EP1028226A2 - Méthode et appareil pour la construction d'un tunnel souterrain - Google Patents
Méthode et appareil pour la construction d'un tunnel souterrain Download PDFInfo
- Publication number
- EP1028226A2 EP1028226A2 EP00200339A EP00200339A EP1028226A2 EP 1028226 A2 EP1028226 A2 EP 1028226A2 EP 00200339 A EP00200339 A EP 00200339A EP 00200339 A EP00200339 A EP 00200339A EP 1028226 A2 EP1028226 A2 EP 1028226A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- base rod
- ground
- tunnel
- tunnel wall
- earth removing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000000034 method Methods 0.000 title claims abstract description 39
- 238000005553 drilling Methods 0.000 claims description 28
- 230000008878 coupling Effects 0.000 claims description 7
- 238000010168 coupling process Methods 0.000 claims description 7
- 238000005859 coupling reaction Methods 0.000 claims description 7
- 238000007789 sealing Methods 0.000 claims description 4
- 230000013011 mating Effects 0.000 claims 1
- 239000003566 sealing material Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 description 8
- 239000000203 mixture Substances 0.000 description 7
- 229910000278 bentonite Inorganic materials 0.000 description 5
- 239000000440 bentonite Substances 0.000 description 5
- SVPXDRXYRYOSEX-UHFFFAOYSA-N bentoquatam Chemical compound O.O=[Si]=O.O=[Al]O[Al]=O SVPXDRXYRYOSEX-UHFFFAOYSA-N 0.000 description 5
- 239000004567 concrete Substances 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 230000001141 propulsive effect Effects 0.000 description 5
- 238000006073 displacement reaction Methods 0.000 description 4
- 239000002689 soil Substances 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000009471 action Effects 0.000 description 2
- 238000000576 coating method Methods 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 229910052751 metal Inorganic materials 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 230000001186 cumulative effect Effects 0.000 description 1
- 230000005489 elastic deformation Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000013341 scale-up Methods 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/0621—Shield advancing devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/28—Enlarging drilled holes, e.g. by counterboring
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/0607—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
Definitions
- the invention relates to a method and device for constructing a tunnel in the ground along a predetermined path.
- Existing methods for constructing a passage or tunnel in the ground include, in addition to the standard controlled horizontal drilling techniques for relatively small diameters, for relatively large diameters, firstly, techniques in which a suitable drilling, jetting or reaming tool which is pulled or pushed through the ground is used and, secondly, techniques in which tunnel building devices are used.
- the known techniques for drilling, jetting and/or reaming a passage in soft ground using a tool which is pulled or pushed through the ground are limited to small-scale projects. These may, for example, include reaming of a passage using a pulled reamer with a metal or plastic pipe pulled along immediately behind it. To keep the friction forces at a low level and to limit risks, the reaming of the passage and the positioning of the pipe may also be carried out as separate steps, in which case the reamed passage is temporarily supported by a bentonite mixture. In the case of larger diameters, the passage may also be reamed by pulling successive reamers with increasing diameters through the passage.
- passages with a relatively large diameter can be obtained using a drilling and/or reaming device which is pulled through the ground. Due to the structure of the ground, a reamed passage does not have to be supported immediately; for example, it is possible for a concrete lining to be formed on the wall of the passage at a subsequent time. Pulling a large-diameter reamer in a vertical direction is known in the mining industry. Furthermore, it is known that a passage running in the horizontal direction can be reamed using a machine which is pulled by a tool which rests against the wall of the (unreamed) passage.
- the existing technique based on reamers cannot readily be scaled up to construct passages with very large transverse dimensions. If the transverse dimensions of the passage which is to be formed become larger, the tensile force in and (usually as a consequence of this) the cross section of a pull rod connected to a reamer increase.
- the tensile force which has to be supplied is not limited to the resistance and digging force of the reamer, but rather the frictional force on the outer surface of the pull rod moving through the ground also has to be applied. This friction is increased still further if the length of the path which has to be reamed, and consequently the length of the pull rod, increases.
- a further drawback of the use of a pull rod moving through weak ground is that the bends in the path are flattened, owing to the fact that at these locations the pull rod works into the wall of the pull-rod passage owing to the tensile force (what is known as the "sawing effect"). The results are deviations in the desired path of the passage.
- the passage has large transverse dimensions, problems arise if the passage needs to be supported by means of a bentonite mixture: in the case of tunnels which are to be formed at a relatively shallow level in the ground, the bridge action required from ground situated above the tunnel is insufficient. In addition, in practical terms the quantities of bentonite required are excessive.
- a further drawback is that the digging process to be carried out using a reamer has to be interrupted periodically in order for sections of the pull rod which have been pulled in at the end of this pull rod to be uncoupled.
- tunnel wall lining comprising annular, prefabricated concrete or iron elements or a lining produced by extruding concrete.
- This tunnel wall lining has to be able to absorb the mechanical loads which occur when constructing a tunnel. If the tunnel wall lining is positioned in situ, an earth removing device must be able to support itself on the tunnel wall lining in order to generate the digging forces required. If, when constructing the tunnel, the tunnel wall lining is pressed into the tunnel and thus moves with respect to the ground, it is necessary for, in particular, the rear part of the tunnel wall lining to be able to withstand the high compressive forces which arise, plus by the forces which are required for the necessary digging action.
- the object of the invention is to provide a device which makes it possible to scale up existing techniques which make use of an earth removing device, such as a drilling, jetting or reaming device, to produce larger tunnel transverse dimensions and a greater length of path than those which are possible in practice given the prior art.
- an earth removing device such as a drilling, jetting or reaming device
- the invention aims to eliminate or at least substantially reduce the abovementioned drawbacks and limitations of the conventional techniques.
- the abovementioned objects are also achieved with the method according to the invention for constructing a tunnel in the ground along a predetermined path, comprising the steps: displacing an earth removing device in the ground for the purpose of constructing the tunnel; positioning at least a second base rod in the ground; fixing the at least one base rod with respect to the ground at at least one location; and displacing at least one tunnel wall section along the at least one base rod, at least one second drive device, which acts on the at least one base rod and the at least one tunnel wall section, being provided for the purpose of supplying at least part of the force for displacing the at least one tunnel wall section.
- the two abovementioned methods according to the invention are based on the common inventive idea of moving an element (in the present case: an earth removing device or a tunnel wall section) in the ground with the aid of a drive device which propels itself on a rod which (at that moment) is stationary and fixed with respect to the ground.
- an element in the present case: an earth removing device or a tunnel wall section
- a drive device which propels itself on a rod which (at that moment) is stationary and fixed with respect to the ground.
- the section of the base rod between the fixing location for example at the end of the base rod, and the earth removing device or the tunnel wall section will be subjected to a tensile load if the earth removing device or the tunnel wall section is moving towards the fixing location, and that the section of the base rod which is between the fixing location and the earth removing device or the tunnel wall section will be subjected to compressive load if the earth removing device or the tunnel wall section is moving away from the fixing location.
- the base rod prefferably fixed with respect to the ground on either side of the earth removing device or the tunnel wall section, that section of the base rod which lies between one of the fixing locations and the earth removing device or the tunnel wall section being subjected to a tensile load if the earth removing device or the tunnel wall section is moving towards this fixing location, and that section of the base rod which lies between the other fixing location and the earth removing device or the tunnel wall section being subjected to a compressive load.
- it is preferably supported at predetermined intervals with respect to the wall of the tunnel.
- the earth removing device and/or each tunnel wall section according to the invention move with respect to a base rod which is stationary with respect to the ground.
- the base rod does not have to be permanently stationary or fixed with respect to the ground; during periods in which the earth removing device and/or the tunnel wall section is not moving with respect to the ground, and therefore there is no need to generate movement forces therefor, the base rod, after it has been uncoupled from the fixing means and the drive device for the earth removing device and/or the tunnel wall section, can be displaced with respect to the ground with the aid of pushing and/or pulling forces exerted on the base rod, for example in order for a section of this rod to be assembled or dismantled in an buildingbuilding pit or the like.
- the force which the base rod has to apply during the displacement of the earth removing device and/or the tunnel wall section is limited to the force which is required to move the earth removing device and/or each tunnel wall section along; the frictional force between the base rod and the ground is then advantageously used to fix the base rod in the ground.
- the pulling or pushing force which is to be supplied by the base rod is independent of the length of the path. It is possible to increase the transverse dimensions of the base rod without this leading as quickly as in the case of a moving pull or push rod to limits in the transverse dimensions of the tunnel or its length.
- the base rod apart from its elastic deformation, does not move in the ground means that bends in the path can be produced much more accurately due to the absence of the abovementioned sawing effect.
- Yet another advantage of the method according to the invention is that the base rod, following completion of the tunnel path, can in principle remain entirely intact and is therefore immediately ready for use after it has been moved to the next section of tunnel.
- the composition of the soil along the path of the tunnel to be constructed can be accurately charted using known surveying techniques prior to the actual digging work, while the base rod is being positioned in the ground. This in turn leads to fewer risks during the digging work.
- a desired path can be followed very accurately if the base rod is accurately positioned in the ground.
- the digging process can take place continuously and is to a large extent independent of the construction of the lining of the tunnel wall. In its longitudinal direction, the tunnel wall only has to be subjected to the desired in-use strength, since the earth removing device does not exert cumulative propulsion forces on the lining. Consequently, the choice of possible materials and compositions of the tunnel wall also becomes considerably wider. It is also possible to utilize relatively long tunnel wall sections.
- the outer casing which, at its rear side, has to be able to absorb the propulsive force supplied by the tunnel wall lining.
- the outer casing has to be sufficiently rigid to prevent buckling.
- the outer casing is conical in longitudinal section. The space which is consequently formed between the outer casing and the ground is filled with a bentonite mixture.
- the rigid outer casing of the tunnel-drilling device in combination with the bentonite mixture forms a passive support for the ground and causes the ground to subside.
- the earth removing device to be used in the method according to the invention may be provided with a flexible outer casing which is suitable for following bends, since the outer casing of the earth removing device is not subjected to any compressive loads.
- This flexible outer casing forms an active support for the soil, so that the incidence of subsidence in the ground is reduced.
- the propulsive force required for the earth removing device can be transferred to the base rod at one or more locations. Furthermore, the propulsive force required for the tunnel wall sections at one or more locations can be transferred to the base rod, to a large extent independently of the movement of the earth removing device. If the tunnel wall sections are each coupled to a frame and propulsive forces are transferred to individual tunnel wall sections via interlinked frames, these sections may, if desired, be arranged flexibly with respect to one another. If the lining of the tunnel wall is formed with the aid of sliding formwork for extrusion of concrete, the base rod can also be used for the sliding formwork to move along, largely independently of the movement of the earth removing device.
- the position of the earth removing device in the ground can be established with a very high level of accuracy with the aid of the known length of the base rod, taking into account changes in length caused by forces acting on the base rod. It is also possible for the distance between parallel tunnels and the clearance between underground obstacles and the paths of the tunnel to be determined with a particularly high level of accuracy.
- logistics facilities such as measures for supplying drilling liquid, measures for removing excavated earth, power supply or the like.
- Fig. 1 shows three building pits 2, 4 and 6.
- Drilling machines 8, 10, 12 and 14 are arranged in the building pits 2 and 6 for the purpose of carrying out controlled horizontal drilling from the building pits 2 and 6 to the building pit 4 along the paths 8a, 10a, 12a and 14a, in the directions indicated by the arrows.
- Stage (b) shows how rods 8c, 10c, 12c, and 14c are pulled into the ground, in the direction indicated by arrows, along the paths 8a, 10a, 12a and 14a, respectively, with the aid of drilling rods 8b, 10b, 12b and 14b used for the controlled horizontal drilling.
- a reamer (not shown) can be used at the location of coupling between the drilling rods 8b, 10b, 12b and 14b and the rods 8c, 10c, 12, and 14c.
- the rods 8c, 10c, 12c and 14c which extend between the building pits 2 and 4 and 4 and 6, respectively, are fixed at one end, in a manner not shown in more detail, with the aid of fixing means 8d, 10d, 12d and 14d, respectively.
- four tunnel-drilling operations take place from the building pit 4 with the aid of drilling devices 8e, 10e, 12e and 14e, which are not shown in more detail, the walls of the tunnels constructed in this way being lined with a suitable material, such as concrete.
- the propulsive force required for the drilling devices 8e, 10e, 12e and 14e is supplied via the rods 8c, 10c, 12c and 14c which are fixed in the ground.
- controlled horizontal drilling operations are carried out, in the manner which has already been explained in the description of stage (a), from new building pits 16 and 18 towards the building pits 2 and 6, respectively, with the aid of drilling machines 20, 22, 24 and 26 along paths 20a, 22a, 24a and 26a, in the direction indicated by arrows, in order to prepare for the drilling of additional tunnel sections.
- the rods 8c and 10c are pulled completely out of the finished tunnel sections between the building pits 2 and 4, by drill rods 20b and 22b, respectively, until they extend between the building pits 16 and 2. A similar operation is carried out between the building pits 4, 6 and 18. It is then possible, with the aid of the drilling devices 8e, 10e, 12e and 14e, to bore tunnel sections between the building pits 2 and 16 and the building pits 6 and 18, as already explained with reference to stage (c).
- Fig. 2 shows four building pits 30, 32, 34, 36 which are/have been laid below ground level 38.
- one wall has always been omitted from the substantially rectangular building pits 30-36, so that the interior of the building pit can be shown.
- each of the building pits 30-36 is formed with the aid of a hoisting machine 40 which bears a vibrating device 42, which is not shown in detail and is known per se, and introduces pile planking 44 into the ground until a space which is completely surrounded by the pile planking 44 and is substantially rectangular is formed in the ground. This space is then at least partially excavated, and may possibly be provided with means for controlling the groundwater level in the space.
- an building pit (in this case illustrated on the basis of building pit 32), after they pile planking 44 has been driven in, is excavated down to a base 46, and longitudinal bars 48, 50, 52, 54 and transverse bars 56, 58 are arranged therein.
- the transverse bar 58 can be displaced along the longitudinal bars 48, 50 with the aid of bar drives 57.
- a pull rod 62 is moved into the ground between the building pit 32 and the building pit 30 in a controlled horizontal drilling operation.
- Controlled horizontal drilling is known per se, and the pull rod 62 is pushed through the ground in the direction of arrow 64 by the drilling device 60, one end 62a of the pull rod 62 being provided with means (not shown in more detail) for displacing ground and guiding the end 62a in a predetermined direction.
- means not shown in more detail
- a pull rod 68 is moved from the building pit 32 to the building pit 34, after which one end 68a of the pull rod 68 is connected in the building pit 34 to a reamer 70, a decoupling device 72 and a base rod 74.
- the assembly comprising the pull rod 68, the reamer 70, the decoupling device 72 and the base rod 74 is pulled towards the building pit 32, in the direction of arrow 76, with simultaneous rotation of the pull rod 68, as illustrated by Figs. 2 and 4.
- the drilling device 66 is supported on the base 46 of the building pit 32. If desired, the drilling device 66 can be connected to the transverse bar 58 or one of the longitudinal bars 48-54 if the tensile force required should necessitate this.
- Fig. 5 shows the reamer 70 with a substantially cylindrical body 70a which, at the front end, merges into a truncated cone 70b on which spray nozzles 70c are arranged.
- the rod 68 rotates in one of the directions of double arrow 78 and is displaced in the direction of the arrow 76, the reamer 70 forms a passage in the ground for the components located behind it.
- the decoupling device 72 which comprises two parts 72a and 72b which can rotate freely with respect to one another, ensures that the rotation of the pull rod 68 is not transmitted to the base rod 74, but the tensile force exerted by the pull rod 68 is transmitted to the base rod 74.
- a passageway 80 (not shown in more detail) is shown in the building pit wall 32b, in order for the base rod 74 to be introduced into the building pit 32.
- a base rod is introduced into the ground between the building pits 30 and 32 with the aid of a pull rod 62.
- Figs. 2 and 6 show the building pit 34 with the rear end of the base rod 74 passing through a passageway 82 in building pit wall 34a.
- Building pit wall 34b is provided with a passageway 84 through which a base rod 86 passes.
- One end 86a of the base rod 86 is attached, in a manner not shown in more detail, to the transverse bar 58, which in turn is attached to the longitudinal bars 48, 50 which, at their ends, are supported against the building pit walls 34a, 34b.
- the base rod 86 is thus fixed in the ground.
- An earth removing device 88 is provided with a drive device, which is shown in more detail in Figs.
- Tunnel wall sections 92 which are to be described in more detail with reference to Fig. 7 and Fig. 8, are introduced into the passage which is formed by the earth removing device 88 when it moves in the direction of arrow 90, with the aid of drive devices which are to be discussed in more detail below with reference to Figs. 10a, 10b and 12.
- the earth removing device 88 can be displaced further from the building pit 34 to the building pit 32, and from the building pit 32 to the building pit 30. It will also be clear that, in the situation shown in Fig. 6, the earth removing device 88 exerts an tensile force on that part of the base rod 86 which is located between its end 86a and the earth removing device 88.
- Fig. 7 shows a frame 100 which comprises a central pipe 102 and a number of arms 104 extending from the pipe 102. Furthermore, Fig. 7 shows tunnel wall subsections 106 which are intended to be coupled to one another and to the free ends of the arms 104. It is thus possible to construct a tunnel wall section 108 provided with a frame 100.
- Each tunnel wall subsection 106 is per se constructed from a metal frame 110 which encloses cylinder segments of reinforced concrete.
- the tunnel wall subsections 106 are connected to one another and to the arms 104 of the frame 100 by means of welding.
- the internal diameter of the pipe 102 is greater than the external diameter of the base rod over which the pipe 102 is intended to slide. On the one hand, this is necessary in order to allow the frame 100 to be displacable with respect to the base rod, and on the other hand the clearance between the pipe 102 and the base rod must be sufficiently great for it also to be possible for the frame 100 to move along a curved base rod.
- the pipes 102 may be hinged to one another.
- the pipe 102 is provided with three sets of four arms 104, each set of arms 104 being attached to a ring 112 which is at a radial distance from the pipe 102.
- the two rings 112 in the vicinity of the two ends of the pipe 102 are fixed with respect to the pipe 102, in the longitudinal direction of the latter, by means of collars 114 which are located on either side of the rings 112 and are fixed to the pipe 102.
- the pipe 102 is provided with means (not shown in more detail) for coupling the pipe 102 to that of an adjoining frame 100.
- Figs. 2 and 8 show the way in which tunnel wall sections 108 which are provided with a frame 100 are installed in the building pit 36 using a hoisting device 116.
- the transverse bar 58 and another transverse bar 59 are displaced sufficiently far towards side wall 36b of the building pit 36 for it to be possible for the tunnel wall section 108 which is provided with a frame 100 to be brought into line with tunnel wall sections 118, 120, 122 and 124 which are already in the ground.
- that end of the pipe 102 which faces towards the tunnel wall section 118 is coupled to the pipe situated in the tunnel wall section 118, and the tunnel wall section 108, which is provided with a frame 100, is pulled onto the frame of the tunnel wall section 118 in the tunnel.
- the way in which this takes place will be explained in more detail below with reference to Figs. 10a, 10b and 12.
- Figs. 9a-9c show a drive device 128 for displacing an earth removing device 130, which is illustrated highly diagrammatically, along a base rod 132 which is fixed with respect to the ground.
- the drive device 128 contains two double-acting partial drive devices 128a and 128b, which each in turn comprise two units 134 of the type which will be explained in more detail below with reference to Figs. 11a-11f.
- the partial drive device 128a comprises double-acting piston-cylinder units 136 with connecting rods 138 which are connected to the earth removing device 130.
- the partial drive device 128b comprises double-acting piston-cylinder units 140 with connecting rods 142 which extend through the partial drive device 128a and are connected to the earth removing device 130.
- the partial drive devices 128a and 128b are each provided with wedges 144 which can be engaged with or disengaged from the base rod 132 in a controllable manner in order to fix the partial drive device 128a or 128b, respectively, with respect to the base rod 132.
- the base rod 132 is fixed with respect to the ground, in a manner which is not shown in more detail.
- the partial drive device 128b is fixed with respect to the base rod 132 by means of its wedges 144.
- the connecting rods 142 of the piston-cylinder units 140 of the partial drive device 128b are moved outwards, which will cause the earth removing device to move in the direction of arrow 146 with respect to the ground.
- the partial drive device 128a can move freely with respect to the base rod 132.
- the connecting rods 138 of the piston-cylinder units 136 of the partial drive device 128a are moved inwards, with the result that the partial drive device 128a moves towards the earth removing device 130.
- the partial drive device 128a is then fixed with respect to the base rod 132 with the aid of the wedges 144, after which the connecting rods 138 of the piston-cylinder units 136 of the partial drive device 128a are moved outwards in order for the earth removing device 130 to be advanced further.
- the fixing of the partial drive device 128b on the base rod 132 has been released, and the connecting rods 142 of the piston-cylinder units 140 of the partial drive device 128b are moved inwards until the partial drive device 128b is located immediately behind the partial drive device 128a.
- Fig. 10a diagrammatically shows the earth removing device 130 and the partial drive devices 128a and 128b.
- the tunnel wall drive device 150 comprises three substantially annular sleeves 152a, 152b and 152c, which are each provided with a number of radially projecting lugs 154. Double-acting piston-cylinder units 156 with connecting rods 158 are arranged between the lugs 154 of the sleeves 152a and 152b and between the lugs 154 of the sleeves 152b and 152c.
- the earth removing device 130 can again be displaced further along the base rod 132, as discussed above with reference to Figs. 9a-9c, after which the tunnel wall section(s) can again be displaced along the base rod 132, as discussed above with reference to Figs. 10a and 10b. Consequently, movements of the earth removing device 130 and the tunnel wall section(s) take place alternately. It will, incidentally, be clear that the movements may also take place simultaneously.
- the earth removing device 130 - as seen in the direction of the tunnel path - may also be fixedly connected to the base rod 132, the movement of the earth removing device 130 with respect to the ground being brought about as a result of the base rod 132 being displaced in the direction of the arrow 160 with respect to the ground.
- the tunnel-wall drive device 150 - as seen in the direction of the tunnel path - is fixedly connected to the earth removing device 130 (and consequently to the base rod 132) or directly to the base rod 132 by means of the sleeve 152a
- the tunnel-wall drive device 150 can be used, in the same way as that explained above in conjunction with Figs. 10a and 10b, to advance the tunnel wall section(s) with respect to the ground, the base rod 132 then being temporarily fixed with respect to the ground.
- the base rod behind the earth removing device 130 may, incidentally, be dispensed with altogether.
- Figs. 11a-11f show a unit 134 with a substantially cylindrical housing 170 which is provided with flanges 170a and 170b.
- the unit 134 contains four piston-cylinder units 172 which at one end are coupled, via a projection 174, to the housing 170 and at the other end are coupled to lugs 176 of a ring 178.
- the connecting rods of the piston-cylinder units 172 being moved in and out, the ring is displaced in the housing 170 between the positions shown in Figs. 11b and 11c.
- Figs. 11a-11f show a unit 134 with a substantially cylindrical housing 170 which is provided with flanges 170a and 170b.
- the unit 134 contains four piston-cylinder units 172 which at one end are coupled, via a projection 174, to the housing 170 and at the other end are coupled to lugs 176 of a ring 178.
- the connecting rods of the piston-cylinder units 172 being moved in and out, the
- the unit 134 also contains 12 wedges 144, which, with the aid of the ring 178, can be displaced along ribs 180 provided with sloping edges, between the positions shown in Figs. 11d and 11e.
- the distance between two diametrically opposite wedges 144 in the situation shown in Fig. 11e is greater than that in the situation shown in Fig. 11d, so that the wedges 144 can be used to clamp the unit 134 securely on a base rod 132 which is indicated by a dashed line in Fig. 11a.
- the unit 134 contains eight guides 182 which, on the sides facing towards one another, are provided with a friction-reducing coating 184.
- the distance between two diametrically opposite coatings 184 is greater than the external diameter of the base rod 132.
- Fig. 12 illustrates that the tunnel-wall section drive device 150, with a slight modification, is also suitable for use between adjoining tunnel wall sections 190 and 192: in Fig. 12, the sleeve 152a is designed in such a manner that it can be fixedly connected to one end of the pipe 102 of the tunnel wall section 190.
- the tunnel wall section 190 is provided with a collar 194, the inner surface of which bears against a seal 196 of the tunnel wall section 192.
- Fig. 13 shows an earth removing device 200 which, with the aid of a drive device 204, can be advanced with respect to a base rod 202, which is fixed with respect to the ground, in a similar manner to that explained above with reference to Figs. 9a-9c.
- a drive device 204 With the aid of clamping devices 214, elongate tubular tunnel wall sections 206, 208 are fixed with respect to pipes 210 and 212, respectively, which can be moved freely along the base rod 202.
- the pipes 210, 212 are connected to drive devices 216, a section 216a of which is designed as the unit shown in Figs. 11a-11f, enabling the drive device to be fixed with respect to the base rod 202.
- Another section 216b of the drive device 216 comprises a number of piston-cylinder units which couple the section 216a to the associated pipe 210, 212, the length of which coupling, as seen in the direction of the tunnel path, can be lengthened and shortened in a controllable manner.
- the drive devices can either pull a pipe 210, 212 at one end or can push it at the opposite end, through the ground, during which process the drive devices 216 are supported on the base rod 202 which is fixed with respect to the ground.
- the forwards movement of the earth removing device 200 and the wall sections 206, 208 in the ground may in principle take place independently of one another, provided that they are not moved so far apart that the seal between them is lost.
- tunnel wall sections arranged between them can be displaced in the ground by means of a "caterpillar motion".
- Fig. 14 shows an earth removing device 220 which is advanced through the ground as a result of the rotation in the direction of arrow 222 and as a result of a tensile force being exerted on a pull rod 224 in the direction of arrow 226.
- the earth removing device 220 is connected to a centring device 230 by means of a decoupling device 228.
- the decoupling device 228 transmits the tensile force exerted by the pull rod 224 to the centring device 230, but does not transmit its rotation.
- the centring device 230 is in turn coupled to the pipe 210 via a drive device 232.
- a similar drive device 232 is used to couple pipe 210 to pipe 212.
- a sealing cap 234 which is coupled to the centring device 230 bears in a sealed manner against the outer surface of the tunnel wall section 206 and can slide in the direction of the tunnel path with respect thereto.
- the drive devices 232 are of the type shown in Fig. 12.
- the earth removing device 220 is displaced over a predetermined distance in the ground as a result of the displacement of the pull rod 224 in the direction of the arrow 226, after which the pull rod 224 is fixed with respect to the ground and the tunnel wall sections 206, 208 are displaced in the direction of the arrow 226 with the aid of the drive devices 232.
- the decoupling device 228, the centring device 230, the sealing cap 234 and part of the drive device 232 located behind will be displaced with it.
- Fig. 15 shows, in a similar way to Figs. 7 and 8, tunnel wall sections 240 in which a frame 242 is arranged in the form of a lattice structure.
- the frames 242 can be coupled to one another in order to transmit pushing or pulling forces to the tunnel wall sections 240 which are connected thereto.
- Fig. 16 shows one end of a frame 242a, which is provided with projections 244.
- Another end of a similar frame 242b is provided with openings 246 for receiving the projections 244, so that compressive forces can be transmitted between the frames 242a, 242b in a controlled manner.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Mechanical Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NL1011296 | 1999-02-12 | ||
NL1011296A NL1011296C1 (nl) | 1999-02-12 | 1999-02-12 | Werkwijze en inrichting voor het vervaardigen van een ondergrondse tunnel. |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1028226A2 true EP1028226A2 (fr) | 2000-08-16 |
EP1028226A3 EP1028226A3 (fr) | 2002-09-04 |
Family
ID=19768656
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP00200339A Withdrawn EP1028226A3 (fr) | 1999-02-12 | 2000-02-01 | Méthode et appareil pour la construction d'un tunnel souterrain |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP1028226A3 (fr) |
NL (1) | NL1011296C1 (fr) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012140222A1 (fr) * | 2011-04-14 | 2012-10-18 | Institut De Radioprotection Et De Surete Nucleaire | Procede et dispositif de forage non destructif |
JP2015094181A (ja) * | 2013-11-14 | 2015-05-18 | 前田建設工業株式会社 | シールド発進坑口におけるシールド発進方法 |
JP2016102296A (ja) * | 2014-11-27 | 2016-06-02 | 大成建設株式会社 | 後退防止構造および後退防止方法 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL1015942C2 (nl) * | 2000-08-15 | 2002-11-26 | Heerema Holding Construction I | Werkwijze en inrichting voor het vervaardigen van een ondergrondse tunnel. |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH459285A (de) * | 1965-11-03 | 1968-07-15 | Wirth Alfred & Co Kg | Verfahren und Maschine zum Vortreiben eines Tunnels oder Stollens |
DE2507984A1 (de) * | 1975-02-25 | 1976-09-09 | Fridrich Wilhelm Paurat | Verfahren und vorrichtung zur herstellung eines verbindungstunnels zwischen verkehrstunnels o.dgl. |
EP0316747A2 (fr) * | 1987-11-18 | 1989-05-24 | Kabushiki Kaisha Iseki Kaihatsu Koki | Méthode et dispositif pour la construction d'un conduit |
US5505558A (en) * | 1993-11-09 | 1996-04-09 | Brown; David M. | Underground horizontal pipe installation method and apparatus |
EP0816633A1 (fr) * | 1995-03-22 | 1998-01-07 | Komatsu Ltd. | Excavateur pour tunnel |
EP0890707A1 (fr) * | 1997-07-11 | 1999-01-13 | Heerema Ondergrondse Infrastructuren B.V. | Procédé, système et dispositif pour la construction de parois dans le sol |
-
1999
- 1999-02-12 NL NL1011296A patent/NL1011296C1/nl not_active IP Right Cessation
-
2000
- 2000-02-01 EP EP00200339A patent/EP1028226A3/fr not_active Withdrawn
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH459285A (de) * | 1965-11-03 | 1968-07-15 | Wirth Alfred & Co Kg | Verfahren und Maschine zum Vortreiben eines Tunnels oder Stollens |
DE2507984A1 (de) * | 1975-02-25 | 1976-09-09 | Fridrich Wilhelm Paurat | Verfahren und vorrichtung zur herstellung eines verbindungstunnels zwischen verkehrstunnels o.dgl. |
EP0316747A2 (fr) * | 1987-11-18 | 1989-05-24 | Kabushiki Kaisha Iseki Kaihatsu Koki | Méthode et dispositif pour la construction d'un conduit |
US5505558A (en) * | 1993-11-09 | 1996-04-09 | Brown; David M. | Underground horizontal pipe installation method and apparatus |
EP0816633A1 (fr) * | 1995-03-22 | 1998-01-07 | Komatsu Ltd. | Excavateur pour tunnel |
EP0890707A1 (fr) * | 1997-07-11 | 1999-01-13 | Heerema Ondergrondse Infrastructuren B.V. | Procédé, système et dispositif pour la construction de parois dans le sol |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012140222A1 (fr) * | 2011-04-14 | 2012-10-18 | Institut De Radioprotection Et De Surete Nucleaire | Procede et dispositif de forage non destructif |
FR2974141A1 (fr) * | 2011-04-14 | 2012-10-19 | Irsn | Procede et dispositif de forage non destructif |
JP2015094181A (ja) * | 2013-11-14 | 2015-05-18 | 前田建設工業株式会社 | シールド発進坑口におけるシールド発進方法 |
JP2016102296A (ja) * | 2014-11-27 | 2016-06-02 | 大成建設株式会社 | 後退防止構造および後退防止方法 |
Also Published As
Publication number | Publication date |
---|---|
EP1028226A3 (fr) | 2002-09-04 |
NL1011296C1 (nl) | 2000-08-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
TW507043B (en) | Semi-shield machine | |
EP1028226A2 (fr) | Méthode et appareil pour la construction d'un tunnel souterrain | |
JP3308916B2 (ja) | シールドセグメントのリングケーブル挿入装置 | |
JP3392796B2 (ja) | トンネル埋め戻し装置及び工法 | |
JP2000345790A (ja) | シールド機、シールド機の掘進方法および斜坑または立坑の構築方法 | |
JP2837394B2 (ja) | 管推進機 | |
JP4214082B2 (ja) | 推進工法用掘進装置および推進工法 | |
JP2516582B2 (ja) | トンネル構築方法 | |
JP4334954B2 (ja) | 地下空間拡幅方法及び装置 | |
KR102207553B1 (ko) | 지하 구조물에 직접 도달이 가능한 관추진기 | |
JP2683230B2 (ja) | 急曲進可能な小口径掘進機 | |
JP2746866B2 (ja) | 推進工法用掘進装置および推進工法 | |
JP7398330B2 (ja) | 曲線状トンネル・地中梁又は先行支保を構築するための推進装置の発進設備 | |
NL1021835C2 (nl) | Werkwijze en systeem voor het vervaardigen van een ondergrondse tunnel. | |
JP2006045773A (ja) | 地中推進装置 | |
NL1015942C2 (nl) | Werkwijze en inrichting voor het vervaardigen van een ondergrondse tunnel. | |
JP3219746B2 (ja) | 既設トンネル撤去工法及び既設トンネル撤去用シールド掘進機 | |
JPS6145037B2 (fr) | ||
JP2863492B2 (ja) | 推進工法、掘進装置および推進装置 | |
JP4145751B2 (ja) | 元押装置 | |
KR20030005651A (ko) | 관체 매설장치 | |
JP2005320822A (ja) | 2段階推進工法 | |
JP4752036B2 (ja) | 掘削機構および掘進機 | |
JPH03260293A (ja) | 穿孔推進方法及び穿孔推進装置 | |
JP2001262974A (ja) | 埋設管の布設装置およびその布設工法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: HEEREMA HOLDING CONSTRUCTION INC. |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
17P | Request for examination filed |
Effective date: 20030304 |
|
AKX | Designation fees paid |
Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
17Q | First examination report despatched |
Effective date: 20050411 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20060328 |