position aux tronçons latéraux de la dalle supérieure.Thus, after completion of the bridge, the two hinged ears, that is to say those arranged forward in the direction of shifting, will be raised during the movement of the bridge, folded at the end of travel in appropriate housing arranged in the upper edges of the upper slope, and fixed in this position to the lateral sections of the upper slab.

Les oreilles arrière fixes viennent quant à elles s'engager en fin de déplacement du pont dans d'autres logements ménagés dans les bords arrière du talus.The fixed rear lugs come to engage at the end of displacement of the bridge in other accommodations in the rear edges of the slope.

De préférence, les oreilles pivotantes renferment des tiges métalliques reliées à des manchons noyés dans les tronçons latéraux correspondants de la dalle supérieure.Preferably, the pivoting lugs contain metal rods connected to sleeves embedded in the corresponding lateral sections of the upper slab.

Grâce à ces tiges, les oreilles pivotantes peuvent être reliées rigidement aux tronçons latéraux, ce qui permet de les solidariser au pont.Thanks to these rods, the pivoting lugs can be rigidly connected to the lateral sections, which allows them to be secured to the bridge.

Avantageusement, les tiges des oreilles pivotantes sont vissées dans les manchons des tronçons latéraux et logées dans des canaux ménagés dans lesdites oreilles et remplis de matières anti-corrosion avec vissage.Advantageously, the rods of the pivoting lugs are screwed into the sleeves of the lateral sections and housed in channels formed in said lugs and filled with anti-corrosion materials with screwing.

La mise en place de ces tiges peut être réalisée rapidement puisqu'il suffit de les enfiler dans les canaux, de préférence lorsque les oreilles pivotantes sont dans leur position d'attente, et de les visser dans les manchons lorsque lesdites oreilles pivotantes sont dans leur position définitive.The establishment of these rods can be done quickly since it is sufficient to put them in the channels, preferably when the pivoting ears are in their waiting position, and screw them into the sleeves when said pivoting ears are in their position. final position.

Selon une caractéristique importante de l'invention, les oreilles pivotantes comportent au moins deux tiges métalliques parallèles et adjacentes à leur face longitudinale intérieure.According to an important characteristic of the invention, the pivoting lugs comprise at least two parallel metal rods and adjacent to their inner longitudinal face.

Ainsi, les oreilles pivotantes peuvent parfaitement résister aux efforts auxquels la matière de remblaiement les soumet lors du passage de véhicules se déplaçant sur la voie de circulation.Thus, the pivoting lugs can withstand the forces to which the backfill material submits them during the passage of vehicles moving on the taxiway.

Selon l'invention, les oreilles pivotantes peuvent en outre comporter au moins une tige métallique parallèle et adjacente à la partie supérieure de leur face longitudinale extérieure.According to the invention, the pivoting lugs may further comprise at least one metal rod parallel to and adjacent to the upper part of their outer longitudinal face.

Ces autres tiges métalliques permettent d'augmenter encore la résistance des oreilles pivotantes aux efforts exercés sur elles par la matière de remblaiement lors du passage des véhicules.These other metal rods can further increase the resistance of the pivoting lugs to the forces exerted on them by the backfill material during the passage of vehicles.

Avantageusement, le radier du pont peut comporter deux prolongements latéraux qui s'étendent au-delà des parois latérales, les parois de liaison inclinées reliant les extrémités libres des tronçons latéraux de la dalle supérieure aux extrémités libres des prolongements latéraux correspondants du radier.Advantageously, the deck of the deck may comprise two lateral extensions which extend beyond the side walls, the inclined connecting walls connecting the free ends of the lateral sections of the upper slab at the free ends of the corresponding lateral extensions of the slab.

Cette disposition, qui augmente la distance entre la base de chaque paroi de liaison inclinée et la paroi verticale correspondante, permet de faire encore arriver le pied du talus incliné à 33° à l'intersection de la paroi verticale et du radier de support tout en autorisant une diminution de la longueur des oreilles.This arrangement, which increases the distance between the base of each inclined connecting wall and the corresponding vertical wall, makes it possible to still arrive at the foot of the inclined slope at 33 ° at the intersection of the vertical wall and the support raft while allowing a decrease in the length of the ears.

Un mode d'exécution de la présente invention sera décrit ci-après à titre d'exemple nullement limitatif en référence aux dessins schématiques annexés dans lesquels :

  • la figure 1 est une vue en coupe selon la ligne I-I de la figure 3, montrant un pont à oreilles, après ripage dans une brèche ménagée dans un talus portant deux voies ferrées ;
  • la figure 2 est une vue à échelle agrandie d'un détail de la figure 1, montrant plus particulièrement le mode de coopération du radier de support du pont à oreilles avec son radier de guidage ;
  • la figure 3 est une vue de dessus du pont à oreilles selon l'invention, après ripage dans la brèche du talus ;
  • la figure 4 est une vue en coupe selon la ligne IV-IV de la figure 3 ;
  • la figure 5 est une vue à échelle agrandie d'un détail de la figure 3, montrant une oreille pivotante du pont selon l'invention ;
  • la figure 6 est une vue en coupe selon la ligne VI-VI de la figure 5 ; et
  • la figure 7 est une vue en coupe selon la ligne VII-VII de la figure 5.
An embodiment of the present invention will be described hereinafter by way of non-limiting example with reference to the accompanying schematic drawings in which:
  • Figure 1 is a sectional view along the line II of Figure 3, showing an ear bridge, after shoving into a gap in a slope carrying two railroad tracks;
  • FIG. 2 is a view on an enlarged scale of a detail of FIG. 1, showing more particularly the mode of cooperation of the support raft of the wing bridge with its guide raft;
  • Figure 3 is a top view of the wing bridge according to the invention, after shifting into the breach of the slope;
  • Figure 4 is a sectional view along the line IV-IV of Figure 3;
  • Figure 5 is an enlarged view of a detail of Figure 3, showing a pivoting ear of the bridge according to the invention;
  • Figure 6 is a sectional view along the line VI-VI of Figure 5; and
  • Figure 7 is a sectional view along the line VII-VII of Figure 5.

En référence aux figures 1 à 4, on a représenté un pont 1 destiné à permettre le franchissement, par le dessous, de deux voies de chemin de fer 2 situées sur un talus 3. Le pont 1 est construit d'une manière connue en soi sur un côté du talus, en regard du lieu de franchissement voulu de la voie ferrée, afin que celle-ci reste opérationnelle pendant la construction. Une fois la construction du pont 1 terminée, les voies ferrées 2 et le talus 3 sont respectivement interrompues et ouvert, après quoi le pont 1 est ripé dans la brèche ainsi ouverte tandis que les voies ferrées 2 sont rétablies sur le pont qui ménage un passage de circulation sous celles-ci.Referring to Figures 1 to 4, there is shown a bridge 1 for allowing the crossing, from below, two railway tracks 2 located on a slope 3. The bridge 1 is constructed in a manner known per se on one side of the slope, opposite the desired crossing point of the railway, so that it remains operational during construction. Once the construction of the bridge 1 has been completed, the railway tracks 2 and the embankment 3 are respectively interrupted and opened, whereupon the bridge 1 is slid into the breach thus opened while the railway tracks 2 are re-established on the bridge which provides a passage under these.

Le pont 1 est constitué par un cadre comprenant à sa partie inférieure un radier 4 supportant deux parois latérales verticales 5 qui sont reliées à leur extrémité supérieure par une dalle horizontale 6. La dalle 6 est prolongée de chaque côté, au-delà de la paroi verticale 5 correspondante, par un tronçon latéral 7 dont l'extrémité libre est reliée, par une paroi inclinée 8, à l'extrémité libre de prolongements latéraux 9 du radier de support 4. La paroi de liaison inclinée 8 fait avec le tronçon latéral 7 un angle de l'ordre de 45°.The bridge 1 is constituted by a frame comprising at its lower part a raft 4 supporting two vertical side walls 5 which are connected at their upper end by a horizontal slab 6. The slab 6 is extended on each side, beyond the wall corresponding vertical section 5, by a lateral section 7 whose free end is connected, by an inclined wall 8, to the free end of lateral extensions 9 of the support raft 4. The inclined connecting wall 8 is made with the lateral section 7 an angle of the order of 45 °.

Le radier de support 4 repose sur un radier fixe 10 qui assure son guidage lors de l'opération de ripage. Comme on le voit plus particulièrement sur la figure 2, des cornières métalliques complémentaires 11 et 11' sont respectivement incorporées aux radiers de support 4 et de guidage 10 avec interposition d'un matériau facilitant le glissement et absorbant les défauts de parallélisme.The support raft 4 rests on a fixed base 10 which ensures its guidance during the shifting operation. As can be seen more particularly in FIG. 2, complementary metal angles 11 and 11 'are respectively incorporated in the supporting and guide rafters 4 with the interposition of a material that facilitates sliding and absorbs parallelism defects.

Chaque tronçon latéral 7 se prolonge par deux oreilles 12, 12' disposées symétriquement par rapport à l'axe longitudinal médian du pont 1, chaque oreille 12, 12' de l'un des tronçons latéraux 7 étant alignée avec l'oreille 12, 12' correspondante de l'autre tronçon latéral 7.Each lateral section 7 is extended by two lugs 12, 12 'arranged symmetrically with respect to the median longitudinal axis of the bridge 1, each lug 12, 12' of one of the lateral sections 7 being aligned with the lug 12, 12 corresponding to the other lateral section 7.

Les oreilles 12 disposées en amont, c'est-à-dire celles placées vers l'avant en regardant la flèche F des figures 3 et 4 indiquant le sens de ripage du pont 1, sont articulées chacune à sa partie supérieure, par une charnière 13 disposée parallèlement aux parois verticales 5 (voir les figures 5 et 6), au tronçon latéral 7 correspondant. Un vérin hydraulique 14, dont le cylindre est articulé sur une chape 15 solidaire du tronçon latéral 7 et dont la tige 16 est reliée à une chape 17 solidaire de l'oreille 12, commande le pivotement de cette dernière entre une position verticale d'attente (représentée en trait mixte sur la figure 6) et une position définitive (représentée en trait plein sur la même figure) dans le prolongement du tronçon latéral 7.The ears 12 arranged upstream, that is to say those placed forward looking at the arrow F of Figures 3 and 4 indicating the direction of shifting of the bridge 1, are each articulated at its upper part, by a hinge 13 disposed parallel to the vertical walls 5 (see Figures 5 and 6), the corresponding lateral section 7. A hydraulic cylinder 14, whose cylinder is articulated on a yoke 15 secured to the lateral section 7 and whose rod 16 is connected to a yoke 17 secured to the lug 12, controls the pivoting of the latter between a vertical position waiting (shown in phantom in Figure 6) and a final position (shown in solid lines in the same figure) in the extension of the lateral section 7.

Bien entendu, les vérins 14 pourraient être remplacés par des moufles ou des treuils.Of course, the cylinders 14 could be replaced by mittens or winches.

Comme on l'a représenté sur les figures 5 à 7, chaque oreille pivotante 12 est renforcée intérieurement par des tiges métalliques longitudinales 18, ces tiges étant logées dans des canaux 19 ménagés dans l'épaisseur des oreilles pivotantes. Chaque tige 18 est fixée à son extrémité antérieure dans un manchon 22 noyé dans le tronçon latéral 7 correspondant.As shown in Figures 5-7, each pivoting lug 12 is internally reinforced by longitudinal metal rods 18, these rods being housed in channels 19 formed in the thickness of the pivoting lugs. Each rod 18 is fixed at its front end in a sleeve 22 embedded in the corresponding lateral section 7.

Dans l'exemple représenté, chaque oreille pivotante 12 comporte trois tiges 18, à savoir deux tiges parallèles qui sont adjacentes à sa face latérale intérieure, qui est située du côté où les efforts exercés par les terres et le poids des trains circulant sur les voies ferrées 2 sont les plus grands, et une tige parallèle et adjacente à la partie supérieure de sa face latérale extérieure. Une fois les tiges 18 en position définitive dans leurs canaux 19 respectifs, on introduit avantageusement dans ces canaux un produit anti-corrosion. Enfin, on dépose les vérins 14.In the example shown, each pivoting lug 12 has three rods 18, namely two parallel rods which are adjacent to its inner side face, which is situated on the side where the forces exerted by the earth and the weight of the trains running on the tracks. 2 are the largest, and a rod parallel and adjacent to the upper part of its outer side face. Once the rods 18 in final position in their respective channels 19 is advantageously introduced into these channels an anti-corrosion product. Finally, the cylinders 14 are removed.

Ainsi qu'on l'a indiqué, et comme on le voit en particulier sur la figure 1, la paroi de liaison 8, qui retient le talus 3 sur la largeur du pont 1, fait un angle d'environ 45° avec le tronçon latéral 7 de la dalle supérieure 6. Toutefois, de chaque côté de la paroi de liaison 8, le talus 3 fait avec un plan horizontal un angle de l'ordre de 33° en venant mourir à l'intersection de la paroi verticale 5 et du radier 4 et en empêchant ainsi l'éboulement des terres. Cette disposition est rendue possible du fait que le départ de la partie supérieure du talus 3 se trouve reculé par rapport à la paroi verticale 5, ce recul étant obtenu d'une part par la présence des oreilles 12, 12' et, d'autre part, par celle des prolongements 9 du radier de support 4.As indicated, and as can be seen in particular in FIG. 1, the connecting wall 8, which retains the slope 3 over the width of the bridge 1, makes an angle of approximately 45.degree. Lateral 7 of the upper slab 6. However, on each side of the connecting wall 8, the slope 3 makes with a horizontal plane an angle of the order of 33 ° by coming to die at the intersection of the vertical wall 5 and of the raft 4 and thus preventing landslide. This arrangement is made possible because the departure of the upper part of the slope 3 is retracted relative to the vertical wall 5, this recession being obtained on the one hand by the presence of the ears 12, 12 'and, on the other hand, part, by that of the extensions 9 of the support raft 4.

Comme on le voit en particulier sur les figures 3 et 4, chaque paroi latérale verticale 5 du pont 1 est prolongée à sa partie inférieure, vers l'avant et vers l'arrière, par des murets 20 destinés à retenir les terres dans les zones en forme de quart de cône constituant les arrondis du talus 3 et à rigidifier le radier 4.As seen in particular in FIGS. 3 and 4, each vertical side wall 5 of the bridge 1 is extended at its lower part, towards the front and towards the rear, by walls 20 intended to retain the lands in the zones. in the form of a quarter of a cone constituting the rounded slopes of the slope 3 and to stiffen the raft 4.

Lorsque le pont 1 est construit, les voies ferrées 2 sont interrompues et la brèche destinée à recevoir le pont est réalisée dans le talus 3, on procède à des terrassements à la partie supérieure des bords en regard de la brèche pour ménager vers l'avant et vers l'arrière quatre logements 21 (voir la figure 5) destinés à recevoir les oreilles 12, 12' du pont 1. Les oreilles 12 du pont 1 étant relevées en position d'attente (position en trait mixte sur la figure 6), on procède au ripage du pont 1 dans la direction de la flèche F des figures 3 et 4 jusqu'à ce que celui-ci vienne prendre sa position définitive dans la brèche.When the bridge 1 is built, the tracks 2 are interrupted and the breccia intended to receive the bridge is made in the slope 3, one carries out earthworks with the upper part of the edges opposite the gap to arrange for the front and towards the rear four housings 21 (see FIG. 5) intended to receive the lugs 12, 12 'of the bridge 1. The lugs 12 of the bridge 1 being raised in the waiting position (dashed position in FIG. 6) , the bridge 1 is shifted in the direction of the arrow F of Figures 3 and 4 until it comes to take its final position in the breach.

Dans cette position, les oreilles arrière 12' viennent s'engager dans les logements arrière 21 des bords de l'ouverture. On introduit ensuite les barres d'armature 18 dans les canaux 19 des oreilles 12 et, à l'aide des vérins 14, on fait pivoter ces dernières jusqu'à leur position définitive horizontale dans les logements 21 correspondants. On visse ensuite l'extrémité interne des tiges 18 dans les manchons 22 (à taraudage intérieur) noyés dans les tronçons latéraux 7 correspondants et, après remplissage des canaux 19 avec de la matière anti-corrosion, on immobilise les tiges 18 en vissant un écrou 23 à leur extrémité externe libre. On procède ensuite au remblaiement des logements 21 des oreilles 12, 12'.In this position, the rear lugs 12 'engage in the rear housing 21 edges of the opening. Reinforcing bars 18 are then introduced into the channels 19 of the ears 12 and, with the aid of the cylinders 14, these latter are pivoted to their final horizontal position in the corresponding housings 21. Then screwing the inner end of the rods 18 in the sleeves 22 (internal thread) embedded in the corresponding lateral sections 7 and, after filling the channels 19 with anti-corrosion material, the rods 18 are immobilized by screwing a nut 23 at their free outer end. The lodgings 21 of the lugs 12, 12 'are then backfilled.

On voit donc que, grâce au caractère pivotant des oreilles 12 du pont 1, la mise en place de ce dernier par ripage peut s'effectuer sans avoir à effectuer préalablement, sur toute la largeur du bord supérieur de l'ouverture ménagée dans le talus 3, un terrassement qui serait sinon nécessaire pour le passage d'oreilles fixes identiques aux oreilles arrière 12'. Cela évite en plus, une fois le pont 1 dans sa position définitive, d'avoir à effectuer un remblaiement important et délicat à l'endroit de ce terrassement. Cette réduction sensible des opérations de terrassement et de remblaiement nécessaires permet une réduction des coûts et un gain de temps appréciable.It can thus be seen that, thanks to the pivoting nature of the lugs 12 of the bridge 1, the implementation of the latter by shifting can be done without having to perform beforehand, over the entire width of the upper edge of the opening in the slope. 3, an earthwork that would otherwise be necessary for the passage of fixed ears identical to the rear ears 12 '. This further avoids, once the bridge 1 in its final position, having to perform a large embankment and delicate at the location of this earthwork. This significant reduction in the necessary earthworks and backfilling operations reduces costs and saves valuable time.

On comprendra que la description ci-dessus a été donnée à simple titre d'exemple, sans caractère limitatif, et que des adjonctions ou des modifications constructives pourraient y être apportées sans sortir du cadre de l'invention.It will be understood that the above description has been given merely by way of example, without limitation, and that additions or constructive modifications could be made without departing from the scope of the invention.

Claims (9)

Pont assurant un passage sous une voie de circulation ferroviaire, routière ou autoroutière (2) située sur un talus (3), comprenant un radier (4) supportant deux parois latérales (5) reliées par une dalle supérieure (6) comportant deux tronçons latéraux (7) qui la prolongent au-delà des parois latérales (5), chaque tronçon latéral (7) étant relié au radier (4) par une paroi de liaison inclinée (8) et se prolongeant au-delà de sa jonction avec la paroi de liaison inclinée (8) correspondante, caractérisé en ce que les tronçons latéraux (7) de la dalle supérieure (6) comportent chacun deux oreilles parallèles (12, 12') s'étendant dans leur prolongement.Bridge providing a passage under a rail, road or motorway traffic lane (2) situated on an embankment (3), comprising a raft (4) supporting two side walls (5) connected by an upper slab (6) comprising two lateral sections (7) which extend beyond the side walls (5), each lateral section (7) being connected to the base (4) by an inclined connecting wall (8) and extending beyond its junction with the wall corresponding inclined link (8), characterized in that the lateral sections (7) of the upper slab (6) each comprise two parallel lugs (12, 12 ') extending in their extension. Pont selon la revendication 1, caractérisé en ce que les oreilles (12, 12') des deux tronçons latéraux (7) de la dalle supérieure (6) sont respectivement alignées les unes avec les autres.Bridge according to claim 1, characterized in that the lugs (12, 12 ') of the two lateral sections (7) of the upper slab (6) are respectively aligned with each other. Pont selon la revendication 1 ou 2, destiné à être mis en place par ripage, caractérisé en ce que l'une (12) des oreilles (12, 12') de chaque tronçon latéral (7) est apte à pivoter entre une position d'attente dans laquelle elle est relevée et une position définitive dans laquelle elle est dans le prolongement du tronçon latéral (7) correspondant, les oreilles pivotantes (12) étant situées dans le prolongement du côté longitudinal de la dalle supérieure (6) qui est situé vers l'avant en considérant le sens du ripage.Bridge according to claim 1 or 2, intended to be implemented by shifting, characterized in that one (12) of the lugs (12, 12 ') of each lateral section (7) is able to pivot between a position d waiting in which it is raised and a final position in which it is in the extension of the corresponding lateral section (7), the pivoting lugs (12) being located in the extension of the longitudinal side of the upper slab (6) which is located forward considering the direction of shifting. Pont selon la revendication 3, caractérisé en ce que les oreilles pivotantes (12) sont articulées sur les tronçons latéraux (7) de la dalle supérieure (6), au niveau d'une charnière (13) parallèle aux parois latérales (5), des moyens de commande (14) étant interposés entre les oreilles pivotantes (12) et les tronçons latéraux (7) correspondants pour déplacer lesdites oreilles pivotantes (12) entre leur position d'attente et leur position définitive.Bridge according to claim 3, characterized in that the pivoting lugs (12) are articulated on the lateral sections (7) of the upper slab (6), at a hinge (13) parallel to the side walls (5), control means (14) being interposed between the pivoting lugs (12) and the corresponding lateral sections (7) for moving said pivoting lugs (12) between their waiting position and their final position. Pont selon la revendication 3 ou 4, caractérisé en ce que les oreilles pivotantes (12) renferment des tiges métalliques (18) reliées à des manchons (22) noyés dans les tronçons latéraux (7) correspondants de la dalle supérieure (6).Bridge according to claim 3 or 4, characterized in that the pivoting lugs (12) contain metal rods (18) connected to sleeves (22) embedded in the corresponding lateral sections (7) of the upper slab (6). Pont selon la revendication 5, caractérisé en ce que les tiges (18) des oreilles pivotantes (12) sont vissées dans les manchons (22) des tronçons latéraux (7) et logées dans des canaux (19) ménagés dans lesdites oreilles (12) et remplis de matière anti-corrosion.Bridge according to Claim 5, characterized in that the rods (18) of the pivoting lugs (12) are screwed into the sleeves (22) of the lateral sections (7) and housed in channels (19) formed in the said lugs (12). and filled with anti-corrosion material. Pont selon la revendication 5 ou 6, caractérisé en ce que les oreilles pivotantes (12) comportent au moins deux tiges métalliques (18) parallèles et adjacentes à leur face longitudinale intérieure.Bridge according to claim 5 or 6, characterized in that the pivoting lugs (12) comprise at least two metal rods (18) parallel and adjacent to their inner longitudinal face. Pont selon la revendication 7, caractérisé en ce que les oreilles pivotantes (12) comportent en outre au moins une tige métallique (18) parallèle et adjacente à la partie supérieure de leur face longitudinale extérieure.Bridge according to claim 7, characterized in that the pivoting lugs (12) further comprise at least one metal rod (18) parallel to and adjacent to the upper part of their outer longitudinal face. Pont selon l'une quelconque des revendications précédentes, caractérisé en ce que le radier (4) comporte deux prolongements latéraux (9) qui s'étendent au-delà des parois latérales (5), les parois de liaison inclinées (8) reliant les extrémités libres des tronçons latéraux (7) de la dalle supérieure (6) aux extrémités libres des prolongements latéraux (9) correspondants du radier (4).Bridge according to any one of the preceding claims, characterized in that the raft (4) has two lateral extensions (9) which extend beyond the side walls (5), the inclined connecting walls (8) connecting the free ends of the lateral sections (7) of the upper slab (6) at the free ends of the corresponding lateral extensions (9) of the slab (4).
EP06290069A 2005-01-12 2006-01-11 Bridge the upper slab of which comprises ears Active EP1681396B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR0500309A FR2880638B1 (en) 2005-01-12 2005-01-12 BRIDGE WHERE THE UPPER SLAB CONTAINS EARS

Publications (3)

Publication Number Publication Date
EP1681396A2 true EP1681396A2 (en) 2006-07-19
EP1681396A3 EP1681396A3 (en) 2006-10-25
EP1681396B1 EP1681396B1 (en) 2010-05-05

Family

ID=34954163

Family Applications (1)

Application Number Title Priority Date Filing Date
EP06290069A Active EP1681396B1 (en) 2005-01-12 2006-01-11 Bridge the upper slab of which comprises ears

Country Status (4)

Country Link
EP (1) EP1681396B1 (en)
AT (1) ATE467003T1 (en)
DE (1) DE602006014034D1 (en)
FR (1) FR2880638B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104099943A (en) * 2014-06-30 2014-10-15 中铁四局集团第四工程有限公司 Underground diaphragm wall and deserted underground civil air defense engineering intersection processing method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2704570A1 (en) * 1993-04-28 1994-11-04 Escota Device for reinforcing overhangs of bridges and its implementation method
FR2749331A1 (en) * 1996-06-03 1997-12-05 Beauthier Jean Marie Prefabricated concrete frame forming underpass beneath roads or railways
FR2774710A1 (en) * 1998-02-09 1999-08-13 Vsl France Method enabling elimination of lateral pile supporting bridge roadway
EP1054106A2 (en) * 1999-05-17 2000-11-22 Anderson Technology Corporation Box girder structure for bridge provided with outer cable and method of building the box girder
FR2839990A1 (en) * 2002-05-21 2003-11-28 Sncf Prefabricated Civil engineering structure for installing passage under rail track comprises portico with upper crosspiece connecting two vertical abutments extended by additional spans supported by cover plate on talus ridge
FR2850984A1 (en) * 2003-02-06 2004-08-13 Quille Entreprise New traffic lane creating process for roadway or railway track, involves interrupting existing lane and eliminating embankment to displace pre-fabricated structure horizontally and vertically to bring structure in service position

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2704570A1 (en) * 1993-04-28 1994-11-04 Escota Device for reinforcing overhangs of bridges and its implementation method
FR2749331A1 (en) * 1996-06-03 1997-12-05 Beauthier Jean Marie Prefabricated concrete frame forming underpass beneath roads or railways
FR2774710A1 (en) * 1998-02-09 1999-08-13 Vsl France Method enabling elimination of lateral pile supporting bridge roadway
EP1054106A2 (en) * 1999-05-17 2000-11-22 Anderson Technology Corporation Box girder structure for bridge provided with outer cable and method of building the box girder
FR2839990A1 (en) * 2002-05-21 2003-11-28 Sncf Prefabricated Civil engineering structure for installing passage under rail track comprises portico with upper crosspiece connecting two vertical abutments extended by additional spans supported by cover plate on talus ridge
FR2850984A1 (en) * 2003-02-06 2004-08-13 Quille Entreprise New traffic lane creating process for roadway or railway track, involves interrupting existing lane and eliminating embankment to displace pre-fabricated structure horizontally and vertically to bring structure in service position

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104099943A (en) * 2014-06-30 2014-10-15 中铁四局集团第四工程有限公司 Underground diaphragm wall and deserted underground civil air defense engineering intersection processing method
CN104099943B (en) * 2014-06-30 2016-05-04 中铁四局集团第四工程有限公司 Diaphram wall and discarded underground civil defense engineering intersection processing method

Also Published As

Publication number Publication date
DE602006014034D1 (en) 2010-06-17
EP1681396B1 (en) 2010-05-05
FR2880638A1 (en) 2006-07-14
FR2880638B1 (en) 2008-07-11
ATE467003T1 (en) 2010-05-15
EP1681396A3 (en) 2006-10-25

Similar Documents

Publication Publication Date Title
EP0874941B1 (en) Automatic wicket for a hydraulic structure such as a river sill, a dam spillway or a protective dyke
EP0733584B1 (en) Automatic erection for a crane with a foldable boom
EP2483476B1 (en) Transverse junction comprising two facing transverse ends of two successive pre-fabricated carriageway elements, and connecting system therefor
FR2612215A1 (en) LEVELING DEVICE FOR THE FINE ADJUSTMENT OF A SHAPE LAYER
FR2570723A2 (en) Slip-forming machine with two extrusion plates for making concrete roads
FR2889213A1 (en) SYSTEM FOR TRANSPORTING A WORK BY A ROAD VEHICLE WHICH CAN BE TRANSFORMED IN AN AMPHIBIOUS VEHICLE TO ALLOW A ROAD VEHICLE TO CROSS A DRY OR FILLED BREACH OF WATER
EP1681396B1 (en) Bridge the upper slab of which comprises ears
CH667299A5 (en) CONVEYOR, LAUNCHER AND BRIDGE RECOVERY VEHICLE.
EP0280626A1 (en) System for unfolding and placing a bridge from a vehicle such as a bridge-laying tank for passing an obstacle
FR2597129A1 (en) Folding lightweight bridge-support enabling so-called heavy vehicles, particularly armoured vehicles, to cross gaps
FR2472662A1 (en) DEVICE FOR ADJUSTING THE CUTTING LEVEL OF A COAL PLANER OR THE LIKE
WO2008034955A1 (en) Device for modifying the hull of a floating body and amphibious vehicle comprising such a device
EP0269518B1 (en) Vehicle forming a space spreadable into a conch
CH655333A5 (en) ROLLING MACHINE FOR EXCAVATING THE BALLAST OF RAILWAYS.
FR2723116A1 (en) UNDERGROUND CONDUIT
WO1997005332A1 (en) Spanning construction, in particular for enabling vehicles to cross a gap
EP0741052B1 (en) Cover structure for utility vehicle with a movable stanchion
FR2730896A1 (en) LONG LENGTH SEMI-REACHED PLOW WITH ARTICULATED FRAME
CA1176862A (en) Method and system for powring in place of the floor and the peripheral wall of a concrete storage tank
FR2518143A1 (en) Section for road bridge - comprises parallelepiped sections with end faces incorporating interengaging couplings
FR2642096A1 (en) Stackable road barrier element, in particular for signalling
FR2639600A1 (en) UTILITY TYPE VEHICLE TRAY STRUCTURE MADE OF FOLDED SHEET AND COMPRISING LONGITUDINAL LONGERS
FR2893332A1 (en) Modular bridge with metal deck has prefabricated structure of I-section beams connected by transverse pivoted brackets that are deployed in situ and locked
FR2730508A1 (en) Traffic lane separator e.g. for road
BE1008863A3 (en) Concrete slab and closure component for slab manufacture

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK YU

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK YU

17P Request for examination filed

Effective date: 20061228

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

17Q First examination report despatched

Effective date: 20091027

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: FRENCH

REF Corresponds to:

Ref document number: 602006014034

Country of ref document: DE

Date of ref document: 20100617

Kind code of ref document: P

REG Reference to a national code

Ref country code: NL

Ref legal event code: T3

RAP2 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: SOLETANCHE FREYSSINET

LTIE Lt: invalidation of european patent or patent extension

Effective date: 20100505

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100505

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100816

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100505

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100505

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100505

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100905

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100505

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100505

REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100505

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100505

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100806

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100505

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100505

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100906

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100505

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100505

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100505

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100505

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100505

26N No opposition filed

Effective date: 20110208

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602006014034

Country of ref document: DE

Effective date: 20110207

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110131

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110131

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110131

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602006014034

Country of ref document: DE

Effective date: 20110802

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110802

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100805

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100505

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100505

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 11

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 12

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20231219

Year of fee payment: 19

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20231219

Year of fee payment: 19

Ref country code: LU

Payment date: 20231219

Year of fee payment: 19

Ref country code: FR

Payment date: 20231219

Year of fee payment: 19

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20231219

Year of fee payment: 19