EP1394326A1 - Method for driving a pile and lengthening piece - Google Patents

Method for driving a pile and lengthening piece Download PDF

Info

Publication number
EP1394326A1
EP1394326A1 EP03077614A EP03077614A EP1394326A1 EP 1394326 A1 EP1394326 A1 EP 1394326A1 EP 03077614 A EP03077614 A EP 03077614A EP 03077614 A EP03077614 A EP 03077614A EP 1394326 A1 EP1394326 A1 EP 1394326A1
Authority
EP
European Patent Office
Prior art keywords
pile
lengthening piece
pipe
ground
flexible pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP03077614A
Other languages
German (de)
French (fr)
Inventor
Fenno Harm Leeuwerke
Antonius Franciscus Groeneweg
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BAM NBM Beton and Industriebouw BV
Original Assignee
BAM NBM Beton and Industriebouw BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BAM NBM Beton and Industriebouw BV filed Critical BAM NBM Beton and Industriebouw BV
Publication of EP1394326A1 publication Critical patent/EP1394326A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/32Prefabricated piles with arrangements for setting or assisting in setting in position by fluid jets
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/10Follow-blocks of pile-drivers or like devices

Definitions

  • the invention rel ates to a method for driving a pile into the ground to a position below the ground level by means of a lengthening piece which is pulled out of the ground after the pile has been driven to the desired depth, wherein said pile is provided with at least one pipe which is open at its ends, said pipe extending at least substantially along the length of the pile and being fixed to said pile.
  • Such a pipe fixed to the pile is used for supplying grout into the ground near the lower end of the pile while the pile is being driven into the ground, in such a manner that the pile is being provided with a grout envelope.
  • a lower end of a flexible pipe accommodated within the extension piece is connected to the upper end of the pipe that is fixed to the pile, and an upper end of the flexible pipe that freely extends within the lengthening piece is connected to a grout pump via a lead-through extending through the wall of the lengthening piece, with grout being forced into the ground through the open lower end of the pipe that is fixed to the pile, via the flexible pipe and the pipe fixed to the pile, by means of the grout pump during the pile-driving operation, and once the pile has been inserted into the ground to the desired depth, the lengthening piece together with the flexible pipe accommodated in the lengthening piece is pulled out of the ground, with the flexible pipe being pulled loose from the pipe that is fixed to the pile.
  • a suitable lengthening piece for implementing the method according to the invention is provided with a flexible pipe extending freely within the lengthening piece, which pipe is connected with one end to a lead-through extending through the wall of the lengthening piece.
  • Figure 1 schematically shows the insertion of a pile into the ground by means of a lengthening piece placed on the upper end of the pile.
  • Figure 2 is a sectional view of Figure 1 along the line I-I in Figure 2, showing the pile in a position turned through 90° relative to the position that is shown in Figure 1.
  • FIG 1 schematically shows a pile 1, which has been inserted into the ground to a position some distance below the ground level 3 by means of a lengthening piece 2.
  • a pile 1 of H-shaped section is used in the illustrated embodiment, but it will be understood that the method according to the invention can be carried out in the same manner with piles having a different sectional shape.
  • Two rigid pipes or tubes 4 having open ends are fixed to the pile 1, which pipes are intended for passing grout therethrough. Furthermore, a weighted foot 5 is connected to the lower end of the pile 1 in the illustrated embodiment.
  • a lengthening piece 2 placed on top of the pile 1 is used for driving the pile 1 into the ground to a position below the ground level, on the upper end of which lengthening piece a piling hammer 6 may act for driving the pile into the ground.
  • the lower end of the lengthening piece extends around the outer circumference of the pile 1 over some distance, for example a distance of 1 m, during the pile-driving operation, so that any attachments present at that location for subsequent anchoring of the pile or the like are protected during the pile-driving operation.
  • a closing plate 8 surrounding the pile 1, which may or may not be fixed to the lengthening piece, may be provided at the lower end of the lengthening piece for preventing soil entering the lengthening piece during the pile-driving operation.
  • a lead-through or bent tube 9 is passed through a hole formed in the wall of the lengthening piece 2 and fixed to the lengthening piece near the upper end of the lengthening piece.
  • a flexible pipe 11 is connected to the end of the lead-through 9 present in the interior of the lengthening piece 2 by means of a rubber buffer 10. As is shown in Figure 1, the flexible pipe 11 freely extends in downward directions within the lengthening piece 2. In addition to the flexible pipe 11 as shown, a second flexible pipe (not shown) will be provided in a similar manner. Said flexible pipes are passed through holes formed in the hammering plate 7.
  • the flexible pipes 11 are connected to the ends of the pipes 4 that are fixed to the pile 1, which pipes still extend above the ground level at that stage.
  • a hole 12 is formed in the wall of the lengthening piece at a position below the hammering plate 7, so that the lower ends of the flexible pipes 11 and the upper ends of the pipes 4 are accessible via said hole for connecting the pipes 11 to the pipes 4.
  • a further flexible pipe 14 is connected to the end of the lead-through 9 extending outside the lengthening piece 2 by means of a rubber buffer 13, which pipe 14 is connected to a grout pump 15 with its other end.
  • the other flexible pipe too, will be connected to the grout pump in a similar manner.
  • the lengthening piece 2 can be pulled out of the ground, during which operation the ends of the flexible pipes 11 are pulled off the pipes 4, with the flexible pipes 11 possibly being severed from ends of the pipes 11 that remain behind on the upper ends of the pipes 4.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A method for driving a pile (1) into the ground to a position below the ground level by means of a lengthening piece (2) which is pulled out of the ground after the pile has been driven to the desired depth. The pile is provided with at least one pipe which is open at its ends, said pipe extending at least substantially along the length of the pile and being fixed to said pile. A lower end of a flexible pipe (11) accommodated within the extension piece is connected to the upper end of the pipe that is fixed to the pile, and an upper end of the flexible pipe that freely extends within the lengthening piece is connected to a grout pump via a lead-through extending through the wall of the lengthening piece. Grout is forced into the ground through the open lower end of the pipe (4), via the flexible pipe (11) and the pipe (14) fixed to the pile, by means of the grout pump during the pile-driving operation. Once the pile has been inserted, the lengthening piece is pulled out of the ground.

Description

  • The invention rel ates to a method for driving a pile into the ground to a position below the ground level by means of a lengthening piece which is pulled out of the ground after the pile has been driven to the desired depth, wherein said pile is provided with at least one pipe which is open at its ends, said pipe extending at least substantially along the length of the pile and being fixed to said pile.
  • Such a pipe fixed to the pile is used for supplying grout into the ground near the lower end of the pile while the pile is being driven into the ground, in such a manner that the pile is being provided with a grout envelope.
  • When the pile is inserted into the ground in such a manner that the upper end of the pile is positioned near the ground level, such supplying of grout can generally take place without any problems. A problem arises, however, when the upper end of the pile is to be driven into the ground to a position some distance below the ground level by means of a so-called lengthening piece that is to be placed on the upper end of the pile.
  • According to the invention, a lower end of a flexible pipe accommodated within the extension piece is connected to the upper end of the pipe that is fixed to the pile, and an upper end of the flexible pipe that freely extends within the lengthening piece is connected to a grout pump via a lead-through extending through the wall of the lengthening piece, with grout being forced into the ground through the open lower end of the pipe that is fixed to the pile, via the flexible pipe and the pipe fixed to the pile, by means of the grout pump during the pile-driving operation, and once the pile has been inserted into the ground to the desired depth, the lengthening piece together with the flexible pipe accommodated in the lengthening piece is pulled out of the ground, with the flexible pipe being pulled loose from the pipe that is fixed to the pile.
  • The use of a flexible pipe in the lengthening piece, which is only connected to a lead-through extending through the wall of the lengthening piece with one end and which is connected to the pipe that is fixed to the pile with its other end prevents the flexible pipe being exposed to load variations during the pile-driving operation, which load variations may cause the connection between the pipe and the lengthening piece and even the pipe itself to fracture in those cases in which a rigid pipe fixed to the lengthening piece is used.
  • In accordance with the invention, a suitable lengthening piece for implementing the method according to the invention is provided with a flexible pipe extending freely within the lengthening piece, which pipe is connected with one end to a lead-through extending through the wall of the lengthening piece.
  • The invention will be explained in more detail hereinafter with reference to the accompanying schematic Figures.
  • Figure 1 schematically shows the insertion of a pile into the ground by means of a lengthening piece placed on the upper end of the pile.
  • Figure 2 is a sectional view of Figure 1 along the line I-I in Figure 2, showing the pile in a position turned through 90° relative to the position that is shown in Figure 1.
  • Figure 1 schematically shows a pile 1, which has been inserted into the ground to a position some distance below the ground level 3 by means of a lengthening piece 2. As is shown in particular in Figure 2, a pile 1 of H-shaped section is used in the illustrated embodiment, but it will be understood that the method according to the invention can be carried out in the same manner with piles having a different sectional shape.
  • Two rigid pipes or tubes 4 having open ends are fixed to the pile 1, which pipes are intended for passing grout therethrough. Furthermore, a weighted foot 5 is connected to the lower end of the pile 1 in the illustrated embodiment.
  • As already said before, a lengthening piece 2 placed on top of the pile 1 is used for driving the pile 1 into the ground to a position below the ground level, on the upper end of which lengthening piece a piling hammer 6 may act for driving the pile into the ground.
  • A hammering plate 7, which is supported on the upper end of the pile 1 during the pile-driving operation, is mounted in the lengthening piece 2 at a position some distance above the lower end of the lengthening piece. As a result of this arrangement, the lower end of the lengthening piece extends around the outer circumference of the pile 1 over some distance, for example a distance of 1 m, during the pile-driving operation, so that any attachments present at that location for subsequent anchoring of the pile or the like are protected during the pile-driving operation.
  • A closing plate 8 surrounding the pile 1, which may or may not be fixed to the lengthening piece, may be provided at the lower end of the lengthening piece for preventing soil entering the lengthening piece during the pile-driving operation.
  • A lead-through or bent tube 9 is passed through a hole formed in the wall of the lengthening piece 2 and fixed to the lengthening piece near the upper end of the lengthening piece.
  • The upper end of a flexible pipe 11 is connected to the end of the lead-through 9 present in the interior of the lengthening piece 2 by means of a rubber buffer 10. As is shown in Figure 1, the flexible pipe 11 freely extends in downward directions within the lengthening piece 2. In addition to the flexible pipe 11 as shown, a second flexible pipe (not shown) will be provided in a similar manner. Said flexible pipes are passed through holes formed in the hammering plate 7.
  • Before the pile 1 is driven into the ground to a position below the ground level 3, the flexible pipes 11 are connected to the ends of the pipes 4 that are fixed to the pile 1, which pipes still extend above the ground level at that stage. In order to enable said connecting of the lower ends of the flexible pipes 11 to the upper ends of the pipes 4, a hole 12 is formed in the wall of the lengthening piece at a position below the hammering plate 7, so that the lower ends of the flexible pipes 11 and the upper ends of the pipes 4 are accessible via said hole for connecting the pipes 11 to the pipes 4.
  • One end of a further flexible pipe 14 is connected to the end of the lead-through 9 extending outside the lengthening piece 2 by means of a rubber buffer 13, which pipe 14 is connected to a grout pump 15 with its other end. The other flexible pipe, too, will be connected to the grout pump in a similar manner.
  • While the pile 1 is being driven into a ground to a position some distance below the ground level, grout can be pumped to the lower end of the pile 1 by means of the grout pump 15 via the flexible pipes 14, the lead-throughs 9, the flexible pipes 11 and the pipes 4, as a result of which a grout envelope 16 is formed around the pile 1 in a manner which is known per se. Also as a result of the presence of the rubber buffers 10, 13, the flexible pipes 11 and 14 are capable of absorbing vibrations that occur during the pile-driving operation without any risk of fracturing.
  • Once the pile has been driven to the desired depth, the lengthening piece 2 can be pulled out of the ground, during which operation the ends of the flexible pipes 11 are pulled off the pipes 4, with the flexible pipes 11 possibly being severed from ends of the pipes 11 that remain behind on the upper ends of the pipes 4.

Claims (7)

  1. A method for driving a pile into the ground to a position below the ground level by means of a lengthening piece which is pulled out of the ground after the pile has been driven to the desired depth, wherein said pile is provided with at least one pipe which is open at its ends, said pipe extending at least substantially along the length of the pile and being fixed to said pile, characterized in that a lower end of a flexible pipe accommodated within the extension piece is connected to the upper end of the pipe that is fixed to the pile, and an upper end of the flexible pipe that freely extends within the lengthening piece is connected to a grout pump via a lead-through extending through the wall of the lengthening piece, with grout being forced into the ground through the open lower end of the pipe that is fixed to the pile, via the flexible pipe and the pipe fixed to the pile, by means of the grout pump during the pile-driving operation, and once the pile has been inserted into the ground to the desired depth, the lengthening piece together with the flexible pipe accommodated in the lengthening piece is pulled out of the ground, with the flexible pipe being pulled loose from the pipe that is fixed to the pile.
  2. A method according to claim 1, characterized in that the grout pump is connected to the lead-through extending through the wall of the lengthening piece by means of a flexible pipe.
  3. A method according to claim 1 or 2, characterized in that a flexible pipe is connected to the lead-through by means of a rubber buffer.
  4. A method according to any one of the preceding claims, characterized in that a closing element surrounding the pile and at least substantially closing the lower end of the lengthening piece is provided near the lower end of the lengthening piece.
  5. A lengthening piece provided with a flexible pipe extending loosely within said lengthening piece, which pipe is connected with one end to a lead-through extending through the wall of said lengthening piece.
  6. A lengthening piece according to claim 5, characterized in that a hammering plate is mounted in the lengthening piece at a position some distance above the lower end of the lengthening piece, which hammering plate is provided with a passage for passing the flexible pipe therethrough.
  7. A lengthening piece according to claim 5 or 6, characterized in that an opening is present in the wall of the lengthening piece near the lower end of said lengthening piece, via which opening the lower end of the flexible pipe present within the lengthening piece is accessible.
EP03077614A 2002-09-02 2003-08-21 Method for driving a pile and lengthening piece Withdrawn EP1394326A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL1021373A NL1021373C2 (en) 2002-09-02 2002-09-02 Method for driving a pile pile into the ground to below ground level and for use as a pick-up tool.
NL1021373 2002-09-02

Publications (1)

Publication Number Publication Date
EP1394326A1 true EP1394326A1 (en) 2004-03-03

Family

ID=31492959

Family Applications (1)

Application Number Title Priority Date Filing Date
EP03077614A Withdrawn EP1394326A1 (en) 2002-09-02 2003-08-21 Method for driving a pile and lengthening piece

Country Status (2)

Country Link
EP (1) EP1394326A1 (en)
NL (1) NL1021373C2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101498129B (en) * 2008-01-31 2011-04-27 黄秋生 Water-gas mixing jet apparatus for pile sinking
ITPD20120095A1 (en) * 2012-03-29 2013-09-30 Ennio Gechele PROCEDURE AND EQUIPMENT FOR REALIZING A FOUNDATION POLE
EP3269882A1 (en) * 2016-07-13 2018-01-17 Torsten Hug Pile driver
CN114482045A (en) * 2022-01-25 2022-05-13 建基建设集团有限公司 Section steel pile feeder
CN115288135A (en) * 2022-09-14 2022-11-04 浙江交工集团股份有限公司 Hydraulic pile sinking structure and construction method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114808837A (en) * 2022-04-14 2022-07-29 中国港湾工程有限责任公司 Lengthened sheet pile structure and sheet pile lengthening method for pipe plate combined pile wharf construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE221744C (en) *
DE432544C (en) * 1926-08-06 Siemens Bauunion G M B H Komm Device for flushing hollow piles
US1831209A (en) * 1927-11-02 1931-11-10 Western Foundation Company Method of and apparatus for making cast-in-place piles
DE1280160B (en) * 1965-12-09 1968-10-10 Starkstromanlagen Gemeinschaft Injection pile
DE3109236A1 (en) * 1981-03-11 1982-10-14 Brechtel Spezial-Tiefbau Johannes Brechtel Niederlassung der Heilit + Woerner Bau AG, 6700 Ludwigshafen Extendable driving section

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE221744C (en) *
DE432544C (en) * 1926-08-06 Siemens Bauunion G M B H Komm Device for flushing hollow piles
US1831209A (en) * 1927-11-02 1931-11-10 Western Foundation Company Method of and apparatus for making cast-in-place piles
DE1280160B (en) * 1965-12-09 1968-10-10 Starkstromanlagen Gemeinschaft Injection pile
DE3109236A1 (en) * 1981-03-11 1982-10-14 Brechtel Spezial-Tiefbau Johannes Brechtel Niederlassung der Heilit + Woerner Bau AG, 6700 Ludwigshafen Extendable driving section

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101498129B (en) * 2008-01-31 2011-04-27 黄秋生 Water-gas mixing jet apparatus for pile sinking
ITPD20120095A1 (en) * 2012-03-29 2013-09-30 Ennio Gechele PROCEDURE AND EQUIPMENT FOR REALIZING A FOUNDATION POLE
EP3269882A1 (en) * 2016-07-13 2018-01-17 Torsten Hug Pile driver
DE102016112832A1 (en) * 2016-07-13 2018-01-18 Torsten Hug Piledriver
CN114482045A (en) * 2022-01-25 2022-05-13 建基建设集团有限公司 Section steel pile feeder
CN115288135A (en) * 2022-09-14 2022-11-04 浙江交工集团股份有限公司 Hydraulic pile sinking structure and construction method thereof

Also Published As

Publication number Publication date
NL1021373C2 (en) 2004-03-03

Similar Documents

Publication Publication Date Title
US7338233B2 (en) Soil nail and method of installing a subsurface support
JPH11510574A (en) Method of putting ground anchor in the ground and anchor used for it
EP1394326A1 (en) Method for driving a pile and lengthening piece
KR100712191B1 (en) Apparatus and method for driving pile by pile anchor and winch
JP4901593B2 (en) Underground bite type anchor and its anchor method
US11359344B2 (en) Barbed micropiles for soil reinforcement
JP4430975B2 (en) Grounding device construction method
US20050135882A1 (en) Method and apparatus for creating soil or rock subsurface support
JP2934795B2 (en) Anchor material
KR101624897B1 (en) A foundation pile
US10233607B2 (en) Comprehensive excavation process
JP2009046881A (en) Pile head structure of double tube type
JPH09111758A (en) Cast-in-place concrete pile and construction method thereof
KR100930541B1 (en) Slope reinforcement device and method
JP3659643B1 (en) Seismic ground anchor bolt
JP2001207452A (en) Method for burying pipe
KR100859974B1 (en) Pile and piling method thereof
KR100717252B1 (en) Grouting apparatus and Method of construction work using Earth anchor
JP5145757B2 (en) Ground reinforcement structure, construction method of ground reinforcement structure
US10072390B2 (en) Tubular foundation element, assembly and method for installing tubular foundation elements in a ground formation
JP6588117B2 (en) Foundation pile and its construction method
JP4354373B2 (en) Construction method for inclined concrete piles
JP2873335B2 (en) Permanent ground anchor and its installation method
JP2001146745A (en) Method and device for pulling out pile
JP2964406B1 (en) Driving protection device for protective fence post

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL LT LV MK

17P Request for examination filed

Effective date: 20040902

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

17Q First examination report despatched

Effective date: 20041125

RTI1 Title (correction)

Free format text: METHOD FOR DRIVING A PILE AND LENGTHENING PIECE FOR IMPLEMENTING THE METHOD

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20061116