EP1001089B1 - Novel technique for stay cable system - Google Patents

Novel technique for stay cable system Download PDF

Info

Publication number
EP1001089B1
EP1001089B1 EP98119471A EP98119471A EP1001089B1 EP 1001089 B1 EP1001089 B1 EP 1001089B1 EP 98119471 A EP98119471 A EP 98119471A EP 98119471 A EP98119471 A EP 98119471A EP 1001089 B1 EP1001089 B1 EP 1001089B1
Authority
EP
European Patent Office
Prior art keywords
anchorage
anchoring
girder
steel
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP98119471A
Other languages
German (de)
French (fr)
Other versions
EP1001089A1 (en
Inventor
Yincheng Hou
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to AT98119471T priority Critical patent/ATE244794T1/en
Application filed by Individual filed Critical Individual
Priority to DE69816303T priority patent/DE69816303D1/en
Priority to EP98119471A priority patent/EP1001089B1/en
Priority to CN99238963U priority patent/CN2412029Y/en
Priority to CN99117135.7A priority patent/CN1266929A/en
Priority to CN99117134.9A priority patent/CN1266928A/en
Priority to CN99238964U priority patent/CN2412028Y/en
Publication of EP1001089A1 publication Critical patent/EP1001089A1/en
Application granted granted Critical
Publication of EP1001089B1 publication Critical patent/EP1001089B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables

Definitions

  • the invention relates to the field of stay cable system for cable-stayed bridges.
  • Stay cable system consists basically of tendon member, protection member, the member of anchorage sockets as well as the member of cable-girder and cable-pylon attaching structures. These members relate and influence with each other.
  • Stay cables normally govern the useful life and construction progress of cable-stayed bridges with the following factors: resistance to fatigue loading and corrosion, ease of transportation and erection, allowance of inspecting as well as ability of eventual replacement.
  • the attaching structures influence the safety, economy and aesthetics of whole bridge sensitively by the reliability and compact of their arrangement.
  • DE 3 723 795 A discloses a stay cable system with all the features of the preamble of claim 1.
  • the tendons with parallel strands are more and more widely used in stay cable systems, because of their advantages of easy transportation and erection. But at present there are three serious problems in such kind of cable systems.
  • This invention will solve the entire Problem A, Problem B and Problem C at the same time.
  • Figure 1 illustrates the general layout of the novel stay cable system, which is exclusively for the tendons with parallel strands (I) covered by a sheath pipe (Ib).
  • the system comprises five parts:
  • Part 1 novel arrangement of anchorage holes.
  • monostrand anchored holes on anchor head are normally arranged with odd number (for example 61).
  • monostrand anchored holes on main anchor head (1) are always arranged with even number (for example 60), and are separated into two symmetrical groups (1a and 1b).
  • those two groups of strand can easily pass through the I-girder (II) along both side of girder web respectively keeping axes of cable and girder web in a same plane then can reliably be anchored in a main anchor head (1) under the bottom of the girder (II).
  • the strands (Ia) outside main anchorage socket do not be cut off after the final jacking, for it will be convenient for eventual individual strand replacement and the strands will be under protecting of dehumidification system (see Part 5).
  • Part 2 novel double half-cylindrical auxiliary anchorage sockets.
  • auxiliary anchorage socket works for traffic load only, its construction ought and can be calmly arranged after the final cable force adjustment Besides the fatigue resistant criterion, another design criterion for auxiliary anchorage sockets is that strands must be individually anchored in the sockets to ensure the possibility of individual strand replacement. Two types of auxiliary anchorage socket are created for selecting.
  • Part 3 - novel anchoring tie beam in pylon Part 3 - novel anchoring tie beam in pylon.
  • anchoring tie beams in pylon (III) can be simplified to the most economical type of I-beam (3), web and stiffening plates of which are also signed with (IIa) (IIb) respectively as in I-girder.
  • the structures mentioned in Part 1 and Part 2 are valid in Part 3.
  • Tie beam with I-section can be extensively used for inclined cable plane by the helping of tie bars (3a) (see Figure 6). Advantages of the structure are:
  • Part 4 novel steel anchoring bed.
  • the conventional anchoring bed can be replaced by a novel steel anchoring bed (4), web and stiffening plates of which are also signed with (IIa) (IIb) respectively as in I-girder (see Figure 8).
  • the structures mentioned in Part 1 and Part 2 are valid in Part 4.
  • Two dry air transmission pipes (5b) are erected from the main anchorage plate (4a) in pylon (III) to the cells enclosed by stiffening plates (IIb) and cover plates (IIc) at the bottom of girder (II or IId) and connected to a dehumidification plant (5g), which is installed inside anchoring room at pylon top, by the dry air entrances (5a).
  • a dehumidification plant (5g) works, air circulates within the whole hollow part of cable.
  • Dry air is blown into the transmission pipes (5b) through dry air entrances (5a), then separates out of dry air exits (5c) mainly at the bottom of sheath pipe (Ib), partly at the guide pipes (Ic) and cells enclosed by stiffening plates (IIb) and cover plates (IIc).
  • wet air is exhausted out of cable to the plant (5g) through vent holes (5d), vent pipes (5e), which pass through the positioners (Id) of strands (I) in guide pipe (Ic), and wet air exits (5f).
  • Such operation offers to one cable after another with certain hours per day or per couple of days for each cable. Similar operation offers also to anchoring room in pylon by dry air exit (5o) and wet air entrance (5p) of the plant (5g) at regular intervals to protect the strands (Ia) outside main anchorage socket (see Part 1 also).
  • strand sample (5k) and humidity measuring point (5i) are arranged in the cells enclosed by stiffening plates (IIb) and cover plates (IIc) at the bottom of girder (II or IId), while strand sample (5l) and humidity measuring point (5h) are arranged in the similar cells in pylon (III) respectively.
  • Strand sample (5k) and/or strand sample (5l) can be checked and tested in laboratory, when necessary. Similar checking and testing can be arranged for sample (5n) of the strands (Ia) outside main anchorage socket.
  • Humidity measuring point (5h) can be connected to the automatic control system of dehumidification plant (5g), if necessary. If there is water inside hollow part of cable, it will flow down through drainage holes (5j) and can be pumped out through the drainage valve (5m).

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Flexible Shafts (AREA)
  • Jib Cranes (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

A stay cable system, which is exclusively for the tendons with parallel strands (I) covered by a sheath pipe (Ib), comprises main anchorage sockets (1), auxiliary anchorage sockets (2), anchoring tie beam (3), anchoring bed (4) that is used for girders other than steel I-girder or for pylon anchoring structure other than tie beam, dehumidification protection system (5a) - (5g). Main features of the system are: 1) Anchoring holes in anchorage sockets (1, 2) are divided into two symmetrical groups (1a, 1b, 2a, 2b), so that main anchorage socket (1) can reliably be arranged at bottom part of any kind of girders holding cable axis coincided with girder web and double half-cylindrical auxiliary anchorage sockets (2) can be arranged on both sides of the web in steel I-girder (II), in anchoring tie beam (3) or in steel anchoring bed (4). 2) Based on the help of auxiliary anchorage sockets, in which parallel strands are anchored or bonded individually, ordinary jaws can reliably be used in main anchorage socket while individual strand replacement is allowable. 3) Dehumidification protection system keeps all parts of strands (I, Ia - not to be cut off after final jacking) under observable, controllable and reliable protected condition, which also facilitates individual strand replacement. <IMAGE>

Description

  • The invention relates to the field of stay cable system for cable-stayed bridges.
  • Stay cable system consists basically of tendon member, protection member, the member of anchorage sockets as well as the member of cable-girder and cable-pylon attaching structures. These members relate and influence with each other. Stay cables normally govern the useful life and construction progress of cable-stayed bridges with the following factors: resistance to fatigue loading and corrosion, ease of transportation and erection, allowance of inspecting as well as ability of eventual replacement. The attaching structures influence the safety, economy and aesthetics of whole bridge sensitively by the reliability and compact of their arrangement.
  • DE 3 723 795 A discloses a stay cable system with all the features of the preamble of claim 1.
  • The tendons with parallel strands are more and more widely used in stay cable systems, because of their advantages of easy transportation and erection. But at present there are three serious problems in such kind of cable systems.
  • Problem A - anchorage socket.
  • Two types of anchorage socket are now currently used for such kind of cables:
  • 1. In anchorage zone a grouted tube section, in which all strands are bonded together, is added to reduce the fatigue loading on normal strand jaws [Die Schrägkabelbrücke über den Mississippi bei Burlington, USA, H. Svensson and K. Humpf, Stahlbau 63(1994), Heft 7, p. 196, Fig. 8, 9]. Disadvantage of such kind of anchorage is that individual strand replacement is tremendously difficult to perform under cable service condition.
  • 2. A special kind of jaws has been created to withstand both the static and fatigue load for anchorage. Therefor, individual strand replacement becomes much easier at any moment [Brochure: Freyssinet STAY CABLES May 1994, p.10 and 11, Fig.19]. But, the special jaws must be ensured by very high level of technology and quality control. Otherwise, big risk will be faced.
  • It is ideal to keep the ability of individual strand replacement while to avoid the necessity of extremely high strand jaws.
  • Problem B - corrosion protection.
  • At present the most current corrosion protecting method for such kind of cables is to cover the individual multilayer protected strands by a sheath pipe [Brochure: Freyssinet STAY CABLES MAY 1994 p.14, Fig.22], [Brochure: VSL STAY CABLE SYSTEM 200 SSI section "Corrosion Protection" and "Outer Stay Pipe"]. Easy to erect and replace strands is the main advantage of this method. But a great problem of the method is that if there is water and moisture inside sheath pipe, it is difficult to discover them and clear them away. It is necessary that water and moisture inside sheath pipe can be surveyed and cleared away.
  • Problem C - attaching structures.
  • In concrete cable-stayed bridges, web thickness of girder is usually bigger than diameter of cable anchorage head, so, cable anchorage socket is easy to go through the girder web and to be reliably anchored at the bottom of the girder. In composite cable-stayed bridges, web thickness of steel I-girder, which is the most economical type of steel girder, is much smaller than diameter of cable anchorage head, so, attaching structures become complicated. At present three imperfect types of attaching structure are normally used in composite cable-stayed bridges:
  • Type 1. Cable anchorage socket is arranged above bridge deck and anchored on a steel plate, which is welded to the top part of steel girder holding its axis coincided with girder web [Separate: Annacis Bridge Superstructure - A major composite cable-stayed bridge, P. R. Taylor, CBA - Buckland and Taylor consulting engineers Vancouver, B.C., December 6, 1985, Fig.2]. Main disadvantages of the structure are 1) large tensile and shear stress in weld and certain tensile stress in concrete deck. 2) Distance between damper and anchorage socket is too small, which reduces damper efficiency. 3) Cable can not be tensioned on girder site.
  • Type 2. Cable anchorage socket is arranged on one side of girder web and anchored at the lower part of girder on two stiffening steel plates that are welded to the girder web to avoid tensile force at top part of girder and to get sufficient distance between damper and anchorage socket [Separate: Cable-Stayed Houston Ship Channel Crossing, Holger S. Svensson and Thomas G. Lovett, Transportation Research Record No. 1290, Leonhardt, Andrä und Partner, p. 5, Fig. 7]. Basic disadvantage of the structure is that there is certain eccentricity between axes of cable and girder web, which forms additional moment in transverse beam and large stress in welds. Cable also can not be tensioned on girder site.
  • Type 3. Cable anchorage socket is arranged above bridge deck and anchored on two extended steel plates, which are welded or bolted to the bottom part of steel girder holding cable axis coincide with girder web and avoiding tensile force at top part of girder [Die Schrägkabelbrücke über den Mississippi bei Burlington, USA, H. Svensson and K. Humpf, Stahlbau 63(1994), Heft 7, p. 194, Fig. 4, 5, p. 197, Fig. 10]. Disadvantage of the structure is that the extended steel plates are heavy and bigger place occupied. Again, distance between damper and anchorage socket is too small and cable can not be tensioned on girder site.
  • Although arrangement of attaching structures in the stay cable system with parallel strands is easier to perform than that of other systems, the problem has still not been solved. It will be perfect if a light and handy way can be created to keep axes of cable and girder web in a same plane and to reliably arrange anchorage socket at bottom of steel I-girder.
  • This invention will solve the entire Problem A, Problem B and Problem C at the same time.
  • Figure 1 illustrates the general layout of the novel stay cable system, which is exclusively for the tendons with parallel strands (I) covered by a sheath pipe (Ib). The system comprises five parts:
  • 1. Main anchorage socket (1).
    Anchoring holes in the socket are divided into two symmetrical groups. Axis of two symmetrical groups of strands (I) and the centre plane of web(s) of any kind of girders (II or IId) can coincide while the socket can be arranged under the bottom of the girders.
  • 2. Auxiliary anchorage socket (2).
    It comprises a pair of half-cylindrical anchorage sockets arranged on both sides of the web in steel I-girder (II), in anchoring tie beam (3) or in steel anchoring bed (4). In the sockets (2) strands can individually be anchored or bonded to withstand fatigue loading.
  • 3. Anchoring tie beam (3) with I-section in pylon (III).
  • 4. Steel anchoring bed (4) in pylon (III) instead of anchoring tie beam (3) as well as under the girders (IId) other than steel I-girder (II).
  • 5.Cable protection system, which consists mainly of dry air entrances (5a), dry air transmission pipes (5b), dry air exits (5c) vent holes (5d), vent pipes (5e), wet air exits (5f) and dehumidification plant (5g).
  • Detail of each part is respectively described as follows.
  • Part 1 - novel arrangement of anchorage holes.
  • In current stay cable system with parallel strands, monostrand anchored holes on anchor head are normally arranged with odd number (for example 61). In this invention (see Figure2), monostrand anchored holes on main anchor head (1) are always arranged with even number (for example 60), and are separated into two symmetrical groups (1a and 1b). The minimum central distance Dg between the two groups of holes is Dg = Tw (thickness of web IIa of steel I-girder II) + Dh (diameter of monostrand anchored hole 2c and 2d in auxiliary anchorage sockets 2a and 2b) + 2At (thickness of inside wall of auxiliary anchorage sockets 2a and 2b). Thus, those two groups of strand (Ie and If) can easily pass through the I-girder (II) along both side of girder web respectively keeping axes of cable and girder web in a same plane then can reliably be anchored in a main anchor head (1) under the bottom of the girder (II). In pylon anchoring room, the strands (Ia) outside main anchorage socket (see Figure 1) do not be cut off after the final jacking, for it will be convenient for eventual individual strand replacement and the strands will be under protecting of dehumidification system (see Part 5).
  • Advantages of such arrangement are:
  • 1) There is no eccentricity between axes of cable and girder web.
  • 2) Approximately 60% of cable jacking force transfers directly to girder web by compression stress while the rest force transfers by four stiffening steel plates (3) and eight shear welds, very reliable.
  • 3) Strands within the area of girder web and stiffening steel plates can be touched when cover plates (IIc, see Figure 3, 5) are removed, which facilitates strand erection, surveillance and replacement, furthermore, fatigue resistant facilities (left auxiliary anchorage socket 2a and right auxiliary anchorage socket 2b) can be arranged within this area (see the following part).
  • 4) Cable can be tensioned on girder site, when necessary.
  • 5) Distance between damper and anchorage socket is sufficient.
  • Part 2 - novel double half-cylindrical auxiliary anchorage sockets.
  • As mentioned above, within the area of girder web and stiffening steel plates, there is plenty of space to arrange fatigue resistant facilities-auxiliary anchorage sockets, which will help the main anchorage socket to withstand fatigue load (see Figure 2). Consequently, it becomes sufficiently safe to use ordinary jaws in main anchorage socket. Since auxiliary anchorage socket works for traffic load only, its construction ought and can be calmly arranged after the final cable force adjustment
    Besides the fatigue resistant criterion, another design criterion for auxiliary anchorage sockets is that strands must be individually anchored in the sockets to ensure the possibility of individual strand replacement. Two types of auxiliary anchorage socket are created for selecting.
  • 1. Auxiliary anchorage socket 1. Structure of the socket is showed in Figure 3 and Figure 4. In the socket there are auxiliary jaws (2j) with smaller bevel angle to anchor strands individually. Edge of teeth on auxiliary jaw is circular to prevent injury and big stress concentration on the anchored strand (I).
  • 1.1 Construction procedure of auxiliary anchorage socket 1 is:
  • 1) Guide rails (2f) are erected and fixed on girder web (IIa).
  • 2) Fastening plates (2e1), on which auxiliary jaws (2j), nylon positioners (2k) and nylon washers (2l) as well as fastening threaded bars (2h) have been fixed, auxiliary anchor heads (2a1) and nuts (2i) are erected along the guide rails (2f) in proper order.
  • 3) Main anchorage socket (1, see Figure 2) and strands (I) are erected, stressed and anchored.
  • 4) When the final cable force adjustment has been done, triple cylinder hydraulic jacks (2m) are erected and then guide rails (2g) are fixed on stiffening plates (IIb) of girder.
  • 5) Triple cylinder hydraulic jacks (2m) are driven to design force then nuts (2i) are tightened.
  • 6) Triple cylinder hydraulic jacks (2m) are released and taken off together with guide rails (2g).
  • 7) Cover plates (IIc) are erected and fixed onto stiffening plates (2b).
  • 1.2 Procedure of eventual individual strand replacement of auxiliary anchorage socket 1 is:
  • 1) Cover plate (IIc) is removed. Then nuts (2i) are released.
  • 2) The strand, which should be replaced, is released by a single strand jack in pylon and removed.
  • 3) A new strand is erected, stressed and anchored on main anchor head by a single strand jack. Then the procedure 4) to 7) aforementioned is repeated.
  • 2. Auxiliary anchorage socket 2. Structure of the socket is showed in Figure 5 and Figure 6. In the socket (2a2) there are coned holes for each individual strands. Epoxy, zinc powder and quartz sand mixture (2q) is injected into the coned holes after the final tensioning of cable.
  • 2.1 Construction procedure of auxiliary anchorage socket 2 is:
  • 1) Guide rails (2f) are erected and fixed on girder web (IIa).
  • 2) Isolation plates (2n), isolation plates (2o), auxiliary anchor heads (2a2), fastening plates (2e2), on which fastening threaded bars (2h) have been fixed and release agent (2t) has been smeared, isolation plates (2p) and nuts (2i) are erected along the guide rails (2f) in proper order.
  • 3) Main anchorage socket (1, see Figure 2) and strands (I) are erected, stressed and anchored.
  • 4) When the final cable force adjustment has been done nuts (2i) and isolation plates (2p) are tightened.
  • 5) Epoxy, zinc powder and quartz sand mixture (2q) is injected into auxiliary anchorage sockets (2a2) at grout hole (2r - in pylon) and (2s - under girder) until the mixture jets out from vent hole (2s - in pylon) and (2r - under girder). The mixture (2q) is then solidified in heating condition.
  • 6) Cover plates (IIc) are erected and fixed onto stiffening plates (IIb).
  • 2.2 Procedure of eventual individual strand replacement of auxiliary anchorage socket 2 is:
  • 1) Cover plate (IIc) is taken off. Then nuts (2i) are released.
  • 2) The strand, which should be replaced, is released by a single strand jack in pylon and by heating on the strand individually in both auxiliary anchorage sockets. At the same time fastening plate (2e2) is pried open from auxiliary anchor head (2a2). Then the strand is removed.
  • 3) A new strand is erected, stressed and anchored on main anchor head by a single strand jack.
  • 4) The mixture (2q) in grout holes (2s) is drilled away.
  • 5) The nuts (2i) are tightened again while new mixture (2q) is injected into the coned hole through grout holes (2s). The new mixture is then solidified in heating condition.
  • 6) Cover plates (IIc) are erected and fixed onto stiffening plates (IIb).
  • Part 3 - novel anchoring tie beam in pylon.
  • In order to arrange the double half cylindrical auxiliary anchorage sockets, anchoring tie beams in pylon (III) can be simplified to the most economical type of I-beam (3), web and stiffening plates of which are also signed with (IIa) (IIb) respectively as in I-girder. The structures mentioned in Part 1 and Part 2 are valid in Part 3. Tie beam with I-section can be extensively used for inclined cable plane by the helping of tie bars (3a) (see Figure 6).
    Advantages of the structure are:
  • 1) Basic internal force in the structure is axial tension, which is totally withstood by the steel tie beams (3) and tie bars (3a), while no large moment and shear force happens.
  • 2) Mass of pylon top can be reduced.
  • 3) Operating space in pylon top becomes roomy in case of inclined cable plane.
  • Part 4 - novel steel anchoring bed.
  • In case the girders (IId) other than steel I-girder or the anchoring structures in pylon (III) other than tie beam are adopted and in order to arrange the double half cylindrical auxiliary anchorage sockets, the conventional anchoring bed can be replaced by a novel steel anchoring bed (4), web and stiffening plates of which are also signed with (IIa) (IIb) respectively as in I-girder (see Figure 8). The structures mentioned in Part 1 and Part 2 are valid in Part 4.
  • Compare with the conventional concrete anchoring bed, advantage of such anchoring bed is that it can simplify the form work of anchoring zone in concrete pylon, therefore mass of pylon top and construction period can be reduced.
  • Part 5 -- novel cable protection system.
  • Dehumidification system has been successfully used on Lillebaelt bridge since 1972. Now the system is being used on more and more bridges to protect steel box girders, saddles and anchoring blocks [Book: East Bridge, The Storebaelt Publications, 1998, P.374,375]. Similar principle is adopted for this novel cable protection system (see Figure 9).
  • Two dry air transmission pipes (5b) are erected from the main anchorage plate (4a) in pylon (III) to the cells enclosed by stiffening plates (IIb) and cover plates (IIc) at the bottom of girder (II or IId) and connected to a dehumidification plant (5g), which is installed inside anchoring room at pylon top, by the dry air entrances (5a). When the dehumidification plant (5g) works, air circulates within the whole hollow part of cable. Dry air is blown into the transmission pipes (5b) through dry air entrances (5a), then separates out of dry air exits (5c) mainly at the bottom of sheath pipe (Ib), partly at the guide pipes (Ic) and cells enclosed by stiffening plates (IIb) and cover plates (IIc). At the same time wet air is exhausted out of cable to the plant (5g) through vent holes (5d), vent pipes (5e), which pass through the positioners (Id) of strands (I) in guide pipe (Ic), and wet air exits (5f). Such operation offers to one cable after another with certain hours per day or per couple of days for each cable. Similar operation offers also to anchoring room in pylon by dry air exit (5o) and wet air entrance (5p) of the plant (5g) at regular intervals to protect the strands (Ia) outside main anchorage socket (see Part 1 also).
  • Water concentrates usually at the lowest part of cable and moisture concentrates usually at the highest part of cable. Therefore, strand sample (5k) and humidity measuring point (5i) are arranged in the cells enclosed by stiffening plates (IIb) and cover plates (IIc) at the bottom of girder (II or IId), while strand sample (5l) and humidity measuring point (5h) are arranged in the similar cells in pylon (III) respectively. Strand sample (5k) and/or strand sample (5l) can be checked and tested in laboratory, when necessary. Similar checking and testing can be arranged for sample (5n) of the strands (Ia) outside main anchorage socket. Humidity measuring point (5h) can be connected to the automatic control system of dehumidification plant (5g), if necessary. If there is water inside hollow part of cable, it will flow down through drainage holes (5j) and can be pumped out through the drainage valve (5m).
  • Advantages of this cable protection system are:
  • 1) Its obsevability, controllability and reliability are higher than those of the current cable protection systems are.
  • 2) It is easy for replacing individual strand.
  • 3) It is possible to simplify the individual strand protection (for example galvanised only).
  • 4) If dehumidification plant can blow warm air into sheath pipe, will melt the ice on the pipe. So that it is possible to solve the problem of ice-wind-induced vibration on cable thoroughly.

Claims (4)

  1. A stay cable system exclusively for the tendons with parallel strands (I) covered by a sheath pipe (Ib) comprising a cable protection system, which consists of dry air entrances (5a), dry air transmission pipes (5b), dry air exits (5c), vent holes (5d), vent pipes (5e), wet air exits (5f), dehumidification plant (5g) as well as some other surveying, measuring, controlling and testing facilities, which ensures strands under a observable, controllable and reliable protected condition, said stay cable system being characterized in that it further comprises:
    Main anchorage socket (1), in which anchoring holes are divided into two symmetrical groups, which can be arranged under steel I-girder or girders other than steel I-girder) so that the cable axis and the centre plane of girder web coincide. In pylon anchoring room, the strands (Ia) outside main anchorage socket are not cut off after the final jacking, for eventual individual strand replacement and the strands will be under protecting of the said dehumidification system,
    Double half-cylindrical auxiliary anchorage sockets (2) which can be arranged on both sides of the web in steel I-girder (II), in anchoring tie beam (3) or in steel anchoring bed (4). In the sockets, strands can individually be anchored or bonded to withstand fatigue loading and to facilitate eventual individual strand replacement. Based on the help of said double half-cylindrical auxiliary anchorage sockets (2), ordinary jaws can reliably be used in said main anchorage socket,
    Anchoring tie beams (3) with I-section which can be arranged in pylon (III) to facilitate the arrangement of auxiliary anchorage sockets and extend utilisation from vertical cable plane to inclined cable plane with the help of tie bars (3a), or, instead of said anchorage tie beams,
    Steel anchoring bed (4) with stiffening plate and web, which facilitates the arrangement of auxiliary anchorage sockets in pylon (III) as well as under the girders (IId) other than steel I-girder (II), in order to keep axes of cable and web in a same plane.
  2. A stay cable system as claimed in Claim 1, characterised in that the anchoring holes in main anchorage socket are divided into two symmetrical groups. The minimum central distance (Dg) between the two groups of holes is the sum of the thickness of web (IIa) in steel I-girder (II), in steel tie beam (3) with I-section or in steel anchoring bed (4) + diameter (Dh) of monostrand anchored hole (2c, 2d) in auxiliary anchorage sockets (2a, 2b) + twice the thickness (At) of inside wall of auxiliary anchorage sockets (2a, 2b), to facilitate the arrangement of double half-cylindrical auxiliary anchorage socket (2).
  3. A stay cable system as claimed in Claim 1, characterised in that the double half-cylindrical auxiliary anchorage socket (2) can withstand fatigue loading. Two types of auxiliary anchorage socket are created for selecting. In auxiliary anchorage socket of the first type strands (I) are individually anchored by auxiliary jaws (2j), which can be released when individual strand replacement carries out, without injury and big stress concentration. In the coned holes of auxiliary anchorage socket of the second type, strands (I) are individually bonded by epoxy, zinc powder and quartz sand mixture (2q), which can be milted by heating when individual strand replacement carries out.
  4. A stay cable system as claimed in Claim 1, characterised in that cable protection system further comprises some other surveying, measuring, controlling and testing facilities. These facilities are: humidity measuring points (5h, Si), drainage holes (5j), strand control and testing samples (5k, 5l) as well as drainage valve (5m). The similar members, dry air exit (5o) and wet air entrance (5p) of dehumidification plant (5g), as well as humidity measuring point (5n) are equipped to protect the strands outside main anchorage socket. When the dry air entrances, the dry air transmission pipes, the dry air exits, the vent holes, the vent pipes, the wet air exits, the dehumidification plant, and the dry air exit and wet air entrance of dehumidification plant (5a-5g 5o, 5p) operate, within all the hollow parts of cable and pylon anchoring room runs the air circulation, which is under the inspecting and controlling of said facilities (5h - 5n).
EP98119471A 1998-10-15 1998-10-15 Novel technique for stay cable system Expired - Lifetime EP1001089B1 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
DE69816303T DE69816303D1 (en) 1998-10-15 1998-10-15 Stay cable system
EP98119471A EP1001089B1 (en) 1998-10-15 1998-10-15 Novel technique for stay cable system
AT98119471T ATE244794T1 (en) 1998-10-15 1998-10-15 CABLE STAYED SYSTEM
CN99117135.7A CN1266929A (en) 1998-10-15 1999-10-12 Guy system for bridge
CN99238963U CN2412029Y (en) 1998-10-15 1999-10-12 Bridge dragline protecting appts.
CN99117134.9A CN1266928A (en) 1998-10-15 1999-10-12 Guy protector
CN99238964U CN2412028Y (en) 1998-10-15 1999-10-12 Bridge dragline structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP98119471A EP1001089B1 (en) 1998-10-15 1998-10-15 Novel technique for stay cable system

Publications (2)

Publication Number Publication Date
EP1001089A1 EP1001089A1 (en) 2000-05-17
EP1001089B1 true EP1001089B1 (en) 2003-07-09

Family

ID=8232803

Family Applications (1)

Application Number Title Priority Date Filing Date
EP98119471A Expired - Lifetime EP1001089B1 (en) 1998-10-15 1998-10-15 Novel technique for stay cable system

Country Status (4)

Country Link
EP (1) EP1001089B1 (en)
CN (4) CN2412029Y (en)
AT (1) ATE244794T1 (en)
DE (1) DE69816303D1 (en)

Families Citing this family (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1435413A1 (en) 2002-12-30 2004-07-07 Yincheng Hou Improved anchorage sockets for the "novel technique for stay cable system"
CN101057040B (en) * 2004-11-12 2010-12-08 Vsl国际股份公司 Corrosion protection system for a structure including a stay cable
CN101672006B (en) * 2009-09-25 2012-12-12 威胜利工程有限公司 Stay cable
CN101775781B (en) * 2010-01-09 2012-08-15 深圳中建院建筑科技有限公司 Long-acting building guy cable
CN102704396A (en) * 2012-06-27 2012-10-03 四川天元机械工程股份有限公司 Anchorage method for main cable of suspension bridge
CN103437284B (en) * 2012-11-14 2016-12-21 中铁九桥工程有限公司 A kind of parallelogram section rod member anchor case localization method
CN102979034A (en) * 2012-12-05 2013-03-20 江苏法尔胜缆索有限公司 Parallel steel wire guy cable system dehumidified by using dry air and capable of monitoring humidity of guy cable
CN103074851A (en) * 2012-12-21 2013-05-01 柳州欧维姆机械股份有限公司 Composite strand tapered anchoring steel strand finished product cable and manufacture method thereof
CN103105256B (en) * 2013-01-29 2015-08-19 葛洲坝集团第五工程有限公司 A kind of Cable-stayed Bridge Model test cable force test macro and method
CN103981807B (en) * 2014-05-30 2015-11-18 中建三局集团有限公司 A kind of without bracket steel anchor beam
CN104818674A (en) * 2015-03-13 2015-08-05 中交公路规划设计院有限公司 Suspension bridge unbonded prestressed anchorage corrosion resistant method and structure
CN105256720A (en) * 2015-09-17 2016-01-20 中铁大桥科学研究院有限公司 Partial ground anchor balancing cable cable-stayed bridge
CN107034785A (en) * 2017-05-24 2017-08-11 柳州欧维姆机械股份有限公司 Rope construction method is changed in a kind of interchangeable anchorage prestress anchoraging device and its installation
CN107558352B (en) * 2017-09-12 2023-07-25 柳州欧维姆机械股份有限公司 Arch bridge steel strand suspender capable of replacing single cable and installation and construction method thereof
CN107794842B (en) * 2017-10-20 2023-05-05 宁波大学 High-performance durable anti-corrosion inhaul cable anchorage device and construction method thereof
CN107988907A (en) * 2017-12-27 2018-05-04 中铁第四勘察设计院集团有限公司 A kind of anchor of suspension cable and concrete girder
CN108842619A (en) * 2018-06-14 2018-11-20 法尔胜泓昇集团有限公司 The stayed structure and its implementation of dry air dehumidifying
CN108589530A (en) * 2018-06-14 2018-09-28 法尔胜泓昇集团有限公司 The air feeder structure and its implementation of dry air dehumidifying
CN108691273A (en) * 2018-06-22 2018-10-23 深圳市科兰德实业发展有限公司 Steel strand stay cable
CN109295861B (en) * 2018-11-14 2023-08-01 柳州欧维姆机械股份有限公司 Cable with anchor box type anchoring structure and tensioning construction method thereof
CN110259246B (en) * 2019-06-27 2024-03-19 柳州欧维姆机械股份有限公司 Steel strand external stay rope structure system for wind tower and manufacturing and mounting method thereof
CN111778852A (en) * 2020-06-18 2020-10-16 中建三局第二建设工程有限责任公司 Installation method of stay cable dehumidification system
CN112523085B (en) * 2020-12-01 2022-08-16 柳州欧维姆机械股份有限公司 Inhaul cable protecting sleeve with functional elements and construction method thereof
CN113774790B (en) * 2021-07-19 2023-04-07 重庆万桥交通科技发展有限公司 Anti-corrosion cable rope of cable-stayed bridge
CN115977260A (en) * 2022-10-31 2023-04-18 中冶(上海)钢结构科技有限公司 L-shaped lug plate type anchoring connection device for stay cable structure and use method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3723795A1 (en) * 1987-06-11 1988-12-29 Wolfgang Dipl Ing Borelly CORROSION PROTECTION FOR A TENSION LINK CONSTRUCTED FROM STEEL ROPES OR PARALLEL WIRE OR STRAND

Also Published As

Publication number Publication date
CN2412029Y (en) 2000-12-27
DE69816303D1 (en) 2003-08-14
CN1266929A (en) 2000-09-20
CN2412028Y (en) 2000-12-27
ATE244794T1 (en) 2003-07-15
EP1001089A1 (en) 2000-05-17
CN1266928A (en) 2000-09-20

Similar Documents

Publication Publication Date Title
EP1001089B1 (en) Novel technique for stay cable system
US6065257A (en) Tendon alignment assembly and method for externally reinforcing a load bearing beam
EP1629154B9 (en) Method for anchoring parallel wire cables
Daly et al. Strengthening of bridges using external post-tensioning
CN115724331A (en) Prefabricated box girder hoisting device and rapid construction method
Colford et al. Forth Road Bridge main cables: replacement/augmentation study
CN211897811U (en) Transverse segmented prefabricated prestressed concrete bent cap structure
KR200184684Y1 (en) Apparatus to prevent the negative moment of a bridge
Petrangeli et al. Rehabilitation of Sidi M’Cid Suspension Bridge, Algeria
KR0141551B1 (en) Repairing method of bridge beam and apparatus therefor
Kamei et al. Konohana Bridge, Japan
KR20060115699A (en) Construction Method of Composite Slab Bridge Using Composite Truss Girder
CN206204784U (en) Steel anchor beam
CN113981769B (en) Metal prefabricated pavement slab structure and prefabricated pavement
Flint et al. STRENGTHENING AND REFURBISHMENT OF SEVERN CROSSING. PART 2: DESIGN.(JOINT WINNER OF 1993 TELFORD MEDAL).
Alambai et al. Double Cable System Suspension Bridge, Indonesia
Woodward et al. Strategies for the management of post-tensioned concrete bridges
Humpf Second bridge over the Orinoco–design, construction and operation
Flint et al. STRENGTHENING AND REFURBISHMENT OF THE SEVERN CROSSING.(JOINT WINNER OF 1993 TELFORD MEDAL).
Delatte Listening to the Structure—Signs of Impending Collapse
Pritchard Bridge Strengthening Using Load Relieving Techniques
AHMED et al. A COMPREHENSIVE COMPARATIVE STUDY BETWEEN HOWRAH BRIDGE AND SECOND HOOGHLY BRIDGE
WO2023047408A1 (en) Composite rcc deck and prestressed parabolic bottom chord underslung open web steel girder bridge superstructure
Yoshioka The latest technologies of prestressed concrete bridges in Japan
JPH11181723A (en) Method for rotating and erecting member by traction

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19991227

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

AKX Designation fees paid
REG Reference to a national code

Ref country code: DE

Ref legal event code: 8566

RBV Designated contracting states (corrected)

Designated state(s): AT

RBV Designated contracting states (corrected)

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

17Q First examination report despatched

Effective date: 20021002

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20030709

Ref country code: LI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20030709

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20030709

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20030709

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20030709

Ref country code: CH

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20030709

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20030709

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20030709

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REF Corresponds to:

Ref document number: 69816303

Country of ref document: DE

Date of ref document: 20030814

Kind code of ref document: P

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20031009

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20031009

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20031009

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20031010

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20031015

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20031015

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20031015

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20031020

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20031031

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20031209

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20040414

EN Fr: translation not filed
REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20041109

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20051015

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20051015