EP0065695B1 - Leg of an offshore platform and method of placing it - Google Patents
Leg of an offshore platform and method of placing it Download PDFInfo
- Publication number
- EP0065695B1 EP0065695B1 EP82104068A EP82104068A EP0065695B1 EP 0065695 B1 EP0065695 B1 EP 0065695B1 EP 82104068 A EP82104068 A EP 82104068A EP 82104068 A EP82104068 A EP 82104068A EP 0065695 B1 EP0065695 B1 EP 0065695B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- leg
- insert
- platform
- barge
- legs
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000000034 method Methods 0.000 title claims description 8
- 238000003466 welding Methods 0.000 claims description 3
- 230000005484 gravity Effects 0.000 claims description 2
- 239000002184 metal Substances 0.000 claims description 2
- 238000000151 deposition Methods 0.000 claims 1
- 230000035939 shock Effects 0.000 description 5
- 239000006096 absorbing agent Substances 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 230000006378 damage Effects 0.000 description 2
- 229920001971 elastomer Polymers 0.000 description 2
- 241001080024 Telles Species 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000013016 damping Methods 0.000 description 1
- 239000013013 elastic material Substances 0.000 description 1
- 239000000806 elastomer Substances 0.000 description 1
- 239000013536 elastomeric material Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/02—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
- E02B17/021—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform
- E02B17/024—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform shock absorbing means for the supporting construction
Definitions
- the invention applies to any platform intended to be placed at sea on a fixed structure pre-installed and which is therefore subject, at the time of its installation, to the action of the swell.
- the platform transported from its place of construction on a transport barge, comprises legs which, at the end of the operation, must rest on determined locations on the structure (generally piles which protrude from the surface of the water ) and be secured to this structure, most generally by welding.
- This operation is easily carried out in the river or in a site protected from swell by simple ballasting of the transport barge.
- the swell is not regular, but has waves trains interspersed with periods of relative calm, it is imperative to have a system to ensure the connection in the horizontal plane between platform and structure in a time less than the duration of the periods of calm, that is to say, in the majority of cases, less than one minute.
- a classic solution is to suspend the platform at the end of a crane carried by a barge and drop it suddenly, at the time of the coincidence between the piles of the structure and the legs of the platform. Crane operators are skilled enough to succeed in this maneuver.
- An object of the invention is therefore to define a device making it possible to achieve a beautiful manner. more economical blow an almost instantaneous connection between a platform equipped with legs and the heads of the piles of a fixed structure intended to receive the platform.
- the subject of the invention is a leg of a marine platform engaging on a pile belonging to a fixed structure and the head of which has a receiving cone, said platform having legs equal in number to the piles, each leg being intended to be fixed to a stack, said leg being hollow and enclosing an insert which can slide in the leg and intended to secure the leg and the corresponding stack by its partial introduction into the receiving cone, characterized in that the insert is associated to a means which makes it possible to secure it to the leg and to detach it suddenly, causing the insert to fall by gravity.
- the means comprises at least one finger passing through the leg and cooperating with a bore of the insert.
- a wedge crossing the leg above the insert is inserted into each of the legs concerned by holes facing two by two.
- FIG. 1 A schematically represents a platform 1 carried by a transport barge 2.
- This structure includes piles whose heads can emerge from the water; one of these battery heads, referenced 4, is shown in the figures. It has a receiving cone 5, female.
- Each stack 4 corresponds to a leg 6 secured to the platform 1.
- a platform may for example include four legs which will be secured to 4 stacks.
- At least two of the legs consist of a hollow cylinder closed at the upper end by a stop 7 generally called a lifter. It is legs of this type which are shown in the figures.
- the transport barge is positioned using anchor lines, the platform and its legs passing freely above the pile heads.
- the distance (or clear) between the lower end of the insert and the pile head depends on the tide, the amplitude of the barge's vertical movements and certain factors of security. This value is designated by AGo.
- the transport barge / platform assembly being positioned using the anchor lines oscillates, due to the swell, around an average position of perfect coincidence between stacks and legs.
- the transport barge is first ballasted until the clear AGo is reduced to a minimum value compatible with the vertical movements of the assembly and in such a way that there is no contact between pile head and leg of the platform. This is the position shown in fig. 1 A.
- inserts are released simultaneously and fall into the cones of reception of the battery heads, instantly making the horizontal connection between the plate -form and structure.
- the number of inserts to be dropped simultaneously depends on their capacity and that of the piers of the structure to withstand the horizontal forces generated by the wave trains. Their number is at least two to avoid any rotation of the platform which could occur after connection on a single insert and which would prevent the others from going down into the receiving cones.
- the barge / platform assembly remains free to move vertically with the swell, along the insert.
- the depth of the reception cone will advantageously be taken at least equal to the value of the maximum possible heaving to prevent any accidental dislodging of an insert after connection by friction of the insert inside the leg, at the moment of the passage of wave trains.
- the receiving cone can advantageously be mounted on a damper 14 made of rubber, elastomer or any other suitable elastic material, to absorb the shock created by the fall of the insert and to ensure that the latter does not damage the battery head of the structure, if the centering of the platform is not perfect when the inserts are released.
- Fig. 1 D shows the crushing of the shock absorber at the end of ballasting.
- the length of the insert and the location of the spreader inside the leg are studied so that the distance, at the end of the operation, between the lower end of the platform leg and the head of the structure's stack is sufficient to allow two metal half-ferrules (16A and 16B) to be welded, which ultimately provide continuity of the structure installed between the stack and the leg of the platform.
- the shock absorber can then be destroyed, for example by chemical action (fig. 1 E).
- the relief height D is close to 2 m. If the initial clear is 0.6 m and the heaving 0.9 m, the ballasting height is close to 4 m; ballasting then requires a very large quantity of water, of the order of 13,000 tonnes.
- a variant of the system makes it possible to reduce this ballasting height; this variant will preferably apply to very large platforms.
- the variant is based on the following consideration:
- Figs. 2A to 2E represent the variant of the device of the invention using this wedge.
- the leg is provided with orifices 20A, 20B, 21 A facing two by two.
- a shim 19 is introduced by a pair of orifices (here the orifices 21 A, 21 B lower), so as to serve as a stop for the insert at the end of ballasting (fig. 2D).
- Fig. 2E shows the final position of the various elements after welding of two half-ferrules 16A and 16B and destruction of the shock absorber.
- the wedge is mounted on a slide (not shown) which crosses the leg of the platform so as not to impede the sliding of the insert - passing, for example, on either side of the insert to the inside of the leg - and is extended to the outside of the leg where the wedge is in the waiting position before connection.
- the introduction of the wedge inside the leg can be carried out manually or using a mechanical device such as for example a jack (not shown) whose required capacity is limited to the value of the friction due to the dead weight of the hold.
- a mechanical device such as for example a jack (not shown) whose required capacity is limited to the value of the friction due to the dead weight of the hold.
- An additional advantage of this variant lies in the fact that, after dropping the inserts, the resumption of the horizontal forces due to the swell induces smaller moments in the inserts, the distance between the bottom of the reception cone and the guide 9 mounted at the lower end of the leg being reduced, relative to the device of FIGS. 1A to 1 E, of a length equal to that of the protrusion of the insert under the leg; this length can reach 1.5 m.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Earth Drilling (AREA)
- Beans For Foods Or Fodder (AREA)
- Soy Sauces And Products Related Thereto (AREA)
- Revetment (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Description
1. L'invention s'applique à toute plate-forme destinée à être placée en mer sur une structure fixe préinstallée et qui est donc soumise, au moment de sa pose, à l'action de la houle.1. The invention applies to any platform intended to be placed at sea on a fixed structure pre-installed and which is therefore subject, at the time of its installation, to the action of the swell.
La plate-forme, acheminée depuis son lieu de construction sur une barge de transport, comporte des jambes qui, en fin d'opération, doivent reposer sur des emplacements déterminés de la structure (généralement des piles qui dépassent de la surface de l'eau ) et être solidarisées à cette structure, le plus généralement par soudure.The platform, transported from its place of construction on a transport barge, comprises legs which, at the end of the operation, must rest on determined locations on the structure (generally piles which protrude from the surface of the water ) and be secured to this structure, most generally by welding.
Cette opération se réalise facilement en rivière ou en site protégé de la houle par simple ballastage de la barge de transport.This operation is easily carried out in the river or in a site protected from swell by simple ballasting of the transport barge.
En mer, une des principales difficultés réside, au moment du contact entre la plate-forme et la sous-structure, dans le fait que la barge de transport, et par conséquent la plate-forme qui repose sur elle, étant soumises à la houle, sont animées d'un mouvement horizontal alternatif de période égale à celle de la houle.At sea, one of the main difficulties lies, at the time of contact between the platform and the substructure, in the fact that the transport barge, and consequently the platform which rests on it, being subjected to swell , are driven by an alternating horizontal movement of period equal to that of the swell.
Pour réaliser la connexion entre plate-forme et structure, il est nécessaire que les piles de la structure et les jambes de la plate-forme soient en coïncidence.To make the connection between platform and structure, it is necessary that the piles of the structure and the legs of the platform are in coincidence.
Du fait que la houle n'est pas régulière, mais présente des trains de vagues entrecoupés de périodes de calme relatif, il est impératif de disposer d'un système permettant d'assurer la liaison dans le plan horizontal entre plate-forme et structure dans un temps inférieur à la durée des périodes de calme, c'est-à-dire, dans la majorité des cas, inférieur à la minute.Because the swell is not regular, but has waves trains interspersed with periods of relative calm, it is imperative to have a system to ensure the connection in the horizontal plane between platform and structure in a time less than the duration of the periods of calm, that is to say, in the majority of cases, less than one minute.
Une solution classique est de suspendre la plate-forme au bout d'une grue portée par une barge et de la laisser tomber brusquement, au moment de la coïncidence entre les piles de la structure et les jambes de la plate-forme. Les grutiers sont assez habiles pour réussir une telle manoeuvre.A classic solution is to suspend the platform at the end of a crane carried by a barge and drop it suddenly, at the time of the coincidence between the piles of the structure and the legs of the platform. Crane operators are skilled enough to succeed in this maneuver.
Ce type de solution conduit à la mise en oeuvre des moyens navals très onéreux dès que les plates-formes atteignent un poids de l'ordre du millier de tonnes.This type of solution leads to the implementation of very expensive naval means as soon as the platforms reach a weight of the order of a thousand tonnes.
Un but de l'invention est donc de définir un dispositif permettant de réaliser de manière beau- . coup plus économique une connexion quasi instantanée entre une plate-forme équipée de jambes et les têtes des piles d'une structure fixe destinée à recevoir la plate-forme.An object of the invention is therefore to define a device making it possible to achieve a beautiful manner. more economical blow an almost instantaneous connection between a platform equipped with legs and the heads of the piles of a fixed structure intended to receive the platform.
L'invention a pour objet une jambe d'une plate-forme marine s'engageant sur une pile appartenant à une structure fixe et dont la tête présente un cône récepteur, ladite plate-forme présentant des jambes en nombre égal aux piles, chaque jambe étant destinée à être fixée à une pile, ladite jambe étant creuse et enfermant un insert pouvant coulisser dans la jambe et destiné à solidariser la jambe et la pile correspondante par son introduction partielle dans le cône récepteur, caractérisé en ce que l'insert est associé à un moyen qui permet de le solidariser à la jambe et de le désolidariser brusquement, provoquant la chute de l'insert par gravité.The subject of the invention is a leg of a marine platform engaging on a pile belonging to a fixed structure and the head of which has a receiving cone, said platform having legs equal in number to the piles, each leg being intended to be fixed to a stack, said leg being hollow and enclosing an insert which can slide in the leg and intended to secure the leg and the corresponding stack by its partial introduction into the receiving cone, characterized in that the insert is associated to a means which makes it possible to secure it to the leg and to detach it suddenly, causing the insert to fall by gravity.
Dans un mode particulier de réalisation le moyen comprend au moins un doigt traversant la jambe et coopérant avec un alésage de l'insert.In a particular embodiment the means comprises at least one finger passing through the leg and cooperating with a bore of the insert.
L'invention a également pour objet un procédé de mise en oeuvre d'un dispositif pour la mise en place d'une plate-forme sous-marine portée par une barge sur une structure fixe au moyen d'un dispositif selon la revendication 1, caractérisé en ce qu'il comprend les phases suivantes:
- a) on accroche la barge de la structure de manière à mettre les jambes au-dessus des têtes de piles,
- b) on désolidarise brusquement au moins deux inserts de leur jambe respective par action simultanée des moyens de solidarisation correspondants,
- c) on ballaste la barge jusqu'à permettre son éloignement de la structure,
- d) on effectue la liaison définitive entre chaque jambe et pile correspondante.
- a) the barge is hung from the structure so as to put the legs above the pile heads,
- b) at least two inserts of their respective legs are suddenly separated by simultaneous action of the corresponding securing means,
- c) the barge is ballasted until it is removed from the structure,
- d) the final connection is made between each leg and corresponding pile.
Avantageusement entre les phases c et d on insère dans chacune des jambes concernées une cale traversant la jambe au-dessus de l'insert par des orifices se faisant face deux à deux.Advantageously, between phases c and d, a wedge crossing the leg above the insert is inserted into each of the legs concerned by holes facing two by two.
L'invention sera bien comprise par la description donnée ci-après de deux modes préférés de réalisation de l'invention, en référence au dessin annexé dans lequel:
- - les fig. 1A et 1 E représentent schématiquement le dispositif de l'invention et illustrent un procédé pour sa mise en oeuvre,
- - les fig. 2A à 2E illustrent une variante du dispositif du procédé pour sa mise en oeuvre.
- - figs. 1A and 1E schematically represent the device of the invention and illustrate a method for its implementation,
- - figs. 2A to 2E illustrate a variant of the device of the method for its implementation.
La fig. 1 A représente schématiquement une plate-forme 1 portée par une barge de transport 2.Fig. 1 A schematically represents a platform 1 carried by a
Sur le fond de la mer 3 est ancrée une structure destinée à recevoir la plate-forme. Cette structure comporte des piles dont les têtes peuvent émerger de l'eau; l'une de ces têtes de piles, référencée 4, est représentée dans les figures. Elle possède un cône de réception 5, femelle.On the bottom of the
A chaque pile 4 correspond une jambe 6 solidaire de la plate-forme 1. Une plate-forme pourra comprendre par exemple quatre jambes qui seront solidarisées à 4 piles.Each stack 4 corresponds to a
Au moins deux des jambes sont constituées d'un cylindre creux fermé à l'extrémité supérieure par une butée 7 appelée généralement palonnier. Ce sont des jambes de ce type qui sont représentées dans les figures.At least two of the legs consist of a hollow cylinder closed at the upper end by a stop 7 generally called a lifter. It is legs of this type which are shown in the figures.
A l'intérieur du tube est disposé un insert 8 dont les caractéristiques sont les suivantes:
- - Il peut coulisser dans la jambe dans laquelle il est guidé par des
moyens 9 tels que des bossages (et/ou des plaques telles que 9A). - - Il est maintenu à l'intérieur de la jambe, en butée contre le palonnier, au moyen d'un dispositif mécanique, qui peut par exemple être un
doigt 10, traversant la jambe par un orifice approprié, et s'engageant dans un alésage correspondant de l'insert. Le doigt est escamotable au moyen d'unvérin 11. En variante, il peut y avoir plusieurs doigts déplaçables simultanément. - - Il est terminé par un
cône 12 destiné à faciliter son centrage dans lecône récepteur 5 de la tête de pile 4. - - Il dépasse de la jambe à son extrémité inférieure.
- - Il est constitué de deux
tubes 8A et 8B coaxiaux, fixés chacun par l'une de leur extrémité à undispositif amortisseur 14, de préférence constitué d'un bloc en matériau élastomère.
- - It can slide in the leg in which it is guided by
means 9 such as bosses (and / or plates such as 9A). - - It is held inside the leg, in abutment against the lifter, by means of a mechanical device, which can for example be a
finger 10, passing through the leg through an appropriate orifice, and engaging in a bore correspondent of the insert. The finger is retractable by means of ajack 11. As a variant, there can be several fingers that can be moved simultaneously. - - It is terminated by a
cone 12 intended to facilitate its centering in thereceiving cone 5 of the battery head 4. - - It protrudes from the leg at its lower end.
- - It consists of two
8A and 8B, each fixed by one of their ends to acoaxial tubes damping device 14, preferably consisting of a block of elastomeric material.
Le fonctionnement du dispositif est le suivant:
- Durant le transport, l'insert 8 est rentré à l'intérieur de la jambe et est maintenu en butée contre le palonnier 7.
- During transport, the
insert 8 is inserted inside the leg and is held in abutment against the lifter 7.
La barge de transport est positionnée à l'aide de lignes d'ancrage, la plate-forme et ses jambes passant librement au-dessus des têtes de piles.The transport barge is positioned using anchor lines, the platform and its legs passing freely above the pile heads.
Au moment de l'introduction de la barge, la distance (ou clair) entre l'extrémité inférieure de l'insert et la tête de pile est fonction de la marée, de l'amplitude des mouvements verticaux de la barge et de certains facteurs de sécurité. Cette valeur est désignée par AGo.When the barge is introduced, the distance (or clear) between the lower end of the insert and the pile head depends on the tide, the amplitude of the barge's vertical movements and certain factors of security. This value is designated by AGo.
L'ensemble barge de transport/plate-forme étant positionné à l'aide des lignes d'ancrage oscille, du fait de la houle, autour d'une position moyenne de coïncidence parfaite entre piles et jambes.The transport barge / platform assembly being positioned using the anchor lines oscillates, due to the swell, around an average position of perfect coincidence between stacks and legs.
La barge de transport est dans un premier temps ballastée jusqu'à réduire le clair AGo à une valeur minimale compatible avec les mouvements verticaux de l'ensemble et de telle manière qu'il n'y ait pas de contact entre tête de pile et jambe de la plate-forme. C'est la position représentée dans la fig. 1 A.The transport barge is first ballasted until the clear AGo is reduced to a minimum value compatible with the vertical movements of the assembly and in such a way that there is no contact between pile head and leg of the platform. This is the position shown in fig. 1 A.
Au cours d'une accalmie de houle, la coïncidence verticale étant assurée pour un temps de l'ordre de la minute, des inserts sont largués simultanément et tombent dans les cônes de réception des têtes de piles, réalisant instantanément la connexion horizontale entre la plate-forme et la structure. On opère ce largage par manoeuvre simultanée des vérins correspondants 11. On pourra se contenter de larguer deux inserts, ce qui suffit à assurer l'immobilisation horizontale de la plate-forme. Mais bien entendu on peut larguer plus de deux inserts simultanément et même la totalité d'entre eux. Le nombre d'inserts à larguer simultanément dépend de leur capacité et de celle des piles de la structure à supporter les efforts horizontaux engendrés par les trains de vagues. Leur nombre est de deux au minimum pour éviter toute rotation de la plate-forme qui pourrait se produire après connexion sur un seul insert et qui interdirait de descendre les autres dans les cônes récepteurs.During a swell lull, the vertical coincidence being assured for a time of the order of a minute, inserts are released simultaneously and fall into the cones of reception of the battery heads, instantly making the horizontal connection between the plate -form and structure. We operate this release by simultaneous operation of the corresponding
Une fois les inserts largués (fig. 1 B), l'ensemble barge/plate-forme reste libre de se mouvoir verticalement au gré de la houle, le long de l'insert. A titre de sécurité, la profondeur du cône de réception sera avantageusement prise au moins égale à la valeur du pilonnement maximal envisageable pour interdire tout déboîtement accidentel d'un insert après connexion par frottement de l'insert à l'intérieur de la jambe, au moment du passage de trains de vagues.Once the inserts have been released (fig. 1 B), the barge / platform assembly remains free to move vertically with the swell, along the insert. As a safety measure, the depth of the reception cone will advantageously be taken at least equal to the value of the maximum possible heaving to prevent any accidental dislodging of an insert after connection by friction of the insert inside the leg, at the moment of the passage of wave trains.
Le cône récepteur peut avantageusement être monté sur un amortisseur 14 en caoutchouc, élastomère ou tout autre matériau élastique approprié, pour amortir le choc créé par la chute de l'insert et assurer que celle-ci n'endommage pas la tête de pile de la structure, si le centrage de la plate-forme n'est pas parfait au moment du largage des inserts.The receiving cone can advantageously be mounted on a
La dépose de la plate-forme sur la structure est ensuite réalisée par ballastage de la barge jusqu'à ce que le palonnier de la jambe de la plate-forme vienne en butée sur la tête de l'insert, la position relative jambe/insert étant redevenue la même qu'avant largage de l'insert (fig. 1 C).The removal of the platform on the structure is then carried out by ballasting the barge until the lifter of the leg of the platform comes into abutment on the head of the insert, the relative position leg / insert being again the same as before dropping the insert (fig. 1 C).
Au cours de ce ballastage, les mouvements verticaux de la barge et de la plate-forme occasionnent des chocs entre le palonnier et l'insert, qui sont amortis par l'amortisseur intégré à l'insert.During this ballasting, the vertical movements of the barge and the platform cause shocks between the lifter and the insert, which are absorbed by the damper integrated into the insert.
La poursuite du ballastage de la barge permet ensuite de dégager la plate-forme de celle-ci, la plate-forme reposant en fin d'opération sur la tête de pile de la structure, par l'intermédiaire des inserts. La fig. 1 D montre l'écrasement de l'amortisseur en fin de ballastage.Continuing ballasting of the barge then makes it possible to release the platform from the latter, the platform resting at the end of the operation on the pile head of the structure, by means of the inserts. Fig. 1 D shows the crushing of the shock absorber at the end of ballasting.
La longueur de l'insert et l'emplacement du palonnier à l'intérieur de la jambe sont étudiés de manière à ce que la distance, en fin d'opération, entre l'extrémité inférieure de la jambe de plate-forme et la tête de pile de la structure soit suffisante pour permettre de souder deux demi-viroles métalliques (16A et 16B) qui assurent en finale là continuité de la structure installée entre pile et jambe de la plate-forme.The length of the insert and the location of the spreader inside the leg are studied so that the distance, at the end of the operation, between the lower end of the platform leg and the head of the structure's stack is sufficient to allow two metal half-ferrules (16A and 16B) to be welded, which ultimately provide continuity of the structure installed between the stack and the leg of the platform.
On peut alors détruire l'amortisseur, par exemple par action chimique (fig. 1 E).The shock absorber can then be destroyed, for example by chemical action (fig. 1 E).
La hauteur de ballastage, c'est-à-dire la hauteur dont la barge doit pouvoir s'enfoncer pour permettre l'opération ci-dessus, est au moins égale à la somme de quatre termes:
- - la hauteur D correspondant à l'allégement du poids de la plate-forme,
- - le clair initial AGo,
- - la valeur H du demi-pilonnement,
- - la profondeur h du cône de réception (h=2H).
- - the height D corresponding to the reduction in weight of the platform,
- - the initial clear AGo,
- - the H value of the half-heave,
- - the depth h of the reception cone (h = 2H).
Pour une barge de dimension 120 m x 30 m, supportant une plate-forme de 6000 tonnes, la hauteur d'allégement D est voisine de 2 m. Si le clair initial est de 0,6 m et le pilonnement de 0,9 m, la hauteur de ballastage est voisine de 4 m; le ballastage nécessite alors une quantité d'eau très importante, de l'ordre de 13000 tonnes.For a barge with a dimension of 120 m x 30 m, supporting a platform of 6000 tonnes, the relief height D is close to 2 m. If the initial clear is 0.6 m and the heaving 0.9 m, the ballasting height is close to 4 m; ballasting then requires a very large quantity of water, of the order of 13,000 tonnes.
Une variante du système permet de réduire cette hauteur de ballastage; cette variante s'appliquera de préférence aux très grosses plates-formes.A variant of the system makes it possible to reduce this ballasting height; this variant will preferably apply to very large platforms.
La variante repose sur la considération ci-après:The variant is based on the following consideration:
Immédiatement après le largage de l'insert 8, la distance entre le palonnier 7 de la jambe 6 et le sommet de l'insert est devenue:
- AGo+h±H, H étant toujours le pilonnement de la barge.
- AGo + h ± H, H being always the heaving of the barge.
Si on interpose alors, entre le palonnier et le sommet de l'insert, une cale d'épaisseur totale: (AGo+h-H), la hauteur du ballastage est réduite d'autant.If we then interpose, between the lifter and the top of the insert, a block of total thickness: (AGo + h-H), the ballasting height is reduced accordingly.
Dans l'exemple numérique considéré précédemment, le gain est de:
- (0,60+0,90-0,45)=1,05 m, soit plus de 25% sur la hauteur de ballastage.
- (0.60 + 0.90-0.45) = 1.05 m, i.e. more than 25% of the ballasting height.
Les fig. 2A à 2E représentent la variante du dispositif de l'invention utilisant cette cale.Figs. 2A to 2E represent the variant of the device of the invention using this wedge.
La jambe est munie d'orifices 20A, 20B, 21 A se faisant face deux à deux. La paire la plus basse est située à une distance maximale du palonnier telle que la distance entre le palonnier et la partie inférieure de la cale soit égale à d'=AGo+h-H, où ces symboles ont les mêmes significations que précédemment.The leg is provided with
Comme le montre la fig. 2C qui représente le dispositif au début de l'opération de ballastage, une cale 19 est introduite par une paire d'orifices (ici les orifices 21 A, 21 B inférieurs), de manière à servir de butée à l'insert en fin de ballastage (fig. 2D).As shown in fig. 2C which represents the device at the start of the ballasting operation, a
En fonction du niveau de la marée, de l'état de la mer au moment de l'opération, en particulier de la valeur du pilonnement, on choisit la paire d'orifices qui convient le mieux.Depending on the level of the tide, the state of the sea at the time of the operation, in particular the value of the heaving, we choose the pair of orifices which is best suited.
La fig. 2E montre la position finale des divers éléments après soudage de deux demi-viroles 16A et 16B et destruction de l'amortisseur.Fig. 2E shows the final position of the various elements after welding of two half-
La cale est montée sur une glissière (non représentée) qui traverse la jambe de la plate-forme de manière à ne pas entraver le coulissement de l'insert - en passant, par exemple, de part et d'autre de l'insert à l'intérieur de la jambe - et est prolongée à l'extérieur de la jambe où la cale est en position d'attente avant la connexion.The wedge is mounted on a slide (not shown) which crosses the leg of the platform so as not to impede the sliding of the insert - passing, for example, on either side of the insert to the inside of the leg - and is extended to the outside of the leg where the wedge is in the waiting position before connection.
L'introductin de la cale à l'intérieur de la jambe peut s'effectuer manuellement ou à l'aide d'un dispositif mécanique comme par exemple un vérin (non représenté) dont la capacité requise se limite à la valeur du frottement dû au poids propre de la cale.The introduction of the wedge inside the leg can be carried out manually or using a mechanical device such as for example a jack (not shown) whose required capacity is limited to the value of the friction due to the dead weight of the hold.
Un intérêt supplémentaire de cette variante réside dans le fait que, après largage des inserts, la reprise des efforts horizontaux dus à la houle induit des moments plus faibles dans les inserts, la distance entre le fond du cône de réception et le guidage 9 monté à l'extrémité inférieure de la jambe étant réduite, par rapport au dispositif des fig. 1A à 1 E, d'une longueur égale à celle du dépassement de l'insert sous la jambe; cette longueur peut atteindre 1,5 m.An additional advantage of this variant lies in the fact that, after dropping the inserts, the resumption of the horizontal forces due to the swell induces smaller moments in the inserts, the distance between the bottom of the reception cone and the
Claims (10)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR8109708A FR2505900A1 (en) | 1981-05-15 | 1981-05-15 | DEVICE FOR PLATFORM PLACEMENT AND METHOD OF USING THE DEVICE |
FR8109708 | 1981-05-15 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0065695A1 EP0065695A1 (en) | 1982-12-01 |
EP0065695B1 true EP0065695B1 (en) | 1985-02-06 |
Family
ID=9258500
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP82104068A Expired EP0065695B1 (en) | 1981-05-15 | 1982-05-11 | Leg of an offshore platform and method of placing it |
Country Status (6)
Country | Link |
---|---|
US (1) | US4413926A (en) |
EP (1) | EP0065695B1 (en) |
JP (1) | JPS57193619A (en) |
DE (1) | DE3262205D1 (en) |
FR (1) | FR2505900A1 (en) |
NO (1) | NO155783C (en) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5992746U (en) * | 1982-12-10 | 1984-06-23 | 日立造船株式会社 | Plant module installation equipment |
GB8522975D0 (en) * | 1985-09-17 | 1985-10-23 | Conoco Uk Ltd | Offshore platforms |
DK46186A (en) * | 1985-02-01 | 1986-08-02 | Conoco Uk Ltd | PROCEDURE AND EQUIPMENT FOR THE ASSEMBLY OF A OFFSHORE PLATFORM COVER AND PARTS |
US4669918A (en) * | 1986-02-04 | 1987-06-02 | Riles William G | Offshore platform construction including preinstallation of pilings |
JPS6336462A (en) * | 1986-07-31 | 1988-02-17 | Pfu Ltd | Serial data receiving circuit |
US4848967A (en) * | 1988-01-04 | 1989-07-18 | Exxon Production Research Company | Load-transfer system for mating an integrated deck with an offshore platform substructure |
US4930938A (en) * | 1989-06-02 | 1990-06-05 | Exxon Production Research Company | Offshore platform deck/jacket mating system and method |
US5445476A (en) * | 1993-09-30 | 1995-08-29 | Shell Oil Company | Reusable offshore platform jacket |
US5447391A (en) * | 1993-09-30 | 1995-09-05 | Shell Oil Company | Offshore platform structure and system |
US5431512A (en) * | 1993-12-28 | 1995-07-11 | Mcdermott International, Inc. | Flex tube compliant offshore structure |
BR9507588A (en) | 1994-05-02 | 1998-07-21 | Shell Int Research | Method for installing a foundation without a tlp template |
US5741089A (en) * | 1994-12-23 | 1998-04-21 | Shell Offshore Inc. | Method for enhanced redeployability of hyjack platforms |
US5593250A (en) * | 1994-12-23 | 1997-01-14 | Shell Offshore Inc. | Hyjack platform with buoyant rig supplemental support |
US5551801A (en) * | 1994-12-23 | 1996-09-03 | Shell Offshore Inc. | Hyjack platform with compensated dynamic response |
US20100316450A1 (en) * | 2007-12-21 | 2010-12-16 | Vestas Wind Systems A/S | Method for installing an offshore wind turbine and a barge system |
US8926225B2 (en) * | 2013-03-18 | 2015-01-06 | J. Ray Mcdermott, S.A. | Leg mating unit |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3736756A (en) * | 1971-11-03 | 1973-06-05 | Exxon Co | Method and apparatus for assembling an offshore structure |
US3826099A (en) * | 1972-09-25 | 1974-07-30 | Eng Technology Analysts Inc | Self-elevating offshore platform with folding legs |
US3895471A (en) * | 1974-04-09 | 1975-07-22 | Brown & Root | Method and apparatus for forming elongated batter piling in situ |
US4090367A (en) * | 1976-04-06 | 1978-05-23 | Verschure Pietrus J M | Offshore drilling platform with vertically movable legs |
NO771673L (en) * | 1976-05-20 | 1977-11-22 | Pool Co | FIXED OFFSHORE PLATFORM AND PROCEDURE FOR SETTING UP THE SAME |
DE2736938C2 (en) * | 1977-08-16 | 1979-03-15 | Howaldtswerke-Deutsche Werft Ag Hamburg Und Kiel, 2300 Kiel | Sea jack-up platform |
NL7806612A (en) * | 1977-09-21 | 1979-03-23 | Babcock Ag | SOAP PLATFORM. |
US4242011A (en) * | 1978-04-03 | 1980-12-30 | Brown & Root, Inc. | Method and apparatus for forming integrated deck sub-structure assembly including arch-vessel passage means |
FR2496730A1 (en) * | 1980-12-23 | 1982-06-25 | Bretagne Atel Chantiers | DEVICE FOR THE PLACEMENT OF A MARINE PLATFORM ON ITS SUPPORT STRUCTURE |
-
1981
- 1981-05-15 FR FR8109708A patent/FR2505900A1/en active Granted
- 1981-08-06 US US06/290,537 patent/US4413926A/en not_active Expired - Fee Related
-
1982
- 1982-05-11 EP EP82104068A patent/EP0065695B1/en not_active Expired
- 1982-05-11 DE DE8282104068T patent/DE3262205D1/en not_active Expired
- 1982-05-13 NO NO821592A patent/NO155783C/en unknown
- 1982-05-14 JP JP57082307A patent/JPS57193619A/en active Granted
Also Published As
Publication number | Publication date |
---|---|
NO155783B (en) | 1987-02-16 |
FR2505900A1 (en) | 1982-11-19 |
US4413926A (en) | 1983-11-08 |
FR2505900B1 (en) | 1984-10-26 |
NO821592L (en) | 1982-11-16 |
DE3262205D1 (en) | 1985-03-21 |
NO155783C (en) | 1987-05-27 |
JPS6130086B2 (en) | 1986-07-11 |
EP0065695A1 (en) | 1982-12-01 |
JPS57193619A (en) | 1982-11-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0065695B1 (en) | Leg of an offshore platform and method of placing it | |
EP0054914B1 (en) | Device for setting up an offshore platform on a supporting structure | |
EP0020232B1 (en) | Method and apparatus for anchoring conduits such as pipe-lines on sea beds | |
FR2966175A1 (en) | DEVICE FOR SUPPORTING A WIND TURBINE FOR PRODUCING ELECTRIC ENERGY AT SEA, INSTALLATION FOR PRODUCING CORRESPONDING ELECTRIC ENERGY IN SEA. | |
CA2380816A1 (en) | Device for launching and recovering an underwater vehicle and process for its use | |
FR3051823A1 (en) | ||
FR3049567A1 (en) | ||
EP1650355B1 (en) | Device for mitigation of a wave | |
EP0942102B1 (en) | Self-elevating platform with submerged reservoir and method for placing and raising the reservoir | |
FR2631355A1 (en) | PROTECTION DEVICE FOR SEA WORKS AND METHOD FOR IMPLEMENTING SAID DEVICE | |
FR2536456A1 (en) | DRILLING SYSTEM FROM A WATER PLAN, INSENSITIVE TO THE COOL | |
WO2022018147A1 (en) | Method for installing at least one mooring line of a floating installation in a body of water and associated floating installation | |
EP0699803B1 (en) | Offshore drilling or production platform with anchoring means | |
WO2016096994A1 (en) | Method for mounting an undersea installation comprising at least one section of pipe, and associated installation | |
FR2508073A1 (en) | DEVICE FOR CONNECTING AND DISCONNECTING AN OSCILLATING MARINE PLATFORM BALL AND METHOD USING SAID DEVICE | |
EP0352204B1 (en) | Method and device for securing landing-stages on piles | |
FR2507146A1 (en) | MARINE PLATFORM, ESPECIALLY DRILLING, AND RELATED PLACING METHOD | |
FR2903126A1 (en) | MOBILE BALLASTABLE SHIRTS FOR METAL PILES OR DUCS-OF ALB | |
WO2021094191A1 (en) | Installation for supporting a self-raising platform | |
FR2720086A1 (en) | Procedure for installation of device for protection against swell | |
FR2779408A1 (en) | METHOD OF INSTALLING A SELF-LIFTING GRAVITY PLATFORM FOR THE OPERATION OF AN OIL FIELD AT SEA | |
FR3147784A1 (en) | Anchoring device in a seabed | |
WO2007006905A2 (en) | Installation and method for cutting submarine structures embedded in the sea floor | |
FR2528464A1 (en) | Leg elevation modification system - for sea-going rigs, uses deck equipment to modify and stow leg sections | |
FR2838100A1 (en) | Positioning and installation of structure on floating platform at sea, employs vertically-tethered barge for location, then varies line tension and ballasting to deposit structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Designated state(s): DE FR GB IT NL |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: ALSTHOM-ATLANTIQUE SOCIETE ANONYME DITE: |
|
17P | Request for examination filed |
Effective date: 19830530 |
|
ITF | It: translation for a ep patent filed | ||
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Designated state(s): DE FR GB IT NL |
|
REF | Corresponds to: |
Ref document number: 3262205 Country of ref document: DE Date of ref document: 19850321 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 19860531 Year of fee payment: 5 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Effective date: 19871201 |
|
NLV4 | Nl: lapsed or anulled due to non-payment of the annual fee | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Effective date: 19880202 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Effective date: 19880511 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19890131 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee | ||
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |