EP0947265A2 - Process for continuous casting and finish rolling of a cast strand within a predetermined net width - Google Patents

Process for continuous casting and finish rolling of a cast strand within a predetermined net width Download PDF

Info

Publication number
EP0947265A2
EP0947265A2 EP99106087A EP99106087A EP0947265A2 EP 0947265 A2 EP0947265 A2 EP 0947265A2 EP 99106087 A EP99106087 A EP 99106087A EP 99106087 A EP99106087 A EP 99106087A EP 0947265 A2 EP0947265 A2 EP 0947265A2
Authority
EP
European Patent Office
Prior art keywords
width
actuators
mold
slab
finishing train
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP99106087A
Other languages
German (de)
French (fr)
Other versions
EP0947265A3 (en
EP0947265B1 (en
Inventor
Jürgen Seidel
Karl-Ernst Dr. Hensger
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SMS Siemag AG
Original Assignee
SMS Schloemann Siemag AG
SMS Demag AG
Schloemann Siemag AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SMS Schloemann Siemag AG, SMS Demag AG, Schloemann Siemag AG filed Critical SMS Schloemann Siemag AG
Publication of EP0947265A2 publication Critical patent/EP0947265A2/en
Publication of EP0947265A3 publication Critical patent/EP0947265A3/en
Application granted granted Critical
Publication of EP0947265B1 publication Critical patent/EP0947265B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/12Accessories for subsequent treating or working cast stock in situ
    • B22D11/1206Accessories for subsequent treating or working cast stock in situ for plastic shaping of strands
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49764Method of mechanical manufacture with testing or indicating
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/4998Combined manufacture including applying or shaping of fluent material
    • Y10T29/49988Metal casting
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/4998Combined manufacture including applying or shaping of fluent material
    • Y10T29/49988Metal casting
    • Y10T29/49991Combined with rolling

Definitions

  • the invention relates to a method for continuous casting and finish rolling a casting slab within a specified finished width tolerance, where for the casting slab and occasionally a follow-up slab Adjustment of the mold position, in particular according to different ones Rolling conditions is made.
  • Slabs enable continuous casting with continuous casting formats between about 30 and 100 mm thickness at 800 to 2200 mm width and a preferred direct rolling with compared to conventional production processes significantly reduced forming work in a rolling mill, the production chain from raw steel to rolled product is significantly shortened.
  • the device shows a corresponding prior art EP-OS 0 149 734.
  • This document is a Mold for the continuous casting of thin slabs with cooled broad side walls and narrow side walls, the wide side walls only one funnel-shaped, restricted to part of the mold height Form the pouring area to the narrow sides and in the pouring direction is reduced to the size of the cast slab.
  • the broad side walls to the side of the funnel-shaped pouring area a distance parallel to the slab thickness up to that respective narrow side wall to form a respective from the pouring area outgoing parallel area.
  • the narrow side walls are adjustable in the parallel area of the broad side walls. The adjustment e.g. the width of thin slabs is also from DE 35 01 422 C2 known.
  • the present invention is based on the aforementioned prior art the task is based on a method in the preamble of claim 1 mentioned type to develop in continuous cast and rolled thin slabs adhering to narrow width tolerances when To be able to keep finished tape.
  • the actuators relieved the finishing train and through the finishing width Presetting of the mold slab started for slab.
  • An embodiment of the method provides that the actuators the mold in accordance with the calculated TARGET setting be approached before casting the subsequent slabs, and that the Calculating the finishing train actuators using a pass schedule model Contour model and a spreading model are used, and before the subsequent slabs are rolled, the TARGET setting determined by the invoice the finishing train actuators are approached.
  • finishing train actuators be used for the width adjustment.
  • the effective parameters of the finishing train are used for the width, that the desired (often the same) finished bandwidth within the tolerance arises (see explanations for Fig. 3).
  • One embodiment of the method provides that the width is preset for the mold actuators and the finishing train actuators (Preset) is made in such a way that for each rolled strip approximately the middle of the tolerance band of the finished width.
  • the production control system according to the invention is advantageous achieved that a width preset on the mold is made and at the same time the adjustment ranges in the Rolling mill can be withdrawn.
  • the method according to the invention provides that by Comparison of the measured width of the slab with the calculated one Slab width an adaptation correction coefficient obtained and to Correction of the spreading model is used.
  • a width error measured in the caster area can also affect the Spreading model of the finishing train can be activated.
  • the procedure provides for enlargement the tolerance range for the setting of the mold position the minimum / maximum setting ranges of the finishing train sections be determined so that only after reaching minimum or maximum Adjustment ranges of the finishing train actuators a change in Chill position is made.
  • the diagram lines in the upper area of FIG. 1 show a pass schedule with a larger number of coils, the thicknesses of the Products of individual coils vary between 1 and 3 mm.
  • the lower diagram lines show that when the Position of the mold there are considerably different bandwidths to adjust.
  • the hatched areas under the bandwidth line indicate the excess widths that occur when the rolled strip is thin on. From this it can be seen that as the thickness of a rolled one increases Band whose spread decreases disproportionately.
  • the result is Conclusion that a calculation of the necessary for each finished strip Mold width must be carried out, for the associated instantly cast slab or for the present slab. Width adjustment of the mold from slab to slab is required like this from the dependence between strip thickness and Spread from the diagrams of Fig. 1 can be read in order with the Width of a strip rolled out, for example, to a strip thickness of 1 mm within the tolerance range Tol, i.e. under the hatched area lie.
  • the finishing train actuators to use for the width adjustment.
  • the frequency of the adjustment of the mold adjustment elements to minimize or avoid their adjustment, the Effective parameters ( ⁇ W) of the finishing train are used so that the desired Finished bandwidth within the specified tolerance is observed.
  • the maximum permitted strip dimensions of a planned production program are considered and the effective parameters ( ⁇ W) of the finishing train are used in the direction of spreading or constriction. If the input width (B BR ) is present, then according to the flow diagram according to FIG. 2, the finishing line effective parameters ( ⁇ W) for the bandwidth are used for fine tuning in accordance with the claimed ranking so that the difference between the calculated finished tape width and the target width is below Consideration of the plant and material limits is minimized.
  • the width of the rolled strip is checked to see whether it is within the permissible range. If so, the optimization measures are not iterated. If not, then the finishing train parameters are changed iteratively, ie step by step. After the change has been defined, the finished road setting consisting of stitch plan model 10, contour model 11 and widening model 12 is triggered again, both for the width change (12a) on the caster C and for the width change (12b) in the Finishing line F. This iteration loop is called up until the options for changing the finishing line operating parameters ⁇ W have been exhausted.
  • the designation B F1-n denotes the bandwidths between the individual stands of the finishing train.
  • the flow chart also shows that an adaptation value 13 is obtained by comparing the measured width of the casting slab B BR with the calculated slab width (12a).
  • the measured bandwidth 16 is also used for a correction value in comparison to the calculated bandwidth 14 and is applied to the spreading model 12.
  • FIG. 3 shows the procedure for determining the optimum Mold width with the goal for the planned production spectrum to select the same mold positions as possible in a rolling program, shown.
  • the dashed lines show finished strip widths Standard driving style, i.e. without mold width optimization and without Use of the finishing train actuators.
  • the thick solid lines show finished strip widths with mold width optimization and with Use of the finishing train actuators.
  • the mold width B K is selected so that the width B F2 for the finished product 2 lies in the hatched tolerance window or is equal to the target width B Z , then over-widths B F1 often result for the finished product 1 with the same mold width.
  • the effective width ranges W 1 , W 2 of the finishing train actuators for both finished products 2 and 1 are determined.
  • the mean value B M between the maximum possible finished width B F2 and the minimum possible finished width B F1 is determined.

Abstract

The mold width is preset with the limiting values of the final strip width. For each new cast strip calculations are carried out for optimal application of the control elements of the mold and the finish rolling section. With the width of the cast strip at the entry into the finish rolling section known, additional optimization of the final strip width is undertaken using the control elements of the finish rolling section.

Description

Die Erfindung betrifft ein verfahren zum Stranggießen und Fertigwalzen einer Gießbramme innerhalb einer vorgegebenen Fertigbreitentoleranz, wobei für die Gießbramme und fallweise eine Folgebramme eine Einstellung der Kokillenposition insbesondere nach Maßgabe unterschiedlicher Walzbedingungen vorgenommen wird.The invention relates to a method for continuous casting and finish rolling a casting slab within a specified finished width tolerance, where for the casting slab and occasionally a follow-up slab Adjustment of the mold position, in particular according to different ones Rolling conditions is made.

Die mit großem Vorteil angewendete Technologie des Gießens dünner Brammen ermöglicht das Stranggießen mit Stranggußformaten zwischen ca. 30 und 100 mm Dicke bei 800 bis 2200 mm Breite und ein bevorzugt direktes Auswalzen mit gegenüber konventionellen Produktionsverfahren erheblich verringerter Umformarbeit in einer Walzstraße, wobei die Produktionskette vom Rohstahl bis zum Walzerzeugnis erheblich verkürzt ist.The technology of casting used with great advantage Slabs enable continuous casting with continuous casting formats between about 30 and 100 mm thickness at 800 to 2200 mm width and a preferred direct rolling with compared to conventional production processes significantly reduced forming work in a rolling mill, the production chain from raw steel to rolled product is significantly shortened.

Bei dieser Technologie werden zunehmend höhere Anforderungen an die einzuhaltenden Breitentoleranzen des Fertigproduktes gefordert.With this technology, increasingly high demands are placed on the required width tolerances of the finished product.

Es ist allgemein bekannt, Brammen-Kokillen zur Einstellung eines vorgegebenen Brammen-Formates mit verstellbaren Breitseiten- und/oder Schmalseitenwänden sowie mit zugehörigen mechanischen bzw. hydraulischen Stellgliedern auszurüsten.It is generally known to set up a slab mold predetermined slab formats with adjustable broadsides and / or Narrow side walls and with associated mechanical or hydraulic actuators.

Einen entsprechenden Stand der Technik zeigt die Vorrichtung nach der EP-OS 0 149 734. Es handelt sich bei diesem Dokument um eine Kokille zum Stranggießen von Dünnbrammen mit gekühlten Breitseitenwänden und Schmalseitenwänden, wobei die Breitseitenwände einen nur auf einen Teil der Kokillenhöhe beschränkten, trichterförmigen Eingießbereich bilden, der zu den Schmalseiten und in Gießrichtung auf das Format der gegossenen Bramme reduziert ist. Die Breitseitenwände seitlich des trichterförmigen Eingießbereiches verlaufen in einem der Brammendicke entsprechenden Abstand parallel, bis zu der jeweiligen Schmalseitenwand unter Bildung eines jeweils vom Eingießbereich ausgehenden Parallelbereichs. Die Schmalseitenwände sind im Parallelbereich der Breitseitenwände verstellbar. Die Verstellung bspw. der Breite von Dünnbrammen ist u.a. auch aus der DE 35 01 422 C2 bekannt.The device shows a corresponding prior art EP-OS 0 149 734. This document is a Mold for the continuous casting of thin slabs with cooled broad side walls and narrow side walls, the wide side walls only one funnel-shaped, restricted to part of the mold height Form the pouring area to the narrow sides and in the pouring direction is reduced to the size of the cast slab. The broad side walls to the side of the funnel-shaped pouring area a distance parallel to the slab thickness up to that respective narrow side wall to form a respective from the pouring area outgoing parallel area. The narrow side walls are adjustable in the parallel area of the broad side walls. The adjustment e.g. the width of thin slabs is also from DE 35 01 422 C2 known.

Ausgehend vom vorgenannten Stand der Technik liegt der Erfindung die Aufgabe zugrunde, ein Verfahren der im Oberbegriff von Anspruch 1 genannten Art weiter zu entwickeln, um bei stranggegossenen und gewalzten Dünnbrammen die Einhaltung enger Breitentoleranzen beim Fertigband einhalten zu können.The present invention is based on the aforementioned prior art the task is based on a method in the preamble of claim 1 mentioned type to develop in continuous cast and rolled thin slabs adhering to narrow width tolerances when To be able to keep finished tape.

Zur Lösung der Aufgabe wird mit der Erfindung vorgeschlagen,

  • daß zur Erzielung der vorgegebenen Fertigbreite innerhalb eines Toleranzbandes zunächst eine Voreinstellung der Kokillenposition unter anderem unter Berücksichtigung der extremen Bandabmessungen des geplanten Produktionsprogramms vorgenommen und
  • für jede Gießbramme und fallweise eine Folgebramme eine Berechnung für den optimalen Einsatz der Kokillenstellglieder und der Stellglieder der Fertigstraße vorgenommen, und
  • daß bei vorliegender Eingangsbreite der Gießbramme in die Fertigstraße eine Nachoptimierung der Fertigbreite mit Hilfe der Stellglieder der Fertigstraße vorgenommen wird.
To achieve the object, the invention proposes
  • that in order to achieve the specified finished width within a tolerance band, the mold position is first preset, taking into account, among other things, the extreme band dimensions of the planned production program and
  • a calculation for the optimal use of the mold actuators and the actuators of the finishing train is carried out for each casting slab and occasionally a subsequent slab, and
  • that when the pouring slab enters the finishing train, the finishing width is re-optimized using the actuators on the finishing train.

Mit Vorteil gliedert sich das erfindungsgemäße Verfahren der Breitenoptimierung einer stranggegossenen Dünnbramme in die Schritte:

  • a) Erzeugen der Brammenbreite bzw. Bestimmen der Kokillenposition und gegebenenfalls auch der Vorbandbreite einer konventionellen Straße, sowie
  • b) Nachoptimieren der Fertigstraßenstellglieder bei vorliegender Eingangsbreite.
  • The method according to the invention of optimizing the width of a continuously cast thin slab is advantageously divided into the steps:
  • a) generating the slab width or determining the mold position and possibly also the sliver width of a conventional road, and
  • b) Fine-tuning of the finishing train actuators with the available entrance width.
  • Dies gilt sowohl für Dünnbrammen-Fertigstraßen, wie auch für konventionelle Fertigstraßen. Das erfindungsgemäße Verfahren der Breitenoptimierung kann sowohl in einer mehrgerüstigen Anlage, als auch bei einem Reversiergerüst mit mehreren Stichen Anwendung finden.This applies to thin slab finishing lines as well as conventional ones Prefabricated streets. The inventive method of Width optimization can be done both in a multi-stand system also applicable to a reversing scaffold with multiple stitches Find.

    Bei einer möglichen Fahrweise gemäß der Erfindung werden die Stellglieder der Fertigstraße entlastet und die Fertigbreite durch Voreinstellung der Kokille Bramme für Bramme angefahren.In a possible driving style according to the invention, the actuators relieved the finishing train and through the finishing width Presetting of the mold slab started for slab.

    Eine Ausgestaltung des Verfahrens sieht vor, daß die Stellglieder der Kokille entsprechend der rechnerisch ermittelten SOLL-Einstellung vor dem Gießen der Folgebramme angefahren werden, und daß der Berechnung der Fertigstraßen-Stellglieder ein Stichplanmodell, ein Konturmodell und ein Breitungsmodell zugrunde gelegt werden, und vor dem Walzen der Folgebramme die durch Rechnung ermittelte SOLL-Einstellung der Fertigstraßen-Stellglieder angefahren wird.An embodiment of the method provides that the actuators the mold in accordance with the calculated TARGET setting be approached before casting the subsequent slabs, and that the Calculating the finishing train actuators using a pass schedule model Contour model and a spreading model are used, and before the subsequent slabs are rolled, the TARGET setting determined by the invoice the finishing train actuators are approached.

    Ein weiterer Anwendungsfall zwecks der erfindungsgemäßen Optimierung für die Brammenbreite besteht darin, daß bevorzugt die Fertigstraßenstellglieder für die Breiteneinstellung verwendet werden.Another application for the purpose of optimization according to the invention for the slab width it is preferred that the finishing train actuators be used for the width adjustment.

    Um aus übergeordneten Gründen, bspw. der Oberflächenqualität oder der Gießgeschwindigkeit, eine Änderung der Kokillenposition zu vermeiden oder die Verstellbeträge bzw. -häufigkeit zu minimieren, werden die Wirkparameter der Fertigstraße für die Breite so eingesetzt, daß die gewünschte (oft gleiche) Fertigbandbreite innerhalb der Toleranz entsteht (siehe Erläuterungen zu Fig. 3). For overriding reasons, e.g. the surface quality or the casting speed, a change in the mold position avoid or minimize the adjustment amounts or frequency, the effective parameters of the finishing train are used for the width, that the desired (often the same) finished bandwidth within the tolerance arises (see explanations for Fig. 3).

    Eine Ausgestaltung des Verfahrens sieht vor, daß die Breitenvoreinstellung für die Kokillenstellglieder und die Fertigstraßen-Stellglieder (Preset) so vorgenommen wird, daß sich für jedes Walzband etwa die Mitte des Toleranzbandes der Fertigbreite ergibt.One embodiment of the method provides that the width is preset for the mold actuators and the finishing train actuators (Preset) is made in such a way that for each rolled strip approximately the middle of the tolerance band of the finished width.

    Weiterhin sieht das Verfahren nach der Erfindung vor,

    • daß vor der Produktion einer neuen Gießbramme eine Band-Kontur-Berechnung und eine Stichplanberechnung sowie das Breitungsmodell angestoßen werden, wonach
    • ein entsprechendes Preset der Kokillen-Stellglieder vorgenommen wird,
    • anschließend die effektive Breite des fertig gewalzten Bandes gemessen, und
    • das Ergebnis einer fallweise erforderlichen Korrektur des Breitungsmodells und damit der Berechnung der Fertigstraßen-Stellglieder zugrunde gelegt wird.
    Furthermore, the method according to the invention provides
    • that before the production of a new casting slab a belt contour calculation and a pass schedule calculation as well as the spreading model are initiated, after which
    • a corresponding preset of the mold actuators is made,
    • then measured the effective width of the finished rolled strip, and
    • the result of a correction of the expansion model, which is necessary in some cases, and thus the calculation of the finishing train actuators is used.

    Mit Vorteil wird durch das erfindungsgemäße Produktionssteuerungssystem erreicht, daß eine Breitenvoreinstellung an der Kokille vorgenommen wird und gleichzeitig die Verstellbereiche in der Walzstraße zurückgenommen werden können.The production control system according to the invention is advantageous achieved that a width preset on the mold is made and at the same time the adjustment ranges in the Rolling mill can be withdrawn.

    Eine weitere Ausgestaltung des Verfahrens sieht vor, daß für einen optimalen Einsatz der Stellglieder für Kokille und Fertigstraße zur Erzielung hoher Genauigkeit ein Breitungsmodell als Grundlage für eine Preset-Einstellung verwendet wird, das wenigstens die folgenden Einflüsse berücksichtigt:

    • Breitenänderung zwischen Kokille und Caster austritt
    • Temperaturschrumpf vom Caster bis zum Fertigband
    • Bandzüge innerhalb der Fertigstraße
    • Konturänderungen der Brammenform bis hin zur Fertigbandform
    • Planheitszustand des Bandes zwischen den Fertiggerüsten
    • natürliche Breitung des Bandes, Dicke des Bandes
    • Walzgeschwindigkeit, Walztemperatur
    • Materialqualität des Bandes
    • Stauchabnahme
    • Brammen- bzw. Vorbandkontur (als Meß- oder Rechenwert).
    A further embodiment of the method provides that a spreading model is used as the basis for a preset setting, which takes into account at least the following influences, for optimal use of the actuators for the mold and the finishing train in order to achieve high accuracy.
    • Change in width between mold and caster emerges
    • Temperature shrinkage from the caster to the finished belt
    • Belt trains within the finishing train
    • Contour changes from the slab shape to the finished strip shape
    • Flatness of the belt between the finishing stands
    • natural width of the band, thickness of the band
    • Rolling speed, rolling temperature
    • Material quality of the band
    • Shrinkage decrease
    • Slab or pre-strip contour (as measured or calculated value).

    Weiterhin sieht das Verfahren nach der Erfindung vor, daß durch Vergleich der gemessenen Breite der Gießbramme mit der berechneten Brammenbreite ein Adaptions-Korrekturkoeffizient gewonnen und zur Korrektur des Breitungsmodelles verwendet wird.Furthermore, the method according to the invention provides that by Comparison of the measured width of the slab with the calculated one Slab width an adaptation correction coefficient obtained and to Correction of the spreading model is used.

    Auch kann ein im Casterbereich gemessener Breitenfehler auf das Breitungsmodell der Fertigstraße aufgeschaltet werden.A width error measured in the caster area can also affect the Spreading model of the finishing train can be activated.

    Mit dem Verfahren nach der Erfindung ist weiterhin vorgesehen, daß zum Fine-Tuning der Fertigbreite des gewalzten Bandes in der Fertigstraße die folgenden Wirkparameter in der angegebenen Rangfolge berücksichtigt und derart eingesetzt werden, daß die Differenz zwischen der errechneten Breite und der Zielbreite minimiert wird:

    • Änderung der Abnahmeverteilung in der Straße
    • Änderung des Zielprofils im Rahmen des Profiltoleranzbandes
    • Änderung der Zugspannung zwischen den Gerüsten
    • Einsatz eines Stauchers
    • Änderung der aktiven Gerüstzahl oder der Stichanzahl.
    With the method according to the invention it is further provided that for fine-tuning the finished width of the rolled strip in the finishing train, the following operating parameters are taken into account in the given order and used in such a way that the difference between the calculated width and the target width is minimized:
    • Change in the distribution of purchases in the street
    • Change of the target profile within the scope of the profile tolerance band
    • Change of tension between the scaffolding
    • Use of an edger
    • Change the active number of stands or the number of stitches.

    Und schließlich ist mit dem Verfahren vorgesehen, daß zur Erweiterung des Toleranzbereiches für die Einstellung der Kokillenposition die minimalen/maximalen Stellbereiche der Fertigstraßenglieder ermittelt werden, so daß erst nach Erreichen minimaler oder maximaler Stellbereiche der Fertigstraßenstellglieder eine Änderung der Kokillenposition vorgenommen wird.And finally, the procedure provides for enlargement the tolerance range for the setting of the mold position the minimum / maximum setting ranges of the finishing train sections be determined so that only after reaching minimum or maximum Adjustment ranges of the finishing train actuators a change in Chill position is made.

    Weitere Einzelheiten, Merkmale und Vorteile der Erfindung ergeben sich aus der nachstehenden Erläuterung einiger in Zeichnungen diagrammatisch dargestellter Beispiele. Es zeigen:

    Figur 1
    ein Walzprogramm mit einer Anzahl Coils unterschiedlicher Banddicke und daraus resultierender unterschiedlicher Fertigbreite bei konstant eingestellter Kokillenposition (dargestellt anhand einer bekannten CSP-Anlage);
    Figur 2
    ein Berechnungsmodell zur Bestimmung und zum Fine-Tuning der Bandbreite;
    Figur 3
    Diagramme gleicher Kokillenbreite für unterschiedliche Fertigprodukte mit und ohne Optimierungsverfahren.
    Further details, features and advantages of the invention will become apparent from the following explanation of some examples shown diagrammatically in the drawings. Show it:
    Figure 1
    a rolling program with a number of coils of different strip thickness and the resulting different finishing width with a constantly set mold position (shown using a known CSP system);
    Figure 2
    a calculation model for determining and fine-tuning the bandwidth;
    Figure 3
    Diagrams of the same mold width for different finished products with and without optimization processes.

    Zum besseren Verständnis werden zunächst die Zeichnungen in den Figuren 1 bis 3 wie folgt erläutert:

  • Figur 1
    dF(mm)
    = Fertigbanddicke
    ΔBF(mm)
    = Breitenabweichung
    Tol
    = max. Toleranzbreite des Walzbandes
    BFSoll
    = SOLL-Fertigbreite des Walzbandes
    Ww
    = Walzenwechsel
  • Figur 2
    BK
    = Kokillenbreite/Vorbandbreite (Kopf/Ende)
    BF
    = eff. Fertigbreite des Walzbandes
    BF1-n
    = Bandbreiten zwischen den Gerüsten
    BBR
    = gemessene Brammenbreite
    ΔW
    = Änderung der Fertigstraßen-Wirkparameter
    10
    = Stichplan-Modell
    11
    = Kontur-Modell
    12
    = Breitungs-Modell (C = Caster;
    F = Fertigstraße)
    13
    = Adaption Casterbreite
    14
    = Adaption Bandbreite
    15
    = Position Seitenführungen
    16
    = gemessene Fertigbreite des Walzbandes
  • Figur 3
    BK1; BK2
    = Kokillenbreite ohne Optimierung
    BKopt
    = Kokillenbreite mit Optimierung
    W1; W2
    = Wirkglieder-Stellbereich der Fertigstraße
    St
    = Einfluß der Stellglieder
    BF1; BF2
    = Fertigbandbreiten ohne Optimierung
    B'F1; B'F2
    = Fertigbandbreiten mit Optimierung
    BZ
    = Zielbreite
    ΔB
    = Breitentoleranz des Walzbandes
    ΔBopt
    = Breitendifferenz der Kokille zwischen den Positionen mit und ohne Optimierung
    BM
    = Mittelwert zwischen max. möglicher Fertig breite BF2 und min. möglicher Fertigbreite BF1
    Index 1
    = Fertigprodukt 1
    Index 2
    = Fertigprodukt 2
  • For a better understanding, the drawings in FIGS. 1 to 3 are first explained as follows:
  • Figure 1
    d F (mm)
    = Finished strip thickness
    ΔB F (mm)
    = Width deviation
    Tol
    = max. Tolerance range of the rolled strip
    B FSoll
    = TARGET finished width of the rolled strip
    Ww
    = Roller change
  • Figure 2
    B K
    = Mold width / sliver width (head / end)
    B F
    = eff. Finished width of the rolled strip
    B F1-n
    = Bandwidth between the stands
    B BR
    = measured slab width
    ΔW
    = Change of the finishing line parameters
    10th
    = Pass schedule model
    11
    = Contour model
    12th
    = Expansion model (C = caster;
    F = finishing train)
    13
    = Adaptation caster width
    14
    = Adaption bandwidth
    15
    = Position of side guides
    16
    = measured finished width of the rolled strip
  • Figure 3
    B K1 ; B K2
    = Mold width without optimization
    B Kopt
    = Mold width with optimization
    W 1 ; W 2
    = Actuator setting area of the finishing train
    St
    = Influence of the actuators
    B F1 ; B F2
    = Finished strip widths without optimization
    B 'F1; B ' F2
    = Finished strip widths with optimization
    B Z
    = Target width
    Δ B
    = Width tolerance of the rolled strip
    Δ Bopt
    = Width difference of the mold between the positions with and without optimization
    B M
    = Average between max. possible finished width B F2 and min. possible finished width B F1
    Index 1
    = Finished product 1
    Index 2
    = Finished product 2
  • Die Diagrammlinien im oberen Bereich der Fig. 1 zeigen einen Stichplan mit einer größeren Anzahl von Coils, wobei die Dicken der Produkte einzelner Coils zwischen 1 und 3 mm variieren.The diagram lines in the upper area of FIG. 1 show a pass schedule with a larger number of coils, the thicknesses of the Products of individual coils vary between 1 and 3 mm.

    In den unteren Diagrammlinien zeigt sich, daß bei konstant gehaltener Position der Kokille sich erheblich unterschiedliche Bandbreiten einstellen. Die schraffierten Flächen unter der Bandbreitenlinie geben die bei geringer Dicke des Walzbandes entstehenden Überbreiten an. Hieraus ist erkennbar, daß mit zunehmender Dicke eines gewalzten Bandes dessen Breitung überproportional abnimmt. Es ergibt sich die Folgerung, daß für jedes Fertigband eine Berechnung der notwendigen Kokillenbreite durchgeführt werden muß, und zwar für die dazugehörige augenblicklich gegossene Bramme bzw. für die vorliegende Bramme. Eine Breitenverstellung der Kokille von Bramme zu Bramme ist erforderlich, wie dies aus der Abhängigkeit zwischen Banddicke und Breitung aus den Diagrammen von Fig. 1 ablesbar ist, um mit der Breite eines bspw. auf 1 mm Banddicke ausgewalzten Bandes innerhalb der Toleranzbreite Tol, d.h. unter der schraffierten Fläche zu liegen. The lower diagram lines show that when the Position of the mold there are considerably different bandwidths to adjust. The hatched areas under the bandwidth line indicate the excess widths that occur when the rolled strip is thin on. From this it can be seen that as the thickness of a rolled one increases Band whose spread decreases disproportionately. The result is Conclusion that a calculation of the necessary for each finished strip Mold width must be carried out, for the associated instantly cast slab or for the present slab. Width adjustment of the mold from slab to slab is required like this from the dependence between strip thickness and Spread from the diagrams of Fig. 1 can be read in order with the Width of a strip rolled out, for example, to a strip thickness of 1 mm within the tolerance range Tol, i.e. under the hatched area lie.

    Wie das Flußdiagramm der Fig. 2 zeigt, besteht eine Optimierungsaufgabe für die Bandfertigbreite darin, bevorzugt die Fertigstraßenstellglieder für die Breiteneinstellung zu verwenden. Um für die Kokille die Häufigkeit der Verstellung der Kokillenverstellglieder zu minimieren oder deren Verstellung zu vermeiden, werden die Wirkparameter (ΔW) der Fertigstraße so eingesetzt, daß die gewünschte Fertigbandbreite innerhalb der vorgegebenen Toleranz eingehalten wird.As the flowchart in FIG. 2 shows, there is an optimization task for the finished strip width in it, prefers the finishing train actuators to use for the width adjustment. To for the Mold the frequency of the adjustment of the mold adjustment elements to minimize or avoid their adjustment, the Effective parameters (ΔW) of the finishing train are used so that the desired Finished bandwidth within the specified tolerance is observed.

    Bei der Optimierung werden die maximal zulässigen Bandabmessungen eines geplanten Produktionsprogrammes betrachtet und die Wirkparameter (ΔW) der Fertigstraße in Richtung Breitung bzw. Einschnürung eingesetzt. Liegt die Eingangsbreite (BBR) vor, so werden gemäß dem Flußdiagramm nach Fig. 2 die Fertigstraßen-Wirkparameter (ΔW) für die Bandbreite entsprechend der beanspruchten Rangfolge zum Fine-Tuning so eingesetzt, daß die Differenz zwischen der gerechneten Bandfertigbreite und der Zielbreite unter Beachtung der Anlage- und Materiallimits minimiert wird.During the optimization, the maximum permitted strip dimensions of a planned production program are considered and the effective parameters (ΔW) of the finishing train are used in the direction of spreading or constriction. If the input width (B BR ) is present, then according to the flow diagram according to FIG. 2, the finishing line effective parameters (ΔW) for the bandwidth are used for fine tuning in accordance with the claimed ranking so that the difference between the calculated finished tape width and the target width is below Consideration of the plant and material limits is minimized.

    Dabei wird ausgehend von einem Presetting einer Standard-Fertigstraße die Breite des gewalzten Bandes überprüft, ob diese im zulässigen Bereich liegt. Wenn ja, dann findet keine Iteration der Optimierungsmaßnahmen statt. Wenn nein, dann werden iterativ, d.h. Schritt für Schritt, die Fertigstraßenparameter geändert. Nach Festlegung der Änderung erfolgt ein erneutes Anstoßen der Fertigstraßeneinstellung bestehend aus Stichplan-Modell 10, Kontur-Modell 11 und Breitungs-Modell 12, und zwar sowohl für die Breitenänderung (12a) am Caster C, als auch für die Breitenänderung (12b) in der Fertigstraße F. Diese Iterationsschleife wird so oft aufgerufen, bis die Änderungs-Möglichkeiten der Fertigstraßen-Wirkparameter ΔW ausgeschöpft sind. Mit der Bezeichnung BF1-n sind die Bandbreiten zwischen den einzelnen Gerüsten der Fertigstraße bezeichnet. Das Flußdiagramm zeigt ferner, daß durch Vergleich der gemessenen Breite der Gießbramme BBR mit der errechneten Brammenbreite (12a) ein Adaptionswert 13 gewonnen wird. Ebenfalls wird die gemessene Bandbreite 16 im Vergleich zur errechneten Bandbreite 14 für einen Korrekturwert verwendet und dem Breitungsmodell 12 aufgeschaltet. Bei Erreichen der effektiven Fertigbreite BF ist die Iteration für die Änderung der Fertigstraßen-Wirkparameter beendet und das korrekte Fertigprodukt bedarf keiner weiteren Korrekturen.Starting from a presetting of a standard finishing train, the width of the rolled strip is checked to see whether it is within the permissible range. If so, the optimization measures are not iterated. If not, then the finishing train parameters are changed iteratively, ie step by step. After the change has been defined, the finished road setting consisting of stitch plan model 10, contour model 11 and widening model 12 is triggered again, both for the width change (12a) on the caster C and for the width change (12b) in the Finishing line F. This iteration loop is called up until the options for changing the finishing line operating parameters ΔW have been exhausted. The designation B F1-n denotes the bandwidths between the individual stands of the finishing train. The flow chart also shows that an adaptation value 13 is obtained by comparing the measured width of the casting slab B BR with the calculated slab width (12a). The measured bandwidth 16 is also used for a correction value in comparison to the calculated bandwidth 14 and is applied to the spreading model 12. When the effective finished width B F is reached, the iteration for the change of the effective finishing line parameters has ended and the correct finished product requires no further corrections.

    In der Fig. 3 wird die Vorgehensweise bei Ermittlung der optimalen Kokillenbreite mit dem Ziel für das geplante Produktionsspektrum eines Walzprogramms möglichst gleiche Kokillenpositionen zu wählen, gezeigt.3 shows the procedure for determining the optimum Mold width with the goal for the planned production spectrum to select the same mold positions as possible in a rolling program, shown.

    Es sind zur Veranschaulichung Diagrammlinien gleicher Kokillenbreite für unterschiedliche Fertigprodukte mit und ohne Optimierung dargestellt. Die gestrichelten Linien zeigen Fertigbandbreiten bei Standard-Fahrweise, d.h. ohne Kokillenbreitenoptimierung und ohne Nutzung der Fertigstraßen-Stellglieder. Die dick ausgezogenen Linien zeigen Fertigbandbreiten mit Kokillenbreitenoptimierung und mit Einsatz der Fertigstraßen-Stellglieder.To illustrate, there are diagram lines of the same mold width for different finished products with and without optimization. The dashed lines show finished strip widths Standard driving style, i.e. without mold width optimization and without Use of the finishing train actuators. The thick solid lines show finished strip widths with mold width optimization and with Use of the finishing train actuators.

    Wenn die Kokillenbreite BK so gewählt ist, daß für das Fertigprodukt 2 die Bandbreite BF2 im schraffierten Toleranzfenster liegt bzw. gleich der Zielbreite BZ ist, so ergeben sich häufig für das Fertigprodukt 1 bei gleicher Kokillenbreite Überbreiten BF1.If the mold width B K is selected so that the width B F2 for the finished product 2 lies in the hatched tolerance window or is equal to the target width B Z , then over-widths B F1 often result for the finished product 1 with the same mold width.

    Im ersten Schritt werden dann die Breitenwirkbereiche W1, W2 der Fertigstraßen-Stellglieder für beide Fertigprodukte 2 bzw. 1 ermittelt. Im zweiten Schritt wird der Mittelwert BM zwischen maximal möglicher Fertigbreite BF2 und minimal möglicher Fertigbreite BF1 bestimmt.In the first step, the effective width ranges W 1 , W 2 of the finishing train actuators for both finished products 2 and 1 are determined. In the second step, the mean value B M between the maximum possible finished width B F2 and the minimum possible finished width B F1 is determined.

    Die Differenz ΔBopt zwischen der Breite BM und der Zielbreite Bz ergibt die optimierte Kokillenbreite BKopt = BK - ΔBopt , um für die beiden Produkte des Produktionsprogramms das schraffierte Breitentoleranzfenster ΔB zu erreichen. The difference ΔB opt between the width B M and the target width B z results in the optimized mold width B Copt = B K - ΔB opt to achieve the hatched width tolerance window Δ B for the two products in the production program.

    Ausgehend von der optimierten Kokillenbreite BKopt (B'K1 = B'K2 ) ergeben sich mit der Nutzung der Fertigstraßenstellglieder die optimierten Breiten B'F1; B'F2, die beide im Breitentoleranzfenster ΔB liegen. Liegt die Fertigbreite B'F2 unterhalb der minimalen Breitentoleranzgrenze, demnach im unzulässigen Bereich, so muß die Kokillenbreite um diesen Betrag korrigiert werden.Based on the optimized mold width B Kopt ( B ' K1 = B ' K2 ) the use of the finishing train actuators results in the optimized widths B 'F1; B 'F2, both of which are within tolerance window width Δ B. If the finished width B ' F2 is below the minimum width tolerance limit, and therefore in the inadmissible range, the mold width must be corrected by this amount.

    Zur Ermittlung der erforderlichen Kokillenposition werden dann iterativ die Modellbausteine gemäß Fig. 2, nämlich:

    • Stichplanmodell (10)
    • Konturmodell (11)
    • Breitungsmodell (12)
    • Algorithmus zur Veränderung von Fertigstraßenwirkparametern ΔW in beanspruchter Rangfolge
    entsprechend dem Flußdiagramm nach Fig. 2 verwendet. To determine the required mold position, the model modules according to FIG. 2 are then iteratively, namely:
    • Pass schedule model (10)
    • Contour model (11)
    • Spreading model (12)
    • Algorithm for changing prefabricated street effective parameters ΔW in claimed order
    used according to the flow chart of FIG. 2.

    Bedeutung der Zeichen in den Figuren:Meaning of the characters in the figures:

  • Figur 1
    dF(mm)
    = Fertigbanddicke
    ΔBF(mm)
    = Breitenabweichung
    Tol
    = max. Toleranzbreite des Walzbandes
    BFSoll
    = SOLL-Fertigbreite des Walzbandes
    Ww
    = Walzenwechsel
    Figure 1
    d F (mm)
    = Finished strip thickness
    ΔB F (mm)
    = Width deviation
    Tol
    = max. Tolerance range of the rolled strip
    B FSoll
    = TARGET finished width of the rolled strip
    Ww
    = Roller change
  • Figur 2
    BK
    = Kokillenbreite/Vorbandbreite (Kopf/Ende)
    BF
    = eff. Fertigbreite des Walzbandes
    BF1-n
    = Bandbreiten zwischen den Gerüsten
    BBR
    = gemessene Brammenbreite
    ΔW
    = Änderung der Fertigstraßen-Wirkparameter
    10
    = Stichplan-Modell
    11
    = Kontur-Modell
    12
    = Breitungs-Modell (c = Caster;
    F = Fertigstraße)
    13
    = Adaption Casterbreite
    14
    = Adaption Bandbreite
    15
    = Position Seitenführungen
    16
    = gemessene Fertigbreite des Walzbandes
    Figure 2
    B K
    = Mold width / sliver width (head / end)
    B F
    = eff. Finished width of the rolled strip
    B F1-n
    = Bandwidth between the stands
    B BR
    = measured slab width
    ΔW
    = Change of the finishing line parameters
    10th
    = Pass schedule model
    11
    = Contour model
    12th
    = Expansion model (c = caster;
    F = finishing train)
    13
    = Adaptation caster width
    14
    = Adaption bandwidth
    15
    = Position of side guides
    16
    = measured finished width of the rolled strip
  • Figur 3
    BK1; BK2
    = Kokillenbreite ohne Optimierung
    BKopt
    = Kokillenbreite mit Optimierung
    W1; W2
    = Wirkglieder-Stellbereich der Fertigstraße
    St
    = Stellglieder
    BF1; BF2
    = Fertigbandbreiten ohne Optimierung
    B'F1; B'F2
    = Fertigbandbreiten mit Optimierung
    BZ
    = Zielbreite
    ΔB
    = Breitentoleranz des Walzbandes
    ΔBopt
    = Breitendifferenz der Kokille zwischen den Positionen mit und ohne Optimierung
    BM
    = Mittelwert zwischen max. möglicher Fertig breite BF2 und min. möglicher Fertigbreite BF1
    Index 1
    = Fertigprodukt 1
    Index 2
    = Fertigprodukt 2
    Figure 3
    B K1 ; B K2
    = Mold width without optimization
    B Kopt
    = Mold width with optimization
    W 1 ; W 2
    = Actuator setting area of the finishing train
    St
    = Actuators
    B F1 ; B F2
    = Finished strip widths without optimization
    B 'F1; B ' F2
    = Finished strip widths with optimization
    B Z
    = Target width
    Δ B
    = Width tolerance of the rolled strip
    Δ Bopt
    = Width difference of the mold between the positions with and without optimization
    B M
    = Average between max. possible finished width B F2 and min. possible finished width B F1
    Index 1
    = Finished product 1
    Index 2
    = Finished product 2
  • Claims (12)

    Verfahren zum Stranggießen und Fertigwalzen einer gegossenen Bramme innerhalb einer vorgegebenen Fertigbreitentoleranz des Walzbandes, wobei für die Gießbramme und fallweise eine Folgebramme eine Einstellung der Kokillenposition insbesondere nach Maßgabe unterschiedlicher Walzbedingungen vorgenommen wird,
    dadurch gekennzeichne, daß zur Erzielung der vorgegebenen Fertigbreite (Bz) des Walzbandes innerhalb eines Toleranzbandes (ΔB) zunächst eine Voreinstellung der Kokillenposition (BK) unter anderem unter Berücksichtigung der extremen Bandabmessungen des geplanten Produktionsprogramms vorgenommen, und für jede Gießbramme und fallweise eine Folgebramme eine Berechnung für den optimalen Einsatz der Kokillenstellglieder und der Stellglieder der Fertigstraße vorgenommen wird, und
    daß bei vorliegender Eingangsbreite der Gießbramme in die Fertigstraße eine Nachoptimierung der Fertigbreite des Walzbandes mit Hilfe der Stellglieder der Fertigstraße vorgenommen wird.
    Process for continuous casting and finish rolling of a cast slab within a predetermined finished width tolerance of the rolled strip, the mold position being adjusted for the cast slab and occasionally a subsequent slab, in particular in accordance with different rolling conditions,
    characterized by that in order to achieve the predetermined finished width (B z ) of the rolled strip within a tolerance band (Δ B ), a presetting of the mold position (B K ) is first carried out, taking into account the extreme strip dimensions of the planned production program, and a calculation for the optimal use of the mold actuators and the actuators of the finishing train is carried out for each casting slab and occasionally a subsequent slab, and
    that when the casting slab enters the finishing train, the finished width of the rolled strip is re-optimized using the actuators on the finishing train.
    Verfahren nach Anspruch 1,
    dadurch gekennzeichnet,
    daß die Stellglieder der Kokille entsprechend der rechnerisch ermittelten SOLL-Einstellung vor dem Gießen der Folgebramme angefahren werden, und daß der Berechnung der Kokillen-Stellglieder und/oder der Fertigstraßen-Stellglieder ein Stichplanmodell (10), ein Konturmodell (11) und ein Breitungsmodell (12) zugrunde gelegt werden, und vor dem Walzen der Folgebramme die durch Rechnung ermittelte SOLL-Einstellung der Fertigstraßen-Stellglieder angefahren wird.
    Method according to claim 1,
    characterized,
    that the actuators of the mold are approached according to the mathematically determined TARGET setting before casting the subsequent slabs, and that the calculation of the mold actuators and / or the finishing train actuators includes a pass schedule model (10), a contour model (11) and an expansion model ( 12), and before the rolling of the subsequent slabs, the TARGET setting of the finishing train actuators determined by calculation is started.
    Verfahren nach Anspruch 1 oder 2,
    dadurch gekennzeichnet,
    daß die Breitenvoreinstellung für die Kokillenstellglieder und die Fertigstraßenstellglieder (Preset) so vorgenommen wird, daß sich für jedes Walzband etwa die Mitte des Toleranzbandes (ΔB) der Fertigbreite des Walzbandes ergibt.
    The method of claim 1 or 2,
    characterized,
    that the width presetting for the Kokillenstellglieder and the finishing mill actuators (preset) is carried out so that about the center of the tolerance band (Δ B) results in the finished width of the rolled strip for each rolled strip.
    Verfahren nach einem oder mehreren der Ansprüche 1 bis 3,
    dadurch gekennzeichnet, daß vor der Produktion einer neuen Gießbramme eine Band-Kontur-Berechnung und eine Stichplanberechnung sowie das Breitungsmodell angestoßen werden, wonach ein entsprechendes Preset der Kokillenstellglieder vorgenommen, anschließend die effektive Breite (BF) des fertig gewalzten Bandes gemessen, und das Ergebnis einer fallweise erforderlichen Korrektur des Breitungsmodells und damit der Berechnung der Fertigstraßen-Stellglieder zugrunde gelegt wird.
    Method according to one or more of claims 1 to 3,
    characterized, that before the production of a new casting slab a belt contour calculation and a pass schedule calculation as well as the spreading model are initiated, after which a corresponding preset of the mold actuators has been made, then measured the effective width (B F ) of the finished rolled strip, and the result of a correction of the expansion model, which is necessary in some cases, and thus the calculation of the finishing train actuators is used.
    Verfahren nach einem oder mehreren der Ansprüche 1 bis 4,
    dadurch gekennzeichnet,
    daß nach Maßgabe einer erforderlichen Korrekturgröße des Preset bevorzugt bei unveränderter Kokillenposition zunächst die Fertigstraßen-Stellglieder geändert werden.
    Method according to one or more of claims 1 to 4,
    characterized,
    that, in accordance with a required correction size of the preset, the finishing train actuators are preferably changed with unchanged mold position.
    Verfahren nach einem oder mehreren der Ansprüche 1 bis 5,
    dadurch gekennzeichnet,
    daß für einen optimalen Einsatz der Stellglieder für Kokille und Fertigstraße zur Erzielung hoher Genauigkeit ein Breitungsmodell (12) als Grundlage für eine Preset-Einstellung verwendet wird, das wenigstens die folgenden Einflüsse berücksichtigt: Breitenänderung zwischen Kokille und Casteraustritt Temperaturschrumpf vom Caster bis zum Fertigband Bandzüge innerhalb der Fertigstraße Konturäßderungen der Brammenform bis hin zur Fertigbandform Planheitszustand des Bandes zwischen den Fertiggerüsten Banddicke, natürliche Breitung des Bandes Walzgeschwindigkeit, Walztemperatur Materialqualität des Bandes Stauchabnahme Brammen- bzw. Vorbandkontur (als Meß- oder Rechenwert)
    Method according to one or more of claims 1 to 5,
    characterized,
    that a spreading model (12) is used as the basis for a preset setting, which takes into account at least the following influences, for optimal use of the actuators for the mold and the finishing train in order to achieve high accuracy: Change in width between the mold and the caster outlet Temperature shrinkage from the caster to the finished belt Belt trains within the finishing train Contour changes from the slab shape to the finished strip shape Flatness of the belt between the finishing stands Band thickness, natural spreading of the band Rolling speed, rolling temperature Material quality of the band Shrinkage decrease Slab or pre-strip contour (as measured or calculated value)
    Verfahren nach einem oder mehreren der Ansprüche 1 bis 6,
    dadurch gekennzeichnet,
    daß durch Vergleich der gemessenen Breite (BBR) der Gießbramme mit der errechneten Brammenbreite ein Adaptions-Korrekturkoeffizient (13) gewonnen und zur Korrektur des Breitungsmodelles (12a) verwendet wird.
    Method according to one or more of claims 1 to 6,
    characterized,
    that an adaptation correction coefficient (13) is obtained by comparing the measured width (B BR ) of the casting slab with the calculated slab width and is used to correct the spreading model (12a).
    Verfahren nach einem oder mehreren der Ansprüche 1 bis 7,
    dadurch gekennzeichnet,
    daß ein im Casterbereich gemessener Breitenfehler auf das Breitungsmodell der Fertigstraße (12b) aufgeschaltet wird.
    Method according to one or more of claims 1 to 7,
    characterized,
    that a width error measured in the caster area is applied to the spreading model of the finishing train (12b).
    Verfahren nach einem oder mehreren der Ansprüche 1 bis 8,
    dadurch gekennzeichnet,
    daß zum Fine-Tuning der Fertigbreite des Walzbandes in der Fertigstraße die folgenden Wirkparameter (ΔW) in der angegebenen Rangfolge berücksichtigt und derart eingesetzt werden, daß die Differenz zwischen der errechneten Breite und der Zielbreite minimiert wird: Änderung der Abnahmeverteilung in der Fertigstraße Änderung des Zielprofils im Rahmen des Profiltoleranzbandes Änderung der Zugspannung zwischen den Gerüsten Einsatz eines Stauchers Änderung der aktiven Gerüstzahl oder der Stichzahl.
    Method according to one or more of claims 1 to 8,
    characterized,
    that for fine-tuning the finished width of the rolled strip in the finishing train, the following operating parameters (ΔW) are taken into account in the given order and used in such a way that the difference between the calculated width and the target width is minimized: Change in the distribution of purchases in the finishing train Change of the target profile within the scope of the profile tolerance band Change of tension between the scaffolding Use of an edger Change the active number of stands or the number of stitches.
    Verfahren nach einem oder mehreren der Ansprüche 1 bis 9,
    dadurch gekennzeichnet,
    daß zur Erweiterung des Toleranzbereiches für die Einstellung der Kokillenposition die minimalen/maximalen Stellbereiche der Fertigstraßenstellglieder ermittelt werden.
    Method according to one or more of claims 1 to 9,
    characterized,
    that to expand the tolerance range for the setting of the mold position, the minimum / maximum setting ranges of the finishing train actuators are determined.
    Verfahren nach einem oder mehreren der Ansprüche 1 bis 10,
    dadurch gekennzeichnet,
    daß die Stellglieder der Kokille und/oder die Stellglieder für die Breitenbeeinflussung in der Fertigstraße statisch bzw. über die Bandlänge veränderbar eingesetzt werden.
    Method according to one or more of claims 1 to 10,
    characterized,
    that the actuators of the mold and / or the actuators for influencing the width in the finishing train are used statically or can be changed over the length of the strip.
    Anwendung des Verfahrens nach mindestens einem der Ansprüche 1 bis 11 auf mindestens eine Dünnbrammengießmaschine mit mindestens einer unmittelbar nachgeschalteten, insbesondere mehrgerüstigen Walzstraße, auf konventionelle, insbesondere mehrgerüstige Fertigstraßen, auf Walzstraßen mit einem Reversiergerüst, insbesondere mit mehreren Stichen arbeitend, auf das Walzen von Endlosbändern, auf das Walzen von Einzelbändern. Application of the method according to at least one of claims 1 to 11 on at least one thin slab casting machine with at least one immediately downstream, in particular multi-stand rolling mill, on conventional, especially multi-stand finishing lines, working on rolling mills with a reversing stand, especially with multiple passes, on rolling endless belts, on the rolling of single strips.
    EP99106087A 1998-03-31 1999-03-26 Process for continuous casting and finish rolling of a cast strand within a predetermined net width Expired - Lifetime EP0947265B1 (en)

    Applications Claiming Priority (2)

    Application Number Priority Date Filing Date Title
    DE19814222 1998-03-31
    DE19814222A DE19814222A1 (en) 1998-03-31 1998-03-31 Process for continuous casting and finish rolling of a casting strand within a specified finished width tolerance

    Publications (3)

    Publication Number Publication Date
    EP0947265A2 true EP0947265A2 (en) 1999-10-06
    EP0947265A3 EP0947265A3 (en) 2001-01-31
    EP0947265B1 EP0947265B1 (en) 2005-09-28

    Family

    ID=7862993

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP99106087A Expired - Lifetime EP0947265B1 (en) 1998-03-31 1999-03-26 Process for continuous casting and finish rolling of a cast strand within a predetermined net width

    Country Status (6)

    Country Link
    US (1) US6112394A (en)
    EP (1) EP0947265B1 (en)
    JP (1) JPH11319901A (en)
    AT (1) ATE305347T1 (en)
    DE (2) DE19814222A1 (en)
    ES (1) ES2249855T3 (en)

    Cited By (1)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    EP3173166A1 (en) * 2015-11-26 2017-05-31 SMS group GmbH Method and device for setting the width of a continuously cast metal strand

    Families Citing this family (3)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE10047381A1 (en) * 2000-09-25 2002-04-18 Siemens Ag Method and device for operating a plant in the raw materials industry
    CN101786146B (en) * 2009-12-30 2012-01-11 东北大学 Online steelmaking continuous casting control method
    RU2453385C2 (en) * 2010-08-30 2012-06-20 Закрытое акционерное общество "Волгоградский металлургический завод "Красный Октябрь" (ЗАО "ВМЗ "Красный Октябрь") Method of rolling creating preset tension in cross section of work-piece and work-piece for making same

    Citations (6)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    US3358358A (en) * 1964-12-31 1967-12-19 United States Steel Corp Method of reducing width of metal slabs
    DE3501422A1 (en) * 1984-02-16 1985-08-22 Voest-Alpine Ag, Linz Open-ended mould for a continuous casting installation
    EP0149734B1 (en) * 1984-01-05 1988-04-20 Sms Schloemann-Siemag Aktiengesellschaft Continuous casting mould for steel slabs
    JPS63252609A (en) * 1987-04-10 1988-10-19 Mitsubishi Heavy Ind Ltd Method for controlling sheet width in hot strip mill
    JPH01233005A (en) * 1988-03-14 1989-09-18 Sumitomo Metal Ind Ltd Method for controlling plate width in hot rolling of thin cast billet
    JPH08192209A (en) * 1995-01-13 1996-07-30 Kobe Steel Ltd Method for hot-rolling strip

    Family Cites Families (6)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    JPS5340631A (en) * 1976-09-27 1978-04-13 Kawasaki Steel Co Method of changing width of casting in continuous casting
    US4110824A (en) * 1977-05-18 1978-08-29 Youngstown Sheet And Tube Company Method and apparatus for continuously processing strand
    US4577277A (en) * 1983-03-07 1986-03-18 Kabushiki Kaisha Kobe Seiko Sho Method and apparatus of continuous casting by the use of mold oscillating system
    US5205345A (en) * 1991-08-07 1993-04-27 Acutus Industries Method and apparatus for slab width control
    JP2698520B2 (en) * 1992-08-31 1998-01-19 日立金属株式会社 How to make a casting plan for a breathable mold
    DE4310332A1 (en) * 1993-03-31 1994-10-06 Mueller Weingarten Maschf Method for determining optimal parameters of a casting process, especially on die casting machines

    Patent Citations (6)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    US3358358A (en) * 1964-12-31 1967-12-19 United States Steel Corp Method of reducing width of metal slabs
    EP0149734B1 (en) * 1984-01-05 1988-04-20 Sms Schloemann-Siemag Aktiengesellschaft Continuous casting mould for steel slabs
    DE3501422A1 (en) * 1984-02-16 1985-08-22 Voest-Alpine Ag, Linz Open-ended mould for a continuous casting installation
    JPS63252609A (en) * 1987-04-10 1988-10-19 Mitsubishi Heavy Ind Ltd Method for controlling sheet width in hot strip mill
    JPH01233005A (en) * 1988-03-14 1989-09-18 Sumitomo Metal Ind Ltd Method for controlling plate width in hot rolling of thin cast billet
    JPH08192209A (en) * 1995-01-13 1996-07-30 Kobe Steel Ltd Method for hot-rolling strip

    Non-Patent Citations (3)

    * Cited by examiner, † Cited by third party
    Title
    PATENT ABSTRACTS OF JAPAN vol. 013, no. 045 (M-792), 2. Februar 1989 (1989-02-02) & JP 63 252609 A (MITSUBISHI HEAVY IND LTD), 19. Oktober 1988 (1988-10-19) *
    PATENT ABSTRACTS OF JAPAN vol. 013, no. 560 (M-906), 13. Dezember 1989 (1989-12-13) & JP 01 233005 A (SUMITOMO METAL IND LTD), 18. September 1989 (1989-09-18) *
    PATENT ABSTRACTS OF JAPAN vol. 1996, no. 11, 29. November 1996 (1996-11-29) & JP 08 192209 A (KOBE STEEL LTD), 30. Juli 1996 (1996-07-30) *

    Cited By (1)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    EP3173166A1 (en) * 2015-11-26 2017-05-31 SMS group GmbH Method and device for setting the width of a continuously cast metal strand

    Also Published As

    Publication number Publication date
    EP0947265A3 (en) 2001-01-31
    DE59912593D1 (en) 2005-11-03
    ES2249855T3 (en) 2006-04-01
    EP0947265B1 (en) 2005-09-28
    ATE305347T1 (en) 2005-10-15
    DE19814222A1 (en) 1999-10-07
    JPH11319901A (en) 1999-11-24
    US6112394A (en) 2000-09-05

    Similar Documents

    Publication Publication Date Title
    EP1799368B1 (en) Method and device for continuously producing a thin metal strip
    EP0121148B1 (en) Method of making hot rolled strip with a high quality section and flatness
    EP1519798B1 (en) Method and casting roller plant for the semi-endless or endless rolling by casting of a metal in particular a steel strip which may be transversely separated as required after solidification
    DE19654068A1 (en) Method and device for rolling a rolled strip
    DE60016999T2 (en) Method and device for regulating the strip shape during strip rolling
    DE19644132B4 (en) Method for optimizing the bandwidth distribution at the ends of a strip passing through a rolling train
    DE3522631C2 (en)
    DE4009861C2 (en) Process for the production of hot-rolled bar material such as fine steel or wire and plant for carrying out the process
    EP0873428A1 (en) Process for the hot rolling of steel bands
    DE3006544A1 (en) METHOD FOR AUTOMATICALLY CONTROLLING OR ADJUSTING THE WIDTH OF A SLAM OR METAL SHEET WHILE ROLLING THE SAME
    WO2002034432A1 (en) Method and device for continuous casting and subsequent forming of a steel billet, especially a billet in the form of an ingot or a preliminary section
    EP2906369B1 (en) Width-altering system for strip-shaped rolled material
    EP0947265A2 (en) Process for continuous casting and finish rolling of a cast strand within a predetermined net width
    EP0811435B1 (en) Presetting for a cold mill reversing stand
    EP0734793A1 (en) Method and apparatus for the production of hot-rolled steel strip
    DE19704337B4 (en) Method and device for the course control of a rolled strip
    WO1999024183A1 (en) Process and device for rolling a rolled strip with a variable thickness
    DE3401894A1 (en) Method for the production of rolled strip with high strip shape accuracy and flatness
    DE60113132T2 (en) BLECH WIDTH CONTROL FOR HOT ROLLING
    DE19746876C2 (en) Method and device for producing narrow hot strip of different widths from thin slabs
    DE19644131C2 (en) Method for optimizing the distribution of strip width at the ends of a strip passing through a rolling train in one or more passes
    EP0936002B1 (en) Rolling method for a strip, in particular a metal strip
    DE10025080A1 (en) Method of making metal tape
    DE1958162A1 (en) Procedure for advance control of a tandem mill
    EP1059125A2 (en) Method for the manufacture of metal strip

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    17P Request for examination filed

    Effective date: 19990326

    AK Designated contracting states

    Kind code of ref document: A2

    Designated state(s): AT BE CH CY DE DK ES LI

    AX Request for extension of the european patent

    Free format text: AL;LT;LV;MK;RO;SI

    RTI1 Title (correction)

    Free format text: PROCESS FOR CONTINUOUS CASTING AND FINISH ROLLING OF A CAST STRAND WITHIN A PREDETERMINED NET WIDTH

    RAP1 Party data changed (applicant data changed or rights of an application transferred)

    Owner name: SMS DEMAG AG

    PUAL Search report despatched

    Free format text: ORIGINAL CODE: 0009013

    AK Designated contracting states

    Kind code of ref document: A3

    Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

    AX Request for extension of the european patent

    Free format text: AL;LT;LV;MK;RO;SI

    AKX Designation fees paid

    Free format text: AT BE CH CY DE DK ES LI

    RBV Designated contracting states (corrected)

    Designated state(s): AT DE ES FR GB IT NL

    17Q First examination report despatched

    Effective date: 20021104

    APBR Date of receipt of statement of grounds of appeal recorded

    Free format text: ORIGINAL CODE: EPIDOSNNOA3E

    APBX Invitation to file observations in appeal sent

    Free format text: ORIGINAL CODE: EPIDOSNOBA2E

    APBZ Receipt of observations in appeal recorded

    Free format text: ORIGINAL CODE: EPIDOSNOBA4E

    APBT Appeal procedure closed

    Free format text: ORIGINAL CODE: EPIDOSNNOA9E

    GRAP Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOSNIGR1

    APAA Appeal reference recorded

    Free format text: ORIGINAL CODE: EPIDOS REFN

    GRAS Grant fee paid

    Free format text: ORIGINAL CODE: EPIDOSNIGR3

    GRAA (expected) grant

    Free format text: ORIGINAL CODE: 0009210

    AK Designated contracting states

    Kind code of ref document: B1

    Designated state(s): AT DE ES FR GB IT NL

    REG Reference to a national code

    Ref country code: GB

    Ref legal event code: FG4D

    Free format text: NOT ENGLISH

    APAH Appeal reference modified

    Free format text: ORIGINAL CODE: EPIDOSCREFNO

    REF Corresponds to:

    Ref document number: 59912593

    Country of ref document: DE

    Date of ref document: 20051103

    Kind code of ref document: P

    GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

    Effective date: 20060108

    REG Reference to a national code

    Ref country code: ES

    Ref legal event code: FG2A

    Ref document number: 2249855

    Country of ref document: ES

    Kind code of ref document: T3

    ET Fr: translation filed
    PLBE No opposition filed within time limit

    Free format text: ORIGINAL CODE: 0009261

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

    26N No opposition filed

    Effective date: 20060629

    REG Reference to a national code

    Ref country code: DE

    Ref legal event code: R082

    Ref document number: 59912593

    Country of ref document: DE

    Representative=s name: HEMMERICH & KOLLEGEN, DE

    Ref country code: DE

    Ref legal event code: R081

    Ref document number: 59912593

    Country of ref document: DE

    Owner name: SMS GROUP GMBH, DE

    Free format text: FORMER OWNER: SMS SIEMAG AKTIENGESELLSCHAFT, 40237 DUESSELDORF, DE

    REG Reference to a national code

    Ref country code: FR

    Ref legal event code: PLFP

    Year of fee payment: 18

    REG Reference to a national code

    Ref country code: FR

    Ref legal event code: PLFP

    Year of fee payment: 19

    REG Reference to a national code

    Ref country code: FR

    Ref legal event code: PLFP

    Year of fee payment: 20

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: DE

    Payment date: 20180322

    Year of fee payment: 20

    Ref country code: GB

    Payment date: 20180321

    Year of fee payment: 20

    Ref country code: NL

    Payment date: 20180321

    Year of fee payment: 20

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: AT

    Payment date: 20180322

    Year of fee payment: 20

    Ref country code: FR

    Payment date: 20180323

    Year of fee payment: 20

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: ES

    Payment date: 20180427

    Year of fee payment: 20

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: IT

    Payment date: 20180327

    Year of fee payment: 20

    REG Reference to a national code

    Ref country code: DE

    Ref legal event code: R071

    Ref document number: 59912593

    Country of ref document: DE

    REG Reference to a national code

    Ref country code: NL

    Ref legal event code: MK

    Effective date: 20190325

    REG Reference to a national code

    Ref country code: GB

    Ref legal event code: PE20

    Expiry date: 20190325

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: GB

    Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

    Effective date: 20190325

    REG Reference to a national code

    Ref country code: AT

    Ref legal event code: MK07

    Ref document number: 305347

    Country of ref document: AT

    Kind code of ref document: T

    Effective date: 20190326

    REG Reference to a national code

    Ref country code: ES

    Ref legal event code: FD2A

    Effective date: 20220104

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: ES

    Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

    Effective date: 20190327