EP0385828A1 - Arrangement for maintaining a track for rail laying portal cranes, and method for laying a track by means of said arrangement - Google Patents

Arrangement for maintaining a track for rail laying portal cranes, and method for laying a track by means of said arrangement Download PDF

Info

Publication number
EP0385828A1
EP0385828A1 EP90400443A EP90400443A EP0385828A1 EP 0385828 A1 EP0385828 A1 EP 0385828A1 EP 90400443 A EP90400443 A EP 90400443A EP 90400443 A EP90400443 A EP 90400443A EP 0385828 A1 EP0385828 A1 EP 0385828A1
Authority
EP
European Patent Office
Prior art keywords
gantries
elements
raceway
track
handling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP90400443A
Other languages
German (de)
French (fr)
Inventor
Loîc Perron
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TRAVAUX DU SUD-OUEST
Original Assignee
TRAVAUX DU SUD-OUEST
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TRAVAUX DU SUD-OUEST filed Critical TRAVAUX DU SUD-OUEST
Publication of EP0385828A1 publication Critical patent/EP0385828A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/05Transporting, laying, removing, or renewing both rails and sleepers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B23/00Easily dismountable or movable tracks, e.g. temporary railways; Details specially adapted therefor
    • E01B23/02Tracks for light railways, e.g. for field, colliery, or mine use
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/16Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
    • E01B29/17Lengths of rails assembled into strings, e.g. welded together

Definitions

  • the present invention relates generally to the laying of railways.
  • gantry cranes wider than the width are used of the way. These gantry cranes are such that they can overlap wagons in order to load or unload them into track elements (sleepers, rails or even pre-constituted track sections, the rails being assembled on the sleepers).
  • the gantry cranes are self-propelled machines, some are provided with wheels with tires in order to roll on the laying platform but those most commonly used are provided with rolling means in the form of a roller and a raceway must be intended for them.
  • the raceway of said gantries is very often formed by long welded rails intended for the track that we are going to set up.
  • This method has many drawbacks.
  • the gantries are generally in the form of an inverted U positioned transversely to the raceway in order to rest by rollers located at the lower ends of the branches of the U on said raceway.
  • the two branches of the U are elements of fairly large dimensions since they are constituted by jacks ensuring the variation in height of the gantry.
  • An engine control station allowing the gantry to move is also provided on one of the two branches of the U.
  • the width available inside the gantry is less than the spacing of the raceway thereof. It is then difficult to carry the profiles from the upper crossbar thereof and to place them at the necessary spacing for the raceway.
  • the present invention tends to solve this problem by proposing an arrangement for handling a raceway for gantries for laying railway tracks from said gantries, said raceway being formed from profiles, characterized in that that it comprises a beam for handling said profiles to the load-bearing elements to which are fixed hoist guide rails and elements formed by similar rail elements to the rails, movable between a rest position for which the ends of the handling beam have a width (l) less than the space available inside the gantry cranes and a working position for which said portions are arranged in the extension of said rails, the handling beam then having, at its ends, a width (L) greater than (l), (L) being the spacing necessary for the raceway of the gantries.
  • the profiles are, quite interestingly, made from sheet piles which, by the width of their flat bottom, to lay them on even unprepared ground.
  • the present invention also relates to the method of laying such a raceway as well as a method of laying a railway track implementing such a raceway.
  • gantry 1 which is, in a manner known per se, in the general form of an inverted U. It rests by rollers 12 provided at the lower ends of the vertical branches 11 of the U on a raceway not shown.
  • One of the branches 11 carries a control station 15 for the hydraulic motor M of the gantry 1 as well as for the control of the jacks 13 and other equipment that it carries.
  • two gantries 1 are paired as seen for example in Figures 7, 8 and 9.
  • the gantries 1 can carry equipment thanks to the attachment means 16.
  • each gantry crane 1 is equipped with removable cross-pieces 17 making it possible to constitute temporary storage areas 18 whose usefulness will be explained below.
  • a handling beam 2 visible in FIGS. 2 and 3, is attached to the hooking means 16.
  • the gantries 1 are used in pairs, this is why the beam 2 has loops 26 for its attachment to the hooking means 16 in two distinct zones preferably situated symmetrically with respect to its medium.
  • said handling beam 2 comprises two load-bearing elements 23 held in relation to each other by cross-pieces 24.
  • the beam 2 is thus generally rectangular and its width is less than the space available between the vertical branches 11 of the gantries which carry it.
  • said portions 25 are formed by rail elements similar to rails 21. These elements 25 are mounted movably on the carrier elements 23 by supports 27 of generally triangular shape. Each element 25 being carried by two supports 27.
  • the supports 27 are carried by the carrier elements 23, along one of their sides, around a vertical axis 28, they can thus pivot around their axes 28 between a position for which they are against the carrier element 23 as on the right of FIG. 3 and a position for which they are perpendicular to the support element 23 as on the left of FIG. 3.
  • the supports 27 carry, by the apex opposite to the side by which they are mounted on the carrier element 23, the elements 25 by portions of vertical axes 29.
  • the carrier element 23, the supports 27 and the element 25 thus form deformable parallelograms.
  • the element 25 has a very flat S-shape in order to ensure a connection without sharp angles between the portions of rails located at different distances.
  • the hoists 22 can carry elements and position them at a distance (L) from one another when they arrive at the end of the beam 2 in the working position while when the beam 2 has its ends in the rest position it can be overlapped by the gantries 1 so as to be taken up by the attachment means 16.
  • Figures 4 and 5 show the profiles intended to form the raceway of the gantries 1.
  • sheet piles such as those used in construction are used for the manufacture of these profiles to create earth retaining walls.
  • sheet piles are interesting for creating a raceway according to the invention because they have, in section, the shape of a bowl with a wide flat bottom 31 and low vertical edges 32.
  • the presence of the wide flat bottom 31 ensures good stability of said sheet pile when it rests on the ground by said bottom and this even on unprepared soils.
  • the sheet piles 3 are rectangular, their length being much greater than their width.
  • the flanges 32 are connected to the bottom 31 by an oblique wall 33 and have their upper end folded back into the butt 34 in order to give good rigidity to the sheet pile 3.
  • an inverted U-shaped section is welded axially in order to form an axial groove 35 of dimensions such that the rollers 12 of the gantry cranes 1 can collaborate by their circumferential groove 19 with it.
  • the sheet pile 3 has four bridges 37 intended for hooking it to a lifting beam for handling.
  • the rib 35 carries an end piece 38 intended to fit into the end of the rib bearing no end piece of the neighboring sheet pile 3 to ensure proper positioning of the sheet piles 3 by compared to others when they form the gantry track 1.
  • the lifter 4 has a ring 41 by which it can be hung on the hoist 22 of the beam 2. Its parallelepiped body 42 ends in two faces 43 which are perpendicular to it and which carry pins 44, all directed in the same direction, intended to engage under the bridges 37 of the sheet pile 3.
  • Stop means 45 are provided in order to prevent any movement of the studs 44 relative to the bridges 37 when the lifter 4 transports a sheet pile 3.
  • FIGS. 7 to 9 will show an example of the use of a handling arrangement as described above.
  • An arrow F indicates the direction of progress of the site.
  • the handling beam 2 is deposited at the front end of said raceway.
  • the elements 25 of its end facing the raceway are brought back to the rest position so that the gantries 1 can overlap it in order to go to the rear end of the raceway.
  • the cross members 17 are dismantled in order to free the internal space of said gantries.
  • the gantries 1 circulate in order to unload the track elements 5 carried by wagons 8. We see that for this purpose said gantries overlap the wagons 8 and their loading, and, this is why the cross members 17 have been dismantled.
  • the track elements 5 are positioned inside the raceway and then spliced.
  • the gantries 1 When the new track has been laid over a length substantially equal to the raceway, the gantries 1 are brought above the beam 2 which is then taken up. The cross members 17 are reassembled and the gantries go to the other end of the raceway in order to ensure removal, FIG. 9.
  • the sheet piles 3 are lifted by the lifting beams 4 and stacked in the storage volumes 18. Once the raceway removed, it is again placed as in FIG. 7 at the front of the new path.
  • the beam 2 and the sleepers would be placed on a train wagon located at the front, or on the wagon intended for the routing of gantries.
  • the gantry cranes would then shuttle between the empty train at the front which they would load with deposited track elements and the train at the rear in order to unload the new track elements.
  • the new track can also be formed in a known manner by sleepers, for example concrete, on which are deposited long rails welded directly in place, for example by pulling them through gantries.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

Arrangement for the handling of a runway for track-laying portal cranes from said portal cranes, the said runway being formed of sections. It comprises a girder (2) for handling said sections, whose carrier elements (23) have fixed to them rails (21) for guiding lifting gear, and elements (25) formed by rail elements similar to the rails (21), which are movable between a rest position for which the ends of the handling girder (2) have a width (l) which is less than the available space inside the portal cranes, and a working position for which the said portal cranes are arranged in the extension of the said rails (21), the handling girder (2) then having, at its ends, a width (L) greater than (l), (L) being the necessary spacing for the runway of the portal cranes. <IMAGE>

Description

La présente invention concerne d'une manière générale la pose de voies ferrées.The present invention relates generally to the laying of railways.

De manière habituelle, lors de la pose de voies ferrées, que ce soit la pose d'une voie nouvelle ou la pose d'une voie neuve en remplacement d'une voie usagée, on utilise des portiques d'empattement plus large que la largeur de la voie. Ces portiques sont tels qu'ils peuvent chevaucher des wagons afin de les charger ou de les décharger en éléments de voie (traverses, rails ou même de tronçons de voie préconstitués, les rails étant assemblés sur les traverses).Usually, when laying rail tracks, whether laying a new track or laying a new track to replace a worn track, gantry cranes wider than the width are used of the way. These gantry cranes are such that they can overlap wagons in order to load or unload them into track elements (sleepers, rails or even pre-constituted track sections, the rails being assembled on the sleepers).

Les portiques sont des engins automoteurs, certains sont pourvus de roues avec pneumatiques afin de rouler sur la plate-forme de pose mais ceux le plus couramment utilisés sont pourvus de moyens de roulement ayant la forme d'un galet et un chemin de roulement doit être prévu à leur intention.The gantry cranes are self-propelled machines, some are provided with wheels with tires in order to roll on the laying platform but those most commonly used are provided with rolling means in the form of a roller and a raceway must be intended for them.

Le chemin de roulement desdits portiques est très souvent formé par les longs rails soudés destinés à la voie que l'on va mettre en place.The raceway of said gantries is very often formed by long welded rails intended for the track that we are going to set up.

Lorsque l'on utilise ainsi les longs rails comme chemin de roulement pour les portiques, il est nécessaire de positionner lesdits rails à l'écartement requis pour le passage des portiques puis, à l'aide d'une substitueuse, de les reprendre afin de les positionner sur les traverses.When the long rails are thus used as a raceway for the gantry cranes, it is necessary to position the said rails at the spacing required for the passage of the gantry cranes and then, using a substitute machine, to take them back in order to position them on the sleepers.

Cette méthode présente de nombreux inconvénients.This method has many drawbacks.

D'une part cela oblige à des manipulations multiples desdits longs rails, mais de plus il faut quelque fois prévoir de caler lesdits rails si la plate-forme de pose n'est pas parfaitement réglée ou encore si elle menace de s'affaisser.On the one hand this requires multiple manipulations of said long rails, but moreover it is sometimes necessary to provide for wedging said rails if the laying platform is not perfectly adjusted or if it threatens to sag.

D'autre part, la pose des longs rails sur la plate-forme nécessite l'existence d'une voie pour la circulation du train de pose ; une voie provisoire doit donc être mise en place lors de la pose d'une voie nouvelle.On the other hand, the laying of long rails on the platform requires the existence of a way for the running of the laying train; a provisional track must therefore be put in place when laying a new track.

Un autre inconvénient de cette méthode est qu'elle ne peut bien entendu pas être mise en oeuvre lorsque la voie à mettre en place ne comporte pas de longs rails soudés.Another drawback of this method is that it cannot of course be implemented when the track to be installed does not have long welded rails.

Il a déjà été proposé une méthode suivant laquelle les portiques roulent sur un chemin de roulement constitué par des profilés mis en place et déposés par les portiques eux-mêmes mais celle-ci est peu utilisée car la pose des profilés à l'écartement désiré pour le chemin de roulement pose un problème encore mal résolu.A method has already been proposed according to which the gantries roll on a raceway constituted by profiles put in place and deposited by the gantries themselves, but this is little used because the installation of the profiles at the desired spacing for the raceway poses a problem that is still poorly resolved.

En effet, les portiques se présentent globalement sous la forme d'un U renversé positionné transversalement au chemin de roulement afin de reposer par des galets situés aux extrémités inférieures des branches du U sur ledit chemin de roulement. Les deux branches du U sont des éléments d'assez grandes dimensions puisqu'ils sont constitués par des vérins assurant la variation en hauteur du portique. Un poste de commande du moteur permettant le déplacement du portique est également prévu sur une des deux branches du U.Indeed, the gantries are generally in the form of an inverted U positioned transversely to the raceway in order to rest by rollers located at the lower ends of the branches of the U on said raceway. The two branches of the U are elements of fairly large dimensions since they are constituted by jacks ensuring the variation in height of the gantry. An engine control station allowing the gantry to move is also provided on one of the two branches of the U.

On comprend alors que la largeur disponible à l'intérieur du portique est inférieure à l'écartement du chemin de roulement de celui-ci. Il est alors mal aisé de porter les profilés à partir de la barre transversale supérieure de celui-ci et de les poser à l'écartement nécessaire pour le chemin de roulement.It is then understood that the width available inside the gantry is less than the spacing of the raceway thereof. It is then difficult to carry the profiles from the upper crossbar thereof and to place them at the necessary spacing for the raceway.

C'est pourquoi, la présente invention tend à résoudre ce problème en proposant un agencement pour la manutention d'un chemin de roulement pour portiques de pose de voie ferrée à partir desdits portiques, ledit chemin de roulement étant formé de profilés, caractérisé en ce qu'il comporte une poutre de manutention desdits profilés aux éléments porteurs de laquelle sont fixés des rails de guidage de palans et des éléments formés par des éléments de rail semblables aux rails , mobiles entre une position de repos pour laquelle les extrémités de la poutre de manutention ont une largeur (l) inférieure à l'espace disponible à l'intérieur des portiques et une position de travail pour laquelle lesdites portions sont disposées dans le prolongement desdits rails , la poutre de manutention ayant alors, à ses extrémités, une largeur (L) supérieure à (l), (L) étant l'écartement nécessaire pour le chemin de roulement des portiques.This is why, the present invention tends to solve this problem by proposing an arrangement for handling a raceway for gantries for laying railway tracks from said gantries, said raceway being formed from profiles, characterized in that that it comprises a beam for handling said profiles to the load-bearing elements to which are fixed hoist guide rails and elements formed by similar rail elements to the rails, movable between a rest position for which the ends of the handling beam have a width (l) less than the space available inside the gantry cranes and a working position for which said portions are arranged in the extension of said rails, the handling beam then having, at its ends, a width (L) greater than (l), (L) being the spacing necessary for the raceway of the gantries.

L'utilisation d'une poutre de manutention ainsi agencée afin de permettre l'utilisation de palans pouvant se déplacer entre l'espace interne des portiques (l) et une position extrême pour laquelle ils sont en place pour poser le chemin de roulement (L) , permet de réaliser la pose et la dépose dudit chemin de roulement de manière aisée et rapide.The use of a handling beam thus arranged in order to allow the use of hoists which can move between the internal space of the gantries (l) and an extreme position for which they are in place to lay the raceway (L ), makes it possible to install and remove said raceway easily and quickly.

Suivant un autre aspect de l'invention, les profilés sont, de manière tout à fait intéressante, fabriqués à partir des palplanches ce qui permet, par la largeur de leur fond plat de les poser sur des terrains même non préparés.According to another aspect of the invention, the profiles are, quite interestingly, made from sheet piles which, by the width of their flat bottom, to lay them on even unprepared ground.

La présente invention concerne également la méthode de pose d'un tel chemin de roulement ainsi qu'une méthode de pose de voie ferrée mettant en oeuvre un tel chemin de roulement.The present invention also relates to the method of laying such a raceway as well as a method of laying a railway track implementing such a raceway.

La présente invention sera mieux comprise et d'autres avantages de celle-ci ressortiront de la description qui va suivre d'un exemple de mise en oeuvre de celle-ci en référence aux dessins dans lesquels :

  • La figure 1 est une vue de face d'un portique;
  • La figure 2 est une vue de côté d'une poutre de manutention des profilés;
  • La figure 3 est une vue de dessus de ladite poutre de manutention;
  • La figure 4 est une vue en coupe suivant la ligne IV-IV de la figure 5 d'un profilé;
  • La figure 5 est une vue partielle de dessus d'un profilé, à échelle réduite;
  • La figure 6 montre un palonnier destiné à la manutention des profilés;
  • La figure 7 montre schématiquement la pose du chemin de roulement;
  • La figure 8 montre schématiquement la pose d'une voie;
  • La figure 9 montre schématiquement la dépose du chemin de roulement.
The present invention will be better understood and other advantages of it will emerge from the description which follows of an example of implementation thereof with reference to the drawings in which:
  • Figure 1 is a front view of a gantry;
  • Figure 2 is a side view of a profile handling beam;
  • Figure 3 is a top view of said handling beam;
  • Figure 4 is a sectional view along line IV-IV of Figure 5 of a profile;
  • Figure 5 is a partial top view of a profile, on a reduced scale;
  • FIG. 6 shows a spreader intended for the handling of profiles;
  • Figure 7 schematically shows the installation of the raceway;
  • Figure 8 shows schematically the laying of a track;
  • Figure 9 schematically shows the removal of the raceway.

On voit à la figure 1, un portique 1 qui se présente, de manière connue en soi, sous la forme générale d'un U renversé. Il repose par des galets 12 prévus aux extrémités inférieures des branches verticales 11 du U sur un chemin de roulement non représenté.We see in Figure 1, a gantry 1 which is, in a manner known per se, in the general form of an inverted U. It rests by rollers 12 provided at the lower ends of the vertical branches 11 of the U on a raceway not shown.

On voit en 13 les vérins permettant de déplacer la poutre transversale 14 entre la position haute représentée en traits pleins et la position basse représentée en pointillé.We see at 13 the cylinders for moving the transverse beam 14 between the high position shown in solid lines and the low position shown in dotted lines.

L'une des branches 11 porte un poste de commande 15 pour le moteur hydraulique M du portique 1 ainsi que pour la commande des vérins 13 et autres équipements qu'il porte. En service, deux portiques 1 sont jumelés comme on le voit par exemple sur les figures 7, 8 et 9.One of the branches 11 carries a control station 15 for the hydraulic motor M of the gantry 1 as well as for the control of the jacks 13 and other equipment that it carries. In service, two gantries 1 are paired as seen for example in Figures 7, 8 and 9.

Les portiques 1 peuvent porter du matériel grâce aux moyens d'accrochage 16.The gantries 1 can carry equipment thanks to the attachment means 16.

Tel que représenté, chaque portique 1 est équipé de traverses 17 démontables permettant de constituer des zones de stockage 18 provisoires dont l'utilité sera expliquée plus loin.As shown, each gantry crane 1 is equipped with removable cross-pieces 17 making it possible to constitute temporary storage areas 18 whose usefulness will be explained below.

Pour la manipulation des profilés devant constituer le chemin de roulement des portiques 1, une poutre de manutention 2, visible aux figures 2 et 3, est accrochée aux moyens d'accrochage 16.For handling the profiles which must constitute the raceway for the gantry cranes 1, a handling beam 2, visible in FIGS. 2 and 3, is attached to the hooking means 16.

Comme indiqué plus haut, les portiques 1 sont utilisés par paires, c'est pourquoi la poutre 2 présente des boucles 26 pour sa solidarisation aux moyens d'accrochage 16 en deux zones distinctes de préférence situées de manière symétrique par rapport à son milieu.As indicated above, the gantries 1 are used in pairs, this is why the beam 2 has loops 26 for its attachment to the hooking means 16 in two distinct zones preferably situated symmetrically with respect to its medium.

De manière usuelle, ladite poutre de manutention 2 comporte deux éléments porteurs 23 maintenus l'un par rapport à l'autre par des croisillons 24. La poutre 2 est ainsi globalement rectangulaire et sa largeur est inférieure à l'espace disponible entre les branches verticales 11 des portiques qui la portent.Usually, said handling beam 2 comprises two load-bearing elements 23 held in relation to each other by cross-pieces 24. The beam 2 is thus generally rectangular and its width is less than the space available between the vertical branches 11 of the gantries which carry it.

Afin d'assurer la manutention des profilés avec une telle poutre 2, on lui a associé deux palans 22 déplaçables sur des rails longitudinaux 21 fixés à cet effet sur lesdits éléments porteurs 23.In order to ensure the handling of the sections with such a beam 2, two hoists 22 movable on longitudinal rails 21 have been associated with it, fixed for this purpose on said load-bearing elements 23.

Pour qu'il soit possible de mettre en place avec une telle poutre 2 des éléments écartés de la distance (L) nécessaire pour le chemin de roulement des portiques 1, on a prévu selon l'invention aux extrémités de la poutre 2 des portions 25 mobiles, desdits rails 21.So that it is possible to put in place with such a beam 2 elements spaced apart by the distance (L) necessary for the raceway of the gantries 1, there are provided according to the invention at the ends of the beam 2 portions 25 movable, said rails 21.

On voit à la figure 3, en traits pleins, l'extrémité droite de la poutre 2 avec lesdites portions 25 en position de repos et l'extrémité gauche de ladite poutre avec lesdites portions 25 en position de travail. On remarque que lorsque ces portions 25 sont en position de travail, l'extrémité de la poutre a alors une largeur (L) alors que lorsque ces portions 25 sont en position de repos, l'extrémité de la poutre a une largeur (l).We see in Figure 3, in solid lines, the right end of the beam 2 with said portions 25 in the rest position and the left end of said beam with said portions 25 in the working position. Note that when these portions 25 are in the working position, the end of the beam then has a width (L) whereas when these portions 25 are in the rest position, the end of the beam has a width (L) .

On voit aux figures 2 et 3 que lesdites portions 25 sont formées par des éléments de rails semblables aux rails 21. Ces éléments 25 sont montés mobiles sur les éléments porteurs 23 par des supports 27 de forme globalement triangulaire. Chaque élément 25 étant porté par deux supports 27.It can be seen in FIGS. 2 and 3 that said portions 25 are formed by rail elements similar to rails 21. These elements 25 are mounted movably on the carrier elements 23 by supports 27 of generally triangular shape. Each element 25 being carried by two supports 27.

Les supports 27 sont portés par les éléments porteurs 23, suivant un de leur côté, autour d'un axe 28 vertical, ils peuvent ainsi pivoter autour de leurs axes 28 entre une position pour laquelle ils sont contre l'élément porteur 23 comme à droite de la figure 3 et une position pour laquelle ils sont perpendiculaires à l'élément porteur 23 comme à gauche de la figure 3.The supports 27 are carried by the carrier elements 23, along one of their sides, around a vertical axis 28, they can thus pivot around their axes 28 between a position for which they are against the carrier element 23 as on the right of FIG. 3 and a position for which they are perpendicular to the support element 23 as on the left of FIG. 3.

Les supports 27 portent, par le sommet opposé au côté par lequel ils sont montés sur l'élément porteur 23, les éléments 25 par des portions d'axes verticaux 29.The supports 27 carry, by the apex opposite to the side by which they are mounted on the carrier element 23, the elements 25 by portions of vertical axes 29.

L'élément porteur 23, les supports 27 et l'élément 25 forment ainsi des parallélogrammes déformables.The carrier element 23, the supports 27 and the element 25 thus form deformable parallelograms.

Dans la position de travail, montrée à gauche de la figure 3, l'extrémité de l'élément 25 dirigée vers le centre de la poutre se positionne contre l'extrémité du rail 21 en prolongement de celui-ci afin que le palan 22 puisse circuler dudit rail 21 à l'élément 25.In the working position, shown on the left in FIG. 3, the end of the element 25 directed towards the center of the beam is positioned against the end of the rail 21 in extension thereof so that the hoist 22 can run from said rail 21 to element 25.

Comme visible sur les figures, l'élément 25 a une forme en S très aplatie afin d'assurer un raccordement sans angle vif entre les portions de rails situées à des écartements différents.As can be seen in the figures, the element 25 has a very flat S-shape in order to ensure a connection without sharp angles between the portions of rails located at different distances.

On comprend que par de telles dispositions, les palans 22 peuvent porter des éléments et les positionner à une distance (L) l'un de l'autre lorsqu'ils arrivent à l'extrémité de la poutre 2 en position de travail tandis que lorsque la poutre 2 a ses extrémités en position de repos elle peut être chevauchée par les portiques 1 afin d'être prise par les moyens d'accrochage 16.It is understood that by such arrangements, the hoists 22 can carry elements and position them at a distance (L) from one another when they arrive at the end of the beam 2 in the working position while when the beam 2 has its ends in the rest position it can be overlapped by the gantries 1 so as to be taken up by the attachment means 16.

Les figures 4 et 5 montrent les profilés destinés à former le chemin de roulement des portiques 1.Figures 4 and 5 show the profiles intended to form the raceway of the gantries 1.

Selon l'invention, on utilise pour la fabrication de ces profilés des palplanches telles que celles utilisées dans la construction pour créer des murs de retenue de terre.According to the invention, sheet piles such as those used in construction are used for the manufacture of these profiles to create earth retaining walls.

Ces palplanches sont intéressantes pour la création d'un chemin de roulement selon l'invention car elles ont, en coupe, la forme d'une cuvette à large fond plat 31 et rebords verticaux 32 peu élevés.These sheet piles are interesting for creating a raceway according to the invention because they have, in section, the shape of a bowl with a wide flat bottom 31 and low vertical edges 32.

En effet, la présence du large fond plat 31 permet d'assurer une bonne stabilité de ladite palplanche lorsqu'elle repose sur le sol par ledit fond et ceci même sur des sols non préparés.Indeed, the presence of the wide flat bottom 31 ensures good stability of said sheet pile when it rests on the ground by said bottom and this even on unprepared soils.

De manière usuelle, les palplanches 3 sont rectangulaires, leur longueur étant beaucoup plus grande que leur largeur.Usually, the sheet piles 3 are rectangular, their length being much greater than their width.

Les rebords 32 sont raccordés au fond 31 par une paroi oblique 33 et ont leur extrémité supérieure repliée en crosse 34 afin de donner une bonne rigidité à la palplanche 3.The flanges 32 are connected to the bottom 31 by an oblique wall 33 and have their upper end folded back into the butt 34 in order to give good rigidity to the sheet pile 3.

Pour que ces palplanches servent de chemin de roulement, on soude axialement un profilé en U renversé afin de former une rainure axiale 35 de dimensions telles que les galets 12 des portiques 1 puissent collaborer par leur rainure circonférentielle 19 avec elle.So that these sheet piles serve as a raceway, an inverted U-shaped section is welded axially in order to form an axial groove 35 of dimensions such that the rollers 12 of the gantry cranes 1 can collaborate by their circumferential groove 19 with it.

En des points peu éloignés de son milieu, la palplanche 3 comporte quatre pontets 37 destinés à son accrochage à un palonnier en vue de sa manutention.At points not far from its center, the sheet pile 3 has four bridges 37 intended for hooking it to a lifting beam for handling.

A une des extrémités de la palplanche 3, la nervure 35 porte un embout 38 destiné à s'emboîter dans l'extrémité de la nervure ne portant pas d'embout de la palplanche 3 voisine pour assurer un bon positionnement des palplanches 3 les unes par rapport aux autres lorsqu'elles forment le chemin de roulement des portiques 1.At one end of the sheet pile 3, the rib 35 carries an end piece 38 intended to fit into the end of the rib bearing no end piece of the neighboring sheet pile 3 to ensure proper positioning of the sheet piles 3 by compared to others when they form the gantry track 1.

On voit à la figure 6 le palonnier 4 destiné à la manutention des palplanches 3 telles qu'elles viennent d'être décrites.We see in Figure 6 the spreader 4 for handling sheet piles 3 as they have just been described.

Le palonnier 4 présente un anneau 41 par lequel il peut être accroché au palan 22 de la poutre 2. Son corps parallélépipédique 42 se termine par deux faces 43 qui lui sont perpendiculaires et qui portent des tétons 44, tous dirigés dans le même sens, destinés à s'engager sous les pontets 37 de la palplanche 3.The lifter 4 has a ring 41 by which it can be hung on the hoist 22 of the beam 2. Its parallelepiped body 42 ends in two faces 43 which are perpendicular to it and which carry pins 44, all directed in the same direction, intended to engage under the bridges 37 of the sheet pile 3.

Des moyens d'arrêt 45 sont prévus afin d'empêcher tout mouvement des tétons 44 par rapport aux pontets 37 lorsque le palonnier 4 transporte une palplanche 3.Stop means 45 are provided in order to prevent any movement of the studs 44 relative to the bridges 37 when the lifter 4 transports a sheet pile 3.

Les figures 7 à 9 vont montrer un exemple d'utilisation d'un agencement de manutention tel qu'il vient d'être décrit.Figures 7 to 9 will show an example of the use of a handling arrangement as described above.

Dans cet exemple, on désire poser une voie nouvelle formée de tronçons de voie. Une flèche F donne le sens d'avancement du chantier.In this example, we want to lay a new track formed of track sections. An arrow F indicates the direction of progress of the site.

A cet effet, on pose, figure 7, le chemin de roulement des portiques 1. On voit qu'à cet effet, des palplanches 3 sont stockées dans les volumes 18 créés par les traverses 17 démontables des portiques 1, la poutre de manutention 2 est accrochée aux portiques avec ses éléments mobiles 25 en position de travail.For this purpose, we put, figure 7, the path of bearing of the gantries 1. We can see that for this purpose sheet piles 3 are stored in the volumes 18 created by the removable sleepers 17 of the gantries 1, the handling beam 2 is hooked to the gantries with its movable elements 25 in the working position .

On prend alors les palplanches 3 à l'aide des palonniers 4 décrits ci-dessus accrochés aux palans 22 puis, par déplacement desdits palans sur les rails 21, 25, on les met en place à l'avant des portiques afin de créer le chemin de roulement.We then take the sheet piles 3 using the lifting beams 4 described above hooked to the hoists 22 then, by displacement of said hoists on the rails 21, 25, they are put in place at the front of the gantries in order to create the path of rolling.

Lorsqu'une grande longueur de chemin de roulement est ainsi créée, la poutre de manutention 2 est déposée à l'extrémité avant dudit chemin de roulement. Les éléments 25 de son extrémité tournée vers le chemin de roulement sont ramenés en position de repos afin que les portiques 1 puissent la chevaucher afin d'aller à l'extrémité arrière du chemin de roulement. Les traverses 17 sont démontées afin de libérer l'espace interne desdits portiques.When a long length of raceway is thus created, the handling beam 2 is deposited at the front end of said raceway. The elements 25 of its end facing the raceway are brought back to the rest position so that the gantries 1 can overlap it in order to go to the rear end of the raceway. The cross members 17 are dismantled in order to free the internal space of said gantries.

On voit à la figure 8 les portiques 1 positionnés sur le wagon les acheminant sur le chantier.We see in Figure 8 the gantry cranes 1 positioned on the wagon transporting them to the site.

Une fois déchargés sur leur chemin de roulement, les portiques 1 circulent afin de décharger les éléments de voie 5 portés par des wagons 8. On voit qu'à cet effet lesdits portiques chevauchent les wagons 8 et leur chargement , et, c'est pourquoi les traverses 17 ont été démontées.Once unloaded on their track, the gantries 1 circulate in order to unload the track elements 5 carried by wagons 8. We see that for this purpose said gantries overlap the wagons 8 and their loading, and, this is why the cross members 17 have been dismantled.

Les éléments de voie 5 sont positionnés à l'intérieur du chemin de roulement puis éclissés.The track elements 5 are positioned inside the raceway and then spliced.

Lorsque la voie nouvelle a été posée sur une longueur sensiblement égale au chemin de roulement, les portiques 1 sont amenés au dessus de la poutre 2 qui est alors reprise. Les traverses 17 sont remontées et les portiques vont à l'autre extrémité du chemin de roulement afin d'en assurer la dépose, figure 9.When the new track has been laid over a length substantially equal to the raceway, the gantries 1 are brought above the beam 2 which is then taken up. The cross members 17 are reassembled and the gantries go to the other end of the raceway in order to ensure removal, FIG. 9.

A cet effet, les palplanches 3 sont soulevées par les palonniers 4 et empilées dans les volumes de stockage 18. Une fois le chemin de roulement déposé, il est de nouveau posé comme à la figure 7 à l'avant de la voie nouvelle.To this end, the sheet piles 3 are lifted by the lifting beams 4 and stacked in the storage volumes 18. Once the raceway removed, it is again placed as in FIG. 7 at the front of the new path.

On comprend aisément que l'on pourrait avec le même matériel effectuer la dépose d'une voie ancienne, il suffirait qu'un train de wagons vides soit stationné en avant des portiques.We can easily understand that we could use the same equipment to remove an old track, it would be enough for a train of empty wagons to be parked in front of the gantry cranes.

On effectuerait la pose du chemin de roulement de la même manière, puis, la poutre 2 et les traverses seraient posées sur un wagon du train situé à l'avant, ou sur le wagon destiné à l'acheminement des portiques.We would install the raceway in the same way, then, the beam 2 and the sleepers would be placed on a train wagon located at the front, or on the wagon intended for the routing of gantries.

Les portiques feraient alors la navette entre le train vide situé à l'avant qu'ils chargeraient d'éléments de voie déposés et le train situé à l'arrière afin d'en décharger les éléments de voie neufs. La voie nouvelle peut également être formée de manière connue par des traverses, par exemple en béton, sur lesquelles on dépose des longs rails soudés directement en place par exemple en les tirant grâce aux portiques.The gantry cranes would then shuttle between the empty train at the front which they would load with deposited track elements and the train at the rear in order to unload the new track elements. The new track can also be formed in a known manner by sleepers, for example concrete, on which are deposited long rails welded directly in place, for example by pulling them through gantries.

Claims (10)

1. Agencement pour la manutention d'un chemin de roulement pour portiques de pose de voie ferrée à partir desdits portiques, ledit chemin de roulement étant formé de profilés, caractérisé en ce qu'il comporte une poutre de manutention (2), desdits profilés aux éléments porteurs (23) de laquelle sont fixés des rails (21) de guidage de palans (22) et des éléments (25) formés par des éléments de rail semblables aux rails (21), mobiles entre une position de repos pour laquelle les extrémités de la poutre de manutention (2) ont une largeur (l) inférieure à l'espace disponible à l'intérieur des portiques et une position de travail pour laquelle lesdites portions sont disposées dans le prolongement desdits rails (21) , la poutre de manutention (2) ayant alors, à ses extrémités, une largeur (L) supérieure à (l), (L) étant l'écartement nécessaire pour le chemin de roulement des portiques.1. Arrangement for the handling of a raceway for gantries for laying railway tracks from said gantries, said raceway being formed from profiles, characterized in that it comprises a handling beam (2), from said profiles to the supporting elements (23) from which are fixed rails (21) for guiding hoists (22) and elements (25) formed by rail elements similar to the rails (21), movable between a rest position for which the ends of the handling beam (2) have a width (l) less than the space available inside the gantries and a working position for which said portions are arranged in the extension of said rails (21), the beam handling (2) then having, at its ends, a width (L) greater than (l), (L) being the spacing necessary for the raceway of the gantries. 2. Agencement selon la revendication 1, caractérisé en ce que les éléments mobiles (25) sont en forme de S aplati.2. Arrangement according to claim 1, characterized in that the movable elements (25) are in the form of a flattened S. 3. Agencement selon la revendication 1 ou 2, caractérisé en ce que les supports (27) sont portés par les éléments porteurs (23) autour d'un axe (28) et portent les éléments mobiles (25) par un axe (29).3. Arrangement according to claim 1 or 2, characterized in that the supports (27) are carried by the carrier elements (23) around an axis (28) and carry the movable elements (25) by an axis (29) . 4. Agencement selon la revendication 3, caractérisé en ce que l'élément porteur (23), les supports (27) et l'élément mobile (25) forment un parallélogramme déformable avec lesdits supports (27) perpendiculaires à l'élément porteur (23) lorsque l'élément mobile (25) est en position de travail.4. Arrangement according to claim 3, characterized in that the carrier element (23), the supports (27) and the movable element (25) form a deformable parallelogram with said supports (27) perpendicular to the carrier element ( 23) when the movable element (25) is in the working position. 5. Agencement selon l'une quelconque des revendications 1 à 4, caractérisé en ce que les éléments mobiles (25) sont montés sur les éléments porteurs (23) par des supports (27) de forme globalement triangulaire.5. Arrangement according to any one of claims 1 to 4, characterized in that the mobile elements (25) are mounted on the carrier elements (23) by supports (27) of generally triangular shape. 6. Agencement selon l'une quelconque des revendications précédentes, caractérisé en ce que les profilés sont des palplanches (3) présentant en coupe la forme d'une cuvette à large fond plat (31) sur lequel est agencée une nervure axiale (35) avec laquelle peuvent collaborer des galets (12) des portiques (1) par leur rainure circonférentielle (19).6. Arrangement according to any one of the preceding claims, characterized in that the sections are sheet piles (3) having in section the shape of a bowl with a wide flat bottom (31) on which is arranged an axial rib (35) with which the rollers (12) of the gantries (1) can collaborate by their groove circumferential (19). 7. Agencement selon la revendication 6, caractérisé en ce qu'un palonnier (4) de manutention des profilés (3) est accroché au palan (22) de la poutre (2) par un anneau (41) et porte lesdits profilés (3) par des tétons (44) qui s'engagent sous des pontets (37) de ladite palplanche (3).7. Arrangement according to claim 6, characterized in that a lifting beam (4) for handling the profiles (3) is attached to the hoist (22) of the beam (2) by a ring (41) and carries said profiles (3 ) by pins (44) which engage under bridges (37) of said sheet pile (3). 8. Procédé de pose de voie ferrée comportant la mise en place, avant la pose de la voie proprement dite, d'un chemin de roulement par des portiques de manutention des éléments de voie, ledit chemin de roulement étant disposé de part et d'autre de l'emplacement de la voie future et étant contitué de profilés susceptibles de coopérer avec les galets de roulement des portiques de pose, caractérisé en ce que l'on utilise pour la pose dudit chemin de roulement des éléments de chemin de roulement stockés à l'intérieur de l'espace définis par lesdits portiques et qui sont manutentionnés à l'aide d'une poutre, portée par lesdits portiques, munie d'éléments mobiles permettant de poser les éléments de chemin de roulement à l'écartement désiré.8. A method of laying a railway track comprising the installation, before the laying of the track proper, of a raceway by gantry cranes for handling track elements, said raceway being arranged on either side other of the location of the future track and being made up of profiles capable of cooperating with the rollers of the installation gantries, characterized in that one uses for the installation of said raceway elements of raceway stored at inside the space defined by said gantries and which are handled using a beam, carried by said gantries, provided with movable elements making it possible to place the raceway elements at the desired spacing. 9. Procédé de pose d'une voie ferrée par des portiques selon la revendication 8, caractérisé en ce qu'après avoir posé leur chemin de roulement, après la dépose de la poutre de manutention dont les éléments mobiles sont mis en position de repos et le démontage des traverses (17), lesdits portiques assurent la mise en place des éléments de voie qu'ils déchargent de wagons.9. A method of laying a railroad track using gantries according to claim 8, characterized in that after having laid their raceway, after the removal of the handling beam whose movable elements are put in the rest position and disassembling the sleepers (17), said gantries ensure the installation of track elements which they unload from wagons. 10. Procédé de pose d'un chemin de voie ferrée selon la revendication 8 ou 9, caractérisé en ce que les profilés sont des palplanches (3) stockées dans des volumes (18) créés par des traverses (17) reliant les branches desdits portiques (1), la poutre de manutention (2) est accrochée auxdits portiques, les éléments mobiles (25) sont mis en position de travail, et en ce que chacun des palans (22) porte un palonnier (4) par lequel il prend une palplanche (3) dans le volume (18) et l'amène par déplacement le long des rails (21, 25) à l'avant des portiques puis, les extrémités des éléments (25) étant espacées de la largeur (L) nécessaire au chemin de roulement, chacun des portiques pose la palplanche qu'il porte sur la plate-forme de pose de voie.10. A method of laying a railroad track according to claim 8 or 9, characterized in that the sections are sheet piles (3) stored in volumes (18) created by sleepers (17) connecting the branches of said gantries (1), the handling beam (2) is attached to said gantries, the movable elements (25) are put in the working position, and in that each of the hoists (22) carries a lifting beam (4) by which it takes a sheet pile (3) in the volume (18) and brings it by displacement the along the rails (21, 25) at the front of the gantries then, the ends of the elements (25) being spaced by the width (L) necessary for the raceway, each of the gantries places the sheet pile which it carries on the flat - track laying form.
EP90400443A 1989-03-03 1990-02-19 Arrangement for maintaining a track for rail laying portal cranes, and method for laying a track by means of said arrangement Withdrawn EP0385828A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR8902769A FR2643922B1 (en) 1989-03-03 1989-03-03 ARRANGEMENT FOR THE HANDLING OF A RUNNING ROAD FOR GATES FOR LAYING RAILWAYS AND A METHOD OF LAYING A RUNNING ROAD WITH THIS ARRANGEMENT
FR8902769 1989-03-03

Publications (1)

Publication Number Publication Date
EP0385828A1 true EP0385828A1 (en) 1990-09-05

Family

ID=9379323

Family Applications (1)

Application Number Title Priority Date Filing Date
EP90400443A Withdrawn EP0385828A1 (en) 1989-03-03 1990-02-19 Arrangement for maintaining a track for rail laying portal cranes, and method for laying a track by means of said arrangement

Country Status (2)

Country Link
EP (1) EP0385828A1 (en)
FR (1) FR2643922B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113800449A (en) * 2021-11-16 2021-12-17 四川明阳承起机械有限公司 Automatic change big arm dismouting equipment of hoist

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1353025A (en) * 1963-01-11 1964-02-21 Railway track replacement process; special platform car and rail used in this process
FR2371547A2 (en) * 1976-11-19 1978-06-16 Installations Ferroviaires Ste Railway line laying system - uses temporary wide gauge track to support gantry assembly receiving rail and sleepers from double deck supply train
DE2740181A1 (en) * 1977-09-07 1979-03-08 Robel Georg Gmbh & Co Mobile railway track renovation machine - has motors for two horizontally swivelling chassis with rail grabs

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1353025A (en) * 1963-01-11 1964-02-21 Railway track replacement process; special platform car and rail used in this process
FR2371547A2 (en) * 1976-11-19 1978-06-16 Installations Ferroviaires Ste Railway line laying system - uses temporary wide gauge track to support gantry assembly receiving rail and sleepers from double deck supply train
DE2740181A1 (en) * 1977-09-07 1979-03-08 Robel Georg Gmbh & Co Mobile railway track renovation machine - has motors for two horizontally swivelling chassis with rail grabs

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113800449A (en) * 2021-11-16 2021-12-17 四川明阳承起机械有限公司 Automatic change big arm dismouting equipment of hoist

Also Published As

Publication number Publication date
FR2643922B1 (en) 1991-06-21
FR2643922A1 (en) 1990-09-07

Similar Documents

Publication Publication Date Title
EP0183632B1 (en) Vehicle carrier comprising individual cross-supporting structures
EP1046006B1 (en) Device and method for installing conduits at very great depths
EP1157950B1 (en) Device for conveying bulk objects, especially metal coils
EP0971071B1 (en) Method and device for laying railway track elements using a tracked vehicle
EP0245155B1 (en) Process for carrying out works under railway tracks in operation
FR2640208A1 (en) SYSTEM FOR TRANSPORTING AND REMOVING AT LEAST ONE WORK OF A VEHICLE SUCH AS AN ARMY ENGINE
CA1182135A (en) Method and installation for the packaging of cast iron bell and spigot pipes
EP1772573A1 (en) Multi-storey plant for automatic parking of vehicles
EP0505240B1 (en) Device for placing and replacing rail components and procedure for using this device
EP3421717B1 (en) Follower gear of a tunnelling machine comprising means for conveying a keystone
EP0385828A1 (en) Arrangement for maintaining a track for rail laying portal cranes, and method for laying a track by means of said arrangement
FR2597129A1 (en) Folding lightweight bridge-support enabling so-called heavy vehicles, particularly armoured vehicles, to cross gaps
EP0773153B1 (en) Mobile platform for surmounting height deviations
CH680865A5 (en)
EP2162371B1 (en) Equipment comprising an apparatus for receiving a structure capable of being taken up by a carrier vehicle equipped with a handling arm or ramp
EP1473411A1 (en) Device for lateral transposition of median barrier
BE536101A (en)
FR2845701A1 (en) Railway track laying procedure consists of making up track sections with temporary rails and permanent sleepers and replacing rails after laying
FR2546924A1 (en) Multi chassis rail track laying and lifting machine
FR3118073A1 (en) Channel unloading system
BE507168A (en)
FR2529186A1 (en) Handling lift for marine vessel - is carried on bogies on track carried on supports which can move similarly.
WO2023052444A1 (en) System and method for placing a heavy load in water
EP2949814A1 (en) Assembly for railway track renovation
FR2507654A1 (en) Breeze block wall construction method - uses rolling track and bogey to handle and place heavy blocks

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB GR IT LI LU NL SE

17P Request for examination filed

Effective date: 19901004

17Q First examination report despatched

Effective date: 19910418

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19920317