EP1210494B1 - Method for mounting guide rails of cable-actuated window lifters - Google Patents

Method for mounting guide rails of cable-actuated window lifters Download PDF

Info

Publication number
EP1210494B1
EP1210494B1 EP00965934A EP00965934A EP1210494B1 EP 1210494 B1 EP1210494 B1 EP 1210494B1 EP 00965934 A EP00965934 A EP 00965934A EP 00965934 A EP00965934 A EP 00965934A EP 1210494 B1 EP1210494 B1 EP 1210494B1
Authority
EP
European Patent Office
Prior art keywords
guide rails
die
joining
punch
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP00965934A
Other languages
German (de)
French (fr)
Other versions
EP1210494A1 (en
Inventor
Manuel Stotz
Reiner Gath
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kuester Automotive Door Systems GmbH
Original Assignee
Kuester Automotive Door Systems GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kuester Automotive Door Systems GmbH filed Critical Kuester Automotive Door Systems GmbH
Publication of EP1210494A1 publication Critical patent/EP1210494A1/en
Application granted granted Critical
Publication of EP1210494B1 publication Critical patent/EP1210494B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05FDEVICES FOR MOVING WINGS INTO OPEN OR CLOSED POSITION; CHECKS FOR WINGS; WING FITTINGS NOT OTHERWISE PROVIDED FOR, CONCERNED WITH THE FUNCTIONING OF THE WING
    • E05F11/00Man-operated mechanisms for operating wings, including those which also operate the fastening
    • E05F11/38Man-operated mechanisms for operating wings, including those which also operate the fastening for sliding windows, e.g. vehicle windows, to be opened or closed by vertical movement
    • E05F11/382Man-operated mechanisms for operating wings, including those which also operate the fastening for sliding windows, e.g. vehicle windows, to be opened or closed by vertical movement for vehicle windows
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D39/00Application of procedures in order to connect objects or parts, e.g. coating with sheet metal otherwise than by plating; Tube expanders
    • B21D39/03Application of procedures in order to connect objects or parts, e.g. coating with sheet metal otherwise than by plating; Tube expanders of sheet metal otherwise than by folding
    • B21D39/031Joining superposed plates by locally deforming without slitting or piercing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J15/00Riveting
    • B21J15/02Riveting procedures
    • B21J15/025Setting self-piercing rivets
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05FDEVICES FOR MOVING WINGS INTO OPEN OR CLOSED POSITION; CHECKS FOR WINGS; WING FITTINGS NOT OTHERWISE PROVIDED FOR, CONCERNED WITH THE FUNCTIONING OF THE WING
    • E05F11/00Man-operated mechanisms for operating wings, including those which also operate the fastening
    • E05F11/38Man-operated mechanisms for operating wings, including those which also operate the fastening for sliding windows, e.g. vehicle windows, to be opened or closed by vertical movement
    • E05F11/48Man-operated mechanisms for operating wings, including those which also operate the fastening for sliding windows, e.g. vehicle windows, to be opened or closed by vertical movement operated by cords or chains or other flexible elongated pulling elements, e.g. tapes
    • E05F11/481Man-operated mechanisms for operating wings, including those which also operate the fastening for sliding windows, e.g. vehicle windows, to be opened or closed by vertical movement operated by cords or chains or other flexible elongated pulling elements, e.g. tapes for vehicle windows
    • E05F11/483Man-operated mechanisms for operating wings, including those which also operate the fastening for sliding windows, e.g. vehicle windows, to be opened or closed by vertical movement operated by cords or chains or other flexible elongated pulling elements, e.g. tapes for vehicle windows by cables
    • E05F11/488Man-operated mechanisms for operating wings, including those which also operate the fastening for sliding windows, e.g. vehicle windows, to be opened or closed by vertical movement operated by cords or chains or other flexible elongated pulling elements, e.g. tapes for vehicle windows by cables with two cable connections to the window glass
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05YINDEXING SCHEME ASSOCIATED WITH SUBCLASSES E05D AND E05F, RELATING TO CONSTRUCTION ELEMENTS, ELECTRIC CONTROL, POWER SUPPLY, POWER SIGNAL OR TRANSMISSION, USER INTERFACES, MOUNTING OR COUPLING, DETAILS, ACCESSORIES, AUXILIARY OPERATIONS NOT OTHERWISE PROVIDED FOR, APPLICATION THEREOF
    • E05Y2201/00Constructional elements; Accessories therefor
    • E05Y2201/60Suspension or transmission members; Accessories therefor
    • E05Y2201/622Suspension or transmission members elements
    • E05Y2201/684Rails; Tracks
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05YINDEXING SCHEME ASSOCIATED WITH SUBCLASSES E05D AND E05F, RELATING TO CONSTRUCTION ELEMENTS, ELECTRIC CONTROL, POWER SUPPLY, POWER SIGNAL OR TRANSMISSION, USER INTERFACES, MOUNTING OR COUPLING, DETAILS, ACCESSORIES, AUXILIARY OPERATIONS NOT OTHERWISE PROVIDED FOR, APPLICATION THEREOF
    • E05Y2800/00Details, accessories and auxiliary operations not otherwise provided for
    • E05Y2800/45Manufacturing
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05YINDEXING SCHEME ASSOCIATED WITH SUBCLASSES E05D AND E05F, RELATING TO CONSTRUCTION ELEMENTS, ELECTRIC CONTROL, POWER SUPPLY, POWER SIGNAL OR TRANSMISSION, USER INTERFACES, MOUNTING OR COUPLING, DETAILS, ACCESSORIES, AUXILIARY OPERATIONS NOT OTHERWISE PROVIDED FOR, APPLICATION THEREOF
    • E05Y2800/00Details, accessories and auxiliary operations not otherwise provided for
    • E05Y2800/69Permanence of use
    • E05Y2800/692Temporary use, e.g. removable tools
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05YINDEXING SCHEME ASSOCIATED WITH SUBCLASSES E05D AND E05F, RELATING TO CONSTRUCTION ELEMENTS, ELECTRIC CONTROL, POWER SUPPLY, POWER SIGNAL OR TRANSMISSION, USER INTERFACES, MOUNTING OR COUPLING, DETAILS, ACCESSORIES, AUXILIARY OPERATIONS NOT OTHERWISE PROVIDED FOR, APPLICATION THEREOF
    • E05Y2900/00Application of doors, windows, wings or fittings thereof
    • E05Y2900/50Application of doors, windows, wings or fittings thereof for vehicles
    • E05Y2900/53Type of wing
    • E05Y2900/55Windows

Definitions

  • the invention relates to a method for fastening of guide rails according to the preamble of claim 1.
  • the side panels a window frame with the frame bow and the parts of the Shaft reinforcement of the vehicle door in each case by welding or by other suitable joining methods, such as gluing, Clinching, punching, soldering, joining together.
  • the invention is based on the object, a method specify which one is simple, exactly one another coordinated positioning of guide rails, in particular Guide rail pairs, allows the subframe, wherein it in the attachment process to no non-parallelism of the mutually corresponding guide sections of the Windows system should come.
  • the inventive method with a fixation of Guide rails by means of clinching, punch rivets, Welding or gluing waiving bores are so those in which the attachment in a single Work step is performed.
  • drilling and screwing It can happen that the holes are still exact the fastening of the rails as the second, separately to be performed, but not so exactly, so that the fastened rails no longer run parallel.
  • the method according to the invention ensured that the parallelism of the slide contours of Window lift system also during or after the attachment process remain. This leads to a quiet running of the windows without jamming the system.
  • a so-called "x-compensation" or a pre-positioning of the driver in the window is not more required.
  • the process reliability is increased and reduced assembly costs.
  • a sealing function between wet and Dry space of the vehicle door reached It is understood that the method not only for double-rail window regulators but Also beneficial for single-rail window regulators for Application can get.
  • the slide contour having guide rails with their Slider sections aligned and before the Fastening process fixed in its final position.
  • the rails positioned in this way can then be fixed for example via gripper or holder become.
  • the guide rails are in the desired Location, for example with parallel spaced Slide contours, positioned.
  • This automatically results in a exact alignment of the two guide rails to each other and to the carrier. Due to the exact alignment of the slide contours omitted in the known power window systems under Circumstances necessary compensation devices.
  • Fixing method is the higher touch quality or Stability of the disc, especially compared to a Window regulator with a compensation device.
  • Fig. 1 shows an assembly carrier 1 of a vehicle door.
  • Subframe 1 has a two-rail cable window lifter 2, which two laterally spaced guide rails. 3 having slider contours 4.
  • Slide contours 4 are with the window pane 5 connectable sliding elements slidably guided.
  • the sliding elements in turn are with connectable to a cable.
  • the cable is inside the Outer shells 6 out.
  • the guide rails 3 are at attachment points 8 with the Sheet metal of the subframe 1 connected. How to Fig. 1 sees, it is enormously important, the guide rails 3 very accurately to attach to the subframe 1 and parallel to each other, to ensure easy running of the window pane 5.
  • the attachment can according to the invention by means of clinching corresponding to Figure 2, punch rivets according to Figure 3 or by welding or gluing (not shown in detail).
  • the Bulge if it disturbs visually, for example flat-pressed so-called flat point. This happens between an upper die, whose lead less protrudes far, and a flat lower punch.
  • the sheet of the subframe 1 is first within the automatic assembly process positioned with respect to the joining device.
  • the Guide rails 3 are merely pre-positioned.
  • punch side positioning pins 24th or receiving pins provided, preferably are designed as taper pins.
  • the pins 24, which the stamp 10 of the joining tool 27 arranged ahead are in the corresponding positioning receptacles 23 in the or the guide rails 3 and thus ensure a exact positioning of the guide rails 3 during the Joining process.
  • the position of the pins 24 on the joining tool 27th is tuned to the overall system.
  • the area of Positioning receptacles 23 in the guide rails 3 is so chosen that between the guide rail 3 and the sheet metal of the Aggregate carrier 1 a space 25 is present, so that the Pens 24 for positioning also the corresponding ones Positioning receptacles 23 of the guide rails 3 can reach through.
  • Positioning receptacles 23 in such an area of the Guide rails 3 to be arranged over the sheet metal of Aggregate carrier 1 also protrudes.
  • the holder of Positioning pins 24 is slidable or resilient by means of a spring 26 on the joining tool 27, since according to the Positioning by the pins only the actual Joining process between guide rail 3 and sheet metal of the Aggregate carrier 1 begins and the punch of the joining tool 27 is moved on. Due to these measures can be a extremely exact positioning of the guide rails 3 on the plate of the subframe 1 during the joining process.
  • FIG 5 In addition to the fixation of the guide rails over Positioning aids, which, as shown in Figure 4, on Tool are attached, is also an embodiment according to FIG 5 possible, in which the unit support plate 1 with Guide rails 3 is shown.
  • the unit support plate 1 with Guide rails 3 For the required Parallel position of their slide contours must be Guide rails are positioned exactly. This can, for example. done by means of a teaching.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Window Of Vehicle (AREA)
  • Automatic Assembly (AREA)

Description

Die Erfindung bezieht sich auf ein Verfahren zum Befestigen von Führungsschienen gemäß dem Oberbegriff des Anspruches 1.The invention relates to a method for fastening of guide rails according to the preamble of claim 1.

Die Befestigung der Führungsschienen von Fensterhebern an Fahrzeugtüren oder Aggregateträgerblechen erfolgt derzeit häufig mittels Nieten. Nachteilig hierbei ist, daß sich aufgrund des Nietprozesses per se die Bohrungsachsen von Aggregateträger und Führungsschienen zueinander ausrichten, so daß es aufgrund von Bohrungslagetoleranzen bei der Montage der Führungsschienenpaaren zwangsläufig zu Unparallelitäten der Gleiterkonturen der Schienen kommt. Dies bedingt u. a. eine Schwergängigkeit des Fensterhebers, so daß in der Serie zur Abdeckung aller Eventualitäten unter Umständen Motoren mit höherer Leistung eingesetzt werden.The attachment of the guide rails of window regulators Vehicle doors or subframe sheets currently takes place often by riveting. The disadvantage here is that due to the riveting process per se the bore axes of Align subframe and guide rails to each other, see above that it due to hole tolerances in the assembly of the Guide rail pairs inevitably to nonparallelism of the Slider contours of the rails comes. This requires u. a. a Binding of the window regulator, so that in the series to Covering all eventualities may include motors with higher power can be used.

Auch ist es bereits bekannt, in den mit der Fensterscheibe zu verbindenden und in den Führungsschienen gleitenden Mitnehmern eine Ausgleichseinrichtung vorzusehen, was jedoch ebenfalls mit entsprechendem Aufwand verbunden ist. Darüber hinaus ergibt sich aufgrund dieser Ausgleichsmöglichkeiten der Fensterscheibe eine Instabilität des Systems, so daß eine unerwünscht hohe Beweglichkeit der Scheibe gegeben ist. Falls kein Toleranzausgleich vorgesehen ist, kann es aber zu einem erhöhten Verschleiß des Fensterhebersystems kommen. Also, it is already known in the window pane too connecting and sliding in the guide rails drivers to provide a balancing device, which, however, also associated with corresponding effort. Furthermore arises because of these balancing possibilities of Window pane is an instability of the system, so that a undesirably high mobility of the disc is given. If no tolerance compensation is provided, but it can be a increased wear of the window regulator system come.

Ein weiterer Nachteil der bislang eingesetzten Niettechnik ist eine ggf. unzureichende Dichtigkeit zwischen Naß- und Trockenraum der Fahrzeugtür.Another disadvantage of the riveting technique used hitherto is a possibly insufficient tightness between wet and Drying room of the vehicle door.

Aus der DE 197 27 010 A ist bereits bekannt, die Seitenteile eines Fensterrahmens mit dem Rahmenbogen und den Teilen der Schachtverstärkung der Fahrzeugtür jeweils durch Schweißen oder durch andere geeignete Fügeverfahren, wie Kleben, Durchsetzfügen, Stanznieten, Löten, miteinander zu verbinden.From DE 197 27 010 A is already known, the side panels a window frame with the frame bow and the parts of the Shaft reinforcement of the vehicle door in each case by welding or by other suitable joining methods, such as gluing, Clinching, punching, soldering, joining together.

Aus der US 5 074 077 A ist ein Seilzug-Fensterheber für Kraftfahrzeuge bekannt, dessen Führungsschiene an einer mit der Fahrzeugtür zu befestigenden Halteplatte durch einen Punktschweißprozeß befestigt ist.From US 5 074 077 A is a cable window regulator for Motor vehicles known whose guide rail at one with the vehicle door to be fastened by a holding plate Spot welding process is attached.

Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren anzugeben, welches ein einfaches, exakt aufeinander abgestimmtes Positionieren von Führungsschienen, insbesondere Führungsschienenpaaren, am Aggregateträger ermöglicht, wobei es bei dem Befestigungsvorgang zu keinen Unparallelitäten der miteinander korrespondierenden Führungsabschnitte des Fensterhebersystems kommen soll.The invention is based on the object, a method specify which one is simple, exactly one another coordinated positioning of guide rails, in particular Guide rail pairs, allows the subframe, wherein it in the attachment process to no non-parallelism of the mutually corresponding guide sections of the Windows system should come.

Gelöst wird die Aufgabe durch ein Verfahren mit den Merkmalen des Anspruches 1. Vorteilhafte Ausgestaltungen finden sich in den Unteransprüchen.The problem is solved by a method with the characteristics of claim 1. Advantageous embodiments can be found in the dependent claims.

Die erfindungsgemäßen Verfahren mit einer Fixierung der Führungsschienen mittels Durchsetzfügen, Stanznieten, Schweißen oder Kleben unter Verzicht auf Bohrungen sind also solche, bei denen die Befestigung in einem einzigen Arbeitsschritt durchgeführt wird. Beim Bohren und Schrauben kann es durchaus passieren, daß die Bohrlöcher noch exakt eingebracht wurden, die Befestigung der Schienen als zweiter, getrennt durchzuführender Arbeitsvorgang, aber nicht mehr so exakt erfolgt, so daß die befestigten Schienen nicht mehr parallel verlaufen. Durch das erfindungsgemäße Verfahren ist sichergestellt, daß die Parallelität der Gleiterkonturen des Fensterhebersystems auch bei bzw. nach dem Befestigungsvorgang erhalten bleiben. Dies führt zu einem ruhigen Lauf der Fenster ohne Klemmen des Systems. Ein sogenannter "x-Ausgleich" oder eine Vorpositionierung der Mitnehmer im Fensterheber ist nicht mehr erforderlich. Insgesamt ist die Prozeßsicherheit erhöht und der Montageaufwand erniedrigt. Auch wird bei dieser Befestigungstechnik eine Dichtfunktion zwischen Naß- und Trockenraum der Fahrzeugtür erreicht. Es versteht sich, daß das Verfahren nicht nur bei Zweischienen-Fensterhebern sondern auch von Vorteil auch bei Einschienen-Fensterhebern zur Anwendung gelangen kann.The inventive method with a fixation of Guide rails by means of clinching, punch rivets, Welding or gluing waiving bores are so those in which the attachment in a single Work step is performed. When drilling and screwing It can happen that the holes are still exact the fastening of the rails as the second, separately to be performed, but not so exactly, so that the fastened rails no longer run parallel. By the method according to the invention ensured that the parallelism of the slide contours of Window lift system also during or after the attachment process remain. This leads to a quiet running of the windows without jamming the system. A so-called "x-compensation" or a pre-positioning of the driver in the window is not more required. Overall, the process reliability is increased and reduced assembly costs. Also will be at this Fastening technology a sealing function between wet and Dry space of the vehicle door reached. It is understood that the method not only for double-rail window regulators but Also beneficial for single-rail window regulators for Application can get.

Weitere Vorteile des Durchsetznietens oder Stanzfügens sind hohe Festigkeit, visuelle Prüfbarkeit, Reproduzierbarkeit, kein Vorbohren, Flüssigkeits- und Gasdichtigkeit, Eignung für unterschiedliche metallische und nichtmetallische Werkstoffe, Erhalt der Oberflächenbeschichtung (der Galvanisierung oder der Lackierung; Verzinkungsschichten fließen mit), Eignung für verschiedene Werkstoffdicken und Eignung für verschiedene Werkstoffestigkeiten. Es besteht die Möglichkeit, auch drei oder mehrere Bleche oder Lagen (auch Papier oder Textil als Zwischenlagen) miteinander zu verbinden. Further advantages of penetration riveting or punch joining are high strength, visual testability, reproducibility, no pre-drilling, liquid and gas tightness, suitability for different metallic and non-metallic materials, Obtaining the surface coating (electroplating or the paint job; Galvanizing layers flow), suitability for different material thicknesses and suitability for different Strengths of materials. There is a possibility, even three or several sheets or layers (also paper or textile as Intermediate layers).

Durch die Erfindung ist ein Automatisieren der Befestigung der Gleiterkonturen des Fensterhebers ermöglicht. Hierzu werden die die Gleiterkontur aufweisenden Führungsschienen mit ihren Gleiterabschnitten aufeinander ausgerichtet und vor dem Fügevorgang in ihrer endgültigen Position fixiert. Dies erfolgt über ein Hilfswerkzeug, mit dem die Gleiterkonturen zueinander ausgerichtet werden. Die so positionierten Schienen können dann zum Beispiel über Greifer oder Halter fixiert werden. Somit sind die Führungsschienen in der gewünschten Lage, beispielsweise mit parallel beabstandeten Gleiterkonturen, positioniert. Danach erfolgt der eigentliche Befestigungsvorgang der Führungsschienen mit anschließendem Entfernen des Hilfswerkzeugs. So ergibt sich automatisch eine exakte Ausrichtung der beiden Führungsschienen zueinander und zum Träger. Durch die exakte Ausrichtung der Gleiterkonturen entfallen die bei den bekannten Fensterhebersystemen unter Umständen erforderlichen Ausgleichseinrichtungen. Daneben ist ein besserer Wirkungsgrad des Fensterhebers bei gleichzeitiger Verringerung des Streukreises des Wirkungsgrades von Fensterheber zu Fensterheber einer Serie erreicht.By the invention is an automation of the attachment of the Slide contours of the window lift allows. To do this the slide contour having guide rails with their Slider sections aligned and before the Fastening process fixed in its final position. This via an auxiliary tool with which the slide contours aligned with each other. The rails positioned in this way can then be fixed for example via gripper or holder become. Thus, the guide rails are in the desired Location, for example with parallel spaced Slide contours, positioned. Then the actual takes place Fixing process of the guide rails followed by Remove the auxiliary tool. This automatically results in a exact alignment of the two guide rails to each other and to the carrier. Due to the exact alignment of the slide contours omitted in the known power window systems under Circumstances necessary compensation devices. Next to it is a better efficiency of the window lift at the same time Reduction of the leakage circuit of the efficiency of Window lift to windows of a series reached.

Ein weiterer Vorteil des erfindungsgemäßen Befestigungsverfahrens ist die höhere Anfaßqualität bzw. Stabilität der Scheibe, insbesondere im Vergleich zu einem Fensterheber mit einer Ausgleichseinrichtung.Another advantage of the invention Fixing method is the higher touch quality or Stability of the disc, especially compared to a Window regulator with a compensation device.

Der Verfahrensablauf beim Stanznieten und Durchsetzfügen ist aus "Stanznieten und Durchsetzfügen", Verlag Moderne Industrie, Bd. 115, 1995, bekannt. The procedure for punch riveting and clinching is from "punch rivets and clinching", Verlag Moderne Industrie, Vol. 115, 1995, known.

Die Verfahrensschritte des Schweißens oder Klebens als Befestigungsarten, die in einem einzigen Arbeitsschritt dichte Materialverbindungen ergeben, sind dem Fachmann bekannt, so daß hier nicht besonders darauf einzugehen ist.The steps of welding or gluing as Types of fasteners that seal in a single step Material compounds result, are known in the art, so that here is not particularly to be discussed.

Weitere Vorteile und Anwendungsmöglichkeiten der vorliegenden Erfindung ergeben sich aus der nachfolgenden Beschreibung eines Ausführungsbeispieles anhand der Zeichnungen.Further advantages and applications of the present Invention will become apparent from the following description an embodiment with reference to the drawings.

Es zeigen:

Figur 1
einen Aggregateträger für eine Fahrzeugtür mit erfindungsgemäß angebrachten Führungsschienen mit Gleitkonturen,
Figur 2
die grundsätzlichen Bewegungsabläufe beim Durchsetzfügen,
Figur 3
die grundsätzlichen Bewegungsabläufe beim Stanznieten,
Figur 4
die Anordnung des Aggregateträgers in einem Fügewerkzeug nach der Erfindung und
Figur 5
eine mögliche Ausführungsform eines erfindungsgemäßen Hilfswerkzeuges zum Ausrichten der Führungsschienen bzgl. des Aggregateträgers.
Show it:
FIG. 1
an assembly carrier for a vehicle door with guide rails according to the invention with sliding contours,
FIG. 2
the basic motion sequences during clinching,
FIG. 3
the basic movements in punch riveting,
FIG. 4
the arrangement of the subframe in a joining tool according to the invention and
FIG. 5
a possible embodiment of an auxiliary tool according to the invention for aligning the guide rails with respect. The subframe.

Fig. 1 zeigt einen Aggregateträger 1 einer Fahrzeugtüre. Der Aggregateträger 1 weist einen Zweischienen-Seilzugfensterheber 2 auf, welcher zwei seitlich beabstandete Führungsschienen 3 mit Gleiterkonturen 4 aufweist. An den Gleiterkonturen 4 sind mit der Fensterscheibe 5 verbindbare Gleitelemente verschiebbar geführt. Die Gleitelemente ihrerseits sind mit einem Seilzug verbindbar. Der Seilzug ist innerhalb der Außenhüllen 6 geführt.Fig. 1 shows an assembly carrier 1 of a vehicle door. Of the Subframe 1 has a two-rail cable window lifter 2, which two laterally spaced guide rails. 3 having slider contours 4. At the slide contours 4 are with the window pane 5 connectable sliding elements slidably guided. The sliding elements in turn are with connectable to a cable. The cable is inside the Outer shells 6 out.

Der Vollständigkeit halber sei erwähnt, daß der Seilzug in bekannter Weise auf eine in einem Gehäuse 7 aufgenommene Seiltrommel auf- und abwickelbar ist, wodurch ein Anheben und Absenken der Fensterscheibe 5 erfolgt.For completeness, it should be mentioned that the cable in known manner to a recorded in a housing 7 Cable drum is wound up and unwound, causing a lifting and Lowering the window pane 5 takes place.

Die Führungsschienen 3 sind an Befestigungspunkten 8 mit dem Blech des Aggregateträgers 1 verbunden. Wie man an Fig. 1 sieht, ist es enorm wichtig, die Führungsschienen 3 sehr exakt zum Aggregateträger 1 und zueinander parallel zu befestigen, um einen leichten Lauf der Fensterscheibe 5 zu gewährleisten.The guide rails 3 are at attachment points 8 with the Sheet metal of the subframe 1 connected. How to Fig. 1 sees, it is enormously important, the guide rails 3 very accurately to attach to the subframe 1 and parallel to each other, to ensure easy running of the window pane 5.

Die Befestigung kann erfindungsgemäß mittels Durchsetzfügen entsprechend Figur 2, Stanznieten entsprechend Figur 3 oder durch Schweißen oder Kleben (nicht näher gezeigt) erfolgen.The attachment can according to the invention by means of clinching corresponding to Figure 2, punch rivets according to Figure 3 or by welding or gluing (not shown in detail).

Fig. 2 zeigt schematisch die Vorgehensweise beim Stauch-Preßvorgang des Durchsetzfügens ohne Schneidanteil in vier Schritten.

  • 1. Ausgangsstellung:
  • Das Durchsetzfügen erfolgt dadurch, daß die beiden zu verbindenden Materialien (oben ein dunkel gezeichnetes Blech 9, darunter ein heller gezeichnetes Blech 11) aufeinander gelegt werden. Oberhalb der Fügestelle wird ein einfacher Formstempel 10 mit einem runden Vorsprung positioniert. Unterhalb der Fügestelle wird eine Matrize 12, die eine runde Ausnehmung mit Hinterschneidungen aufweist, positioniert. Die Ausnehmung hat dabei einen größeren Radius als der Vorsprung und hat parallele oder leicht konisch nach außen verlaufende Seitenwände.
  • 2. Tiefziehvorgang:
  • Der Formstempel 10 wird von seiner Ausgangsstellung in eine erste Position gebracht (Pfeil), in welcher ein Tiefziehen der miteinander zu verbindenden Blechteile 9, 11 in die Matrize 12 erfolgt. Die rückgesprungenen Teile des Formstempels 10 liegen noch nicht auf dem oberen Blech 9 auf.
  • 3. Auspreßvorgang:
  • Beim anschließenden Auspreßvorgang wird der Formstempel 10 weiter nach unten gedrückt, bis er am oberen Blech 9 aufliegt. Durch den Druck fließt das Material des unteren Bleches 11 in die Hinterschneidungen der Matrize 12 und neben dem Vorsprung des Formstempels 10 seitlich nach innen über das Material des oberen Bleches 9, so daß sich ein vom Material des unteren Bleches 11 umflossener "Knopf" der oberen Bleches 9 ergibt. Dies führt zu einem Formschluß zwischen beiden Blechen 9, 11, wodurch der Fügevorgang beendet ist.
  • 4. Fertige Verbindung:
  • Danach wird der Formstempel 10 in seine Ausgangsstellung zurückverfahren, wodurch die miteinander verbundenen Bauteile 9, 11 freigegeben und abgenommen werden können.
  • Fig. 2 shows schematically the procedure in the compression-compression of the clinching without cutting in four steps.
  • 1. Initial position:
  • The clinching takes place in that the two materials to be joined (above a dark drawn sheet 9, including a lighter drawn sheet 11) are placed on each other. Above the joint, a simple forming die 10 is positioned with a round projection. Below the joint, a die 12, which has a round recess with undercuts, positioned. The recess has a larger radius than the projection and has parallel or slightly conical outwardly extending side walls.
  • 2nd deep drawing process:
  • The forming die 10 is brought from its initial position into a first position (arrow), in which a deep drawing of the sheet metal parts 9, 11 to be joined together takes place in the die 12. The recessed parts of the forming die 10 are not yet on the upper plate 9.
  • 3. pressing out:
  • During the subsequent squeezing process, the forming die 10 is pressed further down until it rests against the upper sheet 9. By the pressure of the material of the lower plate 11 flows into the undercuts of the die 12 and adjacent to the projection of the forming die 10 laterally inwardly over the material of the upper plate 9, so that a surrounded by the material of the lower plate 11 "button" of the upper Sheet 9 results. This leads to a positive connection between the two sheets 9, 11, whereby the joining process is completed.
  • 4. Finished connection:
  • Thereafter, the forming die 10 is returned to its initial position, whereby the interconnected components 9, 11 can be released and removed.
  • In einem weiteren, hier nicht gezeigten Schritt kann die Ausbuchtung, wenn sie zum Beispiel optisch stört, zu einem sogenannten Flachpunkt flachgepreßt werden. Dies erfolgt zwischen einem oberen Formstempel, dessen Vorsprung weniger weit vorragt, und einem ebenen unteren Stempel. In another step, not shown here, the Bulge, if it disturbs visually, for example flat-pressed so-called flat point. this happens between an upper die, whose lead less protrudes far, and a flat lower punch.

    Fig. 3 zeigt schematisch die Vorgehensweise beim Stanznieten, wieder in vier Schritten.

  • 1. Ausgangsstellung:
  • Das Stanznieten erfolgt dadurch, daß die beiden zu verbindenden Materialien (oben ein hell gezeichnetes Blech 14, darunter ein dunkler gezeichnetes Blech 16) aufeinander gelegt werden. Oberhalb der Fügestelle wird ein Stempel 18 mit einem Halbhohlniet 22 positioniert. Unterhalb der Fügestelle wird eine Matrize 20, die eine runde Ausnehmung mit einer zentralen Erhebung (Matrizengravur) aufweist, positioniert. Die Ausnehmung hat dabei einen größeren Radius als der Halbhohlniet 22.
  • 2. Tiefziehvorgang:
  • Der Stempel 18 wird von seiner Ausgangsstellung in eine erste Position gesenkt. Mit dem Vorschub der Setzeinheit 18, 22 erfolgt durch das Aufsetzen der Setzeinheit 18, 22 eine Fixierung der Fügestelle. Beim Weiterschieben erfolgt ein Tiefziehen der miteinander zu verbindenden Blechteile 14, 16 in die Matrize 20. Mit dem weiteren Vorschub wird das Nietelement 22 dann der Fügestelle zugeführt. Die rückgesprungenen Teile des Stempels 18 liegen noch nicht auf dem oberen Blech 14 auf.
  • 3. Stanzvorgang:
  • Beim anschließenden Stanzvorgang wird der Halbhohlniet 22 weiter nach unten gedrückt, wobei er den oder die oberen Werkstoffe (Blech 14) durchstanzt und sich im duktilen matrizenseitigen Werkstoff des unteren Bleches 16 über die Matrizengravur spreizt. In diesem Fügevorgang stanzt das Stanznietteil 22 also das obere Blechteil 14 durch und formt das untere Blechteil 16 plastisch zu einem Schließkopf um. Der Niet 22 durchdringt das untere Blech 16 nicht, bildet aber einen formschlüssigen Verbund zwischen beiden Blechen 14 und 16, wodurch der Fügevorgang beendet ist.
  • 4. Fertige Verbindung:
  • Danach wird der Stempel 18 in seine Ausgangsstellung zurückverfahren (Rückhub). Der Niet 22 sowie ein ausgestanztes Materialteil des Bleches 14 bleiben in der Verbindungsstelle der Bleche 14 und 16 zurück. Das Nietelement 22 erhält im plastisch ungeformten unteren Blechteil 16 über eine Kragenbildung seinen Schließkopf. Das aus dem oberen Blechteil 14 ausgestanzte Material füllt den hohlen Nietschaft aus und wird dabei unverlierbar eingeschlossen. Die miteinander verbundenen Bauteile 14, 16 können freigegeben und abgenommen werden.
  • Fig. 3 shows schematically the procedure in the punch riveting, again in four steps.
  • 1. Initial position:
  • The punch riveting is carried out in that the two materials to be joined (above a brightly drawn sheet 14, including a darker drawn sheet 16) are placed on each other. Above the joint, a punch 18 is positioned with a Halbhohlniet 22. Below the joint, a die 20, which has a round recess with a central elevation (matrix engraving) positioned. The recess has a larger radius than the Halbhohlniet 22nd
  • 2nd deep drawing process:
  • The punch 18 is lowered from its initial position to a first position. With the advancement of the setting unit 18, 22 takes place by placing the setting unit 18, 22 a fixation of the joint. Upon further advancement, deep drawing of the sheet-metal parts 14, 16 to be joined together takes place into the die 20. With the further advance, the rivet element 22 is then fed to the joint. The recessed parts of the punch 18 are not yet on the upper plate 14.
  • 3. punching process:
  • During the subsequent punching process, the half-tubular rivet 22 is pressed further down, wherein it pierces the or the upper materials (sheet metal 14) and spreads in the ductile matrix-side material of the lower sheet 16 via the matrix engraving. In this joining process, the punch rivet part 22 thus punches the upper sheet metal part 14 and plastically forms the lower sheet metal part 16 into a closing head. The rivet 22 does not penetrate the lower plate 16, but forms a positive connection between the two sheets 14 and 16, whereby the joining operation is completed.
  • 4. Finished connection:
  • Thereafter, the punch 18 is returned to its original position (return stroke). The rivet 22 and a punched-out material part of the sheet 14 remain in the connection point of the sheets 14 and 16 back. The rivet 22 receives in the plastically unshaped lower sheet metal part 16 via a collar forming its closing head. The punched out of the upper sheet metal part 14 material fills the hollow rivet shank and is captive trapped. The interconnected components 14, 16 can be released and removed.
  • Der Unterschied des Durchsetzfügens gemäß Figur 2 gegenüber dem Stanznietens nach Figur 3 besteht darin, daß bei letzterem ein Hilfsfügeteil in Form eines Halbhohlnietes 22 erforderlich ist. Durch die Stauchung dieses Stanznietes 22 wird ein spaltfreier Formschluß der Fügeteile 14, 16 erreicht.The difference of the clinching according to FIG 2 opposite the punch rivet of Figure 3 is that in the latter an auxiliary joining part in the form of a semi-tubular rivet 22 is required is. By the compression of this punch rivet 22 is a gap-free positive engagement of the joining parts 14, 16 achieved.

    Von Vorteil besitzen die Führungsschienen 3 gemäß Figur 4 ein oder mehrere Positionierungsaufnahmen 23, wie Löcher, Durchbrechungen oder Einsenkungen oder dergleichen zur genauen Positionierung der Führungsschiene 3 am Aggregateträger 1 während des Fügevorganges. Das Blech des Aggregateträgers 1 wird zunächst innerhalb des automatischen Montageprozesses bezüglich der Fügevorrichtung positioniert. Die Führungsschienen 3 werden lediglich vorpositioniert. Am Fügewerkzeug 10 sind stempelseitig Positionierstifte 24 beziehungsweise Aufnahmestifte vorgesehen, die vorzugsweise als Kegelstifte ausgebildet sind. Sobald das Fügewerkzeug 27 zum Fügevorgang zusammenfährt, greifen die Stifte 24, welche dem Stempel 10 des Fügewerkzeuges 27 vorauseilend angeordnet sind, in die entsprechenden Positionierungsaufnahmen 23 in der oder den Führungsschienen 3 und gewährleisten somit eine exakte Positionierung der Führungsschienen 3 während des Fügevorganges. Die Position der Stifte 24 am Fügewerkzeug 27 ist auf das Gesamtsystem abgestimmt. Der Bereich der Positionierungsaufnahmen 23 in den Führungsschienen 3 ist so gewählt, daß zwischen der Führungsschiene 3 und dem Blech des Aggregateträgers 1 ein Freiraum 25 vorhanden ist, so daß die Stifte 24 zur Positionierung auch die entsprechenden Positionierungsaufnahmen 23 der Führungsschienen 3 durchgreifen können. Es ist jedoch auch möglich, die Positionierungsaufnahmen 23 in einem solchen Bereich der Führungsschienen 3 anzuordnen, der über das Blech des Aggregateträgers 1 hinaus ragt. Die Halterung der Positionierungsstifte 24 erfolgt verschiebbar oder federnd mittels einer Feder 26 an dem Fügewerkzeug 27, da nach der Positionierung durch die Stifte erst der eigentliche Fügevorgang zwischen Führungsschiene 3 und Blech des Aggregateträgers 1 beginnt und der Stempel des Fügewerkzeuges 27 weiterbewegt wird. Aufgrund dieser Maßnahmen läßt sich eine äußerst exakte Positionierung der Führungsschienen 3 am Blech des Aggregateträgers 1 während des Fügevorganges durchführen.Advantageously, the guide rails 3 according to Figure 4 a or a plurality of positioning receptacles 23, such as holes, Breakthroughs or depressions or the like for exact Positioning of the guide rail 3 on the subframe 1 during the joining process. The sheet of the subframe 1 is first within the automatic assembly process positioned with respect to the joining device. The Guide rails 3 are merely pre-positioned. At the Joining tool 10 are punch side positioning pins 24th or receiving pins provided, preferably are designed as taper pins. Once the joining tool 27 collapses to the joining process, the pins 24, which the stamp 10 of the joining tool 27 arranged ahead are in the corresponding positioning receptacles 23 in the or the guide rails 3 and thus ensure a exact positioning of the guide rails 3 during the Joining process. The position of the pins 24 on the joining tool 27th is tuned to the overall system. The area of Positioning receptacles 23 in the guide rails 3 is so chosen that between the guide rail 3 and the sheet metal of the Aggregate carrier 1 a space 25 is present, so that the Pens 24 for positioning also the corresponding ones Positioning receptacles 23 of the guide rails 3 can reach through. However, it is also possible that Positioning receptacles 23 in such an area of the Guide rails 3 to be arranged over the sheet metal of Aggregate carrier 1 also protrudes. The holder of Positioning pins 24 is slidable or resilient by means of a spring 26 on the joining tool 27, since according to the Positioning by the pins only the actual Joining process between guide rail 3 and sheet metal of the Aggregate carrier 1 begins and the punch of the joining tool 27 is moved on. Due to these measures can be a extremely exact positioning of the guide rails 3 on the plate of the subframe 1 during the joining process.

    Neben der Fixierung der Führungsschienen über Positionierhilfen, die, wie in Figur 4 dargestellt, am Werkzeug angebracht sind, ist auch eine Ausführung gemäß Figur 5 möglich, in welcher das Aggregateträgerblech 1 mit Führungsschienen 3 dargestellt ist. Für die erforderliche parallele Lage ihrer Gleiterkonturen müssen die Führungsschienen exakt positioniert werden. Dies kann bspw. mittels einer Lehre erfolgen.In addition to the fixation of the guide rails over Positioning aids, which, as shown in Figure 4, on Tool are attached, is also an embodiment according to FIG 5 possible, in which the unit support plate 1 with Guide rails 3 is shown. For the required Parallel position of their slide contours must be Guide rails are positioned exactly. This can, for example. done by means of a teaching.

    Die so positionierten Führungsschienen 3 bzw. Gleiterkonturen werden nun über Halter oder Greifer 29, die an einem Rahmen oder einem Hilfswerkzeug 28 befestigt sind, in ihrer Position gehalten. Die Positionierung und Fixierung kann dabei manuell oder automatisch erfolgen und ist auf das Referenzpunkt-System des Aggregateträgers 1 abgestimmt. Anschließend kann der Verbindungsvorgang, bspw. mit einem Tox-Werkzeug durchgeführt werden. The thus positioned guide rails 3 and slide contours are now using holders or grippers 29, attached to a frame or an auxiliary tool 28 are fixed in position held. The positioning and fixation can be done manually or automatically and is on the reference point system matched the subframe 1. Then the Connecting process, for example, performed with a Tox tool become.

    Bezugszeichenreference numeral

    11
    Aggregateträgerassembly carrier
    22
    Zweischienen-FensterheberTwo rail windows
    33
    Führungsschieneguide rail
    44
    Gleiterkonturglider contour
    55
    Fensterscheibewindowpane
    66
    Außenhülleouter shell
    77
    Gehäusecasing
    88th
    Befestigungspunktattachment point
    99
    oberes Blechupper sheet
    1010
    Formstempelforming punch
    1111
    unteres Blechlower sheet
    1212
    Matrizedie
    1414
    oberes Blechupper sheet
    1616
    unteres Blechlower sheet
    1818
    Stempelstamp
    2020
    Matrizedie
    2222
    Halbhohlnietsemi-hollow rivet
    2323
    Positionieraufnahmepositioning seat
    2424
    Positionierstiftpositioning
    2525
    Freiraumfree space
    2626
    Federfeather
    2727
    Fügewerkzeugjoining tool
    2828
    Hilfswerkzeugauxiliary tool

    Claims (8)

    1. Method of fastening guide rails (3) to vehicle doors by means of penetration joining or punch riveting or welding or gluing, wherein the connection of one or more guide rails (3), particularly a guide rail pair, of a Bowden cable window lifter (2) with an assembly carrier (1) of the vehicle door is carried out with elimination of bores and with use of an auxiliary tool (28) which can be aligned with the assembly carrier (1) and at which the guide rails (3), particularly the guide rail pair, are mounted or placed.
    2. Method according to claim 1, characterised in that the one or more guide rails (3) have one or more positioning receptacles (23), such as holes, passages or depressions, which co-operate with positioning pins (24), particularly cone pins, of the joining tool during the joining process.
    3. Method according to claim 1 or 2, characterised in that a punching die (10) with projection and a die (12) with an undercut are used for penetration joining.
    4. Method according to claim 3, characterised in that in a further working step the joint location is smoothed by means of an upper punching die with projection and a flat lower punch.
    5. Method according to claim 1 or 2, characterised in that a punch (18), a semi-tubular rivet (22) remaining in the joint location and a die (20) having a round recess with a central elevation are used for punch riveting.
    6. Method according to claim 1 or 2, characterised in that the guide rails (3) of the guide rail pair or the slide profiles thereof are held by way of grippers or holders (29), prior to the joining process, in their position with mutually parallelly extending slide profiles.
    7. Method according to claim 2, characterised in that the positioning receptacles (23) are associated with corresponding free spaces of the assembly carrier (1).
    8. Method according to claim 2 or 7, characterised in that the positioning pins (24) are displaceably or resiliently held at the joining tool.
    EP00965934A 1999-09-07 2000-09-07 Method for mounting guide rails of cable-actuated window lifters Expired - Lifetime EP1210494B1 (en)

    Applications Claiming Priority (3)

    Application Number Priority Date Filing Date Title
    DE19942569 1999-09-07
    DE19942569 1999-09-07
    PCT/EP2000/008736 WO2001018338A1 (en) 1999-09-07 2000-09-07 Method for mounting guide rails of cable-actuated window lifters

    Publications (2)

    Publication Number Publication Date
    EP1210494A1 EP1210494A1 (en) 2002-06-05
    EP1210494B1 true EP1210494B1 (en) 2005-11-02

    Family

    ID=7921033

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP00965934A Expired - Lifetime EP1210494B1 (en) 1999-09-07 2000-09-07 Method for mounting guide rails of cable-actuated window lifters

    Country Status (3)

    Country Link
    EP (1) EP1210494B1 (en)
    DE (1) DE50011518D1 (en)
    WO (1) WO2001018338A1 (en)

    Families Citing this family (2)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    FR2997028B1 (en) * 2012-10-22 2014-11-28 Valeo Securite Habitacle METHOD FOR MANUFACTURING A FUNCTIONAL LOCKING MEMBER
    DE202015105205U1 (en) * 2015-10-02 2017-01-09 BROSE SCHLIEßSYSTEME GMBH & CO. KG Door module for installation in a motor vehicle door

    Family Cites Families (6)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE2220986A1 (en) * 1972-04-28 1973-11-08 Golde Gmbh H T DEVICE FOR CONNECTING THE GUIDE TUBE OF A CABLE WINDOW LIFTER WITH A CENTRAL GUIDE RAIL, ESPECIALLY ON MOTOR VEHICLES
    DE2313050C2 (en) * 1973-03-16 1982-12-23 Rockwell Golde Gmbh, 6000 Frankfurt Device for connecting the threaded cable of a cable window regulator to a sliding window pane, in particular on motor vehicles
    DE3921289C1 (en) * 1989-06-29 1991-01-10 Brose Fahrzeugteile Gmbh & Co Kg, 8630 Coburg, De
    JPH03209042A (en) * 1990-01-08 1991-09-12 Koito Mfg Co Ltd Elevating and sinking device
    DE19616788A1 (en) * 1996-04-26 1997-11-06 Bayerische Motoren Werke Ag Vehicle door
    DE19727010B4 (en) * 1997-06-25 2006-03-09 Wagon Automotive Gmbh Window frame module for the production of motor vehicle doors

    Also Published As

    Publication number Publication date
    DE50011518D1 (en) 2005-12-08
    EP1210494A1 (en) 2002-06-05
    WO2001018338A1 (en) 2001-03-15

    Similar Documents

    Publication Publication Date Title
    EP2486288B1 (en) Connection between two components made of reinforced plastic and method for the production thereof
    EP2834528B1 (en) Self-piercing rivet with a pre-perforated flat element, production method and joining method therefor
    DE102012013325A1 (en) Joining of components made of different materials by means of a joining aid
    EP1034055A2 (en) Process and device for joining by punching and riveting
    DE3710929A1 (en) METHOD AND DEVICE FOR CONNECTING LAYER THIN PLATES
    EP2117746A1 (en) Method and tool for clinching thick sheet metal, and use of the tool
    EP2508274B1 (en) Method and device for increasing the bearing area of a fine blanked workpiece with a tooth, a tooth section or the like
    DE102011114306A1 (en) Method for joining two fiber-reinforced plastic components by metallic joining element, involves driving setting bolt through fiber-reinforced plastic-components as joint element and subsequently through metal sheet lying in joint area
    DE69729298T2 (en) SELF-DRILLING RIVET
    DE102018117387A1 (en) Method for connecting two components, auxiliary joining part and assembly part
    DE19905528B4 (en) Method and device for joining materials by means of punched rivets
    WO2018019467A1 (en) Method for undetachably introducing guiding aid elements into a component, component with guiding aid elements and composite component
    WO2018177629A1 (en) Method for joining at least one plastic component to a metal component without using a pilot hole, composite component, and self-piercing rivet setting tool
    DE102005037914B3 (en) Method for setting punched rivets
    EP1210494B1 (en) Method for mounting guide rails of cable-actuated window lifters
    DE19912460C2 (en) Method for connecting two or more workpieces with rivet elements
    EP0064263A2 (en) Apparatus for forming chamfered holes in sheet material
    DE102010009026A1 (en) Method for manufacturing punching rivet joint for connecting thin-walled components during construction of automobile structure, involves plastically deforming metal sheet component with shaft that is expanded
    DE102017205940A1 (en) Method for producing a composite component and motor vehicle
    EP3134218B1 (en) Method for the series production of punch rivet connections between frp workpieces and metal workpieces
    DE102012021756B4 (en) Process for producing a riveted joint
    DE102016200357A1 (en) Method for joining at least two components by means of a hardened joining element
    EP1321205B1 (en) Method for connecting pieces
    DE10102712A1 (en) Jointing method for two overlapping metal plates uses auxiliary jointing part formed into panels by upper and lower tools
    DE10323740B4 (en) Assembly, with a punch rivet and at least two components to be joined

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    17P Request for examination filed

    Effective date: 20020228

    AK Designated contracting states

    Kind code of ref document: A1

    Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

    17Q First examination report despatched

    Effective date: 20040311

    RBV Designated contracting states (corrected)

    Designated state(s): DE ES FR GB

    RAP1 Party data changed (applicant data changed or rights of an application transferred)

    Owner name: KUESTER AUTOMOTIVE DOOR SYSTEMS GMBH

    GRAP Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOSNIGR1

    GRAS Grant fee paid

    Free format text: ORIGINAL CODE: EPIDOSNIGR3

    GRAA (expected) grant

    Free format text: ORIGINAL CODE: 0009210

    AK Designated contracting states

    Kind code of ref document: B1

    Designated state(s): DE ES FR GB

    REG Reference to a national code

    Ref country code: GB

    Ref legal event code: FG4D

    Free format text: NOT ENGLISH

    REF Corresponds to:

    Ref document number: 50011518

    Country of ref document: DE

    Date of ref document: 20051208

    Kind code of ref document: P

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: ES

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060213

    GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

    Effective date: 20060220

    ET Fr: translation filed
    PLBE No opposition filed within time limit

    Free format text: ORIGINAL CODE: 0009261

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

    26N No opposition filed

    Effective date: 20060803

    REG Reference to a national code

    Ref country code: FR

    Ref legal event code: PLFP

    Year of fee payment: 17

    REG Reference to a national code

    Ref country code: FR

    Ref legal event code: PLFP

    Year of fee payment: 18

    REG Reference to a national code

    Ref country code: FR

    Ref legal event code: PLFP

    Year of fee payment: 19

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: FR

    Payment date: 20180924

    Year of fee payment: 19

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: GB

    Payment date: 20180919

    Year of fee payment: 19

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: DE

    Payment date: 20180930

    Year of fee payment: 19

    REG Reference to a national code

    Ref country code: DE

    Ref legal event code: R119

    Ref document number: 50011518

    Country of ref document: DE

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: DE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20200401

    GBPC Gb: european patent ceased through non-payment of renewal fee

    Effective date: 20190907

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: GB

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20190907

    Ref country code: FR

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20190930