EP0121545A1 - Assembly for handling and racking drill pipe in a derrick - Google Patents

Assembly for handling and racking drill pipe in a derrick

Info

Publication number
EP0121545A1
EP0121545A1 EP19830903229 EP83903229A EP0121545A1 EP 0121545 A1 EP0121545 A1 EP 0121545A1 EP 19830903229 EP19830903229 EP 19830903229 EP 83903229 A EP83903229 A EP 83903229A EP 0121545 A1 EP0121545 A1 EP 0121545A1
Authority
EP
European Patent Office
Prior art keywords
rack
pipe
derrick
racking
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP19830903229
Other languages
German (de)
French (fr)
Inventor
Oivind Tore Iversen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Total Transportation Systems International AS
Moss Rosenberg Verft AS
Original Assignee
Total Transportation Systems International AS
Moss Rosenberg Verft AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Total Transportation Systems International AS, Moss Rosenberg Verft AS filed Critical Total Transportation Systems International AS
Publication of EP0121545A1 publication Critical patent/EP0121545A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/14Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
    • E21B19/146Carousel systems, i.e. rotating rack systems

Definitions

  • the invention relates to an assembly for handling and racking stands of drill pipe in a derrick.
  • the drill string When drilling for oil, it is not uncommon that the length of the drill string exceeds 6000 meters.
  • the drill string is usually composed of lengths of pipe about 10 meters long. In the course of a drilling operation, the entire drill string has to be drawn up and disassembled several times for replacing the drill bit, rigging up and cementing casings, and for other reasons.
  • the drill string is normally broken down in lengths of three pipes, i.e., about 30 meters, and these stands or "thribbles" of pipe are temporarily stored verti ⁇ cally in the derrick.
  • the storage automat comprises a storage platform on the drill floor, and at least one so-called finger board, which is spaced a suitable vertical distance above the storage platform and contains grooves for receiving the respective stands of pipe. On each of the fingers of the finger board, wherein the spaces between the fingers form the grooves for receiving
  • the pipe racking equipment consists primarily of horizontal arms with a grab/support claw an one end of the arm that is intended to engage with a length of pipe.
  • the arms can be moved toward and away from the line of drilling (the well), and toward and away from the vertical storage rack. At least one of the arms can be moved vertically, for raising and lowering the stand of pipe.
  • the pipe racking equipment i.e., mainly the arms, should be able to execute more movements, and the arms should be able to be controlled accurately and stopped precisely at selected locations for depositing and retrieving the stands of pipe at the rack.
  • the finger board has several parallel receiving grooves with associated access openings, and the respective stands of pipe must be guided into the correct groove during racking. There is therefore a need for simplifying the mechanized handling of pipe to enable the pipe racking to be accomplished with fewer, but controlled and defined, move ⁇ ments.
  • OMPI ⁇ is performed between two fixed, defined positions, namely, the line of drilling and the rack access opening, and the racking operation therefore is accomplished with few and defined movements of the racking members.
  • the racking equipment comprises horizontal racker arms with a grab/ support head that is movable laterally within the derrick frame
  • the grab/support head is preferably mounted on a support arm that is pivotable about a vertical axis and is carried by the racker arm, said support arm also being telescopic so that the grab/support head can be moved relative to the axis of rotation of the support arm.
  • the racker arm moves between two distinct positions, i.e., from the line of drilling to a position in which the length of pipe held by the grab, by pivoting the support arm, is moved into a position vis-a-vis the fixed entrance to the rack. Thereafter, the grab/ support head is moved in a direction toward the rack entrance and toward the groove in the finger board that has been brought into alignment with said entrance.
  • This ove- ent will also be distinct and defined, since the movement of the pipe into the groove is translational, stopping when the the pipe abuts against a barrier in the groove or against another stand of pipe already deposited within the groove. Removal of pipe from the rack occurs in a similar manner, by reversing the above movements.
  • the storage rack is formed as a carousel, wherein the finger boards are substantially circular and rotatable about a common vertical axis, with radially extending fingers and intermediate grooves therebetween.
  • the grooves can successively be brought into a predetermined orientation, with the groove opening ready to receive/release a stand of pipe, and this groove opening then represents the access opening of the rack.
  • a guide means can also be arranged, if desired, and in that case the guide means would then represent the access opening of the rack.
  • the carousel comprises one or more fixed annular frames which are concentric with the axis of rotation of the carousel, each ring having a minimum aperture corresponding to the cross section of the bundle of pipe strings that the carousel can hold.
  • Each ring is discontin ⁇ uous, having a gap at the perimeter which forms the access opening to the rack.
  • two storage carousels are placed on each side of a joint racker- assembly, with the rack access openings facing toward each other.
  • simple snap-locks may be used for retaining the lengths of pipe in the groove.
  • remotely controlled latch mechanisms or the like could also be used.
  • the annular frames form an outer safeguard for the pipe bundles, and the perimeter gaps in the rings form the fixed access openings to the racks.
  • Figure 1 is a schematic drawing, in cross section, of a derrick equipped with an assembly in accordance with the invention
  • Figure 2 shows the derrick of Figure 1 in plan view, with a horizontal section through the derrick along line II-II in Figure 1, drawn on a larger scale, and
  • Figure 3 shows the derrick in cross section as in Figure 1, with a bundle of pipe strings stored vertically in the derrick.
  • the derrick is designated by reference numeral 1, and the line of drilling is designated by 2.
  • the drill string is not shown, but during a drilling operation it will extend down into the well 3 along the line of drilling 2.
  • the necessary equipment for drilling such as hoisting equipment with elevator, kelly, rotary table, etc., is not shown, as the equipment utilized is known per se.
  • the lower racking assembly 6 comprises essentially a racker arm 8 which in this case is movably supported by a horizontal support member 9.
  • a column 10 rotable about a vertical axis, is mounted on the racker arm 8 and carries a support arm 11 at the upper end thereof.
  • the support arm 11 is telescopic and the telescopic arm carries a grab/support head 12 formed for grasping and holding a stand of pipe 13, see Figure 3.
  • the horizontal support 9 is mounted in a guide 14 that permits upward and downward movement of the support member 9, as indicated by the twin-headed arrow at the guide 14.
  • the upper racking assembly 7 is constructed in the same way as the lower assembly, but its horizontal support member 15 is fixedly attached to the derrick 1.
  • the grab head 16 on the upper assembly can be formed like the grab head 12 , but it does not need to be made for supporting weight, as its function is only to hold about the pipe and guide it.
  • a central column 17 is pivotally mounted on the drill floor 18 and on a bracket 19 at a higher point on the derrick 1, respectively. At its base, the central column 17 carries a circular storage platform 20, and spaced apart vertically above this platform, the central column carries
  • each of the finger boards has a total of 24 grooves, or the capacity to hold 96 pipe strings (four stands
  • the drill string is drawn up so that the uppermost stand of pipe is above the level of the drill floor 18.
  • the racker assemblies 6 and 7 are then actuated and the respective grab heads 12 and 16 take hold around the pipe.
  • the stand of pipe is unscrewed in a manner
  • the stand of pipe is held by the grab head 16.
  • the stand of pipe 13 can be elevated as required ( Figure 3) .
  • the drill string remaining within the well is suspended from the rotary table by means of. slips, as known per se.
  • the racker arms 8 and 26 are driven back from the line of drilling 2, to a position corresponding to that shown in Figure 1.
  • the grab heads 12 and 16 are pivoted 90° one way or the other as indicated by the arrows in Figure 2, and the support arms 11 and 27 are extended, whereby the heads 12,16 are moved toward the selected rack 4 or 5.
  • the receiving groove in the selected rack has already been brought into position through a corres ⁇ ponding rotation of the carousel.
  • This rotary movement occurs in clearly defined stages, corresponding to the groove subdivision.
  • Two annular frames 28 and 29 are mounted on the derrick 1.
  • the apertures of the rings are adapted to the cross section of the pipe bundle 30 which can be placed in the carousel.
  • Each annular frame has a gap in the perimeter, at 31 and 32 respectively, thereby forming openings which are in alignment with the receiving groove lying internally thereof.
  • the stand of pipe 13 that is being racked is guided through the gaps 31,32 into the receiving grooves in the two finger boards 21 and 22.
  • the pipe string is moved inwardly until it meets some resistance, after which the stand of pipe is lowered down onto the storage platform 20 by moving the lower racker assembly downwardly in the guide 14.
  • the grab heads 12,16 are opened and guided back to the drill string at the line of drilling 2 with corresponding movements in reverse.
  • a retainer ring 31 is also preferably arranged around the storage platform 20.
  • the racking assembly can be constructed in various ways, which will be familiar to the skilled person, without depart ⁇ ing from the scope of the present invention.
  • the support arms 11,27 could rotate about fixed columns, or optionally rotate directly on the racker arms 8,26.
  • the columns 10 could optionally be tele ⁇ scopic. Different modifications could also be imagined for the racker arms, etc. The important point is that all move- ments are distinct. Hydraulic actuators are preferably utilized, especially for the radial movements of the grab heads 12,16 toward and away from the pipe racks.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

Pour la manipulation et le gerbage de tiges de forage dans une tour de forage (1), un râtelier de stockage pour stocker verticalement des longueurs de tiges dans la tour de forage est proposé. Le râtelier (4) comprend une plate-forme de stockage (20) et une ou plusieurs plaques à doigts (21, 22) espacées entre elles d'une certaine distance au-dessus de la plate-forme de stockage (20). Un équipement de râtelier (6, 7) est également placé dans la tour de forage pour transporter les longueurs de tiges entre la ligne de forage (2) et le râtelier (4). Le râtelier présente une ouverture d'accès fixe (31, 32) en un emplacement déterminé dans la tour de forage, et les doigts et les rainures intermédiaires de réception de longueurs de tiges sur les plaques à doigts (21, 22) sont mobiles vers et depuis une position où une rainure est en alignement avec l'ouverture d'accès fixe au râtelier. L'équipement de râtelier (6, 7) peut ainsi effectuer des mouvements distincts et définis. Dans un mode préférentiel de réalisation, le râtelier (4) est un carrousel, les plaques à doigts (20, 21, 22) étant montées sur une colonne centrale rotative verticale (17) dans la tour de forage. Des bras annulaires fixes (28, 29) entourent et tiennent le groupe de tiges placées dans le carrousel et un espace au niveau du périmètre (31, 32) des anneaux respectifs est prévu pour former l'ouverture d'accès au râtelier.For handling and stacking of drill pipe in a drill tower (1), a storage rack for vertically storing lengths of pipe in the drill tower is provided. The rack (4) includes a storage platform (20) and one or more finger plates (21, 22) spaced apart a certain distance above the storage platform (20). Rack equipment (6, 7) is also placed in the drilling tower to transport the lengths of rods between the drilling line (2) and the rack (4). The rack has a fixed access opening (31, 32) at a predetermined location in the drilling tower, and the fingers and intermediate grooves for receiving rod lengths on the finger plates (21, 22) are movable towards and from a position where a groove is in alignment with the fixed access opening to the rack. The rack equipment (6, 7) can thus perform distinct and defined movements. In a preferred embodiment, the rack (4) is a carousel, the finger plates (20, 21, 22) being mounted on a vertical rotary central column (17) in the drilling tower. Fixed annular arms (28, 29) surround and hold the group of rods placed in the carousel and a space at the perimeter (31, 32) of the respective rings is provided to form the access opening to the rack.

Description

ASSEMBLY FOR HANDLING AND RACKING DRILL PIPE IN A DERRICK The invention relates to an assembly for handling and racking stands of drill pipe in a derrick.
When drilling for oil, it is not uncommon that the length of the drill string exceeds 6000 meters. The drill string is usually composed of lengths of pipe about 10 meters long. In the course of a drilling operation, the entire drill string has to be drawn up and disassembled several times for replacing the drill bit, rigging up and cementing casings, and for other reasons. During a "trip", as the withdrawal of the drill string is known, the drill string is normally broken down in lengths of three pipes, i.e., about 30 meters, and these stands or "thribbles" of pipe are temporarily stored verti¬ cally in the derrick.
The normal procedure earlier was to have two derrickmen up in the derrick for guiding the screwed-apart stands of pipe to the side for racking the pipe lengths in the derrick, and this procedure is still followed to some extent today. This job, in addition to requiring the labor of two men, is both difficult and dangerous. The difficulties and risks increase in offshore drilling, especially when using drilling vessels and other floating platforms, and various solutions for semi- and fully-automatic handling and temporary storage of stands of drill pipe have been proposed and utilized in practice. The most advanced systems today comprise pipe- racking equipment which takes hold of the stand of pipe that has been pulled up by the hoisting equipment on the derrick before the length of pipe has been screwed apart from its neighbors, and after disengagement transports the pipe laterally to a storage automat in the derrick. The storage automat comprises a storage platform on the drill floor, and at least one so-called finger board, which is spaced a suitable vertical distance above the storage platform and contains grooves for receiving the respective stands of pipe. On each of the fingers of the finger board, wherein the spaces between the fingers form the grooves for receiving
-BURE U
OMPI the pipes, there are remotely controlled locking means which secure the individual lengths of pipe within the grooves. When the drill string is to be reassembled and guided down into the well once again, the lengths of pipe are retrieved one at a time from the vertical storage rack by means of the racking equipment. The pipe racking equipment consists primarily of horizontal arms with a grab/support claw an one end of the arm that is intended to engage with a length of pipe. The arms can be moved toward and away from the line of drilling (the well), and toward and away from the vertical storage rack. At least one of the arms can be moved vertically, for raising and lowering the stand of pipe.
Although the handling and racking of stands of pipe in the derrick can thus be said to be fully mechanized, there is a - need for improvements on the prior art systems. The pipe racking equipment, i.e., mainly the arms, should be able to execute more movements, and the arms should be able to be controlled accurately and stopped precisely at selected locations for depositing and retrieving the stands of pipe at the rack. The finger board has several parallel receiving grooves with associated access openings, and the respective stands of pipe must be guided into the correct groove during racking. There is therefore a need for simplifying the mechanized handling of pipe to enable the pipe racking to be accomplished with fewer, but controlled and defined, move¬ ments. This can be obtained by ensuring that the stands of pipe are deposited in and removed from the vertical storage rack at the same, fixed location, the lengths of pipe being moved in a defined manner between the line of drilling, where the drill string is located, and the fixed access opening to the rack, i.e., the place where a stand of pipe enters the groove of a finger board and is retained in that groove, the respective grooves being brought successively, as needed, into a position in which the groove opening coincides with the fixed deposit/retrieval location.
An embodiment of this type provides the advantage that racking
OMPI ~~ is performed between two fixed, defined positions, namely, the line of drilling and the rack access opening, and the racking operation therefore is accomplished with few and defined movements of the racking members. When the racking equipment comprises horizontal racker arms with a grab/ support head that is movable laterally within the derrick frame, the grab/support head is preferably mounted on a support arm that is pivotable about a vertical axis and is carried by the racker arm, said support arm also being telescopic so that the grab/support head can be moved relative to the axis of rotation of the support arm. For racking the drill string, the racker arm moves between two distinct positions, i.e., from the line of drilling to a position in which the length of pipe held by the grab, by pivoting the support arm, is moved into a position vis-a-vis the fixed entrance to the rack. Thereafter, the grab/ support head is moved in a direction toward the rack entrance and toward the groove in the finger board that has been brought into alignment with said entrance. This ove- ent will also be distinct and defined, since the movement of the pipe into the groove is translational, stopping when the the pipe abuts against a barrier in the groove or against another stand of pipe already deposited within the groove. Removal of pipe from the rack occurs in a similar manner, by reversing the above movements.
Preferably, the storage rack is formed as a carousel, wherein the finger boards are substantially circular and rotatable about a common vertical axis, with radially extending fingers and intermediate grooves therebetween. By rotating the finger boards, preferably utilizing a common, central, vertical column, the grooves can successively be brought into a predetermined orientation, with the groove opening ready to receive/release a stand of pipe, and this groove opening then represents the access opening of the rack. At this location a guide means can also be arranged, if desired, and in that case the guide means would then represent the access opening of the rack. In a preferred embodiment, the carousel comprises one or more fixed annular frames which are concentric with the axis of rotation of the carousel, each ring having a minimum aperture corresponding to the cross section of the bundle of pipe strings that the carousel can hold. Each ring is discontin¬ uous, having a gap at the perimeter which forms the access opening to the rack.
Preferably, two storage carousels are placed on each side of a joint racker- assembly, with the rack access openings facing toward each other.
Within the individual grooves of the finger board, simple snap-locks may be used for retaining the lengths of pipe in the groove. Alternately, remotely controlled latch mechanisms or the like could also be used. The annular frames form an outer safeguard for the pipe bundles, and the perimeter gaps in the rings form the fixed access openings to the racks.
The invention will be described in greater detail in the following with reference to the accompanying drawings, wherein:
Figure 1 is a schematic drawing, in cross section, of a derrick equipped with an assembly in accordance with the invention,
Figure 2 shows the derrick of Figure 1 in plan view, with a horizontal section through the derrick along line II-II in Figure 1, drawn on a larger scale, and
Figure 3 shows the derrick in cross section as in Figure 1, with a bundle of pipe strings stored vertically in the derrick.
The derrick is designated by reference numeral 1, and the line of drilling is designated by 2. The drill string is not shown, but during a drilling operation it will extend down into the well 3 along the line of drilling 2. The necessary equipment for drilling, such as hoisting equipment with elevator, kelly, rotary table, etc., is not shown, as the equipment utilized is known per se.
In the derrick 1, laterally of the line of drilling 2, two storage racks 4 and 5 are placed for temporary storage of stands of pipe during a "trip". Racking equipment is placed between the two racks 4,5, in this case comprising a lower racking assembly 6 and an upper racking assembly 7. The lower racking assembly 6 comprises essentially a racker arm 8 which in this case is movably supported by a horizontal support member 9. A column 10, rotable about a vertical axis, is mounted on the racker arm 8 and carries a support arm 11 at the upper end thereof. The support arm 11 is telescopic and the telescopic arm carries a grab/support head 12 formed for grasping and holding a stand of pipe 13, see Figure 3. The horizontal support 9 is mounted in a guide 14 that permits upward and downward movement of the support member 9, as indicated by the twin-headed arrow at the guide 14.
The upper racking assembly 7 is constructed in the same way as the lower assembly, but its horizontal support member 15 is fixedly attached to the derrick 1. The grab head 16 on the upper assembly can be formed like the grab head 12 , but it does not need to be made for supporting weight, as its function is only to hold about the pipe and guide it.
The racks 4 and 5 are identical, but mirror images of each other when in position, and only the rack 4 will be described. A central column 17 is pivotally mounted on the drill floor 18 and on a bracket 19 at a higher point on the derrick 1, respectively. At its base, the central column 17 carries a circular storage platform 20, and spaced apart vertically above this platform, the central column carries
-βURi- __OMPJ
WϊprJ- a lower and an upper finger board, 21 and 22, respectively. The two finger boards are identical, having radially extending fingers with intermediate grooves opening toward the peri¬ meter of the circular finger board. Per se, the finger boards
5 are made like prior art finger boards with parallel grooves and fingers, but in this case the grooves and fingers are oriented radially, see Figure 2, on which some of the grooves 23 and fingers 24 are shown. In the rack 4 in Figure 2, four grooves are shown as being full, and one empty. In the rack
10 5 there is one full groove, one groove containing one stand of pipe, and one empty groove. The grooves and fingers are distributed around the entire periphery, and in the exemplary embodiment each of the finger boards has a total of 24 grooves, or the capacity to hold 96 pipe strings (four stands
15 of pipe in each groove). , and the two racks together can thus contain 192 stands of pipe. Assuming that each stand of pipe is 30 meters long, this arrangement provides storage capacity for 5,760 meters of pipe. The storage capacity could be increased by increasing the dimensions of the racks.
20
The mode of operation of the assembly of the invention will be explained in further detail with reference to the draw¬ ings. Let us assume that a drill string, represented by the line of drilling 2, has to be pulled up from the well 3. By
25 means of an elevator (not shown) , the drill string is drawn up so that the uppermost stand of pipe is above the level of the drill floor 18. The racker assemblies 6 and 7 are then actuated and the respective grab heads 12 and 16 take hold around the pipe. The stand of pipe is unscrewed in a manner
30 known per se. During this operation, the lower racker assembly 6 is moved vertically into a position in which the grab head 12 grips around the stand of pipe 13 (see Figure 3) . The elevator is released and the stand of pipe is unscrewed. The stand of pipe is now supported by the grab/support head
35 12. At the top, the stand of pipe is held by the grab head 16. By an upward movement of the lower racker assembly 6, the stand of pipe 13 can be elevated as required (Figure 3) . The drill string remaining within the well is suspended from the rotary table by means of. slips, as known per se. From the position shown in Figure 3, the racker arms 8 and 26 are driven back from the line of drilling 2, to a position corresponding to that shown in Figure 1. The grab heads 12 and 16 are pivoted 90° one way or the other as indicated by the arrows in Figure 2, and the support arms 11 and 27 are extended, whereby the heads 12,16 are moved toward the selected rack 4 or 5. The receiving groove in the selected rack has already been brought into position through a corres¬ ponding rotation of the carousel. This rotary movement occurs in clearly defined stages, corresponding to the groove subdivision. Two annular frames 28 and 29 are mounted on the derrick 1. The apertures of the rings are adapted to the cross section of the pipe bundle 30 which can be placed in the carousel. Each annular frame has a gap in the perimeter, at 31 and 32 respectively, thereby forming openings which are in alignment with the receiving groove lying internally thereof. The stand of pipe 13 that is being racked is guided through the gaps 31,32 into the receiving grooves in the two finger boards 21 and 22. The pipe string is moved inwardly until it meets some resistance, after which the stand of pipe is lowered down onto the storage platform 20 by moving the lower racker assembly downwardly in the guide 14. The grab heads 12,16 are opened and guided back to the drill string at the line of drilling 2 with corresponding movements in reverse.
To retrieve stands of pipe from the pipe rack, the above procedure is reversed.
It should be understood that the carousel always rotates to a defined position and that all racking movements are distinct, from a fetching position to a delivery position. This provides more reliable operation and requires less inter¬ ference by the operator, and results in less damage to the pipes and threads during handling. The stands of pipe can be secured in the receiving grooves with simple snap-locks, or remotely controlled flaps could be utilized. The annular frames 28,29 provide an additional safeguard around the racked pipe bundle. A retainer ring 31 is also preferably arranged around the storage platform 20.
The racking assembly can be constructed in various ways, which will be familiar to the skilled person, without depart¬ ing from the scope of the present invention. Instead of rotatable columns 10, the support arms 11,27 could rotate about fixed columns, or optionally rotate directly on the racker arms 8,26. The columns 10 could optionally be tele¬ scopic. Different modifications could also be imagined for the racker arms, etc. The important point is that all move- ments are distinct. Hydraulic actuators are preferably utilized, especially for the radial movements of the grab heads 12,16 toward and away from the pipe racks.

Claims

Patent Claims
1. An assembly for handling and racking drill pipe in a derrick, comprising a rack for vertical storage of stands of drill pipe in the derrick, with a storage platform and one or more finger boards spaced apart vertically above the storage platform, and racking equipment for transporting the stands of pipe between the line of drilling and the rack in the derrick, characterized in that the rack in the derrick has a fixed access opening, and the fingers of the finger board with intermediate grooves for receiving lengths of pipe are movable to and from a position in which the groove opening of one of the grooves is located at the fixed access opening to the rack.
2. An assembly according to claim 1, having racking equipment that comprises horizontal racker arms with grab/ support heads that can be moved laterally in the derrick, characterized in that the grab/support head is mounted on a support arm that is pivotable about a vertical axis on the racker arm, in such manner that the grab/support head can be moved in relation to the axis of rotation of the support arm.
3. An assembly according to claims 1 or 2, character- ized in that the rack is formed as a carousel, the finger boards being substantially circular and rotatable about a common vertical axis, with radially extending fingers and intermediate grooves therebetween.
4. An assembly according to claim 3, characterized in that a common, rotatable, central column supports the finger boards.
5. An assembly according to one of the preceding claims, characterized by one or more fixed annular frames each having a minimum aperture corresponding to the cross section of the bundle of pipe lengths that the rack can contain, each annular frame having a gap in the perimeter which forms the access opening to the storage rack.
6. An assembly according to one of the preceding claims, characterized in that two racks are placed on either side of a common racker assembly, with the access openings to the racks facing toward each other.
EP19830903229 1982-10-13 1983-10-13 Assembly for handling and racking drill pipe in a derrick Withdrawn EP0121545A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NO823416 1982-10-13
NO823416 1982-10-13

Publications (1)

Publication Number Publication Date
EP0121545A1 true EP0121545A1 (en) 1984-10-17

Family

ID=19886752

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19830903229 Withdrawn EP0121545A1 (en) 1982-10-13 1983-10-13 Assembly for handling and racking drill pipe in a derrick

Country Status (2)

Country Link
EP (1) EP0121545A1 (en)
WO (1) WO1984001599A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103867144A (en) * 2014-04-09 2014-06-18 天时海洋工程及石油装备研究院(青岛)有限公司 Double-layer finger board system of derrick

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL8402734A (en) * 1984-09-07 1986-04-01 Schelde Nv DEVICE FOR STORING PIPES.
GB8600053D0 (en) * 1986-01-03 1986-02-12 Drg Uk Ltd Off-shore drilling
DE3629946A1 (en) * 1986-09-03 1988-03-10 Deutag Deutsche Tiefbohr Aktie DERRICK
NO891944D0 (en) * 1989-05-12 1989-05-12 Hitec As DEVICE FOR ROD HANDLING SYSTEM.
FI85905C (en) * 1990-06-15 1992-06-10 Tampella Oy Ab Device for storing drill rods
FI86461C (en) * 1990-11-12 1992-08-25 Tampella Oy Ab BORRSTAONGSKASSETT.
FI95621C (en) * 1993-04-08 1996-02-26 Tamrock Oy Bar cage for a rock drill
GB9622480D0 (en) 1996-10-29 1997-01-08 Weatherford Lamb Apparatus and method for running tubulars
AR018459A1 (en) * 1998-06-12 2001-11-14 Shell Int Research METHOD AND PROVISION FOR MOVING EQUIPMENT TO AND THROUGH A VAIVEN CONDUCT AND DEVICE TO BE USED IN SUCH PROVISION
IT1314808B1 (en) 2000-03-08 2003-01-16 Casagrande Spa AUTOMATIC LOADER FOR DRILLING RODS
US20090196712A1 (en) 2008-01-31 2009-08-06 Asbjorn Mortensen Pipe handling system and method
SG10201708521TA (en) 2012-10-22 2017-12-28 Ensco Services Ltd Automated pipe tripping apparatus and methods
US10294737B2 (en) 2017-03-23 2019-05-21 Ensco International Incorporated Vertical lift rotary table
US10724310B2 (en) 2018-06-08 2020-07-28 Glider Products LLC Integrated pipe handling system for well completion and production

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3633767A (en) * 1969-08-12 1972-01-11 Dresser Ind Pipe-racking apparatus for oil well derricks or the like
DE2018884C3 (en) * 1970-04-20 1973-10-18 Wirth Co Kg Masch Bohr Drill rig with drill rod magazine
FR2117753B1 (en) * 1970-12-15 1974-10-31 Activite Atom Avance
US4077525A (en) * 1974-11-14 1978-03-07 Lamb Industries, Inc. Derrick mounted apparatus for the manipulation of pipe

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO8401599A1 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103867144A (en) * 2014-04-09 2014-06-18 天时海洋工程及石油装备研究院(青岛)有限公司 Double-layer finger board system of derrick
CN103867144B (en) * 2014-04-09 2016-03-02 天时海洋工程及石油装备研究院(青岛)有限公司 The double-deck fingerboard system of derrick

Also Published As

Publication number Publication date
WO1984001599A1 (en) 1984-04-26

Similar Documents

Publication Publication Date Title
EP0121545A1 (en) Assembly for handling and racking drill pipe in a derrick
EP1246998B1 (en) Horizontal pipe handling device
AU717094B2 (en) Drilling apparatus
US3655071A (en) Horizontal pipe racking and handling apparatus
US8052370B2 (en) System for handling pipes between a pipe rack and a derrick, and also a device for assembling and disassembling pipe stands
US4708563A (en) Arrangement for storing pipes
CA2617028C (en) A drill pipe handling and moving system
US9045948B2 (en) Drilling installation
EP0228907B1 (en) Apparatus for handling drilling equipment, especially for off-shore drilling
US20090053015A1 (en) Pipe Handling Equipment
US20090257848A1 (en) Apparatus for handling and racking pipes
EP0272850A2 (en) Apparatus for racking and handling drilling tubulars between a horizontal and a vertical position
JPH0432917B2 (en)
BRPI0721340B1 (en) A drilling system with a drilling platform, method for tubular assembling and method for moving a plurality of tubular
RO112442B1 (en) Plant for a pipe vertical launching
CA2872057C (en) Method, handling unit and stand for acquiring a sample from a seabed top layer
US20080053704A1 (en) Device for Gripping and Transporting Pipe Lengths and an Intermediate Storage Facility for Storage of Pipes
US3612286A (en) Horizontal pipe rack
US4582133A (en) Pipe handling assembly
WO1999031346A1 (en) Device for moving an elongated object, in particular a riser part or a drill pipe cassette
US4050590A (en) Drilling rigs
US10214975B2 (en) Vertical pipe handling system and method for its use
JPS63134783A (en) Boring tower apparatus
US3742562A (en) Well pipe supporting unit
JP3156985B2 (en) Refueling machine

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): FR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19840914

RIN1 Information on inventor provided before grant (corrected)

Inventor name: IVERSEN, OIVIND TORE