FR2507146A1 - MARINE PLATFORM, ESPECIALLY DRILLING, AND RELATED PLACING METHOD - Google Patents
MARINE PLATFORM, ESPECIALLY DRILLING, AND RELATED PLACING METHOD Download PDFInfo
- Publication number
- FR2507146A1 FR2507146A1 FR8111254A FR8111254A FR2507146A1 FR 2507146 A1 FR2507146 A1 FR 2507146A1 FR 8111254 A FR8111254 A FR 8111254A FR 8111254 A FR8111254 A FR 8111254A FR 2507146 A1 FR2507146 A1 FR 2507146A1
- Authority
- FR
- France
- Prior art keywords
- tube
- platform according
- water
- platform
- upper structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims description 13
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 41
- 238000005553 drilling Methods 0.000 claims abstract description 23
- 238000004873 anchoring Methods 0.000 claims abstract description 20
- 238000009434 installation Methods 0.000 claims description 12
- 241001573881 Corolla Species 0.000 claims description 9
- 238000005452 bending Methods 0.000 claims description 4
- 238000010586 diagram Methods 0.000 claims description 4
- 238000007789 sealing Methods 0.000 claims description 4
- 230000000284 resting effect Effects 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 2
- 238000005065 mining Methods 0.000 claims description 2
- 230000000694 effects Effects 0.000 description 6
- 238000010276 construction Methods 0.000 description 5
- 230000035945 sensitivity Effects 0.000 description 5
- 230000008901 benefit Effects 0.000 description 3
- 238000007667 floating Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 239000004568 cement Substances 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000011347 resin Substances 0.000 description 1
- 229920005989 resin Polymers 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/01—Risers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
- B63B21/502—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers by means of tension legs
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B75/00—Building or assembling floating offshore structures, e.g. semi-submersible platforms, SPAR platforms or wind turbine platforms
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F03D13/25—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors specially adapted for offshore installation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B2035/4433—Floating structures carrying electric power plants
- B63B2035/446—Floating structures carrying electric power plants for converting wind energy into electric energy
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0091—Offshore structures for wind turbines
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2240/00—Components
- F05B2240/90—Mounting on supporting structures or systems
- F05B2240/93—Mounting on supporting structures or systems on a structure floating on a liquid surface
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2240/00—Components
- F05B2240/90—Mounting on supporting structures or systems
- F05B2240/95—Mounting on supporting structures or systems offshore
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/727—Offshore wind turbines
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Combustion & Propulsion (AREA)
- Chemical & Material Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Ocean & Marine Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Sustainable Energy (AREA)
- Sustainable Development (AREA)
- Earth Drilling (AREA)
Abstract
Description
La présente invention concerne une plate-forme marine, pouvant être destinée aux forages pétroliers, ou plus généralement a tout forage en vue de rechercher du charbon ou des minerais, ou encore à capter l'énergie de la houle, des courants ou des vents. D'autres usages de l'invention sont égale ment envisageables. The present invention relates to a marine platform, which may be intended for oil drilling, or more generally for any drilling in order to search for coal or ores, or else to capture the energy of swells, currents or winds. Other uses of the invention are also conceivable.
La présente invention concerne également, de façon plus précise, une plate-forme de forage. The present invention also relates, more specifically, to a drilling platform.
La présente invention concerne également un procédé de mise en place de la plate-forme sur le site d'utilisation. The present invention also relates to a method of setting up the platform on the site of use.
On connait différents types de plates-formes marines, parmi lesquels on choisit en fonction de la profondeur de l'eau a l'emplacement du forage. We know different types of sea platforms, among which we choose according to the depth of the water at the location of the drilling.
Au-del de 300 mètres de profondeur, les plates-formes fixes reposant sur des piles rigides sont abandonnées au profit de structures flottantes. Beyond 300 meters deep, fixed platforms resting on rigid piers are abandoned in favor of floating structures.
On connaît en particulier une plate-forme comprenant un flotteur immergé portant les installations de travail au moyen de jambes traversant la surface de l'eau. Le flotteur est di mensionné de façon a conserver sa flottabilité même si le chargement en installations ou autres est maximal. I1 est relié, par une série de câbles tendus, à des caissons massifs reposant au fond de la mer. In particular, a platform is known comprising a submerged float carrying the working installations by means of legs crossing the surface of the water. The float is dimensioned so as to maintain its buoyancy even if the loading in installations or others is maximum. It is connected, by a series of stretched cables, to massive caissons resting on the bottom of the sea.
Le flotteur est immergé à une profondeur suffisante pour que la houle ne puisse jamais le découvrir, de sorte que la plate-forme présente une certaine insensibilité au mauvais temps. The float is submerged to a sufficient depth so that the swell can never discover it, so that the platform has a certain insensitivity to bad weather.
Pour tenter de maintenir la plate-forme en une position sensiblementfixe malgré les efforts latéraux tels que vents et courants, certains des câbles sont disposés obliquement entre la plate-forme et les caissons.In an attempt to maintain the platform in a substantially fixed position despite lateral forces such as winds and currents, some of the cables are arranged obliquely between the platform and the caissons.
Cette plate-forme connue présente certains inconvénients. This known platform has certain drawbacks.
En effet, l'insensibilité au mauvais temps est très imparfaite car la houle immerge defaçon variable les jambages supportant les installations émergées. La variation de la poussée d'Archimède qui en résulte entraîne du fait de l'élasticité des câbles qui est non négligeable sur des longueurs voisines de 500 ou 1.000 m, un mouvement de pilonnement de la plateforme qui est extrêmement néfaste quelle que soit l'utili- sation prévue pour cette plate-forme. C'est ainsi que dans le cas de forages pétroliers, ce pilonnement fait fluctuer considérablement l'effort de coupe sur l'outil de forage et peut causer sa rupture.Indeed, the insensitivity to bad weather is very imperfect because the swell immersed in a variable way the legs supporting the emerged installations. The variation in Archimedes' thrust which results therefrom causes, due to the elasticity of the cables which is not negligible over lengths close to 500 or 1,000 m, a heaving movement of the platform which is extremely harmful whatever the intended use for this platform. This is how in the case of oil drilling, this heaving causes the cutting force on the drilling tool to fluctuate considerably and can cause it to break.
En outre, cette plate-forme est inévitablement sensible aux efforts latéraux. En effet, l'élasticité des câbles obliques ne permet pas d'éviter totalement la dérive. Le flotteur a en outre la possibilité de s'incliner, ce qui lui permet de dériver encore bien plus que ne le laisserait prévoir la simple élasticité des câbles. In addition, this platform is inevitably sensitive to lateral forces. Indeed, the elasticity of the oblique cables does not completely avoid the drift. The float also has the ability to tilt, allowing it to drift even more than would be expected from the simple elasticity of the cables.
On comprend donc que dans la plate-forme connue, on doit admettre une certaine sensibilité au mauvais temps ainsi qu'une certaine sensibilité aux efforts latéraux. Ces sensibilités sont difficiles à évaluer à la construction, et de toute façon, ont des valeurs rédhibitoires pour certaines applications. We therefore understand that in the known platform, we must admit a certain sensitivity to bad weather as well as a certain sensitivity to lateral forces. These sensitivities are difficult to assess during construction, and in any case have unacceptable values for certain applications.
On notera également que les nombreux câbles nécessaires dans la réalisation connue ont une masse considérable. Cette masse est portée par le flotteur, au détriment de la charge utile que ce dernier peut recevoir sous forme d'installations notamment. It will also be noted that the numerous cables necessary in the known embodiment have a considerable mass. This mass is carried by the float, to the detriment of the payload that the latter can receive in the form of installations in particular.
Le but de l'invention est de remédier à ces inconvénients en réalisant une plate-forme marine qui permette de régler facilement, à la construction, la sensibilité à la houle et aux efforts latéraux, et de donner à ces sensibilités des valeurs acceptables pour la quasi totalité des applications. The object of the invention is to remedy these drawbacks by providing a marine platform which makes it possible to easily adjust, during construction, the sensitivity to swell and to lateral forces, and to give these sensitivities acceptable values for the almost all applications.
L'invention vise ainsi une plate-forme marine comprenant un corps de densité inférieure à l'unité, ce corps portant un chargement et étant relié à des moyens d'ancrage au fond de l'eau par des moyens de liaison sous tension de façon qu'il se trouve en service immergé sensiblement en totalité. Le corps est dimensionné de façon que la structure supérieure, comprenant ledit corps et son chargement, ait une flottabilité positive même lorsque le chargement atteint sa masse maximale prévue. The invention thus relates to a marine platform comprising a body of density less than unity, this body carrying a load and being connected to means for anchoring to the bottom of the water by means of connection under tension so that it is in substantially submerged service. The body is dimensioned so that the upper structure, comprising said body and its load, has positive buoyancy even when the load reaches its maximum expected mass.
Suivant l'invention, la plate-forme marine est caractérisée en ce que les moyens de liaison présentent une déformabilité propre autorisant à la structure supérieure une dérive sous 1' effort latéral telle que ces moyens de liaison viennent sensiblement en alignement avec la résultante des efforts subis par la structure supérieure. According to the invention, the marine platform is characterized in that the connecting means have their own deformability allowing the upper structure to drift under one lateral force such that these connecting means come substantially in alignment with the result of the forces undergone by the upper structure.
Au cours de la construction de la plate-forme, on définit la dérive maximale que l'on considère comme acceptable pour la plate-forme par rapport à la verticale issue des moyens d'ancrage. On calcule la proportion entre cette dérive et la profondeur de l'eau à l'emplace- ment où la plate-forme doit être installée. On choisit ensuite l'effort vertical ascendant appliqué à la structure supérieure de sorte que la proportion entre les efforts latéraux prévus de la part des courants, des vents, etc., et ledit effort vertical soit égakà à la proportion précitée entre la dérive maximale admissible et la profondeur de l'eau. During the construction of the platform, the maximum drift that is considered acceptable for the platform is defined with respect to the vertical from the anchoring means. The proportion between this drift and the depth of the water at the location where the platform is to be installed is calculated. We then choose the vertical upward force applied to the upper structure so that the proportion between the lateral forces expected from currents, winds, etc., and said vertical force is equal to the aforementioned proportion between the maximum allowable drift and the depth of the water.
Certes, augmenter l'effort vertical revient à augmenter le volume du flotteur donc à augmenter les efforts latéraux dus aux courants Cependant, la poussée d'Archimède augmente comme le volume du flotteur tandis que les efforts hydrodynamiques n'augmentent que proportionnellement à son malte couple qui est une surface. Certainly, increasing the vertical force amounts to increasing the volume of the float, therefore increasing the lateral forces due to the currents.However, Archimedes' thrust increases like the volume of the float while the hydrodynamic forces only increase in proportion to its malte torque. which is a surface.
Une solution peut donc être trouvée à chaque problème.A solution can therefore be found for each problem.
On notera que l'invention procède d'une démarche contraire à celle de l'état de la technique. Selon l'invention, on recherche une position d'équilibre naturel du corps sous l'effet des efforts latéraux, et on règle la tension des moyens de liaison pour que cet équilibre soit compatible avec l'utilisation prévue. It will be noted that the invention proceeds from an approach contrary to that of the state of the art. According to the invention, a position of natural equilibrium of the body is sought under the effect of the lateral forces, and the tension of the connecting means is adjusted so that this balance is compatible with the intended use.
Selon l'état de la technique, on multiplie les câbles et on varie leurs orientations pour empêcher le flotteur de prendre la position d'équilibre qui est recherchée selon l'invention. Ainsi, dans la plate-forme connue, il suffit que les câbles soient tendus, mais la valeur de la tension ne joue pas de rôle, et en pratique on choisit bien entendu une valeur réduite.According to the state of the art, the cables are multiplied and their orientations are varied to prevent the float from taking the equilibrium position which is sought according to the invention. Thus, in the known platform, it is sufficient for the cables to be tensioned, but the value of the voltage does not play a role, and in practice, of course, a reduced value is chosen.
Au contraire, selon l'invention, on est amené dans la plupart des cas à choisir une valeur de-tension très élevée, de façon par exemple que les efforts aéroou hydrodynamiques restent faibles par rapport à cette tension. On the contrary, according to the invention, in most cases it is necessary to choose a very high de-tension value, so that, for example, the aero or hydrodynamic forces remain low compared to this tension.
Ainsi, les variations de poussée d'Archimède qu'engendre la houle sur la structure supérieure sont très faibles par rapport à la tension sur les moyens de liaison, et le pilonnement qui en résulte est négligeable. Thus, the variations in Archimedes' thrust generated by the swell on the upper structure are very small compared to the tension on the connecting means, and the resulting heaving is negligible.
Selon un autre aspect de l'invention, la plate-forme-marine destinée aux forages pétroliers ou miniers, comprenant des installations notamment pour faire descendre une tige de forage vers le fond de liteau, un corps de densité inférieure à 1 portant ces installations et dimensionné de façon à avoir une flottabilité positive même avec le chargement maximal prévu, ce corps étant relié à des moyens d'ancrage au fond de l'eau par des moyens de liaison sous tension de façon qu'il se trouve en service immergé sensiblement en totalité, est caractérisée en ce que les moyens de liaison comprennent un tube étanche à l'eau, à l'intérieur duquel est guidée la tige de forage. According to another aspect of the invention, the marine platform intended for oil or mining drilling, comprising installations in particular for bringing down a drilling rod towards the bottom of the batten, a body of density less than 1 carrying these installations and dimensioned so as to have a positive buoyancy even with the maximum loading envisaged, this body being connected to anchoring means at the bottom of the water by means of connection under tension so that it is in service submerged substantially in whole, is characterized in that the connecting means comprise a watertight tube, inside which the drill pipe is guided.
Dans cet aspect, l'invention enseigne une réalisation qui permet de ' bénéficier des avantages du premier objet de l'invention, et qui est en outre particulièrement avantageuse dans le cadredes techniques de forage. In this aspect, the invention teaches an embodiment which makes it possible to benefit from the advantages of the first object of the invention, and which is also particularly advantageous in the context of drilling techniques.
En effet, compte tenu des efforts mis en jeu, le tube de liaison étanche à l'eau se comporte comme une attache souple même si une liaison du type encastrement le relie aux moyens d'ancrage. Sa flexibilité est suffisante pour cela. En outre, le tube est particulièrement avantageux dans son rôle de guidage de la tige de forage. Si par exemple l'outil de forage doit être changé, il n'existe plus de problème pour retrouver le forage. Indeed, given the efforts involved, the waterproof connection tube behaves like a flexible clip even if a connection of the embedding type connects it to the anchoring means. Its flexibility is sufficient for this. In addition, the tube is particularly advantageous in its role of guiding the drill pipe. If, for example, the drilling tool needs to be changed, there is no longer any problem finding the drilling.
Selon un autre objet de l'invention, le procédé pour mettre en place une plate-forme du genre ci-dessus est caractérisé par les étapes suivantes:
on fait flotter librement le corps à l'emplacement où l'on désire installer la plate-forme;
on devide depuis le corps une attache destinée à faire ultérieurement partie des moyens de liaison, jusqu'à ce que l'extrémité libre de cette attache atteigne le fond de l'eau;
on amarre l'attache au fond de l'eau; et
on tire sur l'attache depuis le corps, de façon à enfoncer celui-ci dans l'eau jusqu'à la profondeur voulue.According to another object of the invention, the method for setting up a platform of the above kind is characterized by the following steps:
the body is floated freely at the location where it is desired to install the platform;
an attachment intended to form part of the connecting means is unwound from the body, until the free end of this attachment reaches the bottom of the water;
the tie is moored at the bottom of the water; and
the tie is pulled from the body, so as to push it into the water to the desired depth.
D'autres particularités et avantages de l'invention résulteront encore de la description ci-après. Other features and advantages of the invention will also result from the description below.
Aux dessins annexés, donnés à titre d'exemples non limitatifs:
- la figure 1 est une vue schématique en élévation latérale d'une plate-forme conforme à l'invention;
- la figure 2 est une vue en élévation latérale et coupe axiale de la plate-forme en cours de mise en place;
- la figure 3 est une vue schématique en élévation latérale et coupe axiale d'une plate-forme de forage conforme à l'invention;
- la figure 4 est une vue en coupe axiale des moyens d'ancrage; - les figures 5 et 6 sont @@@ @@ montrant deux étapes de la mise en place de la plate-forme de la figure 3;
- la f@ @@ partielle en éléva- tion latérale et coupe @@ variante de réalisation;
- la figure 8 est une vue en élévation latéra- le d'une plate-forme portant une éolienne; et
- la figure 9 est une vue en coupe selon la ligne IX-IX de la figure 8.In the appended drawings, given by way of nonlimiting examples:
- Figure 1 is a schematic side elevation view of a platform according to the invention;
- Figure 2 is a side elevational view and axial section of the platform being set up;
- Figure 3 is a schematic side elevational view in axial section of a drilling platform according to the invention;
- Figure 4 is an axial sectional view of the anchoring means; - Figures 5 and 6 are @@@ @@ showing two stages of the establishment of the platform of Figure 3;
- the partial @ @ @ @ in side elevation and section @@ variant embodiment;
- Figure 8 is a side elevational view of a platform carrying a wind turbine; and
- Figure 9 is a sectional view along line IX-IX of Figure 8.
La plate-forme représentée schématiquement à la figure 1 peut être appliquée à différents usages tels que forage ou encore captage de l'énergie de la houle, des vents ou des courants. The platform shown schematically in Figure 1 can be applied to different uses such as drilling or capturing energy from swells, winds or currents.
Elle comprend un corps 1, de densité in S re à 1, constitué d'une sphère creuse étanche à l'eau, immergée de façon que les creux de la houle ne puis la découvrir, même si la houle a son amplitude maximale prévisible, compte-tenu du site. It comprises a body 1, of density in S re to 1, consisting of a hollow waterproof sphere, immersed so that the hollows of the swell cannot then discover it, even if the swell has its maximum foreseeable amplitude, considering the site.
Le corps 1 porte un chargement essentiellement constitué d'installations dont la nature est liée à l'utilisation prévue pour la plate-forme. The body 1 carries a load essentially consisting of installations the nature of which is linked to the use intended for the platform.
Le chargement comprend également un plateau 6 destiné à permettre aux navires d'accoster ou aux hélicoptères de se poser. Le plateau 6 est supporté par le corps 1 au moyen d'un jambage 7 qui traverse la surface de l'eau 8. The load also includes a tray 6 intended to allow ships to dock or helicopters to land. The plate 6 is supported by the body 1 by means of a leg 7 which crosses the surface of the water 8.
Le corps 1 est relié à des moyens 9 d'ancrage au fond de l'eau 11 par des moyens de liaison 12. The body 1 is connected to means 9 for anchoring to the bottom of the water 11 by connection means 12.
Même lorsque le chargement supporté par le corps 1 est maximal, l'ensemble constitué par le corps 1 et son chargement (comprenant notamment les installations, le plate 6, le jambage 7, etc.) a une flottabilité pO9ltiV g cest-à-dire qu'il tend à remonter vers la
sX ont les moyens de liaison 12, qui par ler empêchent cette remontée du corps 1.Even when the load supported by the body 1 is maximum, the assembly constituted by the body 1 and its load (comprising in particular the installations, the plate 6, the jamb 7, etc.) has a buoyancy pO9ltiV g that is to say that it tends to go up towards the
sX have the connecting means 12, which in turn prevent this ascent of the body 1.
Conforme'ent à l'invention, les moyens de liaison 12 présentent une déformabilité propre autorisant à la plate-forme une dérive sous l'effort latéral telle que ces moyens de liaison viennent en alignement avec la résultanté des efforst appliqués à l'ensemble supérieur qui comprend le corps 1 et son chargement. In accordance with the invention, the connection means 12 have their own deformability allowing the platform to drift under lateral force such that these connection means come into alignment with the result of the forces applied to the upper assembly which includes the body 1 and its load.
Ces particularités sont explicitées ci-après en référence à la figure 2, dans laquelle la sphère 1 est soumise, par exemple de la part des courants marins, à un effort latéral L. These particularities are explained below with reference to FIG. 2, in which the sphere 1 is subjected, for example on the part of sea currents, to a lateral force L.
D'autre part, la sphère 1 subit une poussée verticale ascendante P égale à la différence entre la poussée d'Archimède subie par la structure supérieure et son poids. On the other hand, the sphere 1 undergoes an upward vertical thrust P equal to the difference between the Archimedes' thrust undergone by the upper structure and its weight.
La profondeur de l'eau est h à l'emplacement de la plate-forme et, sous l'effet de l'effort L, le flotteur 1 subit une dérive d. The water depth is h at the location of the platform and, under the effect of the force L, the float 1 undergoes a drift d.
Selon l'invention, les moyens de liaison 12 sont tels que L/P = d/h. According to the invention, the connecting means 12 are such that L / P = d / h.
Dans l'exemple représenté à la figure 1, les moyens de liaison 12 sont une attache souple unique, telle qu'un câble, et la condition énoncée revient à dire que la résultante R des efforts P et L est sensiblement alignée avec le câble 12. In the example shown in FIG. 1, the connecting means 12 are a single flexible attachment, such as a cable, and the condition stated amounts to saying that the resultant R of the forces P and L is substantially aligned with the cable 12 .
Dans la représentation simplifiée de la figure 1, on a volontairement exagéré l'angle d'inclinaison du câble 12 par rapport à la verticale. In the simplified representation of FIG. 1, the angle of inclination of the cable 12 relative to the vertical has been deliberately exaggerated.
En pratique, on peut rendre cet angle aussi petit que l'on veut en augmentant la poussée P, c'està-dire en augmentant la différence entre la poussée d'Archimède sur le corps 1 d'une part et le poids du corps 1 et de son chargement d'autre part. In practice, we can make this angle as small as we want by increasing the thrust P, that is to say by increasing the difference between the buoyancy on the body 1 on the one hand and the weight of the body 1 and its loading on the other hand.
De préférence, à cet effet, la masse d'eau déplacée par le corps 1 est au moins'environ le double de la masse du corps 1 et de son chargement maximal prévu. Preferably, for this purpose, the mass of water displaced by the body 1 is at least about twice the mass of the body 1 and of its maximum expected loading.
De préférence également, on donne à la poussée
P une valeur telle que le rapport d/h soit égal au plus à 5%, dans le cas d'un effort latéral L sensiblement maximal.Also preferably, the push is given
P a value such that the ratio d / h is at most 5%, in the case of a substantially maximum lateral force L.
Bien entendu, les valeurs choisies dépendent de l'application envisagée et des sujétions qu'elle implique. Of course, the values chosen depend on the application envisaged and the subjugations that it implies.
D'autre part, les conséquences pratiques sur la construction qui résultent du choix du rapport d/h dépendent de l'effort maximal L prévu, et celuici dépend généralement du lieu où la plate-forme doit être installée. On the other hand, the practical consequences on construction which result from the choice of the ratio d / h depend on the maximum effort L expected, and this generally depends on the place where the platform is to be installed.
A titre d'exemple, un corps 1 constitué par une sphère de 10 mètres de diamètre a un volume de 525 m3. By way of example, a body 1 constituted by a sphere 10 meters in diameter has a volume of 525 m3.
Si sa paroi a 0,02 m d'épaisseur, son poids est de 49 tonnes environ. En respectant la condition précitée selon laquelle le poids d'eau déplacé est le double du poids de l'ensemble flottant, ce flotteur peut supporter un chargement de 210 tonnes environ. Si comme on peut raisonnablement l'envisager, une telle sphère subit de la part des courants une force latérale L de 3 tonnes, le rapport L/P = d/h est égal à 3/(525-(210+49)) = 1,13%.If its wall is 0.02 m thick, its weight is around 49 tonnes. By respecting the aforementioned condition that the weight of water displaced is twice the weight of the floating assembly, this float can support a load of approximately 210 tonnes. If as one can reasonably imagine, such a sphere undergoes from the currents a lateral force L of 3 tonnes, the ratio L / P = d / h is equal to 3 / (525- (210 + 49)) = 1.13%.
On va maintenant décrire, en référence à la figure 2, un procédé d'installation de la plate-forme sur le site d'utilisation. Les étapes du procédé sont les suivantes:
- On prépare un ancrage 9 au fond de l'eau 11 et on fait flotter librement sur le site le corps 1 muni d'une cheminée destinée à servir ultérieurement de jambage 7. La cheminée 7 est surmontée d'un treuil 10 sur lequel le câble 12 est enroulé.We will now describe, with reference to FIG. 2, a method of installing the platform on the site of use. The process steps are as follows:
- An anchor 9 is prepared at the bottom of the water 11 and the body 1 provided with a free float on the site provided with a chimney intended to serve later as a jamb 7. The chimney 7 is surmounted by a winch 10 on which the cable 12 is wound.
- On dévide le câble 12 qui entre dans le corps 1 par la cheminée 7, et ressort du corps 1 par un orifice 15 muni de moyens d'étanchéité évitant toute entrée d'eau dans le corps 1. - The cable 12 which enters the body 1 is unwound through the chimney 7, and leaves the body 1 through an orifice 15 provided with sealing means preventing any entry of water into the body 1.
- Quand le câble atteint le fond de l'eau 11, on le fixe à l'ancrage 9, par exemple à l'aide de personnel se rendant sur les lieux au moyen d'un véhicule sous-marin. - When the cable reaches the bottom of the water 11, it is fixed to the anchor 9, for example using personnel traveling to the scene by means of an underwater vehicle.
- On réenroule le câble 12 à l'aide du treuil 10 de façon à faire descendre le corps 1 jusqu'à la profondeur voulue. C'est l'étape représentée à la figure 2. - The cable 12 is rewound using the winch 10 so as to bring the body 1 down to the desired depth. This is the step shown in Figure 2.
Dès lors, le câble 12 constitue l'attache définitive du corps 1 à l'ancrage 9. Consequently, the cable 12 constitutes the final attachment of the body 1 to the anchor 9.
Dans l'exemple des figures 3 et 4, qui concerne une plate-forme marine destinée au forage pétrolier, les éléments analogues à ceux de la figure 1 ne sont pas décrits à nouveau. Les moyens de liaison 9 comprennent ici un tube unique 13 fixé rigidement aux moyens d'ancrage 9 et à la sphère 1. Malgré cette fixation rigide, le tube 13 se comporte comme une attache souple permettant d'assurer que la condition L/P - d/h est remplie. In the example of FIGS. 3 and 4, which relates to a marine platform intended for oil drilling, the elements similar to those of FIG. 1 are not described again. The connection means 9 here comprise a single tube 13 rigidly fixed to the anchoring means 9 and to the sphere 1. Despite this rigid fixing, the tube 13 behaves like a flexible fastener making it possible to ensure that the condition L / P - d / h is met.
Le tube 13 est étanche à l'eau et on a fait en sorte à la construction qu'il ne contienne pas d'eau. The tube 13 is waterproof and the construction has been made to contain no water.
En outre, on a choisi un tube en acier dont l'épaisseur e satisfait avec le diamètre D de ce tube la relation e = D/31,2. Ainsi, compte tenu de la densité de l'acier égale à 7,8, on vérifie que le poids du tube plongé dans l'eau est équilibré par la poussée d'Archimède, autrement dit que le poids apparent du tube est nul. In addition, a steel tube was chosen whose thickness e satisfies with the diameter D of this tube the relation e = D / 31.2. Thus, taking into account the density of the steel equal to 7.8, it is checked that the weight of the tube immersed in water is balanced by the buoyancy, in other words that the apparent weight of the tube is zero.
Le diamètre D est choisi en fonction des contraintes subies par le tube, notamment en traction sous l'effet des efforts tels que P, et en compression radiale sous l'effet de la pression de l'eau. The diameter D is chosen as a function of the stresses undergone by the tube, in particular in traction under the effect of forces such as P, and in radial compression under the effect of the water pressure.
Les moyens d'ancrage 9 qui sont représentés en détail à la figure4 , comprennent un pieu tubulaire 14, étanche à l'eau, scellé par un ciment ou une résine 16 dans un puits 17 creusé verticalement au fond de l'eau. Ce type d'ancrage est décrit en détail dans la demande de brevet français nO 78 19 897 aux noms des Demandeurs. The anchoring means 9 which are shown in detail in FIG. 4, comprise a tubular pile 14, waterproof, sealed by a cement or a resin 16 in a well 17 dug vertically at the bottom of the water. This type of anchoring is described in detail in French patent application No. 78 19 897 in the names of the Applicants.
Le tube 13, dont le diamètre est inférieur au diamètre interne du pieu tubulaire 14 s'étend jusqu'au fond du puits 17, coaxialement à ce dernier. Un scellement en béton 18 est interposé entre le tube 13 et le pieu 14. Le scellement 18 est prolongé vers le haut par une corolle 19 destinée à limiter le rayon de courbure en flexion du tube 13. Vue en section droite, la face 21 de la corolle 19 qui fait face au tube 13 est tangente au tube 13 au niveau de l'embouchure du puits 17, puis s'éloigne du tube 13 selon un arc de cercle, Le rayon de cet arc de cercle 21 est le rayon maximal que l'on admet pour la courbure du tube 13. La hauteur de la corolle 19 est telle que l'angle au sommet de l'arc de cercle 21 est au moins égal à l'angle d'inclinaison maximal admis pour le tube 13, cet angle étant défini par le rapport d/h. The tube 13, the diameter of which is less than the internal diameter of the tubular pile 14 extends to the bottom of the well 17, coaxial with the latter. A concrete seal 18 is interposed between the tube 13 and the pile 14. The seal 18 is extended upwards by a corolla 19 intended to limit the radius of curvature in bending of the tube 13. View in straight section, the face 21 of the corolla 19 which faces the tube 13 is tangent to the tube 13 at the mouth of the well 17, then moves away from the tube 13 in an arc, the radius of this arc 21 is the maximum radius that the curvature of the tube 13 is accepted. The height of the corolla 19 is such that the angle at the top of the arc of a circle 21 is at least equal to the maximum angle of inclination allowed for the tube 13, this angle being defined by the ratio d / h.
La paroi du tube 13 est surépaissie depuis le fond du puits 17 jusqu'au sommet de la corolle 19 car c'est dans cette zone que le tube 13 travaille en flexion, comme on le verra plus loin. The wall of the tube 13 is thickened from the bottom of the well 17 to the top of the corolla 19 because it is in this area that the tube 13 works in bending, as will be seen below.
Comme le montrent les figures 3 et 4 , la tige de forage 22 servant à l'exploration pétrolière, est montée dans un tube 23 de guidage qui à son tour est installé dans le tube 13. Le forage 24 est réalisé à partir du fond du puits 17. Le tube 23 sert à gainer la paroi du forage 24 et à évacuer vers le haut les matières résultant du travail de forage. De préférence, un dispositif obturateur de sécurité 26 (figure 3) est installé dans les moyens d'ancrage 9 pour prévenir l'éven- tuel jaillissement brutal du pétrole ou du gaz. As shown in FIGS. 3 and 4, the drilling rod 22 used for petroleum exploration is mounted in a guide tube 23 which in turn is installed in the tube 13. The drilling 24 is carried out from the bottom of the well 17. The tube 23 is used to cover the wall of the borehole 24 and to evacuate upwards the materials resulting from the drilling work. Preferably, a safety shutter device 26 (FIG. 3) is installed in the anchoring means 9 to prevent any sudden spurting of oil or gas.
Les installations de forage, schématisées à la figure 3 sous la forme d'un derrick 27 sont installées dans le corps 1 qui est une sphère creuse. La plateforme 6 permet aux navires d'accoster et/ou aux hélicoptères de se poser. The drilling rigs, shown diagrammatically in FIG. 3 in the form of a derrick 27, are installed in the body 1 which is a hollow sphere. Platform 6 allows ships to dock and / or helicopters to land.
On va maintenant décrire le fonctionnement de la plate-forme. We will now describe the operation of the platform.
Seul le jambage 7 traverse la surface de l'eau 8, et comme il ne porte-que le plateau 6 et non pas la totalité des installations, le jambage 7 est relativement mince. En conséquence, l'influence de la houle sur le volume d'eau déplacé par la plate-forme est très réduite et entendre des variations de poussée
P très faibles qui sont tout à fait négligeables si on les rapporte à la valeur de la poussée P. La houle est donc sans influence sur la plate-forme.Only the leg 7 crosses the surface of the water 8, and since it only carries the plate 6 and not all of the installations, the leg 7 is relatively thin. As a result, the influence of swell on the volume of water displaced by the platform is very reduced and hearing variations in thrust
P very weak which are quite negligible if we relate them to the value of the thrust P. The swell is therefore without influence on the platform.
Compte-tenu de la longueur du tube 13, e dernier se comporte comme un câble, c'est-à-dire que sous l'effet de la résultante R il tend à s'aligner avec cette résultante dès sa sortie des moyens d'ancrage 9. Grâce à la corolle 19, la contrainte effective dans le tube 13 est limitée par le rayon de courbure de la face 21. Ainsi, toute courbure du tube 13 a lieu en appui contre une partie ou, dans les cas extrêmes, la totalité de la hauteur de la face 21. Au-dessus, le tube est tendu de façon rectiligne sous l'effet de la résultante R. Given the length of the tube 13, the latter behaves like a cable, that is to say that under the effect of the resultant R it tends to align with this resultant as soon as it leaves the means of anchoring 9. Thanks to the corolla 19, the effective stress in the tube 13 is limited by the radius of curvature of the face 21. Thus, any curvature of the tube 13 takes place in abutment against a part or, in extreme cases, the the entire height of the face 21. Above, the tube is stretched in a rectilinear fashion under the effect of the resultant R.
Quand on doit extraire entièrement la tige de forage 22 pour changer l'outil de forage (non représenté) qui se trouve à son extrémité inférieure, il n'y a ensuite aucun problème pour retrouver le forage 24 puisqu'il suffit de réengager la tige de forage 22 dans le tube de guidage 23. When the drill rod 22 has to be completely extracted to change the drill tool (not shown) which is at its lower end, there is then no problem finding the drill 24 since it suffices to re-engage the rod drilling 22 in the guide tube 23.
Les figures 5 et 6 montrent deux étapes du procédé de mise en place sur le site de la plate-forme des figures 3 et 4. Ce procédé comprend les étapes suivantes:
- On scelle le pieu 14 dans le puits 17 et on laisse flotter librement le flotteur 1 sur le site.FIGS. 5 and 6 show two stages of the method of placing the platform of FIGS. 3 and 4 on the site. This method comprises the following stages:
- The pile 14 is sealed in the well 17 and the float 1 is allowed to float freely on the site.
- On construit le tube 13 par éléments 28 à l'intérieur de la sphère 1, et on le fait sortir de la sphère 1 vers le bas, par un orifice 29 ménagé à la base de la sphère 1. C'est l'étape représentée à la figure 5. Une technique pour dévider un tube depuis une enceinte étanche sans risquer l'intrusion d'eau dans l'enceinte est décrite dans la demande de brevet français nO 78 19 467 du 29 juin 1978 aux noms des Demandeurs. - The tube 13 is constructed by elements 28 inside the sphere 1, and it is brought out of the sphere 1 downwards, through an orifice 29 formed at the base of the sphere 1. This is the step shown in Figure 5. A technique for unwinding a tube from a sealed enclosure without risking the intrusion of water into the enclosure is described in French patent application No. 78 19 467 of June 29, 1978 in the names of the Applicants.
- Quand le tube 13 atteint le fond du puits 17, on réalise le scellement en béton 18 entre le tube 13 et le pieu 14. A cet effet, du personnel se rend auprès de l'ancrage 9 à l'aide d'un véhicule progressant sur le fond marin 11. - When the tube 13 reaches the bottom of the well 17, the concrete seal 18 is made between the tube 13 and the pile 14. To this end, personnel go to the anchor 9 using a vehicle advancing on the seabed 11.
- On installe-des vérins 31 dans la sphère 1, entre la sphère (1) et l'extrémité du tube 13, et à l'aide de ces vérins, on enfonce la sphère 1 dans l'eau jusqu'à la profondeur voulue. C'est l'étape représentée à la figure 6. - Cylinders 31 are installed in the sphere 1, between the sphere (1) and the end of the tube 13, and using these cylinders, the sphere 1 is pushed into the water to the desired depth . This is the step shown in Figure 6.
Dans 1' exemple représenté à la figure 7 le corps 1 est de forme horizontale oblongue et peut pivoter autour du tube 13 grâce à un pivot étanche 28. In the example shown in FIG. 7, the body 1 is of oblong horizontal shape and can pivot around the tube 13 thanks to a sealed pivot 28.
Le derrick 27 est monté sur un épaulement 29 du tube 13.The derrick 27 is mounted on a shoulder 29 of the tube 13.
Ce mode de réalisation permet au flotteur de s'orienter de lui-même dans sa direction de moindre résistance aux courants marins. This embodiment allows the float to orient itself in its direction of least resistance to sea currents.
Dans l'exemple représenté aux figures 8 et 9, la plate-forme est destinée à supporter une éolienne 35. In the example shown in FIGS. 8 and 9, the platform is intended to support a wind turbine 35.
Pour lui assurer la grande stabilité nécessaire, la plate-forme comprend trois corps cylindriques 1, de densité intérieure à 1, disposés selon un schéma de triangle équilatéral (figure 9). To provide it with the necessary great stability, the platform comprises three cylindrical bodies 1, of interior density at 1, arranged according to an equilateral triangle diagram (FIG. 9).
Chaque corps 1 est relié à un ancrage respectif 9, par exemple du genre à pieu creux tel que 14 enfoncé dans un puits tel que 17, par des moyens de liaison 9 comprenant chaque fois une tige 34 articulée à l'ancrage 9 correspondant par un joint universel 36 faisant office de rotule. Each body 1 is connected to a respective anchor 9, for example of the kind with hollow pile such as 14 driven into a well such as 17, by connecting means 9 each time comprising a rod 34 articulated to the anchor 9 corresponding by a universal joint 36 acting as a ball joint.
Les ancrages 9 sont disposés selon le même schéma que les corps 1, de sorte que les tiges 34, qui sont de même longueur, sont parallèles entre elles. The anchors 9 are arranged according to the same diagram as the bodies 1, so that the rods 34, which are of the same length, are parallel to each other.
Un châssis 37, qui repose sur les trois corps 1 par l'intermédiaire de trois pieds 38 qui traversent la surface de l'eau 8, porte ltéolienne 35. Pour renforcer la rigidité de la structure supérieure, les corps 1 sont reliés entre eux par trois entretoises 39 qui matérialisent le schéma en triangle équilatéral de l'enem- ble. A frame 37, which rests on the three bodies 1 by means of three feet 38 which cross the surface of the water 8, lteolian door 35. To reinforce the rigidity of the upper structure, the bodies 1 are connected together by three spacers 39 which materialize the equilateral triangle diagram of the assembly.
La plate-forme obéit aux conditions générales posées selon l'invention et-explicitées en référence à la figure 1. The platform obeys the general conditions laid down according to the invention and explained with reference to FIG. 1.
La poussée P est égale à la différence entre le poids de l'eau déplacéepar la structure supérieure et le poids total de la structure supérieure comprenant l'éolienne 35, le plateau 37, les trois jambes 38 et les trois corps 1. The thrust P is equal to the difference between the weight of the water displaced by the upper structure and the total weight of the upper structure comprising the wind turbine 35, the plate 37, the three legs 38 and the three bodies 1.
Les barres 34 sont fixées rigidement aux corps 1. En cas d'effort latéral sur la structure supérieure, elles peuvent subir un moment fléchissant très important. Pour limiter ce moment, des corolles 41, de conception analogue à la corolle 19 de la figure 4, mais dirigées vers le bas, entourent les tiges 34 à leur jonction avec les corps 1. The bars 34 are rigidly fixed to the bodies 1. In the event of lateral force on the upper structure, they can undergo a very significant bending moment. To limit this moment, corollas 41, of a design similar to the corolla 19 of FIG. 4, but directed downwards, surround the rods 34 at their junction with the bodies 1.
On a pu constater que l'invention, malgré la simplification surprenante qu'elle apporte relativement à l'état de la technique des plate-formes flottantes, se prête avantageusement à de très nombreuses applications. It has been observed that the invention, despite the surprising simplification which it provides relative to the state of the art of floating platforms, advantageously lends itself to very numerous applications.
Bien entendu, l'invention n'est pas limitée aux exemples décrits et représentés et de nombreux aménagements peuvent être apportés à ces exemples sans sortir du cadre de l'invention. Of course, the invention is not limited to the examples described and shown and numerous modifications can be made to these examples without departing from the scope of the invention.
C'est ainsi par exemple que tout le système d'amarrage par tube 13, pieu 14, scellement 18 et corolle 19 est parfaitement applicable à une plate-forme qui ne soit pas destinée au forage. Thus, for example, the entire mooring system by tube 13, pile 14, sealing 18 and corolla 19 is perfectly applicable to a platform which is not intended for drilling.
D'autre part, dans le procédé de mise en place décrit en référence à la figure 2, on peut prévoir que la cheminée est prolongée jusqu'au bas de la sphère 1, auquel cas il suffit d'une étanchéité statique entre la cheminée 7 et l'orifice 15, l'eau pouvant sans inconvénient pénétrer dans la cheminée 7, On the other hand, in the positioning process described with reference to FIG. 2, it is possible to provide that the chimney is extended to the bottom of the sphere 1, in which case it suffices for a static seal between the chimney 7 and the orifice 15, the water being able without inconvenience to enter the chimney 7,
Claims (21)
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR8111254A FR2507146A1 (en) | 1981-06-05 | 1981-06-05 | MARINE PLATFORM, ESPECIALLY DRILLING, AND RELATED PLACING METHOD |
EP82901600A EP0080471A1 (en) | 1981-06-05 | 1982-06-04 | Sea platform, particularly derrick platform and method for the assembly thereof |
PCT/FR1982/000094 WO1982004233A1 (en) | 1981-06-05 | 1982-06-04 | Sea platform,particularly derrick platform and method for the assembly thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR8111254A FR2507146A1 (en) | 1981-06-05 | 1981-06-05 | MARINE PLATFORM, ESPECIALLY DRILLING, AND RELATED PLACING METHOD |
Publications (2)
Publication Number | Publication Date |
---|---|
FR2507146A1 true FR2507146A1 (en) | 1982-12-10 |
FR2507146B1 FR2507146B1 (en) | 1983-12-02 |
Family
ID=9259270
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR8111254A Granted FR2507146A1 (en) | 1981-06-05 | 1981-06-05 | MARINE PLATFORM, ESPECIALLY DRILLING, AND RELATED PLACING METHOD |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP0080471A1 (en) |
FR (1) | FR2507146A1 (en) |
WO (1) | WO1982004233A1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002010589A1 (en) * | 2000-07-27 | 2002-02-07 | Christoffer Hannevig | Floating structure for mounting a wind turbine offshore |
FR2837535A1 (en) * | 2002-03-22 | 2003-09-26 | Doris Engineering | Sea based wind generator electricity installation having wind generator horizontal triangular floater placed three taut sections connected marine base part sea floor. |
EP1878652A2 (en) | 2006-07-13 | 2008-01-16 | Jan They | Buoyancy supported offshore foundation for wind power stations and other constructions |
US7347667B2 (en) | 2001-02-10 | 2008-03-25 | Aloys Wobben | Wind power installation |
CN114455017A (en) * | 2022-03-10 | 2022-05-10 | 中国电建集团华东勘测设计研究院有限公司 | Floating body, floating type offshore transformer substation and installation method thereof |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5117914A (en) * | 1990-12-13 | 1992-06-02 | Blandford Joseph W | Method and apparatus for production of subsea hydrocarbon formations |
PT107606A (en) * | 2014-04-25 | 2015-10-26 | Miguel Marinho Mendes Abreu | FLOATING PLATFORM STABILIZED BY TENSIONED MOORINGS FOR WIND ENERGY GENERATOR WITH ARMED CONCRETE FLOATERS AND VISIBLE MOORING CHAMBER |
WO2020148374A1 (en) * | 2019-01-17 | 2020-07-23 | Gicon Windpower Ip Gmbh | Offshore wind turbine for converting wind energy into electrical energy |
DE102019101209B4 (en) | 2019-01-17 | 2022-06-09 | Gicon Windpower Ip Gmbh | Offshore wind turbine for converting wind energy into electrical energy |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1302162A (en) * | 1961-09-29 | 1962-08-24 | Method for fixing in water a floating construction submerged to an arbitrary depth | |
US3080583A (en) * | 1959-06-08 | 1963-03-12 | Fuller Richard Buckminster | Undersea island |
US3355899A (en) * | 1966-05-31 | 1967-12-05 | Exxon Production Research Co | Offshore operations |
FR1564879A (en) * | 1968-03-13 | 1969-04-25 | ||
US3517517A (en) * | 1968-09-19 | 1970-06-30 | Pan American Petroleum Corp | Encapsulated cable for marine use |
US3919957A (en) * | 1974-04-15 | 1975-11-18 | Offshore Co | Floating structure and method of recovering anchors therefor |
US4062313A (en) * | 1975-09-25 | 1977-12-13 | Standard Oil Company (Indiana) | Installation of vertically moored platforms |
FR2424182A1 (en) * | 1978-04-24 | 1979-11-23 | Standard Oil Co | BUILDING FLOATING ON A MASS OF WATER AND IN CONNECTION WITH AN UNDERWATER WELL |
-
1981
- 1981-06-05 FR FR8111254A patent/FR2507146A1/en active Granted
-
1982
- 1982-06-04 EP EP82901600A patent/EP0080471A1/en not_active Ceased
- 1982-06-04 WO PCT/FR1982/000094 patent/WO1982004233A1/en not_active Application Discontinuation
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3080583A (en) * | 1959-06-08 | 1963-03-12 | Fuller Richard Buckminster | Undersea island |
FR1302162A (en) * | 1961-09-29 | 1962-08-24 | Method for fixing in water a floating construction submerged to an arbitrary depth | |
US3355899A (en) * | 1966-05-31 | 1967-12-05 | Exxon Production Research Co | Offshore operations |
FR1564879A (en) * | 1968-03-13 | 1969-04-25 | ||
US3517517A (en) * | 1968-09-19 | 1970-06-30 | Pan American Petroleum Corp | Encapsulated cable for marine use |
US3919957A (en) * | 1974-04-15 | 1975-11-18 | Offshore Co | Floating structure and method of recovering anchors therefor |
US4062313A (en) * | 1975-09-25 | 1977-12-13 | Standard Oil Company (Indiana) | Installation of vertically moored platforms |
FR2424182A1 (en) * | 1978-04-24 | 1979-11-23 | Standard Oil Co | BUILDING FLOATING ON A MASS OF WATER AND IN CONNECTION WITH AN UNDERWATER WELL |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002010589A1 (en) * | 2000-07-27 | 2002-02-07 | Christoffer Hannevig | Floating structure for mounting a wind turbine offshore |
US7347667B2 (en) | 2001-02-10 | 2008-03-25 | Aloys Wobben | Wind power installation |
FR2837535A1 (en) * | 2002-03-22 | 2003-09-26 | Doris Engineering | Sea based wind generator electricity installation having wind generator horizontal triangular floater placed three taut sections connected marine base part sea floor. |
EP1348867A1 (en) * | 2002-03-22 | 2003-10-01 | Doris Engineering | Offshore wind-power plant as well as construction and erection method for such a plant |
EP1878652A2 (en) | 2006-07-13 | 2008-01-16 | Jan They | Buoyancy supported offshore foundation for wind power stations and other constructions |
EP1878652A3 (en) * | 2006-07-13 | 2008-08-27 | Jan They | Buoyancy supported offshore foundation for wind power stations and other constructions |
CN114455017A (en) * | 2022-03-10 | 2022-05-10 | 中国电建集团华东勘测设计研究院有限公司 | Floating body, floating type offshore transformer substation and installation method thereof |
Also Published As
Publication number | Publication date |
---|---|
EP0080471A1 (en) | 1983-06-08 |
FR2507146B1 (en) | 1983-12-02 |
WO1982004233A1 (en) | 1982-12-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0020232B1 (en) | Method and apparatus for anchoring conduits such as pipe-lines on sea beds | |
EP1073823B1 (en) | Method and device for linking surface to the seabed for a submarine pipeline installed at great depth | |
EP2286056B1 (en) | Bed-to-surface connector installation of a rigide tube with a flexible duct having positive flotation | |
FR2966175A1 (en) | DEVICE FOR SUPPORTING A WIND TURBINE FOR PRODUCING ELECTRIC ENERGY AT SEA, INSTALLATION FOR PRODUCING CORRESPONDING ELECTRIC ENERGY IN SEA. | |
EP2321470A2 (en) | Seat portion structure for a hydraulic turbine engine | |
CA1320396C (en) | Component part of a catenary anchor line, anchor line comprising such component part, and device and process for implementing such anchor line | |
FR2536456A1 (en) | DRILLING SYSTEM FROM A WATER PLAN, INSENSITIVE TO THE COOL | |
FR2631355A1 (en) | PROTECTION DEVICE FOR SEA WORKS AND METHOD FOR IMPLEMENTING SAID DEVICE | |
FR2507146A1 (en) | MARINE PLATFORM, ESPECIALLY DRILLING, AND RELATED PLACING METHOD | |
EP2401468A1 (en) | Bottom-surface connecting installation of the multi-riser hybrid tower type, comprising sliding buoyancy modules | |
WO2004070165A1 (en) | Device for collecting a product and for the tranquilization of a column in an undersea environment and use thereof | |
EP2571753B1 (en) | Seabed-to-surface linking equipment including a flexible pipe guiding structure | |
FR2636670A1 (en) | METHOD AND APPARATUS FOR MOORING AND CONNECTING A FLEXIBLE LINE END WITH A DRIVE OF A FLOATING MARINE BUILDING | |
FR2853673A1 (en) | Flexible column recovering gases, liquids, viscous substances or solids from marine depths, is sectional with support blocks at intervals, joined by ropes for tension relief | |
FR2951800A1 (en) | Pipe e.g. suspended type pipe, for pumping e.g. sea water, to produce ocean thermal energy, has maintaining frames located between consecutive tubular segments, and maintaining cables placed parallel to main axis and passing through frames | |
BE887882A (en) | STRUCTURE FOR SUPPORTING APPARATUS ABOVE THE BOTTOM OF A MASS OF WATER | |
EP1648761B1 (en) | Self-contained submarine station | |
FR2713588A1 (en) | Self-elevating floating platform | |
EP2640923B1 (en) | Tower for exploiting fluid in an expanse of water and associated installation method | |
WO1979000016A1 (en) | Process for erecting a flame supporting structure on an oil extracting platform | |
WO2024184604A1 (en) | Counterweight for semi-submersible float of offshore wind turbine and installation method therefor | |
EP3061871A1 (en) | Gravity structure for a maritime civil-engineering construction and associated manufacturing method | |
WO2015028650A9 (en) | Submerged modular device for breaking and monitoring waves | |
FR2675169A1 (en) | Support for a structure at sea and method of installing it | |
FR3137056A1 (en) | Locking and unlocking system for slender element with casing and two fixing elements, one at each end of the casing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ST | Notification of lapse |