EP0121545A1 - Handhabungs- und abstelleinrichtung für bohrgestänge in einem bohrturm - Google Patents

Handhabungs- und abstelleinrichtung für bohrgestänge in einem bohrturm

Info

Publication number
EP0121545A1
EP0121545A1 EP19830903229 EP83903229A EP0121545A1 EP 0121545 A1 EP0121545 A1 EP 0121545A1 EP 19830903229 EP19830903229 EP 19830903229 EP 83903229 A EP83903229 A EP 83903229A EP 0121545 A1 EP0121545 A1 EP 0121545A1
Authority
EP
European Patent Office
Prior art keywords
rack
pipe
derrick
racking
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP19830903229
Other languages
English (en)
French (fr)
Inventor
Oivind Tore Iversen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Total Transportation Systems International AS
Moss Rosenberg Verft AS
Original Assignee
Total Transportation Systems International AS
Moss Rosenberg Verft AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Total Transportation Systems International AS, Moss Rosenberg Verft AS filed Critical Total Transportation Systems International AS
Publication of EP0121545A1 publication Critical patent/EP0121545A1/de
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/14Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
    • E21B19/146Carousel systems, i.e. rotating rack systems

Definitions

  • the invention relates to an assembly for handling and racking stands of drill pipe in a derrick.
  • the drill string When drilling for oil, it is not uncommon that the length of the drill string exceeds 6000 meters.
  • the drill string is usually composed of lengths of pipe about 10 meters long. In the course of a drilling operation, the entire drill string has to be drawn up and disassembled several times for replacing the drill bit, rigging up and cementing casings, and for other reasons.
  • the drill string is normally broken down in lengths of three pipes, i.e., about 30 meters, and these stands or "thribbles" of pipe are temporarily stored verti ⁇ cally in the derrick.
  • the storage automat comprises a storage platform on the drill floor, and at least one so-called finger board, which is spaced a suitable vertical distance above the storage platform and contains grooves for receiving the respective stands of pipe. On each of the fingers of the finger board, wherein the spaces between the fingers form the grooves for receiving
  • the pipe racking equipment consists primarily of horizontal arms with a grab/support claw an one end of the arm that is intended to engage with a length of pipe.
  • the arms can be moved toward and away from the line of drilling (the well), and toward and away from the vertical storage rack. At least one of the arms can be moved vertically, for raising and lowering the stand of pipe.
  • the pipe racking equipment i.e., mainly the arms, should be able to execute more movements, and the arms should be able to be controlled accurately and stopped precisely at selected locations for depositing and retrieving the stands of pipe at the rack.
  • the finger board has several parallel receiving grooves with associated access openings, and the respective stands of pipe must be guided into the correct groove during racking. There is therefore a need for simplifying the mechanized handling of pipe to enable the pipe racking to be accomplished with fewer, but controlled and defined, move ⁇ ments.
  • OMPI ⁇ is performed between two fixed, defined positions, namely, the line of drilling and the rack access opening, and the racking operation therefore is accomplished with few and defined movements of the racking members.
  • the racking equipment comprises horizontal racker arms with a grab/ support head that is movable laterally within the derrick frame
  • the grab/support head is preferably mounted on a support arm that is pivotable about a vertical axis and is carried by the racker arm, said support arm also being telescopic so that the grab/support head can be moved relative to the axis of rotation of the support arm.
  • the racker arm moves between two distinct positions, i.e., from the line of drilling to a position in which the length of pipe held by the grab, by pivoting the support arm, is moved into a position vis-a-vis the fixed entrance to the rack. Thereafter, the grab/ support head is moved in a direction toward the rack entrance and toward the groove in the finger board that has been brought into alignment with said entrance.
  • This ove- ent will also be distinct and defined, since the movement of the pipe into the groove is translational, stopping when the the pipe abuts against a barrier in the groove or against another stand of pipe already deposited within the groove. Removal of pipe from the rack occurs in a similar manner, by reversing the above movements.
  • the storage rack is formed as a carousel, wherein the finger boards are substantially circular and rotatable about a common vertical axis, with radially extending fingers and intermediate grooves therebetween.
  • the grooves can successively be brought into a predetermined orientation, with the groove opening ready to receive/release a stand of pipe, and this groove opening then represents the access opening of the rack.
  • a guide means can also be arranged, if desired, and in that case the guide means would then represent the access opening of the rack.
  • the carousel comprises one or more fixed annular frames which are concentric with the axis of rotation of the carousel, each ring having a minimum aperture corresponding to the cross section of the bundle of pipe strings that the carousel can hold.
  • Each ring is discontin ⁇ uous, having a gap at the perimeter which forms the access opening to the rack.
  • two storage carousels are placed on each side of a joint racker- assembly, with the rack access openings facing toward each other.
  • simple snap-locks may be used for retaining the lengths of pipe in the groove.
  • remotely controlled latch mechanisms or the like could also be used.
  • the annular frames form an outer safeguard for the pipe bundles, and the perimeter gaps in the rings form the fixed access openings to the racks.
  • Figure 1 is a schematic drawing, in cross section, of a derrick equipped with an assembly in accordance with the invention
  • Figure 2 shows the derrick of Figure 1 in plan view, with a horizontal section through the derrick along line II-II in Figure 1, drawn on a larger scale, and
  • Figure 3 shows the derrick in cross section as in Figure 1, with a bundle of pipe strings stored vertically in the derrick.
  • the derrick is designated by reference numeral 1, and the line of drilling is designated by 2.
  • the drill string is not shown, but during a drilling operation it will extend down into the well 3 along the line of drilling 2.
  • the necessary equipment for drilling such as hoisting equipment with elevator, kelly, rotary table, etc., is not shown, as the equipment utilized is known per se.
  • the lower racking assembly 6 comprises essentially a racker arm 8 which in this case is movably supported by a horizontal support member 9.
  • a column 10 rotable about a vertical axis, is mounted on the racker arm 8 and carries a support arm 11 at the upper end thereof.
  • the support arm 11 is telescopic and the telescopic arm carries a grab/support head 12 formed for grasping and holding a stand of pipe 13, see Figure 3.
  • the horizontal support 9 is mounted in a guide 14 that permits upward and downward movement of the support member 9, as indicated by the twin-headed arrow at the guide 14.
  • the upper racking assembly 7 is constructed in the same way as the lower assembly, but its horizontal support member 15 is fixedly attached to the derrick 1.
  • the grab head 16 on the upper assembly can be formed like the grab head 12 , but it does not need to be made for supporting weight, as its function is only to hold about the pipe and guide it.
  • a central column 17 is pivotally mounted on the drill floor 18 and on a bracket 19 at a higher point on the derrick 1, respectively. At its base, the central column 17 carries a circular storage platform 20, and spaced apart vertically above this platform, the central column carries
  • each of the finger boards has a total of 24 grooves, or the capacity to hold 96 pipe strings (four stands
  • the drill string is drawn up so that the uppermost stand of pipe is above the level of the drill floor 18.
  • the racker assemblies 6 and 7 are then actuated and the respective grab heads 12 and 16 take hold around the pipe.
  • the stand of pipe is unscrewed in a manner
  • the stand of pipe is held by the grab head 16.
  • the stand of pipe 13 can be elevated as required ( Figure 3) .
  • the drill string remaining within the well is suspended from the rotary table by means of. slips, as known per se.
  • the racker arms 8 and 26 are driven back from the line of drilling 2, to a position corresponding to that shown in Figure 1.
  • the grab heads 12 and 16 are pivoted 90° one way or the other as indicated by the arrows in Figure 2, and the support arms 11 and 27 are extended, whereby the heads 12,16 are moved toward the selected rack 4 or 5.
  • the receiving groove in the selected rack has already been brought into position through a corres ⁇ ponding rotation of the carousel.
  • This rotary movement occurs in clearly defined stages, corresponding to the groove subdivision.
  • Two annular frames 28 and 29 are mounted on the derrick 1.
  • the apertures of the rings are adapted to the cross section of the pipe bundle 30 which can be placed in the carousel.
  • Each annular frame has a gap in the perimeter, at 31 and 32 respectively, thereby forming openings which are in alignment with the receiving groove lying internally thereof.
  • the stand of pipe 13 that is being racked is guided through the gaps 31,32 into the receiving grooves in the two finger boards 21 and 22.
  • the pipe string is moved inwardly until it meets some resistance, after which the stand of pipe is lowered down onto the storage platform 20 by moving the lower racker assembly downwardly in the guide 14.
  • the grab heads 12,16 are opened and guided back to the drill string at the line of drilling 2 with corresponding movements in reverse.
  • a retainer ring 31 is also preferably arranged around the storage platform 20.
  • the racking assembly can be constructed in various ways, which will be familiar to the skilled person, without depart ⁇ ing from the scope of the present invention.
  • the support arms 11,27 could rotate about fixed columns, or optionally rotate directly on the racker arms 8,26.
  • the columns 10 could optionally be tele ⁇ scopic. Different modifications could also be imagined for the racker arms, etc. The important point is that all move- ments are distinct. Hydraulic actuators are preferably utilized, especially for the radial movements of the grab heads 12,16 toward and away from the pipe racks.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
EP19830903229 1982-10-13 1983-10-13 Handhabungs- und abstelleinrichtung für bohrgestänge in einem bohrturm Withdrawn EP0121545A1 (de)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NO823416 1982-10-13
NO823416 1982-10-13

Publications (1)

Publication Number Publication Date
EP0121545A1 true EP0121545A1 (de) 1984-10-17

Family

ID=19886752

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19830903229 Withdrawn EP0121545A1 (de) 1982-10-13 1983-10-13 Handhabungs- und abstelleinrichtung für bohrgestänge in einem bohrturm

Country Status (2)

Country Link
EP (1) EP0121545A1 (de)
WO (1) WO1984001599A1 (de)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103867144A (zh) * 2014-04-09 2014-06-18 天时海洋工程及石油装备研究院(青岛)有限公司 井架双层指梁系统

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL8402734A (nl) * 1984-09-07 1986-04-01 Schelde Nv Inrichting voor het opslaan van pijpen.
GB8600053D0 (en) * 1986-01-03 1986-02-12 Drg Uk Ltd Off-shore drilling
DE3629946A1 (de) * 1986-09-03 1988-03-10 Deutag Deutsche Tiefbohr Aktie Bohrturm
NO891944D0 (no) * 1989-05-12 1989-05-12 Hitec As Anordning ved roer-haanteringssystem.
FI85905C (fi) * 1990-06-15 1992-06-10 Tampella Oy Ab Anordning foer lagring av borrstaenger.
FI86461C (fi) * 1990-11-12 1992-08-25 Tampella Oy Ab Borrstaongskassett.
FI95621C (fi) * 1993-04-08 1996-02-26 Tamrock Oy Tankokasetti kallionporauslaitetta varten
GB9622480D0 (en) 1996-10-29 1997-01-08 Weatherford Lamb Apparatus and method for running tubulars
AR018459A1 (es) * 1998-06-12 2001-11-14 Shell Int Research Metodo y disposicion para mover equipos hacia y a traves de un conducto y dispositivo de vaiven para ser usado en dicha disposicion
IT1314808B1 (it) 2000-03-08 2003-01-16 Casagrande Spa Caricatore automatico per aste di perforazione
SG10201503315QA (en) 2008-01-31 2015-06-29 Keppel Offshore & Marine Technology Ct Pte Ltd Pipe handling system and method
SG11201503105TA (en) 2012-10-22 2015-05-28 Drilling Technologies Llc Quicksilver Automated pipe tripping apparatus and methods
SG11201908806WA (en) 2017-03-23 2019-10-30 Ensco Int Inc Vertical lift rotary table
US10724310B2 (en) 2018-06-08 2020-07-28 Glider Products LLC Integrated pipe handling system for well completion and production

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3633767A (en) * 1969-08-12 1972-01-11 Dresser Ind Pipe-racking apparatus for oil well derricks or the like
DE2018884C3 (de) * 1970-04-20 1973-10-18 Wirth Co Kg Masch Bohr Bohrgerat mit Bohrgestange Magazin
FR2117753B1 (de) * 1970-12-15 1974-10-31 Activite Atom Avance
US4077525A (en) * 1974-11-14 1978-03-07 Lamb Industries, Inc. Derrick mounted apparatus for the manipulation of pipe

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO8401599A1 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103867144A (zh) * 2014-04-09 2014-06-18 天时海洋工程及石油装备研究院(青岛)有限公司 井架双层指梁系统
CN103867144B (zh) * 2014-04-09 2016-03-02 天时海洋工程及石油装备研究院(青岛)有限公司 井架双层指梁系统

Also Published As

Publication number Publication date
WO1984001599A1 (en) 1984-04-26

Similar Documents

Publication Publication Date Title
EP0121545A1 (de) Handhabungs- und abstelleinrichtung für bohrgestänge in einem bohrturm
EP1246998B1 (de) Handhabungsvorrichtung für ein horizontales gestänge
AU717094B2 (en) Drilling apparatus
US3655071A (en) Horizontal pipe racking and handling apparatus
US8052370B2 (en) System for handling pipes between a pipe rack and a derrick, and also a device for assembling and disassembling pipe stands
US4708563A (en) Arrangement for storing pipes
US8550761B2 (en) Drill pipe handling and moving system
US9045948B2 (en) Drilling installation
EP0228907B1 (de) Vorrichtung zur Handhabung von Bohrausrüstungen, insbesondere für Unterwasserbohrungen
US20090053015A1 (en) Pipe Handling Equipment
US20090257848A1 (en) Apparatus for handling and racking pipes
EP0272850A2 (de) Vorrichtung zum Lagern und Handhaben von Bohrrohren zwischen waagerechten und senkrechten Lage
JPH0432917B2 (de)
BRPI0721340B1 (pt) A drilling system with a drilling platform, method for assembling tubular and method for moving a plurality of tubular
RO112442B1 (ro) Instalatie pentru lansarea verticala a unei conducte
CA2872057C (en) Method, handling unit and stand for acquiring a sample from a seabed top layer
US20080053704A1 (en) Device for Gripping and Transporting Pipe Lengths and an Intermediate Storage Facility for Storage of Pipes
US3612286A (en) Horizontal pipe rack
US4582133A (en) Pipe handling assembly
WO1999031346A1 (en) Device for moving an elongated object, in particular a riser part or a drill pipe cassette
US4050590A (en) Drilling rigs
US10214975B2 (en) Vertical pipe handling system and method for its use
JPS63134783A (ja) ボーリングタワー装置
US3742562A (en) Well pipe supporting unit
US11927060B2 (en) Offshore vessel and method of operation of such an offshore vessel

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): FR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19840914

RIN1 Information on inventor provided before grant (corrected)

Inventor name: IVERSEN, OIVIND TORE