EP0426788A1 - Colonne de tubes de pression pour forage thermique en continu de puits profonds, procede et dispositif pour sa fabrication, son vidage et son demontage. - Google Patents

Colonne de tubes de pression pour forage thermique en continu de puits profonds, procede et dispositif pour sa fabrication, son vidage et son demontage.

Info

Publication number
EP0426788A1
EP0426788A1 EP90906112A EP90906112A EP0426788A1 EP 0426788 A1 EP0426788 A1 EP 0426788A1 EP 90906112 A EP90906112 A EP 90906112A EP 90906112 A EP90906112 A EP 90906112A EP 0426788 A1 EP0426788 A1 EP 0426788A1
Authority
EP
European Patent Office
Prior art keywords
pipe string
pressure pipe
drilling
pressure
supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP90906112A
Other languages
German (de)
English (en)
Other versions
EP0426788B1 (fr
Inventor
Werner Foppe
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Compisa AG
Original Assignee
Technologie Transfer Ets
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Technologie Transfer Ets filed Critical Technologie Transfer Ets
Publication of EP0426788A1 publication Critical patent/EP0426788A1/fr
Application granted granted Critical
Publication of EP0426788B1 publication Critical patent/EP0426788B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/20Flexible or articulated drilling pipes, e.g. flexible or articulated rods, pipes or cables
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/14Drilling by use of heat, e.g. flame drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/10Wear protectors; Centralising devices, e.g. stabilisers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/10Wear protectors; Centralising devices, e.g. stabilisers
    • E21B17/12Devices for placing or drawing out wear protectors
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/20Flexible or articulated drilling pipes, e.g. flexible or articulated rods, pipes or cables
    • E21B17/203Flexible or articulated drilling pipes, e.g. flexible or articulated rods, pipes or cables with plural fluid passages
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/20Flexible or articulated drilling pipes, e.g. flexible or articulated rods, pipes or cables
    • E21B17/206Flexible or articulated drilling pipes, e.g. flexible or articulated rods, pipes or cables with conductors, e.g. electrical, optical
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/22Handling reeled pipe or rod units, e.g. flexible drilling pipes
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F7/00Magnets
    • H01F7/06Electromagnets; Actuators including electromagnets
    • H01F7/08Electromagnets; Actuators including electromagnets with armatures
    • H01F7/16Rectilinearly-movable armatures
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F7/00Magnets
    • H01F7/06Electromagnets; Actuators including electromagnets
    • H01F7/08Electromagnets; Actuators including electromagnets with armatures
    • H01F7/16Rectilinearly-movable armatures
    • H01F7/1607Armatures entering the winding
    • H01F7/1615Armatures or stationary parts of magnetic circuit having permanent magnet
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01HELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
    • H01H51/00Electromagnetic relays
    • H01H51/22Polarised relays
    • H01H51/2209Polarised relays with rectilinearly movable armature
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F7/00Magnets
    • H01F7/06Electromagnets; Actuators including electromagnets
    • H01F7/08Electromagnets; Actuators including electromagnets with armatures
    • H01F7/121Guiding or setting position of armatures, e.g. retaining armatures in their end position
    • H01F7/122Guiding or setting position of armatures, e.g. retaining armatures in their end position by permanent magnets

Definitions

  • the present invention relates to a pressure pipe string for continuous fusion drilling for deep drilling.
  • the invention also relates to a method for producing this pressure train as well as for advancing it in the borehole and thereafter breaking it off.
  • the invention also relates to devices for performing the aforementioned methods.
  • Continuous screed drilling is understood to mean a drilling technique in which a temperature is generated in front of or at the drill head tip such that the rock is melted there and the rock melt due to the pressure exerted on the drill head into that due to thermostress resulting cracks (thermo-fraction) is pressed off in the side rock.
  • thermostress resulting cracks thermo-fraction
  • the drill head can continuously push in, melt and press rock.
  • fusion drilling techniques are for example described in the German patent DE 25 54 101 C2 and in the German patent application 37 01 676 AI.
  • the required temperatures are generated by high-pressure flame jets which stoichi etrically burn hydrogen and oxygen.
  • the method according to the German patent DE 25 54 101 C2 is designed for total compression of the drilling material resulting as a melt into the side rock.
  • German laid-open specification 37 01 676 AI is a profile melting drilling method, in which only the outer profile of a borehole is melted in a minimal cross section, which just offers space for the drilling device and its supply lines. The resulting melt from this area is largely pressed into the standing core of the borehole.
  • the core of the borehole is increased in volume and is sheared off in sections after passing through the inner cooling zone of the melting drilling rig and is conveyed upwards.
  • Both fusion drilling processes are designed as continuous processes, that is to say the drilling process takes place in one go up to the drilling target.
  • the lateral pressing of the melted drilling material creates a solid borehole casing which serves as a guide for the melting drilling machine and prevents side rocks from breaking into the borehole.
  • a continuous drilling process without interruption and "round trips" is possible by means of such a fusion drilling method even at depths of 10,000 m to 15 * 000 m because the service life of the pressure drilling head can be designed so that it has a service life that is Sufficient achievement of the drilling target.
  • methods are to be selected in which possible causes of failure are reduced to a minimum and devices are available several times, so that if one unit fails, the others can be used immediately.
  • a continuous, uninterrupted drilling process increases the drilling progress enormously and reduces the drilling costs.
  • a pressure pipe string for continuous melt drilling for deep drilling in the interior of which the supply, measuring and control lines for the drilling device are stored and which is characterized in that it includes at least two shell-shaped components, which each form a longitudinal segment of a tube, and that the longitudinal segments have means for assembly to form an externally smooth, dense, tensile and pressure-tight tube.
  • the object is also achieved by a method for producing, advancing and afterwards breaking off a pressure pipe string for continuous fusion drilling for deep drilling, in which the supply, measurement and control lines are fed continuously over the depth to be drilled and in which during the Drilling around the supply, measurement and control lines from several components a pressure and tensile, tight pressure pipe string is assembled in sections, which is then driven continuously.
  • a device for performing the above method which is characterized in that the supply, measurement and control lines are each wound on a supply carousel, which is a circular, rotatably mounted and motor-driven platform for receiving the windings, and that there is a multi-storey installation tower, in which, on its floors, means are arranged for section-wise assembly, for continuous propulsion and afterwards for breaking off the pressure pipe string.
  • FIG. 1 shows the three main components of the pressure
  • FIG. 1 Section during assembly; Figure 2 seen the assembled pressure pipe string from above; Figure 3 shows the interface of two pressure pipe sections;
  • FIG. 4 shows a section through an installation tower for assembling, driving forward and after breaking off the pressure pipe string
  • Figure 5 shows a supply carousel in perspective view with a segmental cut.
  • the lines for supplying the drill head with hydrogen, oxygen and cooling water and also for the control and measurement are endless, that is to say lines are used which are seamlessly produced over the entire depth to be drilled of up to approximately 15 km .
  • these pipes have to be pulled on site as transport is impossible.
  • the hydrogen and oxygen lines are endless tubes made of suitable tensile and bending-resistant steel alloys. These lines have to withstand a pressure of approx. 2 * 000 bar and have an outside diameter of the order of 20 mm.
  • the cooling water pipes are somewhat larger and have an outside diameter of approximately 50 mm. In order for the lines to withstand the high pressures, their wall thicknesses for these outside diameters are approximately 1/4 to 1/3 of the outside diameter.
  • Such cables can easily be bent elastically by a radius of around 20 meters. Even pipes with an even larger outside diameter are bent elastically by such a radius.
  • the invention now creates a pressure pipe string that allows such endless pipes continuously insert into the borehole.
  • the pressure pipe string receives and protects the continuous line system. In addition, it transmits the required pressure to the melt drilling rig or absorbs the tensile forces necessary to be able to pull the pressure pipe string out of the borehole again after the drilling target has been reached.
  • FIG. 1 shows a pressure pipe string during assembly. It consists of three components, namely an inner profile 1 with a central tube 2, which has profiles 3 on its outside, which give the entire inner profile 1 a cross-shaped cross section, and further consists of two congruent, shell-shaped components 4, each of which has a longitudinal segment Tube. On the inner sides of these longitudinal segments 4 there are lugs 5, 6, 7 projecting in the radial direction. The geometry of the three components 1, 4 is selected such that the lugs on the longitudinal segments 4 fit on the outer surfaces of the profiles 3. The components 1, 4 have joining surfaces which are hatched in FIG. 1 and which fit exactly onto one another during assembly. Before assembling the longitudinal segments 4, the inner profile 1 is mounted on the melting drilling machine or on the preceding pipe element of the pressure pipe string.
  • the uninterrupted lines 10, 11 are fastened in the free spaces 8 of the inner profile 1 by means of special insulating brackets 9, which then carry the lines 10, 11 by frictional adhesion.
  • the two longitudinal segments 4 are then assembled around the inner profile 1 and the lines 10, 11.
  • the assembly takes place Advantageously by means of temperature-resistant industrial adhesive with high shear and tensile strength, which are applied to the joining surfaces and hardened by heating. With each assembly of three such elements 1, 4, the pressure pipe string is extended by a further pipe section.
  • Figure 2 shows an assembled pressure pipe section from above.
  • the cross section shows a rosette-shaped geometry, which has four free spaces 12-15 on the inside and which gives the pressure pipe string optimum stability with the lowest weight.
  • the endless lines for hydrogen 10, oxygen 11 and cooling water 16 as well as for measurements 17 to be carried out and for the control 18 of the drill head are fastened by means of the insulating holders 9.
  • FIG. 3 shows an interface between two pressure pipe sections 30, 31. Each of these sections extends by approximately 20 meters. At their ends, the pressure pipe longitudinal segments each have an edge 3 __, 33 through which a flange is formed.
  • a two-part stabilizing ring 34, 35 is mounted behind each of these edges or flanges 32.33. Its two parts can be glued to one another and also to the pressure pipe and additionally screwed.
  • the stabilizing rings 34, 35 reinforce the pressure tube and enlarge the adhesive surface in the pressure tube attachment.
  • Two-part securing sleeves 36, 37 are also slipped over these stabilizing rings 34, 35 from the tube side and with the Stabilizing rings 34.35 glued. They can also be screwed together in the axial direction.
  • These sleeves 36, 37 pull the two pressure pipe sections 30, 31 together and additionally secure them for gluing.
  • a long pressure pipe string can absorb considerable tensile forces, so that it has come out of the borehole after drilling .
  • can be pulled up by the securing sleeves are gripped by the driver of a hydraulic pressure system.
  • the securing sleeves also take on an anti-slip function with respect to the borehole wall and protect the pressure pipe units from damage.
  • the dismantling of the pressure pipe string after reaching the drilling target with return is carried out in reverse order, in that the bonded joining surfaces are heated above the temperature resistance level of the industrial adhesive and so that the individual components of the pressure pipe can be dismantled.
  • the pressure pipe components are assembled in an installation tower above the borehole in stacked assembly halls to form a tight and pressure-stable, tight pressure pipe string, which is then used to guide the uninterrupted supply, measurement and control lines and to transmit pressure to the melt drilling rig.
  • Such an installation tower 40 is shown in a partial section in FIG. 4. It has four floors 41-44.
  • the endless lines 10, 11, 16 for hydrogen, oxygen and cooling water will be used later written supply carousel, then guided around a bending device 55 from rollers in a vertical direction upwards to the installation tower 40 and conveyed there vertically from above into the installation tower 40 via a driven deflection wheel 45.
  • the deflection wheel 45 is provided on its circumferential surface with rubber grooves in which the individual supply lines 10, 11, 16 are held by static friction.
  • the measuring and control lines are not shown here.
  • they can consist of telecommunication or fiber optic cables and can be unwound from a much smaller roll, which can be arranged directly on the roof of the installation tower 40, without these cables having to run over the deflection wheel 45.
  • the work processes for assembling the pressure pipe string 48 by means of processor-controlled automatic assembly machines 50, 51 take place with continuous drilling progress, in that they are tracked by the pressure pipe string 48, which is moving steadily downward.
  • the inner profile 1 of the pressure pipe string 48 is mounted on the top floor 44.
  • Such internal profiles 1 are stored in sufficient numbers on this floor and are fed to the automatic assembly machines 50 by a conveyor system (not shown).
  • the automatic assembly machines 50 grip the inner profile 1, for example by means of electromagnetic shoes 38 or grippers, and place it on that of the previously assembled pressure pipe section. Then they mount the insulating holders 9 in order to firmly attach the endless supply lines 10, 11 and 16 and the cables (not shown) for the measurements and the control of the drill head to the inner profile 1. to build. As soon as all the lines and cables have been mounted on the inner profile 1, the machines 50 each take a shell-shaped pipe segment 4, which is also fed by a corresponding bearing, and fit these two pipe segments 4 together and press them together. While the tube assembled in this way travels down from the fourth floor 44 to the third floor 43, the adhesive is thermally hardened by heating the joining strips by heating means, which can either be installed in the pressure tube segments themselves or are arranged externally.
  • a hydraulic molding press can also be used for this purpose, which hot presses the elements as the drilling progresses.
  • further assembly machines 51 On the third floor 43, further assembly machines 51 first mount the two-part stabilizing rings 34, 35 in the flange area of the interfaces of the pressure pipe string, as has already been described. The securing sleeves 36, 37 are then installed.
  • the automats 51 which are equipped, for example, with electromagnetic shoes 39, control the elements to be assembled in a processor-controlled manner in accordance with the drilling step of the pressure pipe string 48 and press them against the outside of the pressure pipe during the time required for the adhesive to harden .
  • the hydraulic pressure and lifting device is arranged, which consists of two multi-cylinder hydraulic systems 46, 47, which can transmit the high pressures required for the melt drilling process via the pressure pipe string 48 to the melt drilling machine, or that each by borehole depth and borehole diameter more or less large weight of the Druckrohr ⁇ strand 48 are able to lift.
  • Each hydraulic system includes grippers 49, by means of which the pressure pipe string 48 for pressing down above a securing collar 36, 37 can be encompassed.
  • the grippers 49 each enclose the pressure pipe string 48 below a securing sleeve 36, 37.
  • the grippers 49 can be actuated by means of hydraulic piston-cylinder units 52.
  • the force for pushing and pulling up the pressure pipe string 48 is generated by means of a plurality of multi-cylinder hydraulic piston-cylinder units 53. In the event of a cylinder failure, the remaining cylinders are able to continue drilling.
  • the pistons act on a continuous pressure beam 54, which lowers on the gripper 49 over the respective stroke.
  • the entire pressure and lifting device is designed on two levels, so that alternately one pressure system 46, 47 can be active. In FIG. 4, the pressure system 47 is currently in the process of pushing the pressure pipe string 48 downwards with its closed gripper 49, while the other 46 is moving up again with its open gripper 49 in order to then be ready for the next push cycle .
  • the process of vacuum stabilization serves as an additional reinforcement, with the upper opening space being sealed airtight and pressure-tight after installation of a new pressure pipe element, and the interior being evacuated via valves in the side wall.
  • the cooling water pumped through line 16 is passed under high pressure through the parts of the drill head to be cooled, so that it always remains in the liquid phase and can thus absorb and dissipate a maximum amount of heat. After the area to be cooled has passed and the optimum heat absorption has been reached, the cooling water outlet valves open on the top of the drill head, at the end of its cooling zone, directly into the borehole clearance, that is, between the borehole wall and the pressure pipe string.
  • the cooling water pressure must be significantly above the pressure of the water column building up in the borehole from the cooling water being released, so that the released energy of the overheated cooling water can still be used for motor forces.
  • steam pressure operated, self-advancing side pressure transmitters are installed for controlling and correcting the course of the melting drilling device, which are laser and glass fiber controlled via a gravitational pendulum.
  • the steam pressure is supplied via steam units, which are arranged in the melting drilling rig.
  • FIG. 5 shows a supply carousel 60 from which the supply lines can be unwound according to the "tube-coil system", that is to say the supply lines are deposited on such a supply carousel that can be unwound in each case over their entire length without break-prone connecting points , which also houses the required pressure, refrigeration or energy units, as well as storage tanks 61.
  • a supply carousel 60 consists of a rigid, circular platform 62, which runs in the outer and middle area on a circular track 63 and is driven, for example, by means of a gear drive via a plurality of synchronously running electric motors in a precisely controllable manner.
  • the supply carousel 60 is surrounded by a supply line 64 for tanker vehicles 65, so that it is possible to refuel its storage containers 61 while the carousel 60 is rotating.
  • the inner line end is connected to the storage container 61 via a pump station, so that the line 10 is continuously and at a constant pressure supplied with the liquid oxygen, hydrogen or the cooling water.
  • the supply line 10 is rolled up in a depot in several layers of several hundred windings, as in a huge, high-level open shelf.
  • the individual layers are secured on the outer edge of the platform 62 of the carousel 60 by hydraulically adjustable layer holders 66, which each release only the uppermost layer for processing.
  • layer holders 66 isolate the layer windings from the outside and are retracted layer by layer during the unwinding by means of hydraulic cylinder / piston units 67, so that the "endless" supply line is led out cleanly and in an orderly manner.
  • the windings of line 10 are covered by a well-insulating, tight cover 69, which also ensures that no water penetrates between the windings.
  • the uninterrupted line 10 is led via a hydraulically alignable conveying device 68 with rollers in a large arc to the bending device 55 on the installation tower.
  • the minimum bending radii should be chosen so that they remain within the elasticity limits of the pipes used, thus avoiding kink damage to the feed lines.
  • There is a separate carousel for each supply line so that there are no coordination problems due to the different unwinding speeds with different line diameters. Settlement by the individual. Carousels are synchronized by the drive motors of the carousels controlled by controllers, so that all lines of the entire supply line are always promoted at constant speed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Electromagnetism (AREA)
  • Power Engineering (AREA)
  • Earth Drilling (AREA)
  • Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Punching Or Piercing (AREA)
  • Manufacture Of Motors, Generators (AREA)
  • Golf Clubs (AREA)
  • Electrochromic Elements, Electrophoresis, Or Variable Reflection Or Absorption Elements (AREA)
  • Reciprocating, Oscillating Or Vibrating Motors (AREA)
  • Tents Or Canopies (AREA)
  • Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)
  • Paper (AREA)

Abstract

Les canalisations d'alimentation (10, 11, 16), les canalisations de mesure et les canalisations de commande des équipements de forage sont logées à l'intérieur de la colonne de tubes de pression (48) en vue du forage thermique en continu de puits profonds. La colonne de tubes renferme au moins deux composants (4) en forme de coquille dont chacun forme un segment longitudinal (4) d'un tube, ainsi que des moyens pour assembler un tube étanche extérieurement lisse qui résiste aux efforts de tension et de compression. Dans le procédé pour fabriquer, guider et ensuite démonter une colonne de tubes de pression en vue du forage thermique en continu de puits profonds, les canalisations d'alimentation (10, 11, 16), de mesure et de commande sont passées en continu le long de la profondeur à forer. A cet effet, pendant le guidage du forage, plusieurs composants (1, 4) sont assemblés en tronçons autour des canalisations d'alimentation (10, 11, 12), de mesure et de commande afin de former une colonne hermétique de tubes de pression (48), résistante aux efforts de tension et de compression et qui est ensuite guidée en continu. Le dispositif permettant la mise en oeuvre de ce procédé comprend un carrousel d'alimentation (60) pour chaque canalisation d'alimentation (10, 11, 16), sur lequel est enroulée cette dernière. Ledit carrousel (60) comporte une plateforme (62) circulaire montée rotative et motorisée pour maintenir les enroulements. En outre, le dispositif comprend une tour d'installation (40) à plusieurs étages (41 - 44) dans lesquels sont répartis des moyens (50, 51; 46, 47) permettant le montage par tronçons, le guidage en continu et le démontage ultérieur de la colonne de tubes de pression (48).
EP90906112A 1989-05-03 1990-05-03 Colonne de tubes de pression pour forage thermique en continu de puits profonds, procede et dispositif pour sa fabrication, son vidage et son demontage Expired - Lifetime EP0426788B1 (fr)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE3914617A DE3914617A1 (de) 1989-05-03 1989-05-03 Vorrichtungen und verfahren zur gewaehrleistung kontinuierlich ablaufender schmelzbohrprozesse fuer tiefbohrungen
DE3914617 1989-05-03
PCT/CH1990/000123 WO1990013729A1 (fr) 1989-05-03 1990-05-03 Colonne de tubes de pression pour forage thermique en continu de puits profonds, procede et dispositif pour sa fabrication, son vidage et son demontage

Publications (2)

Publication Number Publication Date
EP0426788A1 true EP0426788A1 (fr) 1991-05-15
EP0426788B1 EP0426788B1 (fr) 1996-06-26

Family

ID=6380012

Family Applications (1)

Application Number Title Priority Date Filing Date
EP90906112A Expired - Lifetime EP0426788B1 (fr) 1989-05-03 1990-05-03 Colonne de tubes de pression pour forage thermique en continu de puits profonds, procede et dispositif pour sa fabrication, son vidage et son demontage

Country Status (12)

Country Link
US (1) US5148874A (fr)
EP (1) EP0426788B1 (fr)
JP (1) JPH04502044A (fr)
KR (1) KR910005457B1 (fr)
AT (1) ATE139822T1 (fr)
AU (1) AU648504B2 (fr)
BR (1) BR9006753A (fr)
CA (1) CA2033068A1 (fr)
DE (2) DE3914617A1 (fr)
FI (1) FI95617C (fr)
HU (1) HU205787B (fr)
WO (1) WO1990013729A1 (fr)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5168940A (en) * 1987-01-22 1992-12-08 Technologie Transfer Est. Profile melting-drill process and device
US6870128B2 (en) 2002-06-10 2005-03-22 Japan Drilling Co., Ltd. Laser boring method and system
DE102006013836A1 (de) * 2006-03-24 2007-09-27 Werner Foppe Verfahren und Vorrichtung zur sicheren Betreibung von Kernkraftwerken durch sichere Endlagerung hochradioaktiver, wärmeproduzierender Abfälle mittels Selbstversenkung im Erdmantel Vorort
DE102008049943A1 (de) * 2008-10-02 2010-04-08 Werner Foppe Verfahren und Vorrichtung zum Schmelzbohren
KR101437133B1 (ko) * 2010-06-25 2014-09-02 현대중공업 주식회사 전자접촉기용 영구자석형 조작기
WO2012060711A1 (fr) * 2010-11-04 2012-05-10 Georigg As Dispositif de forage destiné à être utilisé spécialement pendant un forage directionnel pour la récupération d'énergie géothermique
SK500062013A3 (sk) 2013-03-05 2014-10-03 Ga Drilling, A. S. Generovanie elektrického oblúka, ktorý priamo plošne tepelne a mechanicky pôsobí na materiál a zariadenie na generovanie elektrického oblúka
CN107313749A (zh) * 2017-07-12 2017-11-03 张发旺 3d打印离子体智能莫霍井钻井完井方法

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB733628A (en) * 1952-05-22 1955-07-13 Nat Res Dev Improvements in or relating to articulated rods
US3193918A (en) * 1962-01-08 1965-07-13 Russell C Heldenbrand Method of fabricating drill pipe
US3467206A (en) * 1967-07-07 1969-09-16 Gulf Research Development Co Plasma drilling
US3476194A (en) * 1968-04-29 1969-11-04 Browning Eng Corp Flame jet drilling
US3690136A (en) * 1970-10-27 1972-09-12 Bowen Tools Inc Well tubing guide and straightener apparatus
US3791697A (en) * 1971-05-12 1974-02-12 Z Hokao Method and apparatus for flame jet cutting
FR2151467A5 (fr) * 1971-08-27 1973-04-20 Inst Francais Du Petrole
US3841407A (en) * 1973-01-02 1974-10-15 J Bozeman Coil tubing unit
DE2554101C2 (de) * 1975-12-02 1986-01-23 Werner 5130 Geilenkirchen Foppe Schmelzbohrgerät
US4099584A (en) * 1976-06-10 1978-07-11 Pei, Inc. Flame jet tool for drilling to great depths
GB1597952A (en) * 1976-12-20 1981-09-16 Sabol K Method of boring lateral channels through a subsurface carbonaceous deposit
US4193461A (en) * 1978-02-13 1980-03-18 Intrusion-Prepakt, Inc. Means and method for forming and enlarging holes in soil
US4523644A (en) * 1978-08-14 1985-06-18 Dismukes Newton B Thermal oil recovery method
FR2483509A1 (fr) * 1980-05-28 1981-12-04 Remlinger Francois Flexible pour le forage thermique de galeries dans des veines de charbon
US4585066A (en) * 1984-11-30 1986-04-29 Shell Oil Company Well treating process for installing a cable bundle containing strands of changing diameter
DE3701676A1 (de) * 1987-01-22 1988-08-04 Werner Foppe Profil-schmelzbohr-verfahren
SE456431B (sv) * 1987-02-06 1988-10-03 Bo Andreasson Palningsmetod

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO9013729A1 *

Also Published As

Publication number Publication date
HU903468D0 (en) 1991-12-30
ATE139822T1 (de) 1996-07-15
FI95617B (fi) 1995-11-15
US5148874A (en) 1992-09-22
FI95617C (fi) 1996-02-26
CA2033068A1 (fr) 1990-11-04
KR920701605A (ko) 1992-08-12
FI906397A0 (fi) 1990-12-27
EP0426788B1 (fr) 1996-06-26
HU205787B (en) 1992-06-29
DE59010390D1 (de) 1996-08-01
KR910005457B1 (en) 1991-07-29
AU648504B2 (en) 1994-04-28
BR9006753A (pt) 1991-08-06
AU5442390A (en) 1990-11-29
HUT58119A (en) 1992-01-28
DE3914617A1 (de) 1990-11-08
JPH04502044A (ja) 1992-04-09
WO1990013729A1 (fr) 1990-11-15

Similar Documents

Publication Publication Date Title
DE3750972T2 (de) Bohreinrichtung.
EP2013438B1 (fr) Procédé et dispositifs de pose sans tranchéde conduites
DE2552095C2 (de) Vorrichtung und Verfahren zum Einlassen und Aufholen von Rohren in Bohrlöcher bzw. aus Bohrlöchern
DE102005021216A1 (de) Verfahren und Vorrichtungen zur grabenlosen Verlegung von Rohrleitungen
WO2005073495A1 (fr) Dispositif permettant de forer des trous profonds dans des structures geologiques
DE102012203342A1 (de) Vor-ort-herstellung einer verbundpipeline
EP0426788B1 (fr) Colonne de tubes de pression pour forage thermique en continu de puits profonds, procede et dispositif pour sa fabrication, son vidage et son demontage
DE2211247B2 (de) Verfahren zum installieren einer oberleitung fuer schienenbahnen und vorrichtung zur durchfuehrung des verfahrens
DE202012004882U1 (de) Rohrführungseinrichtung, Rohrschieber und Rollenbock
EP3933241A1 (fr) Procédé de pose de conduites
DE8913689U1 (de) Rohrbildungsgerät
WO2009095046A1 (fr) Procédé de pose, sans tranchée, de conduites
DE3590520C2 (fr)
EP2047064B1 (fr) Dispositif de pose d'une garniture dans le tunnel
DE102012012139B4 (de) Vorrichtung und Verfahren zum Biegen von Rohrleitungen für Pipelines
EP0735303A1 (fr) Procédé de pose de canalisations enterrées entre des regards d'égout
DE3729560A1 (de) Verfahren und vorrichtung zur herstellung einer rohrleitung in einer im erdreich ausgebildeten durchbohrung
EP3431702B1 (fr) Procédé et dispositif de pose sans tranchée d'un câble ou d'un tuyau dans un sol
DE19619532C2 (de) Verfahren zur Herstellung einer begehbarer Tunnelverbindung zwischen zwei benachbarten, verbohrten Schachtbohrungen und Vorrichtung zur Durchführung des Verfahrens
DE19929893C2 (de) Verfahren zum grabenlosen Verlegen von Rohrleitungen und Kabeln
WO2006063562A1 (fr) Ensemble pompe pour extraire un liquide d'un puits de forage
DE3538014A1 (de) Verfahren zum aufbringen eines korrosionsschutzes auf paralleldrahtbuendel
AT505667B1 (de) Vorrichtung und verfahren zum einziehen von rohren in bestehende altrohre
EP4013949A1 (fr) Installation de forage souterraine et son procédé de mise en place
DE1552131A1 (de) Maschine zur Herstellung von Drahtarmierungskaefigen

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB IT LI LU NL SE

17P Request for examination filed

Effective date: 19910502

17Q First examination report despatched

Effective date: 19921221

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: COMPISA AG

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE DK ES FR GB IT LI LU NL SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT

Effective date: 19960626

Ref country code: DK

Effective date: 19960626

Ref country code: ES

Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY

Effective date: 19960626

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19960626

REF Corresponds to:

Ref document number: 139822

Country of ref document: AT

Date of ref document: 19960715

Kind code of ref document: T

REF Corresponds to:

Ref document number: 59010390

Country of ref document: DE

Date of ref document: 19960801

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Effective date: 19960926

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: FELBER & PARTNER AG PATENTANWAELTE

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 19960926

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
ET Fr: translation filed

Free format text: CORRECTIONS

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19970531

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19980428

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 19980429

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 19980512

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 19980514

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 19980602

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19980609

Year of fee payment: 9

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990503

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990503

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990531

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990531

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990531

BERE Be: lapsed

Owner name: COMPISA A.G.

Effective date: 19990531

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 19990503

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20000131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20000301

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST