EP0909844A2 - Sliver can stand - Google Patents

Sliver can stand Download PDF

Info

Publication number
EP0909844A2
EP0909844A2 EP98116705A EP98116705A EP0909844A2 EP 0909844 A2 EP0909844 A2 EP 0909844A2 EP 98116705 A EP98116705 A EP 98116705A EP 98116705 A EP98116705 A EP 98116705A EP 0909844 A2 EP0909844 A2 EP 0909844A2
Authority
EP
European Patent Office
Prior art keywords
cans
work
row
spinning
stand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP98116705A
Other languages
German (de)
French (fr)
Other versions
EP0909844A3 (en
EP0909844B1 (en
Inventor
Manfred Langen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LANGEN, MANFRED
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP0909844A2 publication Critical patent/EP0909844A2/en
Publication of EP0909844A3 publication Critical patent/EP0909844A3/en
Application granted granted Critical
Publication of EP0909844B1 publication Critical patent/EP0909844B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/18Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for supplying bobbins, cores, receptacles, or completed packages to, or transporting from, paying-out or take-up stations ; Arrangements to prevent unwinding of roving from roving bobbins
    • D01H9/185Transporting cans

Definitions

  • the invention relates to the spinning can stand of a sliver processing machine, such as a flyer or jet spinning machine 1, which has a plurality of spindles in at least one row, with each individual spindle currently having a spinning can, a so-called working can, for removing sliver and the spindles in total at least one row of work cans, a so-called work series, is assigned.
  • a sliver processing machine such as a flyer or jet spinning machine 1
  • a so-called working can for removing sliver and the spindles in total at least one row of work cans, a so-called work series, is assigned.
  • Strekken are among the machines that use fiber sliver (Stretching machines) and combing machines; here is instead of “Spindles” read “sliver-processing places”.
  • a flyer's spindles are generally divided into two straight lines Rows - staggered - arranged.
  • the spindles of a jet spinning machine should be in a straight line. Belong to a flyer conventionally at least four straight rows of round work cans (so-called Round cans) or work series. If between a work series and the spindles a gear or conveyor path is provided, can from the respective A sliver of sliver drawn with the help of a gate high above the conveyor to the processing spindle.
  • the same applies to a jet spinning machine however, there are usually only two rows of round cans.
  • the slivers processed on the spinning machines usually come from one or more stretching machine (s).
  • flyers and jet spinning machines like other sliver processing machines Machines - previously supplied from pound cans.
  • the round cans e.g. with the flyer, the round cans from a reserve position into a work position (work series) moved or the reserve cans are in a second row.
  • the invention has for its object to overcome the disadvantages; in particular the can change should be made easier or more economical without to increase the number of work series, but even to reduce them, so that the number of routes is reduced. In particular, automation in connection with a can change.
  • the invention Solution specified in claim 1.
  • rectangular cans used instead of round cans. Rectangles (spinning) are known in each work series, whose small rectangle side is approximately equal to the radius of conventional ones standardized round (spinning) is parallel with its large rectangular sides arranged.
  • the invention ensures that in each case instead of two round cans standing in a row in two work rows two in only Rectangular cans (the specified Proportions) are required for a certain amount of fibers. Because of the Geometry can make the two rectangular cans even more sliver than the conventional ones Pick up round cans.
  • a current level is provided, which differs from that of a Differentiate neighboring work can by a certain fraction of a can fill can, at least the position of the most emptied Working jug a full jug, which is a so-called reserve jug, assigned.
  • the "certain fraction” can generally be 0 to 1 of the can filling.
  • the "difference" in the filling of neighboring cans can be close to zero go so that the neighboring jugs are equally full and (later) at the same time are empty; any "actual” differences in the can filling are also conceivable.
  • the fill level of a work can preferably differs at the moment from that of a neighboring work can - the same work series or one Neighbor work series - by a quarter or half can filling. In every work series should preferably be at most two different fill levels from those currently running Work cans occur.
  • the filling level of neighboring cans in this row is preferred by approximately half a can filling.
  • the neighbor can mentioned stand in the same or in a neighboring work series.
  • the cans can be inside one and the same series of work by a certain fraction - including Zero - distinguish the can filling; the invention also includes the Case that in each one and the same work row all cans have the same level have and that the inventive differentiation of the level by one certain fraction of the can filling in the ratio of work series to work series applies.
  • a preferred solution is to that exactly two rows of work with tightly packed rectangular work cans be provided that the rectangular reserve cans in a separate the standby line provided between the work lines and that between the work rows and the standby row and around the latter is a clear path for empty or full cans - as a connection to one preceding machine or a memory or the like - provided the standby line with its large ones before a can change Rectangular sides parallel to each other and with space for one empty jug on each gap contains full cans (spare cans). Then stands in the standby line a full can for each of the work cans that will soon become empty when the flyer is operated ready.
  • the empty jug or empty jug pulled out of the work series and into a (e.g. the closest) gap on the standby line. Then the full jug is ready brought from the standby line into the work line.
  • This work can be done under the invention mechanically, in particular automatically using a can changer, but can also be done manually.
  • a flyer exactly two rows of work with closely spaced cans provided and immediately adjacent to each row of work is a standby row arranged for full or reserve cans.
  • Around the row pairs as well as between the row pairs can again be a conveyor for empty and full cans, e.g. connected to a previous machine.
  • the respective standby row should be filled with full cans be.
  • the tape can be removed from the resulting Empty cans on an adjacent one in the adjacent standby row pass the full can.
  • the reserve or full can in the standby row is on site and Place a work can and the standby line becomes a work line.
  • the function of the cans and rows of each row pair after this Aspects of the invention are therefore exchanged without a can movement.
  • a Flyers exactly four work series, each with the same but different from series to series Level, can be provided (in principle, all work cans can also be used here have the same level).
  • the fill level from row to row e.g. 1/4 or 1/2 can filling, changes, should be in the so-called cans containing so-called "sorted" Series of work
  • the work cans on gap so with space for one spare jug each in the gap.
  • Two work series can be preferred can be combined into double rows.
  • the cans are said to be again with the narrow sides of the rectangle on an O-axis parallel to the rows of spindles border on both sides.
  • a conveyor path can be provided for each empty and full can.
  • the work cans in each work row should - at least block by block - at the moment they all have the same level.
  • Block by block refers to a group of jugs, e.g. on 1/2, 1/3 or 1/4 of a row of cans, for example on a group of cans that is to be exchanged with an exchange device at the same time.
  • the same applies of course again in the event of application on a jet spinning machine, taking exactly two single-work series (with gaps) in a double row become.
  • the new beginning of the belt can be particularly easily and safely with Helped by an automatic tape feeder and automatically at the end of the Tape of the just expired jug.
  • the defined location of the The beginning of the tape can preferably be on a narrow side of the respective rectangular can be provided. If these narrow sides of the rectangular cans essentially on a line, e.g. on an O axis explained above, the Belt feeder or belt connector only a linear movement for execution to carry out his task.
  • the spinning can stand of a flyer consists of two working rows 1 and 2 and a standby row 3. Be in each of rows 1 and 2 there are only working cans 4, in the standby row 3 are shown Condition only reserve or full cans 5. Between two full cans 5 is one Gap 6 is provided for inserting an empty jug. To the standby row 3 a conveyor path 7 leads around - between the two work series 1, 2 Conveyor path 7, a car 8 full cans 9 or 10 empty cans between Transport storage 11 of a stretch (stretching machine) 12 and standby row 3.
  • the work rows 1 and 2 and the standby row become 3 existing spinning can stand 13 assigned to a flyer 14.
  • the 4 sliver drawn from the individual working cans is (not drawn) pulled up and over a over the rows of cans 1 to 3 and the conveyor 7 arranged gate transported to the spindles 15 of the flyer 14.
  • each working can 4th the work series 1 and 2 a current level is provided, which varies from that of each neighboring work can positioned in the same work row 1, 2 4 differs by half a can filling.
  • the current shot 1 are the work cans 4 of the work series 1 to 2/4 to 4/4, the work cans 4 in the work row 2 filled to 1/4 or 3/4.
  • the level of a work can 4 from the work row 1 from the level the next adjacent work can 4 of the work row 2 by 1 ⁇ 4 can content differs.
  • the carriage 8 can - as shown - with two positions or with one position, but also equipped with any number of pitches for cans become. He can e.g. be trained so that he is capable of several Pick up or put down cans at the same time. In this way one can Accelerate can replacement in standby row 3.
  • the trolley can replace 8 cans in sections or blocks.
  • a section denotes a group 16 of spindles on the flyer 14.
  • a block denotes several sections 16, e.g. half or full length of the flyer 14 or a row of work or standby cans.
  • FIG. 2 shows a spinning can stand 13 of a flyer 14, which includes two pairs of can rows 17 and 18 with a conveyor path 7 running around the row pairs and in between.
  • Each of the pairs of can rows 17, 18 currently consists of a work row 1 or 2 and a standby row 3a or 3b.
  • a fill level ratio of adjacent working cans 4 is selected within the working rows 1 and 2, as in the exemplary embodiment according to FIG. 1. Since there are as many reserve cans as there are work cans in the can stand 13 in the embodiment according to FIG. 2, here ( 3 and 4, see below), in contrast to the case of FIG. 1, all work cans have the same fill level.
  • the working cans are different Level, e.g. the cans of work row 1, filled to 1/4, need for the next reserve jug to be spun, no jug is moved at all, because it will be the beginning of the band that adjoins the empty can Reserve jug or full jug of standby 3a withdrawn. As a result this means that the standby line 3a becomes a work line.
  • the downtime of the flyer 14 is compared with a can change the case of Fig. 1 significantly reduced.
  • a can change namely only the stripped tape from a jug to a neighboring jug be placed.
  • the previously created empty jug is then removed using the Wagens 8 picked up and replaced by a new full can. If the pitchers at a transition from a work can to a reserve can no longer be postponed there is an enormous time saving when changing the tape, a correspondingly short machine stop and an increase in Efficiency of the machine.
  • the spinning can stand 13 according to FIG. 3 in that the cans of each of a double row 23, 24 pairs of Work series 1/21 and 2/22 with the narrow rectangular sides 25 on both sides border an O-axis 27 parallel to the longitudinal direction 26 of the flyer 14.
  • a belt feeder 28 can be movably supported in this direction of travel 29 in the direction of travel 29 become. If it is ensured that the beginning of the band of each reserve jug or Full can 5 at a defined point, preferably on the narrow side of the rectangle 25 of the respective full can 5 is positioned, the tape feeder 28 can on the way in the direction of travel 29 (e.g. on the O-axis) grasp and automatically at the end of the band of the previously expired jug start.
  • the downtimes become even shorter than in the representation according to FIG. 2, since not only the time for the can exchange during a machine stop, but also a large part of the tape application time be saved.
  • the positioning and execution with automatic tape feeder can of course, with the appropriate addition - can also be provided in the embodiment of FIG. 2.
  • the spinning can arrangement in booth 13 can be simplified even more if 4, the working cans 4a to d and the reserve cans each in the block 31, 32 positioned side by side or one behind the other in the double rows 23, 24 become.
  • the two blocks 31 and 32 contain the same principle many work cans 4 and gaps 6 filled with rectangular cans like the work series 4a of Fig. 3.
  • the difference is essentially that now (in Fig. 4) in a block 31 only cans 4a and in the currently adjacent Block 32 only reserve cans 9 are available.
  • FIG. 5 shows in principle the design of the spinning can stand 13 from FIG. 1 for the case of a jet spinning machine 30.
  • the work cans 4 running in a row 1 contain two different (for example 1/2 can filling) levels.
  • cans 1 with the fill levels of 2/4 and 4/4 are shown.
  • 5 is assigned a standby row 3. This is essentially identical to that of FIG. 1.
  • the operation of the standby row 3 with the help of the carriage 8 from the store 11 of a route 12 can also take place along the conveyor path 7, as in FIG. 1.
  • the variants according to FIGS. 2 to 4 can be designed accordingly for a jet spinning machine 30.
  • the change consists essentially in the fact that half as many work series are currently being deducted as for the flyer 14.
  • the work and standby rows 1, 3 according to FIG. 5 can also be pushed together completely ( similar to Fig. 2).
  • the ⁇ conveyor path 7 should then lead around the row pair 1, 3 thus formed.
  • a sliver can stand of a sliver processing machine, such as a flyer or jet spinning machine, which has a large number of spindles in at least one row of spindles have described.
  • a sliver processing machine such as a flyer or jet spinning machine
  • rectangular cans are used instead of round cans.
  • every running spinning can (working can) a current filling level is provided, which differs from that of each neighboring work can by a specific one Fraction of the can filling differs. The position of each furthest an empty can is assigned a full can (reserve can).

Abstract

Es wird ein Spinnkannenstand einer faserbandverarbeitenden Maschine, wie Flyer oder Jet-Spinnmaschine, die eine Vielzahl von Spindeln in mindestens einer Spindelreihe aufweisen, beschrieben. Um den Aufwand beim Spinnkannenaustausch zu vermindern, werden anstelle von Rundkannen Rechteckkannen eingesetzt. In jeder ablaufenden Spinnkanne (Arbeitskanne) wird ein momentaner Füllstand vorgesehen, der sich von demjenigen jeder Nachbar-Arbeitskanne um einen bestimmten Bruchteil der Kannenfüllung unterscheidet. Der Position der jeweils am weitesten geleerten Arbeitskanne wird eine volle Kanne (Reservekanne) zugeordnet. <IMAGE>A spinning can stand of a sliver processing machine, such as a flyer or jet spinning machine, which has a large number of spindles in at least one row of spindles, is described. Rectangular cans are used instead of round cans to reduce the effort involved in replacing spinning cans. A current filling level is provided in each spinning can (working can) that is running, which differs from that of each neighboring working can by a certain fraction of the can filling. A full can (reserve can) is assigned to the position of the most empty working can. <IMAGE>

Description

Die Erfindung betrifft den Spinnkannenstand einer faserbandverarbeitenden Maschine, wie Flyer oder Jet-Spinnmaschine1 die in mindestens einer Reihe eine Vielzahl von Spindeln aufweisen, wobei jeder einzelnen Spindel momentan eine Spinnkanne, eine sogenannte Arbeitskanne, zum Abziehen von Faserband und den Spindeln insgesamt mindestens eine Reihe von Arbeitskannen, eine sogenannte Arbeitsreihe, zugeordnet ist.The invention relates to the spinning can stand of a sliver processing machine, such as a flyer or jet spinning machine 1, which has a plurality of spindles in at least one row, with each individual spindle currently having a spinning can, a so-called working can, for removing sliver and the spindles in total at least one row of work cans, a so-called work series, is assigned.

Zu den faserband-verbrauchenden Maschinen gehören unter anderem auch Strekken (Streckmaschinen) und Kämm-Vorbereitungsmaschinen; hier ist anstelle von "Spindeln" zu lesen "faserband-verarbeitende Plätze".Strekken are among the machines that use fiber sliver (Stretching machines) and combing machines; here is instead of "Spindles" read "sliver-processing places".

Die Erfindung soll jedoch insbesondere anwendbar sein bei Flyern oder Jet-Spinnmaschinen. Die Spindeln eines Flyers werden im allgemeinen in zwei geraden Reihen - gegeneinander versetzt - angeordnet. Die Spindeln einer Jet-Spinnmaschine sollen dagegen in einer geraden Reihe stehen. Zu einem Flyer gehören herkömmlich wenigstens vier gerade Reihen von runden Arbeitskannen (sogenannte Rundkannen) bzw. Arbeitsreihen. Wenn zwischen einer Arbeitsreihe und den Spindeln ein Gang bzw. Förderweg vorgesehen ist, kann das aus der jeweiligen Arbeitskanne gezogene Faserband mit Hilfe eines Gatters hoch über dem Förderweg zur verarbeitenden Spindel geleitet werden. Ähnliches gilt für eine Jet-Spinnmaschine, hier gibt es jedoch herkömmlich in der Regel nur zwei Reihen der runden Arbeitskannen. Die auf den Spinnmaschinen verarbeiteten Faserbänder kommen normalerweise von einer oder mehreren Streckmaschine(n).However, the invention is intended to be particularly applicable to flyers or jet spinning machines. A flyer's spindles are generally divided into two straight lines Rows - staggered - arranged. The spindles of a jet spinning machine should be in a straight line. Belong to a flyer conventionally at least four straight rows of round work cans (so-called Round cans) or work series. If between a work series and the spindles a gear or conveyor path is provided, can from the respective A sliver of sliver drawn with the help of a gate high above the conveyor to the processing spindle. The same applies to a jet spinning machine, however, there are usually only two rows of round cans. The slivers processed on the spinning machines usually come from one or more stretching machine (s).

Wie gesagt, werden Flyer und Jet-Spinnmaschinen - ebenso wie andere faserbandverarbeitende Maschinen - bisher aus Pundkannen versorgt. Rundkannen besitzen genormte Größen, insbesondere genormte (Kreis-)Durchmesser. Es gibt Kannenwechsel- bzw. Transportsysteme für Rundkannen. Dabei werden, z.B. beim Flyer, die Rundkannen von einer Reserveposition in eine Arbeitsposition (Arbeitsreihe) verschoben oder die Reservekannen stehen in einer zweiten Reihe. Im Ergebnis werden einem Flyer vier Reihen von Rundkannen (= Arbeitskannen), einer Jet-Spinnmaschine zwei Reihen der Rundkannen zugeordnet. Jeder Arbeitskannenreihe (kurz: Arbeitsreihe) kann eine Reservekannenreihe (kurz: Reservereihe) zugeordnet werden.As I said, flyers and jet spinning machines - like other sliver processing machines Machines - previously supplied from pound cans. Have round cans standardized sizes, especially standardized (circular) diameters. There are can changing or transport systems for round cans. Here, e.g. with the flyer, the round cans from a reserve position into a work position (work series) moved or the reserve cans are in a second row. As a result are a flyer four rows of round cans (= work cans), a jet spinning machine assigned to two rows of round cans. Every row of work cans (short: work series) can a reserve jug row (short: spare series) be assigned.

Die Arbeit beim Rundkannenwechsel ist zeitaufwendig, wenn weniger Reserve- als Arbeitskannen vorhanden sind, weil die jeweils auszutauschenden Kannen, nämlich leere Kannen - kurz Leerkannen - durch Hin- und Herrangieren durch Reservekannen, nämlich volle Kannen bzw. Vollkannen, ersetzt werden müssen. Wenn dagegen ebenso viele Reserve- wie Arbeitskannen bereitstehen sollen, werden aufwendige angetriebene Förderelemente für die Kannen gebraucht.The work of changing round cans is time-consuming if less reserve than Work cans are available because the cans to be replaced, namely empty cans - briefly empty cans - by moving back and forth through reserve cans, namely full cans or full cans must be replaced. If against just as many reserve cans as there are work cans will be expensive driven conveyor elements for the cans used.

Der Erfindung liegt die Aufgabe zugrunde, die Nachteile zu überwinden; insbesondere soll der Kannenwechsel erleichtert bzw. wirtschaftlicher gestaltet werden, ohne die Zahl der Arbeitsreihen zu vermehren, sondern sie sogar zu vermindern, so daß die Zahl der Fahrwege verkleinert wird. Insbesondere soll die Automatisierung im Zusammenhang mit einem Kannenwechsel erleichtert werden.The invention has for its object to overcome the disadvantages; in particular the can change should be made easier or more economical without to increase the number of work series, but even to reduce them, so that the number of routes is reduced. In particular, automation in connection with a can change.

Für den eingangs beschriebenen Spinnkannenstand wird die erfindungsgemäße Lösung im Anspruch 1 angegeben. Nach der Erfindung werden Rechteckkannen anstelle von Rundkannen verwendet. In jeder Arbeitsreihe werden Rechteck(spinn)kannen, deren kleine Rechteckseite etwa gleich dem Radius herkömmlicher genormter Rund(spinn)kannen ist, mit ihren großen Rechteckseiten parallelsiert angeordnet. For the spinning can stand described at the beginning, the invention Solution specified in claim 1. According to the invention, rectangular cans used instead of round cans. Rectangles (spinning) are known in each work series, whose small rectangle side is approximately equal to the radius of conventional ones standardized round (spinning) is parallel with its large rectangular sides arranged.

Durch die Erfindung wird erreicht, daß im Spinnkannenstand jeweils anstelle von zwei hintereinander in zwei Arbeitsreihen stehenden Rundkannen zwei in nur noch einer Arbeitsreihe nebeneinander stehende Rechteckkannen (der angegebenen Größenverhältnisse) für eine bestimmte Fasermenge erforderlich sind. Wegen der Geometrie können die beiden Rechteckkannen sogar mehr Faserband als die herkömmlichen Rundkannen aufnehmen.The invention ensures that in each case instead of two round cans standing in a row in two work rows two in only Rectangular cans (the specified Proportions) are required for a certain amount of fibers. Because of the Geometry can make the two rectangular cans even more sliver than the conventional ones Pick up round cans.

Allein durch den Einsatz der Rechteckkannen kann die Zahl der Arbeitsreihen im Spinnkannenstand halbiert werden. Weniger Reihen erfordern weniger Fahrwege. Vor allem aber läßt sich dadurch - wie im folgenden noch kurz gesagt wird - die Dauer eines Kannenwechsels mit Umlegen des Faserbandes stark verkürzen; auch die Automatisierung kann erheblich vorangetrieben werden. Schließlich werden kaum noch aufwendige Bandfördermitttel gebraucht, statt dessen genügen gegebenenfalls fahrbare Transporter, die (nacheinander) auch andere Maschinen bedienen können. Einige Verbesserungen und weitere Ausgestaltungen der Erfindung werden in den Unteransprüchen und im vorliegenden Text beschrieben.Simply by using the rectangular cans, the number of work rows in the Spin can stand halved. Fewer rows require fewer routes. Above all, however, as can be said shortly in the following, the Shorten the duration of a can change by folding the sliver; also automation can be significantly advanced. Finally be hardly any expensive belt conveyors are used, instead, if necessary, are sufficient Mobile transporters that also operate other machines (one after the other) can. Some improvements and further refinements of the invention are described in the subclaims and in the present text.

Gemäß weiterer Erfindung wird im jeweiligen Spinnkannenstand in jeder Arbeitskanne ein momentaner Füllstand vorgesehen, der sich von demjenigen einer Nachbar-Arbeitskanne um einen bestimmten Bruchteil einer Kannenfüllung unterscheiden kann, ferner wird zumindest der Position der jeweils am weitesten geleerten Arbeitskanne eine volle Kanne, das ist eine sogenannte Reservekanne, zugeordnet. Der "bestimmte Bruchteil" kann allgemein 0 bis 1 der Kannenfüllung betragen. Der "Unterschied" der Füllung benachbarter Kannen kann also gegen Null gehen, so daß die jeweils benachbarten Kannen gleich voll und (später) zugleich leer sind; auch beliebige "tatsächliche" Unterschiede der Kannenfüllung sind denkbar. Vorzugsweise unterscheidet sich der Füllstand einer Arbeitskanne momentan von demjenigen einer Nachbar-Arbeitskanne - derselben Arbeitsreihe oder einer Nachbar-Arbeitsreihe - um eine viertel oder halbe Kannenfüllung. In jeder Arbeitsreihe sollen bevorzugt höchstens zwei verschiedene Füllstände von momentan ablaufenden Arbeitskannen vorkommen. According to another invention, in each spinning can stand in each working can a current level is provided, which differs from that of a Differentiate neighboring work can by a certain fraction of a can fill can, at least the position of the most emptied Working jug a full jug, which is a so-called reserve jug, assigned. The "certain fraction" can generally be 0 to 1 of the can filling. The "difference" in the filling of neighboring cans can be close to zero go so that the neighboring jugs are equally full and (later) at the same time are empty; any "actual" differences in the can filling are also conceivable. The fill level of a work can preferably differs at the moment from that of a neighboring work can - the same work series or one Neighbor work series - by a quarter or half can filling. In every work series should preferably be at most two different fill levels from those currently running Work cans occur.

Für den Spinnkannenstand einer Jet-Spinnmaschine mit nur einer Arbeitsreihe heißt das, daß sich der Füllstand benachbarter Arbeitskannen in dieser Reihe bevorzugt um annähernd eine halbe Kannenfüllung unterscheiden soll. Bei einem Flyer, der z.B. zwei Arbeitsreihen besitzt, kann die genannte Nachbar-Arbeitskanne in derselben oder in einer Nachbar-Arbeitsreihe stehen. Ähnliches gilt - mit entsprechender Anpassung - auch für Strecken, Kämm-Vorbereitungsmaschinen und andere faserband-verarbeitende Maschinen. Hiernach können sich die Kannen innerhalb ein und derselben Arbeitsreihe um den bestimmten Bruchteil - einschließlich Null - der Kannenfüllung unterscheiden; die Erfindung umfaßt also auch den Fall, daß in jeweils ein und derselben Arbeitsreihe alle Kannen denselben Füllstand besitzen und daß die erfindungsgemäße Unterscheidung des Füllstands um einen bestimmten Bruchteil der Kannenfüllung im Verhältnis von Arbeitsreihe zu Arbeitsreihe gilt.For the spinning can stand of a jet spinning machine with only one work row this means that the filling level of neighboring cans in this row is preferred by approximately half a can filling. At a Flyer, e.g. has two rows of work, the neighbor can mentioned stand in the same or in a neighboring work series. The same applies - with the corresponding Adaptation - also for routes, comb preparation machines and others sliver processing machines. After that, the cans can be inside one and the same series of work by a certain fraction - including Zero - distinguish the can filling; the invention also includes the Case that in each one and the same work row all cans have the same level have and that the inventive differentiation of the level by one certain fraction of the can filling in the ratio of work series to work series applies.

Der Übergang von Rundkannen auf Rechteckkannen des angegebenen Größenverhältnisses läßt die Teilung der Arbeitsposition der jeweiligen Maschine unverändert und schafft den Vorteil eines Kannenwechsels aus einer nicht angetriebenen Position in eine andere nicht angetriebene Position. Alle Kannenplätze können "passiv" bleiben, das heißt es werden - wie gesagt - Fahrbänder oder sonstige sich längs der Förderwege erstreckende Transportmittel nicht benötigt.The transition from round cans to rectangular cans of the specified size ratio leaves the division of the working position of the respective machine unchanged and creates the advantage of a can change from a non-driven one Position in another non-driven position. All pitches can Remain "passive", which means that - as I said - there will be conveyor belts or something else means of transport extending along the conveying paths are not required.

Für einen Spinnkannenstand eines Flyers besteht eine bevorzugte Lösung darin, daß genau zwei Arbeitsreihen mit dicht an dicht stehenden Rechteck-Arbeitskannen vorgesehen werden, daß die Rechteck-Reservekannen in einer separat zwischen den Arbeitsreihen vorgesehene Bereitschaftsreihe aufgestellt werden und daß zwischen den Arbeitsreihen und der Bereitschaftsreihe sowie um letztere herum ein freier Weg für Leer- bzw. Vollkannen - als Verbindung zu einer vorausgehenden Maschine bzw. einem Speicher oder dergleichen - vorgesehen wird, wobei die Bereitschaftsreihe vor einem Kannenwechsel mit ihren großen Rechteckseiten parallel zueinander sowie mit Platz für je eine Leerkanne auf Lücke gesetzte Vollkannen (Reservekannen) enthält. In der Bereitschaftsreihe steht dann eine Vollkanne für jede der bei Betrieb des Flyers demnächst leerwerdende Arbeitskanne bereit. Beim Wechsel wird die geleerte Arbeitskanne bzw. Leerkanne aus der Arbeitsreihe herausgezogen und in eine (z.B. die nächstliegende) Lücke der Bereitschaftsreihe geschoben. Daraufhin wird die bereitgehaltene Vollkanne aus der Bereitschaftsreihe in die Arbeitsreihe gebracht. Diese Arbeit kann im Rahmen der Erfindung mechanisch, insbesondere automatisch mit Hilfe eines Kannenwechslers, aber auch manuell ausgeführt werden.For a flyer spinning can stand, a preferred solution is to that exactly two rows of work with tightly packed rectangular work cans be provided that the rectangular reserve cans in a separate the standby line provided between the work lines and that between the work rows and the standby row and around the latter is a clear path for empty or full cans - as a connection to one preceding machine or a memory or the like - provided the standby line with its large ones before a can change Rectangular sides parallel to each other and with space for one empty jug on each gap contains full cans (spare cans). Then stands in the standby line a full can for each of the work cans that will soon become empty when the flyer is operated ready. When changing, the empty jug or empty jug pulled out of the work series and into a (e.g. the closest) gap on the standby line. Then the full jug is ready brought from the standby line into the work line. This work can be done under the invention mechanically, in particular automatically using a can changer, but can also be done manually.

Während des Kannentausches zwischen Bereitschafts- und Arbeitsreihe wird in der Regel die ganze Maschine angehalten, das heißt auch die aus den gegebenenfalls relativ volleren Arbeitskannen abziehenden Spindeln werden gestoppt. Erst wenn die in einer Arbeitsreihe entstandenen Leerkannen ersetzt und die Bandanfänge an die abgelaufenen Bandenden und an die Spindeln angeschlossen sind, wird die Maschine insgesamt wieder für die Spinnarbeit eingeschaltet. Während der Spinnarbeit können dann die in die Bereitschaftsreihe überstellten Leerkannen einzeln oder gruppenweise manuell oder mit Hilfe eines Transportwagens durch neue Vollkannen ersetzt werden.During the can exchange between the standby and work series, the As a rule, the whole machine is stopped, which also means that if necessary Spindles pulling relatively fuller work cans are stopped. Only when the empty cans created in a work series replaced and the beginning of the band the expired tape ends and are connected to the spindles, the Machine switched on again for spinning work. During the spinning work can then empty cans transferred to the standby row individually or in groups manually or with the help of a trolley through new full cans be replaced.

Bei Anwendung des vorgenannten Ausführungsbeispiel auf eine Jet-Spinnmaschine wird für deren Spindelreihe eine Arbeitsreihe mit dicht an dicht stehenden Arbeitskannen vorgesehen, wobei die Reservekannen in einer unmittelbar angrenzenden oder separat - getrennt durch einen Förderweg (wie vorher) - neben der Arbeitsreihe vorgesehenen Bereitschaftsreihe aufzustellen sind. Auch bei dieser Maschine soll die Bereitschaftsreihe vor einem Kannenwechsel mit ihren großen Rechteckseiten zueinander parallele sowie mit Platz für je eine Leerkanne auf Lücke gesetzte Vollkannen enthalten. Der Kannenaustausch von in der Arbeitsreihe entstandenen Leerkannen durch die in der Bereitschaftsreihe stehenden Vollkannen erfolgt dann im Prinzip genauso beim Flyer.When applying the aforementioned embodiment to a jet spinning machine For their spindle row, a work row with close to each other is used Work cans provided, the reserve cans in an immediate adjacent or separately - separated by a conveyor path (as before) - next to the standby line provided for the work series are to be set up. This one too The machine is said to be ready with a large can before the can change Rectangular sides parallel to each other and with space for one empty jug each Contained full cans included. The can exchange from in the work series empty cans created by the full cans in the standby row in principle, the same applies to the flyer.

Die Verteilung bzw. Zusammenfassung von Arbeitsreihen und Bereitschaftsreihen kann bei den faserbandverarbeitenden Maschinen auch anders als vorstehend beschrieben vorgesehen werden. Gemäß weiterer Erfindung werden bei einem Flyer genau zwei Arbeitsreihen mit dicht an dicht stehenden Arbeitskannen vorgesehen und unmittelbar angrenzend neben jeder Arbeitsreihe wird eine Bereitschaftsreihe für Voll- bzw. Reservekannen angeordnet. Die Kannen bzw. Kannenplätze jeder dieser aus Arbeits- und Bereitschaftsreihe bestehenden Reihenpaare von Rechteckkannen sollen mit den schmalen Rechteckseiten an eine zu den Spindelreihen parallele O-Achse beiderseits angrenzen. Um die Reihenpaare herum sowie zwischen den Reihenpaaren kann wieder ein Förderweg für leere und volle Kannen, z.B. mit Verbindung zu einer vorausgehenden Maschine, vorgesehen werden. Hierbei soll die jeweilige Bereitschaftsreihe dicht an dicht mit Vollkannen zu besetzen sein.The distribution or summary of work series and standby series can also be different with the sliver processing machines than described above be provided. According to another invention, a flyer exactly two rows of work with closely spaced cans provided and immediately adjacent to each row of work is a standby row arranged for full or reserve cans. The pots or pitches of everyone this row pairs of rectangular cans consisting of work and standby rows with the narrow sides of the rectangle to one of the spindle rows Border the parallel O-axis on both sides. Around the row pairs as well as between the row pairs can again be a conveyor for empty and full cans, e.g. connected to a previous machine. The respective standby row should be filled with full cans be.

Wenn bei dem vorgenannten Aufbau des Spinnkannenstands einer faserbandverarbeitenden Maschine in einer Arbeitsreihe die weniger bzw. am wenigsten Faserband enthaltenden Arbeitskannen (oder wenn - im Extremfall - alle Arbeitskannen zugleich) ganz leergelaufen sind, kann der Bandabzug von den so entstandenen Leerkannen auf eine benachbarte, in der angrenzenden Bereitschaftsreihe schon stehende Vollkanne übergehen. Für diesen Übergang selbst braucht bei dem beschriebenen Spinnkannenstand überhaupt keine Kannenbewegung zu erfolgen. Die in der Bereitschaftsreihe stehende Reserve- bzw. Vollkanne wird an Ort und Stelle zu einer Arbeitskanne und die Bereitschaftsreihe wird insoweit zu einer Arbeitsreihe. Die Funktion der Kannen und Reihen jedes Reihenpaars nach diesem Aspekt der Erfindung werden also ohne eine Kannenbewegung ausgetauscht. Ganz ähnliches gilt für den Fall eines Spinnkannenstands mit nur einem Kannenreihenpaar, beispielsweise der Übertragung dieser Ausgestaltung der Erfindung auf eine Jet-Spinnmaschine, gegebenenfalls wird hierbei ein einziges Reihenpaar vorgesehen, bei dem die Funktion der Reihen bzw. Kannen in der vorstehend angegebenen Weise wechselt.If in the aforementioned structure of the sliver can stand of a sliver processing Machine in a work row the less or the least sliver containing cans (or if - in extreme cases - all cans at the same time) are completely empty, the tape can be removed from the resulting Empty cans on an adjacent one in the adjacent standby row pass the full can. For this transition itself needs the described Spinning can stand no can movement at all. The reserve or full can in the standby row is on site and Place a work can and the standby line becomes a work line. The function of the cans and rows of each row pair after this Aspects of the invention are therefore exchanged without a can movement. The same applies to the case of a spinning can stand with only one pair of cans, for example the transfer of this embodiment of the invention on a jet spinning machine, possibly a single pair of rows provided in which the function of the rows or cans in the above Way changes.

In einer weiteren Ausgestaltung der Erfindung können im Spinnkannenstand eines Flyers genau vier Arbeitsreihen mit jeweils gleichem, aber von Reihe zu Reihe anderem Füllstand, vorgesehen werden (grundsätzlich können auch hierbei alle Arbeitskannen den gleichen Füllstand besitzen).In a further embodiment of the invention, a Flyers exactly four work series, each with the same but different from series to series Level, can be provided (in principle, all work cans can also be used here have the same level).

Wenn der Füllstand von Reihe zu Reihe, z.B. um 1/4 oder 1/2 Kannenfüllung, wechselt, sollen in den gleichgefüllte Kannen enthaltenden, sogenannten "sortenreinen" Arbeitsreihen, die Arbeitskannen auf Lücke, also mit Platz für je eine Reservekanne in der Lücke, gesetzt werden. Je zwei Arbeitsreihen können bevorzugt zu Doppelreihen zusammengefaßt werden. In den Doppelreihen sollen die Kannen wieder mit den schmalen Rechteckseiten an eine zu den Spindelreihen parallele O-Achse beiderseits angrenzen. Um die Doppelreihen herum und zwischen je zwei Doppelreihen kann ein Förderweg für jede Leer- und Vollkanne vorgesehen werden. Vor allem sollen die in jeder Arbeitsreihe befindlichen Arbeitskannen - zumindest blockweise - momentan alle den gleichen Füllstand besitzen. Der Begriff "blockweise" (oder sektionsweise) bezieht sich auf eine Gruppe von Kannen, z.B. auf 1/2, 1/3 oder 1/4 einer Kannenreihe, beispielsweise auf eine Kannengruppe, die mit einem Wechselgerät zugleich auszutauschen ist. Entsprechendes gilt natürlich wieder für den Fall der Anwendung bei einer Jet-Spinnmaschine, wobei genau zwei jeweils sortenreine Arbeitsreihen (mit Lücken) in einer Doppelreihe vorgesehen werden.If the fill level from row to row, e.g. 1/4 or 1/2 can filling, changes, should be in the so-called cans containing so-called "sorted" Series of work, the work cans on gap, so with space for one spare jug each in the gap. Two work series can be preferred can be combined into double rows. In the double rows, the cans are said to be again with the narrow sides of the rectangle on an O-axis parallel to the rows of spindles border on both sides. Around the double rows and between two rows In double rows, a conveyor path can be provided for each empty and full can. Above all, the work cans in each work row should - at least block by block - at the moment they all have the same level. The term "Block by block" (or section by section) refers to a group of jugs, e.g. on 1/2, 1/3 or 1/4 of a row of cans, for example on a group of cans that is to be exchanged with an exchange device at the same time. The same applies, of course again in the event of application on a jet spinning machine, taking exactly two single-work series (with gaps) in a double row become.

In diesen Fällen, in denen die Kannen einer Reihe bzw. eines Bocks den gleichen Füllstand besitzen (also sortenrein sind), können alle Kannen mit gleichem Füllstand zugleich ausgetauscht werden. Ein weiterer Vorteil bei dieser Ausgestaltung besteht darin, daR in die Lücken zwischen je zwei noch ablaufenden Arbeitskannen bereits Reservekannen gesetzt werden können. Bei Leerlaufen der jeweils ablaufenden Kannen kann also ohne eine unmittelbar erforderliche Kannenbewegung von einer leergelaufenen Kanne auf eine danebenstehende volle Reservekanne übergegangen werden.In these cases where the cans of a row or a trestle are the same Have a fill level (i.e. are of the same type), all cans can have the same fill level be exchanged at the same time. Another advantage with this design consists in the gap between two working cans that are still running reserve cans can already be placed. When the running expires Pitching can therefore be carried out without the need for an immediate can movement from an empty jug to a full jug next to it be passed over.

Bei Anwendung der Erfindung ergibt sich aber noch ein weiterer wichtiger Vorteil: Wenn der Faserbandanfang jeder in einer Bereitschaftsreihe, in einer Lücke einer Arbeitsreihe usw. bereitgestellten Reservekanne an einer definierten Stelle der Kanne positioniert wird, kann der neue Bandanfang besonders leicht und sicher mit Hilfe eines automatischen Bandanlegers ergriffen und selbsttätig an das Ende des Bandes der gerade abgelaufenen Kanne angelegt werden. Die definierte Lage des Bandanfangs kann vorzugsweise an einer Schmalseite der jeweiligen Rechteckkanne vorgesehen werden. Wenn diese Schmalseiten der Rechteckkannen im wesentlichen auf einer Linie, z.B. auf einer oben erläuterten O-Achse, liegen, hat der Bandanleger bzw. Bandverbinder nur eine lineare Fahrbewegung zum Ausführen seiner Aufgabe auszuführen.However, another important advantage results when using the invention: When the beginning of the sliver everyone in a standby row, in a gap one Series of work etc. provided reserve jug at a defined location of the Jug is positioned, the new beginning of the belt can be particularly easily and safely with Helped by an automatic tape feeder and automatically at the end of the Tape of the just expired jug. The defined location of the The beginning of the tape can preferably be on a narrow side of the respective rectangular can be provided. If these narrow sides of the rectangular cans essentially on a line, e.g. on an O axis explained above, the Belt feeder or belt connector only a linear movement for execution to carry out his task.

Anhand der schematischen Darstellung von Ausführungsbeispielen des Spinnkannenstands eines Flyers und einer Jet-Spinnmaschine werden einige Einzelheiten der Erfindung erläutert. Es zeigen:

Fig. 1
einen Spinnkannenstand eines Flyers mit zwei getrennten Arbeitsreihen und einer mit umlaufendem Förderweg dazwischen angeordneten Bereitschaftsreihe;
Fig. 2
einen Spinnkannenstand mit zwei aus je einer Arbeits- und Bereitschaftsreihe bestehenden Doppelkannenreihen mit umlaufendem Förderweg;
Fig. 3
einen Spinnkannenstand eines Flyers mit zwei Doppelreihen von Arbeitsreihen, wobei in jeder Arbeitsreihe nur Kannen gleichen Füllstands vorgesehen sind;
Fig. 4
einen Kannenfüllstand
Figure 00080001
ähnlich Fig. 3, wobei die Kannen jeder Arbeitsreihe block- oder sektionsweise gleichen Füllstand besitzen; und
Fig. 5
den Spinnkannenstand einer Jet-Spinnmaschine mit einer Arbeitsreihe und einer davon durch einen Förderweg getrennten Bereitschaftsreihe.
Some details of the invention are explained on the basis of the schematic representation of exemplary embodiments of the spinning can stand of a flyer and a jet spinning machine. Show it:
Fig. 1
a spinning can stand of a flyer with two separate work rows and a standby row arranged with a circulating conveyor path between them;
Fig. 2
a spinning can stand with two rows of double cans each consisting of a work and stand-by row with a circulating conveying path;
Fig. 3
a spinning can stand of a flyer with two double rows of work rows, only cans of the same fill level being provided in each work row;
Fig. 4
a can level
Figure 00080001
similar to FIG. 3, the cans of each work row having the same fill level in blocks or sections; and
Fig. 5
the spinning can stand of a jet spinning machine with a work row and a standby row separated from it by a conveyor path.

Der Spinnkannenstand eines Flyers nach Fig. 1 besteht aus zwei Arbeitsreihen 1 und 2 und einer Bereitschaftsreihe 3. In jeder der Arbeitsreihen 1 und 2 befinden sich nur Arbeitskannen 4, in der Bereitschaftsreihe 3 befinden sich im dargestellten Zustand nur Reserve- bzw. Vollkannen 5. Zwischen je zwei Vollkannen 5 wird eine Lücke 6 zum Einsetzen einer Leerkanne vorgesehen. Um die Bereitschaftsreihe 3 herum führt - zwischen den beiden Arbeitsreihen 1, 2 - ein Förderweg 7. Auf dem Förderweg 7 kann ein Wagen 8 Vollkannen 9 bzw. Leerkannen 10 zwischen dem Speicher 11 einer Strecke (Streckmaschine) 12 und der Bereitschaftsreihe 3 transportieren. The spinning can stand of a flyer according to FIG. 1 consists of two working rows 1 and 2 and a standby row 3. Be in each of rows 1 and 2 there are only working cans 4, in the standby row 3 are shown Condition only reserve or full cans 5. Between two full cans 5 is one Gap 6 is provided for inserting an empty jug. To the standby row 3 a conveyor path 7 leads around - between the two work series 1, 2 Conveyor path 7, a car 8 full cans 9 or 10 empty cans between Transport storage 11 of a stretch (stretching machine) 12 and standby row 3.

Im Ausführungsbeispiel wird der aus den Arbeitsreihen 1 und 2 sowie der Bereitschaftsreihe 3 bestehenden Spinnkannenstand 13 einem Flyer 14 zugeordnet. Das aus den einzelnen Arbeitskannen 4 abgezogene Faserband wird (nicht gezeichnet) nach oben gezogen und über ein über den Kannenreihen 1 bis 3 und dem Förderweg 7 angeordnetes Gatter zu den Spindeln 15 des Flyers 14 transportiert.In the exemplary embodiment, the work rows 1 and 2 and the standby row become 3 existing spinning can stand 13 assigned to a flyer 14. The 4 sliver drawn from the individual working cans is (not drawn) pulled up and over a over the rows of cans 1 to 3 and the conveyor 7 arranged gate transported to the spindles 15 of the flyer 14.

Im Ausführungsbeispiel nach Fig. 1 wird vorgesehen, daß in jeder Arbeitskanne 4 der Arbeitsreihen 1 und 2 ein momentaner Füllstand vorgesehen ist, der sich von demjenigen jeder in derselben Arbeitsreihe 1, 2 positionierten Nachbar-Arbeitskanne 4 um eine halbe Kannenfüllung unterscheidet. In der momentanen Aufnahme nach Fig. 1 sind also die Arbeitskannen 4 der Arbeitsreihe 1 zu 2/4 bis 4/4, die Arbeitskannen 4 in der Arbeitsreihe 2 zu 1/4 bzw. 3/4 gefüllt. Zugleich ergibt sich aus Fig. 1, daß sich der Füllstand einer Arbeitskanne 4 aus der Arbeitsreihe 1 vom Füllstand der nächst benachbarten Arbeitskanne 4 der Arbeitsreihe 2 um ¼-Kanneninhalt unterscheidet.In the embodiment according to FIG. 1, it is provided that in each working can 4th the work series 1 and 2 a current level is provided, which varies from that of each neighboring work can positioned in the same work row 1, 2 4 differs by half a can filling. In the current shot 1 are the work cans 4 of the work series 1 to 2/4 to 4/4, the work cans 4 in the work row 2 filled to 1/4 or 3/4. At the same time it follows from Fig. 1 that the level of a work can 4 from the work row 1 from the level the next adjacent work can 4 of the work row 2 by ¼ can content differs.

Wenn eine in der Momentaufnahme nach Fig. 1 zu 1/4 gefüllte Arbeitskanne 4 der Arbeitsreihe 2 schließlich ganz leergelaufen ist, wird die Maschine (der Flyer 14) gestoppt und die leeren Kannen (Leerkannen) werden in die Lücken 6 der Bereitschaftsreihe 3 gezogen. In die dabei entstehenden Freiplätze bzw. Lücken der Arbeitsreihe 2 werden die vollen Reservekannen 5 der Bereitschaftsreihe 3 geschoben. Wenn im Beispiel alle Leerkannen von Reihe 2 durch Vollkannen ersetzt sind, wird die Maschine wieder in Gang gesetzt. Bei Beginn des Anlaufens besteht dann in der Arbeitsreihe 2 ein Füllstandsverhältnis von 2/4 zu 4/4 sowie in der Arbeitsreihe 1 ein Verhältnis ¼ zu 3/4. Der Austausch der jeweils entstandenen Leerkanne durch eine Vollkanne kann von Hand oder mit Hilfe eines nicht gezeichneten Manipulators erfolgen. Die bei dem Austausch in die Bereitschaftsreihe gebrachten Leerkannen 10 können mit Hilfe des Wagens 8 abgeholt und durch Vollkannen 9 aus dem Speicher 11 ersetzt werden. Die Vollkannen 9 werden dabei in zwischen den Leerkannen 10 in der Bereitschaftsreihe 3 entstandene Lücken gesetzt.If one in the snapshot of Fig. 1 to 1/4 filled can 4 of Work row 2 is completely empty, the machine (Flyer 14) stopped and the empty cans (empty cans) are in the gaps 6 of the standby row 3 pulled. In the resulting free spaces or gaps in the work series 2 the full reserve cans 5 of the standby row 3 are pushed. If in the example all empty cans from row 2 are replaced by full cans, the machine is started again. At the beginning of the start-up there is then in the work series 2 a fill level ratio of 2/4 to 4/4 as well as in the work series 1 a ¼ to 3/4 ratio. The exchange of the empty jug created in each case through a full jug can be done by hand or with the help of a manipulator, not shown respectively. The ones brought into the standby line during the exchange Empty cans 10 can be picked up with the help of the car 8 and by full cans 9 be replaced from memory 11. The full cans 9 are in between the empty cans 10 in the standby row 3 gaps created.

Der Wagen 8 kann - wie gezeichnet - mit zwei Stellpositionen oder mit einer Stellposition, aber auch mit jeder beliebigen Zahl von Stellplätzen für Kannen ausgestattet werden. Er kann z.B. so ausgebildet werden, daß er in der Lage ist, mehrere Kannen zugleich aufzunehmen oder abzusetzen. Auf diese Weise läßt sich eine Beschleunigung des Kannenaustausches in der Bereitschaftsreihe 3 erreichen. Beispielsweise kann der Wagen 8 Kannen sektions- oder blockweise austauschen. Eine Sektion bezeichnet eine Gruppe 16 von Spindeln an dem Flyer 14. Ein Block bezeichnet mehrere Sektionen 16, z.B. die halbe oder ganze Länge des Flyers 14 bzw. einer Arbeits- oder Bereitschaftskannenreihe.The carriage 8 can - as shown - with two positions or with one position, but also equipped with any number of pitches for cans become. He can e.g. be trained so that he is capable of several Pick up or put down cans at the same time. In this way one can Accelerate can replacement in standby row 3. For example, the trolley can replace 8 cans in sections or blocks. A section denotes a group 16 of spindles on the flyer 14. A block denotes several sections 16, e.g. half or full length of the flyer 14 or a row of work or standby cans.

In Fig. 2 wird ein Spinnkannenstand 13 eines Flyers 14 dargestellt, zu dem zwei Kannenreihenpaare 17 und 18 mit um die Reihenpaare und dazwischen verlaufendem Förderweg 7 gehören. Jede der Kannenreihenpaare 17, 18 besteht momentan aus einer Arbeitsreihe 1 bzw. 2 und einer Bereitschaftsreihe 3a bzw. 3b. Im Ausführungsbeispiel wird innerhalb der Arbeitsreihen 1 und 2 ein Füllstandsverhältnis benachbarter Arbeitskannen 4 wie im Ausführungsbeispiel nach Fig. 1 gewählt. Da bei dem Ausführungsbeispiel nach Fig. 2 ebenso viele Reserve- wie Arbeitskannen im Kannenstand 13 vorhanden sind, können hier ( ähnlich wie bei Fig. 3 und 4, siehe unten) im Gegensatz zum Fall von Fig. 1 alle Arbeitskannen den gleichen Füllstand haben.2 shows a spinning can stand 13 of a flyer 14, which includes two pairs of can rows 17 and 18 with a conveyor path 7 running around the row pairs and in between. Each of the pairs of can rows 17, 18 currently consists of a work row 1 or 2 and a standby row 3a or 3b. In the exemplary embodiment, a fill level ratio of adjacent working cans 4 is selected within the working rows 1 and 2, as in the exemplary embodiment according to FIG. 1. Since there are as many reserve cans as there are work cans in the can stand 13 in the embodiment according to FIG. 2, here ( 3 and 4, see below), in contrast to the case of FIG. 1, all work cans have the same fill level.

Selbst wenn, wie in Fig. 2 dargestellt wird, die Arbeitskannen unterschiedlichen Füllstands, z.B. die zu 1/4 gefüllten Kannen der Arbeitsreihe 1, geleert sind, braucht für das Anspinnen der nächsten Reservekanne gar keine Kanne bewegt zu werden, denn es wird der Bandanfang der an die entstandene Leerkanne angrenzenden Reservekanne bzw. Vollkanne der Bereitschaftsreihe 3a abgezogen. Im Ergebnis heißt das, daß die Bereitschaftsreihe 3a zu einer Arbeitsreihe wird.Even if, as shown in Fig. 2, the working cans are different Level, e.g. the cans of work row 1, filled to 1/4, need for the next reserve jug to be spun, no jug is moved at all, because it will be the beginning of the band that adjoins the empty can Reserve jug or full jug of standby 3a withdrawn. As a result this means that the standby line 3a becomes a work line.

Bei der Betriebsweise bzw. bei der Anordnung der Kannen im Spinnkannenstand 13 nach Fig. 2 wird die Stillstandszeit des Flyers 14 bei einem Kannenwechsel gegenüber dem Fall von Fig. 1 wesentlich herabgesetzt. Für den Kannenwechsel muß nämlich lediglich das abgezogene Band von einer Kanne auf eine Nachbarkanne gelegt werden. Die vorher entstandene Leerkanne wird anschließend mit Hilfe des Wagens 8 abgeholt und durch eine neue Vollkanne ersetzt. Wenn die Kannen bei einem Übergang von einer Arbeitskanne auf eine Reservekanne nicht mehr verschoben werden müssen, ergibt sich eine enorme Zeitersparnis bei einem Bandwechsel, einem entsprechend kurzen Maschinenstopp und eine Steigerung des Nutzeffekts der Maschine.In the mode of operation or in the arrangement of the cans in the spinning can stand 13 according to FIG. 2, the downtime of the flyer 14 is compared with a can change the case of Fig. 1 significantly reduced. For the can change namely only the stripped tape from a jug to a neighboring jug be placed. The previously created empty jug is then removed using the Wagens 8 picked up and replaced by a new full can. If the pitchers at a transition from a work can to a reserve can no longer be postponed there is an enormous time saving when changing the tape, a correspondingly short machine stop and an increase in Efficiency of the machine.

In den Fig. 1 und 2 wird vorgesehen, daß in jeder Arbeitsreihe Kannen mit verschiedenem Füllstand miteinander abwechseln. Im Ausführungsbeispiel nach Fig. 3 werden in jeder der dort dargestellten Arbeitsreihen 1, 2, 21 und 22 Arbeitskannen 4a, b, c, d jeweils innerhalb der Reihe gleichen Füllstands dargestellt. Die Arbeitskannen ein und derselben Arbeitsreihe sind also gewissermaRen "sortenrein". Die vier Arbeitsreihen 1, 2, 21, 22 des Spinnkannenstands 13 nach Fig. 3 bestehen im Ausführungsbeispiel aus zwei Doppelreihen 23 und 24, in denen die Arbeitskannen 4 auf Lücke gesetzt sind. Zwischen je zwei Arbeitskannen 4a, b, c, d befindet sich also eine Lücke 6, in die, z.B. mit Hilfe des Wagens 8, eine Vollkanne 9 eingesetzt werden kann. Nach Fig. 3 würden beispielsweise die Lücken 6 in der Arbeitsreihe 4a zuerst mit Vollkannen 9 ausgefüllt, damit beim Leerlaufen der Kannen 4a volle Kannen zur Verfügung stehen.1 and 2 it is provided that cans with different in each work series Alternate levels. 3 are in each of the work series 1, 2, 21 and 22 work cans shown there 4a, b, c, d each shown within the row of the same fill level. The work cans one and the same series of works are, so to speak, "single-variety". The four work series 1, 2, 21, 22 of the spinning can stand 13 according to FIG. 3 consist in Embodiment of two double rows 23 and 24 in which the working cans 4 are set to gap. There is between two working cans 4a, b, c, d i.e. a gap 6 into which e.g. with the help of the car 8, a full can 9 used can be. 3 would, for example, the gaps 6 in the work series 4a first filled with full cans 9, so that when the cans 4a are empty, they are full Pitchers are available.

Viele Teile der Anordnung nach Fig. 3 stimmen mit den vorbeschriebenen Vorrichtungen überein. Eine Besonderheit bei dem Spinnkannenstand 13 nach Fig. 3 besteht darin, daß die Kannen der je eine Doppelreihe 23, 24 bildenden Paare von Arbeitsreihen 1/21 und 2/22 mit den schmalen Rechteckseiten 25 beiderseits an eine zur Längsrichtung 26 des Flyers 14 parallele O-Achse 27 angrenzen. Längs dieser O-Achse kann ein Bandanleger 28 in Fahrtrichtung 29 beweglich gelagert werden. Wenn dafür gesorgt wird, daß der Bandanfang jeder Reservekanne bzw. Vollkanne 5 an einer definierten Stelle, vorzugsweise an der schmalen Rechteckseite 25 der jeweiligen Vollkanne 5 positioniert liegt, kann der Bandanleger 28 auf seinem Weg in Fahrtrichtung 29 (z.B. auf der O-Achse) problemlos die Bandanfänge ergreifen und an das Ende des Bandes der vorher abgelaufenen Kanne selbsttätig ansetzen.Many parts of the arrangement according to FIG. 3 are correct with the devices described above match. There is a special feature of the spinning can stand 13 according to FIG. 3 in that the cans of each of a double row 23, 24 pairs of Work series 1/21 and 2/22 with the narrow rectangular sides 25 on both sides border an O-axis 27 parallel to the longitudinal direction 26 of the flyer 14. Along A belt feeder 28 can be movably supported in this direction of travel 29 in the direction of travel 29 become. If it is ensured that the beginning of the band of each reserve jug or Full can 5 at a defined point, preferably on the narrow side of the rectangle 25 of the respective full can 5 is positioned, the tape feeder 28 can on the way in the direction of travel 29 (e.g. on the O-axis) grasp and automatically at the end of the band of the previously expired jug start.

Bei dem Ausführungsbeispiel nach Fig. 3 werden die Stillstandszeiten noch kürzer als bei der Darstellung nach Fig. 2, da nicht nur die Zeit für den Kannenaustausch während eines Maschinenstopps, sondern auch ein großer Teil der Bandanlegezeit gespart werden. Außerdem entfällt der manuelle Aufwand zum Anlegen des Bandes an das Bandende der abgelaufenen Kanne. Die Positionierung und Ausführung mit automatischem Bandanleger kann natürlich bei entsprechender Ergänzung - auch im Ausführungsbeispiel nach Fig. 2 vorgesehen werden.In the exemplary embodiment according to FIG. 3, the downtimes become even shorter than in the representation according to FIG. 2, since not only the time for the can exchange during a machine stop, but also a large part of the tape application time be saved. In addition, there is no manual effort to put on the tape to the end of the belt of the expired jug. The positioning and execution with automatic tape feeder can of course, with the appropriate addition - can also be provided in the embodiment of FIG. 2.

Im Ausführungsbeispiel des Spinnkannenstands nach Fig. 3 gibt es eine typische Bereitschaftsreihe nicht mehr, vielmehr wird die Bereitschaftsreihe durch die zwischen je zwei Arbeitskannen vorgesehene Lücken 6 ersetzt. Beim Ablaufen einer Arbeitskanne tritt an deren Stelle eine bereits an Ort und Stelle neben der Arbeitskanne stehende Bereitschaftskanne. Die Bereitschaftskannen sollen daher vorher, während des Ablaufens der Arbeitskannen, in die Lücken 6 zwischen je zwei Arbeitskannen 4 eingeschoben werden. Wie gesagt, kann es auch beim Ausführungsbeispiel nach Fig. 3, speziell wenn die Bänder automatisch angelegt werden, günstig sein, wenn alle Arbeitskannen 4 den gleichen Füllstand besitzen.In the embodiment of the spinning can stand according to FIG. 3 there is a typical one Standby line no longer, rather the standby line is replaced by the between provided two gaps 6 replaced gaps. When expiring one Work can is replaced by a work can already in place next to the work can standing jug. The ready cans should therefore, while the work cans are running, into the gaps 6 between two work cans 4 can be inserted. As I said, it can also in the embodiment 3, especially when the tapes are automatically applied, be cheap if all the cans 4 have the same level.

Noch mehr vereinfacht werden kann die Spinnkannenordnung im Stand 13, wenn gemäß Fig. 4 die Arbeitskannen 4a bis d und die Reservekannen jeweils im Block 31, 32 nebeneinander bzw. hintereinander in den Doppelreihen 23, 24 positioniert werden. In diesem Fall enthalten die beiden Blöcke 31 und 32 im Prinzip genauso viele Arbeitskannen 4 und mit Rechteckkannen gefüllte Lücken 6 wie die Arbeitsreihe 4a von Fig. 3. Der Unterschied besteht im wesentlichen darin, daß jetzt (in Fig. 4) im einen Block 31 nur Arbeitskannen 4a und im momentan danebenstehenden Block 32 nur Reservekannen 9 stehen. Die Arbeitskannen und Reservekannen der Doppelreihe 23 oder 24 grenzen längs der O-Achse 27 mit den Schmalseiten 25 aneinander. Sie stehen also gewissermaßen "hintereinander"; entsprechendes gilt natürlich auch für andere Spinnkannen-Anordnungen, z.B. für das Ausführungsbeispiel nach Fig. 2.The spinning can arrangement in booth 13 can be simplified even more if 4, the working cans 4a to d and the reserve cans each in the block 31, 32 positioned side by side or one behind the other in the double rows 23, 24 become. In this case, the two blocks 31 and 32 contain the same principle many work cans 4 and gaps 6 filled with rectangular cans like the work series 4a of Fig. 3. The difference is essentially that now (in Fig. 4) in a block 31 only cans 4a and in the currently adjacent Block 32 only reserve cans 9 are available. The work cans and spare cans the double row 23 or 24 border along the O-axis 27 with the narrow sides 25 together. So they are, so to speak, "one behind the other"; corresponding naturally also applies to other spinning can arrangements, e.g. for the embodiment according to Fig. 2.

Wenn die in der Momentaufnahme nach Fig. 4 noch zu 1/4 gefüllten Arbeitskannen 4a des Blocks 31 und 32 geleert sind, werden die Bandenden der abgelaufenen Kannen 4 an die Bandanfänge der hinter diesen Kannen stehenden Vollkannen 9 angelegt. In diesem Fall kann das Bandanlegen wiederum mit Hilfe eines Bandanlegers 28 automatisiert werden. Außerdem ist es möglich, die in den Blöcken 31 und 22 entstandenen Leerkannen als Block oder zumindest gruppenweise herauszunehmen und durch neue Vollkannen zu ersetzen. Durch einen solchen Blockaustausch mehrerer Kannen zugleich wird das Verfahren weiter vereinfacht. Bei überall gleich gefüllten Arbeitskannen umfaßt ein Block alle Arbeitskannen.If the working cans still filled to 1/4 in the snapshot according to FIG. 4 4a of block 31 and 32 are emptied, the tape ends of the expired Cans 4 to the beginning of the belt of the full cans standing behind these cans 9 created. In this case, the tape application can again be done with the help of a tape application 28 can be automated. It is also possible to use the blocks 31 and 22 empty cans created as a block or at least in groups and to be replaced by new full cans. Through such a block exchange The process is further simplified if several cans are used at the same time. At everywhere same filled cans one block includes all cans.

Fig. 5 zeigt im Prinzip die Ausgestaltung des Spinnkannenstands 13 von Fig. 1 für den Fall einer Jet-Spinnmaschine 30. Gegebenenfalls enthält die eine Arbeitsreihe 1 ablaufende Arbeitskannen 4 mit zwei verschiedenen (sich z.B. um 1/2 Kannenfüllung unterscheidenden) Füllständen. In der Momentaufnahme nach Fig. 5 werden Kannen 1 mit den Füllständen von 2/4 und 4/4 dargestellt. Der Arbeitsreihe 1 nach Fig. 5 wird eine Bereitschaftsreihe 3 zugeordnet. Diese ist im wesentlichen identisch mit derjenigen von Fig. 1. Auch die Bedienung der Bereitschaflsreihe 3 mit Hilfe des Wagens 8 aus dem Speicher 11 einer Strecke 12 kann ebenso wie in Fig. 1 längs des Förderwegs 7 erfolgen. Entsprechend lassen sich die Varianten nach den Fig. 2 bis 4 für eine Jet-Spinnmaschine 30 ausgestalten. Die Änderung besteht jeweils im wesentlichen darin, daß momentan halb so viele Arbeitsreihen wie bei dem Flyer 14 abgezogen werden. Die Arbeits- und Bereitschaftsreihen 1, 3 nach Fig. 5 können auch ganz zusammengerückt werden ( ähnlich Fig. 2). Der □ Förderweg 7 soll dann um das so gebildete Reihenpaar 1, 3 herumführen.FIG. 5 shows in principle the design of the spinning can stand 13 from FIG. 1 for the case of a jet spinning machine 30. If appropriate, the work cans 4 running in a row 1 contain two different (for example 1/2 can filling) levels. In the snapshot according to FIG. 5, cans 1 with the fill levels of 2/4 and 4/4 are shown. 5 is assigned a standby row 3. This is essentially identical to that of FIG. 1. The operation of the standby row 3 with the help of the carriage 8 from the store 11 of a route 12 can also take place along the conveyor path 7, as in FIG. 1. The variants according to FIGS. 2 to 4 can be designed accordingly for a jet spinning machine 30. The change consists essentially in the fact that half as many work series are currently being deducted as for the flyer 14. The work and standby rows 1, 3 according to FIG. 5 can also be pushed together completely ( similar to Fig. 2). The □ conveyor path 7 should then lead around the row pair 1, 3 thus formed.

Es wird ein Spinnkannenstand einer faserbandverarbeitenden Maschine, wie Flyer oder Jet-Spinnmaschine, die eine Vielzahl von Spindeln in mindestens einer Spindelreihe aufweisen, beschrieben. Um den Aufwand beim Spinnkannenaustausch zu vermindern, werden anstelle von Rundkannen Rechteckkannen eingesetzt. In jeder ablaufenden Spinnkanne (Arbeitskanne) wird ein momentaner Füllstand vorgesehen, der sich von demjenigen jeder Nachbar-Arbeitskanne um einen bestimmten Bruchteil der Kannenfüllung unterscheidet. Der Position der jeweils am weitesten geleerten Arbeitskanne wird eine volle Kanne (Reservekanne) zugeordnet.It becomes a sliver can stand of a sliver processing machine, such as a flyer or jet spinning machine, which has a large number of spindles in at least one row of spindles have described. To the expense of replacing a spinning can reduce, rectangular cans are used instead of round cans. In every running spinning can (working can) a current filling level is provided, which differs from that of each neighboring work can by a specific one Fraction of the can filling differs. The position of each furthest an empty can is assigned a full can (reserve can).

BezugszeichenlisteReference list

1, 2 =1, 2 =
ArbeitsreiheWork series
3 =3 =
Bereitschaftsreihe Standby line
4 =4 =
ArbeitskanneWork can
5 =5 =
ReservekanneReserve jug
6 =6 =
Lückegap
7 =7 =
FörderwegFunding route
8 =8 =
Wagendare
9 =9 =
VollkanneFull jug
10 =10 =
LeerkanneEmpty jug
11 =11 =
SpeicherStorage
12 =12 =
Streckeroute
13 =13 =
SpinnkannenstandSpinning can stand
14 =14 =
FlyerFlyer
15 =15 =
Spindelspindle
16 =16 =
Sektionsection
17, 18 =17, 18 =
KannenreihenpaarPair of cans
21, 22=21, 22 =
ArbeitsreiheWork series
23, 24=23, 24 =
DoppelreiheDouble row
25 =25 =
schmale Rechteckseitenarrow side of the rectangle
26 =26 =
LängsrichtungLongitudinal direction
27 =27 =
O-AchseO axis
28 =28 =
BandanlegerTape feeder
29 =29 =
FahrtrichtungDirection of travel
30 =30 =
Jet-SpinnmaschineJet spinning machine
31, 32=31, 32 =
Blöckeblocks

Claims (12)

Spinnkannenstand (13) einer faserbandverarbeitenden Maschine, wie Flyer (14) oder Jet-Spinnmaschine (30), die in mindestens einer Reihe eine Vielzahl von Spindeln aufweisen, wobei jeder einzelnen Spindel momentan eine Spinnkanne, eine sogenannte Arbeitskanne (4), zum Abziehen von Faserband und den Spindeln insgesamt mindestens eine Reihe von Arbeitskannen, eine sogenannte Arbeitsreihe (1, 2), zugeordnet ist,
dadurch gekennzeichnet,
daß in jeder Arbeitsreihe (1, 2, 21, 22) Rechteckspinnkannen, deren kleine Rechteckseite (25) etwa gleich dem Radius herkömmlicher genormter Rundspinnkannen ist, mit ihren großen Rechteckseiten parallelisiert angeordnet sind.
Spinning can stand (13) of a sliver processing machine, such as a flyer (14) or jet spinning machine (30), which has a plurality of spindles in at least one row, with each individual spindle currently having a spinning can, a so-called working can (4), for pulling off Sliver and the spindles are assigned a total of at least one row of work cans, a so-called work row (1, 2),
characterized by
that in each work series (1, 2, 21, 22) rectangular spinning cans, the small rectangular side (25) of which is approximately equal to the radius of conventional standardized round spinning cans, are arranged in parallel with their large rectangular sides.
Spinnkannenstand nach Anspruch 1,
dadurch gekennzeichnet,
daß in jeder Arbeitskanne (4) ein momentaner Füllstand vorgesehen ist, der sich von demjenigen einer Nachbar-Arbeitskanne (4) um einen bestimmten Bruchteil von o bis 1/1 einer Kannenfüllung unterscheidet und daß zumindest der Position der jeweils am weitesten geleerten Arbeitskanne (4) eine volle Kanne, das ist eine sogenannte Reservekanne (5), zugeordnet ist.
Spinning can stand according to claim 1,
characterized by
that a current fill level is provided in each work can (4), which differs from that of a neighboring work can (4) by a certain fraction of 0 to 1/1 of a can fill and that at least the position of the most empty work can (4 ) a full can, which is a so-called reserve can (5).
Spinnkannenstand nach Anspruch 1 oder 2,
dadurch gekennzeichnet,
daß sich der Füllstand einer Arbeitskanne (4) von demjenigen einer Nachbar-Arbeitskanne in derselben oder in einer Nachbar-Arbeitsreihe (1, 2, 21, 22) um 1/4, 1/2 oder 3/4 Kannenfüllung unterscheidet und daß jede Arbeitsreihe (1, 2, 21, 22) nur ablaufende Arbeitskannen (4) mit zwei verschiedenen Füllständen oder nur mit demselben Füllstand enthält.
Spinning can stand according to claim 1 or 2,
characterized by
that the fill level of a work can (4) differs from that of a neighboring work can in the same or in a neighboring work row (1, 2, 21, 22) by 1/4, 1/2 or 3/4 can filling and that each work row (1, 2, 21, 22) contains only draining cans (4) with two different fill levels or only with the same fill level.
Spinnkannenstand eines Flyers nach mindestens einem der Ansprüche 1 bis 3,
dadurch gekennzeichnet,
daß genau zwei Arbeitsreihen (1, 2) mit dicht an dicht stehenden Arbeitskannen (4) vorgesehen sind, daß die Reservekannen (5) in einer separat zwischen zwei Arbeitsreihen (1, 2) vorgesehenen Bereitschaftsreihe (3) aufzustellen sind, daß zwischen den Arbeitsreihen um die Bereitschaftsreihe herum ein Förderweg (7) für leere und volle Kannen als Verbindung zu einer vorausgehenden Maschine, insbesondere einer Streckmaschine (11, 12) vorgesehen ist und daß die Bereitschaftsreihe (3) für einen Kannenwechsel mit ihren großen Rechteckseiten parallel zueinander sowie mit Platz auf Lücke (6) für je eine Leerkanne gesetzte Reservekannen (5) enthält (Fig. 1).
Spinning can stand of a flyer according to at least one of claims 1 to 3,
characterized by
that exactly two work rows (1, 2) are provided with close-together work cans (4), that the reserve cans (5) are to be set up in a standby row (3) provided separately between two work rows (1), that between the work rows around the standby row a conveyor path (7) for empty and full cans is provided as a connection to a preceding machine, in particular a stretching machine (11, 12) and that the standby row (3) for a can change with its large rectangular sides parallel to one another and with space contains reserve cans (5) placed on the gap (6) for each empty can (FIG. 1).
Spinnkannenstand einer Jet-Spinnmaschine nach mindestens einem der Ansprrnche 1 bis 3,
dadurch gekennzeichnet,
daß genau eine Arbeitsreihe (1) mit dicht an dicht stehenden Arbeitskannen (4) vorgesehen ist, daß die Reservekannen (5) in einer separat neben der Arbeitsreihe (1) vorgesehenen Bereitschaftsreihe (3) Platz haben, daß zwischen Arbeitsreihe (1) und Bereitschaftsreihe (3) sowie um diese herum ein Förderweg (7) für leere und volle Kannen als Verbindung zu einer vorausgehenden Maschine, insbesondere einer Streckmaschine (11, 12), vorgesehen ist und daß die Bereitschaftsreihe (3) für einen Kannenwechsel mit ihren großen Rechteckseiten parallel zueinander sowie mit Platz für je eine Leerkanne auf Lücke (6) gesetzte Reservekannen (5) enthält (Fig. 5).
Spinning can stand of a jet spinning machine according to at least one of claims 1 to 3,
characterized by
that exactly one row of work (1) with closely spaced work cans (4) is provided, that the reserve cans (5) have space in a standby row (3) provided separately next to the work row (1), that between work row (1) and standby row (3) and around this a conveyor path (7) for empty and full cans is provided as a connection to a preceding machine, in particular a stretching machine (11, 12), and that the stand-by row (3) for a can change with its large rectangular sides in parallel contains each other and with space for an empty jug on gap (6) reserve cans (5) (Fig. 5).
Spinnkannenstand eines Flyers nach mindestens einem der Ansprüche 1 bis 4,
dadurch gekennzeichnet,
daß genau zwei Arbeitsreihen (1, 2) mit dicht an dicht stehenden Arbeitskannen (4) vorgesehen sind, daß unmittelbar neben jeder Arbeitsreihe eine Bereitschaffsreihe (3a, 3b) für Reservekannen (5) angeordnet ist und daß die Kannen bzw. Kannenplätze jedes Reihenpaars (17, 18) von Arbeitsreihe und Bereitschaftsreihe mit den schmalen Rechteckseiten (25) beiderseits an eine zur Flyer-Längsrichtung (26) parallele O-Achse (27) angrenzen und daß um die Reihenpaare (17, 18) herum sowie zwischen den beiden Reihenpaaren ein Förderweg (7) für leere und volle Kannen vorgesehen ist (Fig. 2).
Spinning can stand of a flyer according to at least one of claims 1 to 4,
characterized by
that exactly two rows of work (1, 2) with closely spaced cans (4) are provided, that a standby row (3a, 3b) for reserve cans (5) is arranged immediately next to each row of work, and that the cans or can places of each row pair ( 17, 18) of work row and standby row with the narrow rectangle sides (25) on both sides adjoin an O-axis (27) parallel to the longitudinal direction of the flyer (26) and that around the row pairs (17, 18) and between the two row pairs Conveyor path (7) is provided for empty and full cans (Fig. 2).
Spinnkannenstand einer Jet-Spinnmaschine nach mindestens einem der Ansprüche 1 bis 3 und 5,
dadurch gekennzeichnet,
daß genau eine Arbeitsreihe mit dicht an dicht stehenden Arbeitskannen vorgesehen ist, daß unmittelbar neben der Arbeitsreihe eine Bereitschattsreihe für Reservekannen angeordnet ist, daß die Kannen bzw. Kannenplätze des Reihenpaars von Arbeitsreihe und Bereitschaftsreihe mit den schmalen Rechteckseiten beiderseits an eine zur Spinnmaschinen-Längsrichtung parallele O-Achse angrenzen und daß um das Reihenpaar herum ein Förderweg für leere und volle Kannen vorgesehen ist.
Spinning can stand of a jet spinning machine according to at least one of Claims 1 to 3 and 5,
characterized by
that exactly one row of work with closely spaced work cans is provided, that a standby row for reserve cans is arranged directly next to the work row, that the cans or can places of the row pair of work row and standby row with the narrow rectangle sides on both sides of an O parallel to the longitudinal direction of the spinning machine -Adjust the axis and that a conveyor path for empty and full cans is provided around the pair of rows.
Spinnkannenstand nach Anspruch 6 oder 7,
dadurch gekennzeichnet,
daß in den Kannenreihen (1, 2, 21, 22) die Funktion von Arbeitskanne (4a bis d) und Bereitschaftskanne blockweise wechselt (Fig. 4).
Spinning can stand according to claim 6 or 7,
characterized by
that in the rows of cans (1, 2, 21, 22) the function of the work can (4a to d) and the standby can changes in blocks (Fig. 4).
Spinnkannenstand eines Flyers nach mindestens einem der Ansprüche 1 bis 3,
dadurch gekennzeichnet,
daß genau vier Arbeitsreihen (1, 2, 21, 22), in denen Arbeitskannen (4a bis d) auf Lücke (6), also mit Platz für eine Reservekanne (9) in jeder Lücke (6), gesetzt sind, unter Bildung von zwei Doppelreihen (23, 24) vorgesehen sind, daß die Kannen der eine Doppelreihe (23, 24) bildenden Paare von Arbeitsreihen mit den schmalen Rechteckseiten (25) an eine zur Längsrichtung (26) der Spinnmaschine parallele O-Achse (27) beiderseits angrenzen` daß um die Doppelreihen (23, 24) herum sowie zwischen die Doppelreihen ein Förderweg (7) für leere und volle Kannen (9, 10) vorgesehen ist und daß die in jeder Arbeitsreihe (1, 2, 21, 22) befindlichen Arbeitskannen (4a bis d) zumindest blockweise alle den gleichen Füllstand besitzen (Fig. 3).
Spinning can stand of a flyer according to at least one of claims 1 to 3,
characterized by
that exactly four work series (1, 2, 21, 22), in which work cans (4a to d) are set to gap (6), that is to say with space for a reserve can (9) in each gap (6), with the formation of Two double rows (23, 24) are provided so that the cans of the pairs of working rows forming a double row (23, 24) with the narrow rectangle sides (25) adjoin an O-axis (27) parallel to the longitudinal direction (26) of the spinning machine (27) `That a conveying path (7) for empty and full cans (9, 10) is provided around the double rows (23, 24) and between the double rows and that the working cans located in each work row (1, 2, 21, 22) ( 4a to d) at least in blocks all have the same fill level (FIG. 3).
Spinnkannenstand einer Jet-Spinnmaschine nach mindestens einem der Ansprüche 1 bis 3,
dadurch gekennzeichnet,
daß genau zwei Arbeitsreihen, in denen die Arbeitskannen auf Lücke, also mit Platz für eine Reservekanne in jeder Lücke, positioniert sind, unter Bildung einer Doppelreihe vorgesehen sind, daß die Kannen der die Doppelreihe bildenden Paare von Arbeitskannen mit den schmalen Rechteckseiten an eine zur Spindelreihe parallele O-Achse beiderseits angrenzen, daß um die Doppelreihe herum ein Förderweg für leere und volle Kannen als Verbindung zu einer vorausgehenden Maschine vorgesehen ist und daß die in jeder Arbeitsreihe befindlichen Arbeitskannen zumindest blockweise alle den gleichen Füllstand besitzen.
Spinning can stand of a jet spinning machine according to at least one of claims 1 to 3,
characterized by
that exactly two rows of work, in which the work cans are positioned on a gap, i.e. with space for a reserve can in each gap, are provided to form a double row, that the cans of the pairs of work cans forming the double row with the narrow rectangular sides on one to the row of spindles border the parallel O-axis on both sides so that a conveyor path for empty and full cans is provided around the double row as a connection to a preceding machine and that the work cans in each work row all have the same filling level, at least in blocks.
Spinnkannenstand nach mindestens einem der Ansprüche 1 bis 10,
dadurch gekennzeichnet,
daß der Faserbandanfang jeder Reservekanne (10) an einer definierten Stelle und demgemäß für einen automatischen Bandanleger (28) auffindbar positioniert liegt.
Spinning can stand according to at least one of claims 1 to 10,
characterized by
that the beginning of the sliver of each reserve jug (10) is positioned at a defined location and accordingly can be found for an automatic sliver feeder (28).
Spinnkannenstand nach Anspruch 11,
dadurch gekennzeichnet,
daß der Bandanfang einer Kanne (9) jeweils an deren nach dem Einsetzen an einen Stellplatz an eine O-Achse (27) angrenzenden schmalen Rechteckseite (25) herausragt.
Spinning can stand according to claim 11,
characterized by
that the beginning of the band of a jug (9) protrudes from the narrow side of the rectangle (25) adjacent to an O-axis (27) after being inserted into a parking space.
EP98116705A 1997-09-16 1998-09-03 Sliver can stand Expired - Lifetime EP0909844B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE19740661A DE19740661A1 (en) 1997-09-16 1997-09-16 Sliver can deployment for spinning machines
DE19740661 1997-09-16

Publications (3)

Publication Number Publication Date
EP0909844A2 true EP0909844A2 (en) 1999-04-21
EP0909844A3 EP0909844A3 (en) 2000-05-24
EP0909844B1 EP0909844B1 (en) 2003-03-12

Family

ID=7842493

Family Applications (1)

Application Number Title Priority Date Filing Date
EP98116705A Expired - Lifetime EP0909844B1 (en) 1997-09-16 1998-09-03 Sliver can stand

Country Status (4)

Country Link
US (1) US5974630A (en)
EP (1) EP0909844B1 (en)
JP (1) JPH11140728A (en)
DE (1) DE19740661A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10018184A1 (en) * 2000-04-12 2001-10-25 Evelyn Langen Transport and storage system for rectangular spinning cans
DE10064166A1 (en) * 2000-12-22 2002-07-04 Rieter Ingolstadt Spinnerei Container disposition for machines spinning fibrous bands, alternates pairs of reserve containers and empty spaces in standby row
CN114687023B (en) * 2020-12-30 2023-05-12 苏州多道自动化科技有限公司 Intelligent spinning production system and optimization method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4118429A1 (en) * 1990-06-05 1992-01-02 Murata Machinery Ltd SPIDER CAN PLANT
DE4217981A1 (en) * 1992-05-30 1993-12-02 Schlafhorst & Co W Sliver supply to open-end spinning machine - has sliver transferred in coils without container in U=shaped transporters of same width as spinning position
JPH07189055A (en) * 1993-12-27 1995-07-25 Toyota Autom Loom Works Ltd Sliver supplying in spinning machine
EP0668380A2 (en) * 1990-05-18 1995-08-23 Rieter Ingolstadt Spinnereimaschinenbau AG Process and device for automatically laying a fiber band on a textile machine
DE19526891A1 (en) * 1995-07-22 1997-01-23 Schlafhorst & Co W Rectangular sliver can movement

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5022626B2 (en) * 1972-10-19 1975-08-01
DE3505494A1 (en) * 1985-02-16 1986-09-04 Langen, Manfred, 4050 Mönchengladbach METHOD AND DEVICE FOR REPLACING EMPTY CAN CAN FOR FILLED
EP0220200B1 (en) * 1985-04-30 1988-08-24 Büro Patent AG Installation and method for the automatic feeding of filled cans and the automatic evacuation of empty cans in a spinning machine
US5257897A (en) * 1990-06-05 1993-11-02 Murata Kikai Kabushiki Kaisha Can conveying system
CZ279713B6 (en) * 1991-09-23 1995-06-14 Rieter Elitex A.S. Non-circular receptacle for depositing fiber sliver
DE9210330U1 (en) * 1992-08-01 1992-11-26 Innovatex Unternehmensberatung Gmbh, 4050 Moenchengladbach, De
DE19525737A1 (en) * 1995-07-14 1997-01-16 Schlafhorst & Co W Can storage for rectangular spinning cans at a can filling station

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0668380A2 (en) * 1990-05-18 1995-08-23 Rieter Ingolstadt Spinnereimaschinenbau AG Process and device for automatically laying a fiber band on a textile machine
DE4118429A1 (en) * 1990-06-05 1992-01-02 Murata Machinery Ltd SPIDER CAN PLANT
DE4217981A1 (en) * 1992-05-30 1993-12-02 Schlafhorst & Co W Sliver supply to open-end spinning machine - has sliver transferred in coils without container in U=shaped transporters of same width as spinning position
JPH07189055A (en) * 1993-12-27 1995-07-25 Toyota Autom Loom Works Ltd Sliver supplying in spinning machine
DE19526891A1 (en) * 1995-07-22 1997-01-23 Schlafhorst & Co W Rectangular sliver can movement

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
PATENT ABSTRACTS OF JAPAN vol. 1995, no. 10, 30. November 1995 (1995-11-30) & JP 07 189055 A (TOYOTA AUTOM LOOM WORKS LTD), 25. Juli 1995 (1995-07-25) *

Also Published As

Publication number Publication date
EP0909844A3 (en) 2000-05-24
EP0909844B1 (en) 2003-03-12
JPH11140728A (en) 1999-05-25
DE19740661A1 (en) 1999-03-18
US5974630A (en) 1999-11-02

Similar Documents

Publication Publication Date Title
DE3928648A1 (en) SYSTEM WITH ONE OR MORE SPINNING MACHINES AND WITH AT LEAST ONE CHANGING CARRIAGE TO CHANGE CAN
DE4338552C2 (en) Textile machine producing cross-wound bobbins with a large number of bobbins arranged in series
DE3303733C2 (en)
EP0384360A2 (en) Transporting system for cans between two drawing frames
DE4015938A1 (en) Rotor spinning assembly sliver supply - has station to transfer contents of round cans to flat cans for increased density along row of spinning stations
EP0909844B1 (en) Sliver can stand
EP3670409A1 (en) Textile machine which produces cross-wound bobbins, with a cross-wound bobbin transport device
EP0931188A1 (en) Filament spool or doff handling system
DE10130467B4 (en) Arrangement of service positions for maintenance equipment on a textile machine
EP0646669B1 (en) Device for the selective transfer of healds
DE3606612A1 (en) METHOD AND DEVICE FOR THE AUTONOMOUS REPLACEMENT OF OUTLET PRE-YARN SPOOLS ON A SPINNING MACHINE
EP3556917B1 (en) Transport device for a spinning unit
DE19620265B4 (en) Device for removing bobbins from a collecting station
DE3734820C2 (en)
EP0468198A1 (en) Twisting machine, in particular a two-for-one twisting machine
EP0869206A2 (en) Transport and storage system for spinning cans
EP0311069B1 (en) Transport system for roving bobbins between spinning machines
EP0825283B1 (en) Method for replacing spinning cans at a spinning machine
CH691490A5 (en) Transport and Umsetzanlage between at least one roving frame and a downstream storage or processing area.
DE19535435C2 (en) Cheese conveyor system
CH674857A5 (en)
DE4407099A1 (en) Automatic doffer for ring spinning machine
DE4312855A1 (en) Loading and unloading station for the loading and unloading of trolleys onto the attachment mandrels of which textile bobbins or textile-bobbin tubes are slipped
DE3728929A1 (en) Apparatus for the supply and removal of cans
EP1146153B1 (en) Transport and storage system for rectangular spinning cans

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): CH ES FR IT LI

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

17P Request for examination filed

Effective date: 20001018

AKX Designation fees paid

Free format text: CH ES FR IT LI

REG Reference to a national code

Ref country code: DE

Ref legal event code: 8566

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: LANGEN, MANFRED

RIN1 Information on inventor provided before grant (corrected)

Inventor name: LANGEN, MANFRED

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Designated state(s): CH ES FR IT LI

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20030312

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20030312

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: ROTTMANN, ZIMMERMANN + PARTNER AG

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20030930

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

EN Fr: translation not filed
26N No opposition filed

Effective date: 20031215

REG Reference to a national code

Ref country code: CH

Ref legal event code: PCAR

Free format text: SCHMAUDER & PARTNER AG PATENT- UND MARKENANWAELTE VSP;ZWAENGIWEG 7;8038 ZUERICH (CH)

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20090923

Year of fee payment: 12

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100930

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100930