EP1522616B1 EP20030022392 EP03022392A EP1522616B1 EP 1522616 B1 EP1522616 B1 EP 1522616B1 EP 20030022392 EP20030022392 EP 20030022392 EP 03022392 A EP03022392 A EP 03022392A EP 1522616 B1 EP1522616 B1 EP 1522616B1
Authority
EP
European Patent Office
Prior art keywords
stitches
needle bed
needles
knitting
shoulder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP20030022392
Other languages
German (de)
French (fr)
Other versions
EP1522616A1 (en
Inventor
Henning Schmidt
Thomas Nonnenmacher
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
H Stoll GmbH and Co KG
Original Assignee
H Stoll GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by H Stoll GmbH and Co KG filed Critical H Stoll GmbH and Co KG
Priority to EP20030022392 priority Critical patent/EP1522616B1/en
Priority to CNB2004100835765A priority patent/CN100482872C/en
Publication of EP1522616A1 publication Critical patent/EP1522616A1/en
Application granted granted Critical
Publication of EP1522616B1 publication Critical patent/EP1522616B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • DTEXTILES; PAPER
    • D04BRAIDING; LACE-MAKING; KNITTING; TRIMMINGS; NON-WOVEN FABRICS
    • D04BKNITTING
    • D04B1/00Weft knitting processes for the production of fabrics or articles not dependent on the use of particular machines; Fabrics or articles defined by such processes
    • D04B1/22Weft knitting processes for the production of fabrics or articles not dependent on the use of particular machines; Fabrics or articles defined by such processes specially adapted for knitting goods of particular configuration
    • D04B1/24Weft knitting processes for the production of fabrics or articles not dependent on the use of particular machines; Fabrics or articles defined by such processes specially adapted for knitting goods of particular configuration wearing apparel

Definitions

  • the invention relates to a method for producing a knitted garment as a tube-round knitted fabric with a special design of the shoulder region, which is known as the so-called "French shoulder".
  • This type of shoulder is characterized in that the connection between the front and back of the garment is not in the middle of the shoulder but in the upper part of the back part.
  • a method has been proposed in which the front and back are knitted together in a known manner as tubular fabric until the beginning of the shoulder area.
  • the shoulder part is then only initially formed for one of the two parts, for example for the front part, in such a way that it extends over the middle of the shoulder of the garment.
  • the shoulder portion is optionally formed to form a neckline for the second part.
  • the connection of the shoulder parts of the two parts takes place, starting by the edges of the stitches of one part are transferred to the needles with the stitches of the other part and are formed with these needles after each transfer stitches ,
  • the US 5,456,096 describes a method for making a knit with a neckline, wherein the shoulder portion of the knit piece for the front and back of the knit piece is formed, and then the two pieces are joined together on a shoulder line.
  • the front and back of the shoulder area are knitted with separate thread guides on the back and front needle bed.
  • the connection of the parts to the shoulder line is done by replacing the thread guides, ie the thread guide has previously supplied the needles of the front needle bed thread, now leads thread to the needles of the rear needle bed and vice versa.
  • the EP 1 211 341 A1 describes a method for binding off stitches, stitches being formed along the warp seam to emphasize the joining line.
  • the present invention has for its object to provide a method for forming Schutterpartien for tubular-round knits, with the connection of the front with the back of the body part can be produced outside of the shoulder center and in which the above-mentioned disadvantages are avoided.
  • the object is achieved with a method for producing a knitted garment as a tube-round knit with the features of claim 1.
  • courses of stitches are thus continuously formed in the shoulder area both for the front and for the back part of the garment.
  • the above described in the prior art disadvantages of a non-existent defined knitted fabric thus do not occur here.
  • the displacement of the shoulder line away from the center of the shoulder in the upper region of the back part or the front part is done here solely in that one part always over the entire width of the knitted fabric stitches are formed, while the other part, the number of stitches in the shoulder area is reduced .
  • the number of stitches in the courses of the knitted part on the second needle bed can be increasingly reduced by the knitted edges, so that after connecting the stitches of the two knitted sections in the shoulder area, a connecting line extending obliquely from the neck section to the arm results in the upper area of the second part ,
  • the reduction in the number of stitches in the courses in the shoulder region of the part on the second needle bed can be linear, stepped or made in any other way over the height of the shoulder region.
  • the same number of courses can be formed for the two parts in the shoulder region.
  • the problem of the reduced efficiency of the knitted fabric as described in the prior art can largely be avoided when forming courses for only one of the knit parts.
  • the hanging can preferably be started with the stitches on the outer knitting edges.
  • the joining of the stitches can be carried out in a conventional manner by means of a Ketteltechnik. It is also possible, after each transfer of stitches of the part of the first needle bed on the second needle bed at least with those needles to which the stitches were transferred to form stitches to highlight the line connecting the two parts.
  • stitches may be formed with the needles adjacent to the needles occupied by the loop, which are then transferred in the direction of the center of the knit so that they run exactly along the connecting line of the two knitted parts.
  • the sleeve stitches can be integrated in the shoulder region of the garment exclusively in the shoulder area of the knitted portion on the first needle bed by a transfer technique. After the completion of the shoulder parts for the two parts then only a connection of the stitches of the two knitted parts is necessary. The sleeves are already fully integrated.
  • necklines such as round necked or V-shaped cutouts can also be formed in the middle region of the knitwear.
  • any collars such as collars or Rollkrägen can be knit to the necklines.
  • the invention also relates to a knitted piece which is produced by a method according to the invention.
  • Fig. 1a, 1b show a sweater 1 from the front and back.
  • the front in Fig. 1a are the front part 2 of the body part, the front sides 3, 4 of the sleeves and the front collar side 5 can be seen.
  • Fig. 1b is the back 2 'of the body part and the backs 3', 4 'of the sleeve and the back 5' of the collar shown.
  • the front sides 2, 3, 4, 5 are knitted on the front needle bed of a flat knitting machine and the back sides 2 ', 3', 4 'and 5' on the back needle bed of a flat knitting machine. It will be in the in Fig.
  • Fig. 2 now illustrates the preparation of the shoulder portions C, C 'of the pullover 1 Fig. 1a, 1b .
  • the front sections 2, 3, 4 of the torso and the sleeves, and the associated back parts 2 ', 3', 4 ' which are actually actually present as a common tubular circular knit, are split in a flat position on both sides of a middle one Longitudinal axis M of the flat knitting machine otherwise not shown.
  • contour lines 2 ", 2"'on the back 2' of the body part arise. These contour lines 2 ", 2"'in turn determine the position and the course of the in Fig. 1b shown connecting lines 6, 7 between the front 2 and the back 2 'of the body part of the pullover 1.
  • a so-called "French shoulder” in which the connection between the front and back part 2, 2 'does not run on the shoulder center but in the upper region of the back part 2'.
  • connection of the parts 2, 2 'in the shoulder area is done by hanging the stitches of the front part 2 on the opposite needles, which are occupied with stitches of the back parts 2'. This is in Fig. 2 indicated by the arrows T 3 , T 4 .
  • Fig. 3 shows in the view from above the left shoulder area of the pullover 1 Fig. 1 ,
  • the dot-dash line Y indicates the shoulder center of the pullover. It can be seen clearly that the connecting line 7 between the front part 2 and the back part 2 'does not run on the shoulder center Y, but extends obliquely from the collar 5, 5' to the sleeve 4, 4 'in the back part 2'.
  • the connecting line 7 ends at the integration line 4 "of the sleeve back 4 'in the back part 2'.
  • FIG. 4a - 4c give alternative embodiments of the connecting line 7 Fig. 3 in an otherwise depicting Fig. 3 comparable representation.
  • connecting line 7 ' is stepped. It arises from a discontinuous decrease in the number of knitting needles in the back part 2 '.
  • the front part 2 is formed in the shoulder portion C in an identical manner, as in Fig. 2 is shown.
  • Fig. 4b is a curved course 7 "of the connecting line between the front and back part 2, 2 'shown.
  • Fig. 4c makes it clear that the connecting line 7 "' between the front and back part 2, 2' can also run in the region of the front part 2.
  • the section C of the front part 2 must receive the desired contour by means of the winding technique, while in the back part 2 'over the entire width of the knitted fabric 2 'in the shoulder area C' stitches are formed.
  • the Fig. 5.1 - 5.11 illustrate in the form of a stitch course representation of the preparation of the shoulder portions C, C 'of the pullover 1 Fig. 1 ,
  • the knitting rows R1-R32 relate to the knitting sequence for forming the stitch rows for the front and back 2, 2 'of the body part and connecting the left and right sleeves to the front side 2 of the body part.
  • the knitting lines R33 - R40 the knitting sequence for the connection of the front and back 2, 2 'of the body part and the formation of contour stitches are shown.
  • the front needle bed is marked V and the rear needle bed H.
  • the Nadeleinannon on both needle beds V, H is such that only every other needle is covered with stitches.
  • Each stitch-bearing needle also faces an empty needle.
  • the knitting row R0 shows the last knitting row of the section B of the pullover 1 Fig. 1 .
  • the needles A - D have stitches for the front part 3 of the sleeve, the needles E - O stitches for the front part 2 of the body part and the needles P - S stitches for the front side 4 of the second sleeve.
  • the row R1 is the starting knitting series of the sections C, C '.
  • the last stitches of the sleeves rest on them.
  • stitches are formed in the knitting direction from right to left with the first knitting system and the yarn guide 5 with the needles h-o of the rear needle bed H for the back 2 'of the body part.
  • the back 2 ' is formed in Spickeltechnik. This means that all needles are meshes, but not all stitches participate in stitching.
  • no stitches are formed in row R1 with the needles e - g.
  • the number of knitting needles with increasing knitting height is less and less.
  • This yarn guide 5 is moved in the knitting row R3 in the direction of carriage movement from left to right as well as the yarn guide 4 with the second and third knitting system in their knitting field.
  • the yarn guide 5 is displaced so far that it does not interfere with the yarn guide 4 in the yarn insert from the needle G.
  • the rear needle bed H is displaced from the basic position by two needles to the left. Then, in the carriage movement direction from left to right, with the first knitting system, the stitches are transferred from the needles p '- s' to the needle 0 - R of the front needle bed V.
  • the back needle bed is returned to its home position and the knitting systems are moved to the left fabric side before in row R9 in the direction of knitting from left to right with the first knitting system and the yarn guide 5 with the needles h - I stitches for the back 2 be formed.
  • the needles h - I lie away from the edge of the back part 2 '.
  • stitches for the front part 2 in the shoulder region C are also formed in the knitting direction from left to right with the needles E - K of the front needle bed V with the second knitting system and the yarn guide 4.
  • the needle O are now two stitches, the outermost stitch of the front part 2 and the hinged sleeve mesh of the edge needle P of the left sleeve.
  • row 13 is again moved in the carriage direction from left to right of the yarn guide 5 with the second knitting system as far to the right of the needle 1 that he can safely insert the thread in the next knitting in this needle.
  • the back needle bed has then made an offset of two needle pitches to the right, and the stitches are transferred from the needles a'-d 'to the needles B-E of the front needle bed V.
  • the rear needle bed H is then moved to the left again by a needle pitch.
  • the loop of the needle a of the rear needle bed H is transferred to the needle A of the front needle bed V.
  • This stitch is a stitch on the back of the right sleeve, which has now been transferred to the needle bed on the front of the right sleeve. This results in a uniform transfer process in which all stitches of the sleeve are connected to the front of the body part.
  • the thread guide 5 is moved to the left of the needle i in the carriage direction from right to left with the second knitting system, so that in the next knitting row it can safely insert the thread into this needle.
  • the back needle bed H is then reset by a needle pitch to the right and the stitch s of the back needle bed H is transferred to the needle R of the front needle bed V.
  • the stitch of the needle s is a sleeve stitch from the sleeve back. This results in a uniform Um feeling perspectives by all the stitches of the sleeve are connected to the front side 2 of the body part.
  • the second knitting system and the thread guide 4 are used to form stitches with the needles E - J of the front needle bed V for the front side 2 of the body part.
  • the needle O of the front needle bed V rest two stitches, next to the fuselage mesh the attached stitch of the left sleeve.
  • connection of the front 2 and the back 2 'of the body portion in the shoulder region is made by transferring the stitches of the front side 2 of the body part, which are on the front needle bed V, on the opposite, mesh-carrying needles of the rear needle bed H, the back 2 'have formed the body part.
  • the transfer of the stitches begins at the side knitted edges with at least one needle. In the example shown, two stitches are transferred simultaneously, as shown in row R33.
  • the rear needle bed is previously offset by a needle pitch to the right.
  • the rear needle bed H has been moved back to its normal position.
  • the second knitting system with the yarn guide 3 and the needles forms b - e stitches. These stitches highlight the contour of the connecting line of the front and back of the body in the area of the right shoulder. The more needles mesh, the wider this contour area becomes.
  • the minimum number of needles which emphasize the contour is dictated by the number of needles to which stitches of needles of the front needle bed have been passed. In the example shown, these are two needles.
  • an offset of the rear needle bed H by four needle pitches to the left is performed in row R39.
  • the stitches of the needles A '- D' of the front needle bed V are transferred to the opposite needles d - g of the rear needle bed H.
  • the offset path of the needle bed results from the number of needles from which stitches are transmitted, multiplied by the needle spacing.
  • the back needle bed is then offset to the right by a total of eight needle pitches and the stitches of the needles N'-Q 'of the front needle bed V are transferred to the opposite needles m-p of the back needle bed H.
  • the knitting cycle R33 - R40 is repeated until the front and back of the body part at the left and right shoulder area are connected to each other.

Description

Die Erfindung betrifft ein Verfahren zur Herstellung eines gestrickten Kleidungsstücks als Schlauch-Rund-Gestrick mit einer besonderen Gestaltung des Schulterbereichs, der als so genannte "französische Schulter" bekannt ist. Diese Art der Schulter zeichnet sich dadurch aus, dass die Verbindung zwischen dem Vorder- und Rückenteil des Kleidungsstücks nicht in der Mitte der Schulter sondern im oberen Bereich des Rückenteils verläuft. Zur Realisierung einer solchen Schulterlösung bei Schlauch-Rund-Gestricken ist in der DE 197 04 666 A1 ein Verfahren vorgeschlagen worden, bei dem das Vorder- und Rückenteil in bekannter Weise gemeinsam als Schlauchware bis zum Beginn des Schulterbereichs gestrickt werden. Im Schulterbereich wird dann nur zunächst für eines der beiden Teile, beispielsweise für das Vorderteil die Schulterpartie derart gebildet, dass sie sich über die Mitte der Schulter des Kleidungsstücks hinweg erstreckt. Erst nach Fertigstellung der Schulterpartie für das erste Teil wird die Schulterpartie gegebenenfalls unter Bildung eines Halsausschnitts auch für das zweite Teil gebildet. Während des Strickens des zweiten Teils oder nach dessen Fertigstellung erfolgt die Verbindung der Schulterpartien der beiden Teile, indem beginnend an den Rändern die Maschen des einen Teils auf die Nadeln mit den Maschen des anderen Teils umgehängt werden und mit diesen Nadeln nach jedem Umhängevorgang Maschen gebildet werden.The invention relates to a method for producing a knitted garment as a tube-round knitted fabric with a special design of the shoulder region, which is known as the so-called "French shoulder". This type of shoulder is characterized in that the connection between the front and back of the garment is not in the middle of the shoulder but in the upper part of the back part. To realize such a shoulder solution in tubular-round-knit is in the DE 197 04 666 A1 a method has been proposed in which the front and back are knitted together in a known manner as tubular fabric until the beginning of the shoulder area. In the shoulder region, the shoulder part is then only initially formed for one of the two parts, for example for the front part, in such a way that it extends over the middle of the shoulder of the garment. Only after completion of the shoulder portion for the first part, the shoulder portion is optionally formed to form a neckline for the second part. During the knitting of the second part or after its completion, the connection of the shoulder parts of the two parts takes place, starting by the edges of the stitches of one part are transferred to the needles with the stitches of the other part and are formed with these needles after each transfer stitches ,

Die US 5,456,096 beschreibt ein Verfahren zur Herstellung eines Gestrickstücks mit einem Halsausschnitt, wobei der Schulterbereich des Gestrickstücks für die Vorder- und Rückseite des Gestrickstücks gebildet und anschließend die beiden Teile an einer Schulterlinie miteinander verbunden werden. Das Vorder- und das Rückenteil des Schulterbereichs werden mit getrennten Fadenführern auf dem hinteren und vorderen Nadelbett gestrickt. Das Verbinden der Teile an der Schulterlinie erfolgt durch Austausch der Fadenführer, d. h. der Fadenführer der bisher den Nadeln des vorderen Nadelbetts Faden zugeführt hat, führt nun Faden den Nadeln des hinteren Nadelbetts zu und umgekehrt.The US 5,456,096 describes a method for making a knit with a neckline, wherein the shoulder portion of the knit piece for the front and back of the knit piece is formed, and then the two pieces are joined together on a shoulder line. The front and back of the shoulder area are knitted with separate thread guides on the back and front needle bed. The connection of the parts to the shoulder line is done by replacing the thread guides, ie the thread guide has previously supplied the needles of the front needle bed thread, now leads thread to the needles of the rear needle bed and vice versa.

Die EP 1 211 341 A1 beschreibt ein Verfahren zum Abketteln von Maschen, wobei entlang der Kettelnaht Maschen zur Hervorhebung der Verbindungslinie gebildet werden.The EP 1 211 341 A1 describes a method for binding off stitches, stitches being formed along the warp seam to emphasize the joining line.

Bei Schlauch-Rund-Gestricken werden auf dem vorderen und hinteren Nadelbett Gestricke - hier also das Vorderteil und das Rückenteil eines Kleidungsstücks - gebildet, die an den Rändern miteinander verbunden sind. Beide Gestricke werden von den Abzugsvorrichtungen der Strickmaschine in derselben Welse erfasst wie eine einzelne Gestrickbahn. Es ist daher kaum möglich, dass auf Maschenreihen, die auf dem vorderen Nadelbett gebildet werden, während auf dem hinteren Nadelbett über einen längeren Zeitraum keine Maschen gebildet werden, eine gezielte Abzugskraft wirkt. Die eingeschränkte Wirkung der Abzugsvorrichtung muss also durch das Einwirken von Niederhalteplatinen und Einstreifern kompensiert werden.In tubular-round-knit fabrics on the front and rear needle bed knit - here, the front part and the back part of a garment - formed, which are connected together at the edges. Both knits are seized by the drawers of the knitting machine in the same catfish as a single knitting course. It is therefore hardly possible that on courses that are formed on the front needle bed, while no stitches are formed on the rear needle bed for a long period of time, a targeted trigger force acts. The limited effect of the extraction device must therefore be compensated by the action of hold-down plates and Einreifreifern.

Der vorliegenden Erfindung liegt die Aufgabe zugrunde, ein Verfahren zur Bildung von Schutterpartien für Schlauch-Rund-Gestricke vorzuschlagen, mit dem eine Verbindung der Vorderseite mit der Rückseite des Rumpfteils außerhalb der Schultermitte herstellbar ist und bei dem die oben genannten Nachteile vermieden werden.The present invention has for its object to provide a method for forming Schutterpartien for tubular-round knits, with the connection of the front with the back of the body part can be produced outside of the shoulder center and in which the above-mentioned disadvantages are avoided.

Die Aufgabe wird mit einem Verfahren zur Herstellung eines gestrickten Kleidungsstücks als Schlauch-Rund-Gestrick mit den Merkmalen des Anspruchs 1 gelöst.The object is achieved with a method for producing a knitted garment as a tube-round knit with the features of claim 1.

Nach dem erfindungsgemäßen Verfahren werden nun also fortlaufend sowohl für das Vorder- als auch für das Rückenteil des Kleidungsstücks im Schulterbereich Maschenreihen gebildet. Die vorstehend beim Stand der Technik beschriebenen Nachteile eines nicht vorhandenen definierten Gestrickabzugs treten hier also nicht auf. Die Verlagerung der Schulterlinie weg von der Schultermitte in den oberen Bereich des Rückenteils oder des Vorderteils geschieht hier allein dadurch, dass bei einem Teil stets über die gesamte Breite des Gestrickstücks Maschen gebildet werden, während beim anderen Teil die Zahl der Maschen in der Schulterpartie reduziert wird. Vorzugsweise kann dabei die Maschenzahl bei den Maschenreihen des Gestrickteils auf dem zweiten Nadelbett von den Gestrickrändern her zunehmend reduziert werden, sodass sich nach einem Verbinden der Maschen der beiden Gestricktelle im Schulterbereich eine schräg vom Halsausschnitt zum Arm hin verlaufende Verbindungslinie im oberen Bereich des zweiten Teils ergibt. Die Reduzierung der Maschenzahl bei den Maschenreihen im Schulterbereich des Teils auf dem zweiten Nadelbett kann dabei linear, gestuft oder in beliebiger anderer Weise über die Höhe des Schulterbereichs erfolgen. Dadurch lassen sich gerade, gestufte oder bogenförmige Verbindungslinien zwischen den beiden Gestrickteilen im Schulterbereich erzielen.According to the method of the invention, courses of stitches are thus continuously formed in the shoulder area both for the front and for the back part of the garment. The above described in the prior art disadvantages of a non-existent defined knitted fabric thus do not occur here. The displacement of the shoulder line away from the center of the shoulder in the upper region of the back part or the front part is done here solely in that one part always over the entire width of the knitted fabric stitches are formed, while the other part, the number of stitches in the shoulder area is reduced , Preferably, the number of stitches in the courses of the knitted part on the second needle bed can be increasingly reduced by the knitted edges, so that after connecting the stitches of the two knitted sections in the shoulder area, a connecting line extending obliquely from the neck section to the arm results in the upper area of the second part , The reduction in the number of stitches in the courses in the shoulder region of the part on the second needle bed can be linear, stepped or made in any other way over the height of the shoulder region. As a result, straight, stepped or curved connecting lines between the two knitted parts in the shoulder region can be achieved.

Vorzugsweise können für die beiden Teile im Schulterbereich die gleiche Anzahl von Maschenreihen gebildet werden. Dadurch lässt sich das beim Stand der Technik beschriebene Problem der reduzierten Wirksamkeit des Gestrickabzugs beim Bilden von Maschenreihen für nur eines der Gestrickteile weitgehend vermeiden.Preferably, the same number of courses can be formed for the two parts in the shoulder region. As a result, the problem of the reduced efficiency of the knitted fabric as described in the prior art can largely be avoided when forming courses for only one of the knit parts.

Beim Umhängen der Maschen des Teils des ersten Nadelbetts auf das zweite Nadelbett kann das Umhängen vorzugsweise mit den Maschen an den äußeren Gestrickrändern begonnen werden. Das Verbinden der Maschen kann in an sich bekannter Weise mittels einer Ketteltechnik durchgeführt werden. Dabei ist es auch möglich, nach jedem Umhängen von Maschen des Teils des ersten Nadelbetts auf das zweite Nadelbett mindestens mit denjenigen Nadeln, auf die die Maschen übertragen wurden, Maschen zur Hervorhebung der Verbindungslinie zwischen den beiden Teilen zu bilden. Es können zusätzlich auch mit den zu den mit der umgehängten Masche besetzten Nadeln benachbarten Nadeln Maschen gebildet werden, die dann in Richtung Gestrickmitte derart umgehängt werden, dass sie genau entlang der Verbindungslinie der beiden Gestrickteile verlaufen.When transferring the stitches of the part of the first needle bed to the second needle bed, the hanging can preferably be started with the stitches on the outer knitting edges. The joining of the stitches can be carried out in a conventional manner by means of a Ketteltechnik. It is also possible, after each transfer of stitches of the part of the first needle bed on the second needle bed at least with those needles to which the stitches were transferred to form stitches to highlight the line connecting the two parts. In addition, stitches may be formed with the needles adjacent to the needles occupied by the loop, which are then transferred in the direction of the center of the knit so that they run exactly along the connecting line of the two knitted parts.

Soll ein Kleidungsstück mit Ärmeln hergestellt werden, so können im Schulterbereich des Kleidungsstücks die Ärmelmaschen ausschließlich in dem Schulterbereich des Gestrickteils auf dem ersten Nadelbett durch eine Umhängetechnik eingebunden werden. Nach der Fertigstellung der Schulterpartien für die beiden Teile ist dann nur noch eine Verbindung der Maschen der beiden Gestrickteile nötig. Die Ärmel sind bereits vollständig eingebunden.If a garment with sleeves are to be produced, then the sleeve stitches can be integrated in the shoulder region of the garment exclusively in the shoulder area of the knitted portion on the first needle bed by a transfer technique. After the completion of the shoulder parts for the two parts then only a connection of the stitches of the two knitted parts is necessary. The sleeves are already fully integrated.

Während des Strickens der Schulterbereiche der beiden Gestrickteile können selbstverständlich auch Halsausschnitte wie Rundhals- oder V-Ausschnitte im mittleren Bereich der Gestrickteile ausgebildet werden. Anschließend lassen sich an die Halsausschnitte auch beliebige Krägen, beispielsweise Stehkrägen oder Rollkrägen anstricken.During the knitting of the shoulder regions of the two knit parts, it goes without saying that necklines such as round necked or V-shaped cutouts can also be formed in the middle region of the knitwear. Subsequently, any collars, such as collars or Rollkrägen can be knit to the necklines.

Die Erfindung betrifft auch ein Gestrickstück, das nach einem erfindungsgemäßen Verfahren hergestellt ist.The invention also relates to a knitted piece which is produced by a method according to the invention.

Nachfolgend werden bevorzugte Ausführungsformen erfindungsgemäßer Verfahren anhand der Zeichnung näher beschrieben.Hereinafter, preferred embodiments of the inventive method will be described with reference to the drawings.

Im Einzelnen zeigen:

Fig. 1a, 1b
die Vorder- und die Rückseite eines nach einem erfindungsgemäßen Verfahren hergestellten Pullovers;
Fig. 2
eine Ansicht des Schulterbereichs des Vorder- und Rückenteils des Pullovers aus Fig. 1 bei Fertigung auf der Flachstrickmaschine mit einer fiktiven Auftrennung der Teile entlang der Maschinenlängsachse;
Fig. 3
eine Ansicht des linken Schulterbereichs des Pullovers aus Fig. 1 in Blickrichtung Z;
Fig. 4a - 4c
der Fig. 3 entsprechende Darstellungen mit weiteren Varianten der Verbindungslinien zwischen Vorder- und Rückenteil;
Fig. 5.1 - 5.11
eine schematische Darstellung des Maschenverlaufs eines Strickverfahrens zur Herstellung des Schulterbereichs des Pullovers aus Fig. 1.
In detail show:
Fig. 1a, 1b
the front and the back of a pullover produced by a method according to the invention;
Fig. 2
a view of the shoulder region of the front and back of the pullover Fig. 1 when manufacturing on the flat knitting machine with a fictional separation of the parts along the machine longitudinal axis;
Fig. 3
a view of the left shoulder area of the pullover Fig. 1 in the direction Z;
Fig. 4a - 4c
of the Fig. 3 corresponding representations with other variants of the connecting lines between the front and back;
Fig. 5.1 - 5.11
a schematic representation of the stitch course of a knitting process for producing the shoulder region of the pullover Fig. 1 ,

Fig. 1a, 1b zeigen einen Pullover 1 von der Vorder- und Rückseite her. Bei der Vorderseite in Fig. 1a sind das Vorderteil 2 des Rumpfteils, die Vorderseiten 3, 4 der Ärmel sowie die vordere Kragenseite 5 zu erkennen. In Fig. 1b ist die Rückseite 2' des Rumpfteils sowie die Rückseiten 3', 4' der Ärmel und die Rückseite 5' des Kragens dargestellt. Die Vorderseiten 2, 3, 4, 5 werden auf dem vorderen Nadelbett einer Flachstrickmaschine und die Rückseiten 2', 3', 4' und 5' auf dem hinteren Nadelbett einer Flachstrickmaschine gestrickt. Dabei werden im in Fig. 1a gezeigten Höhenabschnitt A das Vorder- und Rückenteil 2, 2' und die Ärmelvorder- und -rückseiten 3, 3'; 4, 4' als Schlauch-Rund-Gestricke mit separaten Fadenführern parallel zueinander auf der Flachstrickmaschine gestrickt. Nach Erreichen der Achsel werden in der Sektion B die Ärmel 3, 3'; 4, 4' mit den Rumpfteilen 2, 2' nach einem beliebigen Verfahren gemäß dem Stand der Technik verbunden. Anschließend werden nun mit einem gemeinsamen Fadenführer Maschen für ein zusammenhängendes Schlauchgestrick gebildet, bis der Beginn der Schulterpartie C bzw. C' erreicht wird. Im Bereich der Schulterpartien C, C' werden nach einem erfindungsgemäßen Verfahren Strickreihen für die Vorder- und Rückseite 2, 2' des Rumpfteils gebildet und die Vorderseite 2 und die Rückseite 2' entlang von Linien 6, 7 miteinander verbunden, wobei die Linien 6, 7 nicht in der Schultermitte des Pullovers 1 verlaufen sondern im oberen Bereich des Rückenteils 2'. Abschließend wird dann in der Sektion D der Stehkragen 5, 5' wieder nach einem Verfahren gemäß dem Stand der Technik gestrickt. Fig. 1a, 1b show a sweater 1 from the front and back. In the front in Fig. 1a are the front part 2 of the body part, the front sides 3, 4 of the sleeves and the front collar side 5 can be seen. In Fig. 1b is the back 2 'of the body part and the backs 3', 4 'of the sleeve and the back 5' of the collar shown. The front sides 2, 3, 4, 5 are knitted on the front needle bed of a flat knitting machine and the back sides 2 ', 3', 4 'and 5' on the back needle bed of a flat knitting machine. It will be in the in Fig. 1a shown height section A, the front and back part 2, 2 'and the Ärmelvorder- and -rückseiten 3, 3'; 4, 4 'knitted as a tubular circular knit with separate yarn guides parallel to each other on the flat knitting machine. After reaching the armpit in the section B, the sleeves 3, 3 '; 4, 4 'are connected to the body parts 2, 2' by any method according to the prior art. Then meshes are formed with a common yarn guide for a coherent hose knit until the beginning of the shoulder section C or C 'is reached. In the region of the shoulders C, C 'knitting rows for the front and back 2, 2' of the body part are formed and the front 2 and the back 2 'along lines 6, 7 interconnected by a method according to the invention, the lines 6, 7 do not run in the shoulder center of the pullover 1 but in the upper region of the back part 2 '. Finally, in the section D, the stand-up collar 5, 5 'is knitted again according to a method according to the prior art.

Fig. 2 verdeutlicht nun die Herstellung der Schulterpartien C, C' des Pullovers 1 aus Fig. 1a, 1b. Zur besseren Verdeutlichung des Strickablaufs sind hier die eigentlich ja als ein gemeinsames Schlauch-Rund-Gestrick vorliegenden Vorderteile 2, 3, 4 des Rumpfs und der Ärmel und die dazugehörigen Rückenteile 2', 3', 4', aufgetrennt in Planlage, beidseitig einer mittleren Längsachse M der ansonsten nicht weiter dargestellten Flachstrickmaschine gezeigt. Ab der ersten Strickreihe für die Schulterpartien C, C' werden für die Ärmel 3, 3'; 4, 4' keine Maschen mehr gebildet. Für die Vorderseite 2 des Rumpfteils werden in der Sektion C Strickreihen über die gesamte Breite, die das Rumpfteil 2 zu Beginn der Schulterpartie C aufweist, gebildet. Gleichzeitig werden alle Maschen der Vorderseiten des rechten und linken Ärmels 3, ; 4, in Richtung der Pfeile T1, T2 durch eine Umhängetechnik mit dem Vorderteil 2 verbunden. Dabei werden zunächst die Maschen der Ärmelvorderseiten 3, 4 und dann die Maschen der Ärmelrückseiten 3', 4' eingebunden. Fig. 2 now illustrates the preparation of the shoulder portions C, C 'of the pullover 1 Fig. 1a, 1b , For better clarification of the knitting process, the front sections 2, 3, 4 of the torso and the sleeves, and the associated back parts 2 ', 3', 4 ', which are actually actually present as a common tubular circular knit, are split in a flat position on both sides of a middle one Longitudinal axis M of the flat knitting machine otherwise not shown. From the first row of knitting for the shoulders C, C 'are for the sleeves 3, 3'; 4, 4 'no longer formed stitches. For the front side 2 of the body part in the section C knitting rows over the entire width, which has the body part 2 at the beginning of the shoulder portion C, formed. At the same time, all stitches of the front sides of the right and left sleeves 3,; 4, in the direction of the arrows T 1 , T 2 connected by a Umhängetechnik with the front part 2. Initially, the stitches of the sleeve front sides 3, 4 and then the stitches of the sleeve backs 3 ', 4' are integrated.

Im Gegensatz dazu werden in der Schulterpartie C' des Rückenteils 2' nicht über die gesamte Breite des Rückenteils 2' Maschen gebildet. Es wird vielmehr mit einer Spickeltechnik die Zahl der Maschen bildenden Nadeln zunehmend reduziert, im dargestellten Beispiel linear und symmetrisch zur Gestrickstücklängsachse X. Sämtliche Nadeln bleiben jedoch mit Maschen besetzt. Die äußeren Nadeln nehmen nur nicht mehr am Maschenbildungsvorgang teil.In contrast, in the shoulder portion C 'of the back part 2' not over the entire width of the back part 2 'stitches are formed. Rather, the number of stitch-forming needles is increasingly reduced by means of a winding technique, in the illustrated example linear and symmetrical with respect to the longitudinal axis of the knitting piece X. All needles, however, remain meshed. The outer needles no longer participate in the stitching process.

Durch die Veränderung der Anzahl der Maschen bildenden Nadeln in den einzelnen Strickreihen entstehen die Konturlinien 2", 2"' an der Rückseite 2' des Rumpfteils. Diese Konturlinien 2", 2"' wiederum bestimmen die Lage und den Verlauf der in Fig. 1b gezeigten Verbindungslinien 6, 7 zwischen der Vorderseite 2 und der Rückseite 2' des Rumpfteils des Pullovers 1. Im dargestellten Beispiel entsteht eine so genannte "französische Schulter", bei der die Verbindung zwischen Vorder- und Rückenteil 2, 2' nicht auf der Schultermitte verläuft sondern im oberen Bereich des Rückenteils 2'. Beim in Fig. 2 gezeigten Beispiel werden für das Vorderteil 2 und das Rückenteil 2' gleich viele Maschenreihen in den Sektionen C, C' gebildet. Die Verbindung der Teile 2, 2' im Schulterbereich geschieht durch Umhängen der Maschen des Vorderteils 2 auf die gegenüberliegenden Nadeln, die mit Maschen des Rückenteile 2' besetzt sind. Dies ist in Fig. 2 durch die Pfeile T3, T4 angedeutet.By changing the number of stitches forming needles in the individual knitting rows, the contour lines 2 ", 2"'on the back 2' of the body part arise. These contour lines 2 ", 2"'in turn determine the position and the course of the in Fig. 1b shown connecting lines 6, 7 between the front 2 and the back 2 'of the body part of the pullover 1. In the example shown, a so-called "French shoulder", in which the connection between the front and back part 2, 2 'does not run on the shoulder center but in the upper region of the back part 2'. When in Fig. 2 As shown, for the front part 2 and the back part 2 'equal number of courses in the sections C, C' are formed. The connection of the parts 2, 2 'in the shoulder area is done by hanging the stitches of the front part 2 on the opposite needles, which are occupied with stitches of the back parts 2'. This is in Fig. 2 indicated by the arrows T 3 , T 4 .

Fig. 3 zeigt in der Ansicht von oben den linken Schulterbereich des Pullovers 1 aus Fig. 1. Die strichpunktierte Linie Y gibt dabei die Schultermitte des Pullovers an. Man sieht hier deutlich, dass die Verbindungslinie 7 zwischen dem Vorderteil 2 und dem Rückenteil 2' nicht auf der Schultermitte Y verläuft, sondern sich schräg vom Kragen 5, 5' zum Ärmel 4, 4' in das Rückenteil 2' hineinerstreckt. Die Verbindungslinie 7 endet an der Einbindungslinie 4" der Ärmelrückseite 4' in das Rückenteil 2'. Fig. 3 shows in the view from above the left shoulder area of the pullover 1 Fig. 1 , The dot-dash line Y indicates the shoulder center of the pullover. It can be seen clearly that the connecting line 7 between the front part 2 and the back part 2 'does not run on the shoulder center Y, but extends obliquely from the collar 5, 5' to the sleeve 4, 4 'in the back part 2'. The connecting line 7 ends at the integration line 4 "of the sleeve back 4 'in the back part 2'.

Mit 8, 9 sind zusätzliche Maschenstäbchen bezeichnet, die die Kontur der Verbindungslinie 7 optisch verstärken. Sie verlaufen parallel zur Verbindungslinie 7 ebenfalls von der Einbindelinie 4" des Ärmels 4, 4' hin zur linken Seite des Kragens 5, 5'.With 8, 9 additional wales are referred to reinforce the contour of the connecting line 7 optically. They also run parallel to the connecting line 7 from the binding line 4 "of the sleeve 4, 4 'to the left side of the collar 5, 5'.

Die Fig. 4a - 4c geben alternative Ausgestaltungen der Verbindungslinie 7 aus Fig. 3 in einer ansonsten mit der Darstellung aus Fig. 3 vergleichbaren Darstellung an. Die in Fig. 4a gezeigte Verbindungslinie 7' ist gestuft. Sie entsteht durch ein diskontinuierliches Vermindern der Anzahl der strickenden Nadeln im Rückenteil 2'. Das Vorderteil 2 wird in der Schulterpartie C in identischer Weise gebildet, wie dies in Fig. 2 gezeigt ist.The Fig. 4a - 4c give alternative embodiments of the connecting line 7 Fig. 3 in an otherwise depicting Fig. 3 comparable representation. In the Fig. 4a shown connecting line 7 ' is stepped. It arises from a discontinuous decrease in the number of knitting needles in the back part 2 '. The front part 2 is formed in the shoulder portion C in an identical manner, as in Fig. 2 is shown.

In Fig. 4b ist ein geschwungener Verlauf 7" der Verbindungslinie zwischen Vorder- und Rückenteil 2, 2' gezeigt. Fig. 4c verdeutlicht, dass die Verbindungslinie 7"' zwischen dem Vorder- und Rückenteil 2, 2' auch im Bereich des Vorderteils 2 verlaufen kann. Dazu muss nun die Sektion C des Vorderteils 2 durch Spickeltechnik die gewünschte Kontur erhalten, während im Rückenteil 2' über die gesamte Breite des Gestricks 2' im Schulterbereich C' Maschen gebildet werden.In Fig. 4b is a curved course 7 "of the connecting line between the front and back part 2, 2 'shown. Fig. 4c makes it clear that the connecting line 7 "' between the front and back part 2, 2' can also run in the region of the front part 2. For this purpose, the section C of the front part 2 must receive the desired contour by means of the winding technique, while in the back part 2 'over the entire width of the knitted fabric 2 'in the shoulder area C' stitches are formed.

Die Fig. 5.1 - 5.11 verdeutlichen in Form einer Maschenverlaufsdarstellung die Herstellung der Schulterpartien C, C' des Pullovers 1 aus Fig. 1. Dabei betreffen die Strickreihen R1 - R32 den Strickablauf zum Bilden der Maschenreihen für die Vorder- und Rückseite 2, 2' des Rumpfteils und das Verbinden des linken und rechten Ärmels mit der Vorderseite 2 des Rumpfteils. In den Strickreihen R33 - R40 werden der Strickablauf für die Verbindung der Vorder- und Rückseite 2, 2' des Rumpfteils und das Bilden von Konturmaschen gezeigt. In allen Strickreihen sind das vordere Nadelbett mit V und das hintere Nadelbett mit H gekennzeichnet. Die Nadeleinteilung auf beiden Nadelbetten V, H ist derart, dass nur jede zweite Nadel mit Maschen belegt ist. Jeder Maschen tragenden Nadel liegt außerdem eine leere Nadel gegenüber.The Fig. 5.1 - 5.11 illustrate in the form of a stitch course representation of the preparation of the shoulder portions C, C 'of the pullover 1 Fig. 1 , In this case, the knitting rows R1-R32 relate to the knitting sequence for forming the stitch rows for the front and back 2, 2 'of the body part and connecting the left and right sleeves to the front side 2 of the body part. In the knitting lines R33 - R40 , the knitting sequence for the connection of the front and back 2, 2 'of the body part and the formation of contour stitches are shown. In all rows of knitting, the front needle bed is marked V and the rear needle bed H. The Nadeleinteilung on both needle beds V, H is such that only every other needle is covered with stitches. Each stitch-bearing needle also faces an empty needle.

Im dargestellten Beispiel wird eine Strickmaschine mit drei Stricksystemen verwendet, wobei jedes Stricksystem die Nadeln in jede beliebige Stellung bringen kann. Das Verfahren ist jedoch auch mit Strickmaschinen mit weniger Stricksystemen durchführbar. Es müssen dann allerdings mehr Schlittenbewegungen durchgeführt werden. Weiterhin werden im dargestellten Beispiel die Fadenführer von den Stricksystemen mitbewegt. Es sind daher an manchen Stellen Fadenführerkorrekturbewegungen notwendig, die entfallen können, wenn eine Strickmaschine mit einer separaten Bewegungseinrichtung für die Fadenführer verwendet wird.In the example shown, a knitting machine with three knitting systems is used, wherein each knitting system can bring the needles in any position. However, the method is also feasible with knitting machines with fewer knitting systems. However, more sled motions then have to be performed. Furthermore, in the example shown, the thread guides are moved by the knitting systems. It is therefore necessary in some places Fadenführerkorrekturbewegungen that can be omitted when a knitting machine is used with a separate moving device for the thread guides.

Die Strickreihe R0 zeigt die letzte Strickreihe der Sektion B des Pullovers 1 aus Fig. 1. Auf dem vorderen Nadelbett V haben die Nadeln A - D Maschen für das Vorderteil 3 des Ärmels, die Nadeln E - O Maschen für das Vorderteil 2 des Rumpfteils und die Nadeln P - S Maschen für die Vorderseite 4 des zweiten Ärmels gebildet. Auf dem hinteren Nadelbett haben die Nadeln a - d Maschen für die Rückseite 3' des rechten Ärmels, die Nadel e - o Maschen für die Rückseite 2' des Rumpfteils und die Nadeln p - s Maschen für die Rückseite 4' des linken Ärmels gestrickt.The knitting row R0 shows the last knitting row of the section B of the pullover 1 Fig. 1 , On the front needle bed V, the needles A - D have stitches for the front part 3 of the sleeve, the needles E - O stitches for the front part 2 of the body part and the needles P - S stitches for the front side 4 of the second sleeve. On the back needle bed, the needles knit a - d stitches for the back 3 'of the right sleeve, the needle e - o stitches for the back 2' of the body portion, and the needles p - s stitches for the back 4 'of the left sleeve.

Die Reihe R1 ist die Startstrickreihe der Sektionen C, C'. Die Maschen A - D; P - S des vorderen Nadelbetts V und die Nadeln a - d, p - s des hinteren Nadelbetts H, die bisher Maschen für die Ärmel gebildet haben, nehmen jetzt nicht mehr am Strickprozess teil. Auf ihnen ruhen die letzten Maschen der Ärmel. Es werden dann in Strickrichtung von rechts nach links mit dem ersten Stricksystem und dem Fadenführer 5 mit den Nadeln h - o des hinteren Nadelbetts H Maschen für die Rückseite 2' des Rumpfteils gebildet. Die Rückseite 2' wird dabei in Spickeltechnik gebildet. Dies bedeutet, dass alle Nadeln Maschen tragen, aber nicht alle Maschen an der Maschenbildung teilnehmen. So werden in Strickreihe R1 mit den Nadeln e - g keine Maschen mehr gebildet. Wie insbesondere aus Fig. 3 ersichtlich ist, wird die Anzahl der strickenden Nadeln mit zunehmender Gestrickhöhe immer weniger.The row R1 is the starting knitting series of the sections C, C '. The stitches A - D; P - S of the front needle bed V and the needles a - d, p - s of the rear needle bed H, which previously formed stitches for the sleeves, no longer participate in the knitting process. The last stitches of the sleeves rest on them. Then stitches are formed in the knitting direction from right to left with the first knitting system and the yarn guide 5 with the needles h-o of the rear needle bed H for the back 2 'of the body part. The back 2 'is formed in Spickeltechnik. This means that all needles are meshes, but not all stitches participate in stitching. Thus, no stitches are formed in row R1 with the needles e - g. As in particular from Fig. 3 As can be seen, the number of knitting needles with increasing knitting height is less and less.

In Reihe R2 werden mit dem zweiten Stricksystem und dem Fadenführer 4 in derselben Strickrichtung mit den Nadeln H - 0 Maschen für die Vorderseite 2 des Rumpfteils gebildet. Das Vorderteil 2 wird über die gesamte Höhe der Sektion C mit derselben Anzahl von Nadeln gebildet. In Strickreihe R2 werden nur deswegen noch nicht mit den Nadeln E - G Maschen gebildet, da noch der Fadenführer 5 für den weiteren Strickvorgang im Wege steht.In row R2, with the second knitting system and the yarn guide 4 in the same knitting direction with the needles H - 0 stitches are formed for the front side 2 of the body part. The front part 2 is formed over the entire height of the section C with the same number of needles. In knitting row R2 stitches are not formed with the needles E - G only because the thread guide 5 is still in the way for the further knitting process.

Dieser Fadenführer 5 wird in der Strickreihe R3 in Schlittenbewegungsrichtung von links nach rechts ebenso wie der Fadenführer 4 mit dem zweiten und dritten Stricksystem in ihr Strickfeld verschoben. Der Fadenführer 5 wird dabei so weit verschoben, dass er den Fadenführer 4 bei der Fadeneinlage ab der Nadel G nicht behindert.This yarn guide 5 is moved in the knitting row R3 in the direction of carriage movement from left to right as well as the yarn guide 4 with the second and third knitting system in their knitting field. The yarn guide 5 is displaced so far that it does not interfere with the yarn guide 4 in the yarn insert from the needle G.

In Reihe R4 werden dann mit dem Fadenführer 4 die restlichen Maschen auf den Nadeln E - G des vorderen Nadelbetts V gebildet.In row R4, the remaining stitches on the needles E - G of the front needle bed V are then formed with the thread guide 4.

In Reihe R5 wird wieder eine Korrekturbewegung für den Fadenführer 5 mit dem zweiten Stricksystem nach links neben die Nadel h durchgeführt, sodass er in der nächsten Strickreihe den Faden sicher in dieser Nadel einlegen kann.In row R5, a correction movement for the thread guide 5 with the second knitting system is again carried out to the left next to the needle h, so that in the next knitting row it can insert the thread securely into this needle.

In Reihe R6 werden in derselben Schlittenbewegungsrichtung mit dem dritten Stricksystem die Ärmelmaschen P - S auf die gegenüberliegenden leeren Nadeln p' - s' umgehängt.In row R6, in the same direction of carriage movement with the third knitting system, the sleeve stitches P - S are transferred to the opposite empty needles p '- s' .

Anschließend wird in Reihe R7 das hintere Nadelbett H von der Grundstellung um zwei Nadeln nach links versetzt. Dann werden in Schlittenbewegungsrichtung von links nach rechts mit dem ersten Stricksystem die Maschen von den Nadeln p' - s' auf die Nadel 0 - R des vorderen Nadelbetts V umgehängt.Subsequently, in row R7, the rear needle bed H is displaced from the basic position by two needles to the left. Then, in the carriage movement direction from left to right, with the first knitting system, the stitches are transferred from the needles p '- s' to the needle 0 - R of the front needle bed V.

In Reihe R8 werden das hintere Nadelbett wieder in seine Grundstellung gebracht und die Stricksysteme an die linke Gestrickseite bewegt, bevor in Reihe R9 in Strickrichtung von links nach rechts mit dem ersten Stricksystem und dem Fadenführer 5 mit den Nadeln h - I Maschen für das Rückenteil 2' gebildet werden. Die Nadeln h - I liegen dabei entfernt vom Rand des Rückenteils 2'.In row R8, the back needle bed is returned to its home position and the knitting systems are moved to the left fabric side before in row R9 in the direction of knitting from left to right with the first knitting system and the yarn guide 5 with the needles h - I stitches for the back 2 be formed. The needles h - I lie away from the edge of the back part 2 '.

In Reihe R10 werden mit dem zweiten Stricksystem und dem Fadenführer 4 ebenfalls in Strickrichtung von links nach rechts mit den Nadeln E - K des vorderen Nadelbetts V Maschen für das Vorderteil 2 im Schulterbereich C gebildet. Auf der Nadel O liegen nun zwei Maschen, die äußerste Masche des Vorderteils 2 und die eingehängte Ärmelmasche von der Randnadel P des linken Ärmels.In row R10, stitches for the front part 2 in the shoulder region C are also formed in the knitting direction from left to right with the needles E - K of the front needle bed V with the second knitting system and the yarn guide 4. On the needle O are now two stitches, the outermost stitch of the front part 2 and the hinged sleeve mesh of the edge needle P of the left sleeve.

In Reihe R11 werden wieder Korrekturbewegungen für die Fadenführer 5 und 4 durchgeführt. Der Fadenführer 5 wird dabei so verschoben, dass er eine Fadeneinlage durch den Fadenführer 4 ab der Nadel L nicht behindert.Correction movements for the thread guides 5 and 4 are again carried out in row R11. The yarn guide 5 is thereby displaced so that it does not hinder a yarn insert by the yarn guide 4 from the needle L.

Es erfolgt dann in der Reihe R12 das Bilden von Maschen mit den restlichen Nadeln L - O des vorderen Nadelbetts V für das Vorderteil 2.Then, in the row R12, stitching is made with the remaining needles L-O of the front needle bed V for the front part 2.

In Reihe 13 wird wieder in Schlittenrichtung von links nach rechts der Fadenführer 5 mit dem zweiten Stricksystem so weit rechts neben die Nadel 1 bewegt, dass er in der nächsten Strickreihe den Faden sicher in diese Nadel einlegen kann.In row 13 is again moved in the carriage direction from left to right of the yarn guide 5 with the second knitting system as far to the right of the needle 1 that he can safely insert the thread in the next knitting in this needle.

In Reihe R14 werden dann die Ärmelmaschen von den Nadeln A - D des vorderen Nadelbetts V auf die gegenüberliegenden leeren Nadeln a' - d' umgehängt.In row R14, the sleeve stitches are then transferred from the needles A-D of the front needle bed V to the opposite empty needles A'-D '.

In Reihe R15 hat dann das hintere Nadelbett einen Versatz um zwei Nadelteilungen nach rechts durchgeführt, und es werden die Maschen von den Nadeln a' - d' auf die Nadeln B - E des vorderen Nadelbetts V umgehängt.In row R15, the back needle bed has then made an offset of two needle pitches to the right, and the stitches are transferred from the needles a'-d 'to the needles B-E of the front needle bed V.

In Reihe R16 wird dann das hintere Nadelbett H wieder um eine Nadelteilung nach links bewegt. Die Masche der Nadel a des hinteren Nadelbetts H wird auf die Nadel A des vorderen Nadelbetts V umgehängt. Diese Masche ist eine Masche der Rückseite des rechten Ärmels, die jetzt auf das Nadelbett der Vorderseite des rechten Ärmels transferiert worden ist. Dadurch ergibt sich ein gleichförmiger Umhängeprozess, bei dem alle Maschen des Ärmels mit der Vorderseite des Rumpfteils verbunden werden.In row R16, the rear needle bed H is then moved to the left again by a needle pitch. The loop of the needle a of the rear needle bed H is transferred to the needle A of the front needle bed V. This stitch is a stitch on the back of the right sleeve, which has now been transferred to the needle bed on the front of the right sleeve. This results in a uniform transfer process in which all stitches of the sleeve are connected to the front of the body part.

In Reihe R17 ist das hintere Nadelbett H wieder in Grundstellung gebracht worden. Es werden dann mit dem ersten Stricksystem und dem Fadenführer 5 Maschen mit den Nadeln i - I für die Rückseite 2' des Rumpfteils gebildet.In row R17, the rear needle bed H has been restored to its basic position. There are then formed with the first knitting system and the thread guide 5 stitches with the needles i - I for the back 2 'of the body part.

In Reihe R 18 werden mit dem zweiten Stricksystem und dem Fadenführer 4 in Strickrichtung von rechts nach links auf den Nadeln I - 0 auf den Nadeln des vorderen Nadelbetts V Maschen für die Vorderseite des Rumpfteils 2 gebildet. Auf der Nadel E ruhen zwei Maschen, die äußerste Masche der Vorderseite des Rumpfteils und die eingehängte Masche des rechten Ärmels.In row R 18, stitches for the front side of the body part 2 are formed with the second knitting system and the yarn guide 4 in the knitting direction from right to left on the needles I-0 on the needles of the front needle bed V. On the needle E rest two stitches, the outermost stitch of the front of the body and the attached stitch of the right sleeve.

In Reihe R19 werden in Schlittenbewegungsrichtung von links nach rechts mit dem zweiten und dritten Stricksystem die Fadenführer 4, 5 in ihre Strickfelder verschoben.In row R19, the thread guides 4, 5 are moved into their knitting fields in the direction of carriage movement from left to right with the second and third knitting systems.

Anschließend werden in Reihe R20 mit den Nadeln E - H die restlichen Maschen für die Vorderseite 2 des Rumpfteils gebildet.Subsequently, in rows R20 with the needles E - H, the remaining stitches are formed for the front side 2 of the body part.

In Reihe R21 wird in Schlittenrichtung von rechts nach links mit dem zweiten Stricksystem der Fadenführer 5 links neben die Nadel i bewegt, sodass er in der nächsten Strickreihe den Faden sicher in diese Nadel einlegen kann.In row R21, the thread guide 5 is moved to the left of the needle i in the carriage direction from right to left with the second knitting system, so that in the next knitting row it can safely insert the thread into this needle.

In Reihe R22 werden dann in derselben Schlittenbewegungsrichtung mit dem dritten Stricksystem die noch nicht auf das Rumpfteil eingehängten vorderen Ärmelmaschen der Nadel P, Q, R auf die Nadeln p', q', r' des hinteren Nadelbetts H umgehängt.In row R22, in the same direction of carriage movement with the third knitting system, the front sleeve loops of the needle P, Q, R which are not yet hinged to the trunk part are then transferred to the needles p ', q', r 'of the back needle bed H.

Anschließend erfolgt in Reihe R23 ein Versatz des hinteren Nadelbetts H um zwei Nadelteilungen nach links und das Zurückhängen der transferierten Maschen auf das vordere Nadelbett in die Nadeln O, P, Q.Subsequently, in row R23, an offset of the rear needle bed H by two needle pitches to the left and the hanging back of the transferred stitches on the front needle bed in the needles O, P, Q.

In Reihe R24 wird dann das hintere Nadelbett H um eine Nadelteilung nach rechts zurückgesetzt und die Masche s des hinteren Nadelbetts H auf die Nadel R des vorderen Nadelbetts V umgehängt. Die Masche der Nadel s ist eine Ärmelmasche von der Ärmelrückseite. Dadurch ergibt sich ein gleichförmiger Umhängeprozess, indem alle Maschen des Ärmels mit der Vorderseite 2 des Rumpfteils verbunden werden.In row R24, the back needle bed H is then reset by a needle pitch to the right and the stitch s of the back needle bed H is transferred to the needle R of the front needle bed V. The stitch of the needle s is a sleeve stitch from the sleeve back. This results in a uniform Umhängeprozess by all the stitches of the sleeve are connected to the front side 2 of the body part.

In Reihe R25 ist das hintere Nadelbett H wieder in Grundstellung gebracht worden. In Schlittenbewegungsrichtung von links nach rechts wird mit dem ersten Stricksystem und dem Fadenführer 5 eine weitere, sich über drei Nadeln i, j, k erstreckende kurze Maschenreihe für die Rückseite 2' des Rumpfteils gebildet.In row R25, the rear needle bed H has been restored to its basic position. In the direction of carriage movement from left to right, with the first knitting system and the thread guide 5, a further short row of stitches extending over three needles i, j, k is formed for the back 2 'of the body part.

Anschließend erfolgt in Reihe R26 in Schlittenbewegungsrichtung von links nach rechts mit dem zweiten Stricksystem und dem Fadenführer 4 das Bilden von Maschen mit den Nadeln E - J des vorderen Nadelbetts V für die Vorderseite 2 des Rumpfteils. Auf der Nadel O des vorderen Nadelbetts V ruhen zwei Maschen, neben der Rumpfteilmasche die dazu gehängte Masche des linken Ärmels.Subsequently, in row R26 in the direction of carriage movement from left to right, the second knitting system and the thread guide 4 are used to form stitches with the needles E - J of the front needle bed V for the front side 2 of the body part. On the needle O of the front needle bed V rest two stitches, next to the fuselage mesh the attached stitch of the left sleeve.

In Reihe R27 werden wieder die Fadenführer bewegt, sodass insbesondere der Fadenführer 5 nun das Bilden weiterer Maschen auf dem vorderen Nadelbett V nicht behindert, sodass in Reihe R28 auch mit den Nadeln K - 0 des vorderen Nadelbetts V Maschen für die Vorderseite 2 des Rumpfteils gebildet werden können.In row R27, the thread guides are again moved, so that in particular the thread guide 5 does not hinder the formation of further stitches on the front needle bed V, so that in series R28 also with the needles K - 0 of the front needle bed V stitches for the front side 2 of the body part formed can be.

In Reihe R29 wird mit dem zweiten Stricksystem der Fadenführer 5 rechts neben die Nadel k bewegt, sodass er beim anschließenden Strickprozess den Faden sicher in diese Nadel einlegen kann.In row R29 the yarn guide 5 is moved to the right of the needle k with the second knitting system so that it can safely insert the yarn into this needle during the subsequent knitting process.

Zuvor erfolgt jedoch in Reihe R30 ein Umhängen der Maschen der Vorderseite des rechten Ärmels von den Nadeln A - D auf die gegenüberliegenden Nadeln a' - d' des hinteren Nadelbetts H sowie in Reihe R31 ein Versatz des hinteren Nadelbetts H um zwei Nadelteilungen nach rechts und ein Zurückhängen der soeben transferierten Maschen auf die gegenüberliegenden Nadeln B - E des vorderen Nadelbetts V.Prior to this, however, in row R30, the stitches of the front side of the right sleeve are transferred from the needles A-D to the opposite needles a'-d 'of the rear needle bed H, and in row R31 an offset of the rear needle bed H is made to the right and two needle divisions a back hanging of the just transferred stitches on the opposite needles B - E of the front needle bed V.

In Reihe R32 sind nun das hintere Nadelbett wieder in seine Grundstellung gebracht und die Stricksysteme an die rechte Gestrickseite bewegt worden.In row R32, the rear needle bed has now been returned to its basic position and the knitting systems moved to the right side of the fabric.

In dem Strickzyklus der Reihen R1 - R32 sind vier Strickreihen für die Vorder- und Rückseite des Rumpfteils im Schulterbereich C, C' gebildet worden. Von den beiden Ärmeln wurden je zwei Maschen mit der Vorderseite des Rumpfteils verbunden. Dieser Strickzyklus wird so lange wiederholt, bis die für die Sektionen C, C' benötigten Maschenreihen gebildet und alle Maschen der Ärmel mit der Vorderseite 2 des Rumpfteils verbunden sind.In the knitting cycle of the rows R1-R32, four rows of knitting for the front and back of the body part have been formed in the shoulder area C, C '. From the two sleeves were each two stitches connected to the front of the body part. This knitting cycle is repeated until the courses required for the sections C, C 'are formed and all the stitches of the sleeves are connected to the front side 2 of the body part.

Die Verbindung der Vorderseite 2 und der Rückseite 2' des Rumpfteils im Schulterbereich erfolgt durch Umhängen der Maschen der Vorderseite 2 des Rumpfteils, die sich auf dem vorderen Nadelbett V befinden, auf die gegenüberliegenden, Maschen tragenden Nadeln des hinteren Nadelbetts H, die die Rückseite 2' des Rumpfteils gebildet haben. Die Übertragung der Maschen beginnt an den seitlichen Gestrickrändern mit mindestens einer Nadel. Im dargestellten Beispiel werden jeweils zwei Maschen gleichzeitig übertragen, wie in Reihe R33 gezeigt ist. Dazu wird das hintere Nadelbett zuvor um eine Nadelteilung nach rechts versetzt.The connection of the front 2 and the back 2 'of the body portion in the shoulder region is made by transferring the stitches of the front side 2 of the body part, which are on the front needle bed V, on the opposite, mesh-carrying needles of the rear needle bed H, the back 2 'have formed the body part. The transfer of the stitches begins at the side knitted edges with at least one needle. In the example shown, two stitches are transferred simultaneously, as shown in row R33. For this purpose, the rear needle bed is previously offset by a needle pitch to the right.

In Reihe R34 ist das hintere Nadelbett H wieder in seine Grundstellung bewegt worden. In Strickrichtung von links nach rechts bildet das zweite Stricksystem mit dem Fadenführer 3 und den Nadeln b - e Maschen. Mit diesen Maschen wird die Kontur der Verbindungslinie der Vorder- und Rückseite des Rumpfteils im Bereich der rechten Schulter hervorgehoben. Je mehr Nadeln Maschen bilden, desto breiter wird dieser Konturbereich. Die Mindestanzahl der Nadeln, die die Kontur hervorheben, ist durch die Zahl der Nadeln vorgegeben, auf welche Maschen von Nadeln des vorderen Nadelbetts übergeben wurden. Im dargestellten Beispiel sind dies also zwei Nadeln.In row R34, the rear needle bed H has been moved back to its normal position. In the knitting direction from left to right, the second knitting system with the yarn guide 3 and the needles forms b - e stitches. These stitches highlight the contour of the connecting line of the front and back of the body in the area of the right shoulder. The more needles mesh, the wider this contour area becomes. The minimum number of needles which emphasize the contour is dictated by the number of needles to which stitches of needles of the front needle bed have been passed. In the example shown, these are two needles.

In Reihe R35 wird in Strickrichtung von rechts nach links mit dem zweiten Stricksystem und dem Fadenführer 3 eine weitere Reihe von Konturmaschen mit den Nadeln b - e gebildet.In row R35, in the knitting direction from right to left, with the second knitting system and the thread guide 3, a further series of contour stitches is formed with the needles b-e.

Anschließend wird in Reihe R36 in derselben Strickrichtung mit dem dritten Stricksystem und dem Fadenführer 4 eine Konturmaschenreihe mit den Nadeln mit den Nadeln o - r im Bereich der linken Schulter gebildet.Subsequently, in series R36 in the same knitting direction with the third knitting system and the yarn guide 4, a row of contour stitches is formed with the needles with the needles o-r in the region of the left shoulder.

In Reihe R 37 werden mit denselben Nadeln nochmals Konturmaschen erzeugt.In series R 37, contour meshes are again generated with the same needles.

In Reihe R38 werden mit dem dritten Stricksystem die Maschen der Nadeln b - e und o - r, also die Konturmaschen des hinteren Nadelbetts H auf ihre gegenüberliegenden Nadeln A' - D' und N' - Q' des vorderen Nadelbetts V umgehängt.In row R38, with the third knitting system, the stitches of the needles b - e and o - r, that is, the contour stitches of the back needle bed H, are transferred to their opposite needles A '- D' and N '- Q' of the front needle bed V.

Anschließend wird in Reihe R39 ein Versatz des hinteren Nadelbetts H um vier Nadelteilungen nach links durchgeführt. In Schlittenbewegungsrichtung von rechts nach links werden mit dem zweiten Stricksystem die Maschen der Nadeln A' - D' des vorderen Nadelbetts V auf die gegenüberliegenden Nadeln d - g des hinteren Nadelbetts H umgehängt. Der Versatzweg des Nadelbetts ergibt sich dabei aus der Anzahl der Nadeln, von welchen Maschen übertragen werden, multipliziert mit dem Nadelabstand.Subsequently, an offset of the rear needle bed H by four needle pitches to the left is performed in row R39. In the carriage movement direction from right to left, with the second knitting system, the stitches of the needles A '- D' of the front needle bed V are transferred to the opposite needles d - g of the rear needle bed H. The offset path of the needle bed results from the number of needles from which stitches are transmitted, multiplied by the needle spacing.

In Reihe R40 wird dann das hintere Nadelbett um insgesamt acht Nadelteilungen nach rechts versetzt und die Maschen der Nadeln N' - Q' des vorderen Nadelbetts V auf die gegenüberliegenden Nadeln m - p des hinteren Nadelbetts H umgehängt.In row R40, the back needle bed is then offset to the right by a total of eight needle pitches and the stitches of the needles N'-Q 'of the front needle bed V are transferred to the opposite needles m-p of the back needle bed H.

Der Strickzyklus R33 - R40 wird so lange wiederholt, bis die Vorderund Rückseite des Rumpfteils am linken und rechten Schulterbereich miteinander verbunden sind.The knitting cycle R33 - R40 is repeated until the front and back of the body part at the left and right shoulder area are connected to each other.

Claims (9)

  1. Method for producing an item of knitted clothing as tubular knitwear on a flat bed knitting machine with at least two opposing needle beds (V, H), wherein the following steps are carried out to manufacture the shoulder region (C, C') of the tubular knitwear (1) in which no more stitches are formed for the sleeves (3, 3';4, 4'):
    - the progressive forming in the shoulder region (C, C') of rows of stitches both for the part (2) arranged on the first needle bed (V) as well as for part (2') arranged on the second needle bed (H), wherein the full constant width of part (2) is produced for the part (2) of the tubular knitwear (1) arranged on the first needle bed (V), and rows of stitches with fewer stitches than those across the full width of part (2') are formed for part (2') of the tubular knitwear (1) arranged on the second needle bed (H), such that the outer needles with rows of stitches of part (2') no longer take part in the stitch formation process,
    - following the last row of stitches, transfer of the stitches of part (2) of the first needle bed (V) on to the needles of the second needle bed (H) to the stitches of the second part (2') and attachment of both parts (2, 2').
  2. Method according to claim 1, characterised in that the same number of rows of stitches are formed for both parts (2, 2') in the shoulder region (C, C').
  3. Method according to claim 2, characterised in that, in the process of transferring the stitches of part (2) of the first needle bed (V) to the second needle bed (H), the transfer is started with the stitches on the outer edges of the fabric.
  4. Method according to one of claims 1 to 3, characterised in that the stitches of the last rows of stitches of both parts (2, 2') are joined together by a looping technique.
  5. Method according one of claims 1 to 4, characterised in that, after each transfer of stitches of part (2) of the first needle bed (V) to the second needle bed (H) at least with those needles on which stitches were transferred, stitches are formed to accentuate the attachment line (6, 7) between the two parts (2, 2').
  6. Method according to one of claims 1 to 5, characterised in that the number of stitches in the rows of stitches of part (2') on the second needle bed (H) are reduced increasingly from the edges of the fabric.
  7. Method according to one of claims 1 to 6, characterised in that, in the rows of stitches in the shoulder region (C') of part (2') on the second needle bed (H), the reduction in the number of stitches is linear, stepped or varied as desired at the level of the shoulder region (C').
  8. Method according to one of claims 1 to 7, characterised in that, in an item of clothing with sleeves (3, 3'; 4, 4') in the shoulder region (C, C') of the item of clothing (1), the sleeve stitches are joined exclusively in the shoulder region (C) of the part on the first needle bed (V) by a loop transfer technique.
  9. Method according to one of claims 1 to 8, characterised in that, during the knitting of the shoulder regions (C, C') of the two knitted parts (2, 2'), neck cut-outs are formed in the central region of the parts (2, 2').
EP20030022392 2003-10-06 2003-10-06 Method of making a knitted garment Expired - Lifetime EP1522616B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP20030022392 EP1522616B1 (en) 2003-10-06 2003-10-06 Method of making a knitted garment
CNB2004100835765A CN100482872C (en) 2003-10-06 2004-10-08 Method of making a knitted garment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP20030022392 EP1522616B1 (en) 2003-10-06 2003-10-06 Method of making a knitted garment

Publications (2)

Publication Number Publication Date
EP1522616A1 EP1522616A1 (en) 2005-04-13
EP1522616B1 true EP1522616B1 (en) 2013-03-06

Family

ID=34306839

Family Applications (1)

Application Number Title Priority Date Filing Date
EP20030022392 Expired - Lifetime EP1522616B1 (en) 2003-10-06 2003-10-06 Method of making a knitted garment

Country Status (2)

Country Link
EP (1) EP1522616B1 (en)
CN (1) CN100482872C (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE502006004124D1 (en) * 2006-04-04 2009-08-13 Stoll H Gmbh & Co Kg Method for knitting a garment
WO2011004694A1 (en) * 2009-07-09 2011-01-13 株式会社島精機製作所 Knitwear with sleeves and body, and knitting method for same
DE102010012151B4 (en) * 2010-03-20 2013-08-01 H. Stoll Gmbh & Co. Kg Process for the production of a tubular round finished knitted fabric
DE102011012767A1 (en) * 2010-09-18 2012-03-22 H. Stoll Gmbh & Co. Kg Method for producing a hose knit
CN103628238B (en) * 2013-12-04 2015-03-25 宁波慈星股份有限公司 Weaving method of upper pattern
CN112176517B (en) * 2020-09-30 2021-11-30 嘉兴市蒂维时装有限公司 Knitting method for improving knitting efficiency of flat knitting machine full-molded clothes
CN112609308B (en) * 2020-12-15 2022-06-14 嘉兴市蒂维时装有限公司 Weaving method for improving SP collar structure of fully-formed shoulder-insertion garment

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0765258B2 (en) 1990-07-17 1995-07-12 株式会社島精機製作所 Knitted fabric edge treatment method
US5826445A (en) 1996-02-09 1998-10-27 Shima Seiki Manufacturing Ltd. Knitting method on a flat knitting machine and a knit fabric thus produced
EP1211341B1 (en) 1999-07-13 2010-04-14 Shima Seiki Mfg., Ltd Welt-seaming method excellent in stretchability

Also Published As

Publication number Publication date
CN100482872C (en) 2009-04-29
CN1605670A (en) 2005-04-13
EP1522616A1 (en) 2005-04-13

Similar Documents

Publication Publication Date Title
DE69914844T2 (en) Process for knitting a fabric with weft inserted
DE19704666B4 (en) Knitting process for flat bed knitting machines and knitwear produced by this process
EP1918438B1 (en) Method for producing a tubular flat knit fabric with the plating technique
EP0584529B1 (en) Method for manufacturing a fashioned integrally flat knit article for a sleeved garment
DE4006877B4 (en) A method for joining tubular knitted sleeves with a tubular body part on a flat knitting machine
DE69912723T2 (en) A method of knitting a knitted fabric having a connector formed therein
DE2050978A1 (en) Method for machine-fitting a textile semi-finished product which is suitable for further processing into a piece of clothing
DE1937213A1 (en) Method and apparatus for knitting an A-sleeved garment
DE2518508C2 (en) Legless panties
DE2114558A1 (en) Tubular product for a sleeved knitted garment and process for its manufacture
DE102010012310B4 (en) Process for the production of a tubular round finished knitted fabric
DE1785468A1 (en) Knitting process for garments
EP0900868A2 (en) Method for making knitwear on a flat bed knitting machine
EP1522616B1 (en) Method of making a knitted garment
EP1829994B1 (en) Method for producing a patterned knitted fabric
DE69825650T2 (en) Method for knitting tubular goods
DE102008051993B4 (en) Knitted piece with knitted pocket and method for producing a knitted piece with knitted pocket
DE2504028C2 (en) Method of knitting a sleeved garment
EP0854219B1 (en) Method for binding yarnends in knitwear
EP0821090A2 (en) Method for manufacturing seamless open or closed at the edges connected flat knitted articles
EP0852270B1 (en) Method for stich increase of tubular article made on a double bed flat knitting machine
DE2803338C2 (en)
EP0851050B1 (en) Method for manufacturing a tubular knitted article
EP1111109B1 (en) Method for forming new stitches on a knitting machine
EP1584720B1 (en) Method of linking two knit fabrics

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL LT LV MK

17P Request for examination filed

Effective date: 20050924

AKX Designation fees paid

Designated state(s): DE IT TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): DE IT TR

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 50314710

Country of ref document: DE

Effective date: 20130502

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20131025

Year of fee payment: 11

26N No opposition filed

Effective date: 20131209

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 50314710

Country of ref document: DE

Effective date: 20131209

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 50314710

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150501

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: TR

Payment date: 20220929

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20221031

Year of fee payment: 20

P01 Opt-out of the competence of the unified patent court (upc) registered