EP1500567A1 - Procédé de résolution des conflits dans un système de transport guidé sur une voie - Google Patents
Procédé de résolution des conflits dans un système de transport guidé sur une voie Download PDFInfo
- Publication number
- EP1500567A1 EP1500567A1 EP03360088A EP03360088A EP1500567A1 EP 1500567 A1 EP1500567 A1 EP 1500567A1 EP 03360088 A EP03360088 A EP 03360088A EP 03360088 A EP03360088 A EP 03360088A EP 1500567 A1 EP1500567 A1 EP 1500567A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- conflict
- measures
- solution
- class
- measure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 33
- 238000004590 computer program Methods 0.000 claims description 2
- 238000009434 installation Methods 0.000 claims description 2
- 230000008569 process Effects 0.000 abstract description 4
- 239000011159 matrix material Substances 0.000 description 14
- 230000009471 action Effects 0.000 description 11
- 230000006870 function Effects 0.000 description 6
- 230000008859 change Effects 0.000 description 5
- 238000013507 mapping Methods 0.000 description 4
- 238000011156 evaluation Methods 0.000 description 3
- 238000011084 recovery Methods 0.000 description 3
- 238000007619 statistical method Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 2
- 230000000052 comparative effect Effects 0.000 description 2
- 230000001934 delay Effects 0.000 description 2
- 238000005457 optimization Methods 0.000 description 2
- 230000002123 temporal effect Effects 0.000 description 2
- 230000003044 adaptive effect Effects 0.000 description 1
- 230000001174 ascending effect Effects 0.000 description 1
- 238000012512 characterization method Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000004090 dissolution Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000007257 malfunction Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/16—Trackside optimisation of vehicle or train operation
Definitions
- the invention relates to a method for controlling the occupancy in a track-bound traffic system in case of occupancy conflict case or one technical conflict case, with possible alternative measures for resolution the conflict case and taken into account when determining a solution For each solution, a quality factor is determined, and the solution with the best quality factor is applied.
- conflicts can occur, for example when two trains enter the same track at the same time or the same Want to prove track vacancy section (occupancy conflict case) or because technical incompatibility between a train and the infrastructure (technical conflict).
- a technical conflict case i. an incompatibility between train and track, for example, exists between an electric powered train and a non-electrified track.
- Such conflicts must be resolved before they become a dangerous situation, one Malfunction or lead to an accident.
- measures such as the redirection of a case of conflict train to apply before this conflict happens. Which Measures for which conflicts are applicable, for example, by Operating concept of the railway administration determined.
- a measure on Applying a train means the train run (schedule) of a conflict change the train involved so that the conflict is resolved.
- a such action for example, redirecting a train
- the Resolving a conflict therefore means taking action in an orderly manner Order to resolve the original conflict and any subsequent conflicts that caused by the application of measures to dissolve.
- a solution for the resolution of a Conflict case is therefore defined as an ordered n-tuple (record) of Measures that together solve the original conflict and all subsequent conflicts.
- n-tuple Record
- To determine the best solution it is known to have a figure of merit for each To determine solution. This happens, for example, by calculating a Cost function that represents the quality of the solution. The solution with the lowest cost is the best solution. The cost of a solution is only determinable when the whole solution has been determined.
- the object of the invention is to provide a method with which the Occupancy in a track-bound traffic system at a Occupancy conflict case controlled quickly and without great computational effort can be.
- This object is achieved according to the invention by a method of the beginning in which a selection of the resolution of the conflict in Questioning measures taken from an empirical basis and only consider this measure (s) when identifying solutions become.
- the selection of measures to be applied to a conflict should be one or more measures.
- Conflict may be an original conflict or a consequential conflict act. Since only a selection of measures is used, the Solution space limited because fewer solutions must be determined.
- a conflict case is based on the experience base measures taken, with all measures becoming one conflict-free situation. For every measure leading to a follow-up situation leads, the quality of this solution is determined. The measure that is the best Solution is applied.
- the basis of experience in low-performing times of a conflict resolution system and / or after a Warimplement ist of the process, in particular the first installation in the Conflict resolution system built.
- the experience base is built up by complete solution spaces are determined and evaluated for a conflict become. Because of the experience base even in times of slowdown is built, the computer power in the conflict resolution system more evenly exploited or used.
- the experience base can thereby in low-power times, i. if in a track-bound Traffic system little real conflict cases occur, be extended.
- conflict types and conflict circumstance classes are defined, which are assigned to a conflict class and the Conflict classes are stored in the experience base.
- the experience in the experience base is stored, is the connection between the Circumstances of a conflict (conflict situation) and the success of measures, used to resolve conflicts in this conflict circumstance can.
- the conflict type and a conflict circumstance class form together a conflict class.
- This combination of the two components comes in a railway system only once before. Every conflict can be unique be assigned to exactly one conflict class, since each conflict is also accurate associated with one of its components (conflict resource class, conflict type) can be.
- a type of conflict for example, by the Railway administration. She does that from her operational point of view.
- An example of a conflict type is "train following conflict on the open road”.
- One conflict type is therefore the definition of the circumstances of a conflict from view the railway administration according to the operational concept. Every conflict has to can clearly be assigned to exactly one conflict type.
- everyone conflict class the applicable i. the measures eligible for Resolution of a conflict associated.
- a railway administration is determined by its operational concept, which conflict types exist. For each type of conflict is still set, like train 1 and train 2 are determined.
- the determined railway administration for each type of conflict an unordered list of Measures on train 1 and a disorderly list of measures that are applicable to move 2 of a conflict of a conflict type.
- An applicable Action is a measure that, for a given type of conflict, is at one certain of the two moves involved in the conflict. For example, the measures “extend hold at train_1" and “hold extend at Switzerland_2 "two different measures.
- the applicable Measures sorted within a conflict class This allows one fast and good access to appropriate measures to solve a Conflict.
- conflicts are determined by the conflict resource class classified according to their formalized circumstances. This classification happens unaffected by the view of the railway administration.
- the classification is based on abstract place and Vehicle parameters.
- Classification becomes abstract information on the characterization of the trains involved in the conflict and the Infrastructure (conflict location) used. Become the abstraction of this information preferably abstract vehicle parameters and abstract location parameters used.
- abstract vehicle parameters are the train priority Train Performance, Train Run Priority, Line Priority Priority (Line Recoverability Priority).
- Main criteria for line recovery are Reserve times in a train run. If a train has very little or no Having spare time in his schedule, he is prone to unrecoverable Delays. Because he can not spend any spare time to To catch up on delays.
- These vehicle parameters have sorting values how high, medium, low. For example, get train runs with little Reserve time a high value for the parameter line restore.
- abstract location parameters are a detour potential sorting values such as high, medium, low.
- conflict formalization parameters have comparative values such as "train 1 greater than train 2".
- Train 1 greater than train 2
- one conflict circumstance class an ordered n-tuple (record) of allzanformalisanssparameter.
- the values of Conflict formalization parameters for a given conflict arise from the logical link of the abstract vehicle parameters involved in this conflict and the abstract location parameters of the Conflict place.
- Each conflict can clearly be exactly one confluence class be assigned. This means that each conflict is exactly one type of conflict and is assigned to a conflict circumstance class. Every conflict class consists of a conflict type and a conflict circumstance class. this means also that each conflict is associated with exactly one conflict class.
- there Several different conflicts can be assigned to the same conflict type and several (possibly other) conflicts with the same conflict circumstances assigned to the same conflict circumstance class.
- the classification system is adaptive and adapts to Complexity of the transport system to which it is applied.
- the number The conflict classes for a railway system depends on the number of Combinations of abstract parameters used in this railroad system can happen. This number results from the heterogeneity of the Vehicle fleets (train service), timetables (train run priority, priority of Line restoration), the infrastructure (diversion potential, partly Train run priority) and the operating concept (train priority) exactly this Rail system.
- the success factor can be Be a success counter. In this case, it is recorded, for example, which measure a Conflict class that was applied to a conflict of this conflict class best solution. The success counter associated with this action becomes then incremented. On the basis of the success counter, the measures of a Conflict class can be sorted.
- This frequency can be with a weighting factor that expresses how much the best solution is better than the average solution in solution space.
- the quality of a solution may be due to a cost function be determined.
- the weighting factor can express by how much the best solution is cheaper than the cost average in the solution room. It should be noted that the same Action in different conflict classes, i. at different Conflict circumstances, can be different success.
- a sorting key is determined via the the appropriate measures for a conflict to be resolved in the Experience base can be found.
- the sort key sorts the Measures of a conflict class ascending after their success among the Conflicting circumstances of this conflict class. This results in the best, the second best, the third best etc. Measure for conflicts of this conflict class.
- the sort key forms an index for the measures within a conflict class. Together with a conflict class key he forms a matrix. With this matrix one can take the appropriate measure for one Look up conflict in the experience base.
- a conflict class key becomes for example, by the conflict classes of the classification system for Conflicts expressed.
- the sort key is determined by experience and may change as the experience changes over time.
- the Experience here is the connection between the circumstances of a Conflict (conflict circumstance) and the success of measures leading to the dissolution to be used by conflicts with this conflict circumstance.
- a conflict class depend on multiple sort factors that are in the Assess the success of a measure.
- the railway administration can conflict types, measures to resolve Conflicts and a cost function to calculate the cost of a solution To be defined.
- Another sort factor is the conflict circumstance classes, which are applicable to this very railway system. In particular are this is the abstraction of the location and vehicle parameters, the infrastructure and the Timetables. It can be taken into account which measures in exactly good grip on this railroad system. Furthermore, it can be taken into account how the conflict resolution applies measures, namely incorrect or correct.
- the sorting of measures of a conflict class is not constant.
- the sorting is not determined once and then does not change anymore.
- the sorting is not deterministic. It can not be theoretical be precalculated since it is based on experience only.
- the sorting is continues to depend on the sort factors and responds to changes in these Sorting factors.
- At the start of the conflict resolution system is sorting indefinite, there is no sorting. While at system startup to first construction of the experience base complete solution spaces for conflicts calculated, the sorting becomes progressively statistically more and more relevant.
- the significance of sorting before, during and after the first Structure of the empirical basis can be quantified with a statistical method become.
- the sorting applies only to a given traffic system for which they are was created. Once the sort was statistically significant, i.
- a statistical method can be used to describe the mathematical Correlation between the number of evaluated measures on the the sorting is based and the probability that one is considered bad measure will be successful. This Relationship determines how many statistical events are evaluated must have been so that the sort order is statistically significant.
- One Example of a statistical method is a discrete random variable with Binomial distribution.
- the sorting of measures within a conflict class can be optimized become. This can happen especially when the few best Measures of a conflict class do not significantly more often provide the best solutions achieve other measures than the same class of conflict. It should be the Classification system can be improved so that the few best Measures of a conflict class much more often to achieve the best solutions as other measures of the same conflict class.
- the success of Classification system depends on the abstract location and Vehicle parameters. In particular, the parameters and their Value range can be optimized. The value range of the parameters can be extended become. For optimization more than three sorting values like "high”, “medium” and "low” for each or some classification parameters introduced become.
- mapping of train runs or the infrastructure can the abstract vehicle parameters or abstract location parameters (mapping) optimized later, after the conflict resolution system has been running for some time become.
- the boundaries between the sorting values "high”, “medium”, “low” can be changed.
- the Value ranges are changed so that, for example, then some train runs, which were previously mapped to the value "low”, then to the value "medium” are displayed.
- the scope of the invention also includes a conflict resolution system Implementation of the method according to the invention with a memory for Storing an experience base and means for selecting Measures to resolve a conflict based on experience and resources for determining solutions and the figure of merit of a solution.
- a conflict resolution system can conflict in a track-bound Traffic system resolved faster than with the state of the art Technology.
- the scope of the invention also includes a computer program for Implementation of the method according to the invention.
- Fig. 1 the inventive method is shown schematically.
- valid conflict types 2 are defined from an operational point of view.
- An example of a conflict type is "train following conflict on the open road".
- Each railway administration has in its operational concept 1 a catalog of measures 3 for conflict resolution. For example, the assignment of which type of conflict which measure applies to move 1 and which move to move 2 of a conflict is determined by simply deleting those actions that are operationally or technically meaningless for each type of conflict.
- quality standard 4 the railway administration determines how the quality of a solution is measured. For this purpose, guidelines are given by the railway administration. For example, the quality of a solution is determined by calculating a cost function.
- a classification system for conflicts 5 has the two components conflict types and conflict circumstance classes 6 .
- Conflict circumstance classes are used to formalize the circumstances of a conflict by means of abstract parameters.
- the conflict classes of the classification system for conflicts 5 are stored in an empirical basis 7 , with several measures for resolving a conflict being filed for each conflict class.
- a matrix allows access to a measure of the empirical basis 7, wherein the matrix contains a conflict class key and sort key, of which the conflict class key points to a conflict class within the empirical basis and the sort key to a measure within a conflict class.
- the solution space consists of all solutions to an original conflict, with each solution being assigned a quality factor. These solutions are obtained by applying to the original conflict and to all subsequent conflicts all applicable measures (according to the type of conflict). First, all applicable measures are applied to the original conflict. Each measure results in a new situation, usually with consequential conflicts. Then, in each of these new post-conflict situations, the first temporal conflict is resolved by applying all the measures applicable to that type of conflict. This in turn creates a new situation per applied measure.
- the situation S0 represents an original conflict case.
- the measures M1, M2, M3 For each applied measure, this leads to the follow-up situations S1, S2, S3, which each represent a consequential conflict, to which in turn various measures can be applied in order to resolve it.
- the measures M11, M12 For the situation S1, these are the measures M11, M12, which lead to the follow-up situations S11, S12 .
- the consequential conflict S2 can be resolved by the measures M21, M22, M23 , with situations S21, S22, S23 occurring in each case.
- the measures M31, M32, M33 can be applied to the situation S3, which leads to the follow-up situations S31, S32, S33 .
- situations S11, S12, S21, S22, S23, S31, S32, S33 do not represent conflict situations that need to be resolved.
- Each path (path) through the solution tree 10 from the original conflict S0 to a conflict-free situation S11, S12, S21, S22, S23, S31, S32, S33 represents a solution.
- a complete solution tree in which the original conflict and each contention conflict all applicable measures corresponds to the solution space.
- a quality factor for the solution is determined for each solution. In order to obtain the best solution, ie the one with the best quality factor by comparison, the entire solution space must be determined. In the example, the solution 11 is the best solution.
- a matrix 12 is shown simplified.
- Each situation or conflict S0, S1, S2, S3 is assigned to a conflict class KK1 - KK4 .
- the conflicts S0, S1, S2, S3 are assigned to the conflict classes KK2, KK1, KK4 and KK3.
- the applicable measures are stored for each conflict class KK1 - KK4, the measures being sorted according to their chances of success.
- the same measure can exist in different conflict classes. For example, M1 and M23 may be identical.
- measure M1 is the most promising measure and M3 the least promising measure. If in the conflict resolution system it is given that only the two measures for the resolution of a conflict are to be used to find the best solution, which promise the most success, one obtains the (incomplete) solution tree of Fig. 2c.
- FIG. 3 shows a matrix 20 for finding measures in an empirical basis.
- the conflict class key K which is shown on the abscissa, together with the sort key SS (shown on the ordinate) for the measures M a - M i within a conflict class KK1 - KK7 forms a matrix 20.
- the applicable measures M a - M i for each conflict class KK1 - KK7 sorted according to their success under the conflict circumstances of the respective conflict class KK1 - KK7.
- the applicable measure M a - M i can be looked up for a conflict in the empirical basis.
- a measure M x may be applicable in more than one conflict class.
- the measure M g is applicable, for example, to the conflict classes KK1, KK3, KK4 and KK6.
- the conflict class KK1 it is the best measure
- the conflict class KK3 it is the eight best measure
- the conflict class KK4 it is the third best measure
- the conflict class KK6 it is the fifth best measure.
- the basis of experience is built up by the evaluation of completely calculated solution trees. If a conflict of the conflict class KK1 has best been solved by the measure M g , then the success counter for M g in the conflict class KK1 is increased by 1. If a conflict of the conflict class KK3 is best solved by measure M g , then the success counter for M g in the conflict class KK3 is increased by 1, etc. After each change of a success counter, the sorting of the measures within the corresponding conflict class is checked and if necessary tightened.
- success counter Z x The use of the success counter Z x will be explained again below with reference to FIG. 4 a.
- the success of a measure M x is the frequency with which this measure M x has led to the best solution (lowest cost) of conflicts under certain conflict circumstances (conflict class). To be able to determine this frequency, success counters Z x are used. For each conflict class CC1 - KK7 there are per applicable measure M x a success counter Z x. A measure M x can be applicable in more than one conflict class KKx. Then there are for this measure M x several success counter x Z.
- the conflict class is determined to conflict K from the solution tree, for example KK6. Furthermore, it is determined which measure applied to conflict K led to the best solution, for example measure M c .
- the success counter Z c for measure M c for conflict class KK6 is determined and incremented ( FIG. 4b ). After each change of a success counter Z x , the sorting of the measures M x within the corresponding conflict class KKx is checked in the empirical basis and, if necessary, followed. Variants for counting success are conceivable. The counting can for example be combined with a weighting factor. Other variants relate to which and how many measures of a solution tree are taken into account in the success counting.
- the evaluation can be restricted to only the measures applied to the original conflict (ie only M1 in Fig. 2c) or to the measures applied to all conflicts of the best solution (M1, M12 in Fig. 2c), or consider any measures applied to any resolved conflict of the solution tree that have best resolved this (consequence) conflict (M1, M12, either M22 or M21, depending on which of the two corresponding solutions is more cost effective).
- FIG. 5 shows the assignment of the abstract vehicle or train parameters.
- a mapping to abstract train parameters is made for each train number NR .
- FIG. 6 illustrates the assignment of the abstract location parameters.
- the infrastructure IS maps to abstract location parameters.
- conflict formalization parameters are determined which have the same designation as the abstract parameters.
- a method for resolving conflict situations (S0, S1, S2) in a track-bound transport system will be a selection of measures (M1, M2, M11, M12, M21, M22) suitable for resolving the conflict, taken from an empirical basis and only these measures (M1, M2, M11, M12, M21, M22) leading to follow-up situations in the determination a solution (11) considered.
- measures M1, M2, M11, M12, M21, M22
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Traffic Control Systems (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE50301157T DE50301157D1 (de) | 2003-07-22 | 2003-07-22 | Verfahren zur Auflösung von Konflikten in einem spurgebundenen Verkehrssystem |
EP03360088A EP1500567B1 (fr) | 2003-07-22 | 2003-07-22 | Procédé de résolution des conflits dans un système de transport guidé sur une voie |
AT03360088T ATE303930T1 (de) | 2003-07-22 | 2003-07-22 | Verfahren zur auflösung von konflikten in einem spurgebundenen verkehrssystem |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP03360088A EP1500567B1 (fr) | 2003-07-22 | 2003-07-22 | Procédé de résolution des conflits dans un système de transport guidé sur une voie |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1500567A1 true EP1500567A1 (fr) | 2005-01-26 |
EP1500567B1 EP1500567B1 (fr) | 2005-09-07 |
Family
ID=33484065
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP03360088A Revoked EP1500567B1 (fr) | 2003-07-22 | 2003-07-22 | Procédé de résolution des conflits dans un système de transport guidé sur une voie |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP1500567B1 (fr) |
AT (1) | ATE303930T1 (fr) |
DE (1) | DE50301157D1 (fr) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3213974A1 (fr) | 2016-03-03 | 2017-09-06 | Thales Deutschland GmbH | Procédé pour commander des véhicules dans le cas d'une situation de conflit et système d'aide à la décision |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109784684A (zh) * | 2018-12-27 | 2019-05-21 | 中国铁道科学研究院集团有限公司通信信号研究所 | 一种基于案例推理的列车运行调整策略决策方法 |
CN113264086B (zh) * | 2021-06-08 | 2022-08-26 | 卡斯柯信号有限公司 | 一种基于tacs系统的列车间隔防护控制方法及装置 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4122523A (en) * | 1976-12-17 | 1978-10-24 | General Signal Corporation | Route conflict analysis system for control of railroads |
US5794172A (en) * | 1994-09-01 | 1998-08-11 | Harris Corporation | Scheduling system and method |
-
2003
- 2003-07-22 AT AT03360088T patent/ATE303930T1/de not_active IP Right Cessation
- 2003-07-22 DE DE50301157T patent/DE50301157D1/de not_active Expired - Lifetime
- 2003-07-22 EP EP03360088A patent/EP1500567B1/fr not_active Revoked
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4122523A (en) * | 1976-12-17 | 1978-10-24 | General Signal Corporation | Route conflict analysis system for control of railroads |
US5794172A (en) * | 1994-09-01 | 1998-08-11 | Harris Corporation | Scheduling system and method |
Non-Patent Citations (1)
Title |
---|
FAY, ALEXANDER: "Dezentrale Steuerung des Schienenverkehrs durch autonome Agenten", SIGNAL & DRAHT, vol. 92, March 2000 (2000-03-01), pages 14 - 18, XP002262020 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3213974A1 (fr) | 2016-03-03 | 2017-09-06 | Thales Deutschland GmbH | Procédé pour commander des véhicules dans le cas d'une situation de conflit et système d'aide à la décision |
WO2017149076A1 (fr) | 2016-03-03 | 2017-09-08 | Thales Deutschland Gmbh | Procédé de commande de véhicules en cas de situation de conflit et système d'aide à la décision |
Also Published As
Publication number | Publication date |
---|---|
EP1500567B1 (fr) | 2005-09-07 |
DE50301157D1 (de) | 2005-10-13 |
ATE303930T1 (de) | 2005-09-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE19951716A1 (de) | Verfahren zur dynamischen Speicherverwaltung | |
Jonen et al. | Balanced IT Decision Card—An Instrument for Investment Controlling of IT Projects | |
EP1500567B1 (fr) | Procédé de résolution des conflits dans un système de transport guidé sur une voie | |
DE19701928C1 (de) | Verfahren zur Initialisierung einer Simulation des Verhaltens einer technischen Anlage und Simulationssystem für eine technische Anlage | |
DE10115046A1 (de) | Verfahren und Einrichtung zur Erzeugung eines Abbildes eines netzwerkartigen Herstellungsprozesses | |
DE19753034A1 (de) | Verfahren zur Prognose eines den Zustand eines Systems repräsentierenden Parameters, insbesondere eines den Zustand eines Verkehrsnetzes repräsentierenden Verkehrsparameters und Vorrichtung zum Durchführen des Verfahrens | |
EP3475819B1 (fr) | Procédé d'attribution automatique et dynamique de la responsabilité pour tâches aux composants de calcul disponibles dans un système de traitement de données hautement distribué | |
DE102014203226A1 (de) | Verfahren und System zum Bereitstellen von Eingangsdaten für ein Verkehrsmodell eines Verkehrsnetzes | |
DE10332203A1 (de) | Verteiltes Bayesnetz-basiertes Expertensystem zur Fahrzeugdiagnose und Funktions-Wiederherstellung | |
EP0770946B1 (fr) | Procédé pour concevoir automatiquement la redondance optimale pour des mesures dans le système de controle des centrales électriques | |
WO2004040483A2 (fr) | Prevision du degre de respect des delais de livraison dans la fabrication en serie | |
DE102019203427A1 (de) | Verfahren und Vorrichtung zum Führen von Fahrzeugen in einem Parkraum | |
DE102005019335A1 (de) | Verfahren und Vorrichtung zum Auswerten von Ereignissen aus dem Betrieb zumindest eines Fahrzeuges | |
CH670804A5 (fr) | ||
DE2722396C2 (de) | Einrichtung zur Zugsicherung | |
DE3609925A1 (de) | Einrichtung zur simulation von neuronensystemen | |
DE102016216510A1 (de) | Konzept zum Ermitteln eines Belegungszustands eines Stellplatzes eines eine Vielzahl von Stellplätzen umfassenden Parkplatzes | |
WO2023102583A1 (fr) | Procédé de fabrication additive d'une pièce | |
DE102023126862A1 (de) | Systeme und verfahren zum identifizieren und warnen vor stellflächen-überzyklus-risiken bei allgemeinen mehrprodukt-montagelinien | |
DE102022203272A1 (de) | Verfahren zum Planen eines AVP-Vorgangs | |
DE102022213261A1 (de) | System oder Verfahren zur Erkennung von Häufigkeiten von gleichen oder ähnlichen Szenarien | |
DE102005042643A1 (de) | Kommissionierverfahren | |
EP1503178B1 (fr) | Procédé pour classifier des segments d'une route d'un système de navigation et un système de navigation correspondant | |
DE102023202270A1 (de) | Verfahren zum Abgleichen einer digitalen Straßenkarte | |
DE102022003343A1 (de) | Verfahren zum Betreiben einer technischen Anlage und technische Anlage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20040308 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL LT LV MK |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050907 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050907 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050907 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050907 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050907 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050907 Ref country code: IE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050907 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 20050907 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
AKX | Designation fees paid |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR |
|
REF | Corresponds to: |
Ref document number: 50301157 Country of ref document: DE Date of ref document: 20051013 Kind code of ref document: P |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20051207 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20051207 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20051207 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20051207 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20051218 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060207 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060308 |
|
ET | Fr: translation filed | ||
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FD4D |
|
PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
PLAX | Notice of opposition and request to file observation + time limit sent |
Free format text: ORIGINAL CODE: EPIDOSNOBS2 |
|
26 | Opposition filed |
Opponent name: DEUTSCHE BAHN AG PATENTABTEILUNG Effective date: 20060607 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060731 Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060731 |
|
RAP2 | Party data changed (patent owner data changed or rights of a patent transferred) |
Owner name: ALCATEL LUCENT |
|
RDAF | Communication despatched that patent is revoked |
Free format text: ORIGINAL CODE: EPIDOSNREV1 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060722 |
|
APBP | Date of receipt of notice of appeal recorded |
Free format text: ORIGINAL CODE: EPIDOSNNOA2O |
|
APAH | Appeal reference modified |
Free format text: ORIGINAL CODE: EPIDOSCREFNO |
|
BERE | Be: lapsed |
Owner name: ALCATEL Effective date: 20060731 |
|
APBQ | Date of receipt of statement of grounds of appeal recorded |
Free format text: ORIGINAL CODE: EPIDOSNNOA3O |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070731 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070731 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050907 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060722 Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050907 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050907 |
|
APBU | Appeal procedure closed |
Free format text: ORIGINAL CODE: EPIDOSNNOA9O |
|
RAP2 | Party data changed (patent owner data changed or rights of a patent transferred) |
Owner name: ALCATEL LUCENT |
|
PLAY | Examination report in opposition despatched + time limit |
Free format text: ORIGINAL CODE: EPIDOSNORE2 |
|
PLBC | Reply to examination report in opposition received |
Free format text: ORIGINAL CODE: EPIDOSNORE3 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20130717 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20130717 Year of fee payment: 11 Ref country code: FR Payment date: 20130724 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20130716 Year of fee payment: 11 |
|
RAP2 | Party data changed (patent owner data changed or rights of a patent transferred) |
Owner name: ALCATEL LUCENT |
|
RDAD | Information modified related to despatch of communication that patent is revoked |
Free format text: ORIGINAL CODE: EPIDOSCREV1 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 50301157 Country of ref document: DE |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20140722 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20150331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140722 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150203 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 50301157 Country of ref document: DE Effective date: 20150203 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140731 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140722 |
|
RDAG | Patent revoked |
Free format text: ORIGINAL CODE: 0009271 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: PATENT REVOKED |
|
27W | Patent revoked |
Effective date: 20141024 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MA03 Ref document number: 303930 Country of ref document: AT Kind code of ref document: T Effective date: 20141024 |