EP0546864A1 - Entgasungssystem für Gebäude und ein Einrichtungsverfahren dazu - Google Patents

Entgasungssystem für Gebäude und ein Einrichtungsverfahren dazu Download PDF

Info

Publication number
EP0546864A1
EP0546864A1 EP92311362A EP92311362A EP0546864A1 EP 0546864 A1 EP0546864 A1 EP 0546864A1 EP 92311362 A EP92311362 A EP 92311362A EP 92311362 A EP92311362 A EP 92311362A EP 0546864 A1 EP0546864 A1 EP 0546864A1
Authority
EP
European Patent Office
Prior art keywords
chamber
building
annular wall
gas
cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP92311362A
Other languages
English (en)
French (fr)
Other versions
EP0546864B1 (de
Inventor
Philip Hancock
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP0546864A1 publication Critical patent/EP0546864A1/de
Application granted granted Critical
Publication of EP0546864B1 publication Critical patent/EP0546864B1/de
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/16Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate against adverse conditions, e.g. extreme climate, pests
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/008Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against entry of noxious gases, e.g. Radon

Definitions

  • the present invention relates to a suction-balance chamber particularly for location beneath the floor of a building to collect gases permeating from the underlying ground and for connection to a duct for venting the gases to the exterior of the building.
  • the invention is particularly concerned with the venting of radon-containing gases to the exterior of a building but is also applicable to the venting of other noxious gases, such as methane, from underlying strata.
  • chambers are usually built from brick, possibly with a cast-concrete floor and cover. Gaps are left between the bricks to allow gas to percolate into the chamber while a vent pipe leads from the chamber to the exterior or into the roof void to vent gas to the atmosphere.
  • the chamber vent duct and inlets are so-dimensioned as to create a suction-balanced system which enables gas to flow freely through the chamber, possibly assisted by a fan or impeller in the vent duct.
  • a problem with the current brick-built chambers is that they are expensive to construct not only in terms of the actual material and labour costs for the building work itself but also because it is necessary to allow time for the mortar to set before the cover and impermeable barrier layer can be laid on top. This can mean that half a day's labour is lost, with the work force idle and unable to continue their subsequent work.
  • a solution which has been proposed to this problem is to prefabricate the sump by moulding it from plastics materials. This reduces the installation time, and hence the installation costs, but the sump is itself expensive and also requires a separate, load-bearing cover to be placed over it during installation to prevent its deformation by overlying material, in use.
  • the object of the present invention is to provide a cheaper and more convenient chamber for such uses.
  • the present invention provides a prefabricated chamber for sinking in the ground beneath a building, comprising an annular wall having at least one aperture for connection to a vent duct and a plurality of gas-inlet apertures and a load bearing cover engaged with an open end of the annulus to close it.
  • the annular wall is intended to be sunk into the ground with its axis vertical and with the cover placed over it.
  • a base on which the annulus will seat is preferably also included.
  • the cover and base preferably comprise reinforced-concrete slabs of suitable thickness and of substantially the same peripheral dimensions as the external dimensions of the annular wall which is preferably also cast from concrete with suitable reinforcement. The slabs and annular wall may simply be rested one on top of another without any fixing means.
  • the annular wall may be of any sectional shape, such as circular, but conveniently is square. It may have only one aperture for connection to a vent pipe but, conveniently, has an aperture in each face so that, when placed in the ground in any one of four orientations, the face facing the vent pipe will present an aperture for connection thereto.
  • the apertures not used for the vent may then constitute inlet apertures for the chamber and may simply be left open or may be connected to ducts which extend beneath the floor of the building to collect gases from areas remote from the chamber itself.
  • the annular wall preferably has a plurality of smaller apertures in each face for allowing gases into the chamber in use.
  • the total cross-sectional area of the inlets is preferably at least nine times the cross-section of the vent outlet.
  • the annular wall is preferably formed so that it can be used with either open end uppermost.
  • vent apertures are preferably spaced from that edge of the annular wall which will rest on the base, in use, in order to prevent any water which may collect in the chamber, for example due to condensation or seepage, from collecting in the vent duct.
  • a hole is first dug in the ground beneath the building which is to be protected from radon or other gas seepage.
  • the concrete base is then simply placed in the bottom of the hole, the annular wall is placed on it, any pipework that it requires is laid and connected to the various apertures and the cover slab is placed on top.
  • the annulus may be of such a size and weight that it can be rested on the base without any need for attachment or location members although such members, for example in the form of projections on the base which engage in the corners of the square annulus, may be provided if desired.
  • the cover is preferably in the form of a simple square slab of concrete although locating means may be provided.
  • the hole may be back-filled around the chamber with clean rubble.
  • the chamber of the invention may be installed very quickly and easily. No mortar is required to hold the annulus and/or cover in place and, indeed, would be disadvantageous not only because of the setting time involved but also because the slight gaps which would normally exist between the slabs and the edges of the annular wall provide further entry points for gases into the chamber.
  • a further advantage in the use of concrete over plastics material is that the concrete itself may be permeable to gas, thus increasing the cross-sectional area open to the inflow of gas even further.
  • At least the annular wall is preferably manufactured from a lightweight concrete.
  • a concrete reinforced with silica fibres is found to be particularly convenient as it can be cast simply and quickly: galvanized steel reinforcements, which are also suitable, are more time-consuming to lay up.
  • the invention further comprehends a gas-venting system comprising: a suction-balance chamber as described above installed beneath the floor of a building; a vent duct connected at one end to a vent aperture in the annular wall of the chamber and opening at its other end to the exterior of the building or into the roof void, the vent duct optionally including a fan or impeller for drawing gas from the chamber and exhausting it through said other end; and a gas-impermeable membrane covering the chamber and extending beneath the floor of the building to prevent gas seepage from the underlying ground into the building.
  • the vent duct may be sectional, the joints preferably being sealed to prevent the escape of gas therefrom.
  • the system may further include one or more inlet ducts each connected at one end to an inlet aperture to the chamber and extending beneath the floor of the building to duct gas therefrom into the chamber.
  • a vent pipe which terminates in the roof void may rely on the pressure difference between the chamber and the roof of the building to ensure a flow of gases from the chamber up into the roof void from where they can escape to the atmosphere.
  • a fan or impeller is provided in the duct for drawing air from the chamber and expelling it into the roof void.
  • the invention further comprehends a kit comprising a suction-balance chamber and vent pipe, a gas-impermeable membrane and optional accessories as described above for use in the installation of the system described and a method of installing such a kit to protect a building from the percolation of gases from the underlying ground into the building.
  • a suction balance chamber is shown generally indicated 11.
  • the chamber 11 includes two square reinforced concrete slabs 12 and 13, each measuring 600mm along each side and being 40mm thick.
  • the slab 12 constitutes the base of the chamber whilst the slab 13 constitutes the cover.
  • the peripheral wall of the chamber is constituted by a pre-cast, square annulus 14 also having external dimensions of 600mm along each side 14a but having a wall thickness of 75mm.
  • the annulus 14 is 225mm high.
  • the annulus 14 has a central circular through-aperture 15 in each side 14a and a plurality of smaller apertures 16 grouped around each central aperture 15.
  • the apertures 16 are also circular, for convenience of manufacture, but could be of any shape and arranged in any convenient manner. What is important is the cross-sectional area of the apertures 15 and 16 which will be explained further below.
  • the chamber 11 is placed in a hole indicated 17 in the ground 18 beneath the floor of a building (not shown).
  • the hole 17 may be dug in the floor of an existing building or may be dug during the erection of a new building.
  • the chamber 11 is constructed simply by the placing of the base slab 12 on the flat bottom of the hole 17, the location of the annulus 14 on the base 12 and the subsequent placing of the cover 13 on the top of the annulus 14.
  • at least one of the central apertures 15 in the annulus is connected to a vent pipe indicated 20.
  • the connection is effected simply by the fitting of one end of the pipe 20 into the selected aperture 15, the pipe being a fairly close fit but there being no need to seal the pipe in the aperture.
  • From the chamber 11 the pipe 20 extends through a channel 21 in the ground 18 to a suitable point at which it can be connected at an elbow joint, not shown, to a vertical pipe which extends up into the roof void of the building.
  • the vent pipe may be formed in various sections which can be interconnected by sealed joints to form a required configuration to extend from the chamber to any selected outlet point, whether in the roof void or outside the building.
  • a fan also not shown, can be provided in the vent pipe to draw air through it from the chamber 11 and to exhaust it into the roof void or to the exterior of the building.
  • the other three larger apertures 15 in the sides 14a of the annulus 14 which are not connected to the vent pipe 20 may be left free or, as shown in Figure 2, may receive the ends of inlet pipes indicated 22.
  • These inlet pipes may extend only a short distance from the chamber 11 as shown in Figure 2 or extend in suitable channels for a considerable distance beneath the floor of the building.
  • the inlet pipes 22 may be of a porous material and/or may be perforated to allow any gas in the ground 18 beneath the building to seep into them and from there into the chamber 11. Gas will also seep into the chamber through the smaller apertures 16 in its walls.
  • the larger apertures 15 have a diameter of 100mm while the smaller apertures 16 have a diameter of 40mm, there being ten smaller apertures 16 in each side 14a of the annulus 14.
  • the cross-sectional area of the outlet aperture 15 connected to the vent pipe 20 is thus approximately 8,000sq mm while the total cross-sectional area of the three inlet apertures 15 plus the apertures 16 is approximately 74,000sq mm, with a ratio of the inlet cross-sectional area to the outlet cross-sectional area of approximately 9.4:1. This is greater than the minimum ratio of 9:1 which is required to create a suction balance and ensure a free flow of air into the chamber 11 through the various inlets and out through the vent pipe 20.
  • the gaps between the annular wall 14 and the base 12 and cover 13 provide a further inlet for gases while the concrete constituting the three members 12, 13, 14 of the chamber is also gas-permeable.
  • the preferred concrete for the annular wall 14 is a lightweight concrete reinforced with silica fibre.
  • An annulus 14 made from this concrete is sufficiently light to be handled by one person.
  • the slabs 12 and 13 may be made from the same concrete.
  • the slabs 12, 13 and/or for the wall 14 may be made from concrete reinforced with galvanised steel rods.
  • the area around the chamber 11 is back-filled with clean rubble indicated 23 and a gas-impervious membrane 24 of known type is laid over the chamber so as to cover the entire ground area within the building.
  • radon permeating up through the ground will seep through the inlet apertures 16 and through any inlet ducts connected to the apertures 15 into the chamber 11 from where it will be exhausted through the vent pipe 20 by means of the fan. This prevents a build-up of gas beneath the impervious membrane 24 which itself prevents the gas from leaking into the building.
  • a chamber of the size described above is suitable for protecting a building with a floor area of up to about 250sq m.
  • the chamber 11 would preferably be sunk in the centre of such a building and would operate over a radius of about 9m. If it were necessary to locate the chamber near one side or corner of the building, apertures in the sides 14a of the chamber facing out of the building could be blanked off: it might, in addition, be necessary to provide one or more additional chambers under other parts of the building.
  • chamber 11 may be altered at will to suit a particular use, but chambers of the following dimensions have been found suitable in practice: Thickness of cover and base slabs : 50mm Height of annular wall : 225mm External dimension of each side of cover, base and annular wall : 600mm, 407mm or 305mm.
  • apertured plugs are provided for insertion in any of the four central apertures 15 in the annulus 14 which are not connected to a vent pipe 20 or to an inlet pipe 22.
  • the plugs are a close fit in these apertures and themselves have apertures of substantially the same diameter as the apertures 16. The plugs prevent any smaller pieces of the backfill rubble 23 from entering the chamber 11, in use, while providing additional inlet apertures.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Toxicology (AREA)
  • Emergency Management (AREA)
  • Pest Control & Pesticides (AREA)
  • Health & Medical Sciences (AREA)
  • Business, Economics & Management (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Building Environments (AREA)
EP19920311362 1991-12-13 1992-12-14 Entgasungssystem für Gebäude und ein Einrichtungsverfahren dazu Expired - Lifetime EP0546864B1 (de)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB9126487 1991-12-13
GB919126487A GB9126487D0 (en) 1991-12-13 1991-12-13 Suction-balance chamber

Publications (2)

Publication Number Publication Date
EP0546864A1 true EP0546864A1 (de) 1993-06-16
EP0546864B1 EP0546864B1 (de) 1996-11-06

Family

ID=10706205

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19920311362 Expired - Lifetime EP0546864B1 (de) 1991-12-13 1992-12-14 Entgasungssystem für Gebäude und ein Einrichtungsverfahren dazu

Country Status (3)

Country Link
EP (1) EP0546864B1 (de)
DE (1) DE69215063D1 (de)
GB (1) GB9126487D0 (de)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4311810A1 (de) * 1993-04-05 1994-10-06 Horn Wolfgang Verfahren und Abdichtung zum Schutz von Bauwerken gegen Eindringen schädlicher Gase, insbesondere von Radon, aus dem Baugrund
FR2839185A1 (fr) * 2002-04-29 2003-10-31 Jean Pronost Dispositifs de traitement des gaz radioactifs ou nocifs dans les maisons, edifices...
KR101969703B1 (ko) * 2019-01-04 2019-08-20 김홍배 라돈가스의 차단 및 제거를 위한 건물 바닥 기초 시공 방법
KR20200062540A (ko) * 2018-11-27 2020-06-04 김홍배 라돈 저감용 바닥기초의 시공방법

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1989005890A1 (en) * 1987-12-18 1989-06-29 Eriksson Bengt E Apparatus for drawing off ground air
US4957394A (en) * 1989-08-30 1990-09-18 Radon Home Products, Inc. Method and apparatus for sub-floor collection and disposal of radon gas

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1989005890A1 (en) * 1987-12-18 1989-06-29 Eriksson Bengt E Apparatus for drawing off ground air
US4957394A (en) * 1989-08-30 1990-09-18 Radon Home Products, Inc. Method and apparatus for sub-floor collection and disposal of radon gas

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4311810A1 (de) * 1993-04-05 1994-10-06 Horn Wolfgang Verfahren und Abdichtung zum Schutz von Bauwerken gegen Eindringen schädlicher Gase, insbesondere von Radon, aus dem Baugrund
FR2839185A1 (fr) * 2002-04-29 2003-10-31 Jean Pronost Dispositifs de traitement des gaz radioactifs ou nocifs dans les maisons, edifices...
KR20200062540A (ko) * 2018-11-27 2020-06-04 김홍배 라돈 저감용 바닥기초의 시공방법
KR101969703B1 (ko) * 2019-01-04 2019-08-20 김홍배 라돈가스의 차단 및 제거를 위한 건물 바닥 기초 시공 방법
CN111411648A (zh) * 2019-01-04 2020-07-14 金洪培 用于阻挡及去除氡气的建筑地板基础施工方法

Also Published As

Publication number Publication date
DE69215063D1 (de) 1996-12-12
EP0546864B1 (de) 1996-11-06
GB9126487D0 (en) 1992-02-12

Similar Documents

Publication Publication Date Title
US5784838A (en) Drain for draining water from a basement floor
EP0183652B1 (de) Ziegelpaneel
CA1290579C (en) Method and apparatus for collecting and discharging radon gas and fluids
EP0803618A2 (de) Modulares Element zur Unterstützung und Lüftung von Decken
US4620398A (en) Arrangement in building structures incorporating a foundation mat, for creating a volume of air beneath the mat
US5474400A (en) Radon remediation in form-drain apparatus
KR101737193B1 (ko) 수직터널 구조물 및 그 시공방법
EP0546864B1 (de) Entgasungssystem für Gebäude und ein Einrichtungsverfahren dazu
CN113309353A (zh) 一种地下室顶板后浇带提前封闭结构及施工方法
US4074476A (en) Tubular dwelling construction
CA3117698A1 (en) Below-grade modular assembly
GB2262297A (en) Gas-venting apparatus,e.g. a radon sump, for a building and a method for its installation
GB2484588A (en) Vent through a membrane of a building
EP1455022A2 (de) Verfahren zur Herstellung einer Pfahlgründung
PT609146E (pt) Reservatorio enterrado de envolvente estanque para armazenagem por exemplo de um gas liquefeito e construcao desse tipo de reservatorios
WO2020149671A1 (ko) 독립형 공동주택 시공 방법
CN208280410U (zh) 用于厨卫间的预制混凝土整体地面楼板
CN219952560U (zh) 下沉式卫生间的装配式结构
IL101814A (en) Method to create prefabricated buildings and structures and modular units to perform the method
CN113482278B (zh) 一种卫生间防水装饰结构及其施工方法
KR102511993B1 (ko) 공동주택 배기구 시공용 가변형 거푸집
JPH0538877Y2 (de)
KR880002048B1 (ko) 원자로 건물 및 그 내부 구조체를 구성하기 위한 방법
CN201221089Y (zh) 预制钢筋砼组合式通讯手孔井
EP0228730A1 (de) Vorgefertigter Keller

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): DE FR GB NL

17P Request for examination filed

Effective date: 19931201

17Q First examination report despatched

Effective date: 19950214

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): DE FR GB NL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19961106

REF Corresponds to:

Ref document number: 69215063

Country of ref document: DE

Date of ref document: 19961212

ET Fr: translation filed
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Effective date: 19970206

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19970207

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 19970206

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20061220

Year of fee payment: 15

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20081020

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20071231