EP0134892A1 - Lift group control for double-compartment cars - Google Patents

Lift group control for double-compartment cars Download PDF

Info

Publication number
EP0134892A1
EP0134892A1 EP84105114A EP84105114A EP0134892A1 EP 0134892 A1 EP0134892 A1 EP 0134892A1 EP 84105114 A EP84105114 A EP 84105114A EP 84105114 A EP84105114 A EP 84105114A EP 0134892 A1 EP0134892 A1 EP 0134892A1
Authority
EP
European Patent Office
Prior art keywords
cabin
floor
calls
operating costs
scanner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP84105114A
Other languages
German (de)
French (fr)
Other versions
EP0134892B1 (en
Inventor
Joris Dr. Ing.-Dipl. Schröder
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inventio AG
Original Assignee
Inventio AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inventio AG filed Critical Inventio AG
Priority to AT84105114T priority Critical patent/ATE26433T1/en
Publication of EP0134892A1 publication Critical patent/EP0134892A1/en
Application granted granted Critical
Publication of EP0134892B1 publication Critical patent/EP0134892B1/en
Expired legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B1/00Control systems of elevators in general
    • B66B1/24Control systems with regulation, i.e. with retroactive action, for influencing travelling speed, acceleration, or deceleration
    • B66B1/2408Control systems with regulation, i.e. with retroactive action, for influencing travelling speed, acceleration, or deceleration where the allocation of a call to an elevator car is of importance, i.e. by means of a supervisory or group controller
    • B66B1/2458For elevator systems with multiple shafts and a single car per shaft
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B1/00Control systems of elevators in general
    • B66B1/24Control systems with regulation, i.e. with retroactive action, for influencing travelling speed, acceleration, or deceleration
    • B66B1/2408Control systems with regulation, i.e. with retroactive action, for influencing travelling speed, acceleration, or deceleration where the allocation of a call to an elevator car is of importance, i.e. by means of a supervisory or group controller
    • B66B1/2416For single car elevator systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B2201/00Aspects of control systems of elevators
    • B66B2201/10Details with respect to the type of call input
    • B66B2201/102Up or down call input
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B2201/00Aspects of control systems of elevators
    • B66B2201/20Details of the evaluation method for the allocation of a call to an elevator car
    • B66B2201/211Waiting time, i.e. response time
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B2201/00Aspects of control systems of elevators
    • B66B2201/30Details of the elevator system configuration
    • B66B2201/306Multi-deck elevator cars
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S187/00Elevator, industrial lift truck, or stationary lift for vehicle
    • Y10S187/902Control for double-decker car

Definitions

  • the invention relates to a group control for elevators with double cars, which are formed from two cars arranged in a common car frame, with car call memories and the load measuring devices assigned to the cars, with floor call memories, with each elevator assigned to the group, each indicating the floor of a possible stopping, and with a scanning device having at least one position for each floor, a control device being provided by means of which the double cabins of the elevator group can be allocated to the floor calls.
  • Such lifts can carry twice as many passengers on each trip as lifts with single cabins. Since less has to be held, the same number of floor calls can be serviced in a shorter time, so that the conveying capacity can be increased considerably.
  • the control of the elevator group works according to the system of dividing the travel path into zones, with cars and zones being assigned to one another and the cars being distributed over the entire travel path according to the position of the zones.
  • the allocation of the floor calls to the cars is only dependent on the position and direction of the calls, whereas other factors, such as the car load, are practically not taken into account in the allocation procedure.
  • a uniform distribution of the passengers to the individual cabins of the double cabins is therefore not possible during normal operation of the elevator system, so that the passengers have short average waiting times and increasing the delivery rate, optimal results cannot be achieved.
  • the assignments of the cabins to the floor calls can be optimized in terms of time.
  • a computing device in the form of a microprocessor, during a scanning cycle of a first scanner on each floor, whether there is a floor call or not, the distance between the floor and the car position indicated by a selector, the intermediate stops to be expected within this distance and the momentary cabin load is calculated as a sum proportional to the time lost by waiting passengers and the time lost by passengers in the cabin.
  • the cabin load at the time of the calculation is corrected in such a way that the expected boarding and disembarking operations, derived from the number of boarding and disembarking passengers in the past, are taken into account in future stops.
  • This total loss time also called operating costs, is stored in a cost memory.
  • a cost comparison cycle by means of a second scanner are compared with the operating costs of all lifts over the comparison means with each other, each in a Z uillers Grande of the elevator with the lowest operating costs of a Zuillersanwei Solution can be stored, which designates the floor to which the cabin in question is optimally assigned in terms of time.
  • the object on which the invention is based is to provide, by improving the group control described above, a group control for elevators with double cabins, by means of which the double cabins can be allocated to the floor calls in such a way that minimal average waiting times of the passengers are achieved and the conveying capacity is increased.
  • the invention proposes, with the features characterized in the claims, to calculate the operating costs for each of the two cabins of a double cabin and to compare them with one another by means of a comparison circuit, the lower operating costs being stored in the cost memory of the elevator in question, and with If there are allocation instructions for rectified floor calls from two adjacent floors and / or coincidences between car calls and scanner positions, the operating costs to be saved are reduced.
  • the advantages achieved with the invention are, in particular, that stopping on adjacent floors with rectified floor calls and / or on floors with cabin and floor calls is promoted, which means fewer stops, shorter waiting times and increased conveying capacity.
  • Another advantage is that the cab serves a single floor call with the lower operating costs. In this way, the double cabins are filled more evenly and the delivery rate is increased.
  • 1, 1 denotes an elevator shaft of an elevator a of an elevator group consisting of, for example, three elevators a, b and c.
  • a conveyor machine 2 drives a conveyor cable 3 in the elevator shaft 1 guided double car 4, formed from two cars 5, 6 arranged in a common car frame, sixteen floors E1 to E16 being operated according to the elevator system chosen as an example.
  • the distance between the two cabins 5, 6 is selected so that it corresponds to the distance between two adjacent floors.
  • the carrier 2 is controlled by a drive control known from the European patent application No.
  • 0026406 the setpoint generation, the control functions and the initiation of the stop being implemented by means of a microcomputer system 7, and with 8 the measuring and actuating elements of the drive control, which are symbolized by a first interface IF1 are connected to the microcomputer system 7.
  • Each cabin 5, 6 of the double cabin 4 has a load measuring device 9, a device 10 signaling the respective operating state Z of the cabin and cabin call transmitter 11.
  • the devices 9, 10 are connected to the microcomputer system 7 via the first interface IF1.
  • the car call transmitter 11 and the floor call transmitter 12 provided on the floors are connected to the microcomputer system 7, for example, via an input device 13 which has become known with European patent application No. 0062141 and a second interface IF2.
  • the microcomputer system 7 consists of a storey call memory RAM1, two of the individual cabins 5, 6 of the double 4 assigned car call memories RAM2, RAM3, one load memory RAM4 storing the current load P m of each individual car 5, 6, two memories RAM5, RAM6 storing the operating state Z of the cars 5, 6, two cost share memories RAM7, RAM8, one cost memory RAM9, one Allocation memory RAM10, a license memory RAM11 storing an identifier of the cabin 5, 6 with the lower service costs K, a program memory EPROM and a microprocessor CPU which is connected via a bus B to the memories RAM1 to RAM11, EPROM.
  • R1 and R2 denote a first and a second scanner of a scanner, the scanner R1, R2 being registers by means of which addresses corresponding to the floor numbers and the direction of travel are formed.
  • the cost share memory RAM7, RAM8 have two memory locations v, h for each scanning position, which are assigned to the two cabins 5, 6 of the double cabin 4.
  • R3 denotes a selector in the form of a further register which, when the car is moving, displays the address of the floor on which the car could still stop.
  • the selector addresses are assigned target paths which are compared with a target path generated in a setpoint generator. If the paths are identical and a stop command is present, the delay phase is initiated. If there is no stop command, the selector R3 is switched to the next floor.
  • a comparison circuit VS linked to the cost share memories RAM7, RAM8, the cost memory RAM9 and the identification memory RAM11 has, according to FIG. 2, two adders AD1, AD2 and a comparator KO.
  • the comparison circuit VS required for the operations described in more detail below is formed by the microprocessor CPU.
  • microcomputer systems 7 of the individual elevators a, b, c are connected to one another via a comparison device 14 known from European patent application No. 0050304 and a third interface IF3 as well as via a partyline transmission system 15 and a fourth interface IF4 known from European patent application No. 0050305 connected and in this way form the group control according to the invention.
  • the second sampler R2 After completion of the cost calculation cycle KBZ (time II) the second sampler R2 start at all lifts a, b, c at the same time one rotation, hereinafter referred to as K east CPC comparison cycle, starting from the first floor (time III).
  • K east CPC comparison cycle For example, the KVZ cost comparison cycles start five to ten times per second.
  • the operating costs K or K h contained in the cost memories RAM9 of the elevators a, b, c are fed to the comparison device 14 and compared with one another, wherein an allocation instruction in each case in the allocation memory RAM10 of the elevator a, b, c with the lowest operating costs K.
  • Form of a logical "1" can be stored, which designates the floor to which the elevator a, b, c in question is optimally assigned in time. For example, based on the comparison in the scanning position 9, a reassignment may take place by deleting an assignment instruction for elevator b and enrolling one for elevator a (FIG. 1). Since, according to the example for floor E9, a floor call is stored and the selector R3 points to this floor (FIG. 1), the delay phase could be initiated for elevator a if the criteria mentioned at the beginning were given.
  • the indicator "1" is present in the Indicator memory RAM11 predefines the destination path corresponding to the next selector position, so that the double cabin 4 would hold, for example, with the less loaded rear cabin 5 or 6 on floor E9.
  • a new cost calculation cycle KBZ is started for elevators a and b, and cost comparison cycle 5 is interrupted because the former has priority. While the cost calculation cycle KBZ of elevator b runs without interruption, that of elevator a may be suspended between times IV and V due to a drive control process.
  • the cost comparison is then continued from scanner position 10 in order to be interrupted again at scanner position 9 (downward) by the occurrence of an event in elevator c, for example a change in the selector position (time VI).

Landscapes

  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Elevator Control (AREA)
  • Vehicle Body Suspensions (AREA)
  • Saccharide Compounds (AREA)
  • Macromonomer-Based Addition Polymer (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Forklifts And Lifting Vehicles (AREA)
  • Valve Device For Special Equipments (AREA)

Abstract

Mit dieser Gruppensteuerung können die Zuordnungen der einzelnen Kabinen (5, 6) von Doppelkabinen (4) einer Aufzugsgruppe zu gespeicherten Stockwerkrufen zeitlich optimiert und neu eintreffende Stockwerkrufe sofort zugeteilt werden. Eine je Aufzug (a, b, c) vorgesehene Recheneinrichtung (CPU) errechnet für jede Kabine (5, 6) einer Doppelkabine (4) mit Bezug auf jedes Stockwerk den Wartezeiten von Fahrgästen entsprechende Bedienungskosten. Die Bedienungskosten werden reduziert, wenn im Berechnungsstockwerk und einem unmittelbar benachbarten Stockwerk gleichgerichtete Rufe vorliegen und/oder Koinzidenzen von Kabinenrufen und solchen Stockwerken auftreten. Die Bedienungskosten der beiden Kabinen (5, 6) einer Doppelkabine (4) werden miteinander verglichen und die geringeren in einem Kostenspeicher (RAM9) des betreffenden Aufzuges (a, b, c) gespeichert. Während eines Kostenvergleichszyklus werden die Bedienungskosten aller Aufzüge stockwerksweise über eine Vergleichseinrichtung (14) miteinander verglichen, wobei jeweils in einem Zuteilungsspeicher (RAM10) des Aufzuges (a, b, c) mit den geringsten Bedienungskosten eine Zuteilungsanweisung speicherbar ist, die dasjenige Stockwerk bezeichnet, dem die betrettende Kabine (5, 6) der Doppelkabine (4) zeitlich optimal zugeordnet ist.With this group control, the assignments of the individual cars (5, 6) from double cars (4) of an elevator group to stored floor calls can be optimized in terms of time and new incoming floor calls can be assigned immediately. A computing device (CPU) provided for each elevator (a, b, c) calculates operating costs corresponding to the waiting times of passengers for each cabin (5, 6) of a double cabin (4) with respect to each floor. The operating costs are reduced if there are rectified calls in the calculation floor and a directly adjacent floor and / or there are coincidences between car calls and such floors. The operating costs of the two cabins (5, 6) of a double cabin (4) are compared with one another and the lower costs are stored in a cost memory (RAM9) of the elevator (a, b, c) in question. During a cost comparison cycle, the operating costs of all the elevators are compared with each other by means of a comparison device (14), an allocation instruction which designates the floor to which the elevator can be stored being stored in an allocation memory (RAM10) of the elevator (a, b, c) with the lowest operating costs the entering cabin (5, 6) of the double cabin (4) is optimally assigned in terms of time.

Description

Die Erfindung betrifft eine Gruppensteuerung für Aufzüge mit Doppelkabinen, die aus zwei in einem gemeinsamen Fahrkorbrahmen angeordnete Kabinen gebildet sind, mit Kabinenrufspeichern und den Kabinen zugeordneten Lastmesseinrichtungen, mit Stockwerkrufspeichern, mit jedem Aufzug der Gruppe zugeordneten, jeweils das Stockwerk eines möglichen Anhaltens anzeigende Selektoren sowie mit einer für jedes Stockwerk mindestens eine Stellung aufweisende Abtasteinrichtung, wobei eine Steuerungseinrichtung vorgesehen ist, mittels welcher die Doppelkabinen der Aufzugsgruppe den Stockwerkrufen zuteilbar sind.The invention relates to a group control for elevators with double cars, which are formed from two cars arranged in a common car frame, with car call memories and the load measuring devices assigned to the cars, with floor call memories, with each elevator assigned to the group, each indicating the floor of a possible stopping, and with a scanning device having at least one position for each floor, a control device being provided by means of which the double cabins of the elevator group can be allocated to the floor calls.

Derartige Aufzüge können bei jeder Fahrt doppelt soviel Fahrgäste befördern wie Aufzüge mit Einzelkabinen. Da weniger gehalten werden muss, kann die gleiche Anzahl Stockwerkrufe in kürzerer Zeit bedient werden, so dass die Förderleistung beträchtlich gesteigert werden kann.Such lifts can carry twice as many passengers on each trip as lifts with single cabins. Since less has to be held, the same number of floor calls can be serviced in a shorter time, so that the conveying capacity can be increased considerably.

Mit der schweizerischen Patentschrift Nr. 529 054 ist eine Steuerung für eine Aufzugsgruppe mit Doppelkabinen bekannt geworden, bei der die Doppelkabinen derartig ausgebildet sind, dass zwei benachbarte Stockwerke gleichzeitig bedient werden können. Hierbei soll das Füllen eines Gebäudes in möglichst kurzer Zeit bei annähernd gleichmässiger Belegung der Doppelkabinen dadurch erreicht werden, dass im Erdgeschoss die Fahrgäste zu geradzahligen Obergeschossen in die obere Kabine, zu den ungeradzahligen in die untere Kabine einsteigen, wobei jeweils die Kabinenrufgeber für die nicht der Kabine zugeordneten Geschosse gesperrt sind. Sobald die Kabine auf einen Stockwerkruf anhalten muss, wird die Sperrung aufgehoben, so dass der Zusteiger zu beliebigen Stockwerken fahren kann. Die Steuerung der Aufzugsgruppe arbeitet nach dem System der Unterteilung des Fahrweges in Zonen, wobei Kabinen und Zonen einander zugeordnet sind und die Kabinen gemäss der Lage der Zonen über den ganzen Fahrweg verteilt sind. Bei derartigen Steuerungen ist die Zuteilung der Stockwerkrufe zu den Kabinen lediglich von der Lage und Richtung der Rufe abhängig, wohingegen andere Faktoren, wie beispielsweise die Kabinenlast, bei der Zuteilungsprozedur praktisch nicht berücksichtigt werden. Eine gleichmässige Verteilung der Fahrgäste auf die einzelnen Kabinen der Doppelkabinen ist daher bei Normalbetrieb der Aufzugsanlage nicht möglich, so dass in bezug auf kurze durchschnittliche Wartezeiten der Fahrgäste und Steigerung der Förderleistung keine optimalen Ergebnisse erzielbar sind.With the Swiss patent specification No. 529 054 a control for an elevator group with double cars has become known, in which the double cars are designed in such a way that two adjacent floors can be operated simultaneously. In this case, the filling of a building should be achieved in the shortest possible time with approximately even occupancy of the double cabins by the fact that on the ground floor the passengers board the even-numbered upper floors in the upper cabin and the odd-numbered ones in the lower cabin, whereby the cabin callers for those not the Storeys assigned to the cabin are locked. As soon as the cabin has to stop for a floor call, the lock is released so that the boarding person can drive to any floor. The control of the elevator group works according to the system of dividing the travel path into zones, with cars and zones being assigned to one another and the cars being distributed over the entire travel path according to the position of the zones. In the case of such controls, the allocation of the floor calls to the cars is only dependent on the position and direction of the calls, whereas other factors, such as the car load, are practically not taken into account in the allocation procedure. A uniform distribution of the passengers to the individual cabins of the double cabins is therefore not possible during normal operation of the elevator system, so that the passengers have short average waiting times and increasing the delivery rate, optimal results cannot be achieved.

Bei einer aus der europäischen Patentanmeldung Nr. 0032213 bekannten Gruppensteuerung für Aufzüge mit Einzelkabinen können die Zuordnungen der Kabinen zu den Stockwerkrufen zeitlich optimiert werden. Hierbei wird mittels einer Recheneinrichtung in Form eines Mikroprozessors während eines Abtastzyklus eines ersten Abtasters bei jedem Stockwerk, ob ein Stockwerkruf vorhanden ist oder nicht, aus der Distanz zwischen dem Stockwerk und der von einem Selektor angezeigten Kabinenposition, den innerhalb dieser Distanz zu erwartenden Zwischenhalten und der momentanen Kabinenlast eine den Zeitverlusten von wartenden Fahrgästen und den Zeitverlusten der Fahrgäste in der Kabine proportionale Summe errechnet. Dabei wird die im Berechnungszeitpunkt vorhandene Kabinenlast derart korrigiert, dass die voraussichtlichen, aus den Zu- und Aussteigerzahlen der Vergangenheit abgeleiteten Zu- und Aussteiger bei den zukünftigen Zwischenhalten berücksichtigt werden. Diese, auch Bedienungskosten genannte, Verlustzeitsumme wird in einem Kostenspeicher gespeichert. Während eines Kostenvergleichszyklus mittels eines zweiten Abtasters werden die Bedienungskosten aller Aufzüge über die Vergleichseinrichtung miteinander verglichen, wobei jeweils in einem Zuteilungsspeicher des Aufzuges mit den geringsten Bedienungskosten eine Zuteilungsanweisung speicherbar ist, die dasjenige Stockwerk bezeichnet, dem die betreffende Kabine zeitlich optimal zugeordnet ist.With a group control for elevators with single cabins known from European patent application No. 0032213, the assignments of the cabins to the floor calls can be optimized in terms of time. Here, by means of a computing device in the form of a microprocessor, during a scanning cycle of a first scanner on each floor, whether there is a floor call or not, the distance between the floor and the car position indicated by a selector, the intermediate stops to be expected within this distance and the momentary cabin load is calculated as a sum proportional to the time lost by waiting passengers and the time lost by passengers in the cabin. The cabin load at the time of the calculation is corrected in such a way that the expected boarding and disembarking operations, derived from the number of boarding and disembarking passengers in the past, are taken into account in future stops. This total loss time, also called operating costs, is stored in a cost memory. During a cost comparison cycle by means of a second scanner are compared with the operating costs of all lifts over the comparison means with each other, each in a Z uteilungsspeicher of the elevator with the lowest operating costs of a Zuteilungsanwei Solution can be stored, which designates the floor to which the cabin in question is optimally assigned in terms of time.

Die der Erfindung zugrunde liegende Aufgabe besteht darin, durch Verbesserung der vorstehend beschriebenen Gruppensteuerung eine Gruppensteuerung für Aufzüge mit Doppelkabinen zu schaffen, mittels welcher die Doppelkabinen den Stockwerkrufen derart zuteilbar sind, dass minimale durchschnittliche Wartezeiten der Fahrgäste erzielt werden und die Förderleistung gesteigert wird. Zur Lösung dieser Aufgabe schlägt die Erfindung mit den in den Patentansprüchen gekennzeichneten Merkmalen vor, die Bedienungskosten für jede der beiden Kabinen einer Doppelkabine zu errechnen und mittels einer Vergleichsschaltung miteinander zu vergleichen, wobei die geringeren Bedienungskosten im Kostenspeicher des betreffenden Aufzuges gespeichert werden, und wobei bei Vorliegen von Zuteilungsanweisungen für gleichgerichtete Stockwerkrufe zweier benachbarter Stockwerke und/oder Koinzidenzen von Kabinenrufen und Abtasterstellungen die zu speichernden Bedienungskosten reduziert werden.The object on which the invention is based is to provide, by improving the group control described above, a group control for elevators with double cabins, by means of which the double cabins can be allocated to the floor calls in such a way that minimal average waiting times of the passengers are achieved and the conveying capacity is increased. To achieve this object, the invention proposes, with the features characterized in the claims, to calculate the operating costs for each of the two cabins of a double cabin and to compare them with one another by means of a comparison circuit, the lower operating costs being stored in the cost memory of the elevator in question, and with If there are allocation instructions for rectified floor calls from two adjacent floors and / or coincidences between car calls and scanner positions, the operating costs to be saved are reduced.

Die mit der Erfindung erzielten Vorteile liegen insbesondere darin, dass das Anhalten an benachbarten Stockwerken mit gleichgerichteten Stockwerkrufen und/oder an Stockwerken mit Kabinen- und Stockwerkrufen gefördert wird, wodurch weniger Halte entstehen, die Wartezeiten verringert werden und die Förderleistung erhöht wird. Ein weiterer Vorteil liegt darin, dass jeweils die Kabine mit den kleineren Bedienungskosten einen einzelnen zugeteilten Stockwerkruf bedient. Auf diese Weise werden die Doppelkabinen gleichmässiger gefüllt und die Förderleistung zusätzlich gesteigert.The advantages achieved with the invention are, in particular, that stopping on adjacent floors with rectified floor calls and / or on floors with cabin and floor calls is promoted, which means fewer stops, shorter waiting times and increased conveying capacity. Another advantage is that the cab serves a single floor call with the lower operating costs. In this way, the double cabins are filled more evenly and the delivery rate is increased.

Im folgenden wird die Erfindung anhand eines auf der Zeichnung dargestellten Ausführungsbeispieles näher erläutert. Es zeigen :

  • Fig. 1 eine schematische Darstellung der erfindungsgemässen Gruppensteuerung für einen Aufzug einer aus drei Aufzügen bestehenden Aufzugsgruppe,
  • Fig. 2 eine schematische Darstellung einer Vergleichsschaltung eines Aufzuges der Gruppensteuerung gemäss Fig. 1 und
  • Fig. 3 ein Diagramm des zeitlichen Ablaufes der Steuerung.
The invention is explained in more detail below with reference to an exemplary embodiment shown in the drawing. Show it :
  • 1 shows a schematic representation of the group control according to the invention for an elevator of an elevator group consisting of three elevators,
  • Fig. 2 is a schematic representation of a comparison circuit of an elevator of the group control according to Fig. 1 and
  • Fig. 3 is a diagram of the timing of the control.

In der Fig. 1 ist mit 1 ein Aufzugsschacht eines Aufzuges a einer aus beispielsweise drei Aufzügen a, b und c bestehenden Aufzugsgruppe bezeichnet. Eine Fördermaschine 2 treibt über ein Förderseil 3 eine im Aufzugsschacht 1 geführte, aus zwei in einem gemeinsamen Fahrkorbrahmen angeordnete Kabinen 5, 6 gebildete Doppelkabine 4 an, wobei gemäss der als Beispiel gewählten Aufzugsanlage sechzehn Stockwerke E1 bis E16 bedient werden. Der Abstand der beiden Kabinen 5, 6 voneinander ist so gewählt, dass er mit dem Abstand zweier benachbarter Stockwerke übereinstimmt. Die Fördermaschine 2 wird von einer aus der europäischen Patentanmeldung Nr. 0026406 bekannten Antriebssteuerung gesteuert, wobei die Sollwerterzeugung, die Regelfunktionen und die Stoppeinleitung mittels eines Mikrocomputersystems 7 realisiert werden, und wobei mit 8 die Mess- und Stellglieder der Antriebssteuerung symbolisiert sind, die über ein erstes Interface IF1 mit dem Mikrocomputersystem 7 in Verbindung stehen. Jede Kabine 5, 6 der Doppelkabine 4 weist eine Lastmesseinrichtung 9, eine den jeweiligen Betriebszustand Z der Kabine signalisierende Einrichtung 10 und Kabinenrufgeber 11 auf. Die Einrichtungen 9, 10 sind über das erste Interface IF1 mit dem Mikrocomputersystem 7 verbunden. Die Kabinenrufgeber 11 und auf den Stockwerken vorgesehene Stockwerkrufgeber 12 sind beispielsweise über eine mit der europäischen Patentanmeldung Nr. 0062141 bekannt gewordene Eingabeeinrichtung 13 und ein zweites Interface IF2 am Mikrocomputersystem 7 angeschlossen.1, 1 denotes an elevator shaft of an elevator a of an elevator group consisting of, for example, three elevators a, b and c. A conveyor machine 2 drives a conveyor cable 3 in the elevator shaft 1 guided double car 4, formed from two cars 5, 6 arranged in a common car frame, sixteen floors E1 to E16 being operated according to the elevator system chosen as an example. The distance between the two cabins 5, 6 is selected so that it corresponds to the distance between two adjacent floors. The carrier 2 is controlled by a drive control known from the European patent application No. 0026406, the setpoint generation, the control functions and the initiation of the stop being implemented by means of a microcomputer system 7, and with 8 the measuring and actuating elements of the drive control, which are symbolized by a first interface IF1 are connected to the microcomputer system 7. Each cabin 5, 6 of the double cabin 4 has a load measuring device 9, a device 10 signaling the respective operating state Z of the cabin and cabin call transmitter 11. The devices 9, 10 are connected to the microcomputer system 7 via the first interface IF1. The car call transmitter 11 and the floor call transmitter 12 provided on the floors are connected to the microcomputer system 7, for example, via an input device 13 which has become known with European patent application No. 0062141 and a second interface IF2.

Das Mikrocomputersystem 7 besteht aus einem Stockwerkrufspeicher RAM1, zwei den einzelnen Kabinen 5, 6 der Doppelkabine 4 zugeordneten Kabinenrufspeichern RAM2, RAM3, einem die momentane Last Pm jeder einzelnen Kabine 5, 6 speichernden Lastspeicher RAM4, zwei den Betriebszustand Z der Kabinen 5, 6 speichernden Speichern RAM5, RAM6, zwei Kostenanteilspeichern RAM7, RAM8, einem Kostenspeicher RAM9, einem Zuteilungsspeicher RAM10, einem jeweils ein Kennzeichen der Kabine 5, 6 mit den kleineren Bedienungskosten K speichernden Kennzeichenspeicher RAM11, einem Programmspeicher EPROM und einem Mikroprozessor CPU, der über einen Bus B mit den Speichern RAM1 bis RAM11, EPROM verbunden ist. Mit R1 und R2 sind ein erster und ein zweiter Abtaster einer Abtasteinrichtung bezeichnet, wobei die Abtaster Rl, R2 Register sind, mittels welcher den Stockwerknummern und der Laufrichtung entsprechende Adressen gebildet werden. Die Kostenanteilspeicher RAM7, RAM8 weisen je Abtasterstellung zwei Speicherplätze v, h auf, die den beiden Kabinen 5, 6 der Doppelkabine 4 zugeordnet sind. Mit R3 ist ein Selektor in Form eines weiteren Registers bezeichnet, welcher bei fahrender Kabine die Adresse desjenigen Stockwerkes anzeigt, auf dem die Kabine noch anhalten könnte. Wie aus vorstehend genannter Antriebssteuerung bekannt, sind den Selektoradressen Zielwege zugeordnet, die mit einem in einem Sollwertgeber erzeugten Zielweg verglichen werden. Bei Gleichheit der Wege und Vorliegen eines Haltebefehls wird die Verzögerungsphase eingeleitet. Ist kein Haltebefehl vorhanden, so wird der Selektor R3 auf das nächste Stockwerk geschaltet.The microcomputer system 7 consists of a storey call memory RAM1, two of the individual cabins 5, 6 of the double 4 assigned car call memories RAM2, RAM3, one load memory RAM4 storing the current load P m of each individual car 5, 6, two memories RAM5, RAM6 storing the operating state Z of the cars 5, 6, two cost share memories RAM7, RAM8, one cost memory RAM9, one Allocation memory RAM10, a license memory RAM11 storing an identifier of the cabin 5, 6 with the lower service costs K, a program memory EPROM and a microprocessor CPU which is connected via a bus B to the memories RAM1 to RAM11, EPROM. R1 and R2 denote a first and a second scanner of a scanner, the scanner R1, R2 being registers by means of which addresses corresponding to the floor numbers and the direction of travel are formed. The cost share memory RAM7, RAM8 have two memory locations v, h for each scanning position, which are assigned to the two cabins 5, 6 of the double cabin 4. R3 denotes a selector in the form of a further register which, when the car is moving, displays the address of the floor on which the car could still stop. As is known from the drive control mentioned above, the selector addresses are assigned target paths which are compared with a target path generated in a setpoint generator. If the paths are identical and a stop command is present, the delay phase is initiated. If there is no stop command, the selector R3 is switched to the next floor.

Eine mit den Kostenanteilspeichern RAM7, RAM8, dem Kostenspeicher RAM9 und dem Kennzeichenspeicher RAM11 verknüpfte Vergleichsschaltung VS weist gemäss Fig. 2 zwei Addierer AD1, AD2 und einen Komparator KO auf. Die für nachstehend näher beschriebene Operationen benötigte Vergleichsschaltung VS wird vom Mikroprozessor CPU gebildet.A comparison circuit VS linked to the cost share memories RAM7, RAM8, the cost memory RAM9 and the identification memory RAM11 has, according to FIG. 2, two adders AD1, AD2 and a comparator KO. The comparison circuit VS required for the operations described in more detail below is formed by the microprocessor CPU.

Die Mikrocomputersysteme 7 der einzelnen Aufzüge a, b, c sind über eine aus der europäischen Patentanmeldung Nr. 0050304 bekannte Vergleichseinrichtung 14 und ein drittes Interface IF3 sowie über ein aus der europäischen Patentanmeldung Nr. 0050305 bekanntes Partyline-Ubertragungssystem 15 und ein viertes Interface IF4 miteinander verbunden und bilden in dieser Weise die erfindungsgemässe Gruppensteuerung.The microcomputer systems 7 of the individual elevators a, b, c are connected to one another via a comparison device 14 known from European patent application No. 0050304 and a third interface IF3 as well as via a partyline transmission system 15 and a fourth interface IF4 known from European patent application No. 0050305 connected and in this way form the group control according to the invention.

Anhand der Fig. 3 wird im folgenden der zeitliche Ablauf und die Funktion der vorstehend beschriebenen Gruppensteuerung erläutert :

  • Bei Auftreten eines einen bestimmten Aufzug a, b, c der Gruppe betreffenden Ereignisses, wie beispielsweise Eingabe eines Kabinenrufes, Zuteilung eines Stockwerkrufes oder Änderung der Selektorstellung, beginnt der dem betreffenden Aufzug zugeordnete erste Abtaster Rl mit einem Umlauf, im folgenden Kostenberechnungszyklus KBZ genannt, ausgehend von der Selektorstellung in Fahrtrichtung der Kabine, wobei das Ereignis bei Aufzug a eingetreten sein möge (Zeitpunkt I). Bei jeder Abtasterstellung wird nun vom Mikroprozessor CPU des Mikrocomputersystems 7 für jede einzelne Kabine 5, 6 der Doppelkabine 4 gemäss den Formeln der Patentansprüche 2 und 3 eine den Zeitverlusten von wartenden Fahrgästen proportionale Summe, auch Bedienungskosten K genannt, errechnet, wobei die Faktoren k1 und k2 wie bei einer mit der europäischen Patentanmeldung Nr. 0032213 bekannt gewordenen, nach dem gleichen Prinzip arbeitenden Gruppensteuerung für Aufzüge mit Einzelkabinen ermittelt werden. Beim Berechnungsvorgang werden die inneren und äusseren Bedienungskosten KIv, KAv, K Ih' KAh getrennt ermittelt und in den Speicherplätzen v, h der Kostenanteilspeicher RAM7, RAM8 gespeichert. Die danach für jede einzelne Kabine 5, 6 der Doppelkabine 4 mittels der Addierer AD1, AD2 der Vergleichsschaltung VS gebildetenen gesamten Bedienungskosten Kv, Kh werden miteinander verglichen und im Kennzeichenspeicher RAM11 ein Kennzeichen der Kabine 5 oder 6 mit den kleineren Bedienungskosten eingeschrieben, wobei beispielsweise die in Fahrtrichtung hintere Kabine 5 oder 6 die kleineren Bedienungskosten aufweisen möge und die hintere Kabine jeweils durch eine logische "1" gekennzeichnet ist (Fig. 1, 2). Bei Vorhandensein des Kennzeichens "1" werden somit die Bedienungskosten Kh der hinteren Kabine im Kostenspeicher RAM9 gespeichert. Hierauf wird durch Bildung einer neuen Adresse der Abtaster R1 auf das nächste Stockwerk geschaltet und der Berechnungsvorgang wiederholt.
The time sequence and the function of the group control described above are explained below with reference to FIG. 3:
  • When an event relating to a specific elevator a, b, c of the group occurs, such as entering a car call, assigning a floor call or changing the selector position, the first scanner R1 assigned to the elevator concerned begins with one cycle, hereinafter referred to as the cost calculation cycle KBZ from the selector position in the direction of travel of the Cabin, the event may have occurred at elevator a (time I). At each scanning position, the microprocessor CPU of the microcomputer system 7 calculates a sum proportional to the time lost by waiting passengers, also called service costs K, for each individual cabin 5, 6 of the double cabin 4 according to the formulas of claims 2 and 3, the factors k 1 and k 2 can be determined as in a group control for elevators with single cabins which has become known with the European patent application No. 0032213 and works according to the same principle. During the calculation process, the inner and outer service costs K Iv , K Av , K Ih ' K Ah are determined separately and the cost share memory RAM7, RAM8 is stored in the memory locations v, h. The total operating costs K v , K h then formed for each individual cabin 5, 6 of the double cabin 4 by means of the adders AD1, AD2 of the comparison circuit VS are compared with one another and an identifier of the cabin 5 or 6 with the lower operating costs is written into the number memory RAM11, whereby for example, the rear cabin 5 or 6 may have the lower operating costs and the rear cabin is each identified by a logical "1" (FIGS. 1, 2). If the indicator "1" is present, the operating costs K h of the rear cabin are stored in the cost memory RAM9. This is done by creating a new address the scanner R1 is switched to the next floor and the calculation process is repeated.

Nach Beendigung des Kostenberechnungszyklus KBZ (Zeitpunkt II) beginnen die zweiten Abtaster R2 bei allen Aufzügen a, b, c gleichzeitig einen Umlauf, im folgenden Kostenvergleichszyklus KVZ genannt, ausgehend vom ersten Stockwerk (Zeitpunkt III). Der Start der Kostenvergleichszyklen KVZ erfolgt beispielsweise fünf- bis zehnmal pro Sekunde. Bei jeder Abtasterstellung werden die in den Kostenspeichern RAM9 der Aufzüge a, b, c enthaltenen Bedienungskosten K oder Kh der Vergleichseinrichtung 14 zugeleitet und miteinander verglichen, wobei jeweils im Zuteilungsspeicher RAM10 des Aufzuges a, b, c mit den geringsten Bedienungskosten K eine Zuteilungsanweisung in Form einer logischen "1" speicherbar ist, die dasjenige Stockwerk bezeichnet, dem der betreffende Aufzug a, b, c zeitlich optimal zugeordnet ist. Beispielsweise möge aufgrund des Vergleiches in der Abtasterstellung 9 eine Neuzuteilung durch Löschung einer Zuteilungsanweisung bei Aufzug b und Einschreibung einer solchen bei Aufzug a erfolgen (Fig. 1). Da gemäss Beispiel für Stockwerk E9 ein Stockwerkruf gespeichert ist und der Selektor R3 auf dieses Stockwerk zeigt (Fig. 1), könnte beim Aufzug a die Verzögerungsphase eingeleitet werden, wenn die anfänglich erwähnten Kriterien gegeben sind. Hierbei wird bei Vorhandensein des Kennzeichens "1" im Kennzeichenspeicher RAM11 der der nächstfolgenden Selektorstellung entsprechende Zielweg vorgegeben, so dass die Doppelkabine 4 beispielsgemäss mit der weniger beladenen, hinteren Kabine 5 oder 6 auf dem Stockwerk E9 halten würde. Durch die Neuzuteilung bei Abtasterstellung 9 wird bei den Aufzügen a und b je ein neuer Kostenberechnungszyklus KBZ gestartet und der Kostenver5-leichs- zyklus KVZ unterbrochen, da der erstere Priorität hat. Während der Kostenberechnungszyklus KBZ von Aufzug b unterbrechungslos abläuft, möge derjenige des Aufzuges a zwischen den Zeitpunkten IV und V wegen eines Antriebsregelungsvorganges aussetzen. Anschliessend wird der Kostenvergleich ab Abtasterstellung 10 fortgesetzt, um bei Abtasterstellung 9 (abwärts) durch Eintreten eines Ereignisses bei Aufzug c, beispielsweise Änderung der Selektorstellung, wieder unterbrochen zu werden (Zeitpunkt VI). Nach Beendigung des dadurch ausgelösten Kostenberechnungszyklus KBZ bei Aufzug c (Zeitpunkt VII) erfolgt Fortsetzung des Kostenvergleichszyklus KVZ und dessen Beendigung bei Abtasterstellung 2 (abwärts). Zwischen den Zeitpunkten VIII und IX läuft ein weiterer, beispielsweise durch einen Kabinenruf ausgelöster Kostenberechnungszyklus KBZ für Aufzug a ab, worauf zum Zeitpunkt X der nächste Kostenvergleichszyklus KVZ gestartet wird.After completion of the cost calculation cycle KBZ (time II) the second sampler R2 start at all lifts a, b, c at the same time one rotation, hereinafter referred to as K east CPC comparison cycle, starting from the first floor (time III). For example, the KVZ cost comparison cycles start five to ten times per second. At each scanning position, the operating costs K or K h contained in the cost memories RAM9 of the elevators a, b, c are fed to the comparison device 14 and compared with one another, wherein an allocation instruction in each case in the allocation memory RAM10 of the elevator a, b, c with the lowest operating costs K. Form of a logical "1" can be stored, which designates the floor to which the elevator a, b, c in question is optimally assigned in time. For example, based on the comparison in the scanning position 9, a reassignment may take place by deleting an assignment instruction for elevator b and enrolling one for elevator a (FIG. 1). Since, according to the example for floor E9, a floor call is stored and the selector R3 points to this floor (FIG. 1), the delay phase could be initiated for elevator a if the criteria mentioned at the beginning were given. Here, if the indicator "1" is present in the Indicator memory RAM11 predefines the destination path corresponding to the next selector position, so that the double cabin 4 would hold, for example, with the less loaded rear cabin 5 or 6 on floor E9. As a result of the reallocation in scanner position 9, a new cost calculation cycle KBZ is started for elevators a and b, and cost comparison cycle 5 is interrupted because the former has priority. While the cost calculation cycle KBZ of elevator b runs without interruption, that of elevator a may be suspended between times IV and V due to a drive control process. The cost comparison is then continued from scanner position 10 in order to be interrupted again at scanner position 9 (downward) by the occurrence of an event in elevator c, for example a change in the selector position (time VI). After the cost calculation cycle KBZ triggered thereby in elevator c (time VII) has ended, the cost comparison cycle KVZ continues and its termination with scanning position 2 (downward). A further cost calculation cycle KBZ for elevator a, triggered for example by a car call, runs between times VIII and IX, whereupon the next cost comparison cycle KVZ is started at time X.

Claims (3)

1. Gruppensteuerung für Aufzüge mit Doppelkabinen, die aus zwei in einem gemeinsamen Fahrkorbrahmen angeordnete Kabinen (5, 6) gebildet sind, mit Kabinenrufspeichern (RAM2, RAM3) und den Kabinen (5, 6) zugeordneten Lastmesseinrichtungen (9), mit Stockwerkrufspeichern (RAM1), mit jedem Aufzug der Gruppe zugeordneten, jeweils das Stockwerk eines möglichen Anhaltens anzeigende Selektoren (R3) sowie mit einer für jedes Stockwerk mindestens eine Stellung aufweisende Abtasteinrichtung (R1, R2), wobei eine Steuerungseinrichtung vorgesehen ist, die je Aufzug eine Recheneinrichtung (CPU) aufweist, welche bei jeder Stellung eines ersten Abtasters (R1) der Abtasteinrichtung (R1, R2) den Wartezeiten von Fahrgästen entsprechende Bedienungskosten (K) ermittelt, und wobei zwei je einen Bedienungskostenanteil (Kii, KA) speichernde Kostenanteilspeicher (RAM7, RAM8), ein die Bedienungskosten (K) speichernder Kostenspeicher (RAM9), eine die Kabine mit den kleinsten Bedienungskosten (K) bei jeder Stellung eines zweiten Abtasters (R2) der Abtasteinrichtung (R1, R2) ermittelnde Vergleichseinrichtung (14) und ein Zuteilungsspeicher (RAM10) vorgesehen sind, wobei in den Zuteilungsspeicher (RAM10) der die geringsten Bedienungskosten (K) aufweisenden Kabine (4) eine Zuteilungsanweisung für einen vorhandenen oder zukünftigen Stockwerkruf einschreibbar ist,
dadurch gekennzeichnet, - dass die Kostenanteilspeicher (RAM7, RAM8) je Abtasterstellung zwei Speicherplätze (v, h) aufweisen, in welchen für jede einzelne Kabine (5, 6) der Doppelkabine (4) errechnete Bedienungskostenanteile (KIv, KIh' KAv' KAh) gespeichert sind, - dass eine Vergleichsschaltung (VS) vorgesehen ist, die mit den Kostenanteilspeichern (RAM7, RAM8) und dem Kostenspeicher (RAM9) verknüpft ist und welche die Bedienungskosten (Kv, Kh) der beiden Kabinen (5, 6) der Doppelkabine (4) miteinander vergleicht, wobei die geringeren Bedienungskosten (Kv, Kh) im Kostenspeicher (RAM9) speicherbar sind, - dass ein Kennzeichenspeicher (RAM11) vorgesehen ist, der mit der Vergleichsschaltung (VS) und dem Selektor (R3) in Verbindung steht und in welchem ein Kennzeichen der Kabine (5, 6) mit den kleineren Bedienungskosten (Kv, Kh) gespeichert ist, und - dass der in dem einen Kostenanteilspeicher (RAM7) zu speichernde erste Bedienungskostenanteil (KIv, KIh) bei Vorliegen von Zuteilungsanweisungen für gleichgerichtete Stockwerkrufe zweier benachbarter Stockwerke und/oder Koinzidenzen von Kabinenrufen und Abtasterstellungen des ersten Abtasters (R1) reduzierbar ist.
1. Group control for elevators with double cabins, which are formed from two cabins (5, 6) arranged in a common car frame, with cabin call memories (RAM2, RAM3) and load measuring devices (9) assigned to the cabins (5, 6), with storey call memories (RAM1 ), with each elevator of the group assigned selectors (R3) which indicate the floor of a possible stopping as well as with a scanning device (R1, R2) having at least one position for each floor, a control device being provided which has a computing device (CPU ), which determines the operating costs (K) corresponding to the waiting times of passengers at each position of a first scanner (R1) of the scanning device (R1, R2), and two cost share memories (RAM7, RAM8) each storing a service cost share (Kii, K A ) , a cost storage (RAM9) storing the operating costs (K), a the cabin with the lowest operating costs (K) for each position ng a second scanner (R2) of the scanning device (R1, R2) determining comparison device (14) and an allocation memory (RAM10) are provided, wherein in the allocation memory (RAM10) of the cab (4) having the lowest operating costs (K) an allocation instruction for an existing to whom or future floor calls can be registered,
characterized, - That the cost share memory (RAM7, RAM8) has two memory locations (v, h) for each scanning position, in which the operating cost components calculated for each individual cabin (5, 6) of the double cabin (4) (K Iv , K Ih ' K Av' K Ah ) are saved, - That a comparison circuit (VS) is provided, which is linked to the cost share memories (RAM7, RAM8) and the cost memory (RAM9) and which the operating costs (K v , K h ) of the two cabins (5, 6) of the double cabin (4th ) compares with one another, the lower operating costs (K v , K h ) being storable in the cost memory (RAM9), - That a number plate memory (RAM11) is provided, which is connected to the comparison circuit (VS) and the selector (R3) and in which a number plate of the cabin (5, 6) with the lower operating costs (K v , K h ) is stored is and - That the first service cost share (K Iv , K Ih ) to be stored in the one cost share memory (RAM7) can be reduced if there are allocation instructions for rectified floor calls from two adjacent floors and / or coincidences of car calls and scanner positions of the first scanner (R1).
2. Gruppensteuerung für Aufzüge nach Patentanspruch 1, wobei die Ermittlung der Bedienungskosten (K) nach der Beziehung K = tv (PM+k1 RE-k2 RC) +k1 m tm+tv (R+Z) erfolgt, worin tv die Verzögerungszeit bei einem Zwischenhalt, PM die momentane Kabinenlast im Zeitpunkt der Be-rechnung, R die Anzahl zugeteilter Stockwerkrufe zwischen Selektor- und Abtasterstellung, RC die Anzahl Kabinenrufe zwischen Selektor- und Abtasterstellung, k1 eine in Abhängigkeit von den Verkehrsverhältnissen ermittelte voraussichtliche Anzahl zusteigende Personen pro Stockwerkruf, k2 eine in Abhängigkeit von den Verkehrsverhältnissen ermittelte voraussichtliche Anzahl aussteigende Personen pro Kabinenruf, m die Anzahl Stockwerkdistanzen zwischen Selektor-und Abtasterstellung, tm die mittlere Fahrzeit pro Stockwerkdistanz, R die Anzahl der zu erwartenden Halte zwischen Selektor- und Abtasterstellung, Z einem vom Betriebszustand der Kabine abhängigen Zuschlag, tv(PM+k1·RE-k2·RC) den Wartezeiten von in der Kabinevoraussichtlich befindlichen Fahrgästen entsprechende innere Bedienungskosten (KI), die während eines Haltes auf einem von der Abtasterstellung bezeichneten Stockwerk entstehen würden, und
Figure imgb0001
den Wartezeiten von in einem von der Abtasterstellung bezeichneten Stockwerk voraussichtlich befindlichen Fahrgästen entsprechende äussere Bedienungskosten (KA) bedeuten, dadurch gekennzeichnet, dass die Ermittlung der Bedienungskosten (Kv, Kh) jeder einzelnen Kabine (5, 6) der Doppelkabine (4) bei jeder Abtasterstellung nach den Beziehungen
Figure imgb0002
Figure imgb0003
erfolgt, worin KIv, KAv die inneren bzw. äusseren Bedienungskosten der in Fahrtrichtung vorderen Kabine und K Ih' K Ah die inneren bzw. äusseren Bedienungskosten der in Fahrtrichtung hinteren Kabine sowie Sv, Sh einen Statusfaktor bedeuten, wobei Sv,Sh = 0 ist, wenn Koinzidenz eines Kabinenrufes und der Abtasterstellung vorliegt, Sv,Sh = 1 ist, wenn Zuteilungsanweisungen für gleichgerichtete Rufe zweier benachbarter Stockwerke vorliegen, Sv,Sh = 2 ist, wenn weder Koinzidenz noch Zuteilungsanweisungen für gleichgerichtete Rufe zweier benachbarter Stockwerke vorliegen.
2. Group control for elevators according to claim 1, wherein the determination of the service costs (K) according to the relationship K = t v (P M + k 1 R E -k 2 R C ) + k 1 mt m + t v (R + Z), in which the delay time t v the current car load at the time of B at an intermediate stop, P M e-bill, R the number of assigned floor calls between selector and scanner position, R C the number of cabin calls between selector and scanner position, k 1 is an expected number of people getting on per floor call, depending on the traffic conditions, k 2 an expected number of people getting out per cabin call, depending on the traffic conditions, m the number of floor distances between selector and scanner position, t m the average travel time per floor distance, R the number of expected stops between selector and scanner position, Z a surcharge dependent on the operating state of the cabin, t v (P M + k 1 · R E -k 2 · R C ) the waiting times in the cabin Corresponding internal service costs (K I ) that would probably be present to passengers and would arise during a stop on a floor designated by the scanning position, and
Figure imgb0001
External operating costs (K A ) corresponding to the waiting times of passengers likely to be in a floor designated by the scanning position, characterized in that the determination of the operating costs (K v , K h ) of each individual cabin (5, 6) of the double cabin (4) each time you scan according to relationships
Figure imgb0002
Figure imgb0003
takes place in what K Iv , K Av the internal and external service costs the front cab in the direction of travel and K Ih ' K Ah the internal and external operating costs the rear cabin in the direction of travel and S v , S h mean a status factor, where S v , S h = 0 if there is a coincidence of a car call and the scanning position, S v , S h = 1 if there are assignment instructions for rectified calls from two adjacent floors, S v , S h = 2 if there are neither coincidence nor allocation instructions for rectified calls from two neighboring floors.
3. Gruppensteuerung für Aufzüge nach Patentanspruch 2, dadurch gekennzeichnet, dass ein Zähler (CPU) vorgesehen ist, der zugeteilte, gleichgerichtete Rufe zweier benachbarter Stockwerke paarweise zählt, und dass die Anzahl der zu erwartenden Halte (R) zwischen Selektor- und Abtasterstellung nach der Beziehung
Figure imgb0004
errechnet wird, wobei RE die Anzahl zugeteilter Stockwerkrufe zwischen Selektor- und Abtasterstellung, Re die Anzahl Kabinenrufe zwischen Selektor- und Abtasterstellung, REC die Anzahl Koinzidenzen von Kabinenrufen und zugeteilten Stockwerkrufen zwischen Selektor-und Abtasterstellung und REE die Anzahl Paare zugeteilter, gleichgerichteter Rufe zweier benachbarter Stockwerke zwischen Selektor- und Abtasterstellung bedeuten.
3. Group control for elevators according to claim 2, characterized in that a counter (CPU) is provided, the assigned, rectified calls of two adjacent floors counts in pairs, and that the number of expected stops (R) between the selector and scanner position after the relationship
Figure imgb0004
is calculated, whereby R E the number of assigned floor calls between selector and scanner position, R e the number of car calls between selector and scanner position, R EC is the number of coincidences of cabin calls and assigned floor calls between selector and scanner position and R EE means the number of pairs of assigned, rectified calls from two adjacent floors between the selector and scanner positions.
EP84105114A 1983-08-12 1984-05-07 Lift group control for double-compartment cars Expired EP0134892B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT84105114T ATE26433T1 (en) 1983-08-12 1984-05-07 GROUP CONTROL FOR ELEVATORS WITH DOUBLE CARS.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CH4410/83A CH660585A5 (en) 1983-08-12 1983-08-12 GROUP CONTROL FOR ELEVATORS WITH DOUBLE CABINS.
CH4410/83 1983-08-12

Publications (2)

Publication Number Publication Date
EP0134892A1 true EP0134892A1 (en) 1985-03-27
EP0134892B1 EP0134892B1 (en) 1987-04-08

Family

ID=4275611

Family Applications (1)

Application Number Title Priority Date Filing Date
EP84105114A Expired EP0134892B1 (en) 1983-08-12 1984-05-07 Lift group control for double-compartment cars

Country Status (10)

Country Link
US (1) US4582173A (en)
EP (1) EP0134892B1 (en)
AT (1) ATE26433T1 (en)
AU (1) AU567646B2 (en)
CA (1) CA1216084A (en)
CH (1) CH660585A5 (en)
DE (1) DE3463030D1 (en)
ES (1) ES8504071A1 (en)
FI (1) FI74683C (en)
HU (1) HU189926B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3611173A1 (en) * 1985-04-12 1986-10-16 Otis Elevator Co., Farmington, Conn. ELEVATOR SYSTEM WITH MULTIPLE-CABIN CALL ASSIGNMENT
EP0301178A1 (en) * 1987-07-13 1989-02-01 Inventio Ag Lift control device
EP0365782A1 (en) * 1988-10-28 1990-05-02 Inventio Ag Method and device for the group control of double-compartment lifts
EP0459169A1 (en) * 1990-06-01 1991-12-04 Inventio Ag Group control for elevators with double cabins with direct allocation of calls

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3562607D1 (en) * 1984-10-09 1988-06-16 Inventio Ag Control devices for lifts with double cars
JPH0694341B2 (en) * 1986-02-25 1994-11-24 三菱電機株式会社 Elevator waiting time prediction device
US5419414A (en) * 1993-11-18 1995-05-30 Sakita; Masami Elevator system with multiple cars in the same hoistway
JPH07187525A (en) * 1993-11-18 1995-07-25 Masami Sakita Elevator system with plural cars
US5625176A (en) * 1995-06-26 1997-04-29 Otis Elevator Company Crowd service enhancements with multi-deck elevators
FI111929B (en) 1997-01-23 2003-10-15 Kone Corp Elevator control
KR100335986B1 (en) * 1999-10-07 2002-05-10 장병우 Operation control apparatus and method for double deck elevator
JP2001310876A (en) * 2000-04-19 2001-11-06 Otis Elevator Co Control device and controlling method for double deck elevator system
US8151943B2 (en) * 2007-08-21 2012-04-10 De Groot Pieter J Method of controlling intelligent destination elevators with selected operation modes
FI119686B (en) * 2007-10-11 2009-02-13 Kone Corp Lift system
CN102596776B (en) * 2009-11-09 2015-02-25 三菱电机株式会社 Double-deck elevator group controller
CN103946139B (en) * 2011-11-28 2015-07-29 三菱电机株式会社 Elevator group management controller
EP3728095B1 (en) * 2017-12-21 2022-03-16 Inventio AG Method and elevator control for controlling an elevator group with a plurality of elevators based on calls

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3625311A (en) * 1970-04-21 1971-12-07 Otis Elevator Co Controls for multicompartment elevators
EP0032213A2 (en) * 1979-12-21 1981-07-22 Inventio Ag Elevator group control

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5811479A (en) * 1981-07-15 1983-01-22 株式会社日立製作所 Controller for elevator group

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3625311A (en) * 1970-04-21 1971-12-07 Otis Elevator Co Controls for multicompartment elevators
EP0032213A2 (en) * 1979-12-21 1981-07-22 Inventio Ag Elevator group control

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3611173A1 (en) * 1985-04-12 1986-10-16 Otis Elevator Co., Farmington, Conn. ELEVATOR SYSTEM WITH MULTIPLE-CABIN CALL ASSIGNMENT
FR2580268A1 (en) * 1985-04-12 1986-10-17 Otis Elevator Co CALL ASSIGNMENT FOR ELEVATOR WITH SEVERAL COMPARTMENTS
GB2173922A (en) * 1985-04-12 1986-10-22 Otis Elevator Co Multicompartment elevator call assigning
GB2173922B (en) * 1985-04-12 1989-04-19 Otis Elevator Co Multicompartment elevator call assigning
EP0301178A1 (en) * 1987-07-13 1989-02-01 Inventio Ag Lift control device
EP0365782A1 (en) * 1988-10-28 1990-05-02 Inventio Ag Method and device for the group control of double-compartment lifts
US4993518A (en) * 1988-10-28 1991-02-19 Inventio Ag Method and apparatus for the group control of elevators with double cars
EP0459169A1 (en) * 1990-06-01 1991-12-04 Inventio Ag Group control for elevators with double cabins with direct allocation of calls

Also Published As

Publication number Publication date
AU567646B2 (en) 1987-11-26
ATE26433T1 (en) 1987-04-15
FI842481A0 (en) 1984-06-20
FI74683C (en) 1988-03-10
HU189926B (en) 1986-08-28
US4582173A (en) 1986-04-15
AU3183284A (en) 1985-02-14
ES532924A0 (en) 1985-04-16
HUT35603A (en) 1985-07-29
CA1216084A (en) 1986-12-30
EP0134892B1 (en) 1987-04-08
ES8504071A1 (en) 1985-04-16
FI842481A (en) 1985-02-13
FI74683B (en) 1987-11-30
CH660585A5 (en) 1987-05-15
DE3463030D1 (en) 1987-05-14

Similar Documents

Publication Publication Date Title
EP0246395B1 (en) Lift group control
EP0443188B1 (en) Method and arrangement to directly allocate destination call requests for elevator groups on the basis of service costs and variable bonus/penalty factors
EP0134892B1 (en) Lift group control for double-compartment cars
EP0365782B1 (en) Method and device for the group control of double-compartment lifts
DE3611173C2 (en) Elevator system with several double compartment cabins
EP0301178B1 (en) Lift control device
EP0091554B1 (en) Lift groups control comprising a device for the down peak traffic control
DE69714347T2 (en) Elevator system with group control
EP0459169B1 (en) Group control for elevators with double cabins with direct allocation of calls
EP0440967B1 (en) Group control for elevators with direct allocation of calls from a call input register located on the floor
EP1418147A1 (en) Controller for elevator with multi-deck car
EP0312730B1 (en) Group control for lifts with load dependant control of the cabins
EP0248997B1 (en) Control device for dispatching cars at a main landing at lift groups
EP0032213A2 (en) Elevator group control
DE2459887A1 (en) CONTROL DEVICE FOR ELEVATORS
EP0356731A1 (en) Grouped control affording instantaneous attribution of destination calls
DE69208427T2 (en) Elevator system with dynamic sector allocation
EP0308590B1 (en) Group control for lifts affording instantaneous attribution of destination calls
DE2517514A1 (en) LIFT CONTROL SYSTEM
EP1193207A1 (en) Method for controlling an elevator with a multicompartment car
DE2411861C2 (en) Method for distributing floor calls to a number of elevator cars
DE69509264T2 (en) Execution of mezzanine calls with an interchangeable elevator car
DE2411824A1 (en) METHOD AND DEVICE FOR OPERATING AN ELEVATOR GROUP
DE2931155A1 (en) DEVICE FOR SELECTING A LIFT CABIN
DE68905116T2 (en) DYNAMIC SELECTION OF THE SENSING DIRECTION OF LIFT CALL ASSIGNMENT.

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): AT BE DE FR GB IT NL

17P Request for examination filed

Effective date: 19850807

17Q First examination report despatched

Effective date: 19860902

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE DE FR GB IT NL

REF Corresponds to:

Ref document number: 26433

Country of ref document: AT

Date of ref document: 19870415

Kind code of ref document: T

REF Corresponds to:

Ref document number: 3463030

Country of ref document: DE

Date of ref document: 19870514

ITF It: translation for a ep patent filed
ET Fr: translation filed
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
ITTA It: last paid annual fee
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 19970328

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 19970422

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 19970531

Year of fee payment: 14

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19980507

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19980531

BERE Be: lapsed

Owner name: INVENTIO A.G.

Effective date: 19980531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19981201

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee

Effective date: 19981201

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19990419

Year of fee payment: 16

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19990420

Year of fee payment: 16

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20010131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20010301

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20020502

Year of fee payment: 19

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030507

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20030507