EP0910710A1 - Process for carrying out a sheet piling underneath an existing bearing wall or partition and device used therein - Google Patents

Process for carrying out a sheet piling underneath an existing bearing wall or partition and device used therein

Info

Publication number
EP0910710A1
EP0910710A1 EP98914718A EP98914718A EP0910710A1 EP 0910710 A1 EP0910710 A1 EP 0910710A1 EP 98914718 A EP98914718 A EP 98914718A EP 98914718 A EP98914718 A EP 98914718A EP 0910710 A1 EP0910710 A1 EP 0910710A1
Authority
EP
European Patent Office
Prior art keywords
shaped
encasement
case
parts
underneath
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP98914718A
Other languages
German (de)
French (fr)
Other versions
EP0910710B1 (en
Inventor
Etienne Heirwegh
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP0910710A1 publication Critical patent/EP0910710A1/en
Application granted granted Critical
Publication of EP0910710B1 publication Critical patent/EP0910710B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/48Foundations inserted underneath existing buildings or constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/06Separating, lifting, removing of buildings; Making a new sub-structure

Definitions

  • This invention relates to a process for carrying out a sheet piling underneath an existing bearing wall or partition, whereby a series of columns is formed on the ground, against the wall or partition to be supported, using a case-shaped element having three sides and one open side, which is directed towards the bearing wall or partition.
  • each of the columns is built up according to a sequence, in which a column with the same or similar dimensions is formed between two already finished columns, and for that purpose, the lost encasement sheets of the U- shaped encasement parts belonging to two neighbouring columns are used as lateral encasement parts, and at the back side of the column to be formed, vertical sheets with a width somewhat larger than the width of the column to be formed, and a height equal to that of the U-shaped encasement parts, are put up and manually slided with their outer edges behind the already formed U-shaped encasement part, upon which the created encasement space is finished in the same way as described in claim 1 , with sheets which are secured with their edges to the neighbouring U-shaped encasement parts.
  • Figures 1-3 show three subsequent steps of the process according to the invention.
  • Figure 4 shows the final situation, after the positioning one on top of the other of five case-shaped elements.
  • Figure 5 schematically shows the positioning of a series of U-shaped encasement parts with respect to two case-shaped elements.
  • Figure 6 is a top view of a case-shaped element connected with a U-shaped encasement part in a particular embodiment, in which a platform is represented in dotted lines, from which the U-shaped encasement parts are mounted constructively underneath the foundation and to the cases.
  • Figure 7 schematically shows, also from a top view, two finished columns with an encasement under construction between those columns.
  • Figure 8 schematically shows, on another scale, two U-shaped parts according to a horizontal cross section.
  • FIGS 9 and 10 relate to details of the process according to the invention.
  • the encasement part 4 consists of two wings 4' and a wall 4" which extends between the wings 4'. In practice, this wall 4" may be considered as the back wall.
  • Figures 7 and 8 show more details of these U- shaped parts.
  • figure 1 shows the first step
  • the excavations, of which figure 1 shows the first step, are continued until the situations according to figures 2 and 3 are reached.
  • the first case-shaped element 1 is sunk sufficiently deep, to allow to shove all U-shaped encasement parts 4, which together correspond to the height of the case-shaped element, into place.
  • All U-shaped encasement parts 4 are provided with flanges 5 transversely welded on, for the connection by bolts with flanges 6 belonging to the side sheets of each case-shaped element 3.
  • flanges 5 transversely welded on, for the connection by bolts with flanges 6 belonging to the side sheets of each case-shaped element 3.
  • FIG. 8 By way of illustration, reference is made to figures 7 and 8, in which the side walls 7 and the back wall T of the case-shaped elements 3 are visible.
  • lost encasement sheets 10 are placed on the inside of the U-shaped encasement parts 4, against the flanges 5.
  • These sheets have about the same height as the U-shaped encasement parts, and are for example kept in place by a small angle iron 12 (visible in figure 8). This is only required until the moment the concrete 22 is cast. At this moment, also the bolts between the flanges 5 and 6 of the elements 3 and 4 are removed. ,
  • the space 8 is already excavated, while the space 8' has yet to be excavated.
  • the spaces 8 and 8' are only excavated when the neighbouring U-shaped encasement parts 4 of 3 have already been backfilled.
  • the space 8 was excavated by using as an encasement the side walls 7 of neighbouring case-shaped elements 3, already put into place, and their backfilled encasement 4.
  • every time sheets 9 have been used, corresponding to the height of a case-shaped element, or a fraction thereof. These sheets 9 were slided manually or mechanically behind two neighbouring walls 7'.
  • the lost encasement sheets 17 are put into place, and this from top to bottom, while gradually digging deeper.
  • the sheets 17 are secured, for example by tack- welding, to the back wall A".
  • the encasement sheets 10 are put into place from bottom to top, as described above.
  • a foundation slab 15 is laid or pressed underneath the foundation to be formed.
  • This slab 15 can be a steel plate or be made of concrete.
  • a concrete slab may be provided with vertical short reinforcing rods 16 for anchoring the foundation slab 15 to the concrete mass of the sheet piling.
  • common reinforcing bars may be present in each column.
  • the U-shaped encasement parts 4 can be manufactured from widely differing materials, such as steel or recycled synthetics.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Foundations (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention relates to a process for carrying out a sheet piling underneath an existing bearing wall, using a case-shaped element with an open side, which is directed towards the bearing wall, characterised in that the ground is removed from the case-shaped element (3), simultaneously with the ground over a surface which corresponds to the sheet piling to be introduced; in the created space a U-shaped encasement part (4) is introduced; each of the U-shaped encasement parts (4) piled up one on top of the other, is temporarily secured to each of the case-shaped elements (3); an enlarged foundation slab (15) is laid on the ground or pressed underneath the bottom U-shaped encasement part (4), and lost encasement sheets (10) are secured to the front side of each of the U-shaped encasement parts (4), and the concrete is poured in the thus formed encasement.

Description

Process for carrying out a sheet piling underneath an existing bearing wall or partition and device used therein
This invention relates to a process for carrying out a sheet piling underneath an existing bearing wall or partition, whereby a series of columns is formed on the ground, against the wall or partition to be supported, using a case-shaped element having three sides and one open side, which is directed towards the bearing wall or partition.
Such a process is described in the Belgian patent applications no. 09600552 and 09600963 to the applicant.
The process and device used therein according to these patent applications produce excellent results, when the sheet piling has to be carried out up to a depth of 4 to 5 metres. With larger depths, problems may arise, and it is therefore the aim of this invention to prescribe a process and a device allowing to carry out sheet pilings to a depth of 8 - 10 m, by application of an improved technique which is derived from the process and device described in the above said patent applications.
In order to make this possible according to the invention, work should proceed as follows: a) The ground is removed from the case-shaped element, and simultaneously the ground is removed over a surface corresponding to the sheet piling to be introduced, and this over a height which corresponds to a modular fraction of the height of the case-shaped element; b) A U-shaped encasement part is introduced in the created space underneath the bearing wall or partition, with the open side towards the case-shaped element; c) Each of the U-shaped encasement parts piled on each other is temporarily secured to the vertical edges of two sides of said case- shaped element; d) Those operations are repeated until the desired depth is reached; e) An enlarged foundation slab is laid on the ground, or squeezed through, underneath the bottom U-shaped encasement part; f) A lost encasement sheet is secured to the open front side of each of the U-shaped encasement parts, and the bolts between the U- shaped encasement parts and the case-shaped elements are removed; g) The concrete is poured in the encasement thus created; h) The space between two neighbouring columns (shafts) is encased in the same way as described above; i) Upon sufficient curing of the cast concrete, all the case-shaped elements piled on each other are progressively pressed up, with hydraulic means,.
Still according to the invention, each of the columns is built up according to a sequence, in which a column with the same or similar dimensions is formed between two already finished columns, and for that purpose, the lost encasement sheets of the U- shaped encasement parts belonging to two neighbouring columns are used as lateral encasement parts, and at the back side of the column to be formed, vertical sheets with a width somewhat larger than the width of the column to be formed, and a height equal to that of the U-shaped encasement parts, are put up and manually slided with their outer edges behind the already formed U-shaped encasement part, upon which the created encasement space is finished in the same way as described in claim 1 , with sheets which are secured with their edges to the neighbouring U-shaped encasement parts.
Other details and advantages of this invention will appear from the following description of a process for carrying out a sheet piling underneath an existing bearing wall or partition and the device used therein according to the invention. This description, given as an example, refers to the attached figures.
Figures 1-3 show three subsequent steps of the process according to the invention.
Figure 4 shows the final situation, after the positioning one on top of the other of five case-shaped elements.
Figure 5 schematically shows the positioning of a series of U-shaped encasement parts with respect to two case-shaped elements.
Figure 6 is a top view of a case-shaped element connected with a U-shaped encasement part in a particular embodiment, in which a platform is represented in dotted lines, from which the U-shaped encasement parts are mounted constructively underneath the foundation and to the cases.
Figure 7 schematically shows, also from a top view, two finished columns with an encasement under construction between those columns.
Figure 8 schematically shows, on another scale, two U-shaped parts according to a horizontal cross section.
Figures 9 and 10 relate to details of the process according to the invention.
This process, illustrated by the different figures, is derived from the technique described in the patent applications referred to in the preamble. In the first phase of this technique, in front of the wall 1 with foundation footing 2 to be sheet piled, a case-shaped element 3 is put up. In principle, the first case-shaped element 3 is resting on the ground, although according to figure 1 , this case-shaped element has already sunk, up to a certain depth into the excavated soil, and this to a depth allowing to dig up the ground underneath the foundation footing, from the case-shaped element. In practice, such an element is preferably 2.50 m long, having a width of 1.20 m and a height of almost 2 m. These dimensions are not binding, and are only given here as an example. As soon as the ground underneath the wall 1 is removed, a first U-shaped encasement part 4 is shoved into the created space. The encasement part 4 consists of two wings 4' and a wall 4" which extends between the wings 4'. In practice, this wall 4" may be considered as the back wall. Figures 7 and 8 show more details of these U- shaped parts.
It should also be noted in this stage, that for the forming of a series of columns in order to form a sheet piling, work should proceed according to a predetermined scheme, in such a way that at a certain moment the sheet piling columns to be constructed are realised between two already finished columns.
The excavations, of which figure 1 shows the first step, are continued until the situations according to figures 2 and 3 are reached. Herein, the first case-shaped element 1 is sunk sufficiently deep, to allow to shove all U-shaped encasement parts 4, which together correspond to the height of the case-shaped element, into place.
The excavation is continued until the desired depth is reached. This situation is shown in figure 4, in which five case- shaped elements are piled onto each other, and an enlarged foundation slab 15 is put in. Depending on the arbitrary height of the U-shaped encasement parts, 18 up to for example 30 U-shaped encasement parts can be introduced.
All U-shaped encasement parts 4 are provided with flanges 5 transversely welded on, for the connection by bolts with flanges 6 belonging to the side sheets of each case-shaped element 3. By way of illustration, reference is made to figures 7 and 8, in which the side walls 7 and the back wall T of the case-shaped elements 3 are visible. Then, in the reverse sense, from bottom to top, lost encasement sheets 10 are placed on the inside of the U-shaped encasement parts 4, against the flanges 5. These sheets have about the same height as the U-shaped encasement parts, and are for example kept in place by a small angle iron 12 (visible in figure 8). This is only required until the moment the concrete 22 is cast. At this moment, also the bolts between the flanges 5 and 6 of the elements 3 and 4 are removed. ,
In figure 7, three case-shaped elements are positioned at a distance from each other. The spaces 8 and 8' between two case-shaped elements 3 have about the width of these elements 3.
The space 8 is already excavated, while the space 8' has yet to be excavated. The spaces 8 and 8' are only excavated when the neighbouring U-shaped encasement parts 4 of 3 have already been backfilled. The space 8 was excavated by using as an encasement the side walls 7 of neighbouring case-shaped elements 3, already put into place, and their backfilled encasement 4. At the back, i.e. at the side opposite the wall 1 , every time sheets 9 have been used, corresponding to the height of a case-shaped element, or a fraction thereof. These sheets 9 were slided manually or mechanically behind two neighbouring walls 7'.
Along the back side, the lost encasement sheets 17 are put into place, and this from top to bottom, while gradually digging deeper. The sheets 17 are secured, for example by tack- welding, to the back wall A". As soon as the bottom is reached, the encasement sheets 10 are put into place from bottom to top, as described above.
During excavation of a shaft, short reinforcing bars 13 are shoved through holes 14 provided thereto in the side walls 4' of the U-shaped encasement part 4 (figures 5 and 8).
When the desired depth is reached, at the bottom of the excavated shaft, a foundation slab 15 is laid or pressed underneath the foundation to be formed. This slab 15 can be a steel plate or be made of concrete. A concrete slab may be provided with vertical short reinforcing rods 16 for anchoring the foundation slab 15 to the concrete mass of the sheet piling. With this, it should be noted that, apart from the short reinforcing bars 13 (figure 10), in order to form a monolithic structure, common reinforcing bars may be present in each column. Thereupon, starting with the bottom U-shaped encasement parts 4, sheets 17 are secured to both side edges of the wings 4', for example by spotwelding. These different sheets 17, one on top of the other, finish the complete encasement of a column on the inside. On the outside, in the same way as described with respect to a case-shaped element 3, sheets 10 are secured against the flanges 5. Concrete can now be poured from the top into this encasement.
After filling up the realised encasement, the concrete mass is vibrated. This causes the concrete mass to subside over a not insignificant depth. As described in the first said patent application, making use of a slantingly secured close-up sheet 18, concrete is further poured underneath the foundation footing 2 of the wall 1. Due to the height of this slanting close-up sheet 18 and to the weight of the concrete, the cavity formed during the vibrating of the concrete can be correctly filled up (figure 9).
During the excavation works, removable shoring beams 21 were placed between the walls 7 of the case-shaped elements 3 in order to ensure the stability of these elements (figures 5 and 6).
In the final phase, the platforms 19 are recovered.
These necessary parts are used to enable the operations during the excavation and the putting into place of the encasement to be carried out. Their supports along the side walls 7 of the case-shaped elements are clearly indicated by reference 20 (figures 5 and 6).
, The U-shaped encasement parts 4 can be manufactured from widely differing materials, such as steel or recycled synthetics.

Claims

CLAIMS 1. Process for carrying out a sheet piling underneath an existing bearing wall or partition, whereby a series of columns is formed, on the ground, against the wall or partition (1) to be support- ed, using a case-shaped element with three sides and one open side which is directed towards the bearing wall or partition, characterised in that work proceeds as follows: a) The ground is removed from the case-shaped element (3), and simultaneously the ground is removed over a surface which corresponds to the sheet piling to be introduced, and this over a height which corresponds to a modular fraction of the height of the case-shaped element (3); b) In the created space underneath the bearing wall or partition (1), a U- shaped encasement part (4) is introduced with the open side towards the case-shaped element (3); c) Each of the U-shaped encasement parts (4) piled on each other, is temporarily secured to the vertical edges of two sides of said case- shaped element (3); d) Those operations are repeated until the desired depth is reached; e) An enlarged foundation slab (15) is laid on the ground, or squeezed through underneath the bottom U-shaped encasement part (4); f) Lost encasement sheets (10) are secured to the open front side of each of the U-shaped encasement parts (4), and the bolts (11) between the U-shaped encasement parts and the case-shaped elements are removed; g) The concrete is poured in the encasement thus created; h) The spaces between neighbouring columns (shafts) are encased in the same way as described above; i) Upon sufficient curing of the cast concrete, all the case-shaped elements (3) piled onto each other are progressively pressed up, with hydraulic means.
2. Process according to claim 1 , characterised in that each of the columns is built up according to a sequence, in which a column with the same or similar dimensions is formed between two alreay finished columns, and that for that purpose, the walls of the U- shaped encasement parts (4) serving as a lost encasement and belonging to two neighbouring columns, are used as lateral encasement parts, and that vertical sheets (17) with a width somewhat larger than the width of the column to be formed, and a height equal to that of the U-shaped encasement parts (4), are put up at the back side of the column to be formed, and are manually shoved with their outer edges behind the already formed U-shaped encasement part, upon which the created encasement space is finished in the same way as described in claim 1 , with sheets (10) which are secured to the edges of the neigh- bouring U-shaped encasement parts.
3. Process according to any one of claims 1 and 2, characterised in that reinforcing bars (13) are put through the vertical side walls of aforesaid U-shaped encasement parts (4), before the concrete is poured, in order to create a monolithic structure.
4. Process according to any one of claims 1 - 3, characterised in that in aforesaid case-shaped elements (3), internal, transverse shoring beams (21) are put in, against the bending inwards of the walls of the case-shaped elements (3).
5. Device for carrying out the process according to any one of claims 1 - 4, characterised in that aforesaid U-shaped encasement parts (4), which may be made from steel, concrete or plastic material, show a height of almost 0.30 m at a length of almost 1.20 m.
6. Device according to claim 5, characterised in that the opposing walls of said case-shaped elements (3) are provided with supports to receive the ends of shoring beams (21).
7. Device according to any one of claims 6 and 7, characterised in that it also comprises sheets (10) serving as a lost encasement, which seal the encasement along the open front side of > the U-shaped encasement parts (4).
' 8. Device according to any one of claims 5 - 7, characterised in that it also comprises foundation slabs of steel, respectively prefabricated concrete, in order to form an enlarged foundation footing.
EP98914718A 1997-04-15 1998-04-14 Process for carrying out a sheet piling underneath an existing bearing wall or partition Expired - Lifetime EP0910710B1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
BE9700346A BE1011109A3 (en) 1997-04-15 1997-04-15 METHOD FOR PERFORMING A underneath an existing bearing wall or partition SYSTEMS AND DEVICE.
BE9700346 1997-04-15
PCT/BE1998/000053 WO1998046834A1 (en) 1997-04-15 1998-04-14 Process for carrying out a sheet piling underneath an existing bearing wall or partition and device used therein

Publications (2)

Publication Number Publication Date
EP0910710A1 true EP0910710A1 (en) 1999-04-28
EP0910710B1 EP0910710B1 (en) 2001-07-11

Family

ID=3890468

Family Applications (1)

Application Number Title Priority Date Filing Date
EP98914718A Expired - Lifetime EP0910710B1 (en) 1997-04-15 1998-04-14 Process for carrying out a sheet piling underneath an existing bearing wall or partition

Country Status (5)

Country Link
EP (1) EP0910710B1 (en)
AU (1) AU6912598A (en)
BE (1) BE1011109A3 (en)
DE (1) DE69801084T2 (en)
WO (1) WO1998046834A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE1011905A3 (en) 1998-05-11 2000-02-01 Heirwegh Etienne Method for underpinning an existing wall and a box-shaped element used for this
BE1017277A3 (en) * 2006-10-11 2008-05-06 Philippe Ketels Method and device are for introduction of a support under an existing construction
BE1020706A3 (en) * 2012-04-20 2014-04-01 Rooy Carl Van METHOD FOR CARRYING OUT A DAMPER UNDER AN EXISTING WALL AND ACCOMPANYING DEVICE

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3091938A (en) * 1960-07-27 1963-06-04 Jr Harry Schnabel Method and structure for underpinning
BE1008084A3 (en) * 1994-10-25 1996-01-09 Bekaert Sa Nv Method for manufacturing an underpinning wall

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO9846834A1 *

Also Published As

Publication number Publication date
DE69801084T2 (en) 2002-03-14
BE1011109A3 (en) 1999-04-06
DE69801084D1 (en) 2001-08-16
EP0910710B1 (en) 2001-07-11
AU6912598A (en) 1998-11-11
WO1998046834A1 (en) 1998-10-22

Similar Documents

Publication Publication Date Title
US3195312A (en) Method for erecting precast retaining wall
US4405260A (en) Method of constructing underpass across railway and highway without affecting normal traffic thereof
US4015379A (en) In-ground swimming pool and apparatus and method for constructing same
CA1185441A (en) Process of forming a continuous wall in the ground
GB2240350A (en) Forming foundation beams
EP0910710B1 (en) Process for carrying out a sheet piling underneath an existing bearing wall or partition
US4232491A (en) Swimming pool deck
JPH05230845A (en) L-shaped block retaining wall structure and construction method thereof
CA2060894A1 (en) Formwork for forming structural beams
EP0610992B1 (en) Method for providing a sheet pile wall in the ground and a prefabricated wall element for carrying out such method
US4875807A (en) Method and means for basement construction
GB2101177A (en) Method of constructing underpass across railway and highway without affecting normal traffic thereof
JPH09256396A (en) Vertical pile positioning method of earth retaining wall
JPH0784748B2 (en) Construction method of underground press-in pile
JPS63280153A (en) Underground inverted lining method
JPS5851092B2 (en) Earth retaining installation method using advance shoring frame
EP1258566A1 (en) Foundation method and foundation slab made by such a method
JPH0739666B2 (en) Permeable temporary earth retaining material, permeable frame structure and concrete wall construction method
BE1031224B1 (en) Method and equipment for making an underground roof
JPH09158201A (en) Construction method for foundation of building
JP2677441B2 (en) Ground subsidence retaining wall and its construction method
JPS6233372B2 (en)
JPS5841227Y2 (en) Element for mountain retainer
JPH04185816A (en) Construction of beam in underground wall
JPS6160929B2 (en)

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19981210

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): BE DE FR GB NL

17Q First examination report despatched

Effective date: 19991104

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

RTI1 Title (correction)

Free format text: PROCESS FOR CARRYING OUT A SHEET PILING UNDERNEATH AN EXISTING BEARING WALL OR PARTITION

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): BE DE FR GB NL

REF Corresponds to:

Ref document number: 69801084

Country of ref document: DE

Date of ref document: 20010816

ET Fr: translation filed
REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20030227

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20030327

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20030415

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040414

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20041103

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20040414

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20041231

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20050407

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20050411

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20061101

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee

Effective date: 20061101

BERE Be: lapsed

Owner name: *HEIRWEGH ETIENNE

Effective date: 20060430