EP1586706B1 - Method and device for producing asphalt mix - Google Patents

Method and device for producing asphalt mix Download PDF

Info

Publication number
EP1586706B1
EP1586706B1 EP05008075.3A EP05008075A EP1586706B1 EP 1586706 B1 EP1586706 B1 EP 1586706B1 EP 05008075 A EP05008075 A EP 05008075A EP 1586706 B1 EP1586706 B1 EP 1586706B1
Authority
EP
European Patent Office
Prior art keywords
mix
mixer
mixing
asphalt
discharging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP05008075.3A
Other languages
German (de)
French (fr)
Other versions
EP1586706A2 (en
EP1586706A3 (en
Inventor
Karl Gunnar Ohlson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP1586706A2 publication Critical patent/EP1586706A2/en
Publication of EP1586706A3 publication Critical patent/EP1586706A3/en
Application granted granted Critical
Publication of EP1586706B1 publication Critical patent/EP1586706B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/02Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing the materials
    • E01C19/10Apparatus or plants for premixing or precoating aggregate or fillers with non-hydraulic binders, e.g. with bitumen, with resins, i.e. producing mixtures or coating aggregates otherwise than by penetrating or surface dressing; Apparatus for premixing non-hydraulic mixtures prior to placing or for reconditioning salvaged non-hydraulic compositions
    • E01C19/1013Plant characterised by the mode of operation or the construction of the mixing apparatus; Mixing apparatus
    • E01C19/104Mixing by means of movable members in a non-rotating mixing enclosure, e.g. stirrers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/02Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing the materials
    • E01C19/10Apparatus or plants for premixing or precoating aggregate or fillers with non-hydraulic binders, e.g. with bitumen, with resins, i.e. producing mixtures or coating aggregates otherwise than by penetrating or surface dressing; Apparatus for premixing non-hydraulic mixtures prior to placing or for reconditioning salvaged non-hydraulic compositions
    • E01C19/1059Controlling the operations; Devices solely for supplying or proportioning the ingredients
    • E01C19/1068Supplying or proportioning the ingredients

Definitions

  • the invention refers to a method for producing asphalt mix as known from EP 0 756 615 B1 .
  • WO 83/00700 describes a method and apparatus for the production of asphalt concrete.
  • the aggregate is divided into a coarse fraction, a fine fraction and a filler portion.
  • the coarse fraction and the bituminous liquid are mixed, then the filler fraction is added, and last, the fine fraction is added.
  • the apparatus for carrying out such production method is described in detail.
  • the mixing method of WO 83/00700 has been commonly known as "KGO II" mixing method.
  • the known mixing method is characterized by force mixing. The filler is discharged at once, and then the mixing is conducted by the force of mixing paddles.
  • the filler discharge is such controlled that the filler is powdered over the liquid distributed over the surface of the coarse fraction.
  • the same technique is used in the KGO III mixing method. By such mixing, the bituminous liquid, the filler and the fine fraction material becomes enclosed in a combined suspension where the filler, the fine fraction and the coarse fraction are parts of a closed liquid volume. This condition is testable by the TOD-test. The flow rate and the time intervals for discharging the filler and the fine fraction are controlled in such a way that the closed liquid volume is established.
  • EP 1 408 157 A2 discloses European Patent Application 03023201.1 published on the priority date of the present application as EP 1 408 157 A2 and such being state of art according to Art 54(3) EPC, only.
  • the aim of this state of art according to EP 1 408 157 A2 is to find optimal time intervalls and flow rates for production of a closed liquid volume of the mix.
  • An object of the present invention is to improve the mixing methods as known from EP 0 756 615 B1 in such a way that the intervall and flow rates can easier be optimized.
  • a further object of the invention is to increase the viscous resource in batch plant mixed asphalt pavings.
  • the invention especially refers to a start up procedure for starting production of asphalt mix in an asphalt plant. Beginning with such procedure, the optimized intervall and flow rates easily are found by starting with a particular time schedule. The optimized adjustments of an asphalt plant are found easily by producing the mix, testing it with the TOD test and amending the intervall and flow rates, if necessary or advantageous.
  • the coarse fraction and the bitumen are discharged and mixed together in one step.
  • the amount of coarse aggregate and of the bitumen are increasing simultanously.
  • the mixing time for mixing coarse aggregate and bitumen starts at the time starting the discharge of the aggregate and the liquid. So, the effete mixing time starts earlier and can last longer. Since the amount of coarse aggregat and liquid are increasing simultanously, each particle of coarse aggregat will be better covered with liquid so that the closed liquid volume of the whole asphalt mix can be achieved more easily.
  • the effect of the invention is visible by the TOD test. With the invention, one achieves a smoother curve of the deformation versus temperature. The behaviour of a mix produced according to the invention is more like a liquid as compared with Fig. 1 a ) of EP 0 756 615 B1 .
  • the known asphalt product still shows a sharp, sudden fall at a higher temperature.
  • An aspalt product produced by the invention shows a smooth curve without sudden changes or flanks.
  • figure 1 results from a discovery of that the property of viscosity that characterizes the unmixed bituminous liquid, figure 1 refers, is drastically reduced in the known process of mixing, this from lack of relevant time schedule for adding and flow rates of the different fractions of solids at discharge to the mixer.
  • Inertia is a combined function of ductility and cohesion, properties recognized as the resource of durability of the bituminous liquid as the binder of paved mix.
  • One novelty of the invention is the time schedule for entering to the mixer the different fractions of the aggregate and the bituminous liquid of the mix, the mixing times of each fraction entered and the time of emptying the mixer of the ready asphalt mix that is characterized by the viscous resource of the unmixed bituminous liquid.
  • the basic components of asphalt mix are the following:
  • composition of the mixes of an embodiment of the invention differs from the known by that, independent of the type of the mix, the fine fraction and filler, has more or less the same percentage in mix and the different types of the mixes are recognized by the difference in the size of the largest particles of the coarse fraction.
  • FIG. 2 An example of material composition for use with the invention for production of asphalt paving of type surface layer, is shown by figure 2 .
  • a time schedule shows the order of discharge, the intervals between discharge, the rate of flow at discharge and the mixing time between discharge of each component added to the mixer.
  • the production of asphalt paving mix by the shown time schedule results in a paving characterized by the property of the viscosity of the bituminous liquid.
  • the property of viscosity in the mix is shown by test on specimens drilled from the paving.
  • Figure 4a shows a test equipment, and figure 4b ) represents a graph of viscous mix.
  • the time schedule of figure 3 is universal for starting up different make of asphalt plants and will function with all types of mix with the material composition of the invention. Trimming the schedule for adjustment of the respective asphalt plant capacity is allowed, the extent is however limited by the test on the viscous behaviour of the mix.
  • Figure 4 b) refers.
  • the described invention is a technology here described by a time schedule, an example of mix composition, a method for trimming the asphalt plant and a method for testing the asphalt mix. By the method of testing, the limit to which the time schedule can be trimmed is also learned.
  • One embodiment of the invention provides a method for production of asphalt mix depending on a time schedule for entering to the mixer the different fractions of the aggregate and the bituminous liquid of the mix, the mixing times of each fraction entered and the time of emptying the mixer of the ready asphalt mix, this having the effect of the invention of the viscous resource of bituminous liquid, the time schedule being universal for different make of asphalt batch plants for discharges of the components to the mixer to be used when starting production by the invention.
  • the time schedule includes
  • any type of asphalt plant easily can be adjusted to produce asphalt mix with increased viscous behaviour which is testable by TOD test.
  • the time schedule of the invention is universal for starting up production at any asphalt plant.
  • a time schedule to weigh and discharge the material to the mixer can be provided including
  • the apparatus that controls the discharge and mixing times makes those adjustable to the extent allowed for trimming of the plants capacity.
  • An example of a device for carrying out the method has a screw (D) for discharge of the filler into the mixer, wherein the flow rate is adjusted by the change of the revolution/minute of the screw by a frequency converter connected to the motor of the screw.
  • a further example of a device for carrying out the method has a wall fitted in the weigh hopper above the mixer or alternative in the mixer (A), depending on space, the function of this is to prevent the aggregate material from being discharges into area (C) of the mixer where the material flow in the mixer is countercurrent to the flow of the discharged material.
  • the invention results from a discovery that the property of viscosity that characterize the unmixed bituminous liquid is drastically reduced in the known processes of mixing, this from lack of a relevant time schedule for adding, and flow rates of the different fractions of solids at discharge into the mixer.
  • the invention is a technology of mixing the components of the asphalt mix without reduction in the viscous resource of the bituminous liquid.
  • the technology is here described by a time schedule, an example of mix composition, a method for testing the asphalt mix of the viscous resource and devices that control the flow of the components in mix at discharged to the mixer. By the method of testing is also learned the limit to which the time schedule can be trimmed, as to the asphalt plants capacity.
  • the invention is important to the production of asphalt mixes. This as the viscosity of the bituminous liquid is a product of ductility and cohesion, a combination recognized as the resource of durability of the bituminous liquid as the binder of paved mix.

Description

  • The invention refers to a method for producing asphalt mix as known from EP 0 756 615 B1 .
  • Reference is first made to WO 83/00700 which describes a method and apparatus for the production of asphalt concrete. According to this previous method, the aggregate is divided into a coarse fraction, a fine fraction and a filler portion. First, the coarse fraction and the bituminous liquid are mixed, then the filler fraction is added, and last, the fine fraction is added. The apparatus for carrying out such production method is described in detail. The mixing method of WO 83/00700 has been commonly known as "KGO II" mixing method. The known mixing method is characterized by force mixing. The filler is discharged at once, and then the mixing is conducted by the force of mixing paddles.
  • Reference is now made to the above mentioned EP 0 756 615 B1 . In such patent, there is shown and described a test equipment and method for testing of asphalt specimens, called TOD test. The specimens are heated and the deformation in the specimens is determined. The deformation over temperature is plotted in a graphic. The curve of a specimen produced by the KGO II mixing method still shows sharp buckles and cracks. This shows the tendency of an asphalt to crack. In EP 0 756 615 B1 , a new mixing method is given reducing such tendency to crack. The mixing method of EP 0 756 615 B1 - known as KGO III mixing method - is characterized by controlling the flow rate and time intervals for discharging the filler and the fine fraction. The filler discharge is such controlled that the filler is powdered over the liquid distributed over the surface of the coarse fraction. To understand this, one can compare the mixing methods with a preparation of a pancake dough, If the flour is discharged at once into the milk, a forced mixing is necessary. Nevertheless, the dough becomes lumpy. If, however, the flour is powdered over the milk when mixing the dough, lumps are avoided. The same technique is used in the KGO III mixing method. By such mixing, the bituminous liquid, the filler and the fine fraction material becomes enclosed in a combined suspension where the filler, the fine fraction and the coarse fraction are parts of a closed liquid volume. This condition is testable by the TOD-test. The flow rate and the time intervals for discharging the filler and the fine fraction are controlled in such a way that the closed liquid volume is established.
  • With the mixing method of EP 0 756 615 B1 , one has changed from a force mixing to a flow mixing. Further details of the theory and the praxis of such flow mixing are given in "Method and means used in production of asphalt mix. Theory of suspension, mixing method, method of testing, method of analyses", dissertation at Lund University by Ohlson, Karl Gunnar, Institutionen för Trafikteknik, LTH, bulletin 132, available at the Lund University, Box 118, SE-22100 Lund (Sweden) under the code "CODEN LUTVDG/(TVTT-3110)/1-113/(1995)", Lund 1995. This dissertation is incorporated here by reference.
  • When trying to conduct the KGO III mixing method in practice, namely in some asphalt plants, especially such one as given in WO 83/00700 , some problems have been raised. It was particularly difficult to find the optimised time intervals and flow rates for developing the closed liquid volume.
  • Further, reference is made to the European Patent Application 03023201.1 published on the priority date of the present application as EP 1 408 157 A2 and such being state of art according to Art 54(3) EPC, only. The aim of this state of art according to EP 1 408 157 A2 is to find optimal time intervalls and flow rates for production of a closed liquid volume of the mix.
  • An object of the present invention is to improve the mixing methods as known from EP 0 756 615 B1 in such a way that the intervall and flow rates can easier be optimized.
  • A further object of the invention is to increase the viscous resource in batch plant mixed asphalt pavings.
  • Such objects are achieved by the method according to claim 1.
  • Advantageous embodiments are given in the subclaims.
  • The invention especially refers to a start up procedure for starting production of asphalt mix in an asphalt plant. Beginning with such procedure, the optimized intervall and flow rates easily are found by starting with a particular time schedule. The optimized adjustments of an asphalt plant are found easily by producing the mix, testing it with the TOD test and amending the intervall and flow rates, if necessary or advantageous.
  • When comparing the invention with the method according to EP 1 408 157 A2 , it is clear that the order and intervalls for discharging and mixing of the different fractions are different. In EP 1 408 157 A2 , the method is started by discharging the coarse fraction during 3s, then discharging the bitumen for 8s, then mixing coarse fraction and bitumen for 10s. The result of the mixing process is depending on the mixing time of each fraction before the next material is added. According to EP 1 408 157 A2 , the discharge of bitumen starts after having discharged all the coarse aggregate into the mixer. Then, the mixing time starts at the time when all bitumen has been discharged into the mixer. Thus, the effective mixing time for mixing coarse fraction and bitumen, corresponds only to the mixing time of 10s.
  • According to the invention, the coarse fraction and the bitumen are discharged and mixed together in one step. The amount of coarse aggregate and of the bitumen are increasing simultanously. Thus, the mixing time for mixing coarse aggregate and bitumen starts at the time starting the discharge of the aggregate and the liquid. So, the efective mixing time starts earlier and can last longer. Since the amount of coarse aggregat and liquid are increasing simultanously, each particle of coarse aggregat will be better covered with liquid so that the closed liquid volume of the whole asphalt mix can be achieved more easily. The effect of the invention is visible by the TOD test. With the invention, one achieves a smoother curve of the deformation versus temperature. The behaviour of a mix produced according to the invention is more like a liquid as compared with Fig. 1 a) of EP 0 756 615 B1 . The known asphalt product still shows a sharp, sudden fall at a higher temperature. An aspalt product produced by the invention shows a smooth curve without sudden changes or flanks.
  • Embodiments of the invention are now explained in more detail with reference to the enclosed drawings in which:
  • Fig. 1
    is a graph showing the viscous source of different road bitumen.
    Fig. 2
    is a diagramm showing an example of material composition of asphalt mix used by the invention.
    Fig. 3
    shows an example of a mixing time schedule used by the invention.
    Fig. 4a
    shows an test apparatus for testing the viscous resource of produced mix.
    Fig. 4b
    shows an diagramm, comparable with Fig. 1 of EP 0 756 615 B1 , showing the deformation of a specimen over the temperature for a specimen produced with the invention. The diagramm represents an example of a characterisitc result from test of the viscous resource of produced mix.
    Fig. 5
    illustrates a first example of a device for discharge rate of the filler into the mixer for producing asphalt mix.
    Fig. 6
    illustrates a second example of a device for preventing inflew of aggregate material into the mixer to meet with the countercurrent flow in the mixer for producing asphalt mix.
  • The invention results from a discovery of that the property of viscosity that characterizes the unmixed bituminous liquid, figure 1 refers, is drastically reduced in the known process of mixing, this from lack of relevant time schedule for adding and flow rates of the different fractions of solids at discharge to the mixer.
  • "Viscosity resist flow by inertia. Inertia is a combined function of ductility and cohesion, properties recognized as the resource of durability of the bituminous liquid as the binder of paved mix".
  • One novelty of the invention is the time schedule for entering to the mixer the different fractions of the aggregate and the bituminous liquid of the mix, the mixing times of each fraction entered and the time of emptying the mixer of the ready asphalt mix that is characterized by the viscous resource of the unmixed bituminous liquid.
  • The basic components of asphalt mix are the following:
    • Bituminous liquid (road bitumen) of different viscosity, figure 1 refers;
    • Aggregate coarse fraction, particles mainly > 4 mm;
    • Aggregate fine fraction, particles mainly < 4 mm; and
    • Filler, particles mainly < 0.0074 mm.
  • In the known technology there are a number of different types of mixes used for paving work, each with different material composition that concern both the fine and the coarse fraction.
  • The composition of the mixes of an embodiment of the invention differs from the known by that, independent of the type of the mix, the fine fraction and filler, has more or less the same percentage in mix and the different types of the mixes are recognized by the difference in the size of the largest particles of the coarse fraction.
  • An example of material composition for use with the invention for production of asphalt paving of type surface layer, is shown by figure 2.
  • A time schedule, figure 3 refers, shows the order of discharge, the intervals between discharge, the rate of flow at discharge and the mixing time between discharge of each component added to the mixer. The production of asphalt paving mix by the shown time schedule, results in a paving characterized by the property of the viscosity of the bituminous liquid. The property of viscosity in the mix is shown by test on specimens drilled from the paving. Figure 4a) shows a test equipment, and figure 4b) represents a graph of viscous mix.
  • The time schedule of figure 3 is universal for starting up different make of asphalt plants and will function with all types of mix with the material composition of the invention. Trimming the schedule for adjustment of the respective asphalt plant capacity is allowed, the extent is however limited by the test on the viscous behaviour of the mix. Figure 4 b) refers.
  • Am embodiment of the invention requires the following mechanical changes to the asphalt plant:
    1. 1) an apparatus set to administrate the mixing process in accordance with the time schedule shown by fig. 3;
    2. 2) the device for discharge of the filler into the mixer to be furnished with an apparatus for regulating the flow rate of the filler at discharge to the mixer. Example: If there is a screw feed, the flow rate can be adjusted by lowering the revolution/minute of the screw, this by a frequency converter on the motor of the screw. Fig. 5 refers.
    3. 3) a device that prevent the aggregate material from being discharged in to area (C), figure 6 refers, where the material flow in the mixer is countercurrent to the flow of the discharged material.
  • The described invention is a technology here described by a time schedule, an example of mix composition, a method for trimming the asphalt plant and a method for testing the asphalt mix. By the method of testing, the limit to which the time schedule can be trimmed is also learned.
  • One embodiment of the invention provides a method for production of asphalt mix depending on a time schedule for entering to the mixer the different fractions of the aggregate and the bituminous liquid of the mix, the mixing times of each fraction entered and the time of emptying the mixer of the ready asphalt mix, this having the effect of the invention of the viscous resource of bituminous liquid, the time schedule being universal for different make of asphalt batch plants for discharges of the components to the mixer to be used when starting production by the invention. The time schedule includes
    1. a) discharge the coarse fraction and the bituminous liquid simultaneous and mix over a timeperiod of 17s,
    2. b) spread the discharge of the filler over a timeperiod of 17s,
    3. c) discharge and mixing the fine fraction material over a timeperiod of 18s, and
    4. d) discharge of the ready mix from the mixer.
  • By starting the production of asphalt mix with such time schedule, any type of asphalt plant easily can be adjusted to produce asphalt mix with increased viscous behaviour which is testable by TOD test. Such, the time schedule of the invention is universal for starting up production at any asphalt plant.
  • Further, a time schedule to weigh and discharge the material to the mixer can be provided including
    1. e) to weigh up the desired amount of coarse fraction and fine fraction separately at the same time or one after the other to the weigh hopper of the plant
    2. f) to discharge to the mixer, the coarse fraction together with the desired amount of bituminous liquid, discharge time and mixing time 17s
    3. g) to discharge the desired amount of filler to the mixer, at the flow rate that spread the discharge over 17s.
    4. h) discharge the fine fraction, the discharge time and mixing time, 18s, whereupon the mixer is emptied.
    5. i) to repeat the time schedule for continuous production.
  • The apparatus that controls the discharge and mixing times makes those adjustable to the extent allowed for trimming of the plants capacity.
  • An example of a device for carrying out the method has a screw (D) for discharge of the filler into the mixer, wherein the flow rate is adjusted by the change of the revolution/minute of the screw by a frequency converter connected to the motor of the screw.
  • A further example of a device for carrying out the method has a wall fitted in the weigh hopper above the mixer or alternative in the mixer (A), depending on space, the function of this is to prevent the aggregate material from being discharges into area (C) of the mixer where the material flow in the mixer is countercurrent to the flow of the discharged material.
  • The invention results from a discovery that the property of viscosity that characterize the unmixed bituminous liquid is drastically reduced in the known processes of mixing, this from lack of a relevant time schedule for adding, and flow rates of the different fractions of solids at discharge into the mixer.
  • The invention is a technology of mixing the components of the asphalt mix without reduction in the viscous resource of the bituminous liquid. The technology is here described by a time schedule, an example of mix composition, a method for testing the asphalt mix of the viscous resource and devices that control the flow of the components in mix at discharged to the mixer. By the method of testing is also learned the limit to which the time schedule can be trimmed, as to the asphalt plants capacity.
  • The invention is important to the production of asphalt mixes. This as the viscosity of the bituminous liquid is a product of ductility and cohesion, a combination recognized as the resource of durability of the bituminous liquid as the binder of paved mix.

Claims (7)

  1. Method for producing an asphalt mix that includes a coarse fraction, a fine fraction, filler and a bituminous liquid with the following steps in the mentioned order:
    a) mixing the coarse fraction and the bituminous liquid in a mixer,
    b) discharging the filler to be spread over the coarse fraction and the bituminous liquid and
    c) discharging the fine fraction over the filler and mixing,
    d) discharging the ready mix from the mixer,
    wherein the discharge of the fractions are optimized so that the mix behaves like a liquid in a test where a deformation of a specimen of the mix depending from the temperature of the specimen is measured,
    characterized in that,
    for conducting step a), the coarse fraction and the liquid binder are discharged and mixed simultanously over a first time period,
    and in that for starting production of asphalt mix in an asphalt plant, optimized intervall and flow rates are found by starting with a particular time schedule, producing the mix, testing it with said test and amending the intervall and flow rates, if necessary or advantageous until the asphalt product produced shows, in said test, viscous resource by a smooth curve of deformation versus temperature without sudden changes or flanks.
  2. Method according to claim 1,
    characterized in that, for starting production of the asphalt mix in an asphalt plant, the following time schedule is used universally in different types of asphalt plants and for different mix compositions:
    a) discharging the coarse fraction and the bituminous liquid simultanously and mix over a first time period of 17s,
    b) spreading the discharge of the filler over a second time period of 17s,
    c) discharging and mixing the fine fraction material over a third time period of 18s,
    d) discharging the ready mix from the mixer.
  3. Method according to claim 2,
    characterized in that the time schedule is thereafter amended to achieve and/or optimize the viscous behaviour of the mix.
  4. Method according to any of the claims 2 or 3,
    characterized in that the time schedule is then trimmed for adjustment of the respective asphalt plant capacity wherein the extent of trimming is limited by testing the viscous behaviour of the mix.
  5. Method according to any of the preceding claims,
    characterized in that
    the filler and/or the fine fraction is discharged into a downwardly directed material flow in the mixer.
  6. Method according to claim 5,
    characterized by using a mixer with a mixing shaft extending in a horizontally direction and having paddles for driving the flow of the material to be mixed and by discharging the fine fraction material along a mixer wall extending essentially parallel to the shaft where the paddles are rotated in a downward direction.
  7. Method according to any of the claims 5 or 6,
    characterized by using a mixer with at least two mixing shafts having mixing paddles wherein the shafts and their paddles are rotating in opposite directions so that the paddles on the side near to the other shaft are moving upwards and the paddles located near to a wall of the mixer which wall extends essentially parallel to the shafts are moving downwards.
EP05008075.3A 2004-04-14 2005-04-13 Method and device for producing asphalt mix Active EP1586706B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN200410032986 2004-04-14
CN 200410032986 CN1683715B (en) 2004-04-14 2004-04-14 Method and device for increasing asphalt road paving material viscosity mixed by intermittent operation device

Publications (3)

Publication Number Publication Date
EP1586706A2 EP1586706A2 (en) 2005-10-19
EP1586706A3 EP1586706A3 (en) 2006-11-15
EP1586706B1 true EP1586706B1 (en) 2013-04-10

Family

ID=34935112

Family Applications (1)

Application Number Title Priority Date Filing Date
EP05008075.3A Active EP1586706B1 (en) 2004-04-14 2005-04-13 Method and device for producing asphalt mix

Country Status (2)

Country Link
EP (1) EP1586706B1 (en)
CN (1) CN1683715B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2476529A3 (en) 2010-09-28 2014-04-16 Karl Gunnar Ohlson Invention that reduce or eliminate force mixing in production of asphalt pavings and cement concrete

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1996000324A1 (en) * 1994-06-27 1996-01-04 Leif Persson Plant I Lomma Ab Method and device for cold mixing of road surfacing material

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3394094A (en) * 1964-04-20 1968-07-23 Ind Asphalt Of California Inc Process of preparing a paving composition
US4579458A (en) * 1981-08-25 1986-04-01 Ohlson Karl G Method and apparatus for the production of asphalt concrete
SE506581C3 (en) * 1994-04-19 1998-02-05 Karl Gunnar Ohlson Prior to the production of asphalt pulp
CN1173813C (en) * 2002-04-10 2004-11-03 陈启宗 Cold aggregate batching treatment method and device for continuous bituminous concrete mixing equipment
SE525421C2 (en) 2002-10-11 2005-02-15 Karl Gunnar Ohlson Process for the preparation of asphalt pulp and apparatus for its implementation

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1996000324A1 (en) * 1994-06-27 1996-01-04 Leif Persson Plant I Lomma Ab Method and device for cold mixing of road surfacing material

Also Published As

Publication number Publication date
CN1683715B (en) 2013-07-17
EP1586706A2 (en) 2005-10-19
CN1683715A (en) 2005-10-19
EP1586706A3 (en) 2006-11-15

Similar Documents

Publication Publication Date Title
EP0073181B1 (en) Method and apparatus for making asphalt concrete
Heitzman Design and construction of asphalt paving materials with crumb rubber modifier
AU680830B2 (en) Chocolate conching
EP1550535B1 (en) Method and apparatus for manufacturing concrete mass
EP1408157B1 (en) Method and device for producing asphalt mix
CN104975553B (en) A kind of cold-mix asphalt mixing material manufacturing technique and its mixing plant
CN1173813C (en) Cold aggregate batching treatment method and device for continuous bituminous concrete mixing equipment
EP1586706B1 (en) Method and device for producing asphalt mix
CN108195645A (en) For the micro-surface area lying device and operating method of rotary type road surface accelerated loading rut test piece
KR20030027532A (en) adjustable mixture ratio the mobile type concrete mixer
KR890002047B1 (en) Machines or methods for producing of cement
EP0760882B1 (en) Method and device for cold mixing of road surfacing material
CN109342705B (en) Indoor test operation method and device for vibration mixing of asphalt mixture
CN210439103U (en) Agitating unit is used in pitch regeneration
RU2272014C1 (en) Method of preparation of concrete and mortar mix of cast consistency for civil, industrial and highway engineering in self-contained or trailed or installed at area of work mixing plant
CN211472030U (en) Asphalt mixture mixer truck
EP0756615B1 (en) Invention concerning production of asphaltmix
CN110271102A (en) A kind of concrete mixing plant batching control system and control method
CN109972481A (en) A kind of paver with continuous online agitating function
JPS5929026A (en) Method and device for kneading powder of cement or the like and other kneading material
CN215625413U (en) Mixed sand loading attachment
VON et al. RHEOLOGY-BASED MIXING PROCESS TO ENSURE UNIFORM WORKABILITY OF DEMANDING CONCRETE MIXES
CN220146319U (en) Proportioning device is regulated and control to concrete
KR200436292Y1 (en) Mixed aggregate production apparatus
CN220677613U (en) Concrete accelerator batching mixing arrangement

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR LV MK YU

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR LV MK YU

17P Request for examination filed

Effective date: 20070430

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR

17Q First examination report despatched

Effective date: 20100225

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 606111

Country of ref document: AT

Kind code of ref document: T

Effective date: 20130415

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602005038953

Country of ref document: DE

Effective date: 20130606

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: BOHEST AG, CH

REG Reference to a national code

Ref country code: SE

Ref legal event code: RINS

Effective date: 20130723

Ref country code: SE

Ref legal event code: TRGR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130410

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 606111

Country of ref document: AT

Kind code of ref document: T

Effective date: 20130410

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20130410

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130410

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130812

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130410

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130410

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130721

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130810

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130711

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130410

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130410

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130710

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130410

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130410

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130410

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130410

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130410

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130410

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130410

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130410

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130410

26N No opposition filed

Effective date: 20140113

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602005038953

Country of ref document: DE

Effective date: 20140113

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130413

REG Reference to a national code

Ref country code: CH

Ref legal event code: PCAR

Free format text: NEW ADDRESS: HOLBEINSTRASSE 36-38, 4051 BASEL (CH)

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130410

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130413

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20050413

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 602005038953

Country of ref document: DE

Representative=s name: KASTEL PATENTANWAELTE, DE

Ref country code: DE

Ref legal event code: R082

Ref document number: 602005038953

Country of ref document: DE

Representative=s name: KASTEL PATENTANWAELTE PARTG MBB, DE

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 12

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 13

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20200420

Year of fee payment: 16

Ref country code: FR

Payment date: 20200420

Year of fee payment: 16

Ref country code: CH

Payment date: 20200420

Year of fee payment: 16

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20200427

Year of fee payment: 16

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602005038953

Country of ref document: DE

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20210413

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210430

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210430

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210430

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210413

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211103

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20230420

Year of fee payment: 19