EP1340712B1 - Lift apparatus having articulated double parallelogram boom assembly - Google Patents
Lift apparatus having articulated double parallelogram boom assembly Download PDFInfo
- Publication number
- EP1340712B1 EP1340712B1 EP03009867A EP03009867A EP1340712B1 EP 1340712 B1 EP1340712 B1 EP 1340712B1 EP 03009867 A EP03009867 A EP 03009867A EP 03009867 A EP03009867 A EP 03009867A EP 1340712 B1 EP1340712 B1 EP 1340712B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- boom assembly
- compression
- arms
- tension
- parallelogram
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F11/00—Lifting devices specially adapted for particular uses not otherwise provided for
- B66F11/04—Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations
- B66F11/044—Working platforms suspended from booms
- B66F11/046—Working platforms suspended from booms of the telescoping type
Definitions
- the present invention relates to a low profile aerial work platform according to the preamble of claim 1.
- a vehicular low profile self propelled aerial work platform is disclosed in U.S. Pat. 4,757,875, owned by the Assignee of the instant application, wherein a work platform is mounted on the distal end of a telescopic boom assembly having its proximate end pivotally connected to a floating or riser frame assembly which, in turn, is connected to a support frame on the vehicle by a pair of parallel arms, whereby the telescopic boom assembly and associated work platform can be extended to an operative position and folded to a lowered position, so that the vehicle can be maneuvered in warehouses or manufacturing plants having nine foot high doorways.
- the articulated boom assembly includes a lower boom assembly having pairs of compression and tension arms pivotally connected between a support frame on the vehicle and a floating frame, and an upper boom assembly having pairs of compression and tension arms pivotally connected between the floating frame and a riser connected to the proximate end of a telescopic boom assembly having a work platform connected to the distal end thereof.
- a synchronization linkage is mounted in the floating frame and connected between the pairs of compression arms in the upper and lower boom assemblies for maintaining the floating frame in a vertical orientation during the elevating and folding of the articulated parallelogram boom assembly.
- One object of the present invention is to provide a low profile aerial work platform having an articulated parallelogram boom assembly wherein the geometry of the hydraulic cylinder and the synchronization links in the articulated parallelogram boom assembly cause the load on the hydraulic cylinder and the synchronization links to remain substantially constant throughout the working range of the articulated parallelogram boom assembly.
- a low profile self propelled aerial work platform representing an embodiment of the present invention includes a super-structure support frame 1, having vertically extending plates 2 upon which counterweights, not shown, are adapted to be mounted.
- the support frame 1 is mounted on a turntable 3 carried by a vehicle chassis 4.
- An articulated parallelogram boom assembly 5 is operatively connected between parallel upwardly projecting plate portions 1a of the support frame 1 and a riser 6.
- the riser 6 is also connected to the proximate end portion of a telescopic boom assembly 7 having a work platform 8 mounted on the distal end thereof.
- the articulated parallelogram boom assembly 5 includes a lower boom assembly having pairs of parallel, laterally spaced compression and tension arms 9 and 10, respectively, extending between the support frame 1 and a floating frame 11.
- the compression and tensions arms 9 and 10 are pivotally connected to the support frame 1 as at 12 and 13, respectively, and to the floating frame as at 14 and 15, respectively. As shown in Fig. 1, in the retracted position, the compression and tension arms 9 and 10 extend downwardly from the frame 1 to the floating frame 11.
- the articulated parallelogram boom assembly 5 also includes an upper boom assembly having a pair of parallel, laterally spaced compression arms 16 and a tubular tension arm 17 extending between the riser 6 and the floating frame 11.
- the compression arms 16 and the tubular tension arm 17 are pivotally connected to the riser 6 as at 18 and 19, respectively, and to the floating frame 11 as at 20a and 20b, respectively.
- the compression arms 16 and the tubular tension arm 17 extend downwardly from the floating frame 11 to the riser 6.
- FIG. 5 illustrates a planar bottom view of the tubular tension arm 17.
- the tubular tension arm 17 has a hole 42 formed in a bottom wall thereof.
- the hole 42 accommodates the hydraulic cylinder 21 such that the rod of the hydraulic cylinder 21 extends up into the tubular tension arm 17, and is pinned to the side walls of the tubular tension arm 17.
- two pairs of reinforcement plates 40 are attached to and project downwardly from the tubular tension arm 17.
- the reinforcement plates 40 serve as pivot mounting points 44 for a pair of tension links 33.
- the hydraulic cylinder 21 is pinned at 22 and at 23 on the longitudinal center lines of the lower compression arms 9 and the tubular tension arm 17, respectively.
- the hydraulic cylinder 21 is retracted, the articulated parallelogram boom assembly 5 is in the folded position, as shown in Fig. 1, and is in the elevated position, as shown in Fig. 2, when the hydraulic cylinder 21 is extended. Throughout the range of motion of the articulated parallelogram boom assembly 5, the hydraulic cylinder 21 remains vertical.
- a boom lift cylinder 24 is also pivotally connected along the centerline of the frame 1, above the hydraulic cylinder 21, between the riser 6, as at 18, and the telescopic boom assembly 7, as at 26. Accordingly, the boom lift cylinder 24 and the compression arms 16 share a common pivot point 18.
- the remaining components on the telescopic boom assembly 7 are conventional and include a master hydraulic cylinder 27 for controlling a slave cylinder 28 on the distal end of the telescopic boom assembly 7 which, together, maintain the work platform 8 in a horizontal position during the raising and lowering of the articulated parallelogram boom assembly 5 and the luffing of the telescopic boom assembly 7 with boom lift cylinder 24.
- the hydraulic cylinder 21 is nested between the pairs of arms 9 and 10
- the boom lift cylinder 24 is nested between the compression arms 16, above the hydraulic cylinder 21.
- Both the master cylinder 27 and the cylinder for telescoping the telescopic boom assembly 7 are also disposed along the centerline of the frame 1.
- Figs. 3a and 3b illustrate cross-sections of the parallelogram boom assembly 5 along lines 3a-3a and 3b-3b in Fig. 2.
- the riser 6 is formed from parallel plates 31 and a transverse plate 32.
- the tubular tension arm 17 is disposed between the parallel plates 31, and sidewalls of the tubular tension arm 17 are pinned to lower portions of the parallel plates 31 extending below the transverse plate 32.
- a pivot pin 35 pivotally attaches the compression arms 16 to the riser 6 with a boss 34 between each compression arm 16 and plate 31 such that the parallel plates 31 are disposed between the compression arms 16.
- the support frame 1 includes upwardly projecting plate portions 1a to which both pairs of the compression and tension arms 9 and 10 are pivotally attached.
- the compression arms 9 are pinned to the inside of a respective one of the plate portions 1a.
- the tension arms 10 each have lugs 60 attached thereto forming a fork between which a respective plate portion 1a is pinned.
- Fig. 7 illustrates a top view of the lower boom assembly of the articulated parallelogram boom assembly 5, and shows the pivot connections between the tension arms 10 and the plate portions 1a. Consequently, the tension arms 10 are disposed further apart from one another than the compression arms 9.
- the parallel plates 31 of the riser 6 are spaced apart a smaller distance than the parallel plate portions 1a of the frame 1. As shown in Fig. 1, this arrangement permits the tubular tension arm 17 connected to the parallel plates 31 to nest between the tension arms 10, and when nested, the pivot point 19 for the tubular tension arm 17 is disposed below the pivot point 13 for the tension arms 10. As further shown in Figs. 3a and 3b, the pair of compression arms 16, the pair of tension arms 10, and the pair of compression arms 9 are spaced apart substantially the same distance to provide a very stable parallelogram assembly. Because of the stable parallelogram assembly of the lower boom assembly, the floating frame 11 is maintained in a vertical orientation throughout the range of motion of the articulated parallelogram boom assembly 5.
- Fig. 4a illustrates a cross-section view of the articulated parallelogram boom assembly 5 looking in the direction of arrows 4a-4a
- Fig. 4b illustrates the opposite side of the floating frame 11 as compared to Fig. 4a
- the floating frame 11 is formed from parallel plates 52 and transverse plates 54 and 56 (see also Fig. 2).
- the compression arms 9 are pinned to a respective plate 52.
- the tension arms 10 and the compression arms 16 each have lugs attached thereto forming a fork between which a respective plate 52 is pinned.
- Fig. 6 illustrates a top down view of the upper boom assembly of the articulated parallelogram assembly 5, and shows the pivot connections between the compression arms 16 and the floating frame 11.
- Fig. 6 illustrates a top down view of the upper boom assembly of the articulated parallelogram assembly 5, and shows the pivot connections between the compression arms 16 and the floating frame 11.
- FIG. 7 shows the pivot connections between the tension arms 10 and the floating frame 11 (see also Fig. 2).
- the tubular tension arm 17 is pinned between plates 52.
- a cylindrical housing 58 passes through the side walls of the tubular tension arm 17, and the cylindrical housing 58 is pinned to the plates 52.
- the links 33 extend diagonally down from the two pairs of parallel reinforcement plates 40 through a hole in the transverse plate 54, and, as shown in Fig. 2, attach to the end of the compression arms 9 at pivot point 46.
- Fig. 8 illustrates a top down view of the compression arms 9.
- the compression arms 9 have a block 70 welded therebetween.
- Two pairs of lugs 72 extend from the block 70, and form forks between which a respective one of the links 33 is pinned as at 46 in Figs. 1 and 2.
- the pivot point 46 lies in a plane formed between respective extensions of the longitudinal center lines of the compression arms 9.
- Fig. 4b shows a slot section 50 formed in the upper portion of the floating frame 11.
- the slot section 50 accommodates the telescopic boom assembly 7 in the retracted position as shown in Fig. 1. Consequently, the telescopic boom assembly 7 slopes downwardly from the riser 6 in the retracted position.
- three guide blocks 62 e.g.,wear pads, for guiding the telescopic boom assembly 7 to the retracted position, are disposed about the slot section 50.
- each link 33 is pivotally connected to one of the reinforcing plates 40 as at 44.
- the pivot point 44 is disposed further from the floating frame 11 than the pivot point 20b for .the tubular tension arm 17.
- Each link 33 is further pivotally connected to a respective compression arm 9 as at 46.
- the links 33 extend diagonally relative to the pivotal connections 14 and 20b, so that the link pivot connection 44 is on one side of the compression arm 16 pivot connection 20b, and the link pivot connection 46 is on the other side of the compression arm 9 pivot connection 14; whereby, during the actuation of the hydraulic cylinder 21 to pivot the compression arms 9 and 16 relative to each other, the links 33 will synchronize the movement of the upper parallelogram assembly relative to the lower parallelogram assembly.
- the perpendicular moment arm at the lower boom assembly of the articulated parallelogram boom assembly 5 i.e., the distance, measured perpendicularly, between a line passing through the longitudinal axis of the link 33 including the pivot point 46 and a line parallel thereto passing through the pivot point 14
- the perpendicular moment arm for the upper boom assembly i.e., the distance, measured perpendicularly, between a line passing through the longitudinal axis of the link 33 and the pivot point 44 and a line parallel thereto passing through the pivot point 20b.
- the perpendicular moment arms for the lower and upper boom assemblies gradually become equal at about the point when the lower and upper boom assemblies are parallel, and then the perpendicular moment arm for the upper boom assembly becomes larger than the perpendicular moment arm for the lower boom assembly.
- the perpendicular moment arm of the upper boom assembly is substantially larger than the perpendicular moment arm of the lower boom assembly by about the same margin that the perpendicular moment arm of the lower boom assembly exceeded the perpendicular moment arm of the upper boom assembly in the retracted position.
- the perpendicular moment arms of the upper and lower boom assemblies are 69.12mm and 114.04mm in the retracted position, 107.64mm and 123.59mm in the parallel position, and 113.88mm and 68.03mm in the fully extended position.
- the above values are given by way of example only, and in no way limit the possible perpendicular moment arm values of the present invention.
- the height of the frame 1, the length of the floating frame 11, and the length of the riser 6 can be increased without increasing the overall retracted height of the machine. Accordingly, the highest point of the machine in the retracted position is approximately six feet, six inches or less. As one skilled in the art will realize, however, the overall dimensions of the machine could be increased or decreased.
- the increased height of the frame 1, the increased length of the floating frame 11, and the increased length of the riser 6 provides for at least a first and/or second advantage.
- the first advantage is an increase in the working height that the machine can achieve.
- the second advantage is a decrease in the length of the telescopic boom assembly 7 and/or the length of the articulated parallelogram boom assembly 5 without a decrease in the working height as compared to conventional aerial work platforms.
- Fig. 9 illustrates a top view of the aerial work platform according to the present invention. As Figs. 2 and 9 show, the aerial work platform according to the present invention has no tail swing and minimal front swing.
- one skilled in the art can balance the increased working height versus reduced front swing trade-off to meet those characteristics.
- Figs. 1-2, 6-7, and particularly Fig. 9 show, the longitudinal axes of the articulated parallelogram boom assembly 5, the hydraulic lift cylinder 21, the telescopic boom assembly 7, and the boom lift, cylinder 24 lie within the same vertical plane (i.e., are in-line).
- the positioning of the hydraulic cylinder 21 in cooperation with the links 33 sets up a lift geometry which minimizes the loads on both the hydraulic cylinder 21 and the links 33, and maintains the loads on the hydraulic cylinder 21 and the links 33 substantially constant over the range of motion of the articulated parallelogram boom assembly 5.
- the load on the hydraulic cylinder 21 could be reduced by positioning the hydraulic cylinder 21 closer to the frame 1. Doing so, however, presents a clearance problem with the bottom of the hydraulic cylinder 21. Accordingly, the length of the hydraulic cylinder 21 would have to be decreased; thus, decreasing the maximum possible working height of the machine. Depending on desired operating characteristics one skilled in the art can balance the load versus maximum working height trade-off to meet those characteristics.
- the rod of the hydraulic cylinder 21 could be pinned between the compression arms 16. This would require forming a larger version of hole 42, and forming a similar hole in the top of the tubular tension arm 17 to accommodate the cylinder portion of the hydraulic cylinder 21. To make such an accommodation would require increasing the width of the tubular tension arm 17 with the resulting ripple effect being an overall increase in the width of the articulated parallelogram boom assembly 5.
- articulated parallelogram boom assembly 5 may be applied to devices other than self propelled aerial work platforms without departing from the spirit and scope of the present invention.
Description
- The present invention relates to a low profile aerial work platform according to the preamble of
claim 1. - A vehicular low profile self propelled aerial work platform is disclosed in U.S. Pat. 4,757,875, owned by the Assignee of the instant application, wherein a work platform is mounted on the distal end of a telescopic boom assembly having its proximate end pivotally connected to a floating or riser frame assembly which, in turn, is connected to a support frame on the vehicle by a pair of parallel arms, whereby the telescopic boom assembly and associated work platform can be extended to an operative position and folded to a lowered position, so that the vehicle can be maneuvered in warehouses or manufacturing plants having nine foot high doorways.
- An articulated parallelogram assembly for elevating a work platform is disclosed in U.S. Pat. 5,129,480, also owned by the Assignee of the instant application, wherein a lower boom assembly having parallel compression and tension arms, offset from the centerline of the vehicle, are pivotally connected between a floating or riser frame assembly and the vehicle frame. An upper boom assembly is also provided wherein parallel compression and tension arms, offset from the centerline of the vehicle, are pivotally connected between the platform frame and the floating frame.
- Another vehicular low profile, self-propelled aerial work platform having an articulated parallelogram boom assembly is described in U.S. Patent No. 5,584,356, also owned by the Assignee of the instant application, which describes a low profile aerial work platform according to the preamble of
claim 1. The articulated boom assembly includes a lower boom assembly having pairs of compression and tension arms pivotally connected between a support frame on the vehicle and a floating frame, and an upper boom assembly having pairs of compression and tension arms pivotally connected between the floating frame and a riser connected to the proximate end of a telescopic boom assembly having a work platform connected to the distal end thereof. The ends of the tension arms in the upper and lower boom assemblies, which are pivotally connected to the floating frame, share the same pivot connection so that when the articulated parallelogram is in the folded position, the tension arms are inter-digitated and lie in the same common plane so that the vehicle can be maneuvered through a low doorway, in the order of six feet, seven inches. A synchronization linkage is mounted in the floating frame and connected between the pairs of compression arms in the upper and lower boom assemblies for maintaining the floating frame in a vertical orientation during the elevating and folding of the articulated parallelogram boom assembly. - While the self propelled aerial work platforms disclosed in the aforementioned patents have been satisfactory for their intended purposes, certain features contained in these self propelled aerial work platforms are employed in the low profile self propelled aerial work platform of the present invention to provide a new combination of components; whereby the telescopic boom assembly can be folded to a lowered position so that the vehicle can be maneuvered through standard height six foot, seven inch doorways.
- One object of the present invention is to provide a low profile aerial work platform having an articulated parallelogram boom assembly wherein the geometry of the hydraulic cylinder and the synchronization links in the articulated parallelogram boom assembly cause the load on the hydraulic cylinder and the synchronization links to remain substantially constant throughout the working range of the articulated parallelogram boom assembly.
- This object is achieved by providing a low profile aerial work platform according to
claim 1. Further objects are acheived by a low profile aerial work platform according to the dependent claims. - Other objects and further scope of applicability of the present invention will become apparent from the detailed description given hereinafter. However, it should be understood that the detailed description and specific examples, while indicating preferred embodiments of the invention, are given by way of illustration only, since various changes and modifications within the scope of the claims will become apparent to those skilled in the art from this detailed description.
- The present invention will become more fully understood from the detailed description given hereinbelow and the accompanying drawings which are given by way of illustration only, and thus, are not limitative of the present.invention, and wherein:
- Fig. 1 is a side elevational view of a low profile aerial work platform showing the double parallelogram riser assembly according to the invention in a fully lowered position;
- Fig. 2 is a side elevational view showing the double parallelogram riser assembly in an extended raised position;
- Figs. 3a and 3b illustrate cross-sections of the articulated parallelogram boom assembly along lines 3a-3a and 3b-3b in Fig. 2;
- Fig. 4a illustrates a cross-section of the articulated parallelogram boom assembly viewed in the direction of arrows 4a-4a in Fig. 2;
- Fig. 4b illustrates the opposite side of the floating frame of the articulated parallelogram boom assembly as compared to Fig. 4a;
- Fig. 5 illustrates a planar bottom view of the tubular tension arm in the upper boom assembly of the articulated parallelogram boom assembly;
- Fig. 6 illustrates a top view of the upper boom assembly of the articulated parallelogram boom assembly;
- Fig. 7 illustrates a top view of the lower boom assembly of the articulated parallelogram boom assembly;
- Fig. 8 illustrates a top down view of the compression arms in the lower boom assembly of the articulated parallelogram boom assembly; and
- Fig. 9 illustrates a top down view of the low profile aerial work platform according to an embodiment of the present invention.
- Referring to the drawings, and more particularly to Figs. 1-4b, a low profile self propelled aerial work platform representing an embodiment of the present invention includes a
super-structure support frame 1, having vertically extendingplates 2 upon which counterweights, not shown, are adapted to be mounted. Thesupport frame 1 is mounted on aturntable 3 carried by avehicle chassis 4. An articulatedparallelogram boom assembly 5 is operatively connected between parallel upwardly projecting plate portions 1a of thesupport frame 1 and ariser 6. Theriser 6 is also connected to the proximate end portion of a telescopic boom assembly 7 having awork platform 8 mounted on the distal end thereof. - The articulated
parallelogram boom assembly 5 includes a lower boom assembly having pairs of parallel, laterally spaced compression andtension arms support frame 1 and afloating frame 11. The compression andtensions arms support frame 1 as at 12 and 13, respectively, and to the floating frame as at 14 and 15, respectively. As shown in Fig. 1, in the retracted position, the compression andtension arms frame 1 to thefloating frame 11. - The articulated
parallelogram boom assembly 5 also includes an upper boom assembly having a pair of parallel, laterally spacedcompression arms 16 and atubular tension arm 17 extending between theriser 6 and thefloating frame 11. Thecompression arms 16 and thetubular tension arm 17 are pivotally connected to theriser 6 as at 18 and 19, respectively, and to thefloating frame 11 as at 20a and 20b, respectively. As shown in Fig. 1, in the retracted position, thecompression arms 16 and thetubular tension arm 17 extend downwardly from thefloating frame 11 to theriser 6. - An extensible
hydraulic cylinder 21, positioned on the centerline of theframe 1, is pivotally connected as at 22 to and between thelower compression arms 9, and as at 23 to and between side walls of thetubular tension arm 17. Fig. 5 illustrates a planar bottom view of thetubular tension arm 17. As shown, thetubular tension arm 17 has a hole 42 formed in a bottom wall thereof. The hole 42 accommodates thehydraulic cylinder 21 such that the rod of thehydraulic cylinder 21 extends up into thetubular tension arm 17, and is pinned to the side walls of thetubular tension arm 17. As further shown in Figs. 1, 2, 4 and 5, two pairs ofreinforcement plates 40 are attached to and project downwardly from thetubular tension arm 17. As discussed in more detail below, thereinforcement plates 40 serve aspivot mounting points 44 for a pair oftension links 33. - As shown in Figs. 1 and 2, the
hydraulic cylinder 21 is pinned at 22 and at 23 on the longitudinal center lines of thelower compression arms 9 and thetubular tension arm 17, respectively. When thehydraulic cylinder 21 is retracted, the articulatedparallelogram boom assembly 5 is in the folded position, as shown in Fig. 1, and is in the elevated position, as shown in Fig. 2, when thehydraulic cylinder 21 is extended. Throughout the range of motion of the articulatedparallelogram boom assembly 5, thehydraulic cylinder 21 remains vertical. - A
boom lift cylinder 24 is also pivotally connected along the centerline of theframe 1, above thehydraulic cylinder 21, between theriser 6, as at 18, and the telescopic boom assembly 7, as at 26. Accordingly, theboom lift cylinder 24 and thecompression arms 16 share acommon pivot point 18. The remaining components on the telescopic boom assembly 7 are conventional and include a masterhydraulic cylinder 27 for controlling aslave cylinder 28 on the distal end of the telescopic boom assembly 7 which, together, maintain thework platform 8 in a horizontal position during the raising and lowering of the articulatedparallelogram boom assembly 5 and the luffing of the telescopic boom assembly 7 withboom lift cylinder 24. In the folded or retracted position of the articulatedparallelogram boom assembly 5, thehydraulic cylinder 21 is nested between the pairs ofarms boom lift cylinder 24 is nested between thecompression arms 16, above thehydraulic cylinder 21. Both themaster cylinder 27 and the cylinder for telescoping the telescopic boom assembly 7 are also disposed along the centerline of theframe 1. - Figs. 3a and 3b illustrate cross-sections of the
parallelogram boom assembly 5 along lines 3a-3a and 3b-3b in Fig. 2. As shown in Fig. 3a, theriser 6 is formed fromparallel plates 31 and atransverse plate 32. Thetubular tension arm 17 is disposed between theparallel plates 31, and sidewalls of thetubular tension arm 17 are pinned to lower portions of theparallel plates 31 extending below thetransverse plate 32. A pivot pin 35 pivotally attaches thecompression arms 16 to theriser 6 with aboss 34 between eachcompression arm 16 andplate 31 such that theparallel plates 31 are disposed between thecompression arms 16. - As shown in Fig. 3b, the
support frame 1 includes upwardly projecting plate portions 1a to which both pairs of the compression andtension arms compression arms 9 are pinned to the inside of a respective one of the plate portions 1a. Thetension arms 10 each have lugs 60 attached thereto forming a fork between which a respective plate portion 1a is pinned. Fig. 7 illustrates a top view of the lower boom assembly of the articulatedparallelogram boom assembly 5, and shows the pivot connections between thetension arms 10 and the plate portions 1a. Consequently, thetension arms 10 are disposed further apart from one another than thecompression arms 9. - As shown in Figs. 3a and 3b, the
parallel plates 31 of theriser 6 are spaced apart a smaller distance than the parallel plate portions 1a of theframe 1. As shown in Fig. 1, this arrangement permits thetubular tension arm 17 connected to theparallel plates 31 to nest between thetension arms 10, and when nested, thepivot point 19 for thetubular tension arm 17 is disposed below thepivot point 13 for thetension arms 10. As further shown in Figs. 3a and 3b, the pair ofcompression arms 16, the pair oftension arms 10, and the pair ofcompression arms 9 are spaced apart substantially the same distance to provide a very stable parallelogram assembly. Because of the stable parallelogram assembly of the lower boom assembly, the floatingframe 11 is maintained in a vertical orientation throughout the range of motion of the articulatedparallelogram boom assembly 5. - Fig. 4a illustrates a cross-section view of the articulated
parallelogram boom assembly 5 looking in the direction of arrows 4a-4a, and Fig. 4b illustrates the opposite side of the floatingframe 11 as compared to Fig. 4a. As shown, the floatingframe 11 is formed fromparallel plates 52 andtransverse plates 54 and 56 (see also Fig. 2). Thecompression arms 9 are pinned to arespective plate 52. Thetension arms 10 and thecompression arms 16 each have lugs attached thereto forming a fork between which arespective plate 52 is pinned. Fig. 6 illustrates a top down view of the upper boom assembly of the articulatedparallelogram assembly 5, and shows the pivot connections between thecompression arms 16 and the floatingframe 11. Fig. 7 shows the pivot connections between thetension arms 10 and the floating frame 11 (see also Fig. 2). Thetubular tension arm 17 is pinned betweenplates 52. Specifically, acylindrical housing 58 passes through the side walls of thetubular tension arm 17, and thecylindrical housing 58 is pinned to theplates 52. - As further shown in Figs. 4a and 4b, the
links 33 extend diagonally down from the two pairs ofparallel reinforcement plates 40 through a hole in thetransverse plate 54, and, as shown in Fig. 2, attach to the end of thecompression arms 9 at pivot point 46. Fig. 8 illustrates a top down view of thecompression arms 9. As shown, at the floatingframe 11 end of thecompression arms 9, thecompression arms 9 have ablock 70 welded therebetween. Two pairs oflugs 72 extend from theblock 70, and form forks between which a respective one of thelinks 33 is pinned as at 46 in Figs. 1 and 2. The pivot point 46 lies in a plane formed between respective extensions of the longitudinal center lines of thecompression arms 9. - Furthermore, Fig. 4b shows a
slot section 50 formed in the upper portion of the floatingframe 11. Theslot section 50 accommodates the telescopic boom assembly 7 in the retracted position as shown in Fig. 1. Consequently, the telescopic boom assembly 7 slopes downwardly from theriser 6 in the retracted position. As shown in Fig. 4b, three guide blocks 62 (e.g.,wear pads), for guiding the telescopic boom assembly 7 to the retracted position, are disposed about theslot section 50. - As discussed above, each
link 33 is pivotally connected to one of the reinforcingplates 40 as at 44. Thepivot point 44 is disposed further from the floatingframe 11 than the pivot point 20b for .thetubular tension arm 17. Eachlink 33 is further pivotally connected to arespective compression arm 9 as at 46. - By this construction and arrangement, the
links 33 extend diagonally relative to thepivotal connections 14 and 20b, so that thelink pivot connection 44 is on one side of thecompression arm 16 pivot connection 20b, and the link pivot connection 46 is on the other side of thecompression arm 9pivot connection 14; whereby, during the actuation of thehydraulic cylinder 21 to pivot thecompression arms links 33 will synchronize the movement of the upper parallelogram assembly relative to the lower parallelogram assembly. - Specifically, in the retracted position, the perpendicular moment arm at the lower boom assembly of the articulated parallelogram boom assembly 5 (i.e., the distance, measured perpendicularly, between a line passing through the longitudinal axis of the
link 33 including the pivot point 46 and a line parallel thereto passing through the pivot point 14) is substantially larger than the perpendicular moment arm for the upper boom assembly (i.e., the distance, measured perpendicularly, between a line passing through the longitudinal axis of thelink 33 and thepivot point 44 and a line parallel thereto passing through the pivot point 20b). - As the articulated
parallelogram boom assembly 5 extends, the perpendicular moment arms for the lower and upper boom assemblies gradually become equal at about the point when the lower and upper boom assemblies are parallel, and then the perpendicular moment arm for the upper boom assembly becomes larger than the perpendicular moment arm for the lower boom assembly. At the fully extended position, the perpendicular moment arm of the upper boom assembly is substantially larger than the perpendicular moment arm of the lower boom assembly by about the same margin that the perpendicular moment arm of the lower boom assembly exceeded the perpendicular moment arm of the upper boom assembly in the retracted position. - In a preferred embodiment the perpendicular moment arms of the upper and lower boom assemblies are 69.12mm and 114.04mm in the retracted position, 107.64mm and 123.59mm in the parallel position, and 113.88mm and 68.03mm in the fully extended position. The above values are given by way of example only, and in no way limit the possible perpendicular moment arm values of the present invention.
- Disposing the
hydraulic cylinder 21 vertically between thecompression arms 9 and thetubular tension arm 17, permits the compression andtension arms frame 1 in the retracted position, and permits thecompression arms 16 and thetubular tension arm 17 to slope downwardly from the floatingframe 11 in the retracted position. Additionally, theslot section 50 in the floatingframe 11 permits the telescopic boom assembly 7 to slope downwardly from theriser 6 in the retracted position. As a result, the height of theframe 1, the length of the floatingframe 11, and the length of theriser 6 can be increased without increasing the overall retracted height of the machine. Accordingly, the highest point of the machine in the retracted position is approximately six feet, six inches or less. As one skilled in the art will realize, however, the overall dimensions of the machine could be increased or decreased. - The increased height of the
frame 1, the increased length of the floatingframe 11, and the increased length of theriser 6 provides for at least a first and/or second advantage. The first advantage is an increase in the working height that the machine can achieve. The second advantage is a decrease in the length of the telescopic boom assembly 7 and/or the length of the articulatedparallelogram boom assembly 5 without a decrease in the working height as compared to conventional aerial work platforms. As a result, an aerial work platform with no tail swing and minimal front swing is produced without a decrease in working height as compared to conventional aerial work platforms. Fig. 9 illustrates a top view of the aerial work platform according to the present invention. As Figs. 2 and 9 show, the aerial work platform according to the present invention has no tail swing and minimal front swing. Depending on desired operating characteristics, one skilled in the art can balance the increased working height versus reduced front swing trade-off to meet those characteristics. - Furthermore, as Figs. 1-2, 6-7, and particularly Fig. 9 show, the longitudinal axes of the articulated
parallelogram boom assembly 5, thehydraulic lift cylinder 21, the telescopic boom assembly 7, and the boom lift,cylinder 24 lie within the same vertical plane (i.e., are in-line). - The positioning of the
hydraulic cylinder 21 in cooperation with thelinks 33 sets up a lift geometry which minimizes the loads on both thehydraulic cylinder 21 and thelinks 33, and maintains the loads on thehydraulic cylinder 21 and thelinks 33 substantially constant over the range of motion of the articulatedparallelogram boom assembly 5. - The load on the
hydraulic cylinder 21 could be reduced by positioning thehydraulic cylinder 21 closer to theframe 1. Doing so, however, presents a clearance problem with the bottom of thehydraulic cylinder 21. Accordingly, the length of thehydraulic cylinder 21 would have to be decreased; thus, decreasing the maximum possible working height of the machine. Depending on desired operating characteristics one skilled in the art can balance the load versus maximum working height trade-off to meet those characteristics. - Additionally, the rod of the
hydraulic cylinder 21 could be pinned between thecompression arms 16. This would require forming a larger version of hole 42, and forming a similar hole in the top of thetubular tension arm 17 to accommodate the cylinder portion of thehydraulic cylinder 21. To make such an accommodation would require increasing the width of thetubular tension arm 17 with the resulting ripple effect being an overall increase in the width of the articulatedparallelogram boom assembly 5. - As a further note, the articulated
parallelogram boom assembly 5 may be applied to devices other than self propelled aerial work platforms without departing from the spirit and scope of the present invention. - While the invention has been described in connection with what is presently considered the most practical and preferred embodiments, it is to be understood that the invention is not limited to the disclosed embodiments, but on the contrary, is intended to cover various modifications and equivalent arrangements included within the scope of the appended claims.
Claims (3)
- A low profile aerial work platform, comprising:a superstructure frame support (1);a riser (6); andan articulated parallelogram boom assembly (5) operatively connected between said superstructure frame support (1) and said riser (6), said articulated parallelogram boom assembly (5) including,a floating frame (11),a lower parallelogram boom assembly (9, 10) operationally connected between said superstructure frame support (1) and said floating frame (11),an upper parallelogram boom assembly (16, 17) operationally connected between said floating frame (11) and said riser (6), anda lift cylinder (21) raising and lowering said articulated parallelogram boom assembly (5) and connected between said upper parallelogram boom assembly (16, 17) and said lower parallelogram boom assembly (9, 10), said lift cylinder (21) remaining vertically oriented with respect to said superstructure frame support (1) over a range of motion of said articulated parallelogram boom assembly (5),a lower parallelogram boom assembly (9, 10) including a pair of parallel, laterally spaced first compression arms (9) and a pair of parallel, laterally spaced first tension arms (10); andan upper parallelogram, boom assembly (16, 17) including a pair of parallel, laterally spaced second compression arms (16) and a tubular second tension arm (17),
characterised in thatlinks (33) being pivotally connected to a pivot point (44) attached on the tubular tension arm (17), the pivot point (44) being disposed further from the floating frame (11) than a pivot point (20b) for the tubular tension arm (17), and wherein said links (33) being further pivotally connected to the floating frame (11) at a pivot point (46), the pivot point (46) lying above a pivot point (14) for the first compression arm (9),said links (33) extending diagonally relative to the pivot points for the tubular tension arm and the first compression arm (20b, 14); andsaid links (33) synchronising the movement of the upper parallelogram boom assembly (16, 17) relative to the lower parallelogram boom assembly (9, 10) during actuation of the lift cylinder (21). - The low profile aerial work platform of claim 1, wherein
said first compression and tension arms (9, 10) form a parallelogram assembly, said first compression and tension arms (9, 10) pivotally connected at one end to said superstructure frame support (1) and pivotally connected at another end to said floating frame (11);
said second compression arms (16) and said second tension arm (17) form a parallelogram assembly, said second compression and tension arms (16, 17) pivotally connected at one end to said floating frame (11) and pivotally connected at another end to said riser (6); and
said lift cylinder (21) includes a first and second end, said first end connected to said first compression arms (9) and said second end connected to said second tension arm (17). - The low profile aerial work platform of claim 1, wherein
said first compression and tension arms (9, 10) form a parallelogram assembly, said first compression and tension arms (9, 10) pivotally connected at one end to said superstructure frame support (1) and pivotally connected at another end to said floating frame (11);
said second compression arms (16) and said second tension arm (17) form a parallelogram assembly, said second compression and tension arms (16, 17) pivotally connected at one end to said floating frame (11) and pivotally connected at another end to said riser (6); and
said lift cylinder (21) includes a first end and a second end, said first end connected to said first compression arms (9) and said second end connected to said second compression arms (16).
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US3710597P | 1997-01-31 | 1997-01-31 | |
US37105P | 1997-01-31 | ||
EP98101372A EP0856487B1 (en) | 1997-01-31 | 1998-01-27 | Lift apparatus having an articulated double parallelogram boom assembly |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP98101372A Division EP0856487B1 (en) | 1997-01-31 | 1998-01-27 | Lift apparatus having an articulated double parallelogram boom assembly |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1340712A1 EP1340712A1 (en) | 2003-09-03 |
EP1340712B1 true EP1340712B1 (en) | 2006-06-28 |
Family
ID=27736102
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP03009867A Expired - Lifetime EP1340712B1 (en) | 1997-01-31 | 1998-01-27 | Lift apparatus having articulated double parallelogram boom assembly |
EP03009866A Expired - Lifetime EP1340711B1 (en) | 1997-01-31 | 1998-01-27 | Lift apparatus having an articulated double parallelogram boom assembly |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP03009866A Expired - Lifetime EP1340711B1 (en) | 1997-01-31 | 1998-01-27 | Lift apparatus having an articulated double parallelogram boom assembly |
Country Status (1)
Country | Link |
---|---|
EP (2) | EP1340712B1 (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ITMO20130095A1 (en) * | 2013-04-12 | 2014-10-13 | Palfinger Platforms Italy S R L | REDUCED AERIAL PLATFORM. |
CN104741910B (en) * | 2013-12-31 | 2017-01-18 | 中核武汉核电运行技术股份有限公司 | Mounting trolley for integral group-synchronizing stud tensioner |
CN106144978B (en) * | 2016-08-17 | 2018-09-25 | 徐州海伦哲专用车辆股份有限公司 | A kind of mixing arm high-altitude operation vehicle |
CN112079294B (en) * | 2020-09-25 | 2022-02-15 | 山河智能装备股份有限公司 | Cargo handling device and cargo handling car |
CN112407155A (en) * | 2020-12-09 | 2021-02-26 | 中船绿洲镇江船舶辅机有限公司 | Double-parallelogram four-link mechanism boat take-up and pay-off device and use method thereof |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3807575A (en) * | 1972-06-13 | 1974-04-30 | Merrick Hydraulics Inc | Elevating devices |
US4019604A (en) * | 1975-06-16 | 1977-04-26 | Fabtek, Inc. | Elevating platform apparatus |
US5129480A (en) * | 1991-03-21 | 1992-07-14 | Kidde Industries, Inc. | Articulated parallelogram boom assembly synchronization device |
US5584356A (en) * | 1995-05-31 | 1996-12-17 | Kidde Industries, Inc. | Centerline double riser with single lift cylinder and link for a low profile self propelled aerial work platform |
-
1998
- 1998-01-27 EP EP03009867A patent/EP1340712B1/en not_active Expired - Lifetime
- 1998-01-27 EP EP03009866A patent/EP1340711B1/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
EP1340711A1 (en) | 2003-09-03 |
EP1340711B1 (en) | 2006-06-21 |
EP1340712A1 (en) | 2003-09-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0856487B1 (en) | Lift apparatus having an articulated double parallelogram boom assembly | |
CA2177344C (en) | Centerline double riser with single lift cylinder and link for a low profile self propelled aerial work platform | |
US7997369B2 (en) | Articulating cab assembly for excavator | |
US4478014A (en) | Telescopic boom with angled corner construction | |
EP0308595B1 (en) | A vehicular low profile self propelled aerial work platform | |
CN105377743A (en) | Weighted boom assembly | |
EP1282582B1 (en) | Boom mechanism | |
EP1340712B1 (en) | Lift apparatus having articulated double parallelogram boom assembly | |
JP2947773B2 (en) | crane | |
CA2480238C (en) | Lift apparatus having an articulated double parallelogram boom assembly | |
US5355970A (en) | Multicell articulated riser system for a self propelled aerial work platform | |
MXPA98000878A (en) | Elevation apparatus that has a double articulated parallelogram pen assembly | |
US20240011242A1 (en) | Bending boom, boom device, and work machine | |
CN114737763B (en) | Arm support system, control method and engineering machinery | |
JPS6011030Y2 (en) | Forklift cargo handling equipment | |
WO1992004271A1 (en) | Crane | |
CA1292957C (en) | Vehicular low profile self propelled aerial work platform | |
JP2508070Y2 (en) | Jib undulating device in boom with jib | |
JPS6014756B2 (en) | Forklift reach fork equipment | |
JPH0447189Y2 (en) | ||
JPH0217478B2 (en) | ||
JPS6347296A (en) | Mobile type crane | |
GB2092551A (en) | Sideloading industrial truck | |
JP2019059626A (en) | Construction machine | |
JPH01141153A (en) | X-type outrigger device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20030514 |
|
AC | Divisional application: reference to earlier application |
Ref document number: 0856487 Country of ref document: EP Kind code of ref document: P |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): CH DE ES FI FR GB IT LI NL SE |
|
17Q | First examination report despatched |
Effective date: 20040408 |
|
AKX | Designation fees paid |
Designated state(s): CH DE ES FI FR GB IT LI NL SE |
|
REG | Reference to a national code |
Ref country code: HK Ref legal event code: DE Ref document number: 1058662 Country of ref document: HK |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: JLG INDUSTRIES, INC. |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AC | Divisional application: reference to earlier application |
Ref document number: 0856487 Country of ref document: EP Kind code of ref document: P |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): CH DE ES FI FR GB IT LI NL SE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED. Effective date: 20060628 Ref country code: LI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060628 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060628 Ref country code: CH Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060628 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060628 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REF | Corresponds to: |
Ref document number: 69835109 Country of ref document: DE Date of ref document: 20060810 Kind code of ref document: P |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060928 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
ET | Fr: translation filed | ||
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2268209 Country of ref document: ES Kind code of ref document: T3 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20070329 |
|
REG | Reference to a national code |
Ref country code: HK Ref legal event code: WD Ref document number: 1058662 Country of ref document: HK |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 19 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 20 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20170120 Year of fee payment: 20 Ref country code: FR Payment date: 20170120 Year of fee payment: 20 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20170119 Year of fee payment: 20 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20170113 Year of fee payment: 20 Ref country code: IT Payment date: 20170124 Year of fee payment: 20 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R071 Ref document number: 69835109 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: PE20 Expiry date: 20180126 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20180126 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20180508 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20180128 |