EP1033446A1 EP99104322A EP99104322A EP1033446A1 EP 1033446 A1 EP1033446 A1 EP 1033446A1 EP 99104322 A EP99104322 A EP 99104322A EP 99104322 A EP99104322 A EP 99104322A EP 1033446 A1 EP1033446 A1 EP 1033446A1
Authority
EP
European Patent Office
Prior art keywords
lowering body
pit
lowering
steel
underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP99104322A
Other languages
German (de)
French (fr)
Inventor
Gert Dr. Dallach
Alfred Dudszus
Rolf MÜNCH
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to EP99104322A priority Critical patent/EP1033446A1/en
Publication of EP1033446A1 publication Critical patent/EP1033446A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/04Flat foundations in water or on quicksand
    • E02D27/06Floating caisson foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/08Sinking workpieces into water or soil inasmuch as not provided for elsewhere

Definitions

  • the invention relates to a method for producing a civil engineering structure in a underground mine filled with groundwater using a floating Lowering body. Such methods are used in areas where the Groundwater level high and a lowering of the groundwater is not possible or is not required.
  • civil engineering For the construction of buildings below the surface of the site (civil engineering) there are also a variety of proven methods for high groundwater levels civil engineering, the most important of which are listed below.
  • the above methods have a high groundwater level or more of the following shortcomings or disadvantages: high costs, lowering of the groundwater, lack of water resistance, problems with lowering up towards misalignment and snagging as well as the use of for Environmentally harmful lubricants and support emulsions.
  • the object of the invention is simple, ecological to create a beneficial and inexpensive process in which nevertheless the civil engineering structure is securely anchored against buoyancy after being pumped out and static against the external earth and water pressure is safe and tight.
  • a Support wall made of sheet piles, straight or curved, for example circular, manufactured.
  • the sheet piles are driven by ramming, shaking and swinging, Pressing, with or without pre-drilling, assembled to a closed sheet pile, which has the contour of the future civil engineering structure, but one has a larger clear width than the outer dimensions of the civil engineering structure.
  • the sheet pile is placed so deep in the ground that after excavation of the Soil inside is still deep enough to the required excavation depth is anchored in the ground to prevent both breakage and anchoring to ensure against buoyancy.
  • the upper edge is expedient the sheet pile wall by means of a fastening ring, for example a steel ring or reinforced concrete ring or, if necessary, stabilized by additional floor anchors.
  • a fastening ring for example a steel ring or reinforced concrete ring or, if necessary, stabilized by additional floor anchors.
  • the assembly can take the form of prefabricated floating floor sections Steel is made in the construction pit filled with water, onto which the side wall sections are then placed be placed up to the full height of the lowering body.
  • lowerings of the floating lowering body e.g. through ballast with water or solid weights be made.
  • Another installation option is that the Lowering body on land at the manufacturer or next to the construction site largely or fully assembled and with lifting gear or otherwise in the with Water-filled construction pit inserted, lowered and, if necessary, done is assembled.
  • the floating lowering body which is lowered after completion, can be reinforced in the side wall area by concrete, which is connected to the steel wall by anchoring.
  • the inside of the steel floor is given a concrete reinforcement in the dry state, which in combination with steel struts of the steel floor resists the ground pressure.
  • the floating lowering body is provided with suitable horizontally arranged anchor ring plates all around the outside at the level of the tank bottom and stiffened with the side wall in the width of the gap between the lowering body and the sheet pile wall. After the lowering body has been completely lowered and aligned in the construction pit, it is anchored to the sheet pile wall via the anchor ring by means of underwater welding, underwater concreting, etc.
  • the anchorage can also be carried out alone or in addition to the anchor ring by means of suitable anchoring devices, which are arranged on the outside in the upper area of the lowering body and which are connected to the sheet pile in a suitable manner after lowering.
  • suitable anchoring devices which are arranged on the outside in the upper area of the lowering body and which are connected to the sheet pile in a suitable manner after lowering.
  • the gap between the sheet pile wall and the lowering body is filled with a suitable material, which can be excavated soil and / or concrete, for example, and the filling material is compacted.
  • the groundwater is displaced.
  • the lowering body is connected to the sheet pile wall and anchored by a reinforced concrete ring in the area of the terrain surface.
  • ballast water in its interior can be pumped out of the lowering body, which is secured against the existing buoyancy, which completes the watertight civil engineering structure and the other internals can be installed in a dry state.
  • These internals can also be installed in an advantageous manner during the step-by-step lowering process, ballast water being avoided, for example.
  • Fig. 1 shows a section of a site with terrain surface 1, the groundwater table 2 and an assembly pit 18 which is just above the water table is excavated.
  • the assembly pit 18 has such a diameter that from there from a construction pit enclosure, e.g. a circular sheet pile 3, set and an upper support and mounting ring 16 outside the sheet pile wall 3 can be assembled.
  • the sheet pile wall 3 is set lower than that for the lowering body 10 necessary pit depths.
  • the contour 20 of the lowering body in the lowered State is shown.
  • Fig. 2 shows the section of Fig. 1 with the excavation 5 of the soil 4 from the Excavation pit with groundwater level 2 left to a depth 6, which allows to lower the intended lowering body 10 completely.
  • Fig. 3 shows in section the arrangement of the circular sheet pile 3 with the Support and fastening ring 16 around the fully excavated underground pit 6 with a clear diameter that is larger than the outer diameter of the Lowering body 10 made of steel, whereby between the lowering body 10 and the Sheet pile 3 creates a gap 17.
  • the figure shows an intermediate assembly state of the lowering body 10, which floats in the groundwater 2, consisting of a buoyant steel floor 7 with bracing 11 and an anchor ring made of steel 8.
  • the contour 20 of the completely lowered lowering body shown.
  • Fig. 4 shows in section a further intermediate assembly state of the lowering body 10 made of steel in the fully excavated underground pit 6, supported through the sheet pile wall 3 with support and fastening ring 16, with patches Side walls 9, introduced inner floor concrete 13 and introduced Ballast water 19. The possible concrete reinforcement on the outside of the wall the lowering body is not shown.
  • Fig. 5 shows in section the finished civil engineering structure after lowering the Lowering body 10, which is connected to sheet pile wall 3 by means of anchors 8, 14 is.
  • the gap 17 between the sheet pile wall 3 and the lowering body 10 is included Material 15 backfilled and compressed so that a composite construction has arisen.
  • An underbody concrete 12 is placed under the steel floor 7. After filling up Ballast water 19 can be pumped out of the assembly pit 18.

Abstract

The floating box (10) lowered into the pit (6) is assembled on land from a base, side walls (9), reinforcing elements and anchor fittings made from steel or other suitable materials. The watertight box is then floated in the water and lowered continuously or in steps whilst being anchored in the pit. An Independent claim is included for a similar construction method, where the box is assembled in the pit.

Description

Die Erfindung betrifft ein Verfahren zum Herstellen eines Tiefbauwerks in einer mit Grundwasser gefüllten Tiefbaugrube unter Verwendung eines schwimmenden Absenkkörpers. Solche Verfahren kommen in Gebieten zum Einsatz, in denen der Grundwasserstand hoch und eine Grundwasserabsenkung nicht möglich oder nicht erforderlich ist.The invention relates to a method for producing a civil engineering structure in a underground mine filled with groundwater using a floating Lowering body. Such methods are used in areas where the Groundwater level high and a lowering of the groundwater is not possible or is not required.

Für die Herstellung von Bauten unterhalb der Geländeoberfläche (Tiefbauten) gibt es auch für hohen Grundwasserstand eine Vielzahl von bewährten Verfahren der Tiefbautechnik, von denen die wichtigsten nachstehend aufgezählt werden.For the construction of buildings below the surface of the site (civil engineering) there are also a variety of proven methods for high groundwater levels civil engineering, the most important of which are listed below.

Bekannt sind:

  • Die Schlitzwandbautechnik, bei der mit speziellen streifenförmigen Aushub- und Betonierverfahren die Außenwand eines Tiefbauwerkes ohne Baugrube vollständig hergestellt wird. Danach erfolgt der Erdaushub des Tiefbauwerkes und unter Wasser die Betonierung des Bodens, der mit der Seitenwand nach verschiedenen bekannten Methoden verbunden wird. Zum Stützen der Wände beim Aushub wird oft Betonit eingesetzt.
  • Das Verfahren mit Grundwasserabsenkung. Dabei wird nach der durch Grundwasserabsenkung bewirkten Trockenlegung der Baugrube ein Tiefbaukörper nach bekannten Verfahren der Tiefbautechnik, in der Regel in Stahlbeton, hergestellt.
  • Das Caissonverfahren, bei dem vor Aushub der Baugrube ein Caisson aus Beton oder Stahl mit den Abmessungen des Tiefbaukörpers hergestellt wird. Dieser Caisson kann mit geschlossenem Boden und/oder geschlossener Dekke hergestellt sein. Die Absenkung erfolgt beim Caisson durch Aushub des Bodens im Inneren des Caissons nach verschiedenen bekannten Methoden und gesteuerter Absenkung des Caissons durch Schwergewichtsbelastung. Bei einem geschlossenen Caisson kann der Boden im Überdruckverfahren ausgehoben werden.
  • Zur Herstellung spezieller Wasserbauwerke sind Verfahren mit schwimmenden Caissons bekannt, bei denen der schwimmfähige Caisson aus Beton oder Stahl außerhalb des Bauplatzes hergestellt und zum Bauplatz geschwommen wird, um dort abgesenkt und weiter bearbeitet zu werden, beispielsweise als Stützpfeiler für Brückenbauwerke.
  • Das Absenkverfahren, bei dem ringförmige Beton- oder Stahlwände im Schwerkraftverfahren abgesenkt werden, im Zusammenhang mit dem kontinuierlichen Aushub des Bodens im Inneren. An der Unterseite besitzen diese Ringwände schneidenartige Formen, wodurch während des Absenkvorganges Bodeneinbrüche vermieden werden.
  • Aus der DE 42 19 078 A1 ist ein Verfahren unter Verwendung eines schwimmenden Absenkkörpers bekannt, bei dem eine Schalungsplatte an Pfählen aufgehängt wird. Auf der Schalungsplatte wird dann durch Aufbetonieren einzelner Abschnitte unter gleichzeitiger Absenkung das Tiefbauwerk erstellt. Nachteilig hierbei ist der mit dem Einbringen der Pfähle und dem Aufhängen des Tiefbauwerkes an den Pfählen verbundene technische Aufwand.
Are known:
  • The diaphragm wall construction technique, in which the outer wall of a civil engineering structure is completely constructed without a pit using special strip-shaped excavation and concreting processes. This is followed by the excavation of the civil engineering structure and underwater the concreting of the ground, which is connected to the side wall using various known methods. Concrete is often used to support the walls during excavation.
  • The process of lowering groundwater. After the drainage of the excavation pit caused by lowering the groundwater, a civil engineering structure is manufactured using known civil engineering techniques, usually in reinforced concrete.
  • The caisson process, in which a caisson made of concrete or steel with the dimensions of the civil engineering structure is made before the excavation pit is excavated. This caisson can be made with a closed bottom and / or closed ceiling. The caisson is lowered by excavating the soil inside the caisson by various known methods and controlled lowering of the caisson by heavy weight. With a closed caisson, the bottom can be excavated using the overpressure method.
  • For the production of special hydraulic structures, methods with floating caissons are known, in which the floatable caisson is made of concrete or steel outside the construction site and is floated to the construction site in order to be lowered and further processed there, for example as a pillar for bridge structures.
  • The lowering process, in which ring-shaped concrete or steel walls are lowered by gravity, in connection with the continuous excavation of the soil inside. On the underside, these ring walls have cutting-like shapes, which prevents floor slumps during the lowering process.
  • DE 42 19 078 A1 discloses a method using a floating lowering body, in which a formwork panel is suspended on piles. The civil engineering structure is then created on the formwork panel by concreting individual sections while lowering it. The disadvantage here is the technical effort involved in installing the piles and hanging the civil engineering structure on the piles.

Die vorstehend angeführten Verfahren haben bei hohem Grundwasserstand einen oder mehrere der folgenden Mängel oder Nachteile: hohe Kosten, Grundwasserabsenkung, mangelnde Wasserdichtigkeit, Probleme beim Absenken bis hin zur Schiefstellung und Hängenbleiben sowie der Verwendung von für die Umwelt schädigende Gleitmittel und Stützemulsionen.The above methods have a high groundwater level or more of the following shortcomings or disadvantages: high costs, lowering of the groundwater, lack of water resistance, problems with lowering up towards misalignment and snagging as well as the use of for Environmentally harmful lubricants and support emulsions.

Davon ausgehend liegt der Erfindung die Aufgabe zugrunde, ein einfaches, ökologisch zuträgliches und wenig aufwendiges Verfahren zu schaffen, bei welchem dennoch das Tiefbauwerk nach dem Leerpumpen sicher gegen den Auftrieb verankert und gegen den von außen anstehenden Erd- und Wasserdruck statisch sicher und dicht ist.Proceeding from this, the object of the invention is simple, ecological to create a beneficial and inexpensive process in which nevertheless the civil engineering structure is securely anchored against buoyancy after being pumped out and static against the external earth and water pressure is safe and tight.

Diese Aufgabe wird durch die im kennzeichnenden Teil des Anspruchs 1 oder des Anspruchs 2 enthaltenen Merkmale gelöst. Dazu wird mit üblichen Verfahren eine Stützwand aus Spundbohlen, gerade oder gekrümmt, beispielsweise kreisförmig, hergestellt. Die Spundbohlen werden durch Rammen, Rütteln und Schwingen, Pressen, mit oder ohne Vorbohren, zu einer geschlossenen Spundwand zusammengefügt, die die Kontur des zukünftigen Tiefbauwerks aufweist, jedoch eine größere lichte Weite hat, als die äußeren Abmessungen des Tiefbauwerks. Die Spundwand wird so tief in den Boden gesetzt, daß sie nach dem Aushub des Erdbodens im Inneren auf die erforderliche Baugrubentiefe noch ausreichend tief im Boden verankert ist, um sowohl Bodenbruch zu verhindern als auch Verankerung gegen Auftrieb zu gewährleisten. Zweckmäßigerweise wird der obere Rand der Spundwand durch einen Befestigungsring, beispielsweise einen Stahlring oder Stahlbetonring oder, wenn erforderlich, durch zusätzliche Bodenanker stabilisiert. Damit wird der äußere Erddruck durch die Spundwand vollständig aufgenommen. Nach dem Aushub des Bodens aus der durch die Spundwand vorgegebenen Baugrube bis zur vorgesehenen Tiefe bei konstant gehaltenem Grundwasserstand erfolgt die schwimmende Montage des Absenkkörpers aus Stahl, der die Form eines allseitig verstärkten eckigen oder runden Behälters haben kann. Anstelle von Stahl können auch andere geeignete Werkstoffe wie Stahlbeton für den Absenkkörper eingesetzt werden. Ebenso sind Kompositverfahren denkbar. Im folgenden wird die Ausführungsform mit Stahl erläutert.This object is by the in the characterizing part of claim 1 or Features contained claim 2 solved. To do this, a Support wall made of sheet piles, straight or curved, for example circular, manufactured. The sheet piles are driven by ramming, shaking and swinging, Pressing, with or without pre-drilling, assembled to a closed sheet pile, which has the contour of the future civil engineering structure, but one has a larger clear width than the outer dimensions of the civil engineering structure. The sheet pile is placed so deep in the ground that after excavation of the Soil inside is still deep enough to the required excavation depth is anchored in the ground to prevent both breakage and anchoring to ensure against buoyancy. The upper edge is expedient the sheet pile wall by means of a fastening ring, for example a steel ring or reinforced concrete ring or, if necessary, stabilized by additional floor anchors. This means that the external earth pressure is completely absorbed by the sheet pile wall. After excavating the soil from the one specified by the sheet pile wall Excavation pit to the intended depth with a constant groundwater level is carried out the floating assembly of the lowering body made of steel, which the Can have the shape of a square or round container reinforced on all sides. Instead of Steel can also be used for other suitable materials such as reinforced concrete Lowering body can be used. Composite processes are also conceivable. in the The embodiment with steel is explained below.

Die Montage kann in Form vorgefertigter schwimmender Bodenabschnitte aus Stahl in der mit Wasser gefüllten Baugrube erfolgen, auf die dann die Seitenwandabschnitte bis zur vollständigen Höhe des Absenkkörpers aufgesetzt werden. Zur Begrenzung der freien Montagehöhe können zwischendurch, d.h. nach Montage einiger Seitenwandringabschnitte Absenkungen des schwimmenden Absenkkörpers, z.B. durch Beballastung mit Wasser oder festen Gewichtsmassen vorgenommen werden. Eine weitere Montagemöglichkeit besteht darin, daß der Absenkkörper an Land beim Hersteller oder neben dem Bauplatz weitgehend oder vollständig montiert und mit Hebezeugen oder auf andere Weise in die mit Wasser gefüllte Baugrube eingesetzt, abgesenkt und, soweit notwendig, fertig montiert wird.The assembly can take the form of prefabricated floating floor sections Steel is made in the construction pit filled with water, onto which the side wall sections are then placed be placed up to the full height of the lowering body. To limit the free installation height, to Assembly of some side wall ring sections, lowerings of the floating lowering body, e.g. through ballast with water or solid weights be made. Another installation option is that the Lowering body on land at the manufacturer or next to the construction site largely or fully assembled and with lifting gear or otherwise in the with Water-filled construction pit inserted, lowered and, if necessary, done is assembled.

Der schwimmende und nach Fertigstellung abgesenkte Absenkkörper kann im Seitenwandbereich durch Beton verstärkt sein, welcher mit der Stahlwand durch Verankerungen verbunden ist. Ebenso erhält der Stahlboden innen im trockenen Zustand eine Betonverstärkung, die im Verbund mit Stahlverstrebungen des Stahlbodens dem Bodendruck widersteht. Zusätzlich erhält der schwimmende Absenkkörper rundum außen in Höhe des Behälterbodens geeignete waagerecht angeordnete und mit der Seitenwand versteifte Ankerringplatten in der Breite des Spaltes zwischen Absenkkörper und der Spundwand .
Nach vollständiger Absenkung und Ausrichten des Absenkkörpers in der Baugrube erfolgt dessen Verankerung an der Spundwand über den Ankerring durch Unterwasserschweißen, Unterwasserbetonieren usw. Die Verankerung kann aber auch allein oder zusätzlich zum Ankerring durch geeignete Verankerungsvorrichtungen erfolgen, die außen im oberen Bereich des Absenkkörpers angeordnet sind und die nach dem Absenken mit der Spundwand in geeigneter Weise verbunden werden. Der zwischen Spundwand und Absenkkörper vorhandene Spalt wird mit geeignetem Material, das beispielsweise ausgehobener Boden und/oder Beton sein kann, verfüllt und das Verfüllmaterial verdichtet. Hierbei wird das anstehende Grundwasser verdrängt. In bevorzugter Ausgestaltung wird im Bereich der Geländeoberfläche der Absenkkörper mit der Spundwand durch einen Stahlbetonring verbunden und verankert. Aus dem gegen den vorhandenen Auftrieb gesicherten Absenkkörper kann das in seinem Innenraum befindliche Ballastwasser herausgepumpt werden, womit das wasserdichte Tiefbauwerk fertiggestellt ist und die weiteren Einbauten im trockenen Zustand eingebracht werden können. Diese Einbauten können auch schon in vorteilhafter Weise während des schrittweisen Absenkvorgangs montiert werden, wobei beispielsweise Ballastwasser vermieden werden kann.
The floating lowering body, which is lowered after completion, can be reinforced in the side wall area by concrete, which is connected to the steel wall by anchoring. Likewise, the inside of the steel floor is given a concrete reinforcement in the dry state, which in combination with steel struts of the steel floor resists the ground pressure. In addition, the floating lowering body is provided with suitable horizontally arranged anchor ring plates all around the outside at the level of the tank bottom and stiffened with the side wall in the width of the gap between the lowering body and the sheet pile wall.
After the lowering body has been completely lowered and aligned in the construction pit, it is anchored to the sheet pile wall via the anchor ring by means of underwater welding, underwater concreting, etc. However, the anchorage can also be carried out alone or in addition to the anchor ring by means of suitable anchoring devices, which are arranged on the outside in the upper area of the lowering body and which are connected to the sheet pile in a suitable manner after lowering. The gap between the sheet pile wall and the lowering body is filled with a suitable material, which can be excavated soil and / or concrete, for example, and the filling material is compacted. Here, the groundwater is displaced. In a preferred embodiment, the lowering body is connected to the sheet pile wall and anchored by a reinforced concrete ring in the area of the terrain surface. The ballast water in its interior can be pumped out of the lowering body, which is secured against the existing buoyancy, which completes the watertight civil engineering structure and the other internals can be installed in a dry state. These internals can also be installed in an advantageous manner during the step-by-step lowering process, ballast water being avoided, for example.

Die Erfindung wird an Hand von Zeichnungen, die ein Ausführungsbeispiel zeigen, erläutert. Bei dem Beispiel soll ein kreisförmiges Tiefbauwerk, z.B. für Tiefgaragen oder Lagerungszwecke, dargestellt werden. In den Fig. 1 bis 5 ist der Bauablauf in den verschiedenen aufeinander folgenden Bauphasen gezeigt.The invention is illustrated by drawings that show an embodiment, explained. In the example, a circular civil engineering structure, e.g. for underground garages or storage purposes. 1 to 5 is the Construction process shown in the different successive construction phases.

Fig. 1 zeigt im Schnitt einen Bauplatz mit Geländeoberfläche 1, den Grundwasserspiegel 2 und eine Montagegrube 18, die bis kurz über den Grundwasserspiegel ausgehoben ist. Die Montagegrube 18 hat solch einen Durchmesser, daß von dort aus eine Baugrubenumschließung, z.B. eine kreisförmige Spundwand 3, gesetzt und ein oberer Stütz- und Befestigungsring 16 außerhalb der Spundwand 3 montiert werden kann. Die Spundwand 3 ist tiefer gesetzt als die für den Absenkkörper 10 notwendige Baugrubentiefe. Die Kontur 20 des Absenkkörpers im abgesenkten Zustand ist dargestellt.Fig. 1 shows a section of a site with terrain surface 1, the groundwater table 2 and an assembly pit 18 which is just above the water table is excavated. The assembly pit 18 has such a diameter that from there from a construction pit enclosure, e.g. a circular sheet pile 3, set and an upper support and mounting ring 16 outside the sheet pile wall 3 can be assembled. The sheet pile wall 3 is set lower than that for the lowering body 10 necessary pit depths. The contour 20 of the lowering body in the lowered State is shown.

Fig. 2 zeigt den Schnitt von Fig. 1 mit dem Ausheben 5 des Erdreichs 4 aus der Baugrube bei belassenem Grundwasserstand 2 bis zu einer Tiefe 6, die es gestattet, den vorgesehenen Absenkkörper 10 vollständig abzusenken.Fig. 2 shows the section of Fig. 1 with the excavation 5 of the soil 4 from the Excavation pit with groundwater level 2 left to a depth 6, which allows to lower the intended lowering body 10 completely.

Fig. 3 zeigt im Schnitt die Anordnung der kreisförmigen Spundwand 3 mit dem Stütz- und Befestigungsring 16 um die vollständig ausgehobene Tiefbaugrube 6 mit einem lichten Durchmesser, der größer ist als der Außendurchmesser des Absenkkörpers 10 aus Stahl, wodurch zwischen dem Absenkkörper 10 und der Spundwand 3 ein Spalt 17 entsteht. Die Figur zeigt einen Zwischenmontagezustand des Absenkkörpers 10, der im Grundwasser 2 schwimmt, bestehend aus einem schwimmfähigen Stahlboden 7 mit Aussteifungen 11 und einem Ankerring aus Stahl 8. Außerdem ist die Kontur 20 des vollständig abgesenkten Absenkkörpers dargestellt.Fig. 3 shows in section the arrangement of the circular sheet pile 3 with the Support and fastening ring 16 around the fully excavated underground pit 6 with a clear diameter that is larger than the outer diameter of the Lowering body 10 made of steel, whereby between the lowering body 10 and the Sheet pile 3 creates a gap 17. The figure shows an intermediate assembly state of the lowering body 10, which floats in the groundwater 2, consisting of a buoyant steel floor 7 with bracing 11 and an anchor ring made of steel 8. In addition, the contour 20 of the completely lowered lowering body shown.

Fig. 4 zeigt im Schnitt einen weiteren Zwischenmontagezustand des Absenkkörpers 10 aus Stahl in der vollständig ausgehobenen Tiefbaugrube 6, gestützt durch die Spundwand 3 mit Stütz- und Befestigungsring 16, mit schußweise aufgesetzten Seitenwänden 9, eingebrachtem Innenbodenbeton 13 sowie eingebrachtem Ballastwasser 19. Die mögliche Betonverstärkung außen an der Wand des Absenkkörpers ist nicht dargestellt.Fig. 4 shows in section a further intermediate assembly state of the lowering body 10 made of steel in the fully excavated underground pit 6, supported through the sheet pile wall 3 with support and fastening ring 16, with patches Side walls 9, introduced inner floor concrete 13 and introduced Ballast water 19. The possible concrete reinforcement on the outside of the wall the lowering body is not shown.

Fig. 5 zeigt im Schnitt den fertiggestellten Tiefbaukörper nach dem Absenken des Absenkkörpers 10, wobei dieser mittels Anker 8, 14 mit der Spundwand 3 verbunden ist. Der Spalt 17 zwischen der Spundwand 3 und dem Absenkkörper 10 ist mit Material 15 verfüllt und so verdichtet, daß eine Verbundbauweise entstanden ist. Unter dem Stahlboden 7 wird ein Unterbodenbeton 12 eingebracht. Nach Auffüllen der Montagegrube 18 kann das Ballastwasser 19 abgepumpt werden.Fig. 5 shows in section the finished civil engineering structure after lowering the Lowering body 10, which is connected to sheet pile wall 3 by means of anchors 8, 14 is. The gap 17 between the sheet pile wall 3 and the lowering body 10 is included Material 15 backfilled and compressed so that a composite construction has arisen. An underbody concrete 12 is placed under the steel floor 7. After filling up Ballast water 19 can be pumped out of the assembly pit 18.

Claims (7)

Verfahren zum Herstellen eines Tiefbauwerkes in einer teilweise oder vollständig mit Grundwasser (2) gefüllten Tiefbaugrube (6) unter Verwendung eines schwimmenden Absenkkörpers (10), wobei die Wände der Tiefbaugrube (6) durch gekannte Baugrubenumschließungen (3) wie Spundwände o.a. gesichert sind, dadurch gekennzeichnet, daß der einen Boden (7), Seitenwände (9) sowie Verstärkungen und Verankerungen (8, 14) aus Stahl oder einem anderen geeigneten Material aufweisende Absenkkörper (10) an Land montiert, dann wasserdicht schwimmend in die Tiefbaugrube (6) eingesetzt wird, nach Beendigung des Einsatzes kontinuierlich oder schrittweise abgesenkt und in der Tiefbaugrube (6) verankert wird.Process for producing a civil engineering structure in a partial or complete underground mine (6) filled with groundwater (2) using a floating sinker (10), the walls of the underground pit (6) through known construction pit enclosures (3) such as sheet piling or the like secured are characterized in that the one floor (7), side walls (9) as well as reinforcements and anchors (8, 14) made of steel or another lowering bodies (10) having a suitable material are mounted on land, is then inserted into the underground pit (6) in a floating manner End of use continuously or gradually lowered and in the underground pit (6) is anchored. Verfahren zur Herstellung eines Tiefbauwerkes in einer teilweise oder vollständig mit Grundwasser (2) gefüllten Tiefbaugrube, deren Wände durch bekannte Baugrubenumschließungen (3) wie Spundwände o.a. gesichert sind unter Verwendung eines Absenkkörpers (10), dadurch gekennzeichnet, daß der Absenkkörper (10) schwimmend in Abschnittsbauweise in der Weise hergestellt wird, daß ein vorgefertigter schwimmender Bodenabschnitt (7) aus Stahl oder einem anderen Material in die Tiefbaugrube eingesetzt wird, daß auf den Bodenabschnitt (7) aus Stahl oder einem anderen Material bestehende Seitenwandabschnitte (9) bis zur vollständigen Höhe des Absenkkörpers (10), gegebenenfalls unter Zwischenabsenkung des Absenkkörpers (10), aufgesetzt werden, daß der Absenkkörper (10) nach seiner Fertigstellung abschließend abgesenkt und in der Tiefbaugrube (6) verankert wird.Process for the production of a civil engineering structure in a partial or complete underground mine filled with groundwater (2), the walls of which are known Construction pit enclosures (3) such as sheet piling etc. are secured using a lowering body (10), characterized in that the lowering body (10) is made floating in the manner of a section construction will that a prefabricated floating floor section (7) Steel or other material is used in the underground pit that on the bottom section (7) made of steel or another material Side wall sections (9) up to the full height of the lowering body (10), optionally with intermediate lowering of the lowering body (10) be that the lowering body (10) final after its completion lowered and anchored in the underground pit (6). Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß der Absenkkörper (10) aus Beton oder Stahlbeton oder aus einem anderen geeigneten Werkstoff gefertigt ist. A method according to claim 1 or 2, characterized in that the lowering body (10) Concrete or reinforced concrete or any other suitable Material is made. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß der Boden aus Stahl (7) bzw. der Bodenabschnitt aus Stahl (7) und/oder die Seitenwände aus Stahl (9) mit Beton verstärkt werden, wobei der Beton mit dem Boden (7) bzw. den Seitenwänden (9) verankert ist.Method according to claim 1 or 2, characterized in that the bottom made of steel (7) or the bottom section made of steel (7) and / or the side walls made of steel (9) reinforced with concrete, the concrete being reinforced with the floor (7) or the side walls (9) is anchored. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß der Absenkkörper (10) in der Höhe des Bodens (7) an der Außenseite einen Ankerring (8) besitzt und daß der Ankerring (8) an der Wand (3) der Tiefbaugrube (6) verankert ist.Method according to one of claims 1 to 3, characterized in that the lowering body (10) at the level of the bottom (7) on the outside Has anchor ring (8) and that the anchor ring (8) on the wall (3) of the underground pit (6) is anchored. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß der Absenkkörper (10) in Höhe der Oberkante Verankerungsvorrichtungen (14) besitzt, die mit der Oberseite der Wand (3) der Tiefbaugrube (6) verbunden sind.Method according to one of claims 1 to 3, characterized in that the lowering body (10) at the level of the upper edge of the anchoring devices (14), which is connected to the top of the wall (3) of the underground pit (6) are. Verfahren nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, daß zwischen der Wand (3) der Tiefbaugrube (6) und dem Absenkkörper (10) ein Spalt (17) vorhanden ist und daß dieser Spalt (17) nach Fertigstellung und Absenken des Absenkkörpers (10) mit Schüttmaterial (15) ausgefüllt wird.Method according to one of claims 1 to 6, characterized in that between the wall (3) of the underground construction pit (6) and the lowering body (10) Gap (17) is present and that this gap (17) after completion and Lowering the lowering body (10) is filled with bulk material (15).
EP99104322A 1999-03-04 1999-03-04 Method of erection of a foundation structure in a water flooded excavation Withdrawn EP1033446A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP99104322A EP1033446A1 (en) 1999-03-04 1999-03-04 Method of erection of a foundation structure in a water flooded excavation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP99104322A EP1033446A1 (en) 1999-03-04 1999-03-04 Method of erection of a foundation structure in a water flooded excavation

Publications (1)

Publication Number Publication Date
EP1033446A1 true EP1033446A1 (en) 2000-09-06

Family

ID=8237699

Family Applications (1)

Application Number Title Priority Date Filing Date
EP99104322A Withdrawn EP1033446A1 (en) 1999-03-04 1999-03-04 Method of erection of a foundation structure in a water flooded excavation

Country Status (1)

Country Link
EP (1) EP1033446A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1029953C2 (en) * 2005-09-14 2007-03-15 Franki Grondtechnieken B V Method is for build of underground construction at least partly below ground water level and involves formation of pit and introduction of at least one foundation component at pit location prior to or after formation of pit
CN109403350A (en) * 2018-12-18 2019-03-01 山西建筑工程集团有限公司 Foundation pit supporting construction and foundation pit supporting method
CN109881684A (en) * 2019-04-08 2019-06-14 江苏建筑职业技术学院 A kind of moisture-proof drainage facility of foundation pit civil construction
CN113136886A (en) * 2021-05-22 2021-07-20 广东铭濠润建工有限公司 Foundation pit waterproof curtain and construction method thereof
CN113774936A (en) * 2021-09-23 2021-12-10 中铁十一局集团第一工程有限公司 Floating transportation, positioning and sinking construction method for double-wall steel cofferdam with pile foundation firstly and cofferdam secondly
US20220162827A1 (en) * 2020-11-20 2022-05-26 Kevin R. NEPRUD Floating foundation
CN115059102A (en) * 2022-06-30 2022-09-16 中海石油(中国)有限公司 Installation method of wet steel cofferdam protection structure for oil-gas production under seabed mud surface
EP4151315A1 (en) 2021-09-16 2023-03-22 BlueCatBio GmbH Centrifuge and method for cleaning a centrifuge

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1067658A (en) * 1965-04-20 1967-05-03 Equipments D Entpr S Soc Et Improvements in or relating to methods of manufacturing floating tanks for the storage of oil
DE2030259A1 (en) * 1970-06-19 1971-12-23 Wayss & Freytag Kg, 6000 Frankfurt Process for the production of structures below the water table
GB1405880A (en) * 1971-10-08 1975-09-10 Kennedy F E Building of underground constructions
US3986367A (en) * 1975-10-01 1976-10-19 Kalpins Alexandrs K Earthquake-resistant anchoring system
DE4219078A1 (en) 1992-06-11 1993-12-16 Hochtief Ag Hoch Tiefbauten Erecting building standing in ground-water - using vertical posts with projecting heads in water-filled pit, shuttering, and hydraulic device to construct and lower foundation unit

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1067658A (en) * 1965-04-20 1967-05-03 Equipments D Entpr S Soc Et Improvements in or relating to methods of manufacturing floating tanks for the storage of oil
DE2030259A1 (en) * 1970-06-19 1971-12-23 Wayss & Freytag Kg, 6000 Frankfurt Process for the production of structures below the water table
GB1405880A (en) * 1971-10-08 1975-09-10 Kennedy F E Building of underground constructions
US3986367A (en) * 1975-10-01 1976-10-19 Kalpins Alexandrs K Earthquake-resistant anchoring system
DE4219078A1 (en) 1992-06-11 1993-12-16 Hochtief Ag Hoch Tiefbauten Erecting building standing in ground-water - using vertical posts with projecting heads in water-filled pit, shuttering, and hydraulic device to construct and lower foundation unit

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1029953C2 (en) * 2005-09-14 2007-03-15 Franki Grondtechnieken B V Method is for build of underground construction at least partly below ground water level and involves formation of pit and introduction of at least one foundation component at pit location prior to or after formation of pit
CN109403350A (en) * 2018-12-18 2019-03-01 山西建筑工程集团有限公司 Foundation pit supporting construction and foundation pit supporting method
CN109881684A (en) * 2019-04-08 2019-06-14 江苏建筑职业技术学院 A kind of moisture-proof drainage facility of foundation pit civil construction
CN109881684B (en) * 2019-04-08 2024-03-15 江苏建筑职业技术学院 Dampproofing water facility of foundation ditch civil engineering construction
US20220162827A1 (en) * 2020-11-20 2022-05-26 Kevin R. NEPRUD Floating foundation
US11746495B2 (en) * 2020-11-20 2023-09-05 Kevin R. NEPRUD Floating foundation
CN113136886A (en) * 2021-05-22 2021-07-20 广东铭濠润建工有限公司 Foundation pit waterproof curtain and construction method thereof
EP4151315A1 (en) 2021-09-16 2023-03-22 BlueCatBio GmbH Centrifuge and method for cleaning a centrifuge
CN113774936A (en) * 2021-09-23 2021-12-10 中铁十一局集团第一工程有限公司 Floating transportation, positioning and sinking construction method for double-wall steel cofferdam with pile foundation firstly and cofferdam secondly
CN115059102A (en) * 2022-06-30 2022-09-16 中海石油(中国)有限公司 Installation method of wet steel cofferdam protection structure for oil-gas production under seabed mud surface

Similar Documents

Publication Publication Date Title
EP2360373B1 (en) Offshore station, foundation for an offshore station, and method for building an offshore station
DE102010032259B4 (en) Method for installing a gravity foundation for an offshore installation
EP1033446A1 (en) Method of erection of a foundation structure in a water flooded excavation
DE10239278B4 (en) Foundation for hydraulic structures
DE102005052162A1 (en) Thermal insulated slotted walls for fluids has thermal insulation which is part of precast concrete parts or part of prefabricated finished parts made from reinforcing cage and thermal insulation
DE102005013993B3 (en) Foundation for a flood protection
EP0200754B1 (en) Large container for castable, pasty and muddy materials
DE102011012450A1 (en) Method for installing heavyweight foundation system for offshore-wind energy plant, involves prestressing heavyweight foundation in laterally limited manner by ballast bodies before tower and/or housing of tower is mounted
DE19739106C1 (en) Construction method for foundations etc. in water-filled excavation
DE19525590C2 (en) Construction of an excavation pit with anchoring below the water table
DE4137541A1 (en) Method of on site production of concrete piles - by implement which forms hole in the ground and directs concrete into hole
DE1963852A1 (en) Method of erecting a structure that is at least partially submerged in a body of water
DE3620650A1 (en) Method for producing multi-storey underground structures, in particular underground garages
DE4219078A1 (en) Erecting building standing in ground-water - using vertical posts with projecting heads in water-filled pit, shuttering, and hydraulic device to construct and lower foundation unit
DE102008017785A1 (en) Foundation for e.g. wind energy plant, at e.g. seas, has column supported in body such that fitting section is displaceable under influence of forces affecting column relative to body from transportation position in offshore position
DE102005001422A1 (en) Sinking pits or wells involves filling concrete in shell, compressing, removing soil to let concrete lower, introducing/compressing more concrete, removing more soil to let concrete, repeating until shaft at required depth, removing shell
EP0340599B1 (en) Adjustable bottom slab for high buildings and method for its production
DE3716750A1 (en) Method of constructing and sinking foundation structures
CN214784095U (en) Curtain wall structure
DE202010011625U1 (en) Foundation for a wind energy plant
AT388406B (en) Pile foundation structure and apparatus and concreting tank for producing the same
DE2030259C3 (en) Process for the production of a structure below the water table
DE959089C (en) Founding bodies, especially sink wells
AT318492B (en) Method for sealing the base plate of a foundation structure reaching below the water table, consisting of a lower plate made of underwater poured concrete and an upper plate made of reinforced concrete above it
AT317092B (en) Process for the production of a trough arranged in the ground below the groundwater level and for this purpose prefabricated reinforced concrete girders for their production

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19991116

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): DK NL

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

AKX Designation fees paid

Free format text: DK NL

17Q First examination report despatched

Effective date: 20010731

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN

18W Application withdrawn

Withdrawal date: 20011120

REG Reference to a national code

Ref country code: DE

Ref legal event code: 8566