EP1520938A2 - Method and test arrangement to determine the bearing capacity of displacement piles - Google Patents

Method and test arrangement to determine the bearing capacity of displacement piles Download PDF

Info

Publication number
EP1520938A2
EP1520938A2 EP04019985A EP04019985A EP1520938A2 EP 1520938 A2 EP1520938 A2 EP 1520938A2 EP 04019985 A EP04019985 A EP 04019985A EP 04019985 A EP04019985 A EP 04019985A EP 1520938 A2 EP1520938 A2 EP 1520938A2
Authority
EP
European Patent Office
Prior art keywords
pile
test
strand
head
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP04019985A
Other languages
German (de)
French (fr)
Other versions
EP1520938A3 (en
Inventor
Erwin Emil Dipl.-Ing. Dipl.-Wirtsch.-Ing Stötzer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bauer Maschinen GmbH
Original Assignee
Bauer Maschinen GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bauer Maschinen GmbH filed Critical Bauer Maschinen GmbH
Publication of EP1520938A2 publication Critical patent/EP1520938A2/en
Publication of EP1520938A3 publication Critical patent/EP1520938A3/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds

Definitions

  • the invention relates to a method for determining the carrying behavior of displacement piles, which by introducing a borehole by means of a displacer head and then Fill the borehole with a hardenable suspension made while leaving the displacer head downhole be created, with a test pile and by means of a Loading device subjected to a test load is measured and by means of a measuring device, the bearing behavior becomes.
  • the invention further relates to a test arrangement for determining the carrying behavior of displacement piles.
  • test piles can then be subjected to a predetermined test load become, whereby then the appropriate carrying behavior, in particular a settlement of the pile, can measure.
  • the test pile by means of a load device applied, which a predetermined pressure on the test pile exercises.
  • a load device applied, which a predetermined pressure on the test pile exercises.
  • the invention has for its object to provide a method and a test arrangement for determining the carrying behavior of displacement piles made of concrete with a displacer, with which the bearing behavior of these displacement piles can be determined particularly quickly and economically.
  • the method according to the invention is characterized that the displacer head into the ground by means of a metallic Stakes is introduced, which together with the Displacer forms the test pile.
  • the invention is based on the finding that positive displacement piles with a so-called lost displacer the Trag decisively determined by the displacer becomes.
  • the displacer head becomes instantaneous introduced through a pile strand in the ground, which together forms the test pile with the displacer head.
  • the pile strand is so in its diameter and in its length to the actually provided displacement pile from the hardened Suspension, in particular concrete, adjusted.
  • the displacer head Can be made of metal, concrete or another suitable Material exist.
  • test load immediately after the Inserting the pile strand with the displacer head into the ground respectively. This saves time and money.
  • a particularly accurate determination of the Trag s be achieved by that of the measuring equipment determined values for the metallic test pile by means of a correction factor according to the properties the displacement piles converted from the hardened suspension become.
  • a Lastverteilkopf is arranged, which the Test load transfers to the pile string.
  • the pile string At its top End of the pile strand may have a connecting device, with which the load head or a press device can be easily attached.
  • a preferred development for this is that at least two anchor elements around the test pile around in the ground are introduced and that the Lastverteilkopf with the anchor elements connected to the power dissipation.
  • the anchor elements can be in particular screw anchors, which in the necessary Number at a certain angle to the test pile in be screwed in the floor. The load distribution head will then clamped with the screw anchors, giving a compressive force the test stake can be exercised.
  • a press device is arranged, through which the test load is produced.
  • the press can in particular be a hydraulic pressure cylinder which, when moving apart between the Lastverteilkopf and the test pile the desired Compressive force generated.
  • the displacer head remains in the ground and when removing the pile strand, the hardenable suspension is initiated.
  • the pile strand is detachable with the Displacer coupled, such as by a thread.
  • the test stake can in the test in a simple manner in be converted to a building carrying displacement.
  • the test pile can be placed directly at the location of a carrying pile.
  • the test pole with the metallic Pile string immediately remains in the ground and together with the other to be created displacement piles of concrete the Building carries.
  • the pile strand is a cylindrical element, in particular a pipe is the outer surface for increasing a Friction factor is changed with the soil.
  • a Friction factor can be roughened or with the outer surface of the pile strand Profile elements, be provided about helical.
  • the friction factor can be an empirical friction factor between be adapted to a concrete pile and the ground.
  • the invention further relates to a test arrangement for Determining the bearing behavior of a displacement pile with a Displacement head, comprising a loading device for Apply a test load.
  • the test arrangement according to the invention is characterized in that a metallic drill string is provided, at the lower end of a displacer and at the upper end of the loading device releasably secured is. With this test arrangement, in particular the before described method and the associated Benefits are achieved.
  • the measuring device can in the Pile strand or integrated into the load device. Alternatively, a mobile measuring device can be connected separately become.
  • the invention is based on a preferred embodiment further described, which is schematically in the drawing is shown.
  • the only figure shows one schematic side view of a test arrangement for determining the structural behavior of displacement piles.
  • a test pile was made 30 in the area shown with a ground area Displacer 32 driven, which the soil in the displaced surrounding soil area.
  • the test pile 30 points beside the displacer 32, a metallic pile strand 34th on, which via a connecting device 36 releasably with the displacer 32 is connected.
  • the test pile 30 corresponds in terms of its length and its diameter actual displacement piles made of concrete become.
  • a load device 12 is placed on the test pile 30 with a load distribution head 14 and a hydraulic press device 18 arranged.
  • the Lastverteilkopf with screwed laterally at a predetermined angle Anchor elements 16 coupled.
  • the press device 18 is a predetermined test load on the test pile 30 exercised.
  • the Trag in particular the setting of the test pile 30, measured.
  • the settlement behavior of the test pile 30 with the metallic pile strand with surprisingly high accuracy the settlement behavior of a Concrete displacement pile.
  • the friction value of the metallic pile string 34 to a concrete column can, for example, formed as helical profile elements 38 may be formed along the pile string 34.
  • the tubular pile strand 34 from the displacer head 32 approximately by opposite rotation be released and withdrawn from the Bohr.
  • the resulting cavity with a hardenable suspension, in particular concrete are filled.
  • the metallic test pile can be easily inserted into a concrete pile to be reworked, which then to the building foundation can be used.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

Prepared by putting a bore-hole in place and filling the hole with a hardening suspension under load from a displacement head (32), a test pole (30) is impinged with a test load by means of a loading mechanism (12). A measuring device measures supporting behavior. An independent claim is also included for a test structure for determining the supporting behavior of displacement poles with a displacement head with a loading mechanism for attaching a test load.

Description

Die Erfindung betrifft ein Verfahren zum Bestimmen des Tragverhaltens von Verdrängungspfählen, welche durch Einbringen eines Bohrloches mittels eines Verdrängerkopfes und anschließendes Verfüllen des Bohrloches mit einer aushärtbaren Suspension unter Belassung des Verdrängerkopfes im Bohrloch hergestellt werden, wobei ein Testpfahl erstellt und mittels einer Belastungseinrichtung mit einer Prüfbelastung beaufschlagt wird und mittels einer Messeinrichtung das Tragverhalten gemessen wird. Die Erfindung betrifft weiterhin eine Prüfanordnung zum Bestimmen des Tragverhaltens von Verdrängungspfählen.The invention relates to a method for determining the carrying behavior of displacement piles, which by introducing a borehole by means of a displacer head and then Fill the borehole with a hardenable suspension made while leaving the displacer head downhole be created, with a test pile and by means of a Loading device subjected to a test load is measured and by means of a measuring device, the bearing behavior becomes. The invention further relates to a test arrangement for determining the carrying behavior of displacement piles.

Für die Erstellung von Bauwerken ist es in vielen Fällen erforderlich, zur Sicherstellung einer ausreichenden Tragfähigkeit Gründungspfähle in den Boden einzubringen. Die Tragfähigkeit eines einzelnen Gründungspfahles hängt dabei maßgeblich von den lokalen Bodengegebenheiten ab, so dass das Tragverhalten der Gründungspfähle auf rein theoretischem Berechnungsweg kaum zuverlässig zu bestimmen ist.In many cases it is necessary to create structures to ensure adequate carrying capacity To introduce foundation piles in the ground. The carrying capacity a single foundation pile depends significantly from the local soil conditions, so that the bearing behavior the foundation piles on a purely theoretical calculation path hardly reliable to determine.

Zur Ermittlung des tatsächlichen Tragverhaltens eines Verdrängungspfahles ist es daher in vielen Fällen erforderlich, in dem Baugrund einen oder mehrere Testpfähle zu erstellen. Diese Testpfähle können dann mit einer vorgegebenen Prüflast beaufschlagt werden, wobei sich dann das entsprechende Tragverhalten, insbesondere eine Setzung des Pfahles, messen lässt. Hierzu wird der Testpfahl mittels einer Belastungseinrichtung beaufschlagt, welche einen vorgegebenen Druck auf den Testpfahl ausübt. Bei Betonpfählen ist es hierbei erforderlich, dass der Beton bereits abgebunden und verfestigt ist. Dies kann jedoch mehrere Wochen dauern, so dass insgesamt die Bestimmung des tatsächlichen Tragverhaltens vom Beginn des Einbringens des Pfahles bis zum Abschluss des Testes eine sehr lange Zeit in Anspruch nimmt.To determine the actual load-bearing behavior of a displacement pile It is therefore necessary in many cases in to create one or more test piles on the ground. These Test piles can then be subjected to a predetermined test load become, whereby then the appropriate carrying behavior, in particular a settlement of the pile, can measure. For this purpose, the test pile by means of a load device applied, which a predetermined pressure on the test pile exercises. For concrete piles this is necessary that the concrete is already set and solidified. This However, it can take several weeks, so the overall determination the actual structural behavior from the beginning of the introduction of the pile until the completion of the test a very takes a long time.

Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren und eine Prüfanordnung zum Bestimmen des Tragverhaltens von Verdrängungspfählen aus Beton mit einem Verdrängerkopf anzugeben, mit welchen das Tragverhalten dieser Verdrängungspfähle besonders schnell und wirtschaftlich ermittelt werden kann.The invention has for its object to provide a method and a test arrangement for determining the carrying behavior of displacement piles made of concrete with a displacer, with which the bearing behavior of these displacement piles can be determined particularly quickly and economically.

Die Aufgabe wird nach der Erfindung durch ein Verfahren mit den Merkmalen des Anspruchs 1 und eine Prüfanordnung mit den Merkmalen des Anspruchs 9 gelöst. Bevorzugte Ausführungsformen sind in den abhängigen Ansprüchen angegeben.The object is according to the invention by a method with the features of claim 1 and a test arrangement with the Characteristics of claim 9 solved. Preferred embodiments are indicated in the dependent claims.

Das erfindungsgemäße Verfahren ist dadurch gekennzeichnet, dass der Verdrängerkopf in den Boden mittels eines metallischen Pfahlstranges eingebracht wird, welcher zusammen mit dem Verdrängerkopf den Testpfahl bildet.The method according to the invention is characterized that the displacer head into the ground by means of a metallic Stakes is introduced, which together with the Displacer forms the test pile.

Die Erfindung beruht auf der Erkenntnis, dass bei Verdrängerpfählen mit einem so genannten verlorenen Verdrängerkopf das Tragverhalten maßgeblich durch den Verdrängerkopf bestimmt wird. Gemäß der Erfindung wird der Verdrängerkopf unmittelbar durch einen Pfahlstrang in den Boden eingebracht, welcher zusammen mit dem Verdrängerkopf den Testpfahl bildet. Der Pfahlstrang ist dabei in seinem Durchmesser und in seiner Länge so an den tatsächlich vorgesehenen Verdrängerpfahl aus der erhärteten Suspension, insbesondere Beton, angepasst. Der Verdrängerkopf kann dabei aus Metall, Beton oder einem anderen geeigneten Material bestehen.The invention is based on the finding that positive displacement piles with a so-called lost displacer the Tragverhalten decisively determined by the displacer becomes. According to the invention, the displacer head becomes instantaneous introduced through a pile strand in the ground, which together forms the test pile with the displacer head. The pile strand is so in its diameter and in its length to the actually provided displacement pile from the hardened Suspension, in particular concrete, adjusted. The displacer head Can be made of metal, concrete or another suitable Material exist.

Anders als etwa bei einem Betonpfahl, kann bei dem erfindungsgemäßen Testverfahren die Prüfbelastung unmittelbar nach dem Einbringen des Pfahlstranges mit dem Verdrängerkopf in den Boden erfolgen. Dies erspart Zeit und Kosten.Unlike about a concrete pile, can in the inventive Test method the test load immediately after the Inserting the pile strand with the displacer head into the ground respectively. This saves time and money.

Da nach einer Erkenntnis der Erfindung das Tragverhalten eines Verdrängungspfahles mit verlorenem Verdrängerkopf maßgeblich durch die Aufstandsfläche des Verdrängerkopfes und nur zu einem geringeren Teil durch die Reibung entlang des Umfangs des Pfahles mit dem Boden erfolgt, können die beim Test ermittelten Messwerte zum Tragverhalten direkt auf das Tragverhalten der tatsächlichen Verdrängungspfähle übertragen werden. Aufgrund des höheren Reibungsfaktors zwischen Boden und Beton im Vergleich zu dem Reibungsfaktor zwischen Metall und Boden ergibt sich bei der unmittelbaren Übertragung der Ergebnisse sogar ein zusätzlicher Sicherheitsfaktor für die tatsächlichen Verdrängungspfähle.Since, after a finding of the invention, the carrying behavior of a Displacement pile with lost displacer decisive through the footprint of the displacer and only one smaller part due to the friction along the circumference of the Stake with the ground can be determined by the test Measurements of the load-bearing behavior directly on the load-bearing behavior the actual displacement piles are transmitted. by virtue of the higher friction factor between soil and concrete in the Comparison with the friction factor between metal and soil even in the immediate transfer of the results an additional safety factor for the actual Displacement piles.

Nach der Erfindung kann eine besonders genaue Bestimmung des Tragverhaltens dadurch erreicht werden, dass die von den Messeinrichtungen ermittelten Werte für den metallischen Testpfahl mittels eines Korrekturfaktors entsprechend den Eigenschaften der Verdrängungspfähle aus der erhärteten Suspension umgerechnet werden.According to the invention, a particularly accurate determination of the Tragverhaltens be achieved by that of the measuring equipment determined values for the metallic test pile by means of a correction factor according to the properties the displacement piles converted from the hardened suspension become.

Für ein effizientes Einbringen der Prüflast ist es erfindungsgemäß vorgesehen, dass am oberen Ende des metallischen Pfahlstranges ein Lastverteilkopf angeordnet wird, welcher die Prüfbelastung auf den Pfahlstrang überträgt.An seinem oberen Ende kann der Pfahlstrang eine Verbindungseinrichtung aufweisen, mit welcher der Lastkopf oder eine Presseneinrichtung einfach befestigt werden kann.For an efficient introduction of the test load, it is according to the invention provided that at the upper end of the metallic pile strand a Lastverteilkopf is arranged, which the Test load transfers to the pile string. At its top End of the pile strand may have a connecting device, with which the load head or a press device can be easily attached.

Eine bevorzugte Weiterbildung hierzu besteht darin, dass mindestens zwei Ankerelemente um den Testpfahl herum in den Boden eingebracht werden und dass der Lastverteilkopf mit den Ankerelementen zur Kraftableitung verbunden wird. Die Ankerelemente können insbesondere Schraubanker sein, welche in der notwendigen Anzahl in einem gewissen Anstellwinkel zum Testpfahl in den Boden eingeschraubt werden. Der Lastverteilkopf wird dann mit den Schraubankern verspannt, so dass eine Druckkraft auf den Testpfahl ausgeübt werden kann.A preferred development for this is that at least two anchor elements around the test pile around in the ground are introduced and that the Lastverteilkopf with the anchor elements connected to the power dissipation. The anchor elements can be in particular screw anchors, which in the necessary Number at a certain angle to the test pile in be screwed in the floor. The load distribution head will then clamped with the screw anchors, giving a compressive force the test stake can be exercised.

Zum Erzeugen eines definierten Lastprofils ist es erfindungsgemäß, dass zwischen dem Pfahlstrang und dem Lastverteilkopf eine Presseneinrichtung angeordnet ist, durch welche die Prüfbelastung erzeugt wird. Die Presse kann insbesondere ein Hydraulikdruckzylinder sein, welcher beim Auseinanderfahren zwischen dem Lastverteilkopf und dem Testpfahl die gewünschte Druckkraft erzeugt.To generate a defined load profile, it is according to the invention that between the pile strand and the Lastverteilkopf a press device is arranged, through which the test load is produced. The press can in particular be a hydraulic pressure cylinder which, when moving apart between the Lastverteilkopf and the test pile the desired Compressive force generated.

Im Vergleich zu anderen üblichen Testpfählen aus Beton ist es bei dem erfindungsgemäßen Verfahren von Vorteil, dass nach der Messung der Pfahlstrang mit oder ohne dem Verdrängerkopf aus dem Boden entfernt wird. Der Pfahlstrang und der Verdrängerkopf können so nach dem Versuch wieder verwendet werden.Compared to other conventional concrete test piles it is in the inventive method of advantage that after the Measure the pile strand with or without the displacer head removed from the ground. The pile strand and the displacer head can be reused after the trial.

Aufgrund der langen Testdauer bei den herkömmlichen Testverfahren wurden diese an einer abgelegenen Stelle des Baugrundes erstellt, um den Fortgang der Bauarbeiten nicht unnötig zu behindern. Nach der Erfindung besteht eine bevorzugte Ausführungsform darin, dass der Verdrängerkopf im Boden verbleibt und beim Entfernen des Pfahlstranges die aushärtbare Suspension eingeleitet wird. Der Pfahlstrang ist dabei lösbar mit dem Verdrängerkopf gekoppelt, etwa durch ein Gewinde. Der Testpfahl kann dabei nach dem Testversuch in einfacher Weise in einen das Bauwerk tragenden Verdrängerpfahl umgewandelt werden. Der Testpfahl kann dabei unmittelbar an der Stelle eines tragenden Pfahles durchgeführt werden. Selbstverständlich ist es auch möglich, dass der Testpfahl mit dem metallischen Pfahlstrang unmittelbar im Boden verbleibt und zusammen mit den weiteren zu erstellenden Verdrängerpfählen aus Beton das Bauwerk trägt.Due to the long test duration in conventional test methods These were at a remote location on the ground created so as not to impede the progress of construction unnecessarily. According to the invention there is a preferred embodiment in that the displacer head remains in the ground and when removing the pile strand, the hardenable suspension is initiated. The pile strand is detachable with the Displacer coupled, such as by a thread. The test stake can in the test in a simple manner in be converted to a building carrying displacement. The test pile can be placed directly at the location of a carrying pile. Of course it is It is also possible that the test pole with the metallic Pile string immediately remains in the ground and together with the other to be created displacement piles of concrete the Building carries.

Eine weitere bevorzugte Ausführungsform der Erfindung besteht darin, dass der Pfahlstrang ein zylindrisches Element, insbesondere ein Rohr ist, dessen Außenfläche zur Erhöhung eines Reibungsfaktors mit dem Boden verändert wird. Beispielsweise kann die Außenfläche des Pfahlstranges aufgerauht oder mit Profilelementen, etwa Schraubwendeln versehen sein. Hierdurch kann der Reibungsfaktor einem empirischen Reibungsfaktor zwischen einem Betonpfahl und dem Boden angepasst werden.Another preferred embodiment of the invention is in that the pile strand is a cylindrical element, in particular a pipe is the outer surface for increasing a Friction factor is changed with the soil. For example can be roughened or with the outer surface of the pile strand Profile elements, be provided about helical. hereby the friction factor can be an empirical friction factor between be adapted to a concrete pile and the ground.

Die Erfindung betrifft weiterhin eine Prüfanordnung zum Bestimmen des Tragverhaltens eines Verdrängungspfahles mit einem Verdrängerkopf, umfassend eine Belastungseinrichtung zum Aufbringen einer Prüflast. Die erfindungsgemäße Prüfanordnung ist dadurch gekennzeichnet, dass ein metallischer Bohrstrang vorgesehen ist, an dessen unterem Ende ein Verdrängerkopf und an dessen oberem Ende die Belastungseinrichtung lösbar befestigt ist. Mit dieser Prüfanordnung kann insbesondere das vorher beschriebene Verfahren ausgeführt und die damit verbundenen Vorteile erreicht werden. Die Messeinrichtung kann in den Pfahlstrang oder in die Belastungseinrichtung integriert werden. Alternativ kann eine mobile Messeinrichtung separat angeschlossen werden.The invention further relates to a test arrangement for Determining the bearing behavior of a displacement pile with a Displacement head, comprising a loading device for Apply a test load. The test arrangement according to the invention is characterized in that a metallic drill string is provided, at the lower end of a displacer and at the upper end of the loading device releasably secured is. With this test arrangement, in particular the before described method and the associated Benefits are achieved. The measuring device can in the Pile strand or integrated into the load device. Alternatively, a mobile measuring device can be connected separately become.

Nachfolgend wird die Erfindung anhand eines bevorzugten Ausführungsbeispieles weiter beschrieben, welches schematisch in der Zeichnung dargestellt ist. Die einzige Figur zeigt eine schematische Seitenansicht einer Prüfanordnung zum Bestimmen des Tragverhaltens von Verdrängungspfählen.The invention is based on a preferred embodiment further described, which is schematically in the drawing is shown. The only figure shows one schematic side view of a test arrangement for determining the structural behavior of displacement piles.

Gemäß der erfindungsgemäßen Prüfanordnung 10 wurde ein Testpfahl 30 in den bereichsweise dargestellten Boden mit einem Verdrängerkopf 32 eingetrieben, welcher den Boden in den umgebenden Bodenbereich verdrängt. Der Testpfahl 30 weist neben dem Verdrängerkopf 32 einen metallischen Pfahlstrang 34 auf, welcher über eine Verbindungseinrichtung 36 lösbar mit dem Verdrängerkopf 32 verbunden ist. Der Testpfahl 30 entspricht hinsichtlich seiner Länge und seines Durchmessers den tatsächlichen Verdrängungspfählen, welche aus Beton hergestellt werden.According to the test arrangement 10 according to the invention, a test pile was made 30 in the area shown with a ground area Displacer 32 driven, which the soil in the displaced surrounding soil area. The test pile 30 points beside the displacer 32, a metallic pile strand 34th on, which via a connecting device 36 releasably with the displacer 32 is connected. The test pile 30 corresponds in terms of its length and its diameter actual displacement piles made of concrete become.

Oberirdisch wird am Testpfahl 30 eine Belastungseinrichtung 12 mit einem Lastverteilkopf 14 und einer hydraulischen Presseneinrichtung 18 angeordnet. Zur Kraftableitung ist der Lastverteilkopf mit seitlich in einem vorgegebenen Anstellwinkel eingeschraubten Ankerelementen 16 gekoppelt. Mittels der Presseneinrichtung 18 wird eine vorgegebene Prüflast auf den Testpfahl 30 ausgeübt. Während und/oder nach der Lastaufbringung wird mittels einer nicht dargestellten Messeinrichtung das Tragverhalten, insbesondere die Setzung des Testpfahls 30, gemessen. Nach Kenntnis der Erfindung entspricht das Setzungsverhalten des Testpfahls 30 mit dem metallischen Pfahlstrang mit überraschend großer Genauigkeit dem Setzungsverhalten eines Verdrängungspfahles aus Beton. Zur Angleichung des Reibungswertes des metallischen Pfahlstranges 34 an eine Betonsäule können beispielsweise als Wendeln ausgebildete Profilelemente 38 entlang des Pfahlstranges 34 ausgebildet sein.Above ground, a load device 12 is placed on the test pile 30 with a load distribution head 14 and a hydraulic press device 18 arranged. For power dissipation is the Lastverteilkopf with screwed laterally at a predetermined angle Anchor elements 16 coupled. By means of the press device 18 is a predetermined test load on the test pile 30 exercised. During and / or after load application is by means of a measuring device, not shown, the Tragverhalten, in particular the setting of the test pile 30, measured. To the knowledge of the invention corresponds to the settlement behavior of the test pile 30 with the metallic pile strand with surprisingly high accuracy the settlement behavior of a Concrete displacement pile. For the adjustment of the friction value of the metallic pile string 34 to a concrete column can, for example, formed as helical profile elements 38 may be formed along the pile string 34.

Nach Abschluss der Prüfung kann der rohrförmige Pfahlstrang 34 von dem Verdrängerkopf 32 etwa durch entgegengesetzte Drehung gelöst und aus dem Bohr zurückgezogen werden. Gleichzeitig mit der Rückzugsbewegung kann der entstehende Hohlraum mit einer aushärtbaren Suspension, insbesondere Beton, verfüllt werden. Auf diese Weise kann der metallische Testpfahl problemlos in einen Betonpfahl umgearbeitet werden, welcher dann zur Bauwerksgründung eingesetzt werden kann.After completion of the test, the tubular pile strand 34 from the displacer head 32 approximately by opposite rotation be released and withdrawn from the Bohr. At the same time with the withdrawal movement, the resulting cavity with a hardenable suspension, in particular concrete, are filled. In this way, the metallic test pile can be easily inserted into a concrete pile to be reworked, which then to the building foundation can be used.

Claims (9)

Verfahren zum Bestimmen des Tragverhaltens von Verdrängungspfählen, welche durch Einbringen eines Bohrloches mittels eines Verdrängerkopfes (32) und anschließendes Verfüllen des Bohrloches mit einer aushärtbaren Suspension unter Belassung des Verdrängerkopfes (32) im Bohrloch hergestellt werden, wobei ein Testpfahl (30) erstellt und mittels einer Belastungseinrichtung (12) mit einer Prüfbelastung beaufschlagt wird und mittels einer Messeinrichtung das Tragverhalten gemessen wird,
dadurch gekennzeichnet, dass der Verdrängerkopf (32) in den Boden mittels eines metallischen Pfahlstranges (34) eingebracht wird, welcher zusammen mit dem Verdrängerkopf (32) den Testpfahl (30) bildet.
Method for determining the carrying behavior of displacement piles, which are produced by introducing a borehole by means of a displacer head (32) and then filling the borehole with a curable suspension while leaving the displacer head (32) downhole, wherein a test pile (30) is created and by means of a Loading device (12) is subjected to a test load and by means of a measuring device, the bearing behavior is measured,
characterized in that the displacer head (32) is introduced into the ground by means of a metallic pile strand (34) which together with the displacer head (32) forms the test pile (30).
Verfahren nach Anspruch 1,
dadurch gekennzeichnet, dass die von der Messeinrichtung ermittelten Werte zu dem Testpfahl (30) mit dem metallischen Pfahlstrang (34) mittels eines Korrekturfaktors entsprechend den Eigenschaften der Verdrängungspfähle aus der erhärteten Suspension umgerechnet werden.
Method according to claim 1,
characterized in that the values determined by the measuring device are converted to the test pile (30) with the metallic pile strand (34) by means of a correction factor corresponding to the properties of the displacement piles from the hardened suspension.
Verfahren nach Anspruch 1 oder 2,
dadurch gekennzeichnet, dass am oberen Ende des metallischen Pfahlstranges (34) ein Lastverteilkopf (14) angeordnet wird, welcher die Prüfbelastung auf den Pfahlstrang (34) überträgt.
Method according to claim 1 or 2,
characterized in that at the upper end of the metallic pile strand (34) a Lastverteilkopf (14) is arranged, which transmits the test load on the pile strand (34).
Verfahren nach Anspruch 3,
dadurch gekennzeichnet, dass mindestens zwei Ankerelemente (16) um den Testpfahl (30) herum in den Boden eingebracht werden und
dass der Lastverteilkopf (14) mit den Ankerelementen (16) zur Kraftableitung verbunden wird.
Method according to claim 3,
characterized in that at least two anchor elements (16) are introduced around the test pile (30) into the ground and
in that the load distribution head (14) is connected to the armature elements (16) for power dissipation.
Verfahren nach Anspruch 3 oder 4,
dadurch gekennzeichnet dass zwischen dem Pfahlstrang (34) und dem Lastverteilkopf (14) eine Presseneinrichtung (18) angeordnet wird, durch welche die Prüfbelastung erzeugt wird.
Method according to claim 3 or 4,
characterized in that between the pile strand (34) and the Lastverteilkopf (14) a press device (18) is arranged, through which the test load is generated.
Verfahren nach einem der Ansprüche 1 bis 5,
dadurch gekennzeichnet, dass nach der Messung der Pfahlstrang (34) mit oder ohne dem Verdrängerkopf (32) aus dem Boden entfernt wird.
Method according to one of claims 1 to 5,
characterized in that after the measurement of the pile strand (34) with or without the displacer head (32) is removed from the ground.
Verfahren nach einem der Ansprüche 1 bis 6,
dadurch gekennzeichnet, dass der Verdrängerkopf (32) im Boden verbleibt und beim Entfernen des Pfahlstranges (34) die aushärtbare Suspension eingeleitet wird.
Method according to one of claims 1 to 6,
characterized in that the displacer head (32) remains in the ground and when removing the pile strand (34), the curable suspension is introduced.
Verfahren nach einem der Ansprüche 1 bis 7,
dadurch gekennzeichnet, dass der Pfahlsträng (34) ein zylindrisches Element, insbesondere ein Rohr ist, dessen Außenfläche zur Erhöhung eines Reibungsfaktors mit dem Boden verändert wird.
Method according to one of claims 1 to 7,
characterized in that the pile strand (34) is a cylindrical element, in particular a pipe whose outer surface is changed to increase a friction factor with the ground.
Prüfanordnung zum Bestimmen des Tragverhaltens von Verdrängungspfählen mit Verdrängerkopf (32), insbesondere zum Durchführen eines Verfahrens nach einem der Ansprüche 1 bis 8, mit einer Belastungseinrichtung (12) zum Aufbringen einer Prüflast,
dadurch gekennzeichnet, dass ein metallischer Pfahlstrang (34) vorgesehen ist, an dessen unterem Ende der Verdrängerkopf (34) und an dessen oberem Ende die Belastungseinrichtung (12) lösbar befestigt ist.
Test arrangement for determining the carrying behavior of displacement piles with displacement head (32), in particular for carrying out a method according to one of claims 1 to 8, with a loading device (12) for applying a test load,
characterized in that a metallic pile strand (34) is provided, at the lower end of the displacer head (34) and at the upper end of the loading device (12) is releasably attached.
EP04019985A 2003-10-02 2004-08-23 Method and test arrangement to determine the bearing capacity of displacement piles Withdrawn EP1520938A3 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE10346040A DE10346040A1 (en) 2003-10-02 2003-10-02 Method and test arrangement for determining the carrying behavior of displacement piles
DE10346040 2003-10-02

Publications (2)

Publication Number Publication Date
EP1520938A2 true EP1520938A2 (en) 2005-04-06
EP1520938A3 EP1520938A3 (en) 2006-03-08

Family

ID=34306243

Family Applications (1)

Application Number Title Priority Date Filing Date
EP04019985A Withdrawn EP1520938A3 (en) 2003-10-02 2004-08-23 Method and test arrangement to determine the bearing capacity of displacement piles

Country Status (4)

Country Link
US (1) US7175368B2 (en)
EP (1) EP1520938A3 (en)
CN (1) CN1303290C (en)
DE (1) DE10346040A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2000160C2 (en) * 2006-07-25 2008-01-28 Geodynamic Method for checking the bearing capacity of a pole.
EP3569770A3 (en) * 2018-04-25 2020-02-26 Krinner Innovation GmbH Method of investigating the bearing capacity of screw pile foundations

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101311284A (en) * 2007-05-24 2008-11-26 鸿富锦精密工业(深圳)有限公司 Magnesium alloy and magnesium alloy thin material
US20170073919A1 (en) * 2008-11-21 2017-03-16 Uretek Usa, Inc. Measuring underground pressure
CN102561410A (en) * 2010-12-17 2012-07-11 上海市电力公司 Method for testing mechanical property of uplift pile under deep excavation condition
CN102134861B (en) * 2011-02-17 2012-05-30 苏州市建筑设计研究院有限责任公司 Method for testing precast pile in soil body
US8402837B1 (en) 2011-11-29 2013-03-26 International Marketing & Research, Inc. System for field testing helical piles
US9645062B2 (en) * 2014-04-11 2017-05-09 Duro-Last, Inc. Roofing pull-test frame assembly
CN104060637B (en) * 2014-04-14 2015-12-02 中国矿业大学 A kind of centrifuge model test method that gravel pile reinforcing is soft soil roadbed
US9360397B1 (en) * 2014-07-02 2016-06-07 William H Melton Anchor inspection device
CN105862941A (en) * 2016-05-24 2016-08-17 武汉科技大学 Model device and method for measuring time effect of bearing capacity of pile foundations on site
CN105971033B (en) * 2016-06-17 2017-12-05 侯伯贵 The pressure testing of foundation pile tube detects the combination water tank and pressure testing detection method of counterweight
CN106759552B (en) * 2017-01-24 2018-12-18 重庆大学 A kind of simulation calcareous sand ground piling process Particle Breakage pilot model apparatus and its test method
CN114894624B (en) * 2022-07-14 2022-11-01 浙大城市学院 Drawing force measurement test device and method based on marine pipeline group anchor effect

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1215417A (en) 1968-04-24 1970-12-09 Stichting Waterbouwkundig Lab An apparatus for determining the bearing capacity of the soil
GB2218722A (en) 1988-05-19 1989-11-22 Basil Green Pile pressing
DE4005032A1 (en) 1990-02-19 1991-08-22 Bauer Spezialtiefbau Foundation pile supporting load in loose soil - has device to apply force between baseplate and pile
GB2346917A (en) 1998-12-22 2000-08-23 Robert Tjhing Bo Oei Piling system with continuous load measurement
GB2388624A (en) 2002-05-16 2003-11-19 Roxbury Ltd Pile former with sacrificial tip

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IL42798A (en) * 1973-07-20 1975-11-25 Tech Res & Dev Found Ltd A test rig for load testing of foundations
US4081992A (en) * 1976-11-22 1978-04-04 Farmer Foundation Company, Inc. Apparatus for load testing foundation shafts
US5282701A (en) * 1990-07-10 1994-02-01 Samsung Construction Co., Ltd. Method and apparatus for a loading test of a pile using a self-repulsive force
US5234290A (en) * 1991-11-04 1993-08-10 Rodney B. Stewart Prestressed caisson bearing pier and structural foundation device
CN2119443U (en) * 1992-03-12 1992-10-21 刘小清 Liquid weight counterbalance type static load tester
DE4228580C1 (en) * 1992-09-01 1993-10-28 Strabag Bau Ag Earth drill for the manufacture of an in-situ concrete displacement pile
US6363776B1 (en) * 1999-11-12 2002-04-02 Gary L. Reinert, Sr. Pile testing reaction anchor apparatus and method
GB0028645D0 (en) * 2000-11-24 2001-01-10 Univ Cranfield A handheld measurement device for the determination of racecourse going
JP4047604B2 (en) * 2002-03-15 2008-02-13 鉱研工業株式会社 Pile strength measuring device
CN1161593C (en) * 2002-07-19 2004-08-11 张百全 Self-anchored loading method of testing axial bearing capacity of pile foundation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1215417A (en) 1968-04-24 1970-12-09 Stichting Waterbouwkundig Lab An apparatus for determining the bearing capacity of the soil
GB2218722A (en) 1988-05-19 1989-11-22 Basil Green Pile pressing
DE4005032A1 (en) 1990-02-19 1991-08-22 Bauer Spezialtiefbau Foundation pile supporting load in loose soil - has device to apply force between baseplate and pile
GB2346917A (en) 1998-12-22 2000-08-23 Robert Tjhing Bo Oei Piling system with continuous load measurement
GB2388624A (en) 2002-05-16 2003-11-19 Roxbury Ltd Pile former with sacrificial tip

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2000160C2 (en) * 2006-07-25 2008-01-28 Geodynamic Method for checking the bearing capacity of a pole.
EP3569770A3 (en) * 2018-04-25 2020-02-26 Krinner Innovation GmbH Method of investigating the bearing capacity of screw pile foundations

Also Published As

Publication number Publication date
CN1603527A (en) 2005-04-06
CN1303290C (en) 2007-03-07
EP1520938A3 (en) 2006-03-08
US20050074297A1 (en) 2005-04-07
DE10346040A1 (en) 2005-05-25
US7175368B2 (en) 2007-02-13

Similar Documents

Publication Publication Date Title
EP1520938A2 (en) Method and test arrangement to determine the bearing capacity of displacement piles
DE2627524B2 (en) COMPRESSED ANCHORS
DE102005010957A1 (en) Method and arrangement for tensioning a step anchor
EP2295647B1 (en) Inspection method for piles
DE3424776A1 (en) Method and device for determining the bearing capacity of piles
EP2829661B1 (en) Ground and rock anchor
DE2806840C3 (en) Method and device for removing a grouting anchor
DE3318050C2 (en)
DE69007934T2 (en) Anchoring for tendon and method for its manufacture.
DE102005029364B4 (en) Precast pile and associated method for building foundation
DE3615163C2 (en)
DE102005008679A1 (en) Pile driving by head-, internal-, or vibration driving of pile tube, employs double-walled pile tube with filling of sand in annulus between walls
DE4215383C2 (en) Test load pile for measuring the load-bearing capacity of pile foundations
DE2311385C3 (en) Anchoring device and method for inserting the device into the ground
DE19518066C1 (en) Method of reconstructing borehole pile with at least one gap in concrete
AT394449B (en) Device for determining tensile and/or compressive stresses, and method for putting said device in place
DE902959C (en) Device and method for the production of foundation piles
DE1634357C (en) Process for producing a tie rod and device for carrying out this process
EP2896750B1 (en) Device and method for anchoring a building structure
DE2619431A1 (en) On site concrete pile prodn. - has casing with releasable ram foot rammed into soil and pipe filled with setting concrete
DE4032682A1 (en) Anchor fixed in solid rock - consists of corrugated hollow sleeve surrounding carbon@ steel tension bar set in hardening substance
EP3351687B1 (en) Method of making a pile
DE3631653C1 (en) Anchorage for a rock bolt
DE4411643A1 (en) Method of dismantling free part of tensioned member of prestressed anchor on bore-hole end of loaded anchoring body
EP2998448A1 (en) Method for improving the bearing capacity of open profiles placed in the foundation and system produced using the same

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL HR LT LV MK

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL HR LT LV MK

RIC1 Information provided on ipc code assigned before grant

Ipc: E02D 5/36 20060101ALI20060118BHEP

Ipc: E02D 33/00 20060101AFI20050121BHEP

17P Request for examination filed

Effective date: 20060717

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

17Q First examination report despatched

Effective date: 20091014

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20140301