Method for constructing a cylindric metal building construction as well as apparatus for carrying out said method Download PDFInfo
- Publication number
- EP0282126B1 EP0282126B1 EP88200378A EP88200378A EP0282126B1 EP 0282126 B1 EP0282126 B1 EP 0282126B1 EP 88200378 A EP88200378 A EP 88200378A EP 88200378 A EP88200378 A EP 88200378A EP 0282126 B1 EP0282126 B1 EP 0282126B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- building construction
- metal band
- guiding
- guidings
- construction section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H7/00—Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
- E04H7/02—Containers for fluids or gases; Supports therefor
- E04H7/04—Containers for fluids or gases; Supports therefor mainly of metal
- E04H7/06—Containers for fluids or gases; Supports therefor mainly of metal with vertical axis
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C37/00—Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
- B21C37/06—Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
- B21C37/12—Making tubes or metal hoses with helically arranged seams
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H7/00—Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
- E04H7/22—Containers for fluent solids, e.g. silos, bunkers; Supports therefor
- E04H7/24—Constructions, with or without perforated walls, depending on the use of specified materials
- E04H7/30—Constructions, with or without perforated walls, depending on the use of specified materials mainly of metal
Definitions
- the invention relates to a method for constructing a cylindric metal building construction by positioning successive rings one on top of the other and interconnecting said rings, said method comprising the steps of:
- This known method has a number of disadvantages.
- the applied carrousel for winding the supplied metal band for obtaining a ring in principle can be used only for a limited number of diameters of cilindric building constructions to be constructed. If building constructions have to be constructed of which the diameter largely differs from the diameter of the carrousel a completely new carrousel has to be applied. Also the application of thicker materials offers problems in correctly shaping the material.
- positioning the already constructed building construction section on top of the upper edge of an already constructed ring calls for a separate lifting device, whereas precise positioning the already constructed building construction section on top of the upper edge of the already constructed ring is very difficult. The reasons for this have to be sought in the low dimensional stability of the already constructed building construction section, the rather high mass thereof and the wind sensibility that can be very important at a building site.
- the method according to the invention is characterized in that lifting the building construction already constructed is carried out by synchronously moving the guidings upwards, said guidings comprising supports engaging the lower edge of this building construction section, whereas always that guiding that in the circumferential direction of the building construction section is positioned ahead of the supplied metal band is moved downwards so far shortly before the beginning of the metal band reaches said guiding, that the metal band is moved over said guiding and that the lower edge of the metal band is supported by said guiding.
- the building construction is lowered by synchronously lowering all guidings and is positioned onto support blocks whereafter the guidings are removed from under the lower edge of the lowermosts ring and wherein the building construction is slightly lifted by means of auxiliary means for removing the support blocks and wherein finally the building construction is lowered onto the ground.
- the invention further relates to an apparatus as set out in the preamble of claim 3.
- This apparatus is characterized as set out in the characterizing section of claim 3.
- the apparatus according to the invention is very versatile, for the location of the liftings units always can be chosen corresponding with the diameter of the building construction to be constructed. Therefore the same apparatus can be used for constructing building constructions having every desired diameter. Only the number of applied lifting units should vary, wherein by building constructions having a very large diameter a larger number of lifting units should be applied.
- the apparatus comprises at least a drive unit for circumferentially moving the already constructed building construction section wherein said drive unit, as seen in the direction of motion, is positioned shortly ahead of the location where the upper edge of the metal band is connected to the lower edge of the already constructed building construction section.
- said drive unit as seen in the direction of motion, is positioned shortly ahead of the location where the upper edge of the metal band is connected to the lower edge of the already constructed building construction section.
- the fig. 1 and 2 show an apparatus that can be used for constructing a cylindric metal building construction by positioning successive rings one on top of the other and interconnecting said rings.
- fig. 1 it can be seen clearly that already a number of rings 1, 2 and 3 are positioned one on top of the other.
- Fig. 2 shows the construction of a new ring 4.
- a roof construction has to be positioned on top of the cylindric building construction this roof construction is mounted in a way known perse after the production of a first ring.
- the apparatus comprises a number of lifting units 5 - 12 that are positioned corresponding to the diameter of the building construction to be constructed, or in the present case the diameter of the ring 4 to be constructed.
- the number of lifting units amounts eight (see fig. 2), this number of lifting units can be varied dependent on the diameter of the building construction to be constructed.
- the lifting units 5 - 12 are attached to a foundation constructed earlier, for example of concrete. It is possible too that, if the building construction to be constructed is a tank with a welded bottom, this bottom is firstly constructed whereafter the lifting units are positioned on top thereof. Especially when dealing with heavy and very high constructions it is necessary to support the lifting units for obtaining enough stability, but this is not shown in the fig. 1 and 2. Moreover it is important that the lifting units are leveled.
- the lifting units 5 - 12 each comprise a guiding 13 that is connected to a carriage 16 that can be moved upwards and downwards along a guide track 14.
- This upward and downward motion can be obtained by means of a motor 15 driving a screwed spindle or the like.
- the upward and downward motion of the guidings 13 too can be obtained by any appropiate means, such as mechanical, electrical or hydraulic or pneumatic solutions.
- the lifting units are activated such, that they all can move upwards and downwards synchronously, and that each lifting unit can be moved downwards independently and advantageously with an increased speed.
- a metal band 17 is wound of a coil 18 and is supplied in a vertical position.
- the metal band 17 firstly is shaped into the desired shape by means of a shaping device for shaping the ring four to be produced.
- the shaping device in the present case comprises a stretching unit 19 for stretching the metal band wound of the coil 18 as well as a rolling machine 20 for rolling the metal band to the desired diameter. It is mentioned that by the application of a thicker material it is possible that this does not come from a coil 18 but that it exists of separate metal plates that are interconnected before reaching the rolling machine 20.
- each guiding comprises a number of lower rolls combined with vertical guiding means.
- the metal band 17 is led around the guidings 13 of the liftings units 5 - 12 like this the metal band 17 is, by means of a cutting device 22, cut off to a length that corresponds with the circumference of the ring 4 to be shaped.
- This cutting device 22 can comprise a cutting torch, a plasma cutting device, a slitting disc, a pair of shears or the like. Finally the beginning and the end of the cut off metal band section are interconnected for producing a complete ring 4.
- the guidings 13 of the lifting units 5 - 12 are synchronously moved upwards for which reason the motors 15 are activated.
- the distance over which the guidings 13 are moved upwards equals the width of the supplied metal band 17. This stroke of the guidings 13 can be preset.
- the metal band 17 is supplied again. If the forward end of this metal band 17 has reached the vicinity of the lifting unit 12 the guiding 13 of this lifting unit 12 is moved downwards, for example with an increased speed, such that the metal band 17 can pass above said guiding. As a result the upper edge of this metal band 17 contacts the lower edge of the already constructed building construction section, as appears clearly from fig. 1, in which the upper edge of the metal band 17 contacts the lower edge of ring 3. Next the mentioned upper edge can be attached to the mentioned lower edge, whereafter the already constructed building construction section is rotated synchronously with the supplied metal band 17.
- a further drive unit 23 is applied for moving the metal band 17 and the already constructed building construction section.
- This drive unit 23 is, as seen in the direction of motion, positioned shortly ahead of the location where the upper edge of the metal band 17 is attached to the lower edge of the already constructed building construction section.
- the drive unit 23 comprises two pairs of drive rolls 24, 25 positioned one on top of the other.
- the drive rolls 24 of the upper pair of drive rolls engage both sides of the lower edge of the already constructed building construction section, whereas the drive rolls 25 of the lower pair of drive rolls engage both sides of the upper edge of the metal band 17.
- the drive rolls 24, 25 are inclined such that the rotation axes of the drive rolls positioned at one side of the building construction wall diverge into the direction of motion of the building construction. Consequently the driving force comprises a component forcing the metal band 17 and the already constructed building construction section towards each other.
- each pair of drive rolls 24, 25 at least one roll is settable spring-loaded, so that an automatic setting is possible in reaction to several material gauges.
- a variable circumferential velocity of the building construction is obliged.
- the driving units 21 and 23 as well as the rolling device applied in this embodiment therefore have to be tuned with respect to their drive velocities.
- an automatic welding device 26 is illustrated schematically, said welding device interconnecting the upper edge of the supplied metal band and the lower edge of the already constructed building construction section.
- every other connecting method can be applied, for example the application of bolts or rivets.
- welding constitutes a very simple but however safe connecting method.
- guiding rolls 27 are shown for guiding and leading the metal band 17 as well as the already constructed building construction section at the welding device 26. These guiding rolls too can be settable for an adjustment to several material gauges.
- the welding device comprises a device for single sided welding, in which at the side of the building construction wall facing away from the welding device a cooling unit is applied for cooling this side.
- This cooling unit can be pushed resiliently against the welding seam for obtaining a smooth wall. Further than a change of the structure of the material and a possible reduction of the resistence against corrosion can be avoided as much as possible. Too the mechanical characteristics of the material, such as the tensile strength and the tensile limit are maintained better.
- cooling unit By a number of materials to be used such a cooling unit is desirable if a double sided welding is applied. These cooling units are not shown in fig. 1 or 2.
- an apparatus (not shown) is positioned for treating the edges to be welded, whereas behind the welding device 26 an apparatus for treating the welding seams can be applied.
- the rolling machine 20 is positioned outside of the circumference of a constructed ring 4.
- the separate rolling rolls of this rolling machine can be interconnected at their upper and lower sides in a way not shown in detail.
- this rolling machine 20 too can roll very thick metal band 17 without moving apart the separate rolling rolls of this rolling machine 20.
- this building construction After obtaining a building construction section with the desired height, thus a building construction section having enough rings positioned one on top of the other, this building construction has to be placed onto the ground. This can be achieved as represented schematically in the fig. 3 - 6.
- Fig. 3 shows that it is not directly possible to place the lower ring 4 onto the ground by means of the guidings 13. Therefore, after the entire complete building construction is sligthly lifted, between the guidings 13 support blocks 28 are positioned (fig. 4), said support blocks 28 having such a height that the guidings 13, after lowering the complete building construction onto the support blocks 28, disengage the lower edge of the lower ring 4 if this lower egde rests on the support blocks 28. Next the guidings 13 are disassembled from the lifting units 5 - 12 and are removed from underneath the lower edge of the lower ring 4.
- Fig. 5 shows the next phase, in which the guidings 13 are removed by auxiliary means 29, for example an angle plate with a locking lip.
- auxiliary means 29 engage the lower edge of the ring 4 and lift the entire building construction by a synchronous activation of all lifting units 5 - 12.
- the support blocks 28 are removed, whereafter the auxiliary means 29 are synchronously lowered until one or a number of said auxiliarly means nearly contacts the highest point of the ground, that mostly comprises concrete.
- a number of filling plates are positioned underneath the building construction for filling up the space between the ground and the lower side of the constructed construction, and for leveling and unevennesses of the ground.
- the auxiliary means 29 now can be lowered synchronously until the entire construction rests on the filling plates (fig. 6), whereafter the auxiliary means 29 and the lifting units 5 -12 can be disassembled. Next the complete construction can be anchored in the usual way and be sealed.
- auxiliary means to the inner side and to the lower side of the ring 4 so that by means of specially designed auxiliary means the complete construction can be positioned directly onto the steel bottom.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Coating With Molten Metal (AREA)
- Coating By Spraying Or Casting (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
Description
- The invention relates to a method for constructing a cylindric metal building construction by positioning successive rings one on top of the other and interconnecting said rings, said method comprising the steps of:
- in a vertical position supplying the material for constructing the rings, such as metal band or metal plates to be assembled to a metal band, and shaping the material into the desired shape with a shaping device,
- shaping the supplied material into a ring by means of appropriate guidings,
- cutting the metal band or the metal plates assembled to a metal band to a length corresponding to the circumference of the corresponding ring to be shaped,
- connecting the upper edge of the metal band to the lower edge of an already constructed building construction section and interconnecting the beginning and the end of the cut-off metal band section,
- entirely lifting the building construction section constructed like this and supplying further rings underneath until the building construction has reached the desired height, and
- finally placing the building construction onto the ground.
- In a known method of this type (see EP-A-136.581) the supplied metal band is continuously applied to a carrousel comprising a rotating platform of which the rotation velocity corresponds with the supply velocity of the band. When the length of a metal band section is obtained corresponding with the circumference of a ring the metal band is cut loose whereafter winding it onto the carrousel is completed. Next the building construction section that already has been constructed earlier is positioned on top of the ring just constructed and is connected thereto.
- This known method has a number of disadvantages. The applied carrousel for winding the supplied metal band for obtaining a ring in principle can be used only for a limited number of diameters of cilindric building constructions to be constructed. If building constructions have to be constructed of which the diameter largely differs from the diameter of the carrousel a completely new carrousel has to be applied. Also the application of thicker materials offers problems in correctly shaping the material. As a further disadvantage of this method it can be mentioned that positioning the already constructed building construction section on top of the upper edge of an already constructed ring calls for a separate lifting device, whereas precise positioning the already constructed building construction section on top of the upper edge of the already constructed ring is very difficult. The reasons for this have to be sought in the low dimensional stability of the already constructed building construction section, the rather high mass thereof and the wind sensibility that can be very important at a building site.
- It is an object of the invention to provide a method for constructing a cylindric metal building construction not having the mentioned disadvantages.
- Therefore the method according to the invention is characterized in that lifting the building construction already constructed is carried out by synchronously moving the guidings upwards, said guidings comprising supports engaging the lower edge of this building construction section, whereas always that guiding that in the circumferential direction of the building construction section is positioned ahead of the supplied metal band is moved downwards so far shortly before the beginning of the metal band reaches said guiding, that the metal band is moved over said guiding and that the lower edge of the metal band is supported by said guiding.
- In constrast with the known method an already constructed building construction section is no longer lifted entirely above a new ring to be constructed, but this already constructed building construction section initially rests totally on the guidings. During the progression of the production of a new ring the support of this already constructed building construction section is progressively taken over by the ring section positioned therebelow, said ring section being supported by the lowered guidings. Like this at each moment a safe and reliable support of the already constructed building construction section is provided wherein too a good positioning of this building construction section relative to the supplied metal band for shaping a new ring is accomplished.
- In a preferred embodiment of the method according to the invention after completing the last, lowermost ring and connecting it to the already constructed building construction section, the building construction is lowered by synchronously lowering all guidings and is positioned onto support blocks whereafter the guidings are removed from under the lower edge of the lowermosts ring and wherein the building construction is slightly lifted by means of auxiliary means for removing the support blocks and wherein finally the building construction is lowered onto the ground.
- Like this also during the last phase of the construction of the building construction, namely positioning it onto the ground, no additional hoisting unit or the like is necessary. The guidings that initially are positioned underneath the lower edge of the lowermost ring, can, if the building construction rests on the support blocks, be removed in an easy way, whereafter the building construction is finally positioned onto the ground by means of the auxiliary means.
- The invention further relates to an apparatus as set out in the preamble of
claim 3. This apparatus is characterized as set out in the characterizing section ofclaim 3. By the presence of a number of lifting units lifting the previously completed building construction section can be accomplished without additional means, whereas the apparatus according to the invention is very versatile, for the location of the liftings units always can be chosen corresponding with the diameter of the building construction to be constructed. Therefore the same apparatus can be used for constructing building constructions having every desired diameter. Only the number of applied lifting units should vary, wherein by building constructions having a very large diameter a larger number of lifting units should be applied. - In a handy embodiment of the apparatus according to the invention it comprises at least a drive unit for circumferentially moving the already constructed building construction section wherein said drive unit, as seen in the direction of motion, is positioned shortly ahead of the location where the upper edge of the metal band is connected to the lower edge of the already constructed building construction section. Like this a synchronous motion of the building construction section and the metal band is obtained.
- Hereafter the invention will be elucidated with reference to the drawing, in which an embodiment of the method and apparatus according to the invention is illustrated.
- Fig. 1 shows schematically a side elevational view of an apparatus according to the invention for carrying out the method according to the invention;
- Fig. 2 shows the apparatus of fig. 1 in a top plan view at an earlier moment but only showing the latest ring, and
- Fig. 3 - 6 show a part of the apparatus during a number of successive steps of the method according to the invention.
- The fig. 1 and 2 show an apparatus that can be used for constructing a cylindric metal building construction by positioning successive rings one on top of the other and interconnecting said rings. In fig. 1 it can be seen clearly that already a number of
rings new ring 4. - If a roof construction has to be positioned on top of the cylindric building construction this roof construction is mounted in a way known perse after the production of a first ring.
- As appears from fig. 1 the apparatus comprises a number of lifting units 5 - 12 that are positioned corresponding to the diameter of the building construction to be constructed, or in the present case the diameter of the
ring 4 to be constructed. Although in the shown embodiment the number of lifting units amounts eight (see fig. 2), this number of lifting units can be varied dependent on the diameter of the building construction to be constructed. The lifting units 5 - 12 are attached to a foundation constructed earlier, for example of concrete. It is possible too that, if the building construction to be constructed is a tank with a welded bottom, this bottom is firstly constructed whereafter the lifting units are positioned on top thereof. Especially when dealing with heavy and very high constructions it is necessary to support the lifting units for obtaining enough stability, but this is not shown in the fig. 1 and 2. Moreover it is important that the lifting units are leveled. - The lifting units 5 - 12 each comprise a guiding 13 that is connected to a
carriage 16 that can be moved upwards and downwards along aguide track 14. This upward and downward motion can be obtained by means of amotor 15 driving a screwed spindle or the like. The upward and downward motion of theguidings 13 too can be obtained by any appropiate means, such as mechanical, electrical or hydraulic or pneumatic solutions. - Further it is possible that the lifting units are activated such, that they all can move upwards and downwards synchronously, and that each lifting unit can be moved downwards independently and advantageously with an increased speed.
- During constructing a cylindric metal building construction a
metal band 17 is wound of a coil 18 and is supplied in a vertical position. Themetal band 17 firstly is shaped into the desired shape by means of a shaping device for shaping the ring four to be produced. As appears from fig. 2 the shaping device in the present case comprises astretching unit 19 for stretching the metal band wound of the coil 18 as well as arolling machine 20 for rolling the metal band to the desired diameter. It is mentioned that by the application of a thicker material it is possible that this does not come from a coil 18 but that it exists of separate metal plates that are interconnected before reaching therolling machine 20. - During shaping the first ring of a metallic building construction to be constructed all
guidings 13 of the lifting units 5 - 12 are in their lowermost position. The end of themetal band 17 that has passed therolling machine 20 is moved onwards (clockwise as seen in fig. 2) by means of adrive unit 21 and is successively moved over theguidings 13 of the lifting units 5 - 12. For correctly guiding themetal band 17 the guidings each comprise a support wall with flanged edges. It is possible to apply lockings or additional guidings for holding the construction in case of a strong wind or the like. - In another embodiment of the guidings not shown each guiding comprises a number of lower rolls combined with vertical guiding means.
- When the
metal band 17 is led around theguidings 13 of the liftings units 5 - 12 like this themetal band 17 is, by means of acutting device 22, cut off to a length that corresponds with the circumference of thering 4 to be shaped. Thiscutting device 22 can comprise a cutting torch, a plasma cutting device, a slitting disc, a pair of shears or the like. Finally the beginning and the end of the cut off metal band section are interconnected for producing acomplete ring 4. - After the
first ring 4 has been formed theguidings 13 of the lifting units 5 - 12 are synchronously moved upwards for which reason themotors 15 are activated. The distance over which theguidings 13 are moved upwards equals the width of the suppliedmetal band 17. This stroke of theguidings 13 can be preset. - Next via the
stretching unit 19, through thedrive unit 21 and along therolling unit 20 themetal band 17 is supplied again. If the forward end of thismetal band 17 has reached the vicinity of the liftingunit 12 the guiding 13 of thislifting unit 12 is moved downwards, for example with an increased speed, such that themetal band 17 can pass above said guiding. As a result the upper edge of thismetal band 17 contacts the lower edge of the already constructed building construction section, as appears clearly from fig. 1, in which the upper edge of themetal band 17 contacts the lower edge ofring 3. Next the mentioned upper edge can be attached to the mentioned lower edge, whereafter the already constructed building construction section is rotated synchronously with the suppliedmetal band 17. During said rotation always that guiding 13 that in the circumferential direction of the building construction section is positioned ahead of the suppliedmetal band 17 is moved downwards so far, shortly before the beginning of themetal band 17 reaches said guiding 13, that themetal band 17 is moved over said guiding 13 and that the lower edge of themetal band 17 is supported by said guiding 13. In fig. 1 the situation is represented in which the guiding 13 of the lifting unit 5 is shortly before moving downwards towards the position of said guiding represented in dotted lines. - Like this the already constructed building construction section is always appropiately supported. After reaching the desired length of the
metal band 17 this is cut off again by means of the cuttingdevice 22, whereafter the ends are interconnected and whereafter the previously described steps are repeated until the desired hight of the building construction has been achieved. - For moving the
metal band 17 and the already constructed building construction section afurther drive unit 23 is applied. Thisdrive unit 23 is, as seen in the direction of motion, positioned shortly ahead of the location where the upper edge of themetal band 17 is attached to the lower edge of the already constructed building construction section. As indicated in fig. 1 thedrive unit 23 comprises two pairs of drive rolls 24, 25 positioned one on top of the other. The drive rolls 24 of the upper pair of drive rolls engage both sides of the lower edge of the already constructed building construction section, whereas the drive rolls 25 of the lower pair of drive rolls engage both sides of the upper edge of themetal band 17. Further the drive rolls 24, 25 are inclined such that the rotation axes of the drive rolls positioned at one side of the building construction wall diverge into the direction of motion of the building construction. Consequently the driving force comprises a component forcing themetal band 17 and the already constructed building construction section towards each other. - It is emphasized that it is not necessary to incline the drive rolls 24, 25 as indicated in the figures. Other solutions can be presented for correctly positioning and holding together the
metal band 17 and the already constructed building construction section. - In constructing a metal building construction the gauge of the applied material often increases downwards from ring to ring. Therefore it is advantageous if of each pair of drive rolls 24, 25 at least one roll is settable spring-loaded, so that an automatic setting is possible in reaction to several material gauges. For automatically welding different materials having different gauges a variable circumferential velocity of the building construction is obliged. The driving
units - Further in fig. 2 an
automatic welding device 26 is illustrated schematically, said welding device interconnecting the upper edge of the supplied metal band and the lower edge of the already constructed building construction section. Of course every other connecting method can be applied, for example the application of bolts or rivets. However, if materials such as steel, stainless steel, aluminum and the like are used, welding constitutes a very simple but however safe connecting method. - At both sides of the
welding device 26 guiding rolls 27 are shown for guiding and leading themetal band 17 as well as the already constructed building construction section at thewelding device 26. These guiding rolls too can be settable for an adjustment to several material gauges. - If a thin material is used, it is possible that the welding device comprises a device for single sided welding, in which at the side of the building construction wall facing away from the welding device a cooling unit is applied for cooling this side. This cooling unit can be pushed resiliently against the welding seam for obtaining a smooth wall. Further than a change of the structure of the material and a possible reduction of the resistence against corrosion can be avoided as much as possible. Too the mechanical characteristics of the material, such as the tensile strength and the tensile limit are maintained better.
- By a number of materials to be used such a cooling unit is desirable if a double sided welding is applied. These cooling units are not shown in fig. 1 or 2.
- Further it is possible that ahead of the
welding device 26 an apparatus (not shown) is positioned for treating the edges to be welded, whereas behind thewelding device 26 an apparatus for treating the welding seams can be applied. - Instead of the shown
automatic welding device 26 it is possible however that the welding process is carried out manually. - As appears clearly from fig. 2 the rolling
machine 20 is positioned outside of the circumference of a constructedring 4. As a result the separate rolling rolls of this rolling machine can be interconnected at their upper and lower sides in a way not shown in detail. As a result this rollingmachine 20 too can roll verythick metal band 17 without moving apart the separate rolling rolls of this rollingmachine 20. - If a ring is completed it can be rotated along the
guidings 13 before lifting the constructed building construction section. By a profile apparatus not shown reinforcement ridges can be pressed into the metal band thus offering the complete building construction a greater stiffness. - After obtaining a building construction section with the desired height, thus a building construction section having enough rings positioned one on top of the other, this building construction has to be placed onto the ground. This can be achieved as represented schematically in the fig. 3 - 6.
- Fig. 3 shows that it is not directly possible to place the
lower ring 4 onto the ground by means of theguidings 13. Therefore, after the entire complete building construction is sligthly lifted, between theguidings 13 support blocks 28 are positioned (fig. 4), said support blocks 28 having such a height that theguidings 13, after lowering the complete building construction onto the support blocks 28, disengage the lower edge of thelower ring 4 if this lower egde rests on the support blocks 28. Next theguidings 13 are disassembled from the lifting units 5 - 12 and are removed from underneath the lower edge of thelower ring 4. - Fig. 5 shows the next phase, in which the
guidings 13 are removed byauxiliary means 29, for example an angle plate with a locking lip. These auxiliary means 29 engage the lower edge of thering 4 and lift the entire building construction by a synchronous activation of all lifting units 5 - 12. The support blocks 28 are removed, whereafter the auxiliary means 29 are synchronously lowered until one or a number of said auxiliarly means nearly contacts the highest point of the ground, that mostly comprises concrete. After this, divided along the circumference, a number of filling plates are positioned underneath the building construction for filling up the space between the ground and the lower side of the constructed construction, and for leveling and unevennesses of the ground. The auxiliary means 29 now can be lowered synchronously until the entire construction rests on the filling plates (fig. 6), whereafter the auxiliary means 29 and the lifting units 5 -12 can be disassembled. Next the complete construction can be anchored in the usual way and be sealed. - If the completed building construction has to be mounted onto a prefabricated steel bottom it will be necessary to mount auxiliary means to the inner side and to the lower side of the
ring 4 so that by means of specially designed auxiliary means the complete construction can be positioned directly onto the steel bottom. - The invention is not limited to the embodiment described before but can be varied widely within the scope of the invention, defined by the claims.
Claims (8)
- Method for constructing a cylindric metal building construction by positioning successive rings (1, 2, 3) one on top of the other and interconnecting said rings, said method comprising the steps of:- in a vertical position supplying the material for constructing the rings, such as metal band (17) or metal plates to be assembled to a metal band, and shaping the material into the desired shape with a shaping device (19, 20),- shaping the supplied material into a ring by means of appropriate guidings (13),- cutting the metal band or the metal plates assembled to a metal band to a length corresponding to the circumference of the corresponding ring to be shaped,- connecting the upper edge of the metal band to the lower edge of an already constructed building construction section and interconnecting the beginning and the end of the cut-off metal band section,- entirely lifting the building construction section constructed like this and supplying further rings underneath until the building construction has reached the desired height, and- finally placing the building construction onto the ground
characterized in that lifting the building construction already constructed is carried out by synchronously moving the guidings (13) upwards, said guidings comprising supports engaging the lower edge of this building construction section, whereas always that guiding that in the circumferential direction of the building construction section is positioned ahead of the supplied metal band is moved downwards shortly before the beginning of the metal band reaches said guiding, so that the metal band is moved over said guiding and that the lower edge of the metal band is supported by said guiding. - Method according to claim 1, characterized in that after completing the last, lowermost ring (4) and connecting it to the already constructed building construction section, the building construction is lowered by synchronously lowering all guidings (13) and is positioned onto support blocks (28) whereafter the guidings are removed from under the lower edge of the lowermosts ring and wherein the building construction is slightly lifted by means of auxiliary means (29) for removing the support blocks (28) and wherein finally the building construction is lowered onto the ground.
- Apparatus for carrying out the method according to claim 1 or 2 comprising- a shaping device (19, 20) for shaping the material supplied for constructing the rings, such as metal band or metal plates, into the desired shape;- guidings (13) for shaping the supplied material into a ring;- means (22) for cutting the metal band or the metal plates to a length corresponding to the circumference of the corresponding ring to be shaped;- means (26) for connecting the upper edge of the metal band to the lower edge of an already constructed building construction section and interconnecting the beginning and the end of the cut-off metal band section, and- means (5-12) for lifting the building construction section constructed like this enabling further rings to be supplied underneath until the building construction has reached the desired height,
characterized in that the means for lifting the building construction already constructed comprise lifting units (5-12) for moving the guidings (13) upwards and downwards, said guidings comprising supports engaging the lower edge of this building construction section, whereas always that guiding that in the circumferential direction of the building construction section is positioned ahead of the supplied metal band is moved downwards shortly before the beginning of the metal band reaches said guiding, so that the metal band is moved over said guiding and that the lower edge of the metal band is supported by said guiding. - Apparatus according to claim 3, characterized in that each guiding is connected to a carriage (16) that can be moved upwards and downwards along a guide track (14).
- Apparatus according to claim 4, characterized in than each guiding comprises a support roll (13) that can be released from its carriage and can be replaced by an auxiliary means that is constructed as an angle plate (29) engaging the lower edge of the building construction.
- Apparatus according to one of the claims 3 - 5, with a rolling machine as shaping device, characterized in that the rolling machine (20) is positioned outside of the circumferential track of the rolled metal band as defined by the guidings.
- Apparatus according to one of the claims 3 - 6, characterized in that it comprises at least a drive unit (23) for circumferentially moving the already constructed building construction section wherein said drive unit, as seen in the direction of motion, is positioned shortly ahead of the location where the upper edge of the metal band is connected to the lower edge of the already constructed building construction section.
- Apparatus according to one of the claims 3 - 7, which is provided with a welding device (26) for interconnecting the metal band and the already constructed building construction section, characterized in that near to the welding device at least one pair of guide rolls (27) are provided for guiding the metal band and the building construction section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT88200378T ATE76151T1 (en) | 1987-03-09 | 1988-02-29 | METHOD OF MAKING METALLIC CYLINDRICAL BUILDINGS AND APPARATUS FOR APPLYING THE METHOD. |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NL8700554A NL8700554A (en) | 1987-03-09 | 1987-03-09 | METHOD FOR MANUFACTURING A CYLINDRICAL METAL BUILDING CONSTRUCTION AND APPARATUS FOR CARRYING OUT THIS METHOD |
NL8700554 | 1987-03-09 |
Publications (3)
Publication Number | Publication Date |
---|---|
EP0282126A2 EP0282126A2 (en) | 1988-09-14 |
EP0282126A3 EP0282126A3 (en) | 1989-03-01 |
EP0282126B1 true EP0282126B1 (en) | 1992-05-13 |
Family
ID=19849675
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP88200378A Expired - Lifetime EP0282126B1 (en) | 1987-03-09 | 1988-02-29 | Method for constructing a cylindric metal building construction as well as apparatus for carrying out said method |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP0282126B1 (en) |
AT (1) | ATE76151T1 (en) |
DE (1) | DE3870938D1 (en) |
DK (1) | DK168051B1 (en) |
ES (1) | ES2031994T3 (en) |
NL (1) | NL8700554A (en) |
Cited By (44)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011009185A1 (en) | 2009-07-24 | 2011-01-27 | Dedini S/A. Indústrias De Base | Jack for the construction of vertical cylindrical tanks |
US8306021B2 (en) | 2008-04-02 | 2012-11-06 | Twilio, Inc. | System and method for processing telephony sessions |
US8315369B2 (en) | 2009-03-02 | 2012-11-20 | Twilio, Inc. | Method and system for a multitenancy telephone network |
US8416923B2 (en) | 2010-06-23 | 2013-04-09 | Twilio, Inc. | Method for providing clean endpoint addresses |
US8509415B2 (en) | 2009-03-02 | 2013-08-13 | Twilio, Inc. | Method and system for a multitenancy telephony network |
US8582737B2 (en) | 2009-10-07 | 2013-11-12 | Twilio, Inc. | System and method for running a multi-module telephony application |
US8601136B1 (en) | 2012-05-09 | 2013-12-03 | Twilio, Inc. | System and method for managing latency in a distributed telephony network |
US8638781B2 (en) | 2010-01-19 | 2014-01-28 | Twilio, Inc. | Method and system for preserving telephony session state |
US8649268B2 (en) | 2011-02-04 | 2014-02-11 | Twilio, Inc. | Method for processing telephony sessions of a network |
US8738051B2 (en) | 2012-07-26 | 2014-05-27 | Twilio, Inc. | Method and system for controlling message routing |
US8737962B2 (en) | 2012-07-24 | 2014-05-27 | Twilio, Inc. | Method and system for preventing illicit use of a telephony platform |
US8837465B2 (en) | 2008-04-02 | 2014-09-16 | Twilio, Inc. | System and method for processing telephony sessions |
US8938053B2 (en) | 2012-10-15 | 2015-01-20 | Twilio, Inc. | System and method for triggering on platform usage |
US8948356B2 (en) | 2012-10-15 | 2015-02-03 | Twilio, Inc. | System and method for routing communications |
US8964726B2 (en) | 2008-10-01 | 2015-02-24 | Twilio, Inc. | Telephony web event system and method |
US9001666B2 (en) | 2013-03-15 | 2015-04-07 | Twilio, Inc. | System and method for improving routing in a distributed communication platform |
US9137127B2 (en) | 2013-09-17 | 2015-09-15 | Twilio, Inc. | System and method for providing communication platform metadata |
US9160696B2 (en) | 2013-06-19 | 2015-10-13 | Twilio, Inc. | System for transforming media resource into destination device compatible messaging format |
US9210275B2 (en) | 2009-10-07 | 2015-12-08 | Twilio, Inc. | System and method for running a multi-module telephony application |
US9226217B2 (en) | 2014-04-17 | 2015-12-29 | Twilio, Inc. | System and method for enabling multi-modal communication |
US9225840B2 (en) | 2013-06-19 | 2015-12-29 | Twilio, Inc. | System and method for providing a communication endpoint information service |
US9240941B2 (en) | 2012-05-09 | 2016-01-19 | Twilio, Inc. | System and method for managing media in a distributed communication network |
US9247062B2 (en) | 2012-06-19 | 2016-01-26 | Twilio, Inc. | System and method for queuing a communication session |
US9246694B1 (en) | 2014-07-07 | 2016-01-26 | Twilio, Inc. | System and method for managing conferencing in a distributed communication network |
US9251371B2 (en) | 2014-07-07 | 2016-02-02 | Twilio, Inc. | Method and system for applying data retention policies in a computing platform |
US9253254B2 (en) | 2013-01-14 | 2016-02-02 | Twilio, Inc. | System and method for offering a multi-partner delegated platform |
US9282124B2 (en) | 2013-03-14 | 2016-03-08 | Twilio, Inc. | System and method for integrating session initiation protocol communication in a telecommunications platform |
US9325624B2 (en) | 2013-11-12 | 2016-04-26 | Twilio, Inc. | System and method for enabling dynamic multi-modal communication |
US9338280B2 (en) | 2013-06-19 | 2016-05-10 | Twilio, Inc. | System and method for managing telephony endpoint inventory |
US9338064B2 (en) | 2010-06-23 | 2016-05-10 | Twilio, Inc. | System and method for managing a computing cluster |
US9338018B2 (en) | 2013-09-17 | 2016-05-10 | Twilio, Inc. | System and method for pricing communication of a telecommunication platform |
US9336500B2 (en) | 2011-09-21 | 2016-05-10 | Twilio, Inc. | System and method for authorizing and connecting application developers and users |
US9344573B2 (en) | 2014-03-14 | 2016-05-17 | Twilio, Inc. | System and method for a work distribution service |
US9363301B2 (en) | 2014-10-21 | 2016-06-07 | Twilio, Inc. | System and method for providing a micro-services communication platform |
US9398622B2 (en) | 2011-05-23 | 2016-07-19 | Twilio, Inc. | System and method for connecting a communication to a client |
US9459925B2 (en) | 2010-06-23 | 2016-10-04 | Twilio, Inc. | System and method for managing a computing cluster |
US9459926B2 (en) | 2010-06-23 | 2016-10-04 | Twilio, Inc. | System and method for managing a computing cluster |
US9477975B2 (en) | 2015-02-03 | 2016-10-25 | Twilio, Inc. | System and method for a media intelligence platform |
US9483328B2 (en) | 2013-07-19 | 2016-11-01 | Twilio, Inc. | System and method for delivering application content |
US9495227B2 (en) | 2012-02-10 | 2016-11-15 | Twilio, Inc. | System and method for managing concurrent events |
US9516101B2 (en) | 2014-07-07 | 2016-12-06 | Twilio, Inc. | System and method for collecting feedback in a multi-tenant communication platform |
US9553799B2 (en) | 2013-11-12 | 2017-01-24 | Twilio, Inc. | System and method for client communication in a distributed telephony network |
US9590849B2 (en) | 2010-06-23 | 2017-03-07 | Twilio, Inc. | System and method for managing a computing cluster |
US9602586B2 (en) | 2012-05-09 | 2017-03-21 | Twilio, Inc. | System and method for managing media in a distributed communication network |
Families Citing this family (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2134107B1 (en) * | 1996-06-14 | 2000-04-16 | Del Campo Salvador Garcia | INSTALLATION FOR THE CONSTRUCTION AND ASSEMBLY "IN SITU" OF TANKS WITH VERTICAL AXIS. |
EP1464418A1 (en) * | 2003-04-03 | 2004-10-06 | Constructions Soudees Du Coteau Csc | Method of constructing a cylindrical metal storage tank, and device for implementing this method |
NL1023402C2 (en) * | 2003-05-13 | 2004-11-16 | Swilion B V | Method and device for constructing a steel tower and a steel tower. |
ITTO20090388A1 (en) * | 2009-05-21 | 2010-11-22 | Ct Metal S R L | TRANSPORTABLE PROFILING PLANT |
US20120208495A1 (en) | 2010-06-23 | 2012-08-16 | Twilio, Inc. | System and method for monitoring account usage on a platform |
US8838707B2 (en) | 2010-06-25 | 2014-09-16 | Twilio, Inc. | System and method for enabling real-time eventing |
AR077643A1 (en) * | 2010-07-07 | 2011-09-14 | Cantoni Gruas Y Montajes S R L | METHOD OF CONSTRUCTION OF TANKS AND DEVICE TO CARRY OUT THE VIOLATION SPACE STAGE OF SUCH METHOD |
AR077400A1 (en) * | 2010-07-07 | 2011-08-24 | Cantoni Gruas Y Montajes S R L | SAFE DEVICE FOR ASSEMBLY AND MOLDING IN-SITU OF LARGE CONSTRUCTION PARTS AND ASSEMBLY ACCESSORY |
US20140044123A1 (en) | 2011-05-23 | 2014-02-13 | Twilio, Inc. | System and method for real time communicating with a client application |
US9648006B2 (en) | 2011-05-23 | 2017-05-09 | Twilio, Inc. | System and method for communicating with a client application |
US10182147B2 (en) | 2011-09-21 | 2019-01-15 | Twilio Inc. | System and method for determining and communicating presence information |
US20120137623A1 (en) * | 2011-10-05 | 2012-06-07 | Balaji Haridasu | Wind turbine tower section and method of assembling a wind turbine tower |
CN103009027B (en) * | 2012-12-04 | 2015-04-22 | 三一重工股份有限公司 | Silo cutting method |
US9274858B2 (en) | 2013-09-17 | 2016-03-01 | Twilio, Inc. | System and method for tagging and tracking events of an application platform |
US9774687B2 (en) | 2014-07-07 | 2017-09-26 | Twilio, Inc. | System and method for managing media and signaling in a communication platform |
US10419891B2 (en) | 2015-05-14 | 2019-09-17 | Twilio, Inc. | System and method for communicating through multiple endpoints |
US9948703B2 (en) | 2015-05-14 | 2018-04-17 | Twilio, Inc. | System and method for signaling through data storage |
EP3189906B1 (en) * | 2016-01-11 | 2019-04-10 | Xaver Lipp | Device for making a cylindrical container with large diameter, in particular of a silo |
US10659349B2 (en) | 2016-02-04 | 2020-05-19 | Twilio Inc. | Systems and methods for providing secure network exchanged for a multitenant virtual private cloud |
US10063713B2 (en) | 2016-05-23 | 2018-08-28 | Twilio Inc. | System and method for programmatic device connectivity |
US10686902B2 (en) | 2016-05-23 | 2020-06-16 | Twilio Inc. | System and method for a multi-channel notification service |
DK181492B1 (en) * | 2022-08-18 | 2024-03-07 | Stiesdal Offshore As | Method of assembling a tubular floating structure and its use |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0136581A1 (en) * | 1983-09-06 | 1985-04-10 | Societe Nouvelle Des Constructions Soudees Du Coteau | Process and installation for manufacturing large cylindrical metallic apparatuses |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2866261A (en) * | 1956-09-19 | 1958-12-30 | Kralovopolska Strojirna | Method of erecting sheet plate casings having a cylindrical shape with vertical axis, by shifting the sheet plates along a helical line |
US3182958A (en) * | 1961-11-07 | 1965-05-11 | Rodoverken Svenungson & Co | Apparatus for erecting a vertically extending cylindrical casing |
US4121747A (en) * | 1976-02-09 | 1978-10-24 | Anchortank, Inc. | Storage tank construction procedures |
DE2649839A1 (en) * | 1976-10-29 | 1978-05-03 | Garcia Salvador Garcia | Method of mfr. of metal containers - has flat sheets welded together for feeding into circle of rollers to form cylinder |
US4177915A (en) * | 1978-06-19 | 1979-12-11 | Wikstrom International Ab | Method for manufacturing large tanks |
JPS5691939A (en) * | 1979-12-25 | 1981-07-25 | Nippon Kokan Kk <Nkk> | Production of circumferential barrel ring for construction of cylindrical storage tank |
-
1987
- 1987-03-09 NL NL8700554A patent/NL8700554A/en not_active Application Discontinuation
-
1988
- 1988-02-29 ES ES198888200378T patent/ES2031994T3/en not_active Expired - Lifetime
- 1988-02-29 EP EP88200378A patent/EP0282126B1/en not_active Expired - Lifetime
- 1988-02-29 DE DE8888200378T patent/DE3870938D1/en not_active Expired - Fee Related
- 1988-02-29 AT AT88200378T patent/ATE76151T1/en not_active IP Right Cessation
- 1988-03-08 DK DK122588A patent/DK168051B1/en not_active IP Right Cessation
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0136581A1 (en) * | 1983-09-06 | 1985-04-10 | Societe Nouvelle Des Constructions Soudees Du Coteau | Process and installation for manufacturing large cylindrical metallic apparatuses |
Cited By (65)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8837465B2 (en) | 2008-04-02 | 2014-09-16 | Twilio, Inc. | System and method for processing telephony sessions |
US9306982B2 (en) | 2008-04-02 | 2016-04-05 | Twilio, Inc. | System and method for processing media requests during telephony sessions |
US8611338B2 (en) | 2008-04-02 | 2013-12-17 | Twilio, Inc. | System and method for processing media requests during a telephony sessions |
US8306021B2 (en) | 2008-04-02 | 2012-11-06 | Twilio, Inc. | System and method for processing telephony sessions |
US9596274B2 (en) | 2008-04-02 | 2017-03-14 | Twilio, Inc. | System and method for processing telephony sessions |
US9456008B2 (en) | 2008-04-02 | 2016-09-27 | Twilio, Inc. | System and method for processing telephony sessions |
US8755376B2 (en) | 2008-04-02 | 2014-06-17 | Twilio, Inc. | System and method for processing telephony sessions |
US9591033B2 (en) | 2008-04-02 | 2017-03-07 | Twilio, Inc. | System and method for processing media requests during telephony sessions |
US8964726B2 (en) | 2008-10-01 | 2015-02-24 | Twilio, Inc. | Telephony web event system and method |
US9407597B2 (en) | 2008-10-01 | 2016-08-02 | Twilio, Inc. | Telephony web event system and method |
US8570873B2 (en) | 2009-03-02 | 2013-10-29 | Twilio, Inc. | Method and system for a multitenancy telephone network |
US8737593B2 (en) | 2009-03-02 | 2014-05-27 | Twilio, Inc. | Method and system for a multitenancy telephone network |
US8995641B2 (en) | 2009-03-02 | 2015-03-31 | Twilio, Inc. | Method and system for a multitenancy telephone network |
US8509415B2 (en) | 2009-03-02 | 2013-08-13 | Twilio, Inc. | Method and system for a multitenancy telephony network |
US9357047B2 (en) | 2009-03-02 | 2016-05-31 | Twilio, Inc. | Method and system for a multitenancy telephone network |
US8315369B2 (en) | 2009-03-02 | 2012-11-20 | Twilio, Inc. | Method and system for a multitenancy telephone network |
WO2011009185A1 (en) | 2009-07-24 | 2011-01-27 | Dedini S/A. Indústrias De Base | Jack for the construction of vertical cylindrical tanks |
US9491309B2 (en) | 2009-10-07 | 2016-11-08 | Twilio, Inc. | System and method for running a multi-module telephony application |
US9210275B2 (en) | 2009-10-07 | 2015-12-08 | Twilio, Inc. | System and method for running a multi-module telephony application |
US8582737B2 (en) | 2009-10-07 | 2013-11-12 | Twilio, Inc. | System and method for running a multi-module telephony application |
US8638781B2 (en) | 2010-01-19 | 2014-01-28 | Twilio, Inc. | Method and system for preserving telephony session state |
US9338064B2 (en) | 2010-06-23 | 2016-05-10 | Twilio, Inc. | System and method for managing a computing cluster |
US9590849B2 (en) | 2010-06-23 | 2017-03-07 | Twilio, Inc. | System and method for managing a computing cluster |
US9459925B2 (en) | 2010-06-23 | 2016-10-04 | Twilio, Inc. | System and method for managing a computing cluster |
US9459926B2 (en) | 2010-06-23 | 2016-10-04 | Twilio, Inc. | System and method for managing a computing cluster |
US8416923B2 (en) | 2010-06-23 | 2013-04-09 | Twilio, Inc. | Method for providing clean endpoint addresses |
US8649268B2 (en) | 2011-02-04 | 2014-02-11 | Twilio, Inc. | Method for processing telephony sessions of a network |
US9455949B2 (en) | 2011-02-04 | 2016-09-27 | Twilio, Inc. | Method for processing telephony sessions of a network |
US9398622B2 (en) | 2011-05-23 | 2016-07-19 | Twilio, Inc. | System and method for connecting a communication to a client |
US9336500B2 (en) | 2011-09-21 | 2016-05-10 | Twilio, Inc. | System and method for authorizing and connecting application developers and users |
US9495227B2 (en) | 2012-02-10 | 2016-11-15 | Twilio, Inc. | System and method for managing concurrent events |
US9602586B2 (en) | 2012-05-09 | 2017-03-21 | Twilio, Inc. | System and method for managing media in a distributed communication network |
US8601136B1 (en) | 2012-05-09 | 2013-12-03 | Twilio, Inc. | System and method for managing latency in a distributed telephony network |
US9240941B2 (en) | 2012-05-09 | 2016-01-19 | Twilio, Inc. | System and method for managing media in a distributed communication network |
US9350642B2 (en) | 2012-05-09 | 2016-05-24 | Twilio, Inc. | System and method for managing latency in a distributed telephony network |
US9247062B2 (en) | 2012-06-19 | 2016-01-26 | Twilio, Inc. | System and method for queuing a communication session |
US8737962B2 (en) | 2012-07-24 | 2014-05-27 | Twilio, Inc. | Method and system for preventing illicit use of a telephony platform |
US9270833B2 (en) | 2012-07-24 | 2016-02-23 | Twilio, Inc. | Method and system for preventing illicit use of a telephony platform |
US8738051B2 (en) | 2012-07-26 | 2014-05-27 | Twilio, Inc. | Method and system for controlling message routing |
US8938053B2 (en) | 2012-10-15 | 2015-01-20 | Twilio, Inc. | System and method for triggering on platform usage |
US9307094B2 (en) | 2012-10-15 | 2016-04-05 | Twilio, Inc. | System and method for routing communications |
US8948356B2 (en) | 2012-10-15 | 2015-02-03 | Twilio, Inc. | System and method for routing communications |
US9319857B2 (en) | 2012-10-15 | 2016-04-19 | Twilio, Inc. | System and method for triggering on platform usage |
US9253254B2 (en) | 2013-01-14 | 2016-02-02 | Twilio, Inc. | System and method for offering a multi-partner delegated platform |
US9282124B2 (en) | 2013-03-14 | 2016-03-08 | Twilio, Inc. | System and method for integrating session initiation protocol communication in a telecommunications platform |
US9001666B2 (en) | 2013-03-15 | 2015-04-07 | Twilio, Inc. | System and method for improving routing in a distributed communication platform |
US9338280B2 (en) | 2013-06-19 | 2016-05-10 | Twilio, Inc. | System and method for managing telephony endpoint inventory |
US9160696B2 (en) | 2013-06-19 | 2015-10-13 | Twilio, Inc. | System for transforming media resource into destination device compatible messaging format |
US9240966B2 (en) | 2013-06-19 | 2016-01-19 | Twilio, Inc. | System and method for transmitting and receiving media messages |
US9225840B2 (en) | 2013-06-19 | 2015-12-29 | Twilio, Inc. | System and method for providing a communication endpoint information service |
US9483328B2 (en) | 2013-07-19 | 2016-11-01 | Twilio, Inc. | System and method for delivering application content |
US9137127B2 (en) | 2013-09-17 | 2015-09-15 | Twilio, Inc. | System and method for providing communication platform metadata |
US9338018B2 (en) | 2013-09-17 | 2016-05-10 | Twilio, Inc. | System and method for pricing communication of a telecommunication platform |
US9553799B2 (en) | 2013-11-12 | 2017-01-24 | Twilio, Inc. | System and method for client communication in a distributed telephony network |
US9325624B2 (en) | 2013-11-12 | 2016-04-26 | Twilio, Inc. | System and method for enabling dynamic multi-modal communication |
US9344573B2 (en) | 2014-03-14 | 2016-05-17 | Twilio, Inc. | System and method for a work distribution service |
US9226217B2 (en) | 2014-04-17 | 2015-12-29 | Twilio, Inc. | System and method for enabling multi-modal communication |
US9516101B2 (en) | 2014-07-07 | 2016-12-06 | Twilio, Inc. | System and method for collecting feedback in a multi-tenant communication platform |
US9246694B1 (en) | 2014-07-07 | 2016-01-26 | Twilio, Inc. | System and method for managing conferencing in a distributed communication network |
US9553900B2 (en) | 2014-07-07 | 2017-01-24 | Twilio, Inc. | System and method for managing conferencing in a distributed communication network |
US9251371B2 (en) | 2014-07-07 | 2016-02-02 | Twilio, Inc. | Method and system for applying data retention policies in a computing platform |
US9588974B2 (en) | 2014-07-07 | 2017-03-07 | Twilio, Inc. | Method and system for applying data retention policies in a computing platform |
US9509782B2 (en) | 2014-10-21 | 2016-11-29 | Twilio, Inc. | System and method for providing a micro-services communication platform |
US9363301B2 (en) | 2014-10-21 | 2016-06-07 | Twilio, Inc. | System and method for providing a micro-services communication platform |
US9477975B2 (en) | 2015-02-03 | 2016-10-25 | Twilio, Inc. | System and method for a media intelligence platform |
Also Published As
Publication number | Publication date |
---|---|
EP0282126A2 (en) | 1988-09-14 |
ATE76151T1 (en) | 1992-05-15 |
NL8700554A (en) | 1988-10-03 |
DK122588D0 (en) | 1988-03-08 |
ES2031994T3 (en) | 1993-01-01 |
DK122588A (en) | 1988-09-10 |
EP0282126A3 (en) | 1989-03-01 |
DE3870938D1 (en) | 1992-06-17 |
DK168051B1 (en) | 1994-01-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0282126B1 (en) | Method for constructing a cylindric metal building construction as well as apparatus for carrying out said method | |
CN103465033B (en) | Full-automatic reinforcing bar truss production line | |
US4706488A (en) | Method of roll forming cylindrical pipe | |
RU2639403C2 (en) | Process of tank erection and device for implementation of this process | |
US3863479A (en) | Apparatus for the production of a tube | |
GB1564983A (en) | Storage tank construction procedures | |
CN113275720A (en) | Construction method for manufacturing reinforcement cage by roll welding machine for highway engineering | |
US4420868A (en) | Trough manufacturing process | |
US4074847A (en) | Welded storage tank construction including a structural fin | |
US3521335A (en) | Assembly for forming silos | |
US4288277A (en) | Molding system with retracting mold | |
US4432128A (en) | Method and system for installing a layered vessel on location | |
CN113714435A (en) | Special-shaped reinforcement framework forming welding equipment and construction method thereof | |
US4467633A (en) | Trough, manufacturing process, and apparatus | |
CN111774863B (en) | Flexible production system for automatic welding of cable reel | |
US4606208A (en) | Pipe forming apparatus | |
CN113172182B (en) | Reinforcing cage production process of reinforced precast pile | |
CN216787815U (en) | Slip form system suitable for variable cross-section vertical structure | |
GB2096227A (en) | Method and apparatus for silo construction | |
US3882585A (en) | Method and device for positioning prestressing hoops | |
US3436518A (en) | Apparatus for automatic welding of sheet metal shells,especially cistern shells | |
US4632617A (en) | Method and system for installing a layered vessel on location | |
JPS5832520A (en) | Manufacture of cylindrical sheel having thin wall and large diameter and device thereof | |
CN220209807U (en) | Cable laying mechanism | |
CN219357740U (en) | Steel bar bending machine with adjustable bending diameter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE CH DE ES FR GB IT LI NL SE |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE CH DE ES FR GB IT LI NL SE |
|
17P | Request for examination filed |
Effective date: 19890824 |
|
17Q | First examination report despatched |
Effective date: 19901023 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH DE ES FR GB IT LI NL SE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Effective date: 19920513 Ref country code: CH Effective date: 19920513 Ref country code: AT Effective date: 19920513 |
|
REF | Corresponds to: |
Ref document number: 76151 Country of ref document: AT Date of ref document: 19920515 Kind code of ref document: T |
|
REF | Corresponds to: |
Ref document number: 3870938 Country of ref document: DE Date of ref document: 19920617 |
|
ITF | It: translation for a ep patent filed |
Owner name: BUGNION S.P.A. |
|
ET | Fr: translation filed | ||
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2031994 Country of ref document: ES Kind code of ref document: T3 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
EAL | Se: european patent in force in sweden |
Ref document number: 88200378.3 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20030226 Year of fee payment: 16 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20030227 Year of fee payment: 16 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20040301 Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20040301 |
|
EUG | Se: european patent has lapsed | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED. Effective date: 20050228 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20040301 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20060221 Year of fee payment: 19 Ref country code: GB Payment date: 20060221 Year of fee payment: 19 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20060228 Year of fee payment: 19 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: CD |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20070323 Year of fee payment: 20 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20070228 |
|
NLV4 | Nl: lapsed or anulled due to non-payment of the annual fee |
Effective date: 20070901 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070901 Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070901 |
|
BE20 | Be: patent expired |
Owner name: *OOSTWOUDER SILO-SERVICE Effective date: 20080229 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070228 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20070228 Year of fee payment: 20 |