EP1510430A1 - Process of flexible responsibility allocation for control centers - Google Patents
Process of flexible responsibility allocation for control centers Download PDFInfo
- Publication number
- EP1510430A1 EP1510430A1 EP04016621A EP04016621A EP1510430A1 EP 1510430 A1 EP1510430 A1 EP 1510430A1 EP 04016621 A EP04016621 A EP 04016621A EP 04016621 A EP04016621 A EP 04016621A EP 1510430 A1 EP1510430 A1 EP 1510430A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- line center
- center
- line
- trouble
- driving operation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 24
- 230000008569 process Effects 0.000 title description 2
- 230000003068 static effect Effects 0.000 claims description 17
- 238000004891 communication Methods 0.000 claims description 4
- 230000008878 coupling Effects 0.000 claims 2
- 238000010168 coupling process Methods 0.000 claims 2
- 238000005859 coupling reaction Methods 0.000 claims 2
- 238000012423 maintenance Methods 0.000 description 8
- 230000008901 benefit Effects 0.000 description 3
- 230000007257 malfunction Effects 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 230000007704 transition Effects 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/30—Trackside multiple control systems, e.g. switch-over between different systems
- B61L27/33—Backup systems, e.g. switching when failures occur
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L3/00—Devices along the route for controlling devices on the vehicle or train, e.g. to release brake or to operate a warning signal
- B61L3/16—Continuous control along the route
- B61L3/22—Continuous control along the route using magnetic or electrostatic induction; using electromagnetic radiation
- B61L3/225—Continuous control along the route using magnetic or electrostatic induction; using electromagnetic radiation using separate conductors along the route
- B61L2003/226—German inductive continuous train control, called 'Linienzugbeeinflussung' [LZB]
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/20—Trackside control of safe travel of vehicle or train, e.g. braking curve calculation
- B61L2027/202—Trackside control of safe travel of vehicle or train, e.g. braking curve calculation using European Train Control System [ETCS]
Definitions
- the invention relates to a method for flexible assignment of responsibilities from line centers. This method is used especially in railways applied in which vehicles operate over the radio information and / or data packets to carry out and secure the ride and send.
- ETCS A system with which with the help of a computer-aided plant future nationally and, above all, internationally operating rail traffic should, is ETCS.
- ETCS This determines a running on a route vehicle independently his position via trackers installed in the track, so-called balises.
- the vehicle transmits this position as well as other vehicle data in particular its train number, speed, train data and train length, by radio to a line center, the driving on the track regulates.
- the line center monitors the rides of ETCS Vehicles and determines among other things, the next positions in which the vehicle must change its speed and shares this with the vehicle by radio with.
- the line center needs information about the trains to be driven by the trains Track elements.
- a line center exchanges with those at the assigned area the line center adjacent line center information off to a train ride taking the lead over the borders between the line centers to allow associated areas.
- This information in particular, contain information about the already set for a train Track in the area of one or more neighboring centers to the headquarters, in which the train is located.
- a route center has static information about possible Routes not only for the assigned area, but additionally for in each case at least part of at least one other line center.
- strategic information relates in particular to general information of the route plan, such as location and direction of tracks, shortcuts of tracks by switches, location of signals or feedback devices.
- This information may be permanent or, if necessary, in its entirety or retrieved or made available in sub-information blocks. This is realized in such a way that at the line center the required Information for the assigned area of the at least one other line center completely a second time.
- a geographical Area deposited information in each route center in which they can be identical, once configured data for the Depositing in other route centers continue to be used.
- Another advantage is that due to the existing redundancy for the tasks the line center even if the connection to the transmission of information is disrupted between the line center and external units, e.g. Operations center or interlocking, the operation on the line section, for regularly run by the affected line center can be.
- An advantage of the proposed method is also that savings effects through the deliberate shutdown of overcapacities with a positive effect on service life as well as on energy consumption and maintenance Route centers can be harnessed.
- Claims 2 to 10 include advantageous embodiments of the invention Solution of claim 1.
- the tasks of a signal box from the other Can be perceived in the same way as the main line, so for at least the exact part for which the static information another route center or be retrieved, analogous to Interface of the other route information with the trackside Exchange facilities. This is preferably done over existing ones Connections between the line centers or the line centers to the operations center. Alternatively, a use of separate Radio, cable or optical waveguides possible.
- a branch center takes over tasks of interlockings. This means in particular that no interlockings are required anymore, but Track elements are coupled directly to the line center.
- Fig. 1 shows schematically a railway line with three line centers.
- a first particularly advantageous embodiment relates to the switching the duties of a troubled ETCS route center to two each geographically adjacent line centers.
- Fig. 1 shows schematically a railway line 4 with three line centers 1, 2 and 3, the regularly associated track sections 5, 6 and 7 connect to each other as follows: the area 6 of line center 2 connects directly to the area 5 of line center 1, the area 7 of line center 3 connects directly to the area 6 of line center 2 at.
- FIG. 1 further shows that each route center has static information for each of the half-assigned sections of the neighboring centers and has at least temporary access to the dynamic information for this area.
- dynamic information relates to the location and speed of trains as well as the setting of switches and signals.
- route center 3 proceeds for trains that are in the opposite Turn direction.
- responsibility for the management of trains is defined and for securing the train services to those train control centers, each in addition to the regularly assigned route center on the static information, and with the switching also on access to have the dynamic information of the signal box or the track.
- the transfer of responsibility between the line centers is preferred following a procedure whereby the dynamic information, managed by the line center (e.g., information about Trains in the area of the line center) to the newly responsible line center be handed over. After submitting all required information the external line will continue to be provided to the newly responsible line center Communication partner of the line center, as far as necessary, over the upcoming Bills informed. This is preferably done via the construction of a new communication link to external partners. To conclude the Preparation of the switching will be all pending processes, the one Perform interaction with external units in a defined state brought. After switching responsibility to the newly responsible This is taken care of by the route center, which is responsible for the area executed tasks.
- An alternative feasible procedure ensures that the tasks also can then be taken over by the newly responsible line center, if the hitherto responsible route center does not provide an orderly transfer more automated (e.g., in case of disruption of the information connection, Disturbance of the line center, etc).
- the responsibility for the management of the trains and the securing of the train runs defined again those Transmission center, which is regular to the corresponding area assigned.
- the method for this preferably also corresponds to the previously described.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Test And Diagnosis Of Digital Computers (AREA)
- Hardware Redundancy (AREA)
- Debugging And Monitoring (AREA)
- Communication Control (AREA)
Abstract
Description
Die Erfindung betrifft ein Verfahren zur flexiblen Zuweisung von Verantwortlichkeiten von Streckenzentralen. Dieses Verfahren wird insbesondere bei Schienenbahnen angewendet, bei denen Fahrzeuge verkehren, die über Funk Informationen und/oder Datenpakete zur Durchführung und Sicherung der Fahrt erhalten und senden.The invention relates to a method for flexible assignment of responsibilities from line centers. This method is used especially in railways applied in which vehicles operate over the radio information and / or data packets to carry out and secure the ride and send.
Es ist bekannt, dass im Rahmen der Installation von modernen hochleistungsfähigen Zugsicherungssystemen, insbesondere der Linienzugbeeinflussung (LZB) oder des European Train Control System (ETCS), eine sogenannte Streckenzentrale benötigt wird, die den Fahrbetrieb auf der Strecke regelt und Informationen zur Führung von Zügen und zur Überwachung der Zugfahrten per Funk an die Züge übermittelt.It is known that in the context of the installation of modern high-performance Train control systems, in particular the Linienzugbeeinflussung (LZB) or the European Train Control System (ETCS), a so-called route center is needed, which regulates the driving on the track and information for guiding trains and for monitoring trains by Radio transmitted to the trains.
Ein System, mit dem mit Hilfe einer computergestützten Anlage zukünftig national und vor allem international operierender Schienenverkehr funkgeführt werden soll, ist ETCS. Hierbei bestimmt ein auf einer Strecke verkehrendes Fahrzeug eigenständig seine Position über in der Strecke verlegte Ortungsgeräte, sog. Balisen. Das Fahrzeug übermittelt diese Position sowie weitere Fahrzeugdaten, insbesondere seine Zugnummer, Geschwindigkeit, Zugdaten und Zuglänge, per Funk an eine Streckenzentrale, die den Fahrbetrieb auf der Strecke regelt. Die Streckenzentrale überwacht die Fahrten der durch ETCS geführten Fahrzeuge und ermittelt dazu unter anderem die nächsten Positionen, an denen das Fahrzeug seine Geschwindigkeit ändern muss und teilt diese dem Fahrzeug per Funk mit.A system with which with the help of a computer-aided plant future nationally and, above all, internationally operating rail traffic should, is ETCS. This determines a running on a route vehicle independently his position via trackers installed in the track, so-called balises. The vehicle transmits this position as well as other vehicle data in particular its train number, speed, train data and train length, by radio to a line center, the driving on the track regulates. The line center monitors the rides of ETCS Vehicles and determines among other things, the next positions in which the vehicle must change its speed and shares this with the vehicle by radio with.
Weiterhin ist als Stand der Technik bekannt, dass Stellwerke, die den Fahrweg von Zügen - insbesondere Weichen und Signale - sichern, aus sogenannten Betriebszentralen zentral gesteuert werden können. Die hierzu erforderlichen Informationen werden dabei zur Betriebszentrale übertragen.Furthermore, it is known as the prior art that interlockings, the guideway of trains - especially switches and signals - secure, from so-called Central operations can be controlled centrally. The required for this Information is transmitted to the operations center.
Ebenfalls ist als Stand der Technik bekannt, dass in der Betriebszentrale die Anbindung eines Bedienplatzes an ein Stellwerk in einem gewissen Rahmen, dem sog. Stellbezirk, flexibel umkonfiguriert werden kann. Bei Ausfall, Störung, Wartung und/oder Inbetriebsetzung eines Bedienpiatzes kann die Funktionalität vollständig von einem anderen Bedienplatz übernommen werden. It is also known as prior art that in the operations center the Connection of an operator station to a signal box within a certain range, the so-called Stellbezirk, can be flexibly reconfigured. In case of failure, malfunction, Maintenance and / or commissioning of a Bedienpiatzes the functionality completely taken over by another operator station.
Die Streckenzentrale benötigt Informationen über die von den Zügen zu befahrenden Fahrwegelemente. Gemäß Stand der Technik tauscht dazu die Streckenzentrale Informationen über Fahrwegelemente in dem der Streckenzentrale zugeordneten Bereich mit einem Stellwerk aus. Daher beträgt der einer Streckenzentrale zugeordnete Bereich typischerweise durchschnittlich ca. 40 km Streckenlänge. Dieser Bereich ist dabei bereits bei der Projektierung statisch festgelegt und im Betrieb nicht mehr änderbar. Weiterhin besitzt die Streckenzentrale für diesen Bereich einen Streckenatlas, in dem erforderliche statische Informationen zu möglichen Fahrwegen im zugeordneten Bereich der Streckenzentrale abgelegt sind.The line center needs information about the trains to be driven by the trains Track elements. According to the prior art exchanged for the line center Information about track elements in the the track center assigned area with a signal box. Therefore, that of a line center allocated area typically about 40 km on average Length. This area is already static during configuration fixed and not changeable during operation. Furthermore, has the line center for this area a route Atlas, in the required static Information about possible routes in the assigned area of the line center are stored.
Zusätzlich tauscht eine Streckenzentrale mit denen an den zugeordneten Bereich der Streckenzentralen angrenzenden Streckenzentralen Informationen aus, um eine Zugfahrt unter Führung über die Grenzen zwischen den den Streckenzentralen zugeordneten Bereichen zu ermöglichen. Diese Informationen beinhalten insbesondere Informationen zum für einen Zug bereits eingestellten Fahrweg im Bereich einer oder mehrerer benachbarter Zentralen zu der Zentrale, in der sich der Zug befindet.In addition, a line center exchanges with those at the assigned area the line center adjacent line center information off to a train ride taking the lead over the borders between the line centers to allow associated areas. This information in particular, contain information about the already set for a train Track in the area of one or more neighboring centers to the headquarters, in which the train is located.
Nachteil dieser Lösung ist insbesondere, dass bei Ausfall, Störung, Wartung und/oder Inbetriebsetzung der Streckenzentrale Zugfahrten nur noch mit starken betrieblichen Einschränkungen möglich sind. Unter Führung des jeweiligen Zugsicherungssystems der Streckenzentrale sind Zugfahrten im dieser Streckenzentrale zugeordneten Bereich gar nicht mehr, und unter Führung anderer Zugsicherungssysteme nur noch mit starken betrieblichen Einschränkungen möglich. So muss insbesondere bei Ausfall einer ETCS-Streckenzentrale die Geschwindigkeit der ETCS-geführten Züge auf maximal 40 km/h reduziert werden. Bei LZB-geführten Zügen muss bei Ausfall einer Streckenzentrale auf eine redundant vorhandene punktuelle Zugbeeinflussung (PZB) umgeschaltet werden. Hierbei ist die Geschwindigkeit des Zuges auf maximal 160 km/h begrenzt und aufgrund eines großen Abstandes zwischen den Zugbeeinflussungsanlagen, insbesondere den Lichtsignalen, die Anzahl der Züge auf einer Strecke deutlich reduziert werden, so dass weniger Züge auf der Strecke verkehren können.Disadvantage of this solution is in particular that in case of failure, malfunction, maintenance and / or commissioning of the train control center trains only with strong operational restrictions are possible. Under the leadership of the respective Train control system of the line center are train rides in this line center assigned area no longer, and under the leadership of others Train control systems only with strong operational restrictions possible. Thus, especially in case of failure of an ETCS line center the Speed of the ETCS-guided trains can be reduced to a maximum of 40 km / h. In the case of a LZB-led train, if one of the line centers fails, then redundant local train control (PZB) are switched. Here, the speed of the train is limited to a maximum of 160 km / h and due to a large gap between the train control systems, in particular the light signals, the number of trains on a route be significantly reduced, so fewer trains run on the track can.
Weiterer Nachteil ist, dass Änderungen der Software oder der Projektierung der Streckenzentrale oder andere Wartungs- und Instandhaltungsarbeiten, die eine zeitweise Außerbetriebnahme der Streckenzentrale bedingen, nur in Sperrpausen und mit ggf. entsprechenden betrieblichen Einschränkungen realisierbar sind. Another disadvantage is that changes to the software or the configuration of the Railway control center or other maintenance and servicing, the one Periodic decommissioning of the line center condition, only in lock breaks and, if applicable, corresponding operational restrictions can be realized are.
Eine Anpassung der verfügbaren Leistung der insgesamt zur Verfügung stehenden Streckenzentralen gemäß der momentan erforderten Kapazität ist nicht möglich; sämtliche vorhandenen Kapazitäten müssen jederzeit vollständig betrieben werden, wenn betriebliche Einschränkungen vermieden werden sollen.An adjustment of the available power of the total available Route centers according to the currently required capacity is not possible; all existing capacities must be fully operational at all times when operational constraints are to be avoided.
Es ist somit Aufgabe der Erfindung, ein Verfahren bereitzustellen, mit dem bei einem Ausfall, Störung, Wartung und/oder Inbetriebsetzung einer Streckenzantrale eine störungsfreie Durchführung eines Fahrbetriebs von Schienenfahrzeugen gewährleistet wird.It is therefore an object of the invention to provide a method with which at a failure, malfunction, maintenance and / or commissioning of a line control a trouble-free implementation of a driving operation of rail vehicles is guaranteed.
Diese Aufgabe wird in Verbindung mit dem Oberbegriff des Hauptanspruches
erfindungsgemäß durch die in Anspruch 1 angegebenen Merkmale gelöst.This object is achieved in conjunction with the preamble of the main claim
solved according to the invention by the features specified in
Hierbei besitzt eine Streckenzentrale statische Informationen über mögliche Fahrwege nicht nur für den ihr zugeordneten Bereich, sondern zusätzlich für jeweils mindestens einen Teil mindestens einer anderen Streckenzentrale. Ststische Informationen betreffen hierbei insbesondere allgemeine Informationen des Streckenplans, wie Lage und Richtung von Gleisen, Verknüpfungen von Gleisen durch Weichen, Lage von Signalen oder Rückmeldeeinrichtungen. Diese Informationen können permanent vorliegen oder bei Bedarf gesamthaft oder in Teilinformationsblöcken abgerufen bzw. zur Verfügung gestellt werden. Dies ist dabei derartig realisiert, dass bei der Streckenzentrale die benötigten Informationen für den zugeordnete Bereich der mindestens einen anderen Streckenzentrale vollständig ein zweites Mal vorliegen. Da die für einen geographischen Bereich hinterlegten Informationen in jeder Streckenzentrale, in der sie hinterlegt sind, identisch sein müssen, können einmal projektierte Daten für das Hinterlegen in anderen Streckenzentralen weiterverwendet werden.Here, a route center has static information about possible Routes not only for the assigned area, but additionally for in each case at least part of at least one other line center. In this case, strategic information relates in particular to general information of the route plan, such as location and direction of tracks, shortcuts of tracks by switches, location of signals or feedback devices. This information may be permanent or, if necessary, in its entirety or retrieved or made available in sub-information blocks. This is realized in such a way that at the line center the required Information for the assigned area of the at least one other line center completely a second time. As for a geographical Area deposited information in each route center in which they can be identical, once configured data for the Depositing in other route centers continue to be used.
Fällt somit eine Streckenzentrale teilweise oder vollständig aus, kann sofort mindestens eine andere Streckenzentrale mindestens einen Teil der ausgefallenen Streckenzentrale übernehmen.Thus, if a line center partially or completely fails, can immediately at least one other line center at least part of the failed one Take over the line center.
Das selbe Verfahren wird auch bereitgestellt, um eine dynamische Anpassung der vorgehaltenen Leistung der ingesamt zur Verfügung stehenden Streckenzentralen an die jeweils erforderliche Kapazität zu ermöglichen.The same procedure is also provided for a dynamic adaptation the reserved power of the total available line centers to allow for the required capacity.
Vorteil des erfindungsgemäßen Verfahrens ist, dass sowohl für Störungsfall oder bei Ausfall einer Streckenzentrale wie auch für Wartungs- und Instandhaltungszwecke betriebliche Einschränkungen vermieden werden und eine Führung und Überwachung von Zügen mit dem Zugsicherungsystem der Streckenzentrale möglich bleibt. Advantage of the method is that both for fault case or in the event of a breakdown of a line center as well as for maintenance and repair purposes operational restrictions are avoided and a leadership and monitoring of trains with the train control system of the railway control center remains possible.
Ein weiterer Vorteil ist, dass aufgrund der vorhandenen Redundanz für die Aufgaben der Streckenzentrale auch bei einer Störung der Verbindung zur Informationsübertragung zwischen der Streckenzentrale und externen Einheiten, z.B. Betriebszentrale oder Stellwerk, der Betrieb auf dem Streckenabschnitt, für den die betroffene Streckenzentrale gewöhnlich zuständig ist, regulär weitergeführt werden kann.Another advantage is that due to the existing redundancy for the tasks the line center even if the connection to the transmission of information is disrupted between the line center and external units, e.g. Operations center or interlocking, the operation on the line section, for regularly run by the affected line center can be.
Ein Vorteil des vorgeschlagenen Verfahrens ist auch, dass Einsparungseffekte durch die gezielte Abschaltung von Überkapazitäten mit positiver Auswirkung auf Nutzungsdauer wie auch auf Energieverbrauch und Wartungsaufwand an Streckenzentralen nutzbar gemacht werden.An advantage of the proposed method is also that savings effects through the deliberate shutdown of overcapacities with a positive effect on service life as well as on energy consumption and maintenance Route centers can be harnessed.
Ansprüche 2 bis 10 beinhalten vorteilhafte Ausführungsbeispiele der erfindungsgemäßen
Lösung aus Anspruch 1.
Nach Anspruch 6 ist der an den dieser Streckenzentrale zugeordneten angrenzenden
Bereich benachbarter Streckenzentralen derjenige, für den jeweils zur
Hälfte in den benachbarten Streckenzentralen die Informationen ein zweites
Mal vorgehalten werden.According to
Nach Anspruch 10 können Streckenzentralen, in denen die statischen Informationen
für mindestens einen Teil des zugeordneten Bereichs einer anderen
Streckenzentrale vorliegen, für mindestens genau diesen Teil des zugeordneten
Bereiches der anderen Streckenzentrale permanent mit dem entsprechenden
Stellwerk die Informationen über Fahrwegelemente tauschen.According to
Falls nach Anspruch 9 auch die Aufgaben eines Stellwerks von der anderen Streckenzentrale wahrgenommen werden, so kann besagte andere Streckenzentrale für mindestens genau den Teil, für den die statischen Informationen einer anderen Streckenzentrale vorliegen oder abgerufen werden, analog der Schnittstelle der anderen Streckenzentrale Informationen mit den streckenseitigen Einrichtungen austauschen. Dies geschieht vorzugsweise über bereits bestehende Verbindungen zwischen den Streckenzentralen oder der Streckenzentralen zur Betriebszentrale. Alternativ ist eine Verwendung von gesonderten Funk-, Kabel- oder Lichtwellenleitern möglich.If according to claim 9, the tasks of a signal box from the other Can be perceived in the same way as the main line, so for at least the exact part for which the static information another route center or be retrieved, analogous to Interface of the other route information with the trackside Exchange facilities. This is preferably done over existing ones Connections between the line centers or the line centers to the operations center. Alternatively, a use of separate Radio, cable or optical waveguides possible.
Nach Anspruch 9 übernimmt eine Streckenzentrale Aufgaben von Stellwerken. Dies bedeutet insbesondere, dass keine Stellwerke mehr erforderlich sind, sondern Fahrwegelemente direkte an die Streckenzentrale angekoppelt werden.According to claim 9, a branch center takes over tasks of interlockings. This means in particular that no interlockings are required anymore, but Track elements are coupled directly to the line center.
Die Erfindung wird nachstehend anhand von zwei Ausführungsbeispielen und
einer Zeichnung mit einer Figur näher erläutert. Die Figur zeigt in
Fig. 1 schematisch eine Bahnstrecke mit drei Streckenzentralen.The invention is explained below with reference to two embodiments and a drawing with a figure. The figure shows in
Fig. 1 shows schematically a railway line with three line centers.
Ein erstes besonders vorteilhaftes Ausführungsbeispiel betrifft die Umschaltung der Aufgaben einer gestörten ETCS Streckenzentrale auf zwei jeweils geografisch benachbarte Streckenzentralen.A first particularly advantageous embodiment relates to the switching the duties of a troubled ETCS route center to two each geographically adjacent line centers.
Fig. 1 zeigt schematisch eine Bahnstrecke 4 mit drei Streckenzentralen 1, 2
und 3, deren regulär zugeordneten Streckenbereiche 5, 6 und 7 wie folgt aneinander
anschließen: der Bereich 6 von Streckenzentrale 2 schließt direkt an
den Bereich 5 von Streckenzentrale 1 an, der Bereich 7 von Streckenzentrale 3
schließt direkt an den Bereich 6 von Streckenzentrale 2 an. Fig. 1 zeigt ferner,
dass jede Streckenzentrale für jeweils den halben zugeordeten Abschnitt der
Nachbarzentralen statische Informationen besitzt und auf die dynamischen Informationen
für diesen Bereich zumindest zeitweise Zugriff hat. Dynamische
Informationen betreffen hierbei insbesondere Aufenthaltsort und Geschwindigkeit
von Zügen sowie Stellung von Weichen und Signalen. Fig. 1 shows schematically a railway line 4 with three
Bei Ausfall oder Störung der Streckenzentrale 2 wird über einen Bediener die
Streckenzentrale 2 vom Zugriff auf die dynamischen Informationen für den der
Streckenzentrale 2 regulär zugeordneten Bereich ausgeschlossen; dafür wird
dieser Zugriff den Streckenzentralen 1 und 3 ermöglicht. Über ein entsprechendes
Kommando wird weiterhin den Streckenzentralen 1 und 3 die Zuständigkeit
für jeweils denjenigen Abschnitt des regulär der Streckenzentrale 2 zugeordneten
Bereiches gegeben, für die sie jetzt über statische und dynamische Informationen
verfügen.In case of failure or disruption of the
Durch den Ausfall der Streckenzentrale 2 werden die Datenfunkverbindungen
mit allen Zügen, die zum Zeitpunkt des Ausfalls von Streckenzentrale 2 geführt
werden, zwangsläufig abbrechen. Über eine Anrufweiterleitung des Anschlusses
der Streckenzentrale 2 werden die Anrufe der Züge zur Streckenzentrale 2,
die mit der Intention des Aufbaus einer neuen Datenkommunikationsverbindung
erfolgen, auf Streckenzentrale 1 umgeleitet. Abhängig von der Positionsmeldung
der Züge weist Streckenzentrale 1 die Züge dann an, Streckenzentrale 3
zu kontaktieren, falls sich die Züge nicht in dem regulär Streckenzentrale 2 zugeordneten
Bereich befinden, für den jetzt Streckenzentrale 1 zuständig ist.Due to the failure of the
Für alle folgenden Züge, die gemäß Fig. 1 aus Richtung des Bereichs der Streckenzentrale
1 in Richtung des Bereichs der Streckenzentrale 3 verkehren, wird
anstatt des üblichen Überganges zwischen Streckenzentralen von Streckenzentrale
1 nach Streckenzentrale 2 jetzt ein Übergang an einem anderen, durch
die neuen Zuständigkeiten definierten Ort, direkt zur Streckenzentrale 3 kommandiert.
Analog verfährt Streckenzentrale 3 für Züge, die in der entgegengesetzten
Richtung verkehren.For all the following trains, as shown in FIG. 1 from the direction of the area of the
Somit ist sichergestellt, dass für den gewöhnlich Streckenzentrale 2 zugeordneten
Bereich durchgängig eine Führung unter ETCS ermöglicht wird. Abgesehen
vom Abbruch der Datenfunkverbindung bei Ausfall der Streckenzentrale 2
ergeben sich demzufolge keine betrieblichen Einschränkungen.Thus it is ensured that for the
Im zweiten Ausführungsbeispiel wird eine vorzugsweise Lösung zur Umschaltung der Verantwortung von einer Streckenzentrale auf eine andere angegeben, die ebenfalls auf die statischen und dynamischen Informationen des regulären Verantwortungsbereiches der zuerst genannten Streckenzentrale zugreifen kann.In the second embodiment, a preferred solution for switching the responsibility from one route center to another, which also rely on the static and dynamic information of the regular Area of responsibility of the first mentioned access control center can.
Falls eine ETCS Streckenzentrale gestört ist oder oder beispielsweise aufgrund von Wartungsarbeiten zeitweise ihre Aufgaben nicht wahrnehmen kann oder soll, wird in diesem Fall definiert die Verantwortung für die Führung der Züge und für die Sicherung der Zugfahrten an diejenigen Streckenzentralen übertragen, die jeweils zusätzlich zur regulär zugeordneten Streckenzentrale über die statischen Informationen, und mit der Umschaltung auch über den Zugriff auf die dynamischen Informationen des Stellwerks bzw. den Fahrweg verfügen. Dabei wird gegebenenfalls der Bereich, der regulär nur einer einzigen Streckenzentrale zugeordnet ist, mehreren anderen Streckenzentralen zugeordnet.If an ETCS line center is disturbed or or due to, for example temporarily unable to perform their tasks of maintenance or In this case, responsibility for the management of trains is defined and for securing the train services to those train control centers, each in addition to the regularly assigned route center on the static information, and with the switching also on access to have the dynamic information of the signal box or the track. Where appropriate, the area that is normally only a single route center assigned to several other line centers.
Die Übergabe der Verantwortung zwischen den Streckenzentralen erfolgt vorzugsweise nach einem Verfahren, bei dem zunächst die dynamischen Informationen, die von der Streckenzentrale verwaltet werden (z.B. Informationen zu Zügen im Bereich der Streckenzentrale) an die neu zuständige Streckenzentrale übergeben werden. Nach dem Übermitteln aller erforderlichen Informationen an die neu zuständige Streckenzentrale werden weiterhin die externen Kommunikationspartner der Streckenzentrale, soweit erforderlich, über den anstehenden Wechsel informiert. Dies erfolgt vorzugsweise über den Aufbau einer neuen Kommunikaionsverbindung zu den externen Partnern. Zum Abschluß der Vorbereitung der Umschaltung werden alle anstehenden Prozesse, die eine Interaktion mit externen Einheiten durchführen, in einen definierten Zustand gebracht. Nach der Umschaltung der Verantwortung auf die neu zuständige Streckenzentrale übernimmt diese die von der bisher zuständigen Streckenzentrale ausgeführten Aufgaben.The transfer of responsibility between the line centers is preferred following a procedure whereby the dynamic information, managed by the line center (e.g., information about Trains in the area of the line center) to the newly responsible line center be handed over. After submitting all required information the external line will continue to be provided to the newly responsible line center Communication partner of the line center, as far as necessary, over the upcoming Bills informed. This is preferably done via the construction of a new communication link to external partners. To conclude the Preparation of the switching will be all pending processes, the one Perform interaction with external units in a defined state brought. After switching responsibility to the newly responsible This is taken care of by the route center, which is responsible for the area executed tasks.
Ein alternativ durchführbares Verfahren stellt sicher, dass die Aufgaben auch dann von der neu zuständigen Streckenzentrale übernommen werden können, wenn die bisher zuständige Streckenzentrale eine geordnete Übergabe nicht mehr automatisiert durchführen kann (z.B. bei Störung der Informationsverbindung, Störung der Streckenzentrale, etc).An alternative feasible procedure ensures that the tasks also can then be taken over by the newly responsible line center, if the hitherto responsible route center does not provide an orderly transfer more automated (e.g., in case of disruption of the information connection, Disturbance of the line center, etc).
Sobald die Störung oder der Ausfall oder die Abschaltung der Streckenzentrale behoben oder die Wartungsarbeiten beendet sind, wird die Verantwortung für die Führung der Züge und die Sicherung der Zugfahrten definiert wieder derjenigen Streckenzentrale übertragen, die regulär dem entsprechenden Bereich zugeordnet ist. Das Verfahren hierzu entspricht vorzugsweise ebenfalls dem zuvor beschriebenen. Once the fault or the failure or shutdown of the line center fixed or the maintenance work is completed, the responsibility for the management of the trains and the securing of the train runs defined again those Transmission center, which is regular to the corresponding area assigned. The method for this preferably also corresponds to the previously described.
- 11
-
Streckenzentrale 1
Line center 1 - 22
-
Streckenzentrale 2
Line center 2 - 33
-
Streckenzentrale 3
Line center 3 - 44
- Bahnstreckerailroad track
- 55
-
Streckenabschnitt regulär Streckenzentrale 1 zugeordnetTrack section regularly assigned to
line center 1 - 66
-
Streckenabschnitt regulär Streckenzentrale 2 zugeordnetRoute section regularly assigned to
line center 2 - 77
-
Streckenabschnitt regulär Streckenzentrale 3 zugeordnetTrack section regularly assigned to
line center 3 - 88th
-
statische Informationen vorhanden und Abgriff dynamischer Informationen
möglich für Streckenzentrale 2static information is available and dynamic information is tapped
possible for
line center 2 - 99
-
statische Informationen vorhanden und Abgriff dynamischer Informationen
möglich für Streckenzentrale 1static information is available and dynamic information is tapped
possible for
line center 1 - 1010
-
statische Informationen vorhanden und Abgriff dynamischer Informationen
möglich für Streckenzentrale 3static information is available and dynamic information is tapped
possible for
line center 3
Claims (12)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10336022A DE10336022B4 (en) | 2003-08-01 | 2003-08-01 | Procedure for the flexible allocation of responsibilities of line centers |
DE10336022 | 2003-08-01 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1510430A1 true EP1510430A1 (en) | 2005-03-02 |
EP1510430B1 EP1510430B1 (en) | 2006-03-01 |
Family
ID=34089104
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP04016621A Not-in-force EP1510430B1 (en) | 2003-08-01 | 2004-07-15 | Process of flexible responsibility allocation for control centers |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP1510430B1 (en) |
AT (1) | ATE318745T1 (en) |
DE (2) | DE10336022B4 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1892171A1 (en) * | 2006-08-24 | 2008-02-27 | Alcatel Lucent | Method for operation of an interlocking system and method for operation of a central control station |
WO2009092088A1 (en) * | 2008-01-17 | 2009-07-23 | Lockheed Martin Corporation | Method to monitor a plurality of control centers for operational control and backup purposes |
EP2253525A1 (en) * | 2009-05-18 | 2010-11-24 | Huawei Technologies Co., Ltd. | Train control method, device and system |
WO2014040898A3 (en) * | 2012-09-14 | 2014-05-08 | Siemens Aktiengesellschaft | Energy-saving mode for a rail system signalling system |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004038205B4 (en) * | 2004-08-05 | 2008-05-15 | Deutsche Bahn Ag | Method and arrangement for carrying out a driving operation of rail vehicles |
DE102015201059A1 (en) * | 2015-01-22 | 2016-07-28 | Siemens Aktiengesellschaft | Method and arrangement for carrying out a train service |
DE102017217447A1 (en) | 2017-09-29 | 2019-04-04 | Siemens Mobility GmbH | Method and arrangement for carrying out a driving operation of track-guided vehicles in a route network structured in sections |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5420883A (en) * | 1993-05-17 | 1995-05-30 | Hughes Aircraft Company | Train location and control using spread spectrum radio communications |
EP1148396A1 (en) * | 2000-04-22 | 2001-10-24 | Siemens Schweiz AG | Monitoring of computernetwork |
-
2003
- 2003-08-01 DE DE10336022A patent/DE10336022B4/en not_active Expired - Fee Related
-
2004
- 2004-07-15 DE DE502004000317T patent/DE502004000317D1/en active Active
- 2004-07-15 AT AT04016621T patent/ATE318745T1/en not_active IP Right Cessation
- 2004-07-15 EP EP04016621A patent/EP1510430B1/en not_active Not-in-force
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5420883A (en) * | 1993-05-17 | 1995-05-30 | Hughes Aircraft Company | Train location and control using spread spectrum radio communications |
EP1148396A1 (en) * | 2000-04-22 | 2001-10-24 | Siemens Schweiz AG | Monitoring of computernetwork |
Non-Patent Citations (1)
Title |
---|
MILIUS B: "STELLWERKE VON MORGEN WELCHE ROLLE KANN DAS STELLWERK IN EINEM ETCS-LEVEL-3-SYSTEM NOCH SPIELEN? INTERLOCKINGS FOR TOMORROW HOW TO INTEGRATE INTERLOCKINGS IN ETCS LEVEL 3 SYSTEMS", ZEVRAIL - GLASERS ANNALEN, GEORG SIEMENS VERLAG, BERLIN, DE, vol. 126, no. 2/3, 2002, pages 106 - 114, XP001145097, ISSN: 1618-8330 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1892171A1 (en) * | 2006-08-24 | 2008-02-27 | Alcatel Lucent | Method for operation of an interlocking system and method for operation of a central control station |
WO2009092088A1 (en) * | 2008-01-17 | 2009-07-23 | Lockheed Martin Corporation | Method to monitor a plurality of control centers for operational control and backup purposes |
EP2253525A1 (en) * | 2009-05-18 | 2010-11-24 | Huawei Technologies Co., Ltd. | Train control method, device and system |
WO2014040898A3 (en) * | 2012-09-14 | 2014-05-08 | Siemens Aktiengesellschaft | Energy-saving mode for a rail system signalling system |
US9720481B2 (en) | 2012-09-14 | 2017-08-01 | Siemens Aktiengesellschaft | Energy-saving mode for a rail system signaling system |
RU2636993C2 (en) * | 2012-09-14 | 2017-11-29 | Сименс Акциенгезелльшафт | Energy saving mode for railroad alarm system |
Also Published As
Publication number | Publication date |
---|---|
EP1510430B1 (en) | 2006-03-01 |
DE10336022A1 (en) | 2005-02-24 |
ATE318745T1 (en) | 2006-03-15 |
DE10336022B4 (en) | 2006-02-02 |
DE502004000317D1 (en) | 2006-04-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2301202B1 (en) | Device for controlling and/or monitoring and data retrieval from local functional units along a communication network | |
EP2057056B1 (en) | Method and device for a modular adaptive system for controlling and monitoring railway safety installations | |
DE102008045050A1 (en) | Method for automatic train control in European train control system track, involves using identical procedures for formation of telegrams to control balises for point-like automatic train control and wireless-based automatic train control | |
WO2019243341A1 (en) | Flexible train safety system | |
WO2017153131A1 (en) | Railway-technical installations and method for operating a railway-technical installation | |
DE10336022B4 (en) | Procedure for the flexible allocation of responsibilities of line centers | |
WO1999067117A2 (en) | Method for reducing data in railway operation | |
EP0719224B1 (en) | Traffic control system to control operations and traffic flow in rail transport | |
DE19721246C2 (en) | Communication device for radio-based railway services | |
EP3400161A1 (en) | Track installation and method for operating a track installation | |
DE102004038205B4 (en) | Method and arrangement for carrying out a driving operation of rail vehicles | |
EP2978654A2 (en) | Method for replacing a first signal box with a second signal box | |
DE202005016151U1 (en) | Equipment is for remote control of relay positioning device and uses highly accessible diverse controls | |
EP1118185B1 (en) | Communication system for radio-contolled driving | |
EP3960580A1 (en) | Railway control system with an interface adapter and method for configuration | |
EP2878510B1 (en) | Balise for an automatic train control system, and train safety system with such a balise | |
EP3943363B1 (en) | Railway control system with restriction | |
WO2017092911A1 (en) | Device and method for controlling and/or monitoring decentralized intelligent functional units arranged in a rail network | |
DE10240376A1 (en) | Safe operation of rail systems uses travel and status data entered into protocol memory and continuously transmitted to central point to control alarm system | |
DE102004062987A1 (en) | Train controlling and securing method, involves blocking virtual blocks after clearing following train for other trains and issuing dis-positive drive assignment by host computer or dispatcher that is connected via cellular radio network | |
DE19526158C2 (en) | Train protection system | |
WO2008110320A1 (en) | Method for displaying relevant control status information about components in a manner incorporating all sections | |
DE102005049217A1 (en) | Relay signal tower remote control method for railway transportation, involves controlling tower from control operating place by secure remote control system such that core of tower is maintained without modifications | |
DE19927023A1 (en) | Method of setting call times in railway radio-drive mode reliably prevents unwanted operational disturbances caused by different reaction times of the different types of track elements | |
DE19814242A1 (en) | Data communications system for spatially structured drive system with several drive regions for magnetic bearing track vehicles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL HR LT LV MK |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
17P | Request for examination filed |
Effective date: 20050704 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
AKX | Designation fees paid |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060301 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060301 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060301 Ref country code: IE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060301 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060301 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060301 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060301 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 20060315 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REF | Corresponds to: |
Ref document number: 502004000317 Country of ref document: DE Date of ref document: 20060427 Kind code of ref document: P |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060601 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060601 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060601 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060612 |
|
ET | Fr: translation filed | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060731 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060731 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060801 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FD4D |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20061204 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060715 |
|
BERE | Be: lapsed |
Owner name: DB NETZ A.G. Effective date: 20060731 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060301 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060602 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060301 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060301 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060902 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060715 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060301 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080731 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080731 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20100731 Year of fee payment: 7 Ref country code: FR Payment date: 20100802 Year of fee payment: 7 Ref country code: IT Payment date: 20100728 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20100726 Year of fee payment: 7 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20110715 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20120330 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120201 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110801 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 502004000317 Country of ref document: DE Effective date: 20120201 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110715 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110715 |