EP1380691B1 - Wide channel drainage system - Google Patents

Wide channel drainage system Download PDF

Info

Publication number
EP1380691B1
EP1380691B1 EP03101666A EP03101666A EP1380691B1 EP 1380691 B1 EP1380691 B1 EP 1380691B1 EP 03101666 A EP03101666 A EP 03101666A EP 03101666 A EP03101666 A EP 03101666A EP 1380691 B1 EP1380691 B1 EP 1380691B1
Authority
EP
European Patent Office
Prior art keywords
channel
projections
section
pipe portion
channel section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP03101666A
Other languages
German (de)
French (fr)
Other versions
EP1380691A3 (en
EP1380691A2 (en
Inventor
David Charles Albone
Andrew William Young
Martin Fairley
Peter Alexander Jennings
Robert James King
Walter Summerhill Mcintyre
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ACO Ahlmann SE and Co KG
Original Assignee
ACO Severin Ahlmann GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=9940188&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP1380691(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by ACO Severin Ahlmann GmbH and Co KG filed Critical ACO Severin Ahlmann GmbH and Co KG
Priority to DK07121155.1T priority Critical patent/DK1887137T3/en
Priority to EP07121155A priority patent/EP1887137B1/en
Publication of EP1380691A2 publication Critical patent/EP1380691A2/en
Publication of EP1380691A3 publication Critical patent/EP1380691A3/en
Application granted granted Critical
Publication of EP1380691B1 publication Critical patent/EP1380691B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • E03F3/046Open sewage channels
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/227Gutters; Channels ; Roof drainage discharge ducts set in sidewalks

Definitions

  • the present invention relates to channel drainage systems, and more specifically to high capacity channels typically referred to as wide channel drainage systems.
  • GB-A-2 229 212 One such drainage system is provided by Hodkin & Jones Sheffield Ltd and is described in GB-A-2 229 212 .
  • This provides an open channel member made of glass fibre reinforced concrete, which is anchored into a concrete backfill surrounding the channel in use by means of a framework of reinforcing bars.
  • This type of channel member is intended to be used with a separate lid.
  • the lid As described in GB-A-2 316 428 and GB -A-2 347 707 (Hodkin & Jones), the lid provides a number of projections that terminate in slots extending transverse to the direction of the channel in the surface. Water enters the channel through these transverse slots. The hydraulic efficiency of wide, transverse slots in collecting water from the surface is not great. In storm situations the water may be carried over the slots.
  • This type of drainage channel is intended for use in areas where there is a heavy surface loading from vehicles. It is therefore necessary to provide for reinforcement of the concrete slab covering the channel.
  • the slab reinforcement is provided by a specially designed, manufacturer supplied, reinforcing bar network, which is shaped to co-operate with the projections in the lid. This is a relatively expensive solution.
  • GB-A- 1 456 021 (Chatham De Leeuw Ltd).
  • This describes a pipe that has a series of tubes each arranged to project upwards from the pipe to a point above the surface level and opening into the pipe for drainage flow. Material is then laid over the pipe, with the upper ends of the tubes projecting from the surface. The tubes are moulded with closed ends which are then cut to expose drainage holes.
  • a commercial system of this general type is sold by Marshalls Mono Ltd under the registered trade mark PORCUPIPE.
  • This provides a drainage channel section comprising a longitudinally extending pipe portion and a plurality of longitudinally spaced hollow projections communicating with the pipe portion and is the basis of the preamble of the claims. As with the Hodkin & Jones designs this provides discrete water entry points and provides limited hydraulic efficiency. However the small projecting tubes present relatively little interference with the necessary slab reinforcement.
  • a similar metal system is produced by Elkington Gatic and is described further in GB-A-2 311 549 . It provides a slot drain comprising a polygonal channel portion and a throat portion, the throat portion consisting of two walls extending upwardly from the channel portion to create a slot drain.
  • AU-B-733361 discloses a drainage system with a surface channel in fluid communication with a pipe line via a series of downpipes.
  • the present invention provides a drainage channel section comprising a longitudinally extending pipe portion, a plurality of longitudinally spaced hollow projections communicating with the pipe portion, characterised in that a longitudinal channel is supported by and communicates with the projections and defines a continuous longitudinal slot that lies in use in a surface to be drained.
  • the present invention provides a drainage channel section comprising a longitudinally extending pipe portion, a plurality of longitudinally spaced hollow projections communicating with the pipe portion, characterised in that a plurality of longitudinally extending channel sections are supported by and communicate with the projections in order to define when installed in a surface to be drained a continuous longitudinal slot that lies in a surface to be drained.
  • Supporting a slot drain on a series of projections provides a convenient means of enabling slab reinforcement to pass between the projections and ensures that a continuous reinforcement is provided when the channel sections are embedded.
  • This system therefore has the advantages of high hydraulic capacity and efficiency of the Zurn and Elkington Gatic systems without creating weakness in the load bearing slab.
  • the system is easy to install without the alignment problems of Hodkin & Jones two part channels.
  • a reinforcing mesh can be slid through the channel. This enables the slab covering the channel section to have two dimensional reinforcement. Where the channel is continuous reinforcing rods are preferably installed through arched openings defined between the projections.
  • a high capacity drainage system is intended to be constructed from interconnected plastics channel sections 2 which are laid out in an appropriate configuration before being embedded in concrete.
  • the channel sections serve as a liner in use.
  • the load is borne by a reinforced top slab incorporated during installation of the system.
  • Each channel section 2 may be rotationally moulded from medium density polyethylene (MDPE).
  • MDPE medium density polyethylene
  • Two basic designs of channel section are offered as illustrated in Figures 1 and 2. These may be provided in differing cross sectional sizes depending on the capacity required.
  • the channel sections are preferably constructed having a mean ovoid size of 900mm deep by 600mm wide. A smaller system may be provided with a size of 600mm x 400mm.
  • the basic channel section is illustrated in Figure 1 and is preferably a two metre standard length.
  • Figure 2 shows a one metre back-inlet channel section variant which has a spigot 4 with three knock-outs enabling connections with a 150mm, 225mm and 300mm diameter plastics, clay and concrete pipes.
  • Each channel section 2 comprises a generally ovoid pipe portion 6 having open end faces 8, 10 so that the sections 2 can be butted together.
  • Laterally extending flanges 12 are provided at either side each end face 8 and 10. These flanges define a level base 14 and are provided with holes 16 so that the channel sections can be levelled by means of coarsely screwed feet passing through holes 16 to rest on a base of a trench during installation. Ribs 20 are formed around the pipe portion 6 on its external surface in order to provide greater structural rigidity to the channel section 2 and to grip the surrounding concrete when the channel section 2 is embedded.
  • the female end face 8 is indented to provide a deep groove 60
  • the male end face 10 has a lip 62 which slots into the groove 60
  • both end faces 8 and 10 are formed with double skinned wings 50.
  • the end faces 8 and 10 are further described and claimed in UK patent application No 0312464.1 filed on 30 May 2003 . Other forms of connection between the sections may be employed.
  • the pipe portions 6 will preferably be produced in one and two metre lengths.
  • the longer sections 2 have a longitudinal rib 54 along the length of the pipe portion 6 positioned approximately 200mm from the invert of the ovoid channel section 2 in order to increase longitudinal stiffness and to act as a guide for the level of an initial concrete pour.
  • a series of hollow projections 22 that support a longitudinal slot channel 24 that terminates in an open slot 26 adapted to be located in a horizontal surface plane in use such that water entering the slot 26 passes down through the projections 22 into the pipe portion 6.
  • Each projection 22 has a base 30 which merges into a wall of the pipe portion 6 as best illustrated in Figure 3.
  • the base 30 extends circumferentially around the ovoid pipe portion 6.
  • the hollow projection 22 extends from its base 30 it tapers towards the narrower longitudinal channel 24.
  • the channel 24 has side walls 32 that merge with side walls 34 of each projection.
  • the base of the channel 24 is effectively defined by openings into the hollow projections 22 and intermediate arch sections 38 bridging the gaps between adjacent projections. This configuration directs water flow into the hollow interior of the projections 22.
  • Each projection 22 has two parallel transverse faces 40 that each taper from the base 30 of the projection towards the channel 24. These transverse faces 40 merge with the arch sections 38 so that in between each pair of projections 22 there is effectively defined an arched opening 42 as best seen in Figures 6 and 7.
  • FIG. 2 An identical, but shorter slot channel 24 supported on fewer projections 22 is provided on the Figure 2 channel section.
  • the shorter Figure 2 section is provided with a spigot to enable fitting of lateral pipes of various diameters.
  • rebar supports 56 are disposed externally either side of the base 30 of the hollow projections 22. These rebar supports 56 ensure that longitudinal reinforcement bars can be fitted parallel to the channel 24 and be located in the correct design location. The rebar supports 56 are positioned so that rebars held by them are also supported on upper surfaces of the wings 50 and are therefore retained at the correct level along the length of the channel.
  • the slot 26 can also support a rail 58 or metal edge structure, particularly for airport applications for added security.
  • the rail 58 carries tangs 52 to anchor it into the surrounding concrete during installation.
  • a heel guard grating structure may be mounted on the slot.
  • a ring shaped water seal (not shown) is fitted between end faces 8 and 10 of adjacent channel sections 2 to form a seal.
  • the water seal is placed in the groove 60 provided in the female end face 8, the lip 62 on the male end face 10 of an adjacent pipe portion 6 slots into the groove 60 and abuts against the water seal.
  • the seal may be made of rubber, neoprene or ethylene propylene diene monomer (EPDM) which is highly resistant to water.
  • EPDM ethylene propylene diene monomer
  • the seal is preferably a donut section with a hollow centre to allow easy compressibility to absorb tolerance variations on length. Alternative sealing means may be used.
  • the channel section 2 By moulding the channel section 2 in one piece complete with projections 22 and slot channel 24, this minimises component count and loose items on site as well as creating a stiffer integrated monolithic structure. Alignment problems during installation are also avoided. However, the invention also encompasses a fabricated two part construction as described below.
  • the wide channel system is generally installed by the method outlined below, although variations can be made by contractors to suit their particular circumstances.
  • the trenches are dug and channel restraining straps are laid in the trench with free ends left extending over either side.
  • the channels are preferably hung from the top of the trench by the straps or other supporting arrangements via the metal inlet slot edge in order that they do not rest on the base of the trench.
  • These straps are plastics webbing straps that are fitted with buckles to allow them to be fastened around the channel sections.
  • holes 16 are provided through which coarse screws may passed in order to adjust and level the assembly against the base of the trenches. Straps are also passed through the arched openings 42 to hold the channel in position in order to prevent flotation during the final concrete pour. A layer of base concrete is then laid in the trench to secure the straps.
  • the rib 54 provides a guide to the depth for this initial concrete pour. Excess concrete poured at this stage would lead to problems in inserting the reinforcement and/or too much up-thrust due to excessive buoyancy of the channel produced by the wet concrete during this first pour.
  • the channel sections 2 are assembled end to end to provide the required drainage channel configuration and arranged in the trench.
  • Reinforcing mesh is then positioned around the channel and loose bars passed through the openings 42 so that the concrete slab formed over the channel section is continuously reinforced.
  • a blanking rod is placed in the channel 24 to prevent ingress of wet concrete into the channel and into the hollow interior of the channel section 2 during installation.
  • FIG. 8 A second embodiment of the channel sections 2 of Figures 1 and 2 is shown in Figures 8 and 9. Like reference numerals are used to designate like parts.
  • the channel 24 is notched at a centre point of each arch section 38 to provide a small gap 46 through which reinforced mesh fabric can be placed down over the channel section to rest within the arched openings 42.
  • the gaps 46 allow the mesh to slide through whilst still leaving a continuous slot 26 in the surface to be drained. This may require placing a blanking rod in the channel 24 during the final pour to prevent concrete flowing into the channel 24 through the gaps 46. If the gaps are sufficiently fine so that they can effectively close again once the mesh has been pushed through, this may not be necessary.
  • This second embodiment of the channel section 2 can also be used with loose rod reinforcements as with the first embodiment. However these may be pushed down through the gaps 46 instead of being slid through the arched openings transverse the longitudinal direction of the channel section 2.
  • a galvanised or stainless steel slotted rail 58 as shown in Figure 2 is applied above the plastic slot 26.
  • This rail 58 is fitted like a saddle over the slot (which may be notched as described above) once the reinforcement has been put in place and secured using suitable fixings to maintain mechanical alignment.
  • the rail 58 is slotted to allow fluid access to the projections 22. Alternatively it may comprise two sections of hot or cold rolled steel angle iron placed back to back with suitable spacers welded in place to maintain the slot geometry.
  • the rail 58 or steel sections may be assembled to the channel section 2 at the factory so that they butt one another when the sections assembled.
  • the rail 58 may be fitted to the assembled sections on site by means of a suitable clamp mechanism. In this way the rail sections 58 may be longer than the channel sections 2 and will aid proper alignment of the sections 2.
  • Heavy duty concrete anchors are provided at approximately 500 metres centres on the sides of the angle iron not facing the slot 26 and below the surface.
  • the steel rail 58 or safety edge fabrication may be hot dipped galvanised for corrosion protection. When the final concrete pour is made the concrete anchors are buried deep into the concrete haunch to ensure the assembly stays in place at all times.
  • Such a rail 58 or steel edge is better able to withstand the demands placed on the surface where aircraft towing tractors can achieve wheel loads in excess of 30 tonnes or where jet-blast may aggravate the paved surface.
  • the embodiments described are moulded of plastics as a one piece unit. It is also possible to fabricate the sections 2 from upper and lower parts.
  • the lower part may be any suitable U shaped drainage channel section of polymer concrete, plastics material, galvanised steel or ceramic construction.
  • the upper part requires the arched inlet arrangement and is preferably moulded of plastics material with a suitable lower edge formation to mate with the lower part. Preferably the parts are fabricated together off-site.

Abstract

A wide channel drainage system is constructed from one-piece plastics liner channel sections (2). Each section (2) defines a pipe portion (6) and hollow projections (22) that support a channel (24) having a slot (26) opening into the surface to be drained. The size and spacing of the projections (22) are such as to allow loose reinforcement bars to be seated in arched openings (42) defined between the projections (22). The channel (24) may be notched to allow a reinforcing mesh to be slid through the slot channel (24) into the openings (42).

Description

    Background of the Invention
  • The present invention relates to channel drainage systems, and more specifically to high capacity channels typically referred to as wide channel drainage systems.
  • Technical Background
  • Robust drainage channels with a high hydraulic capacity are required for surface drainage in large areas such as distribution centres, car parks and airports.
  • One such drainage system is provided by Hodkin & Jones Sheffield Ltd and is described in GB-A-2 229 212 . This provides an open channel member made of glass fibre reinforced concrete, which is anchored into a concrete backfill surrounding the channel in use by means of a framework of reinforcing bars. This type of channel member is intended to be used with a separate lid. As described in GB-A-2 316 428 and GB -A-2 347 707 (Hodkin & Jones), the lid provides a number of projections that terminate in slots extending transverse to the direction of the channel in the surface. Water enters the channel through these transverse slots. The hydraulic efficiency of wide, transverse slots in collecting water from the surface is not great. In storm situations the water may be carried over the slots.
  • A number of technical problems are encountered in the installation of such systems.
  • With the Hodkin & Jones system, these are created by the need to align the lids on the channels and ensure that the top of the lid is aligned with the finished surface level. GB - A- 2 316 428 suggests that by forming the lid and the channel in a single unit, the problems of locating the lid relative to the channel in situ are avoided. However, apart from suggesting that the separate concrete lid and channel are bonded together, there is no teaching of how such a single unit might be achieved.
  • This type of drainage channel is intended for use in areas where there is a heavy surface loading from vehicles. It is therefore necessary to provide for reinforcement of the concrete slab covering the channel. In the system proposed by Hodkin & Jones Sheffield Ltd, the slab reinforcement is provided by a specially designed, manufacturer supplied, reinforcing bar network, which is shaped to co-operate with the projections in the lid. This is a relatively expensive solution.
  • An alternative design of drainage system is described in GB-A- 1 456 021 (Chatham De Leeuw Ltd). This describes a pipe that has a series of tubes each arranged to project upwards from the pipe to a point above the surface level and opening into the pipe for drainage flow. Material is then laid over the pipe, with the upper ends of the tubes projecting from the surface. The tubes are moulded with closed ends which are then cut to expose drainage holes. A commercial system of this general type is sold by Marshalls Mono Ltd under the registered trade mark PORCUPIPE. This provides a drainage channel section comprising a longitudinally extending pipe portion and a plurality of longitudinally spaced hollow projections communicating with the pipe portion and is the basis of the preamble of the claims. As with the Hodkin & Jones designs this provides discrete water entry points and provides limited hydraulic efficiency. However the small projecting tubes present relatively little interference with the necessary slab reinforcement.
  • It is acknowledged that line drainage is more efficient than point drainage arrangements. Solutions of this type are proposed by Zurn Industries, Inc in US-A- 6 000 881 , which shows a plastics channel section including a narrow throat drain. Protuberances are provided to secure the channel section into the material in which it is embedded. Support rods and reinforcing rods can also be fixed to the section.
  • A similar metal system is produced by Elkington Gatic and is described further in GB-A-2 311 549 . It provides a slot drain comprising a polygonal channel portion and a throat portion, the throat portion consisting of two walls extending upwardly from the channel portion to create a slot drain.
  • In both these designs there is improved hydraulic efficiency relative to Hodkin & Jones or the Chatham De Leeuw point drainage systems. However the slabs of concrete at either side of the slot are cantilevered out over the channel section and this results in a significant risk of loading damage in this area, especially in the case of plastics channel sections that are clearly not capable of bearing any significant load.
  • AU-B-733361 discloses a drainage system with a surface channel in fluid communication with a pipe line via a series of downpipes.
  • Solution of the Invention
  • Accordingly, the present invention provides a drainage channel section comprising a longitudinally extending pipe portion, a plurality of longitudinally spaced hollow projections communicating with the pipe portion, characterised in that a longitudinal channel is supported by and communicates with the projections and defines a continuous longitudinal slot that lies in use in a surface to be drained.
  • Alternatively, the present invention provides a drainage channel section comprising a longitudinally extending pipe portion, a plurality of longitudinally spaced hollow projections communicating with the pipe portion, characterised in that a plurality of longitudinally extending channel sections are supported by and communicate with the projections in order to define when installed in a surface to be drained a continuous longitudinal slot that lies in a surface to be drained.
  • Supporting a slot drain on a series of projections provides a convenient means of enabling slab reinforcement to pass between the projections and ensures that a continuous reinforcement is provided when the channel sections are embedded. This system therefore has the advantages of high hydraulic capacity and efficiency of the Zurn and Elkington Gatic systems without creating weakness in the load bearing slab. The system is easy to install without the alignment problems of Hodkin & Jones two part channels.
  • In embodiments where the longitudinal channel has gaps between adjacent sections or is notched between at least some projections, a reinforcing mesh can be slid through the channel. This enables the slab covering the channel section to have two dimensional reinforcement. Where the channel is continuous reinforcing rods are preferably installed through arched openings defined between the projections.
  • Other features and aspects of the invention are defined in the appended claims.
  • Brief Description of the Drawings
  • In order that the invention may be well understood, some embodiments thereof will now be described, by way of example only, with reference to the accompanying diagrammatic drawings, in which:
  • Figure 1
    shows a perspective view of a channel section in accordance with the invention;
    Figure 2
    shows a perspective view of a channel section provided with means for creating a lateral connection and with a fitted metal rail;
    Figure 3
    shows a perspective view of a detail of a longitudinal slot channel and supporting projections of the channel section of Figure 1 or 2;
    Figure 4
    shows an end view detail of the slot channel and projections of Figure 1 or 2;
    Figure 5
    shows a top plan view of the slot channel and projections of Figure 3;
    Figure 6
    shows a side view of the slot channel and projections of Figure 1 or 2;
    Figure 7
    shows a section through the slot channel and projections shown in Figure 6;
    Figure 8
    shows a perspective view of a second embodiment of a channel section; and
    Figure 9
    shows a perspective view of a second embodiment of a channel section provided with means for creating a lateral connection.
    Description of a Preferred Embodiment
  • A high capacity drainage system is intended to be constructed from interconnected plastics channel sections 2 which are laid out in an appropriate configuration before being embedded in concrete. The channel sections serve as a liner in use. The load is borne by a reinforced top slab incorporated during installation of the system.
  • Each channel section 2 may be rotationally moulded from medium density polyethylene (MDPE). Two basic designs of channel section are offered as illustrated in Figures 1 and 2. These may be provided in differing cross sectional sizes depending on the capacity required. The channel sections are preferably constructed having a mean ovoid size of 900mm deep by 600mm wide. A smaller system may be provided with a size of 600mm x 400mm. The basic channel section is illustrated in Figure 1 and is preferably a two metre standard length. Figure 2 shows a one metre back-inlet channel section variant which has a spigot 4 with three knock-outs enabling connections with a 150mm, 225mm and 300mm diameter plastics, clay and concrete pipes.
  • Each channel section 2 comprises a generally ovoid pipe portion 6 having open end faces 8, 10 so that the sections 2 can be butted together.
  • Laterally extending flanges 12 are provided at either side each end face 8 and 10. These flanges define a level base 14 and are provided with holes 16 so that the channel sections can be levelled by means of coarsely screwed feet passing through holes 16 to rest on a base of a trench during installation. Ribs 20 are formed around the pipe portion 6 on its external surface in order to provide greater structural rigidity to the channel section 2 and to grip the surrounding concrete when the channel section 2 is embedded.
  • The female end face 8 is indented to provide a deep groove 60, the male end face 10 has a lip 62 which slots into the groove 60, both end faces 8 and 10 are formed with double skinned wings 50. The end faces 8 and 10 are further described and claimed in UK patent application No 0312464.1 filed on 30 May 2003 . Other forms of connection between the sections may be employed.
  • The pipe portions 6 will preferably be produced in one and two metre lengths.
  • As shown in Figure 1, the longer sections 2 have a longitudinal rib 54 along the length of the pipe portion 6 positioned approximately 200mm from the invert of the ovoid channel section 2 in order to increase longitudinal stiffness and to act as a guide for the level of an initial concrete pour.
  • Along the upper surface of the pipe portion 6, there are provided a series of hollow projections 22 that support a longitudinal slot channel 24 that terminates in an open slot 26 adapted to be located in a horizontal surface plane in use such that water entering the slot 26 passes down through the projections 22 into the pipe portion 6.
  • Each projection 22 has a base 30 which merges into a wall of the pipe portion 6 as best illustrated in Figure 3. The base 30 extends circumferentially around the ovoid pipe portion 6. In a vertical section transverse to the longitudinal direction of the channel section, the hollow projection 22 extends from its base 30 it tapers towards the narrower longitudinal channel 24. The channel 24 has side walls 32 that merge with side walls 34 of each projection.
  • The base of the channel 24 is effectively defined by openings into the hollow projections 22 and intermediate arch sections 38 bridging the gaps between adjacent projections. This configuration directs water flow into the hollow interior of the projections 22.
  • Each projection 22 has two parallel transverse faces 40 that each taper from the base 30 of the projection towards the channel 24. These transverse faces 40 merge with the arch sections 38 so that in between each pair of projections 22 there is effectively defined an arched opening 42 as best seen in Figures 6 and 7.
  • An identical, but shorter slot channel 24 supported on fewer projections 22 is provided on the Figure 2 channel section. The shorter Figure 2 section is provided with a spigot to enable fitting of lateral pipes of various diameters.
  • In the longer lengths of pipe section 6 two pairs of rebar supports 56 are disposed externally either side of the base 30 of the hollow projections 22. These rebar supports 56 ensure that longitudinal reinforcement bars can be fitted parallel to the channel 24 and be located in the correct design location. The rebar supports 56 are positioned so that rebars held by them are also supported on upper surfaces of the wings 50 and are therefore retained at the correct level along the length of the channel.
  • The slot 26 can also support a rail 58 or metal edge structure, particularly for airport applications for added security. The rail 58 carries tangs 52 to anchor it into the surrounding concrete during installation.
  • Where the system is intended to be used in a car park with asphalt or block pavior wearing courses, a heel guard grating structure may be mounted on the slot.
  • A ring shaped water seal (not shown) is fitted between end faces 8 and 10 of adjacent channel sections 2 to form a seal. The water seal is placed in the groove 60 provided in the female end face 8, the lip 62 on the male end face 10 of an adjacent pipe portion 6 slots into the groove 60 and abuts against the water seal. The seal may be made of rubber, neoprene or ethylene propylene diene monomer (EPDM) which is highly resistant to water. The seal is preferably a donut section with a hollow centre to allow easy compressibility to absorb tolerance variations on length. Alternative sealing means may be used.
  • By moulding the channel section 2 in one piece complete with projections 22 and slot channel 24, this minimises component count and loose items on site as well as creating a stiffer integrated monolithic structure. Alignment problems during installation are also avoided. However, the invention also encompasses a fabricated two part construction as described below.
  • Installation
  • The wide channel system is generally installed by the method outlined below, although variations can be made by contractors to suit their particular circumstances.
  • The trenches are dug and channel restraining straps are laid in the trench with free ends left extending over either side. The channels are preferably hung from the top of the trench by the straps or other supporting arrangements via the metal inlet slot edge in order that they do not rest on the base of the trench. These straps are plastics webbing straps that are fitted with buckles to allow them to be fastened around the channel sections. Alternatively, however, holes 16 are provided through which coarse screws may passed in order to adjust and level the assembly against the base of the trenches. Straps are also passed through the arched openings 42 to hold the channel in position in order to prevent flotation during the final concrete pour. A layer of base concrete is then laid in the trench to secure the straps. The rib 54 provides a guide to the depth for this initial concrete pour. Excess concrete poured at this stage would lead to problems in inserting the reinforcement and/or too much up-thrust due to excessive buoyancy of the channel produced by the wet concrete during this first pour. The channel sections 2 are assembled end to end to provide the required drainage channel configuration and arranged in the trench.
  • Reinforcing mesh is then positioned around the channel and loose bars passed through the openings 42 so that the concrete slab formed over the channel section is continuously reinforced. A blanking rod is placed in the channel 24 to prevent ingress of wet concrete into the channel and into the hollow interior of the channel section 2 during installation.
  • Variations
  • A second embodiment of the channel sections 2 of Figures 1 and 2 is shown in Figures 8 and 9. Like reference numerals are used to designate like parts.
  • In this variant, the channel 24 is notched at a centre point of each arch section 38 to provide a small gap 46 through which reinforced mesh fabric can be placed down over the channel section to rest within the arched openings 42. The gaps 46 allow the mesh to slide through whilst still leaving a continuous slot 26 in the surface to be drained. This may require placing a blanking rod in the channel 24 during the final pour to prevent concrete flowing into the channel 24 through the gaps 46. If the gaps are sufficiently fine so that they can effectively close again once the mesh has been pushed through, this may not be necessary.
  • This second embodiment of the channel section 2 can also be used with loose rod reinforcements as with the first embodiment. However these may be pushed down through the gaps 46 instead of being slid through the arched openings transverse the longitudinal direction of the channel section 2.
  • In airport installations, it is imperative that there should be no loose components or fragments of pavements and/or drainage products that could be drawn into aircraft engines on the surface. Therefore, a galvanised or stainless steel slotted rail 58 as shown in Figure 2 is applied above the plastic slot 26. This rail 58 is fitted like a saddle over the slot (which may be notched as described above) once the reinforcement has been put in place and secured using suitable fixings to maintain mechanical alignment. The rail 58 is slotted to allow fluid access to the projections 22. Alternatively it may comprise two sections of hot or cold rolled steel angle iron placed back to back with suitable spacers welded in place to maintain the slot geometry.
  • The rail 58 or steel sections may be assembled to the channel section 2 at the factory so that they butt one another when the sections assembled. To overcome the problem of alignment for continuity of the slot 26, the rail 58 may be fitted to the assembled sections on site by means of a suitable clamp mechanism. In this way the rail sections 58 may be longer than the channel sections 2 and will aid proper alignment of the sections 2.
  • Heavy duty concrete anchors are provided at approximately 500 metres centres on the sides of the angle iron not facing the slot 26 and below the surface. The steel rail 58 or safety edge fabrication may be hot dipped galvanised for corrosion protection. When the final concrete pour is made the concrete anchors are buried deep into the concrete haunch to ensure the assembly stays in place at all times. Such a rail 58 or steel edge is better able to withstand the demands placed on the surface where aircraft towing tractors can achieve wheel loads in excess of 30 tonnes or where jet-blast may aggravate the paved surface.
  • Other fittings or gratings may also be supported on top of the slot as required.
  • Fabricated Construction
  • The embodiments described are moulded of plastics as a one piece unit. It is also possible to fabricate the sections 2 from upper and lower parts. The lower part may be any suitable U shaped drainage channel section of polymer concrete, plastics material, galvanised steel or ceramic construction. The upper part requires the arched inlet arrangement and is preferably moulded of plastics material with a suitable lower edge formation to mate with the lower part. Preferably the parts are fabricated together off-site.

Claims (7)

  1. A drainage channel section (2) comprising a longitudinally extending pipe portion (6), a plurality of longitudinally spaced hollow projections (22) communicating with the pipe portion (6) and a longitudinal channel (24), wherein said longitudinal channel (24) communicates with the projections (22) and defines a longitudinal slot (26) that lies in use in a surface to be drained, characterised in that said longitudinal channel (24) is supported by said projections (22).
  2. A drainage channel section as claimed in claim 1, characterised in that the longitudinal channel (24) is notched between at least some of the projections (22), the notch (24) providing a gap (46) arranged to allow a reinforcing mesh or loose bars to be slid through the channel.
  3. A drainage channel section (2) according to claim 1 or claim 2 in which the longitudinal channel (24) comprises a plurality of longitudinally extending channel sections which, when installed in a surface to be drained, define said continuous longitudinal slot (26) that lies in a surface to be drained.
  4. A drainage channel section as claimed in any one of the preceding claims, characterised in that it is moulded of plastics material as a single unit.
  5. A drainage channel section as claimed in any one of the preceding claims, characterised in that it is fabricated from upper and lower parts.
  6. A drainage channel section as claimed in any one of the preceding claims, characterised in that the hollow projections (22) each have a base (30) which merges with the pipe portion (6) and extends circumferentially around the pipe portion (6), each projection (22, 40) tapering towards the supported channel (24).
  7. A drainage channel section as claimed in any one of the preceding claims, characterised in that the pipe portion (6) has an ovoid cross section.
EP03101666A 2002-07-10 2003-06-06 Wide channel drainage system Expired - Lifetime EP1380691B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DK07121155.1T DK1887137T3 (en) 2002-07-10 2003-06-06 Wide drainage system
EP07121155A EP1887137B1 (en) 2002-07-10 2003-06-06 Wide Channel Drainage System

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB0215979A GB2390630B (en) 2002-07-10 2002-07-10 Wide channel drainage system
GB0215979 2002-07-10

Related Child Applications (1)

Application Number Title Priority Date Filing Date
EP07121155A Division EP1887137B1 (en) 2002-07-10 2003-06-06 Wide Channel Drainage System

Publications (3)

Publication Number Publication Date
EP1380691A2 EP1380691A2 (en) 2004-01-14
EP1380691A3 EP1380691A3 (en) 2004-12-15
EP1380691B1 true EP1380691B1 (en) 2007-11-21

Family

ID=9940188

Family Applications (2)

Application Number Title Priority Date Filing Date
EP07121155A Expired - Lifetime EP1887137B1 (en) 2002-07-10 2003-06-06 Wide Channel Drainage System
EP03101666A Expired - Lifetime EP1380691B1 (en) 2002-07-10 2003-06-06 Wide channel drainage system

Family Applications Before (1)

Application Number Title Priority Date Filing Date
EP07121155A Expired - Lifetime EP1887137B1 (en) 2002-07-10 2003-06-06 Wide Channel Drainage System

Country Status (7)

Country Link
EP (2) EP1887137B1 (en)
AT (1) ATE541093T1 (en)
DE (2) DE20321869U1 (en)
DK (1) DK1887137T3 (en)
ES (2) ES2295512T3 (en)
GB (1) GB2390630B (en)
PT (2) PT1887137E (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2402152B (en) * 2003-05-30 2005-08-17 Aco Technologies Plc Drain sealing
GB2406351B (en) * 2003-09-23 2008-04-02 Aco Technologies Plc Surface drainage arrangement
GB2438269A (en) * 2003-10-03 2007-11-21 Aco Technologies Plc Drainage channel section
GB2406602B (en) * 2003-10-03 2008-05-14 Aco Technologies Plc Surface drainage
GB2411194B (en) * 2004-02-17 2006-06-21 Aco Technologies Plc Drainage system flow regulation
DE202005004634U1 (en) 2005-03-22 2005-06-09 Hauraton Betonwarenfabrik Gmbh & Co Kg Retention channel module
EP2520728A1 (en) * 2011-05-02 2012-11-07 Hauraton GmbH & Co. KG Inlet module and method for forming a line run of a drainage device
GB2577100B (en) * 2018-09-14 2021-03-17 Tubosider United Kingdom Ltd Slot drain
WO2020169215A1 (en) 2019-02-21 2020-08-27 Aco Severin Ahlmann Gmbh & Co. Kg Drainage system, drainage units, and methods

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE350461A (en) 1928-04-30
GB1456021A (en) * 1973-11-05 1976-11-17 Chatham De Leeuw Ltd Method of making a drained floor
US4490067A (en) * 1981-12-17 1984-12-25 Quaker Plastic Corporation Modular drain system
GB8617668D0 (en) * 1986-07-18 1986-08-28 Austin G E Surface water slot drain throat
DE3700883A1 (en) * 1987-01-14 1988-07-28 Bonex Epitoeipari Koezoes Vall Method of renewing linear underground structures accessible by walking or crawling and having a closed profile, in particular sewers, as well as a set of plastic structural elements for realising the method
GB2222624B (en) * 1988-09-07 1992-08-12 Cidar Limited Surface drainage and the like
GB8903741D0 (en) 1989-02-18 1989-04-05 Hodkin & Jones Sheffield Ltd Reinforced structural elements
GB2311549B (en) 1996-03-26 1999-07-14 Elkington Gatic Limited A slot drain
GB9611761D0 (en) 1996-06-05 1996-08-07 Hodkin & Jones Sheffield Ltd Drainage assemblies
GB2347706B (en) 1996-06-05 2000-11-29 Hodkin & Jones Drainage channel lid assembly
AU733361B2 (en) * 1997-08-04 2001-05-10 John Joseph Creighton Drainage channel and pipe assembly
US6000881A (en) * 1998-02-17 1999-12-14 Zurn Industries, Inc. Trench drain

Also Published As

Publication number Publication date
GB2390630B (en) 2004-06-30
GB2390630A (en) 2004-01-14
ES2384561T3 (en) 2012-07-09
PT1887137E (en) 2012-02-20
EP1887137A3 (en) 2011-07-20
DE60317611D1 (en) 2008-01-03
DK1887137T3 (en) 2012-02-13
ATE541093T1 (en) 2012-01-15
EP1887137A2 (en) 2008-02-13
EP1887137B1 (en) 2012-01-11
DE20321869U1 (en) 2011-10-20
ES2295512T3 (en) 2008-04-16
DE60317611T2 (en) 2008-10-23
GB0215979D0 (en) 2002-08-21
EP1380691A3 (en) 2004-12-15
PT1380691E (en) 2007-12-11
EP1380691A2 (en) 2004-01-14

Similar Documents

Publication Publication Date Title
US4854775A (en) Precast concrete culvert system
US4564313A (en) Rectilinear culvert structure
US6663317B1 (en) Drainage channel
KR102017871B1 (en) Linear drain apparatus of bridge using cantilever deck and method for constructing this same
EP1380691B1 (en) Wide channel drainage system
KR101559751B1 (en) This does not require a retaining wall erected formwork
US7975436B2 (en) Utility trench cover and manufacturing method
EP1518964B1 (en) Surface drainage arrangement
EP1520942B1 (en) Surface drainage
EP0033651B1 (en) Surface drainage system
CN101956368B (en) Simply structured dewatering element, simply structured dewatering device and construction method thereof
AU2019202413B2 (en) Improved concrete road pavement with more sustainability benefits
KR100810425B1 (en) Glass-fiber reinforced plastics manhole having side contact type sealing rubber ring
GB2315792A (en) Kerb drainage system
KR200339018Y1 (en) Manhole for underground electric power distribution manufactured from precast concrete
JP2021102886A (en) Pedestrian road boundary block
KR100458354B1 (en) Underground laying construction of road
JP7094526B1 (en) Wall-like structure of slope drainage
CA1255112A (en) Rectilinear culvert structure
CN219793954U (en) Old urban drainage pipeline slot concrete dado supporting construction
EP1520943A2 (en) Surface drainage system
GB2438269A (en) Drainage channel section
JP3605537B2 (en) Drainage structure on drainage pavement
WO2008090392A1 (en) Crossings, especially home driveway crossings
KR100609125B1 (en) Corrugated steel culverts and manufacturing method therof

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL LT LV MK

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL LT LV MK

AKX Designation fees paid
REG Reference to a national code

Ref country code: DE

Ref legal event code: 8566

17P Request for examination filed

Effective date: 20050617

RBV Designated contracting states (corrected)

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

17Q First examination report despatched

Effective date: 20060621

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 20071129

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: RIEDERER HASLER & PARTNER PATENTANWAELTE AG

REF Corresponds to:

Ref document number: 60317611

Country of ref document: DE

Date of ref document: 20080103

Kind code of ref document: P

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2295512

Country of ref document: ES

Kind code of ref document: T3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20071121

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20071121

ET Fr: translation filed
PLBI Opposition filed

Free format text: ORIGINAL CODE: 0009260

26 Opposition filed

Opponent name: HAURATON GMBH & CO. KG

Effective date: 20080724

PLAX Notice of opposition and request to file observation + time limit sent

Free format text: ORIGINAL CODE: EPIDOSNOBS2

NLR1 Nl: opposition has been filed with the epo

Opponent name: HAURATON GMBH & CO. KG

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080222

PLBB Reply of patent proprietor to notice(s) of opposition received

Free format text: ORIGINAL CODE: EPIDOSNOBS3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20071121

APAH Appeal reference modified

Free format text: ORIGINAL CODE: EPIDOSCREFNO

APBM Appeal reference recorded

Free format text: ORIGINAL CODE: EPIDOSNREFNO

APBP Date of receipt of notice of appeal recorded

Free format text: ORIGINAL CODE: EPIDOSNNOA2O

APBM Appeal reference recorded

Free format text: ORIGINAL CODE: EPIDOSNREFNO

APBP Date of receipt of notice of appeal recorded

Free format text: ORIGINAL CODE: EPIDOSNNOA2O

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: TR

Payment date: 20110527

Year of fee payment: 9

Ref country code: LU

Payment date: 20110622

Year of fee payment: 9

Ref country code: MC

Payment date: 20110523

Year of fee payment: 9

APBQ Date of receipt of statement of grounds of appeal recorded

Free format text: ORIGINAL CODE: EPIDOSNNOA3O

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120630

APBU Appeal procedure closed

Free format text: ORIGINAL CODE: EPIDOSNNOA9O

PLAG Information modified related to despatch of communication that opposition is rejected

Free format text: ORIGINAL CODE: EPIDOSCREJ1

PLCK Communication despatched that opposition was rejected

Free format text: ORIGINAL CODE: EPIDOSNREJ1

PLBN Opposition rejected

Free format text: ORIGINAL CODE: 0009273

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: OPPOSITION REJECTED

27O Opposition rejected

Effective date: 20131001

REG Reference to a national code

Ref country code: DE

Ref legal event code: R100

Ref document number: 60317611

Country of ref document: DE

Effective date: 20131001

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120606

Ref country code: TR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120606

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 13

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 14

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 15

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 16

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PT

Payment date: 20220527

Year of fee payment: 20

Ref country code: NL

Payment date: 20220621

Year of fee payment: 20

Ref country code: IE

Payment date: 20220616

Year of fee payment: 20

Ref country code: GB

Payment date: 20220623

Year of fee payment: 20

Ref country code: DE

Payment date: 20220621

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20220621

Year of fee payment: 20

Ref country code: AT

Payment date: 20220617

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20220622

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20220630

Year of fee payment: 20

Ref country code: ES

Payment date: 20220719

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20220629

Year of fee payment: 20

REG Reference to a national code

Ref country code: DE

Ref legal event code: R071

Ref document number: 60317611

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MK

Effective date: 20230605

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20230626

REG Reference to a national code

Ref country code: BE

Ref legal event code: MK

Effective date: 20230606

REG Reference to a national code

Ref country code: GB

Ref legal event code: PE20

Expiry date: 20230605

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK07

Ref document number: 379136

Country of ref document: AT

Kind code of ref document: T

Effective date: 20230606

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20230619

Ref country code: ES

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20230607

REG Reference to a national code

Ref country code: IE

Ref legal event code: MK9A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20230606

Ref country code: GB

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20230605