EP1634846B1 - Crane boom for container transport and transport device for the parts of the crane boom - Google Patents
Crane boom for container transport and transport device for the parts of the crane boom Download PDFInfo
- Publication number
- EP1634846B1 EP1634846B1 EP05019844A EP05019844A EP1634846B1 EP 1634846 B1 EP1634846 B1 EP 1634846B1 EP 05019844 A EP05019844 A EP 05019844A EP 05019844 A EP05019844 A EP 05019844A EP 1634846 B1 EP1634846 B1 EP 1634846B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- boom
- crane
- parts
- pieces
- transport
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
- 230000008878 coupling Effects 0.000 claims abstract description 15
- 238000010168 coupling process Methods 0.000 claims abstract description 15
- 238000005859 coupling reaction Methods 0.000 claims abstract description 15
- 239000000969 carrier Substances 0.000 claims 1
- 238000005259 measurement Methods 0.000 claims 1
- 230000032258 transport Effects 0.000 description 50
- 238000005452 bending Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/64—Jibs
- B66C23/70—Jibs constructed of sections adapted to be assembled to form jibs or various lengths
Definitions
- the present invention relates to a crane boom for transport as container cargo, which is composed of a plurality of boom pieces, each having at the front end coupling pieces for engaging the boom pieces, wherein the boom pieces each have at least one lower flange.
- the invention further relates to a container unit consisting of the jib pieces of the crane jib and such a transport device for transporting jib pieces as container cargo.
- a reduction of the transport volume and a greater space utilization can be achieved with a telescopic boom, in which the boom pieces can be copied together.
- telescopic boom require a special trolley shape, since the boom pieces have to work in crane mode with different Untergurtspuren for the trolley or have offset in height lower straps to allow for pushing together.
- Such telescopic boom are relatively expensive.
- Crane jibs in which the jib pieces can be put together in succession by means of coupling pieces provided at the front end are much simpler and also less expensive to produce.
- the jib pieces can be joined together so that the lower chords adjoin one another without offset and jump and form over the interfaces between the boom pieces away a consistently substantially offset and jump-free career for the trolley of the crane.
- the problem arises to be able to transport them space-saving, since the boom pieces regularly correspond to each other, so that they can only be placed side by side. However, this makes it impossible to package a crane boom in a standard 40-foot container. It must be regularly used several containers for the shipment of a crane jib or more transports are carried out.
- the present invention is therefore an object of the invention to provide a crane boom of the type mentioned above and a transport device for transporting the boom pieces of such a crane jib, which avoid the disadvantages of the prior art and further develop the latter in an advantageous manner.
- a space-saving transport of the crane jib as container freight is to be made possible without having to buy this with an expensive manufacturability of the crane jib.
- the boom pieces are such angioetzbar that the lower chords of the boom pieces together form a continuous offset and jump-free track for a trolley, the boom pieces of the crane boom, despite the identical lower chord track dimensions, a largely offset and jump-free track for a normal Create trolley on the lower chords, have such different cross-sections that the boom pieces are telescoped for the purpose of transport, whereby the space is used in the boom pieces.
- At least one of the boom pieces is advantageously also connected in the telescoped state of the boom pieces with a pair of transport frame, each having container containers compatible with standard containers outer terminals.
- the said Trarisportrahmen possess not only the container-compatible outer connection pieces, but also connecting elements for connection to the one jib piece.
- the connecting elements are designed such that they can be connected to the front-side coupling pieces of the corresponding boom piece, which actually serve the Anippoetzen the boom pieces to form the crane jib.
- the transport frames bridge, so to speak, the connection dimensions of the boom pieces to the external connection dimensions of standard containers.
- a Container unit created on the one hand from the crane boom or its boom pieces and on the other hand from the two transport frame, the transport frame are frontally mounted on at least one boom piece, preferably two juxtaposed boom pieces in which the other boom pieces of the crane were pushed.
- This container unit forms a wall-free container, which is self-supporting by the boom piece or the boom pieces, which are connected to the transport frame.
- the transport frames each have two juxtaposed sets of connecting elements by means of which two boom pieces arranged alongside each other can be fastened to the transport frame by their coupling pieces.
- these two boom pieces advantageously the remaining boom pieces of the crane boom can be inserted, which have a correspondingly reduced cross-section.
- the four frame legs assembled into a closed rigid profile can advantageously be stiffened by at least one diagonal strut.
- the jib pieces of the crane jib can have different cross-sectional geometries.
- all boom pieces each have two lower chords, which are formed with identical track dimensions, so that in the assembled state of the boom pieces two each offset and jump-free raceways for the wheels of a trolley are formed.
- a first group of jib pieces in this case has at least two upper chords, while a second group of jib pieces has only one upper chord.
- all boom pieces may also each have only one lower flange, so that the trolley with its wheels on the only one lower flange of the boom pieces moves, but which are also so composable that a continuous offset and jump-free career is formed ,
- the boom pieces preferably have a plurality of upper straps arranged in different track dimensions.
- the cross-sectional differences between the boom pieces may be adapted to the respective boom length and the number of boom pieces into which the crane boom is subdivided.
- a better space utilization for the format of a standardized 40-foot container results from the fact that the boom pieces are formed with such different cross sections that in a boom piece with a larger cross-section two boom pieces with a smaller cross-section are inserted side by side. This makes it possible to form the crane boom still relatively similar to the system. It can be built side by side two boom pieces with a larger, identical cross-section between the transport frame and record up to four boom pieces with smaller each identical cross-section.
- At least one jib piece can be designed as a three-belt carrier, while at least one other jib piece is designed as a four-belt or multi-belt carrier.
- the Viergurt has the larger cross section, so that the Dreigurtiety can be pushed into the Viergurtiety.
- the at least one boom piece with the at least four longitudinal straps can have two lateral diagonal braces, that of the lower straps to the upper straps V-shaped spread are arranged, ie the diagonal braces run from top to bottom inside.
- the lower flange for driving on a trolley remains free, while at the same time the inner cross section remains as large as possible in order to push the other boom pieces can.
- the boom pieces are arranged with the fewer longitudinal straps towards the boom tip, while the boom pieces are arranged with the plurality of longitudinal straps to the boom foot.
- two Viergurtmoi be arranged on the boom foot and be supplemented by several Dreigurtyes to Auslegererspitze out. It is understood, however, that other subdivisions and arrangements are possible in principle.
- the jib pieces arranged towards the jib tip can be tensioned with only three longitudinal belts by bracing on the jib pieces located further inwards and / or on a tower top of a tower crane.
- the crane boom can basically be designed as guyed crane boom, in which case the bracing of the outer boom pieces will be guided to the spire.
- the crane jib can also be designed as a pure bending beam jib. The bracing is performed in this case to the more inner boom pieces.
- fastening means are advantageously provided for fastening the inserted boom pieces to the outer boom pieces with a larger cross-section.
- fastening means are advantageously provided for fastening the inserted boom pieces to the outer boom pieces with a larger cross-section.
- the attachment to the outer boom pieces is particularly advantageous if the inserted boom pieces have a smaller length than the outer boom pieces with a larger cross-section.
- the in FIG. 1 Drawn crane jib 1 of a tower crane is composed of several, in the illustrated embodiment, six jib pieces 2 to 7. It is understood, however, that the crane boom may be composed of more or fewer than six boom pieces. In particular, it is possible to configure the crane boom according to the desired boom length by inserting additional or removing individual boom pieces.
- the boom pieces 2 to 7 each comprise frontally arranged coupling pieces 8, by means of which the boom pieces 2 to 7 can be placed against one another in the manner of a chain and connected to one another.
- the coupling pieces 8 may be formed in the usual way as a pin connector. As FIG. 1 shows, the jib pieces 2 to 7 are each formed as a lattice girder.
- two groups of boom pieces 2, 3 and 4 to 7 are provided, which differ from each other by the number of their longitudinal straps and their cross-sectional shape, wherein within each group, the boom pieces are formed substantially identical to each other.
- the boom pieces are formed substantially identical to each other.
- more than two groups of jib pieces can be provided. The formation of the boom pieces in two groups, however, brings a higher system similarity with it.
- the first two jib pieces 2, 3 constituting the first group of jib pieces are arranged at the foot of the jib and have a larger cross section than the jib pieces 4 to 7 of the second group of jib pieces arranged toward the jib tip.
- the two larger boom pieces 2 and 3 each have four longitudinal straps, in each case two lower straps 9 and two upper straps 10, which are arranged at the corners of a rectangle.
- FIG 4 shows the upper straps 10 are connected to the lower straps 9 by two cross braces 11 of lattice struts 12 together, the cross braces 11 from top to bottom inside, ie the articulation points of the lattice struts 12 on the lower straps 9 are offset inwards, so that the tops the lower straps 9 remain free and each form a career for a trolley, not shown, of the crane.
- the boom pieces 4 to 7 of the second group of boom pieces are each formed as a three-belt carrier. They each have two bottom straps 13 and a top flange 14, wherein the bottom straps 13 are formed with identical track dimensions as the bottom straps 9 of the boom pieces 2 and 3.
- the tops of all lower chords 9 and 13 of the boom pieces 2 to 7 are mutually offset and jump-free, so that a continuous offset and jump-free track for the wheels of the trolley is formed.
- the lengths of the two larger boom pieces 2 and 3 are identical to each other.
- the lengths of the outer boom pieces 4 to 7 are each smaller than the length of the boom pieces 2 and 3.
- the cross sections of the outer boom pieces 4 to 7 are dimensioned such that each two boom pieces 4, 5 and 6, 7 adjacent to each other in one of the larger Boom pieces 2 or 3 can be inserted.
- the trained as Dreigurtieri jib pieces 4 to 7 are this rotated about its longitudinal axis relative to the assembled state, so that the width or the distance of the lower chords 13 from each other, which corresponds to the lower chords 9 of the larger boom pieces 2 and 3, does not bother.
- the advantage here is the oblique arrangement of the cross braces 11 of the larger boom pieces 2 and 3, as FIG. 4 shows.
- the front side transport frame 15 which, as in FIG. 5 shows, consist of four to a closed, rigid frame composite frame legs 16 which are stiffened by a diagonal strut 17.
- the transport frames 15 each have two sets of connecting elements 18, by means of which they can be attached to the coupling pieces 8 of the two superimposed or juxtaposed boom pieces 2 and 3.
- the transport frame 15 have external connection pieces 19, which correspond in their arrangement and their dimensions to the fittings standardized container.
- the transport frame 15 to the package of boom pieces 2 to 7 consisting of the superposed boom pieces 2 and 3 and the inserted therein boom pieces 4 to 7 according to FIG. 3 mounted, a self-supporting, wall-free container unit is created, which is stackable with other standard and commercial containers.
- the transport frames form the outer connecting pieces on which and under the other containers can be stacked.
- one of the transport frame 15 is placed on the ground. With a crane, the two boom pieces 2 and 3 are placed vertically and bolted in the lower part with the connecting elements 18 of the transport frame 15. Then also vertically from above, the introduction of the other boom pieces 4 to 7 in the two boom pieces 2 and 3 in the respective corresponding position, where bearings and / or fastening means are present, so that the boom pieces 4 to 7 in the boom pieces 2 and 3 centered and fixed for transport. Then, the second transport frame 15 is mounted on the above end of the boom pieces 2 and 3, for which purpose this in turn is bolted to the coupling pieces 8 of the boom pieces 2 and 3.
- the boom pieces 4 to 7 of the crane boom need not necessarily be assembled with the transport frame 15 to form a container unit for transport.
- the boom pieces can be advantageously loaded in the telescoped state on commercial semi-trailer, whereby also here the reduction of the transport volume by the nesting of the boom pieces represents a significant, cost-reducing advantage.
- FIG. 1 shows the outer boom pieces 4 to 7 with a smaller cross-section at the inner boom pieces 2, 3 can be braced by a brace 21. This can also be performed via a guy clamp 22, such as FIG. 7 shows.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Jib Cranes (AREA)
Abstract
Description
Die vorliegende Erfindung betrifft einen Kranausleger zum Transport als Containerfracht, der aus mehreren Auslegerstücken zusammensetzbar ist, die jeweils am stirnseitigen Ende Kupplungsstücke zum Aneinandersetzen der Auslegerstücke aufweisen, wobei die Auslegerstücke jeweils mindestens einen Untergurt aufweisen. Die Erfindung betrifft weiterhin eine Containereinheit bestehend aus den Auslegerstücken des Kranauslegers sowie einer solchen Transportvorrichtung zum Transport von Auslegerstücken als Containerfracht.The present invention relates to a crane boom for transport as container cargo, which is composed of a plurality of boom pieces, each having at the front end coupling pieces for engaging the boom pieces, wherein the boom pieces each have at least one lower flange. The invention further relates to a container unit consisting of the jib pieces of the crane jib and such a transport device for transporting jib pieces as container cargo.
Durch die ständig steigenden Transportkosten spielt das Transportvolumen auch bei zu verfrachtenden Kranen eine wesentliche Rolle. Besonders sperrig sind regelmäßig Kranausleger von Turmdrehkranen, die nicht selten Auslegerlängen von über 60 m erreichen. Solche Kranausleger von Turmdrehkranen sind in der Regel über die gesamte Auslegerlänge systemähnlich, so dass sie nur schwierig raumsparend transportiert werden können.Due to the ever increasing transport costs, the transport volume also plays an important role in cranes to be loaded. Especially bulky are crane jibs of tower cranes, which not infrequently reach jib lengths of more than 60 m. Such crane boom of tower cranes are generally similar to the system over the entire boom length, so that they can be transported with difficulty space-saving.
Eine Reduzierung des Transportvolumens und eine größere Raumausnutzung kann mit einem teleskopierbaren Ausleger erreicht werden, bei dem die Auslegerstücke zusammenteleskopiert werden können. Derartige Teleskopausleger bedingen jedoch eine spezielle Laufkatzenform, da die Auslegerstücke im Kranbetrieb mit unterschiedlichen Untergurtspuren für die Laufkatze arbeiten müssen bzw. in der Höhe versetzte Untergurte aufweisen, um ein Zusammenschieben zu ermöglichen. Solche Teleskopausleger sind relativ teuer. Zudem ist es erforderlich, die Laufkatze konstruktiv so auszuführen, dass sie entweder über die Höhensprünge oder den Spurbreitenversatz zwischen den Untergurten verschiedener Auslegerstücke hinwegfahren kann.A reduction of the transport volume and a greater space utilization can be achieved with a telescopic boom, in which the boom pieces can be copied together. However, such telescopic boom require a special trolley shape, since the boom pieces have to work in crane mode with different Untergurtspuren for the trolley or have offset in height lower straps to allow for pushing together. Such telescopic boom are relatively expensive. In addition, it is necessary to construct the trolley so that it can either drive over the height jumps or the track width offset between the lower chords of different boom pieces.
Sehr viel einfacher und auch preisgünstiger herzustellen sind hingegen Kranausleger, bei denen die Auslegerstücke mittels am stirnseitigen Ende vorgesehener Kupplungsstücke hintereinander aneinandergesetzt werden können. Bei solchen Kranauslegern können die Auslegerstücke so zusammengefügt werden, dass die Untergurte versatz- und sprungfrei aneinander anschließen und über die Schnittstellen zwischen den Auslegerstücken hinweg eine durchgehend im wesentlichen versatz- und sprungfreie Laufbahn für die Laufkatze des Krans bilden. Bei solchen Kranauslegern stellt sich jedoch das Problem, sie raumsparend transportieren zu können, da die Auslegerstücke regelmäßig einander entsprechen, so dass sie nur nebeneinander gelegt werden können. Hierdurch ist es jedoch unmöglich, einen Kranausleger in einen genormten 40-Fuß-Container zu verpacken. Es müssen regelmäßig mehrere Container für die Verfrachtung eines Kranauslegers verwendet bzw. mehrere Transporte durchgeführt werden.Crane jibs in which the jib pieces can be put together in succession by means of coupling pieces provided at the front end are much simpler and also less expensive to produce. In such crane jibs, the jib pieces can be joined together so that the lower chords adjoin one another without offset and jump and form over the interfaces between the boom pieces away a consistently substantially offset and jump-free career for the trolley of the crane. In such crane jibs, however, the problem arises to be able to transport them space-saving, since the boom pieces regularly correspond to each other, so that they can only be placed side by side. However, this makes it impossible to package a crane boom in a standard 40-foot container. It must be regularly used several containers for the shipment of a crane jib or more transports are carried out.
Aus der
Der vorliegenden Erfindung liegt daher die Aufgabe zugrunde, einen Kranausleger der eingangs genannten Art sowie eine Transportvorrichtung zum Transport der Auslegerstücke eines solchen Kranauslegers zu schaffen, die die Nachteile des Standes der Technik vermeiden und letzteren in vorteilhafter Weise weiterbilden. Vorzugsweise soll ein platzsparender Transport des Kranauslegers als Containerfracht ermöglicht werden, ohne dies mit einer teuren Herstellbarkeit des Kranauslegers erkaufen zu müssen.The present invention is therefore an object of the invention to provide a crane boom of the type mentioned above and a transport device for transporting the boom pieces of such a crane jib, which avoid the disadvantages of the prior art and further develop the latter in an advantageous manner. Preferably, a space-saving transport of the crane jib as container freight is to be made possible without having to buy this with an expensive manufacturability of the crane jib.
Diese Aufgabe wird hinsichtlich des Kranauslegers durch einen Kranausleger nach Patentanspruch 1 gelöst. Hinsichtlich der Transportvorrichtung wird die genannte Aufgabe durch eine Transportvorrichtung mit den Merkmalen des Anspruchs 11 gelöst.This object is achieved with respect to the crane boom by a crane boom according to
Erfingdungsgemäß sind also die Auslegerstücke derart aneinandersetzbar, dass die Untergurte der Auslegerstücke zusammen eine durchgehend versatz- und sprungfreie Laufbahn für eine Laufkatze bilden, wobei die Auslegerstücke des Kranauslegers trotz der, identischen Untergurt-Spurabmessungen, die eine weitgehend versatz- und sprungfreie Laufbahn für eine normale Laufkatze auf den Untergurten schaffen, derart unterschiedliche Querschnitte besitzen, dass die Auslegerstücke zum Zwecke des Transports ineinanderschiebbar sind, wodurch auch der Raum in den Auslegerstücken genutzt wird. Zumindest eines der Auslegerstücke ist vorteilhafterweise zudem im ineinandergeschobenen Zustand der Auslegerstücke mit einem Paar Transportrahmen verbindbar, die jeweils mit Normcontainern kompatible Containeraußenanschlussstücke aufweisen. Dabei besitzen die genannten Trarisportrahmen nicht nur die containerkompatiblen Außenanschlussstücke, sondern auch Verbindungselemente zum Anschluss an das eine Auslegerstück. Insbesondere sind die Verbindungselemente derart ausgebildet, dass sie an die stirnseitigen Kupplungsstücke des entsprechenden Auslegerstücks anschließbar sind, die eigentlich dem Aneinandersetzen der Auslegerstücke zur Bildung des Kranauslegers dienen. Die Transportrahmen überbrücken sozusagen die Anschlussmaße der Auslegerstücke zu den Außenanschlussmaßen von Normcontainern. Es wird erfindungsgemäß eine Containereinheit geschaffen, die einerseits aus dem Kranausleger bzw. dessen Auslegerstücken und andererseits aus den beiden Transportrahmen besteht, wobei die Transportrahmen stirnseitig an zumindest ein Auslegerstück, vorzugsweise an zwei nebeneinander angeordnete Auslegerstücke montiert sind, in denen die weiteren Auslegerstücke des Krans hineingeschoben wurden. Diese Containereinheit bildet einen wandungsfreien Container, der durch das Auslegerstück bzw. die Auslegerstücke, die mit den Transportrahmen verbunden sind, selbsttragend ist.According to the invention, therefore, the boom pieces are such aneinanderetzbar that the lower chords of the boom pieces together form a continuous offset and jump-free track for a trolley, the boom pieces of the crane boom, despite the identical lower chord track dimensions, a largely offset and jump-free track for a normal Create trolley on the lower chords, have such different cross-sections that the boom pieces are telescoped for the purpose of transport, whereby the space is used in the boom pieces. At least one of the boom pieces is advantageously also connected in the telescoped state of the boom pieces with a pair of transport frame, each having container containers compatible with standard containers outer terminals. The said Trarisportrahmen possess not only the container-compatible outer connection pieces, but also connecting elements for connection to the one jib piece. In particular, the connecting elements are designed such that they can be connected to the front-side coupling pieces of the corresponding boom piece, which actually serve the Aneinanderetzen the boom pieces to form the crane jib. The transport frames bridge, so to speak, the connection dimensions of the boom pieces to the external connection dimensions of standard containers. It is according to the invention a Container unit created on the one hand from the crane boom or its boom pieces and on the other hand from the two transport frame, the transport frame are frontally mounted on at least one boom piece, preferably two juxtaposed boom pieces in which the other boom pieces of the crane were pushed. This container unit forms a wall-free container, which is self-supporting by the boom piece or the boom pieces, which are connected to the transport frame.
Um die üblichen Maße eines genormten 40-Fuß-Containers bestmöglich auszunutzen, besitzen die Transportrahmen jeweils zwei nebeneinander angeordnete Sätze von Verbindungselementen, mit Hilfe derer zwei längs nebeneinander angeordnete Auslegerstücke durch ihre Kupplungsstücke an den Transportrahmen befestigt werden können. In diese beiden Auslegerstücke können vorteilhafterweise die restlichen Auslegerstücke des Kranauslegers eingeschoben sein, die einen entsprechend verringerten Querschnitt besitzen.In order to make the best possible use of the usual dimensions of a standardized 40-foot container, the transport frames each have two juxtaposed sets of connecting elements by means of which two boom pieces arranged alongside each other can be fastened to the transport frame by their coupling pieces. In these two boom pieces advantageously the remaining boom pieces of the crane boom can be inserted, which have a correspondingly reduced cross-section.
Um den Transportrahmen ausreichend zu versteifen, können die vier zu einem geschlossenen starren Profil zusammengesetzten Rahmenschenkel vorteilhafterweise durch zumindest eine Diagonalstrebe ausgesteift sein.In order to sufficiently stiffen the transport frame, the four frame legs assembled into a closed rigid profile can advantageously be stiffened by at least one diagonal strut.
Die Auslegerstücke des Kranauslegers können verschiedene Querschnittsgeometrien besitzen. Gemäß einer ersten vorteilhaften Ausführungsform der Erfindung besitzen alle Auslegerstücke jeweils zwei Untergurte, die mit identischen Spurabmessungen ausgebildet sind, so dass im zusammengebauten Zustand der Auslegerstücke zwei jeweils versatz- und sprungfreie Laufbahnen für die Räder einer Laufkatze gebildet sind. Eine erste Gruppe von Auslegerstücken besitzt in diesem Fall zumindest zwei Obergurte, während eine zweite Gruppe von Auslegerstücken nur einen Obergurt besitzt.The jib pieces of the crane jib can have different cross-sectional geometries. According to a first advantageous embodiment of the invention, all boom pieces each have two lower chords, which are formed with identical track dimensions, so that in the assembled state of the boom pieces two each offset and jump-free raceways for the wheels of a trolley are formed. A first group of jib pieces in this case has at least two upper chords, while a second group of jib pieces has only one upper chord.
Gemäß einer zweiten vorteilhaften Ausführung der Erfindung können alle Auslegerstücke auch jeweils nur einen Untergurt aufweisen, so dass die Laufkatze mit ihren Rädern auf dem nur einen Untergurt der Auslegerstücke fährt, die jedoch ebenfalls so zusammensetzbar sind, dass eine durchgehende versatz- und sprungfreie Laufbahn gebildet wird. In diesem Fall besitzen die Auslegerstücke vorzugsweise mehrere in verschiedenen Spurabmessungen angeordnete Obergurte.According to a second advantageous embodiment of the invention, all boom pieces may also each have only one lower flange, so that the trolley with its wheels on the only one lower flange of the boom pieces moves, but which are also so composable that a continuous offset and jump-free career is formed , In this case, the boom pieces preferably have a plurality of upper straps arranged in different track dimensions.
Die Querschnittunterschiede zwischen den Auslegerstücken können an die jeweilige Auslegerlänge und die Anzahl der Auslegerstücke, in die der Kranausleger unterteilt ist, angepasst sein. Grundsätzlich wäre es möglich, die Auslegerstücke mit derart abgestuften Querschnitten zu versehen, dass die Auslegerstücke zum Zwecke des Transports nach Art eines Teleskopsystems jeweils ineinander geschoben werden können. Eine bessere Raumausnutzung für das Format eines genormten 40-Fuß-Containers ergibt sich jedoch dadurch, dass die Auslegerstücke mit derart unterschiedlichen Querschnitten ausgebildet sind, dass in ein Auslegerstück mit größerem Querschnitt zwei Auslegerstücke mit kleinerem Querschnitt nebeneinanderliegend einschiebbar sind. Hierdurch ist es möglich, den Kranausleger immer noch relativ systemähnlich auszubilden. Es können zwei Auslegerstücke mit größerem, identischem Querschnitt nebeneinanderliegend zwischen die Transportrahmen gebaut werden und bis zu vier Auslegerstücke mit kleinerem zueinander jeweils identischem Querschnitt aufnehmen.The cross-sectional differences between the boom pieces may be adapted to the respective boom length and the number of boom pieces into which the crane boom is subdivided. In principle, it would be possible to use the boom pieces to provide such stepped cross-sections that the boom pieces can be pushed into each other for the purpose of transport in the manner of a telescope system. However, a better space utilization for the format of a standardized 40-foot container results from the fact that the boom pieces are formed with such different cross sections that in a boom piece with a larger cross-section two boom pieces with a smaller cross-section are inserted side by side. This makes it possible to form the crane boom still relatively similar to the system. It can be built side by side two boom pieces with a larger, identical cross-section between the transport frame and record up to four boom pieces with smaller each identical cross-section.
Besonders platzsparend ineinanderschiebbar sind die Auslegerstücke dann, wenn verschiedene Aüslegerstücke eine verschiedene Anzahl von Längsgurten haben. Nach einer Ausführung der Erfindung kann zumindest ein Auslegerstück als Dreigurtträger ausgebildet sein, während zumindest ein anderes Auslegerstück als Viergurt- oder Mehrgurtträger ausgebildet ist. Zweckmäßigerweise besitzt der Viergurtträger den größeren Querschnitt, so dass der Dreigurtträger in den Viergurtträger hineingeschoben werden kann.Particularly space-saving telescoping the boom pieces are then when different Aüslegerstücke have a different number of longitudinal straps. According to one embodiment of the invention, at least one jib piece can be designed as a three-belt carrier, while at least one other jib piece is designed as a four-belt or multi-belt carrier. Conveniently, the Viergurtträger has the larger cross section, so that the Dreigurtträger can be pushed into the Viergurtträger.
Um den Platz in dem Viergurtträger optimal ausnutzen zu können und eine an sich übliche Laufkatze verwenden zu können, die die Untergurte von außen her umgreift, kann das zumindest eine Auslegerstück mit den zumindest vier Längsgurten zwei seitliche Diagonalverbände aufweisen, die von den Untergurten zu den Obergurten V-förmig aufgespreizt angeordnet sind, d.h. die Diagonalverbände verlaufen jeweils von oben nach unten innen. Somit bleibt der Untergurt zum Befahren mit einer Laufkatze frei, während gleichzeitig der Innenquerschnitt möglichst groß verbleibt, um die anderen Auslegerstücke hineinschieben zu können.In order to make optimum use of the space in the four-belt carrier and to use a trolley which engages around the lower straps from the outside, the at least one boom piece with the at least four longitudinal straps can have two lateral diagonal braces, that of the lower straps to the upper straps V-shaped spread are arranged, ie the diagonal braces run from top to bottom inside. Thus, the lower flange for driving on a trolley remains free, while at the same time the inner cross section remains as large as possible in order to push the other boom pieces can.
Zweckmäßigerweise werden die Auslegerstücke mit den wenigeren Längsgurten zur Auslegerspitze hin angeordnet, während die Auslegerstücke mit den mehreren Längsgurten zum Auslegerfuß hin angeordnet werden. Insbesondere können zwei Viergurtträger am Auslegerfuß angeordnet sein und durch mehrere Dreigurtträger zur Auslegerspitze hin ergänzt werden. Es versteht sich jedoch, dass andere Unterteilungen und Anordnungen grundsätzlich möglich sind.Conveniently, the boom pieces are arranged with the fewer longitudinal straps towards the boom tip, while the boom pieces are arranged with the plurality of longitudinal straps to the boom foot. In particular, two Viergurtträger be arranged on the boom foot and be supplemented by several Dreigurtträger to Auslegererspitze out. It is understood, however, that other subdivisions and arrangements are possible in principle.
Um eine ausreichende Steifigkeit des Kranauslegers zu erreichen, können die zur Auslegerspitze hin angeordneten Auslegerstücke mit nur drei Längsgurten durch eine Abspannung an den weiter innen liegenden Auslegerstücken und/oder an einer Turmspitze eines Turmdrehkrans abgespannt sein. Der Kranausleger kann grundsätzlich als abgespannter Kranausleger ausgeführt sein, wobei in diesem Fall die Abspannung der außen liegenden Auslegerstücke zur Turmspitze hingeführt sein wird. Alternativ kann der Kranausleger jedoch auch als reiner Biegebalkenausleger ausgeführt sein. Die Abspannung ist in diesem Fall an die weiter innen liegenden Auslegerstücke geführt.In order to achieve sufficient rigidity of the crane jib, the jib pieces arranged towards the jib tip can be tensioned with only three longitudinal belts by bracing on the jib pieces located further inwards and / or on a tower top of a tower crane. The crane boom can basically be designed as guyed crane boom, in which case the bracing of the outer boom pieces will be guided to the spire. Alternatively, however, the crane jib can also be designed as a pure bending beam jib. The bracing is performed in this case to the more inner boom pieces.
Um die Auslegerstücke mit kleinerem Querschnitt in den Auslegerstücken mit größerem Querschnitt sicher anordnen zu können, sind vorteilhafterweise Befestigungsmittel zur Befestigung der eingeschobenen Auslegerstücke an den außen liegenden Auslegerstücken mit größerem Querschnitt vorgesehen. Grundsätzlich wäre es auch möglich, die eingeschobenen Auslegerstücke auch zu den Rahmenteilen hin zu befestigen. Die Befestigung an den äußeren Auslegerstücken ist jedoch insbesondere dann vorteilhaft, wenn die eingeschobenen Auslegerstücke eine kleinere Länge besitzen als die außen liegenden Auslegerstücke mit größerem Querschnitt.In order to safely arrange the boom pieces with a smaller cross section in the boom pieces with a larger cross-section, fastening means are advantageously provided for fastening the inserted boom pieces to the outer boom pieces with a larger cross-section. In principle, it would also be possible to fix the inserted boom pieces also to the frame parts. However, the attachment to the outer boom pieces is particularly advantageous if the inserted boom pieces have a smaller length than the outer boom pieces with a larger cross-section.
Die Erfindung wird nachfolgend anhand eines bevorzugten Ausführungsbeispiels und zugehöriger Zeichnungen näher erläutert. In den Zeichnungen zeigen:
- Fig. 1:
- eine Seitenansicht eines Kranauslegers für einen Turmdrehkran nach einer bevorzugten Ausführung der Erfindung,
- Fig. 2:
- Stirnansichten der Auslegerstücke des Kranauslegers aus
Fig. 1 , die die unterschiedlichen Querschnittsformen der Auslegerstücke zeigen, - Fig. 3:
- eine Seitenansicht der für den Transport zusammengepackten und ineinander geschobenen Auslegerstücke des Kranauslegers aus
Fig. 1 , - Fig. 4:
- eine Stirnansicht der für den Transport zusammengepackten Auslegerstücke aus
Fig. 3 , - Fig. 5:
- eine Stirnansicht der für den Transport zusammengepackten Auslegerstücke aus
Fig. 3 mit angebauten Transportrahmen, die die Anordnung eines stirnseitigen Transportrahmens an den Auslegerstücken zeigt, - Fig. 6:
- eine Seitenansicht der für den Transport zusammengepackten und ineinander geschobenen Auslegerstücke des Kranauslegers ähnlich
Fig. 3 mit angebauten Transportrahmen, und - Fig. 7:
- eine Seitenansicht eines Kranauslegers für einen Turmdrehkran nach einer alternativen Ausführung der Erfindung, bei der die Abspannung der Auslegerstücke mit kleinerem Querschnitt eine zusätzliche Abspannstrebe aufweist.
- Fig. 1:
- a side view of a crane boom for a tower crane according to a preferred embodiment of the invention,
- Fig. 2:
- End views of the boom pieces of the crane boom
Fig. 1 showing the different cross-sectional shapes of the boom pieces, - 3:
- a side view of the packed together for transport and telescoped boom pieces of the crane boom
Fig. 1 . - 4:
- an end view of the packed together for transport boom pieces
Fig. 3 . - Fig. 5:
- an end view of the packed together for transport boom pieces
Fig. 3 with attached transport frame, which shows the arrangement of a frontal transport frame on the boom pieces, - Fig. 6:
- a side view of the packed together for transport and telescoped boom pieces of the crane boom similar
Fig. 3 with attached transport frames, and - Fig. 7:
- a side view of a crane boom for a tower crane according to an alternative embodiment of the invention, in which the bracing of the boom sections with a smaller cross-section has an additional bracing strut.
Der in
In der gezeichneten Ausführungsform sind zwei Gruppen von Auslegerstücken 2, 3 bzw. 4 bis 7 vorgesehen, die sich durch die Anzahl ihrer Längsgurte sowie ihre Querschnittsform voneinander unterscheiden, wobei innerhalb jeder Gruppe die Auslegerstücke zueinander im wesentlichen identisch ausgebildet sind. Um die Auslegerstücke platzsparend ineinanderschieben und zum Transport anordnen zu können, können je nach Ausführung des Kranauslegers auch mehr als zwei Gruppen von Auslegerstücken vorgesehen sein. Die Ausbildung der Auslegerstücke in zwei Gruppen bringt jedoch eine höhere Systemähnlichkeit mit sich.In the illustrated embodiment, two groups of
Die ersten beiden Auslegerstücke 2, 3, die die erste Gruppe von Auslegerstücken bilden, sind am Fuße des Auslegers angeordnet und besitzen einen größeren Querschnitt als die zur Auslegerspitze hin angeordneten Auslegerstücke 4 bis 7 der zweiten Gruppe von Auslegerstücken. Wie
Die Auslegerstücke 4 bis 7 der zweiten Gruppe von Auslegerstücken sind jeweils als Dreigurtträger ausgebildet. Sie besitzen jeweils zwei Untergurte 13 sowie einen Obergurt 14, wobei die Untergurte 13 mit identischen Spurabmessungen wie die Untergurte 9 der Auslegerstücke 2 und 3 ausgebildet sind. Im zusammengebauten Zustand der Auslegerstücke, wie ihn
Die Längen der beiden größeren Auslegerstücke 2 und 3 sind zueinander identisch. Die Längen der äußeren Auslegerstücke 4 bis 7 sind jeweils kleiner als die Länge der Auslegerstücke 2 und 3. Zudem sind die Querschnitte der äußeren Auslegerstücke 4 bis 7 derart bemessen, dass jeweils zwei Auslegerstücke 4, 5 bzw. 6, 7 nebeneinanderliegend in eines der größeren Auslegerstücke 2 oder 3 eingeschoben werden können. Die als Dreigurtträger ausgebildeten Auslegerstücke 4 bis 7 werden hierzu um ihre Längsachse gegenüber dem zusammengebauten Zustand verdreht, so dass die Breite bzw. der Abstand der Untergurte 13 voneinander, der den Untergurten 9 der größeren Auslegerstücke 2 und 3 entspricht, nicht stört. Von Vorteil ist hierbei die schräge Anordnung der Querverbände 11 der größeren Auslegerstücke 2 und 3, wie
Zum Zwecke des Transports werden an die Kupplungsstücke 8 der beiden nebeneinanderliegenden Auslegerstücke 2 und 3 mit größerem Querschnitt jeweils stirnseitig Transportrahmen 15 montiert, die im wesentlichen, wie
Zudem besitzen die Transportrahmen 15 außen liegende Anschlusstücke 19, die in ihrer Anordnung und ihren Abmessungen den Anschlussstücken genormter Container entsprechen. Werden die Transportrahmen 15 an das Paket von Auslegerstücken 2 bis 7 bestehend aus den übereinanderliegenden Auslegerstücken 2 und 3 sowie den darin eingeschobenen Auslegerstücken 4 bis 7 gemäß
Beim Zusammenbau für den Transport kann dabei folgendermaßen vorgegangen werden: Zunächst wird einer der Transportrahmen 15 auf den Boden gelegt. Mit einem Kran werden die beiden Auslegerstücke 2 und 3 senkrecht aufgesetzt und im unteren Bereich mit den Verbindungselementen 18 der Transportrahmen 15 verbolzt. Sodann erfolgt ebenfalls senkrecht von oben das Einführen der weiteren Auslegerstücke 4 bis 7 in die beiden Auslegerstücke 2 und 3 in die jeweils entsprechende Position, wo auch Lagerungen und/oder Befestigungsmittel vorhanden sind, so dass die Auslegerstücke 4 bis 7 in den Auslegerstücken 2 und 3 für den Transport zentriert und befestigt werden. Sodann wird auf das oben stehende Ende der Auslegerstücke 2 und 3 der zweite Transportrahmen 15 montiert, wozu dieser wiederum mit den Kupplungsstücken 8 der Auslegerstücke 2 und 3 verbolzt wird.When assembling for transport can proceed as follows: First, one of the
Die Auslegerstücke 4 bis 7 des Kranauslegers müssen zum Transport nicht zwangsweise mit den Transportrahmen 15 zu einer Containereinheit zusammengebaut werden. Bei Transport von nur einer Baustelle zur nächsten können die Auslegerstücke vorteilhafterweise im ineinandergeschobenen Zustand auch auf handelsübliche Sattelschlepper verladen werden, wobei auch hier die Reduzierung des Transportvolumens durch die Verschachtelung der Auslegerstücke einen wesentlichen, kostenreduzierenden Vorteil darstellt.The
Wie
Claims (13)
- A crane boom for transport as container freight which can be assembled from a plurality of boom parts (2 - 7) which each have coupling pieces (8) at the front face end for the putting together of the boom parts (2 - 7), wherein the boom parts (2 - 7) each have at least one bottom chord (9, 13), characterized in that the boom parts can be placed next to one another such that the bottom chords (9, 13) of the boom parts (2 - 7) together form a continuous runway free of offset and faults for a crab; and in that the boom parts (2, 7) have different cross-sections so that the boom parts (2 - 7) can be pushed into one another for the purpose of transport and can be transported as container freight in the state pushed into one another.
- A crane boom in accordance with the preceding claim, wherein the boom parts (2 - 7) which can be pushed into one another are dimensioned and made such that, in the state of the boom parts (2 - 7) pushed into one another, at least one of the boom parts (2, 3) can be assembled with its coupling pieces (8) at the end face to form a container unit (20) with a pair of transport frames (15) which each have container connectors (19) compatible with standard containers.
- A crane boom in accordance with any one of the preceding claims, wherein all the boom parts (2 to 7) each have two bottom chords (9, 13) made with identical track measurements.
- A crane boom in accordance with either of claims 1 or 2, wherein all the boom parts (2 - 7) each have only one bottom chord and a plurality of top chords which are arranged in different track widths.
- A crane boom in accordance with any one of the preceding claims, wherein the boom parts (2 - 7) are made with different cross-sections such that two boom parts (4, 5; 6, 7) with smaller cross-sections can be pushed disposed next to one another into a boom part (2, 3) with a larger cross-section.
- A crane boom in accordance with any one of the preceding claims, wherein at least one boom part (4, 5, 6, 7) is made as a three-chord carrier and at least one boom part (2, 3) has at least four longitudinal chords (9, 10).
- A crane boom in accordance with any one of the preceding claims, wherein the at least one boom part (2, 3) with the at least four longitudinal chords (9, 10) has two lateral diagonal bracings (11) which are arranged spread open in V shape from the bottom chords (9) to the top chords (10).
- A crane boom in accordance with any one of the preceding claims, wherein two boom parts (2, 3) identical in cross-section with at least four longitudinal chords (9, 10) and at least two boom parts (4 - 7) identical in cross-section and each made as three-chord carriers are provided.
- A crane boom in accordance with any one of the preceding claims, wherein the boom parts (4 - 7) arranged toward the boom tip are guyed toward the lower end of the boom by means of a guying (21) at the boom parts (2, 3) and/or at a top of the tower.
- A crane boom in accordance with any one of the preceding claims, wherein fastening means are provided for the fastening of the boom parts (4 - 7) with smaller cross-sections pushed into a boom part (2, 3) with a larger cross-section to the boom part (2, 3) with a larger cross-section.
- A container unit comprising a crane boom (1) in accordance with any one of the preceding claims 1 to 10 and a transport apparatus having a pair of transport frames (15) which each have connection elements (18), on the one hand, for connection to the end face coupling pieces (8) of a boom part (2, 3) and container connectors (19) compatible with standard containers, on the other hand, by means of which the transport frames (15) can be stacked with standard containers in the state attached to the boom part (2, 3), with the transport frames (15) each being mounted at the end face to at least one boom part.
- A container unit in accordance with the preceding claim, wherein the transport frames (15) each have two sets of connection elements (18) arranged next to one another for connection to the end face coupling pieces (8) of two boom parts (2, 3) arranged longitudinally next to or on one another.
- A container unit in accordance with either of the two preceding claims, wherein each transport frame (15) has four frame limbs (16) assembled to form a closed rigid section as well as at least one diagonal strut (17).
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102004044182A DE102004044182B4 (en) | 2004-09-13 | 2004-09-13 | Crane boom for compact transport, especially as container cargo |
Publications (3)
Publication Number | Publication Date |
---|---|
EP1634846A2 EP1634846A2 (en) | 2006-03-15 |
EP1634846A3 EP1634846A3 (en) | 2006-11-15 |
EP1634846B1 true EP1634846B1 (en) | 2009-12-16 |
Family
ID=35589313
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP05019844A Not-in-force EP1634846B1 (en) | 2004-09-13 | 2005-09-12 | Crane boom for container transport and transport device for the parts of the crane boom |
Country Status (5)
Country | Link |
---|---|
US (1) | US7422123B2 (en) |
EP (1) | EP1634846B1 (en) |
AT (1) | ATE452104T1 (en) |
DE (2) | DE102004044182B4 (en) |
ES (1) | ES2338240T3 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103754504A (en) * | 2014-01-09 | 2014-04-30 | 中联重科股份有限公司 | Tower crane boom packing device, system and method |
DE102020134714A1 (en) | 2020-12-22 | 2022-06-23 | Tadano Demag Gmbh | Mobile crane with a luffing main boom and with an additional boom system |
US11945700B2 (en) | 2020-11-09 | 2024-04-02 | Tadano Demag Gmbh | Vehicle crane comprising a jib system |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102012013001B4 (en) * | 2012-06-28 | 2019-04-25 | Liebherr-Werk Ehingen Gmbh | Crane boom and crane |
DE102012019248A1 (en) | 2012-09-28 | 2014-04-03 | Liebherr-Werk Biberach Gmbh | Tower Crane |
CN110963426A (en) * | 2018-09-30 | 2020-04-07 | 徐工集团工程机械股份有限公司 | Foldable deformation truss arm section, truss arm and crane |
CN113562638B (en) * | 2021-07-22 | 2024-01-30 | 大连益利亚工程机械有限公司 | Large-arm-length crane boom and crane |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1279904B (en) * | 1967-04-06 | 1968-10-10 | Coles Krane G M B H | Outrigger mast for cranes |
US4016974A (en) * | 1974-11-08 | 1977-04-12 | Hans Tax | Package for transporting units of a modular crane |
DE2525844C2 (en) * | 1975-06-10 | 1977-05-12 | Liebherr Werk Biberach | ROAD DRIVING CRANE |
DE2931422C3 (en) * | 1979-08-02 | 1982-02-25 | Reich Maschinen GmbH, 7911 Nersingen | Top slewing tower crane |
DE2934176A1 (en) * | 1979-08-23 | 1981-03-12 | Hudelmaier, geb. Otto, Ingrid, 7900 Ulm | Telescopic crane jib for travelling crab - has lever links moving extending section into line with fixed one |
DE3105771A1 (en) * | 1981-02-17 | 1982-09-02 | Liebherr-Werk Bischofshofen GmbH, 5500 Bischofshofen | Tower crane |
DE29718157U1 (en) * | 1997-10-14 | 1998-02-19 | Noell Service und Maschinentechnik GmbH, 54294 Trier | Transport unit for tower elements of tower cranes |
FR2792627B1 (en) * | 1999-04-23 | 2001-06-01 | Potain Sa | CRANE WITH MULTI-FUNCTION BOOM |
DE20205223U1 (en) * | 2002-04-04 | 2003-08-14 | Liebherr Werk Biberach Gmbh | Crane has telescopic jib with jib sections with retractable and extendable running tracks for travelling crab which from first jib section continue onto second jib section with same track width |
-
2004
- 2004-09-13 DE DE102004044182A patent/DE102004044182B4/en not_active Expired - Fee Related
-
2005
- 2005-09-12 AT AT05019844T patent/ATE452104T1/en active
- 2005-09-12 ES ES05019844T patent/ES2338240T3/en active Active
- 2005-09-12 EP EP05019844A patent/EP1634846B1/en not_active Not-in-force
- 2005-09-12 DE DE502005008699T patent/DE502005008699D1/en active Active
- 2005-11-25 US US11/225,718 patent/US7422123B2/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103754504A (en) * | 2014-01-09 | 2014-04-30 | 中联重科股份有限公司 | Tower crane boom packing device, system and method |
CN103754504B (en) * | 2014-01-09 | 2015-12-09 | 中联重科股份有限公司 | Arm frame of tower crane packing apparatus, packaging system and packaging method |
US11945700B2 (en) | 2020-11-09 | 2024-04-02 | Tadano Demag Gmbh | Vehicle crane comprising a jib system |
DE102020134714A1 (en) | 2020-12-22 | 2022-06-23 | Tadano Demag Gmbh | Mobile crane with a luffing main boom and with an additional boom system |
DE102020134714B4 (en) | 2020-12-22 | 2023-09-28 | Tadano Demag Gmbh | Mobile crane with a luffing main boom and an additional boom system |
US11884521B2 (en) | 2020-12-22 | 2024-01-30 | Tadano Demag Gmbh | Mobile crane with a luffing main boom and with an additional boom system |
Also Published As
Publication number | Publication date |
---|---|
ES2338240T3 (en) | 2010-05-05 |
EP1634846A3 (en) | 2006-11-15 |
EP1634846A2 (en) | 2006-03-15 |
DE102004044182B4 (en) | 2007-05-24 |
US7422123B2 (en) | 2008-09-09 |
ATE452104T1 (en) | 2010-01-15 |
DE502005008699D1 (en) | 2010-01-28 |
DE102004044182A1 (en) | 2006-03-30 |
US20060118506A1 (en) | 2006-06-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1935833B1 (en) | Framework unit for a large mobile crane and method for its erection | |
EP1634846B1 (en) | Crane boom for container transport and transport device for the parts of the crane boom | |
EP3653435B1 (en) | Vehicle for transporting a long transported item | |
DE102009016033A1 (en) | Lattice boom crane and lattice boom | |
DE102011115355B4 (en) | Boom element, telescopic boom and construction vehicle | |
DE102015007636A1 (en) | Lattice piece for a lattice boom, lattice boom and crane | |
DE3247231A1 (en) | FRAME CONSTRUCTION FOR A PERSONAL SLOPER | |
DE102017000525A1 (en) | Lattice element and lattice piece for crane jib | |
DE102011102110B4 (en) | Undercarriage for crawler crane, crawler crane and method of erecting and dismantling a crawler crane | |
DE2324184B2 (en) | Device for connecting elements of a structure | |
EP2199247A2 (en) | Rotating connection | |
EP1213254B1 (en) | Telescopic boom | |
DE3320186C2 (en) | Recovery device, especially for immobile aircraft | |
DE3340845C1 (en) | Lattice boom crane with main boom that can be dismantled | |
EP0084858A1 (en) | Glass transport rack | |
DE2229318B2 (en) | Tower crane | |
EP2196401B1 (en) | Palette with feet with reinforced tubing | |
DE102014110824B4 (en) | A tower-like amusement device and method for constructing an amusement device | |
DE112010001627B4 (en) | Transport arrangement for fence and / or barrier elements | |
DE4126768A1 (en) | Transportable rack-climbing building lift - uses platform drive in conjunction with removable platform supporting legs to raise lift base so that trailer can be attached. | |
DE102016005343B4 (en) | Mast segment and mast | |
DE2227431A1 (en) | LIFT TRUCK WITH HAND WINCH | |
DE2453166C3 (en) | Transport unit of crane components | |
DE3337163A1 (en) | Tower crane | |
DE1658619C (en) | Structure that can be dismantled, preferably for bridges |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR MK YU |
|
RTI1 | Title (correction) |
Free format text: CRANE BOOM FOR CONTAINER TRANSPORT AND TRANSPORT DEVICE FOR THE PARTS OF THE CRANE BOOM |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR MK YU |
|
17P | Request for examination filed |
Effective date: 20061206 |
|
17Q | First examination report despatched |
Effective date: 20070117 |
|
AKX | Designation fees paid |
Designated state(s): AT CH DE ES FR IT LI |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT CH DE ES FR IT LI |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: CH Ref legal event code: NV Representative=s name: BOVARD AG PATENTANWAELTE |
|
REF | Corresponds to: |
Ref document number: 502005008699 Country of ref document: DE Date of ref document: 20100128 Kind code of ref document: P |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2338240 Country of ref document: ES Kind code of ref document: T3 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20100917 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PFA Owner name: LIEBHERR-WERK BIBERACH GMBH Free format text: LIEBHERR-WERK BIBERACH GMBH#HANS-LIEBHERR-STRASSE 45#88400 BIBERACH AN DER RISS (DE) -TRANSFER TO- LIEBHERR-WERK BIBERACH GMBH#HANS-LIEBHERR-STRASSE 45#88400 BIBERACH AN DER RISS (DE) |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 12 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 13 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 14 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20210930 Year of fee payment: 17 Ref country code: AT Payment date: 20210923 Year of fee payment: 17 Ref country code: CH Payment date: 20210924 Year of fee payment: 17 Ref country code: FR Payment date: 20210924 Year of fee payment: 17 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20210923 Year of fee payment: 17 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20211001 Year of fee payment: 17 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 502005008699 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 452104 Country of ref document: AT Kind code of ref document: T Effective date: 20220912 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220930 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220930 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230401 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220930 Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220912 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20231027 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220912 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220913 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220913 |