CN108691273A - Steel strand stay cable - Google Patents

Steel strand stay cable Download PDF

Info

Publication number
CN108691273A
CN108691273A CN201810654842.7A CN201810654842A CN108691273A CN 108691273 A CN108691273 A CN 108691273A CN 201810654842 A CN201810654842 A CN 201810654842A CN 108691273 A CN108691273 A CN 108691273A
Authority
CN
China
Prior art keywords
anchor
steel strand
tight
main body
mounting hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810654842.7A
Other languages
Chinese (zh)
Inventor
姚超
郭友谊
周波
陈功明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN COLAND INDUSTRY DEVELOPMENT Co Ltd
Original Assignee
SHENZHEN COLAND INDUSTRY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN COLAND INDUSTRY DEVELOPMENT Co Ltd filed Critical SHENZHEN COLAND INDUSTRY DEVELOPMENT Co Ltd
Priority to CN201810654842.7A priority Critical patent/CN108691273A/en
Publication of CN108691273A publication Critical patent/CN108691273A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables

Abstract

Include suspension cable ontology, the tight device of anchor, protecting pipe, protective cover, air-breather and at least two snorkels the invention discloses a kind of steel strand stay cable; there are two the tight device of anchor is set; the tight device of anchor includes the tight main body of anchor, through offering at least one first mounting hole in the tight main body of anchor and along the extending direction of suspension cable ontology;Protection tube has hollow endoporus;There are two protective cover is set, two protective covers are sheathed on one by one respectively outside the end far from protection tube of the tight main body of two anchors, and are enclosed air cavity with the tight main body of anchor one by one respectively, and air admission hole is offered on a protective cover, venthole is offered on another protective cover;Air-breather is arranged in air admission hole;Two snorkels are arranged in respectively in the first mounting hole in the tight main body of each anchor, and one end connection air cavity, the other end of snorkel are connected to hollow endoporus.The dehumidifying to steel strand wires is realized by snorkel.

Description

Steel strand stay cable
Technical field
The present invention relates to a kind of suspension cable more particularly to a kind of steel strand stay cables.
Background technology
Steel strand stay cable is main load receiving part material cable-stayed bridge main-beam and bridge floor weight being directly delivered on pylon, by The influence of rainwater and various etchant gas etc., especially in the higher area of humidity ratio, suspension cable easily corrodes, especially up and down At anchor head, to influence its intensity, lead to its short life, or even there are security risks.
Invention content
For overcome the deficiencies in the prior art, the purpose of the present invention is to provide a kind of steel strand stay cables, solve existing The problem of steel strand stay cable dehumidifies.
The purpose of the present invention adopts the following technical scheme that realization:
A kind of steel strand stay cable includes suspension cable ontology, the tight device of anchor, protecting pipe, protective cover, air-breather and at least Two snorkels, the suspension cable ontology include the parallel arrangement of steel strand wires in multiply interval;There are two the tight device of anchor is set, two A tight device of the anchor is individually fixed in the both ends of the suspension cable ontology, and the tight device of anchor includes the tight main body of anchor, the anchor It is passed through in tight main body and along the extending direction of the suspension cable ontology through each described steel strand wires one end of multiple confessions respectively is offered The first jack and at least one first mounting hole;There is the protection tube hollow endoporus, the protection tube to be sheathed on institute State that suspension cable sheet is external, and the both ends of the protection tube are separately connected the two tight main bodys of anchor;There are two the protective cover is set, Two protective covers are sheathed on one by one respectively outside the end far from the protection tube of the two tight main bodys of anchor, and difference one One is enclosed air cavity with the tight main body of the anchor, and air admission hole is offered on a protective cover, is opened up on another protective cover There is venthole;The air-breather is arranged in the air admission hole;Two snorkels are arranged in each tight main body of the anchor respectively In interior first mounting hole, one end of the snorkel is connected to the air cavity, the other end is connected to the hollow endoporus.
Further, the both ends of the snorkel are all stretched out outside the tight main body of the anchor, and wherein one end is located in the air cavity, The other end is located in the hollow endoporus.
Further, the steel strand stay cable further includes two seal closures being set in the protection tube, and two is described close Sealing cover includes the first bottom plate and the first sleeve, wherein first sleeve side is connect with wherein 1 first bottom plate, The other side is connect with the wherein one tight main body of anchor, and another first sleeve side is connect with another first bottom plate, separately Side is connect with another tight main body of anchor, and the two first set jacket casings are external set on the suspension cable sheet, and described first Multiple the second jacks for supplying each steel strand wires to wear respectively and at least one second mounting hole are offered on bottom plate, it is each described logical The one end of tracheae being located in the protection tube stretches in after being each passed through each second mounting hole in the hollow endoporus.
Further, the snorkel be located at the air cavity in end peripheral surface and in the hollow endoporus End peripheral surface is designed with screw thread, and the steel strand stay cable further includes the nut with the screw-thread fit.
Further, first mounting hole is arranged close to the lateral edges of the tight main body of the anchor, and second mounting hole leans on The lateral edges setting of nearly first bottom plate, first mounting hole and the second mounting hole are respectively positioned on the periphery of the steel strand wires.
Further, the quantity of first mounting hole and second mounting hole is all at least two, and at least two First mounting hole is circumferentially distributed along the tight main body of the anchor, and at least two second mounting holes are along first bottom plate It is circumferentially distributed;The snorkel is equipped at least two.
Further, there are two first mounting hole and second mounting hole are all provided with, and two first mounting holes It is symmetrical arranged, two second installations are symmetrical arranged, there are two the snorkel is set.
Further, the tight device of the anchor further includes multiple fixed plugs, the fixed plug include the first piston part and with it is described The junction of second piston part of the first piston part connection, first piston part and second piston part forms step surface, the fixation The via being arranged through first piston part and second piston part for supplying the steel strand wires to pass through is offered beyond the Great Wall, it is described First piston part is arranged in first jack, and the tight device of anchor further includes that plate face abuts and edges of boards edge is solid with the step surface The pressing plate of main body is tightly filled due to the anchor.
Further, the tight device of the anchor further includes the anchor plate being sheathed in the tight main body of the anchor, the anchor plate Screw hole is offered on end face, the protective cover includes second that the second bottom plate and side are connect with the edges of boards edge of second bottom plate Another side ports of sleeve, the second sleeve form outside flanging, are provided on the flanging corresponding with the screw hole solid Determine hole, the steel strand stay cable further includes the screw for connecting the flanging and the anchor plate.
Further, the piggy-back anchor being welded on the end face of the anchor plate between the anchor plate and the flanging Backing plate offers through-hole corresponding with the screw hole on the auxiliary anchor plate, between the flanging and the auxiliary anchor plate Equipped with rubber seal.
Compared with prior art, the beneficial effects of the present invention are:In the tight main body of two anchors along the extending direction of suspension cable ontology Through the first mounting hole opened up for wearing snorkel, it is connected to air cavity and protection tube, in concrete application, when passing through dress of ventilating It sets and ventilates into protective cover, gas can enter air cavity from air admission hole, then enter in protection tube into snorkel is crossed, will be on steel strand wires Moisture content take away, and by the other end snorkel flow into the other end air cavity, then from venthole be discharged, realize to steel strand wires Dehumidifying.
Description of the drawings
Fig. 1 is the overall structure figure of steel strand stay cable provided in an embodiment of the present invention;
Fig. 2 is the tight device part-structure schematic diagram of an anchor in Fig. 1;
Fig. 3 is another angle schematic diagram in Fig. 2;
Fig. 4 is the partial enlarged view at A in Fig. 3;
Fig. 5 is that another telescopic sealing covers part-structure schematic diagram in Fig. 1;
Fig. 6 is the partial enlarged view at B in Fig. 5.
In figure:
The tight device 1 of snorkel 100, steel strand wires 10, anchor, the tight main body 11 of anchor, anchor plate 12, auxiliary anchor plate 121, sealing ring 122, the 13, first piston part 131 of fixed plug, the second piston part 132, pressing plate 14, protective cover 2, air cavity 20, air admission hole 201, venthole 202, the second bottom plate 21, second sleeve 22, flanging 221, screw 201, seal closure 3, the first bottom plate 31, the first sleeve 32, protection Casing 4, the first tube body 41, the second tube body 42, the first cable guide pipe 43, the second cable guide pipe 44, telescopic sealing set 5, scalable company Socket part 51, annular ring 511, the second sealing 52, the first sealing 53, fluid sealant 55, anchor ear 54, air-breather 6, humiture pass Sensor 71, silica gel constant pressure valve 72, clamping joint 73.
Specific implementation mode
In the following, in conjunction with attached drawing and specific implementation mode, the present invention is described further, it should be noted that not Under the premise of conflicting, new implementation can be formed between various embodiments described below or between each technical characteristic in any combination Example.
A kind of steel strand stay cable, referring to Fig.1 and 2, including suspension cable ontology, the tight device 1 of anchor, protection tube 4, protecting Shield 2, at least two air-breathers 6, snorkel 10, suspension cable ontology include the parallel arrangement of steel strand wires 10 in multiply interval, anchor Tight device 1 is individually fixed in suspension cable ontology both ends, for the both ends of suspension cable ontology to be individually fixed in bridge floor there are two setting On upper and pylon, the tight device 1 of anchor includes the tight main body 11 of anchor, and the extending direction of the tight 11 upper edge suspension cable ontology of main body of anchor, which runs through, to be opened up There are multiple the first jacks (not marked in figure) for supplying each 10 one end of steel strand wires to pass through respectively and at least one first mounting hole (in figure not Mark), there is protection tube 4 hollow endoporus, protection tube 4 to be sheathed on that suspension cable sheet is external, and the both ends difference of protection tube 4 The tight main body 11 of two anchors is connected, for being protected to suspension cable ontology;There are two protective cover 2 is set, two difference of protective covers 2 are one by one It is sheathed on outside the end far from protection tube 4 of the tight main body of two anchors 11, and is enclosed air cavity 20 with the tight main body of anchor 11 respectively, one Air admission hole 201 is offered on protective cover 2, venthole 202 is offered on another protective cover 2, and air-breather 6 is arranged in air admission hole In 201, connective protection cover 2 is inside and outside to dehumidify for being passed through air into suspension cable ontology, and two snorkels 10 are arranged in respectively In the first mounting hole in the tight main body of each anchor 11,10 one end of snorkel is connected to air cavity 20, and the other end is connected to hollow endoporus.
Run through the first installation opened up for wearing snorkel 10 along the extending direction of suspension cable ontology in the tight main body 11 of anchor Hole, is connected to air cavity 20 and protection tube 4, air-breather 6 are ventilated into protective cover 2, and gas enters air cavity 20 from air admission hole 201, Enter in protection tube 4 into snorkel 10 excessively again, the moisture content on steel strand wires 10 is taken away, and is flowed into from the snorkel of the other end 10 The air cavity 20 of the other end, then be discharged from venthole 202, realize the dehumidifying to steel strand wires 10.
Preferably, Fig. 1, Fig. 2 are please referred to, the both ends of snorkel 10 are all stretched out outside the tight main body of anchor 11, and wherein one end is connected to gas In chamber 20, the other end is connected to hollow endoporus, in this way, the effect that gas is connected in snorkel 10 is more preferable.
Preferably, Fig. 2 is please referred to, steel strand stay cable further includes two seal closures 3 being set in protection tube 4, two sealings Cover 3 includes the first bottom plate 31 and the first sleeve 32, wherein one first sleeve, 32 side is connect with wherein one first bottom plate 31, separately The tight main body of side and a wherein anchor 11 is connect, and another first sleeve, 32 side is connect with another first bottom plate 31, the other side with it is another The tight main body 11 of one anchor connects, and two first sleeves 32 are sheathed on that suspension cable sheet is external, and seal closure 3 encloses shape with the tight main body 11 of anchor At protection chamber, multiple the second jacks (not marked in figure) worn respectively for each steel strand wires 10 and at least are offered on the first bottom plate 31 The one end of one the second mounting hole (not marked in figure), each snorkel 10 being located in protection tube 4 is each passed through each second installation Hollow endoporus is stretched in behind hole.Seal closure 3 prevents gas from entering protection tube 4 from the gap of steel strand wires 10 and the first jack, makes Gas conducting all out of snorkel 10, air pressure is stronger, realizes ideal ventilatory effect.
Preferably, please continue to refer to Fig. 2, the end peripheral surface of snorkel 10 being located in air cavity 20 and positioned at hollow endoporus Interior end peripheral surface is designed with screw thread, and steel strand stay cable includes the nut with screw-thread fit.Steel strand stay cable makes ventilation Pipe 10 is more stably fixed on the tight main body 11 of anchor and seal closure 3.
Preferably, please continue to refer to Fig. 2, the first mounting hole is close to the lateral edges setting of the tight main body of anchor 11, the second mounting hole Lateral edges close to the first bottom plate 31 are arranged, and the first mounting hole and the second mounting hole are respectively positioned on the periphery of steel strand wires 10.Steel twists Gap between the periphery of line 10 and the lateral edges of the tight main body of anchor 11 is larger, is easily installed snorkel 10.
Preferably, the quantity of the first mounting hole and the second mounting hole is all at least two, and at least two first installations Hole is circumferentially distributed along the tight main body of anchor 11, and at least two second mounting holes are circumferentially distributed along the first bottom plate 31, and snorkel 10 is set Have at least two.The quantity increase of snorkel 10 is conducive to the increase of air inflow.
Preferably, there are two the first mounting hole and the second mounting hole are all provided with, and two first mounting holes are symmetrical arranged, and two second Mounting hole is symmetrical arranged, and there are two snorkel 10 is set, two snorkels 10 are symmetrically set in the both sides of the tight main body of anchor 11.Except humid gas energy Equably steel strand wires 10 is given to dehumidify.
Preferably, snorkel 10 is the tube body made of stainless steel.
Preferably, the thickness range of the tube wall of snorkel 10 is 1.1mm-1.3mm.
Preferably, the size range of the internal diameter of snorkel 10 is 9mm-11mm.
Preferably, the tight device of anchor 1 further includes multiple fixed plugs 13, fixed plug 13 include the first piston part 131 and with the first plug The junction of the second piston part 132 that portion 131 connects, the first piston part 131 and the second piston part 132 forms step surface, fixed to fill on 13 It offers and penetrates through the first piston part 131 and the second piston part 132 for the via passed through for steel strand wires 10, first piston part 131 are arranged in first jack, and the tight device of anchor 1 further includes that plate face abuts edges of boards edge with step surface and is fixed on the tight main body of anchor 11 On pressing plate 14.In this way, being fixed between steel strand wires 10 and the tight device of anchor 1 more stable.
Preferably, the first piston part 131 is tapered, and the shape of the first jack and the shape of the first piston part 131 coordinate so that the One piston part 131 and the cooperation of the first jack are closer, and fixed function is more preferable.
Preferably, Fig. 3 and Fig. 4 are please referred to, the tight device of anchor 1 further includes the anchor plate 12 being sheathed on outside the tight main body of anchor 11, anchor Screw hole is offered on the end face of backing plate 12, protective cover 2 includes that the second bottom plate 21 and side are connect with the edges of boards edge of the second bottom plate 21 Second sleeve 22, another side ports of second sleeve 22 form outside flanging 221, and mounting hole is provided on flanging 221, and steel twists Line suspension cable further includes and the screw 211 that connect flanging 221 with the end face of anchor plate 12.
Preferably, it is welded on the end face of anchor plate 12 and assists anchor plate between anchor plate 12 and flanging 221, assisted Through-hole corresponding with screw hole is offered on anchor plate.
Preferably, it is equipped with rubber seal 122 between flanging 221 and auxiliary anchor plate 121.Seal flanging 221 and anchor pad Gap between plate 12.
Preferably, Fig. 5 and Fig. 6 are please referred to, suspension cable sheet is external and one end and an anchor are tight including being sheathed on for protection tube 4 The first tube body 41 that main body 11 connects and it is sheathed on that suspension cable sheet is external and the tight device of one end and another anchor 1 is connect second manages The other end of body 42, the second tube body 42 is sheathed on outside the other end of the first tube body 41, the first tube body 41 and the second tube body 42 with The length variation relative movement of suspension cable ontology realizes that flexible compensation, steel strand stay cable further include telescopic sealing set 5, can Flexible 5 one end of sealing shroud is sheathed on outside the first tube body 41 and is tightly connected with the outer surface of the first tube body 41, and the other end is sheathed on It is tightly connected, is sealed between the first tube body 41 and the second tube body 42 outside second tube body 42 and with the outer surface of the second tube body 42 Gap, and can be with the flexible automatic adjustment between the first tube body 41 and the second tube body 42.
Preferably, Fig. 3 is please referred to, telescopic sealing set 5 includes 53 sets of the first sealing being sheathed on outside the first tube body 41 It the second sealing 52 outside the second tube body 42 and is connected to scalable between the first sealing 53 and the second sealing 52 Interconnecting piece 51.Sealing effect between telescopic sealing set 5 and protection tube 4 is more preferable.
Preferably, please continue to refer to Fig. 3, the outer wall of the inner wall of the first sealing 53 and the first tube body 41 is equipped with fluid sealant 55, the outer wall of the inner wall of the second sealing 52 and the second tube body 42 is set to fluid sealant 55.Make the first sealing 53 and the first tube body 41 and second sealing 52 and or the second tube body 42 between sealing effect it is more preferable.
Preferably, telescopic sealing set 5 further includes the first stainless steel hoop 54 being sheathed on outside the first sealing 53 and set The second stainless steel hoop 54 outside the second sealing.Further such that the first sealing 53 and the first tube body 41 or the second are close Connection between envelope portion 52 and the second tube body 42 is more firm.
Preferably, the first stainless steel hoop 54 and the second stainless steel hoop 54 are designed with two, and two the first stainless steels are embraced Hoop 54 is sheathed on along the axially spaced-apart of the first sealing 53 outside the first sealing 53, and two the second stainless steel hoops 54 are close along second The axially spaced-apart parallel sleeve in envelope portion 52 is set to outside the second sealing.
Preferably, scalable interconnecting piece 51 includes multiple annular rings 511 along the arrangement of 4 length direction of protection tube, in axis Each annular ring 511 is tilted with respect to the peripheral surface of protection tube 4 in cross-wise direction, and each annular ring 511 is close to protective jacket Pipe 4 on one side and adjacent annular circle 511 close to protection tube 4 while be rotatablely connected, one side far from protection tube 4 and another On one side rotation connection of the adjacent annular circle 511 far from protection tube 4.Scalable interconnecting piece 51 is in corrugated.Make the first tube body 41 and second tube body 42 when relatively moving, accordingly it can be unfolded and receive between the adjacent annular ring 511 of scalable interconnecting piece 51 Hold together.
Preferably, steel strand stay cable further includes the Temperature Humidity Sensor 71 and silicon being set on protective cover 2 at venthole 202 Glue constant pressure valve 72.
Preferably, by clamping joint, clamping joint 73 is weld diameter 32mm for Temperature Humidity Sensor 71 and silica gel constant pressure valve 72 Fast clamping joint.
Preferably, protection tube 4 further includes the first cable guide pipe 43 and the second cable guide pipe 44, and the first cable guide pipe 43 is set to an anchor It between 11 and first tube body 41 of tight main body, and is sheathed on outside a seal closure 3, the 2nd 1 cable guide pipe is set to tight 11 He of main body of another anchor Between second tube body 42, and it is sheathed on outside another seal closure 3.
The above embodiment is only the preferred embodiment of the present invention, and the scope of protection of the present invention is not limited thereto, The variation and replacement for any unsubstantiality that those skilled in the art is done on the basis of the present invention belong to institute of the present invention Claimed range.

Claims (10)

1. a kind of steel strand stay cable, which is characterized in that including:
Suspension cable ontology, the suspension cable ontology include the parallel arrangement of steel strand wires in multiply interval;
The tight device of anchor, there are two the tight device of anchor is set, two tight devices of anchor are individually fixed in the suspension cable ontology Both ends, the tight device of anchor include the tight main body of anchor, are run through in the tight main body of anchor and along the extending direction of the suspension cable ontology Offer multiple the first jacks for supplying each described steel strand wires one end to pass through respectively and at least one first mounting hole;
Protection tube, the protection tube have hollow endoporus, and it is external that the protection tube is sheathed on the suspension cable sheet, and institute The both ends for stating protection tube are separately connected the two tight main bodys of anchor;
Protective cover, there are two the protective cover is set, two protective covers be sheathed on respectively the two tight main bodys of anchor far from institute It states outside the end of protection tube, and is enclosed air cavity with the tight main body of the anchor respectively, air inlet is offered on a protective cover Hole offers venthole on another protective cover;
Air-breather, the air-breather are arranged in the air admission hole;
At least two snorkels, two snorkels are arranged in respectively in first mounting hole in each tight main body of the anchor, One end of the snorkel is connected to the air cavity, the other end is connected to the hollow endoporus.
2. steel strand stay cable as described in claim 1, which is characterized in that it is tight that the anchor is all stretched out at the both ends of the snorkel Outside main body, wherein one end is located in the air cavity, and the other end is located in the hollow endoporus.
3. steel strand stay cable as claimed in claim 2, which is characterized in that the steel strand stay cable further includes two set on institute The seal closure in protection tube is stated, two seal closures include the first bottom plate and the first sleeve, wherein first sleeve Side is connect with wherein 1 first bottom plate, and the other side is connect with the wherein one tight main body of anchor, another first sleeve Side is connect with another first bottom plate, and the other side is connect with another tight main body of anchor, and the two first set jacket casings are equal It is external set on the suspension cable sheet, multiple the second jacks worn respectively for each steel strand wires are offered on first bottom plate It is each passed through each described second with the one end of at least one second mounting hole, each snorkel being located in the protection tube It is stretched in after mounting hole in the hollow endoporus.
4. steel strand stay cable as claimed in claim 3, which is characterized in that the end of the snorkel being located in the air cavity Portion's peripheral surface and the end peripheral surface in the hollow endoporus are designed with screw thread, and the steel strand stay cable further includes and institute State the nut of screw-thread fit.
5. steel strand stay cable as claimed in claim 3, which is characterized in that first mounting hole is close to the tight main body of the anchor Lateral edges setting, second mounting hole close to first bottom plate lateral edges be arranged, first mounting hole and second Mounting hole is respectively positioned on the periphery of the steel strand wires.
6. steel strand stay cable as claimed in claim 5, which is characterized in that first mounting hole and second mounting hole Quantity be all at least two, and at least two first mounting holes are along the circumferentially distributed of the tight main body of the anchor, at least two Second mounting hole is circumferentially distributed along first bottom plate;The snorkel is equipped at least two.
7. steel strand stay cable as claimed in claim 6, which is characterized in that first mounting hole and second mounting hole There are two being all provided with, and two first mounting holes are symmetrical arranged, and two second installations are symmetrical arranged, and the snorkel is equipped with two It is a.
8. the steel strand stay cable as described in any one of claim 1-7, which is characterized in that the tight device of anchor further includes Multiple fixed plugs, the second piston part that the fixed plug includes the first piston part and connect with first piston part, first piston part Step surface is formed with the junction of second piston part, the fixation is offered beyond the Great Wall through first piston part and described second The via for being passed through for the steel strand wires is arranged in piston part, and first piston part is arranged in first jack, the anchor Tight device further includes that plate face abuts and edges of boards edge is fixed on the pressing plate that the anchor tightly fills main body with the step surface.
9. the steel strand stay cable as described in any one of claim 1-7, which is characterized in that the tight device of anchor further includes The anchor plate being sheathed in the tight main body of the anchor, screw hole is offered on the end face of the anchor plate, and the protective cover includes second The second sleeve that bottom plate and side are connect with the edges of boards edge of second bottom plate, another side ports of the second sleeve formed to Outer flanging is provided with mounting hole corresponding with the screw hole on the flanging, and the steel strand stay cable further includes described in connection The screw of flanging and the anchor plate.
10. steel strand stay cable as claimed in claim 9, which is characterized in that be welded with and be located on the end face of the anchor plate Auxiliary anchor plate between the anchor plate and the flanging offers on the auxiliary anchor plate corresponding with the screw hole logical Hole is equipped with rubber seal between the flanging and the auxiliary anchor plate.
CN201810654842.7A 2018-06-22 2018-06-22 Steel strand stay cable Pending CN108691273A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810654842.7A CN108691273A (en) 2018-06-22 2018-06-22 Steel strand stay cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810654842.7A CN108691273A (en) 2018-06-22 2018-06-22 Steel strand stay cable

Publications (1)

Publication Number Publication Date
CN108691273A true CN108691273A (en) 2018-10-23

Family

ID=63849079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810654842.7A Pending CN108691273A (en) 2018-06-22 2018-06-22 Steel strand stay cable

Country Status (1)

Country Link
CN (1) CN108691273A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944158A (en) * 2019-03-26 2019-06-28 江阴法尔胜住电新材料有限公司 A kind of suspension cable beam-ends sealing structure
CN111535180A (en) * 2020-05-11 2020-08-14 北京赛亿科技有限公司 Stay cable bridge stay cable structure for dehumidifying by using ventilating steel pipes
WO2021008631A3 (en) * 2019-07-16 2021-03-04 深圳市科兰德实业发展有限公司 Stay cable

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1001089A1 (en) * 1998-10-15 2000-05-17 Yincheng Hou Novel technique for stay cable system
CN202626833U (en) * 2012-06-15 2012-12-26 威胜利工程有限公司 Stayed cable transparent cover
CN206109979U (en) * 2016-07-29 2017-04-19 安徽金星预应力工程技术有限公司 Multiple sealed anticorrosive ground tackle
CN106958198A (en) * 2017-04-13 2017-07-18 深圳市科兰德实业发展有限公司 A kind of new suspension cable
CN208618266U (en) * 2018-06-22 2019-03-19 深圳市科兰德实业发展有限公司 Steel strand stay cable

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1001089A1 (en) * 1998-10-15 2000-05-17 Yincheng Hou Novel technique for stay cable system
CN202626833U (en) * 2012-06-15 2012-12-26 威胜利工程有限公司 Stayed cable transparent cover
CN206109979U (en) * 2016-07-29 2017-04-19 安徽金星预应力工程技术有限公司 Multiple sealed anticorrosive ground tackle
CN106958198A (en) * 2017-04-13 2017-07-18 深圳市科兰德实业发展有限公司 A kind of new suspension cable
CN208618266U (en) * 2018-06-22 2019-03-19 深圳市科兰德实业发展有限公司 Steel strand stay cable

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944158A (en) * 2019-03-26 2019-06-28 江阴法尔胜住电新材料有限公司 A kind of suspension cable beam-ends sealing structure
WO2021008631A3 (en) * 2019-07-16 2021-03-04 深圳市科兰德实业发展有限公司 Stay cable
CN111535180A (en) * 2020-05-11 2020-08-14 北京赛亿科技有限公司 Stay cable bridge stay cable structure for dehumidifying by using ventilating steel pipes

Similar Documents

Publication Publication Date Title
CN108691273A (en) Steel strand stay cable
WO2021008631A2 (en) Stay cable
CN208618266U (en) Steel strand stay cable
CN209508813U (en) Steel strand stay cable
CN106638309B (en) A kind of dragline anchorage using single sealing
CN108894107A (en) Steel strand stay cable
CN101824796A (en) All-sealed vibration damping and water preventing device with large regulating quantity
CN102478113A (en) Seal ring and lamp using same
CN201671056U (en) All-sealed damping and waterproof device with large regulating quantity
CN107370111A (en) A kind of cable protection pipe plugging device
CN106032863A (en) Flange and dynamic balance valve using the same
CN206495137U (en) One kind uses single sealed dragline anchorage
CN108869910A (en) High-sealing-performflange flange is used in a kind of connection of pipeline
CN214993091U (en) Cable dehumidification anticorrosion protection technology fills connector
CN105322491B (en) Wedging type drainage strain clamp
CN208589764U (en) A kind of bracing means avoiding tieing damage among cable
CN207362699U (en) The sealing structure of drag-line embedded pipe orifice
CN211256630U (en) Intelligent beam end sealing waterproof cap structure with observable stay cable
CN207321002U (en) A kind of double fluid ring sealing bearing bush watt seat sealing structure
CN209369847U (en) A kind of hollow grouting cable anchor with connecing casting head fastly
CN207094047U (en) Novel threaded plug
CN107558371B (en) Sealing structure of inhaul cable embedded pipe orifice and method for realizing reliable sealing of inhaul cable embedded pipe orifice
CN206784548U (en) Sectionally assembled drainage pipeline
CN207334668U (en) A kind of waterproof and breathable connector
CN207406969U (en) It supplies water with PVC pipeline telescopic joint in a kind of water gate hoist room

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination