EP1528153A2 - Zweiteiliger Bordstein - Google Patents

Zweiteiliger Bordstein Download PDF

Info

Publication number
EP1528153A2
EP1528153A2 EP04256684A EP04256684A EP1528153A2 EP 1528153 A2 EP1528153 A2 EP 1528153A2 EP 04256684 A EP04256684 A EP 04256684A EP 04256684 A EP04256684 A EP 04256684A EP 1528153 A2 EP1528153 A2 EP 1528153A2
Authority
EP
European Patent Office
Prior art keywords
base member
base
kerb
road surface
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP04256684A
Other languages
English (en)
French (fr)
Other versions
EP1528153B1 (de
EP1528153A3 (de
Inventor
Jason Storey
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from GBGB0325185.7A external-priority patent/GB0325185D0/en
Application filed by Individual filed Critical Individual
Publication of EP1528153A2 publication Critical patent/EP1528153A2/de
Publication of EP1528153A3 publication Critical patent/EP1528153A3/de
Application granted granted Critical
Publication of EP1528153B1 publication Critical patent/EP1528153B1/de
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/221Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
    • E01C11/222Raised kerbs, e.g. for sidewalks ; Integrated or portable means for facilitating ascent or descent

Definitions

  • the present invention relates to an apparatus and method for laying a kerb at an edge of a road surface, and relates particularly, but not exclusively, to an apparatus and method for laying a temporary kerb for use during construction work.
  • Preferred embodiments of the present invention seek to overcome the above disadvantages of the prior art.
  • an assembly for forming a kerb at an edge of a road surface comprising:-
  • a base kerb and base course of tarmac can be laid whilst site construction work is ongoing.
  • the base kerb can be made of a material which is resistant to damage due to heavy site machinery, such that when the construction work is completed the cover member can be mounted on the base member to form the completed kerb.
  • the top layer of tarmac can then be laid to complete the road.
  • the assembly further comprises at least one intermediate member adapted to be mounted on at least one said base, and comprising a respective third engaging portion for engaging a respective said first engaging portion.
  • this provides the advantage that the intermediate member can be mounted on top of the base member such that it is level with the tarmac surface of the road. This provides the advantage that the base member is protected from site machinery passing over it, and the intermediate member which is designed to be removed once the construction work has been completed takes any damage which may be caused. The intermediate member can then be removed once site construction has been completed allowing the cover member to be positioned on top of the base member to complete the kerb.
  • an upper surface of the or each said intermediate member is adapted to be positioned at substantially the same vertical level as the level of said road surface in use.
  • This provides the advantage of providing a level surface for site machinery to travel across, thus presenting no edges of either the tarmac road surface or intermediate member to which damage can be caused.
  • the upper surface of said base member in use may be adapted to be positioned at a lower vertical level than the level of said road surface in use.
  • said cover member when said cover member is mounted to said base member, said cover member is adapted to project above the vertical level of said road surface.
  • At least one said base member, intermediate member and/or cover member may be formed from durable plastics material.
  • said durable plastics material may be recycled.
  • said plastics material is recycled by a co-mingling process.
  • This provides the advantage of reducing costs as unsorted, mixed and contaminated plastics waste can be used as raw materials for the recycling process.
  • a method of forming a kerb comprising:-
  • the method further comprises:-
  • the step of laying at least one said base member includes laying at least one said base member such that an upper surface of said base member in use is positioned at a lower vertical level than the level of a road surface in use.
  • the step of mounting at least one said intermediate member to at least one said base member may include mounting the intermediate member such that an upper surface of said intermediate member in use is positioned at substantially the same vertical level as a road surface in use.
  • the step of mounting at least one said cover member to said base member includes mounting the or each said cover member such that the or each said cover member projects above the vertical level of said road surface in use.
  • a road comprises a base layer of tarmac 2 covered by a top layer of tarmac 4.
  • a two part kerb assembly shown generally by 6 comprises a base unit 8 and a top unit 10.
  • the kerb assembly 6 is laid between concrete haunching 12 which may form part of a pathway (not shown), and a road formed from tarmac layers 2 and 4.
  • the components of the three part kerb assembly comprise a base unit 8, a top unit 10 and an intermediate protective strip 14.
  • Base unit 8 comprises a connection channel 8a and a connection rib 8b.
  • Both the top unit 10 and protective strip 14 comprise corresponding connection channels 10a, 14a and connection ribs 10b, 14b which are formed such that both the top unit 10 and protective strip 14 can be mounted to the base unit 8.
  • the connection channel 14a and connection rib 14b of protective strip 14 are adapted to resiliently engage the connection channel 8a and connection rib 8b of the base unit 8 such that the protective strip 14 can be easily removed from base unit 8.
  • the base unit 8, top unit 10 and intermediate strip 14 are all formed from a post consumer recycled durable plastics material.
  • the plastic material used to formed the components of the kerb assembly is produced in a co-mingling process.
  • a co-mingling process allows unsorted and unwashed plastic waste products to be used as raw materials for the recycling process thus making the use of this material economically viable.
  • the co-mingled plastic is surprisingly durable enough to be used to form kerb structures for roads and the like. This plastic also has the advantage that it is a lot lighter than prior art concrete kerb assemblies and therefore presents fewer problems relating to the manual handling of the kerb structures.
  • the first step in the construction of a road on a new housing site using the three part kerb assembly is the laying of a plurality of base units 8 to define the edges of a road (not shown).
  • the base units 8 can be levelled such that when the top units 10 are mounted onto the base units the kerb is complete and does not need re-levelling.
  • the second step is to mount a protective strip 14 on each base unit 8.
  • the connection channel 14a and rib 14b of the protective strips 14 are dimensioned such that they resiliently engage the protection channel 8a and rib 8b of each base unit 8 to allow the protection strip 14 to be removed when required.
  • a base layer of tarmac can then be laid on the road surface between the base units 8.
  • concrete haunching 12 can be placed alongside the base unit 8 to provide support.
  • the base units 8 of the kerb assembly are protected by protective strips 14 such that plant machinery moving around the construction site can move across the kerb assembly without damaging the base unit 8 and only damaging the removable protection strips 14.
  • the protection strips 14 can be removed from the base units 8 by simply pulling them off.
  • the base units were levelled in the first step of road construction, it is not necessary to perform a further levelling operation and a plurality of top units 10 can be mounted onto the base unit 8 to complete the kerb. A top layer of finishing tarmac can then be added to the road surface to complete the road.
  • FIG. 5 A second embodiment of the three part kerb assembly is shown in Figures 5 and 6.
  • the base unit 16 protective strip 18 and top unit 20 are interconnected by means of a plurality of pegs 22 which are received in respective holes in the assembly members.
  • the protective strip 18 protects a roadside edge of the base member 16.
  • a traditional method of laying a temporary kerb has been to lay bricks in the region where the kerb is to be laid whilst construction work is performed, and then remove the bricks and replace them with kerb stone to complete the kerb. It has been found that this operation generally costs more per metre when all materials and labour costs are taken into account than the method of the present invention. If a co-mingled recycled plastic is used to form the components of the three part kerb assembly then the cost of using this method to form the kerbs is substantially less.
  • the components of the three part assembly may be made from materials other that a co-mingled recycled plastic, for example reinforced concrete. It will also be appreciated that the assembly may be a two part assembly with only the top unit and base unit used and also it will be appreciated that there are other methods for interconnecting the components such as the use of adhesives etc.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Floor Finish (AREA)
EP20040256684 2003-10-28 2004-10-28 Zweiteiliger Bordstein Expired - Lifetime EP1528153B1 (de)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
GBGB0325185.7A GB0325185D0 (en) 2003-10-28 2003-10-28 Key-kerb
GB0325185 2003-10-28
GB0405725 2004-03-15
GB0405725A GB2407606B (en) 2003-10-28 2004-03-15 Apparatus and method for laying a kerb

Publications (3)

Publication Number Publication Date
EP1528153A2 true EP1528153A2 (de) 2005-05-04
EP1528153A3 EP1528153A3 (de) 2006-01-04
EP1528153B1 EP1528153B1 (de) 2009-07-08

Family

ID=34424895

Family Applications (1)

Application Number Title Priority Date Filing Date
EP20040256684 Expired - Lifetime EP1528153B1 (de) 2003-10-28 2004-10-28 Zweiteiliger Bordstein

Country Status (1)

Country Link
EP (1) EP1528153B1 (de)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2587004A (en) * 2019-09-12 2021-03-17 Geo Bloc Ltd An edge restraint

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1992009747A1 (en) 1990-12-03 1992-06-11 Trevor George Smith Kerbing structure
WO2002004748A1 (en) 2000-07-07 2002-01-17 Everest Industries Limited Kerb

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB683336A (en) * 1950-09-21 1952-11-26 Martin Harry Jones Unit kerbs
GB2280464B (en) * 1993-07-29 1996-11-27 Joan Otterson Kerb sytem

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1992009747A1 (en) 1990-12-03 1992-06-11 Trevor George Smith Kerbing structure
WO2002004748A1 (en) 2000-07-07 2002-01-17 Everest Industries Limited Kerb

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2587004A (en) * 2019-09-12 2021-03-17 Geo Bloc Ltd An edge restraint
GB2587004B (en) * 2019-09-12 2022-04-20 Geo Bloc Ltd An edge restraint

Also Published As

Publication number Publication date
EP1528153B1 (de) 2009-07-08
EP1528153A3 (de) 2006-01-04

Similar Documents

Publication Publication Date Title
US5020937A (en) Method and apparatus for construction of perdurable artificial roads
US6695527B2 (en) Interlocking mat system for construction of load supporting surfaces
US5163776A (en) Method for road construction
US4889444A (en) Method and apparatus for construction of artificial roads
US20170167084A1 (en) Structural underlayment support system and panel for use with paving and flooring elements
US7594778B2 (en) Method for protecting surfaces of infrastructure improvements in a construction environment
EP2699729A1 (de) Verbesserter modularer schwerlastboden und fahrbahnvorrichtung damit
EP1305476A1 (de) Synthetischer Bordstein und Verfahren zum Gebrauch
US20080104925A1 (en) Concrete paved area
US20040067336A1 (en) Curb mat
Pulaski et al. Field guide for sustainable construction
EP1528153A2 (de) Zweiteiliger Bordstein
KR100773122B1 (ko) 맨홀보수공법
GB2407606A (en) Assembly for forming a kerb
JP2006022574A (ja) 道路補修工法及び道路用仮設材
GB2405895A (en) Trench cover
KR100445627B1 (ko) 도로 경계석 시공방법
GB2490722A (en) Edging product for raised platforms incorporating a tactile surface
KR200498187Y1 (ko) 알루미늄 보도 경계재
US10434549B1 (en) Temporary transfer stations
WO2000079054A1 (en) Highway repair
KR0129202Y1 (ko) 임시도로포장용 포장판재
KR200327800Y1 (ko) 가설도로 포장용 강섬유 합성고무시트
CA1285166C (en) Method and apparatus for construction of artificial roads
BG4535U1 (bg) Пътен панел от бетонни траверси

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL HR LT LV MK

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

17P Request for examination filed

Effective date: 20051102

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL HR LT LV MK

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

17Q First examination report despatched

Effective date: 20080131

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REF Corresponds to:

Ref document number: 602004021889

Country of ref document: DE

Date of ref document: 20090820

Kind code of ref document: P

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090708

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090708

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20091019

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090708

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090708

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090708

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20091008

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20091109

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090708

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090708

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090708

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090708

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20091031

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090708

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090708

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

26N No opposition filed

Effective date: 20100409

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20091031

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20091031

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20091028

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20091009

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090708

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20091028

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20100109

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090708

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090708

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090708

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 12

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20170330

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20170330

Year of fee payment: 13

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602004021889

Country of ref document: DE

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20180629

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180501

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171031

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20230920

Year of fee payment: 20

REG Reference to a national code

Ref country code: GB

Ref legal event code: PE20

Expiry date: 20241027

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20241027

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20241027