EP1033446A1 - Method of erection of a foundation structure in a water flooded excavation - Google Patents
Method of erection of a foundation structure in a water flooded excavation Download PDFInfo
- Publication number
- EP1033446A1 EP1033446A1 EP99104322A EP99104322A EP1033446A1 EP 1033446 A1 EP1033446 A1 EP 1033446A1 EP 99104322 A EP99104322 A EP 99104322A EP 99104322 A EP99104322 A EP 99104322A EP 1033446 A1 EP1033446 A1 EP 1033446A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- lowering body
- pit
- lowering
- steel
- underground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/01—Flat foundations
- E02D27/04—Flat foundations in water or on quicksand
- E02D27/06—Floating caisson foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/08—Sinking workpieces into water or soil inasmuch as not provided for elsewhere
Definitions
- the invention relates to a method for producing a civil engineering structure in a underground mine filled with groundwater using a floating Lowering body. Such methods are used in areas where the Groundwater level high and a lowering of the groundwater is not possible or is not required.
- civil engineering For the construction of buildings below the surface of the site (civil engineering) there are also a variety of proven methods for high groundwater levels civil engineering, the most important of which are listed below.
- the above methods have a high groundwater level or more of the following shortcomings or disadvantages: high costs, lowering of the groundwater, lack of water resistance, problems with lowering up towards misalignment and snagging as well as the use of for Environmentally harmful lubricants and support emulsions.
- the object of the invention is simple, ecological to create a beneficial and inexpensive process in which nevertheless the civil engineering structure is securely anchored against buoyancy after being pumped out and static against the external earth and water pressure is safe and tight.
- a Support wall made of sheet piles, straight or curved, for example circular, manufactured.
- the sheet piles are driven by ramming, shaking and swinging, Pressing, with or without pre-drilling, assembled to a closed sheet pile, which has the contour of the future civil engineering structure, but one has a larger clear width than the outer dimensions of the civil engineering structure.
- the sheet pile is placed so deep in the ground that after excavation of the Soil inside is still deep enough to the required excavation depth is anchored in the ground to prevent both breakage and anchoring to ensure against buoyancy.
- the upper edge is expedient the sheet pile wall by means of a fastening ring, for example a steel ring or reinforced concrete ring or, if necessary, stabilized by additional floor anchors.
- a fastening ring for example a steel ring or reinforced concrete ring or, if necessary, stabilized by additional floor anchors.
- the assembly can take the form of prefabricated floating floor sections Steel is made in the construction pit filled with water, onto which the side wall sections are then placed be placed up to the full height of the lowering body.
- lowerings of the floating lowering body e.g. through ballast with water or solid weights be made.
- Another installation option is that the Lowering body on land at the manufacturer or next to the construction site largely or fully assembled and with lifting gear or otherwise in the with Water-filled construction pit inserted, lowered and, if necessary, done is assembled.
- the floating lowering body which is lowered after completion, can be reinforced in the side wall area by concrete, which is connected to the steel wall by anchoring.
- the inside of the steel floor is given a concrete reinforcement in the dry state, which in combination with steel struts of the steel floor resists the ground pressure.
- the floating lowering body is provided with suitable horizontally arranged anchor ring plates all around the outside at the level of the tank bottom and stiffened with the side wall in the width of the gap between the lowering body and the sheet pile wall. After the lowering body has been completely lowered and aligned in the construction pit, it is anchored to the sheet pile wall via the anchor ring by means of underwater welding, underwater concreting, etc.
- the anchorage can also be carried out alone or in addition to the anchor ring by means of suitable anchoring devices, which are arranged on the outside in the upper area of the lowering body and which are connected to the sheet pile in a suitable manner after lowering.
- suitable anchoring devices which are arranged on the outside in the upper area of the lowering body and which are connected to the sheet pile in a suitable manner after lowering.
- the gap between the sheet pile wall and the lowering body is filled with a suitable material, which can be excavated soil and / or concrete, for example, and the filling material is compacted.
- the groundwater is displaced.
- the lowering body is connected to the sheet pile wall and anchored by a reinforced concrete ring in the area of the terrain surface.
- ballast water in its interior can be pumped out of the lowering body, which is secured against the existing buoyancy, which completes the watertight civil engineering structure and the other internals can be installed in a dry state.
- These internals can also be installed in an advantageous manner during the step-by-step lowering process, ballast water being avoided, for example.
- Fig. 1 shows a section of a site with terrain surface 1, the groundwater table 2 and an assembly pit 18 which is just above the water table is excavated.
- the assembly pit 18 has such a diameter that from there from a construction pit enclosure, e.g. a circular sheet pile 3, set and an upper support and mounting ring 16 outside the sheet pile wall 3 can be assembled.
- the sheet pile wall 3 is set lower than that for the lowering body 10 necessary pit depths.
- the contour 20 of the lowering body in the lowered State is shown.
- Fig. 2 shows the section of Fig. 1 with the excavation 5 of the soil 4 from the Excavation pit with groundwater level 2 left to a depth 6, which allows to lower the intended lowering body 10 completely.
- Fig. 3 shows in section the arrangement of the circular sheet pile 3 with the Support and fastening ring 16 around the fully excavated underground pit 6 with a clear diameter that is larger than the outer diameter of the Lowering body 10 made of steel, whereby between the lowering body 10 and the Sheet pile 3 creates a gap 17.
- the figure shows an intermediate assembly state of the lowering body 10, which floats in the groundwater 2, consisting of a buoyant steel floor 7 with bracing 11 and an anchor ring made of steel 8.
- the contour 20 of the completely lowered lowering body shown.
- Fig. 4 shows in section a further intermediate assembly state of the lowering body 10 made of steel in the fully excavated underground pit 6, supported through the sheet pile wall 3 with support and fastening ring 16, with patches Side walls 9, introduced inner floor concrete 13 and introduced Ballast water 19. The possible concrete reinforcement on the outside of the wall the lowering body is not shown.
- Fig. 5 shows in section the finished civil engineering structure after lowering the Lowering body 10, which is connected to sheet pile wall 3 by means of anchors 8, 14 is.
- the gap 17 between the sheet pile wall 3 and the lowering body 10 is included Material 15 backfilled and compressed so that a composite construction has arisen.
- An underbody concrete 12 is placed under the steel floor 7. After filling up Ballast water 19 can be pumped out of the assembly pit 18.
Abstract
Description
Die Erfindung betrifft ein Verfahren zum Herstellen eines Tiefbauwerks in einer mit Grundwasser gefüllten Tiefbaugrube unter Verwendung eines schwimmenden Absenkkörpers. Solche Verfahren kommen in Gebieten zum Einsatz, in denen der Grundwasserstand hoch und eine Grundwasserabsenkung nicht möglich oder nicht erforderlich ist.The invention relates to a method for producing a civil engineering structure in a underground mine filled with groundwater using a floating Lowering body. Such methods are used in areas where the Groundwater level high and a lowering of the groundwater is not possible or is not required.
Für die Herstellung von Bauten unterhalb der Geländeoberfläche (Tiefbauten) gibt es auch für hohen Grundwasserstand eine Vielzahl von bewährten Verfahren der Tiefbautechnik, von denen die wichtigsten nachstehend aufgezählt werden.For the construction of buildings below the surface of the site (civil engineering) there are also a variety of proven methods for high groundwater levels civil engineering, the most important of which are listed below.
Bekannt sind:
- Die Schlitzwandbautechnik, bei der mit speziellen streifenförmigen Aushub- und Betonierverfahren die Außenwand eines Tiefbauwerkes ohne Baugrube vollständig hergestellt wird. Danach erfolgt der Erdaushub des Tiefbauwerkes und unter Wasser die Betonierung des Bodens, der mit der Seitenwand nach verschiedenen bekannten Methoden verbunden wird. Zum Stützen der Wände beim Aushub wird oft Betonit eingesetzt.
- Das Verfahren mit Grundwasserabsenkung. Dabei wird nach der durch Grundwasserabsenkung bewirkten Trockenlegung der Baugrube ein Tiefbaukörper nach bekannten Verfahren der Tiefbautechnik, in der Regel in Stahlbeton, hergestellt.
- Das Caissonverfahren, bei dem vor Aushub der Baugrube ein Caisson aus Beton oder Stahl mit den Abmessungen des Tiefbaukörpers hergestellt wird. Dieser Caisson kann mit geschlossenem Boden und/oder geschlossener Dekke hergestellt sein. Die Absenkung erfolgt beim Caisson durch Aushub des Bodens im Inneren des Caissons nach verschiedenen bekannten Methoden und gesteuerter Absenkung des Caissons durch Schwergewichtsbelastung. Bei einem geschlossenen Caisson kann der Boden im Überdruckverfahren ausgehoben werden.
- Zur Herstellung spezieller Wasserbauwerke sind Verfahren mit schwimmenden Caissons bekannt, bei denen der schwimmfähige Caisson aus Beton oder Stahl außerhalb des Bauplatzes hergestellt und zum Bauplatz geschwommen wird, um dort abgesenkt und weiter bearbeitet zu werden, beispielsweise als Stützpfeiler für Brückenbauwerke.
- Das Absenkverfahren, bei dem ringförmige Beton- oder Stahlwände im Schwerkraftverfahren abgesenkt werden, im Zusammenhang mit dem kontinuierlichen Aushub des Bodens im Inneren. An der Unterseite besitzen diese Ringwände schneidenartige Formen, wodurch während des Absenkvorganges Bodeneinbrüche vermieden werden.
- Aus der DE 42 19 078 A1 ist ein Verfahren unter Verwendung eines schwimmenden Absenkkörpers bekannt, bei dem eine Schalungsplatte an Pfählen aufgehängt wird. Auf der Schalungsplatte wird dann durch Aufbetonieren einzelner Abschnitte unter gleichzeitiger Absenkung das Tiefbauwerk erstellt. Nachteilig hierbei ist der mit dem Einbringen der Pfähle und dem Aufhängen des Tiefbauwerkes an den Pfählen verbundene technische Aufwand.
- The diaphragm wall construction technique, in which the outer wall of a civil engineering structure is completely constructed without a pit using special strip-shaped excavation and concreting processes. This is followed by the excavation of the civil engineering structure and underwater the concreting of the ground, which is connected to the side wall using various known methods. Concrete is often used to support the walls during excavation.
- The process of lowering groundwater. After the drainage of the excavation pit caused by lowering the groundwater, a civil engineering structure is manufactured using known civil engineering techniques, usually in reinforced concrete.
- The caisson process, in which a caisson made of concrete or steel with the dimensions of the civil engineering structure is made before the excavation pit is excavated. This caisson can be made with a closed bottom and / or closed ceiling. The caisson is lowered by excavating the soil inside the caisson by various known methods and controlled lowering of the caisson by heavy weight. With a closed caisson, the bottom can be excavated using the overpressure method.
- For the production of special hydraulic structures, methods with floating caissons are known, in which the floatable caisson is made of concrete or steel outside the construction site and is floated to the construction site in order to be lowered and further processed there, for example as a pillar for bridge structures.
- The lowering process, in which ring-shaped concrete or steel walls are lowered by gravity, in connection with the continuous excavation of the soil inside. On the underside, these ring walls have cutting-like shapes, which prevents floor slumps during the lowering process.
- DE 42 19 078 A1 discloses a method using a floating lowering body, in which a formwork panel is suspended on piles. The civil engineering structure is then created on the formwork panel by concreting individual sections while lowering it. The disadvantage here is the technical effort involved in installing the piles and hanging the civil engineering structure on the piles.
Die vorstehend angeführten Verfahren haben bei hohem Grundwasserstand einen oder mehrere der folgenden Mängel oder Nachteile: hohe Kosten, Grundwasserabsenkung, mangelnde Wasserdichtigkeit, Probleme beim Absenken bis hin zur Schiefstellung und Hängenbleiben sowie der Verwendung von für die Umwelt schädigende Gleitmittel und Stützemulsionen.The above methods have a high groundwater level or more of the following shortcomings or disadvantages: high costs, lowering of the groundwater, lack of water resistance, problems with lowering up towards misalignment and snagging as well as the use of for Environmentally harmful lubricants and support emulsions.
Davon ausgehend liegt der Erfindung die Aufgabe zugrunde, ein einfaches, ökologisch zuträgliches und wenig aufwendiges Verfahren zu schaffen, bei welchem dennoch das Tiefbauwerk nach dem Leerpumpen sicher gegen den Auftrieb verankert und gegen den von außen anstehenden Erd- und Wasserdruck statisch sicher und dicht ist.Proceeding from this, the object of the invention is simple, ecological to create a beneficial and inexpensive process in which nevertheless the civil engineering structure is securely anchored against buoyancy after being pumped out and static against the external earth and water pressure is safe and tight.
Diese Aufgabe wird durch die im kennzeichnenden Teil des Anspruchs 1 oder des
Anspruchs 2 enthaltenen Merkmale gelöst. Dazu wird mit üblichen Verfahren eine
Stützwand aus Spundbohlen, gerade oder gekrümmt, beispielsweise kreisförmig,
hergestellt. Die Spundbohlen werden durch Rammen, Rütteln und Schwingen,
Pressen, mit oder ohne Vorbohren, zu einer geschlossenen Spundwand zusammengefügt,
die die Kontur des zukünftigen Tiefbauwerks aufweist, jedoch eine
größere lichte Weite hat, als die äußeren Abmessungen des Tiefbauwerks.
Die Spundwand wird so tief in den Boden gesetzt, daß sie nach dem Aushub des
Erdbodens im Inneren auf die erforderliche Baugrubentiefe noch ausreichend tief
im Boden verankert ist, um sowohl Bodenbruch zu verhindern als auch Verankerung
gegen Auftrieb zu gewährleisten. Zweckmäßigerweise wird der obere Rand
der Spundwand durch einen Befestigungsring, beispielsweise einen Stahlring
oder Stahlbetonring oder, wenn erforderlich, durch zusätzliche Bodenanker stabilisiert.
Damit wird der äußere Erddruck durch die Spundwand vollständig aufgenommen.
Nach dem Aushub des Bodens aus der durch die Spundwand vorgegebenen
Baugrube bis zur vorgesehenen Tiefe bei konstant gehaltenem Grundwasserstand
erfolgt die schwimmende Montage des Absenkkörpers aus Stahl, der die
Form eines allseitig verstärkten eckigen oder runden Behälters haben kann. Anstelle
von Stahl können auch andere geeignete Werkstoffe wie Stahlbeton für den
Absenkkörper eingesetzt werden. Ebenso sind Kompositverfahren denkbar. Im
folgenden wird die Ausführungsform mit Stahl erläutert.This object is by the in the characterizing part of
Die Montage kann in Form vorgefertigter schwimmender Bodenabschnitte aus Stahl in der mit Wasser gefüllten Baugrube erfolgen, auf die dann die Seitenwandabschnitte bis zur vollständigen Höhe des Absenkkörpers aufgesetzt werden. Zur Begrenzung der freien Montagehöhe können zwischendurch, d.h. nach Montage einiger Seitenwandringabschnitte Absenkungen des schwimmenden Absenkkörpers, z.B. durch Beballastung mit Wasser oder festen Gewichtsmassen vorgenommen werden. Eine weitere Montagemöglichkeit besteht darin, daß der Absenkkörper an Land beim Hersteller oder neben dem Bauplatz weitgehend oder vollständig montiert und mit Hebezeugen oder auf andere Weise in die mit Wasser gefüllte Baugrube eingesetzt, abgesenkt und, soweit notwendig, fertig montiert wird.The assembly can take the form of prefabricated floating floor sections Steel is made in the construction pit filled with water, onto which the side wall sections are then placed be placed up to the full height of the lowering body. To limit the free installation height, to Assembly of some side wall ring sections, lowerings of the floating lowering body, e.g. through ballast with water or solid weights be made. Another installation option is that the Lowering body on land at the manufacturer or next to the construction site largely or fully assembled and with lifting gear or otherwise in the with Water-filled construction pit inserted, lowered and, if necessary, done is assembled.
Der schwimmende und nach Fertigstellung abgesenkte Absenkkörper kann im
Seitenwandbereich durch Beton verstärkt sein, welcher mit der Stahlwand durch
Verankerungen verbunden ist. Ebenso erhält der Stahlboden innen im trockenen
Zustand eine Betonverstärkung, die im Verbund mit Stahlverstrebungen des
Stahlbodens dem Bodendruck widersteht. Zusätzlich erhält der schwimmende
Absenkkörper rundum außen in Höhe des Behälterbodens geeignete waagerecht
angeordnete und mit der Seitenwand versteifte Ankerringplatten in der Breite des
Spaltes zwischen Absenkkörper und der Spundwand .
Nach vollständiger Absenkung und Ausrichten des Absenkkörpers in der Baugrube
erfolgt dessen Verankerung an der Spundwand über den Ankerring durch Unterwasserschweißen,
Unterwasserbetonieren usw. Die Verankerung kann aber
auch allein oder zusätzlich zum Ankerring durch geeignete Verankerungsvorrichtungen
erfolgen, die außen im oberen Bereich des Absenkkörpers angeordnet
sind und die nach dem Absenken mit der Spundwand in geeigneter Weise verbunden
werden. Der zwischen Spundwand und Absenkkörper vorhandene Spalt
wird mit geeignetem Material, das beispielsweise ausgehobener Boden und/oder
Beton sein kann, verfüllt und das Verfüllmaterial verdichtet. Hierbei wird das anstehende
Grundwasser verdrängt. In bevorzugter Ausgestaltung wird im Bereich
der Geländeoberfläche der Absenkkörper mit der Spundwand durch einen Stahlbetonring
verbunden und verankert. Aus dem gegen den vorhandenen Auftrieb
gesicherten Absenkkörper kann das in seinem Innenraum befindliche Ballastwasser
herausgepumpt werden, womit das wasserdichte Tiefbauwerk fertiggestellt ist
und die weiteren Einbauten im trockenen Zustand eingebracht werden können.
Diese Einbauten können auch schon in vorteilhafter Weise während des schrittweisen
Absenkvorgangs montiert werden, wobei beispielsweise Ballastwasser
vermieden werden kann.The floating lowering body, which is lowered after completion, can be reinforced in the side wall area by concrete, which is connected to the steel wall by anchoring. Likewise, the inside of the steel floor is given a concrete reinforcement in the dry state, which in combination with steel struts of the steel floor resists the ground pressure. In addition, the floating lowering body is provided with suitable horizontally arranged anchor ring plates all around the outside at the level of the tank bottom and stiffened with the side wall in the width of the gap between the lowering body and the sheet pile wall.
After the lowering body has been completely lowered and aligned in the construction pit, it is anchored to the sheet pile wall via the anchor ring by means of underwater welding, underwater concreting, etc. However, the anchorage can also be carried out alone or in addition to the anchor ring by means of suitable anchoring devices, which are arranged on the outside in the upper area of the lowering body and which are connected to the sheet pile in a suitable manner after lowering. The gap between the sheet pile wall and the lowering body is filled with a suitable material, which can be excavated soil and / or concrete, for example, and the filling material is compacted. Here, the groundwater is displaced. In a preferred embodiment, the lowering body is connected to the sheet pile wall and anchored by a reinforced concrete ring in the area of the terrain surface. The ballast water in its interior can be pumped out of the lowering body, which is secured against the existing buoyancy, which completes the watertight civil engineering structure and the other internals can be installed in a dry state. These internals can also be installed in an advantageous manner during the step-by-step lowering process, ballast water being avoided, for example.
Die Erfindung wird an Hand von Zeichnungen, die ein Ausführungsbeispiel zeigen, erläutert. Bei dem Beispiel soll ein kreisförmiges Tiefbauwerk, z.B. für Tiefgaragen oder Lagerungszwecke, dargestellt werden. In den Fig. 1 bis 5 ist der Bauablauf in den verschiedenen aufeinander folgenden Bauphasen gezeigt.The invention is illustrated by drawings that show an embodiment, explained. In the example, a circular civil engineering structure, e.g. for underground garages or storage purposes. 1 to 5 is the Construction process shown in the different successive construction phases.
Fig. 1 zeigt im Schnitt einen Bauplatz mit Geländeoberfläche 1, den Grundwasserspiegel
2 und eine Montagegrube 18, die bis kurz über den Grundwasserspiegel
ausgehoben ist. Die Montagegrube 18 hat solch einen Durchmesser, daß von
dort aus eine Baugrubenumschließung, z.B. eine kreisförmige Spundwand 3, gesetzt
und ein oberer Stütz- und Befestigungsring 16 außerhalb der Spundwand 3
montiert werden kann. Die Spundwand 3 ist tiefer gesetzt als die für den Absenkkörper
10 notwendige Baugrubentiefe. Die Kontur 20 des Absenkkörpers im abgesenkten
Zustand ist dargestellt.Fig. 1 shows a section of a site with
Fig. 2 zeigt den Schnitt von Fig. 1 mit dem Ausheben 5 des Erdreichs 4 aus der
Baugrube bei belassenem Grundwasserstand 2 bis zu einer Tiefe 6, die es gestattet,
den vorgesehenen Absenkkörper 10 vollständig abzusenken.Fig. 2 shows the section of Fig. 1 with the
Fig. 3 zeigt im Schnitt die Anordnung der kreisförmigen Spundwand 3 mit dem
Stütz- und Befestigungsring 16 um die vollständig ausgehobene Tiefbaugrube 6
mit einem lichten Durchmesser, der größer ist als der Außendurchmesser des
Absenkkörpers 10 aus Stahl, wodurch zwischen dem Absenkkörper 10 und der
Spundwand 3 ein Spalt 17 entsteht. Die Figur zeigt einen Zwischenmontagezustand
des Absenkkörpers 10, der im Grundwasser 2 schwimmt, bestehend aus
einem schwimmfähigen Stahlboden 7 mit Aussteifungen 11 und einem Ankerring
aus Stahl 8. Außerdem ist die Kontur 20 des vollständig abgesenkten Absenkkörpers
dargestellt.Fig. 3 shows in section the arrangement of the
Fig. 4 zeigt im Schnitt einen weiteren Zwischenmontagezustand des Absenkkörpers
10 aus Stahl in der vollständig ausgehobenen Tiefbaugrube 6, gestützt
durch die Spundwand 3 mit Stütz- und Befestigungsring 16, mit schußweise aufgesetzten
Seitenwänden 9, eingebrachtem Innenbodenbeton 13 sowie eingebrachtem
Ballastwasser 19. Die mögliche Betonverstärkung außen an der Wand
des Absenkkörpers ist nicht dargestellt.Fig. 4 shows in section a further intermediate assembly state of the lowering
Fig. 5 zeigt im Schnitt den fertiggestellten Tiefbaukörper nach dem Absenken des
Absenkkörpers 10, wobei dieser mittels Anker 8, 14 mit der Spundwand 3 verbunden
ist. Der Spalt 17 zwischen der Spundwand 3 und dem Absenkkörper 10 ist mit
Material 15 verfüllt und so verdichtet, daß eine Verbundbauweise entstanden ist.
Unter dem Stahlboden 7 wird ein Unterbodenbeton 12 eingebracht. Nach Auffüllen
der Montagegrube 18 kann das Ballastwasser 19 abgepumpt werden.Fig. 5 shows in section the finished civil engineering structure after lowering the
Lowering
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP99104322A EP1033446A1 (en) | 1999-03-04 | 1999-03-04 | Method of erection of a foundation structure in a water flooded excavation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP99104322A EP1033446A1 (en) | 1999-03-04 | 1999-03-04 | Method of erection of a foundation structure in a water flooded excavation |
Publications (1)
Publication Number | Publication Date |
---|---|
EP1033446A1 true EP1033446A1 (en) | 2000-09-06 |
Family
ID=8237699
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP99104322A Withdrawn EP1033446A1 (en) | 1999-03-04 | 1999-03-04 | Method of erection of a foundation structure in a water flooded excavation |
Country Status (1)
Country | Link |
---|---|
EP (1) | EP1033446A1 (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL1029953C2 (en) * | 2005-09-14 | 2007-03-15 | Franki Grondtechnieken B V | Method is for build of underground construction at least partly below ground water level and involves formation of pit and introduction of at least one foundation component at pit location prior to or after formation of pit |
CN109403350A (en) * | 2018-12-18 | 2019-03-01 | 山西建筑工程集团有限公司 | Foundation pit supporting construction and foundation pit supporting method |
CN109881684A (en) * | 2019-04-08 | 2019-06-14 | 江苏建筑职业技术学院 | A kind of moisture-proof drainage facility of foundation pit civil construction |
CN113136886A (en) * | 2021-05-22 | 2021-07-20 | 广东铭濠润建工有限公司 | Foundation pit waterproof curtain and construction method thereof |
CN113774936A (en) * | 2021-09-23 | 2021-12-10 | 中铁十一局集团第一工程有限公司 | Floating transportation, positioning and sinking construction method for double-wall steel cofferdam with pile foundation firstly and cofferdam secondly |
US20220162827A1 (en) * | 2020-11-20 | 2022-05-26 | Kevin R. NEPRUD | Floating foundation |
CN115059102A (en) * | 2022-06-30 | 2022-09-16 | 中海石油(中国)有限公司 | Installation method of wet steel cofferdam protection structure for oil-gas production under seabed mud surface |
EP4151315A1 (en) | 2021-09-16 | 2023-03-22 | BlueCatBio GmbH | Centrifuge and method for cleaning a centrifuge |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1067658A (en) * | 1965-04-20 | 1967-05-03 | Equipments D Entpr S Soc Et | Improvements in or relating to methods of manufacturing floating tanks for the storage of oil |
DE2030259A1 (en) * | 1970-06-19 | 1971-12-23 | Wayss & Freytag Kg, 6000 Frankfurt | Process for the production of structures below the water table |
GB1405880A (en) * | 1971-10-08 | 1975-09-10 | Kennedy F E | Building of underground constructions |
US3986367A (en) * | 1975-10-01 | 1976-10-19 | Kalpins Alexandrs K | Earthquake-resistant anchoring system |
DE4219078A1 (en) | 1992-06-11 | 1993-12-16 | Hochtief Ag Hoch Tiefbauten | Erecting building standing in ground-water - using vertical posts with projecting heads in water-filled pit, shuttering, and hydraulic device to construct and lower foundation unit |
-
1999
- 1999-03-04 EP EP99104322A patent/EP1033446A1/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1067658A (en) * | 1965-04-20 | 1967-05-03 | Equipments D Entpr S Soc Et | Improvements in or relating to methods of manufacturing floating tanks for the storage of oil |
DE2030259A1 (en) * | 1970-06-19 | 1971-12-23 | Wayss & Freytag Kg, 6000 Frankfurt | Process for the production of structures below the water table |
GB1405880A (en) * | 1971-10-08 | 1975-09-10 | Kennedy F E | Building of underground constructions |
US3986367A (en) * | 1975-10-01 | 1976-10-19 | Kalpins Alexandrs K | Earthquake-resistant anchoring system |
DE4219078A1 (en) | 1992-06-11 | 1993-12-16 | Hochtief Ag Hoch Tiefbauten | Erecting building standing in ground-water - using vertical posts with projecting heads in water-filled pit, shuttering, and hydraulic device to construct and lower foundation unit |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL1029953C2 (en) * | 2005-09-14 | 2007-03-15 | Franki Grondtechnieken B V | Method is for build of underground construction at least partly below ground water level and involves formation of pit and introduction of at least one foundation component at pit location prior to or after formation of pit |
CN109403350A (en) * | 2018-12-18 | 2019-03-01 | 山西建筑工程集团有限公司 | Foundation pit supporting construction and foundation pit supporting method |
CN109881684A (en) * | 2019-04-08 | 2019-06-14 | 江苏建筑职业技术学院 | A kind of moisture-proof drainage facility of foundation pit civil construction |
CN109881684B (en) * | 2019-04-08 | 2024-03-15 | 江苏建筑职业技术学院 | Dampproofing water facility of foundation ditch civil engineering construction |
US20220162827A1 (en) * | 2020-11-20 | 2022-05-26 | Kevin R. NEPRUD | Floating foundation |
US11746495B2 (en) * | 2020-11-20 | 2023-09-05 | Kevin R. NEPRUD | Floating foundation |
CN113136886A (en) * | 2021-05-22 | 2021-07-20 | 广东铭濠润建工有限公司 | Foundation pit waterproof curtain and construction method thereof |
EP4151315A1 (en) | 2021-09-16 | 2023-03-22 | BlueCatBio GmbH | Centrifuge and method for cleaning a centrifuge |
CN113774936A (en) * | 2021-09-23 | 2021-12-10 | 中铁十一局集团第一工程有限公司 | Floating transportation, positioning and sinking construction method for double-wall steel cofferdam with pile foundation firstly and cofferdam secondly |
CN115059102A (en) * | 2022-06-30 | 2022-09-16 | 中海石油(中国)有限公司 | Installation method of wet steel cofferdam protection structure for oil-gas production under seabed mud surface |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2360373B1 (en) | Offshore station, foundation for an offshore station, and method for building an offshore station | |
DE102010032259B4 (en) | Method for installing a gravity foundation for an offshore installation | |
EP1033446A1 (en) | Method of erection of a foundation structure in a water flooded excavation | |
DE10239278B4 (en) | Foundation for hydraulic structures | |
DE102005052162A1 (en) | Thermal insulated slotted walls for fluids has thermal insulation which is part of precast concrete parts or part of prefabricated finished parts made from reinforcing cage and thermal insulation | |
DE102005013993B3 (en) | Foundation for a flood protection | |
EP0200754B1 (en) | Large container for castable, pasty and muddy materials | |
DE102011012450A1 (en) | Method for installing heavyweight foundation system for offshore-wind energy plant, involves prestressing heavyweight foundation in laterally limited manner by ballast bodies before tower and/or housing of tower is mounted | |
DE19739106C1 (en) | Construction method for foundations etc. in water-filled excavation | |
DE19525590C2 (en) | Construction of an excavation pit with anchoring below the water table | |
DE4137541A1 (en) | Method of on site production of concrete piles - by implement which forms hole in the ground and directs concrete into hole | |
DE1963852A1 (en) | Method of erecting a structure that is at least partially submerged in a body of water | |
DE3620650A1 (en) | Method for producing multi-storey underground structures, in particular underground garages | |
DE4219078A1 (en) | Erecting building standing in ground-water - using vertical posts with projecting heads in water-filled pit, shuttering, and hydraulic device to construct and lower foundation unit | |
DE102008017785A1 (en) | Foundation for e.g. wind energy plant, at e.g. seas, has column supported in body such that fitting section is displaceable under influence of forces affecting column relative to body from transportation position in offshore position | |
DE102005001422A1 (en) | Sinking pits or wells involves filling concrete in shell, compressing, removing soil to let concrete lower, introducing/compressing more concrete, removing more soil to let concrete, repeating until shaft at required depth, removing shell | |
EP0340599B1 (en) | Adjustable bottom slab for high buildings and method for its production | |
DE3716750A1 (en) | Method of constructing and sinking foundation structures | |
CN214784095U (en) | Curtain wall structure | |
DE202010011625U1 (en) | Foundation for a wind energy plant | |
AT388406B (en) | Pile foundation structure and apparatus and concreting tank for producing the same | |
DE2030259C3 (en) | Process for the production of a structure below the water table | |
DE959089C (en) | Founding bodies, especially sink wells | |
AT318492B (en) | Method for sealing the base plate of a foundation structure reaching below the water table, consisting of a lower plate made of underwater poured concrete and an upper plate made of reinforced concrete above it | |
AT317092B (en) | Process for the production of a trough arranged in the ground below the groundwater level and for this purpose prefabricated reinforced concrete girders for their production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 19991116 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): DK NL |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
AKX | Designation fees paid |
Free format text: DK NL |
|
17Q | First examination report despatched |
Effective date: 20010731 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN |
|