EP0003063A2 - Method and device for inserting a pile into the ground - Google Patents
Method and device for inserting a pile into the ground Download PDFInfo
- Publication number
- EP0003063A2 EP0003063A2 EP78200092A EP78200092A EP0003063A2 EP 0003063 A2 EP0003063 A2 EP 0003063A2 EP 78200092 A EP78200092 A EP 78200092A EP 78200092 A EP78200092 A EP 78200092A EP 0003063 A2 EP0003063 A2 EP 0003063A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- pile
- sheath
- ground
- setting
- foot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/20—Placing by pressure or pulling power
Definitions
- the invention relates to a method of inserting a prefabricated pile into the ground, in which a shaft is formed in the ground by introducing a steel sheath into the ground, the prefabricated pile is slipped into the sheath and the sheath is removed from the shaft whilst leaving the pile in the ground.
- the invention has for its object to improve the support of the pile, whilst by means of a comparatively light and readily maniable device the pile can be rapidly inserted into the ground without the risk of destruction of the pile.
- the ground beneath the pile is consolidated by pressing down the pile, which sets off from the sheath to be held in the ground, the sheath being removed from the ground not until has the consolidation been achieved.
- the invention furthermore relates to and improves a device for inserting a prefabricated pile into the ground by using the method in accordance with the invention, said device comprising a tubular sheath and a displaceable guide frame having driving means for introducing the sheath into the ground.
- This device is characterized by setting-off means to be arranged between the pile and the sheath and by means for energizing said setting-off means in order to press down the pile during consolidation of the ground by setting off the pile against the sheath to be held in the ground and by means separated from the setting-off means for withdrawing the sheath from the ground.
- the invention provides furthermore a pile inserted into the ground by the method according to the invention, said pile being characterized in that the pile is fixed in place with respect to the pile foot without the interposition of concrete locally shed in shaft by means of undeformable, interengaging contact surfaces between the pile foot and the pile.
- a prefabricated pile 1, for example, of reinforced concrete is inserted into the ground 4.
- a shaft 5 is formed in the ground 4 by introducing a steel sheath 3 into the ground 4.
- First a pile 1 with an integral, conical pile foot 2 is inserted at the ground surface into the sheath 2.
- the sheath 3 together with the pile insered into it is introduced in some way or other into the ground 4, after which the ground 29 beneath the pile 1 is consolidated by pressing down the pile 1 set off from the sheath 3 to be held in the ground 4, which can be performed by means of a hydraulic cylinder 96, the piston 97 of which excrts pressure on the head 135 of the pile 1, whilst the cylinder 96 is firmly secured to the sheath 3 by means of bolts 136.
- a weight G for example, a ballast weight and/or the weight of a device for introducing the sheath 3 into the ground 4.
- the sheath 3 is withdrawn from the shaft 5, whilst leaving the pile 1 in the ground 4.
- the pile foot 2 and the sheath 3 - safeguarded against relative rotation - are preferably coupled with one another by coupling means 6.
- the coupling means 6 may be formed by projecting steel wedges 7 embedded in the pile 1 at the foot 2, which snap into matching cavities 8 of the sheath 3, which are open on the bottom side.
- the shaft 5 When the sheath 3 is removed, the shaft 5 is filled by earth or, if necessary, it is filled out from above with earth, concrete or similar filling material.
- the sheath 3 can be introduced by exerting a downwardly directed pressure, whilst it is simultaneously rotated in a reciprocatory manner.
- a pile 1 shown in Figures 1 and 2 is introduced into the ground 4 by screwing it together with the sheath 3 into the ground 4, the sheath 3 being pressed down and rotated.
- the sheath 3 is provided throughout its length (see Figure 1) or only at the lower end (see Figure 3) with a screw 12 by which the sheath 3 is also screwed back upwardly, whilst the pile 1 is left in the ground 4.
- the pile 1 of Figure 4 has a screw 13 integral with the pile foot 2 having a pitch z, which is equal to the pitch y of the screw 12.
- a sheath 3 without a pile 1 but together with a pile foot 2, for example, of steel is screwed into the ground 4 ( Figure 5).
- the pile 1 with a cylindrical extension 14 is lowered in the sheath 3, the extension 14 penetrating into a matching cavity 15 of the pile foot 2.
- the pile 1 is fixed in place with respect to the pile foot 2 without the interposition of concrete in the shaft 5 by means of undeformable contact surfaces of the extension 14 and the cavity 15 interengaging between the pile foot 2 and the pile 1.
- the extension 14 may be coated previously with a glue, cement or a similar solid adhesive layer.
- a shaft 5 is formed by screwing a sheath 3 with its open end into the ground 4 and by removing the earth 25 penetrating into the sheath 3 upwardly out of the sheath 3, for example, by means of a rotating driven worm conveyor 16 thus having an excavating effect.
- the pile 1 with a pile foot 2 rigidly connected with the pile above_the ground or preferably formed integrally with the pile is lowered in the sheath 3.
- the sheath 3 is pulled upwards.
- the sheath 3 with a pile 1 arranged therein is screwed into the ground 29, whilst the pile foot 2 is secured to the lower end of the sheath 3 by means of screw bolts 137 having a predetermined common tensile strength.
- the pile 1 is compressed by means of the hydraulic cylinder 96, which is firmly secured to the top end of the sheath 3.
- the screw bolts 137 which together const tute a shear joint, break down, the pile 1 is compressed to a predetermined extent.
- the pile 1 blows down on the ground 29, which is thus additionally consolidated, whilst the pile head 135 sets off against the sheath 3.
- the set-off is improved by the inertia of the sheath 3 and any weight bearing on the same.
- the ground 29 is first additionally consolidated with a constant pressure by a small cylinder 143, to which fluid is fed from a pump 139 through an opened valve 140 and a central feeding tube 145 passed through a large cylinder 144.
- the piston 146 engages the steel, tubular pile 1 by way of a cap 147.
- the cap 147 is connected with the cylinder 143 by means of slack tensile springs 148.
- the small cylinder 143 is rigidly secured to the large cylinder 144, a differential piston 149 of which around the feeding tube 145 also extends into the small cylinder 143.
- the chamber 150 of the cylinder 144 communicates through a rotary gland 152, a spacious feeding duct 151 and a valve 141 with a pressure vessel 142, which is pressurized through a freely movable piston 153 with fluid from a pump 154.
- a pawl 157 is removed by means of a lever 156, as a result of which the valve 141 is abruptly opened, since its flap 158 is blown away by the air against the slack spring 159.
- a funnel 160 is arranged for receiving earth 161 when the sheath 3 is screwed into the ground 4 with a higher speed than is required for screwing the sheath 3 into the ground 4 in relation to the pitch of the helix 12.
- the helix 12 then operates as a worm conveyor, which transports loose earth into the funnel 160.
- a lifting implement 36 deposits each pile 1 on a sequence of rollers 33 of a pile inserting device 34.
- a sheath 3 being located in line on stationary supports 35 of the pile inserting device 34, the pile 1 is slipped in a lying state into the sheath 3 with the aid of a driving carriage 37, which by means of a control-member 38 sets control-slides 39 in a position in which the hydraulic cylinder 40 supporting each time a roller 33 is lowered for allowing a pile foot 2 integral with the-pile 1 to pass.
- the pile foot 2 hits the lower end of the sheath 3
- the pile 1 is clamped tight to the sheath 3 by means of the clamping device 41 of Figures 12, 16 and 17.
- the clamping device 41 comprises three wedges 42, each of which is drawn by means of a hydraulic cylinder 43 into a clamping position and pushed out of said clamping position by springs 44, when the cylinders 43 are de-energized, each wedge being then conducted away from the pile 1 by means of an elongated member 46 fastened to the wedge along a pin 45 of a sliding guide 47.
- the sheath 3 with the pile 1 slipped into and clamped tight in it is deposited by means of the lifting carriage 36 on a carriage-48, conveyed to the locations 30 and lifted by means of hoisting cables 49 from the screwing implement 31 into a vertical position and disposed along a stay frame 50 having rails 51, the sheath 3 being inserted into a support 52, which is passed by guide members 53 along the rails 51.
- An electric motor 59 drives a gear wheel 61 with high power along a vertical toothed rack 62, whilst a further electric motor 63 actuates the rotation of said helical wheel 66 through a helical wheel 64.
- the speed of the electric motor 63 and hence the rotational speed of the sheath 3 is measured by means of a speedometer 67, whereas the speed of the motor 59 and hence the vertical speed of the sheath 3 is measured by means of a speedometer 68.
- the speedometers 67 and 68 apply a signal 69 and 70 respectively to a comparator 71 and 72 respectively both being adjusted by a common setting member 65 and each controlling a control-member 73 and 74 respectively for governing the electric motors 63 and 59 respectively.
- the power of the motors 63 and 59 is so high that the vertical load on the sheath 3 overcomes the sum of the sheath friction and the resistance of the pile foot.
- the screwing implement 31 shown in Figures 25 to 27 comprises a hydraulic worm device 76 having two clamps 77T and 77R engaging the sheath 3, each of which is provided with a hydraulic cylinder 78T and 78R respectively for energizing the clamping jaws 79T and 79R respectively, which engage the sheath 3.
- the clamps 77T and 77R are vertically displaceable with respect to a turntable 89 by means of hydraulic cylinders 81T and 81R respectively.
- an electric motor 82 drives the identical pumps 85T, 85R and 86 through a driving gear 83 and a common driving shaft 84.
- the pump 86 drives the turntable 89, which is journalled in the frame 80 so as to be rotatable about a vertical axis 90. Furthermore an electric motor 94 drives a pump 93 for energizing the hydraulic cylinders 78T and 78R.
- Each pump 85T, 86, 85R and 93 is provided with a control-slide 91T, 92, 91R and 95 respectively, each of which is attracted towards the relay concerned by the energization of the relays 101 to 114.
- FIG 31 shows a different clamp 77, each hydraulic cylinder 81 being linked to a chain 98, which is stretched by means of a hydraulic cylinder 78 setting off from the other hydraulic cylinder 81.
- the screwing implement 31 of Figure 32 differs from the screwing implements 31 described above in that it comprises a boom 120 adapted to pivot upwards about a shaft 99 by means of a hoisting cable 100, said boom having two clamps 121, each of which comprises a stationary clamping jaw 122 and two pivotable clamping jaws 123.
- the empty sheath 3 is replaced by the pivotal movement of the clamps 121 in the direction of the arrow 124 about the boom 120 by a sheath 3 filled with a pile 1.
- the sheath 3 of Figure 34 is disengaged by the clamping jaw 123 pivoting in the direction of the arrow 125, after which, as shown in Figure 35, the boom 120 swings down in the direction of the arrow 126, whilst in addition the clamps 121 turn in the direction of the arrow 127.
- the empty sheath 3 is deposited on a carriage 128, whilst a sheath 3 filled with a pile 1 is removed therefrom by a pivotal movement of the clamping jaws 123 in the direction of the arrows 129 and 130 respectively, after which the boom 120 is again lifted in the direction of the arrow-131 and turned in the direction of the arrow 132 against an empty sheath 3 shown in Figure 37, when it is screwed out of the ground 4. Then the next cycle of Figure 33 starts. In this method the time of replacement of an empty sheath 3 by a filled one is very short. Thus the high power and the means required thereto for screwing the sheath 3 into and out of the ground 4 within a short time can be utilized effectively.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Piles And Underground Anchors (AREA)
Abstract
For inserting a prefabricated pile into the ground, in which a shaft is formed in the ground by introducing a steel sheath into the ground, the ground beneath the pile is consolidated by pressing the pile down whilst bearing on the sheath to be held in the ground.
Description
- The invention relates to a method of inserting a prefabricated pile into the ground, in which a shaft is formed in the ground by introducing a steel sheath into the ground, the prefabricated pile is slipped into the sheath and the sheath is removed from the shaft whilst leaving the pile in the ground.
- Such a method is known. In the known method there is a risk that after the removal of the sheath the pile may subsequently sink too deeply into the ground due to lack of ground resistance.
- The invention has for its object to improve the support of the pile, whilst by means of a comparatively light and readily maniable device the pile can be rapidly inserted into the ground without the risk of destruction of the pile. In a method according to the invention the ground beneath the pile is consolidated by pressing down the pile, which sets off from the sheath to be held in the ground, the sheath being removed from the ground not until has the consolidation been achieved.
- The invention furthermore relates to and improves a device for inserting a prefabricated pile into the ground by using the method in accordance with the invention, said device comprising a tubular sheath and a displaceable guide frame having driving means for introducing the sheath into the ground. This device is characterized by setting-off means to be arranged between the pile and the sheath and by means for energizing said setting-off means in order to press down the pile during consolidation of the ground by setting off the pile against the sheath to be held in the ground and by means separated from the setting-off means for withdrawing the sheath from the ground.
- The invention provides furthermore a pile inserted into the ground by the method according to the invention, said pile being characterized in that the pile is fixed in place with respect to the pile foot without the interposition of concrete locally shed in shaft by means of undeformable, interengaging contact surfaces between the pile foot and the pile.
- The above-mentioned and further features of the invention will be explained in the following description with reference to drawings.
- The drawings show schematically in
- figures 1, 6, 10, 11 and 12 longitudinal sectional views of a sheath with a pile during the consolidation of the ground located beneath the pile,
- Figures 3, 4, 5 and 8 longitudinal sectional views of the lower end of the sheath during the introduction thereof into the ground,
- Figures 2, 7 and 9 longitudinal sectional views of the lower end of a pile inserted into the ground by using the method shown in Figures 1, 6 and 8 respectively,
- Figure 13 a plan view of a site during the insertion of piles into the ground,
- Figure 14 on an enlarged scale a detail XIV of Figure 13,
- Figure 15 a control-system for the device illustrated in Figure 14,
- Figure 16 an enlarged sectional view taken on the line XVI-XVI in Figure 14,
- Figure 17 an enlarged sectional view taken on the line XVII-XVII in Figure 16,
- Figure 18 a side elevation of detail XVIII of Figure 13,
- Figure 19 an elevational view in the direction of the arrow XIX in Figure 18,
- Figure 20 on an enlarged scale detail XX of Figure 19,
- Figure 21 a sectional view taken on the line XXI-XXI in Figure 20,
- Figure 22 on an enlarged scale detail XXII of Figure 20,
- Figure 23 an elevational view taken on the line XXIII-XXIII in Figure 22,
- Figure 24 a control-diagram for detail XXII of Figure 20,
- Figure 25 a variant of Figure 19,
- Figure 26 on an enlarged scale detail XXVI of Figure 25,
- Figure 27 on an enlarged scale detail XXVII of Figure 26,
- Figure 28 a control-diagram of detail XXVII,
- Figures-29 and 30 a working plot of the control-diagram of Figure 28,
- Figure 31 a variant of detail XXVII of Figure 26,
- Figure 32 a variant of the device of Figure 19, and
- Figures 33, 34, 35, 36 and 37 diagrams of the successive stages of movement during the operation of the device of Figure 32.
- By the method according to the invention a
prefabricated pile 1, for example, of reinforced concrete is inserted into the ground 4. As shown in Figures 1 and 2 ashaft 5 is formed in the ground 4 by introducing asteel sheath 3 into the ground 4. First apile 1 with an integral, conical pile foot 2 is inserted at the ground surface into the sheath 2. Subsequently thesheath 3 together with the pile insered into it is introduced in some way or other into the ground 4, after which theground 29 beneath thepile 1 is consolidated by pressing down thepile 1 set off from thesheath 3 to be held in the ground 4, which can be performed by means of ahydraulic cylinder 96, thepiston 97 of which excrts pressure on thehead 135 of thepile 1, whilst thecylinder 96 is firmly secured to thesheath 3 by means ofbolts 136. During this consolidation of theground 29 thecylinder 96 and hence thesheath 3 are subjected to a weight G, for example, a ballast weight and/or the weight of a device for introducing thesheath 3 into the ground 4. Not until has theground 29 been additionally consolidated in the manner described above, thesheath 3 is withdrawn from theshaft 5, whilst leaving thepile 1 in the ground 4. During the introduction of thesheath 3 into the ground 4 the pile foot 2 and the sheath 3 - safeguarded against relative rotation - are preferably coupled with one another by coupling means 6. This permits of exerting on the sheath 3 a torsional moment, which is transferred to the pile foot 2 without thepile 1 itself being subjected to torsional forces. The coupling means 6 may be formed by projectingsteel wedges 7 embedded in thepile 1 at the foot 2, which snap into matchingcavities 8 of thesheath 3, which are open on the bottom side. When thesheath 3 is removed, theshaft 5 is filled by earth or, if necessary, it is filled out from above with earth, concrete or similar filling material. Thesheath 3 can be introduced by exerting a downwardly directed pressure, whilst it is simultaneously rotated in a reciprocatory manner. - Preferably a
pile 1 shown in Figures 1 and 2 is introduced into the ground 4 by screwing it together with thesheath 3 into the ground 4, thesheath 3 being pressed down and rotated. Preferably thesheath 3 is provided throughout its length (see Figure 1) or only at the lower end (see Figure 3) with ascrew 12 by which thesheath 3 is also screwed back upwardly, whilst thepile 1 is left in the ground 4. Thepile 1 of Figure 4 has ascrew 13 integral with the pile foot 2 having a pitch z, which is equal to the pitch y of thescrew 12. - In the method illustrated in Figures 5, 6 and 7 first a
sheath 3 without apile 1 but together with a pile foot 2, for example, of steel is screwed into the ground 4 (Figure 5). Subsequently thepile 1 with a cylindrical extension 14 is lowered in thesheath 3, the extension 14 penetrating into a matchingcavity 15 of the pile foot 2. In this way thepile 1 is fixed in place with respect to the pile foot 2 without the interposition of concrete in theshaft 5 by means of undeformable contact surfaces of the extension 14 and thecavity 15 interengaging between the pile foot 2 and thepile 1. If desired, the extension 14 may be coated previously with a glue, cement or a similar solid adhesive layer. - In the method illustrated in Figure 8 a
shaft 5 is formed by screwing asheath 3 with its open end into the ground 4 and by removing the earth 25 penetrating into thesheath 3 upwardly out of thesheath 3, for example, by means of a rotating drivenworm conveyor 16 thus having an excavating effect. Subsequently thepile 1 with a pile foot 2 rigidly connected with the pile above_the ground or preferably formed integrally with the pile is lowered in thesheath 3. After an additional consolidation of theground 29 thesheath 3 is pulled upwards. - In the method shown in Figure 10 the
sheath 3 with apile 1 arranged therein is screwed into theground 29, whilst the pile foot 2 is secured to the lower end of thesheath 3 by means ofscrew bolts 137 having a predetermined common tensile strength. In order to additionally consolidate theground 29 thepile 1 is compressed by means of thehydraulic cylinder 96, which is firmly secured to the top end of thesheath 3. When the screw bolts 137, which together const tute a shear joint, break down, thepile 1 is compressed to a predetermined extent. When the joint breaks down, thepile 1 blows down on theground 29, which is thus additionally consolidated, whilst thepile head 135 sets off against thesheath 3. The set-off is improved by the inertia of thesheath 3 and any weight bearing on the same. - Instead of using the method shown in Figure 10 an alternative may be employed though not with preference, in which the pile foot 2 is not connected with the lower end of the
sheath 3 and thehydraulic cylinder 96 is connected byshear bolts 138 with the top end of the sheath 3 (see Figure 11). For consolidating theground 29, thepile 1 is compressed, whilst its top end sets off against thesheath 3 screwed into the ground 4 to an extent predetermined by the strength of theshear bolts 138, at which extent the set-off from thesheath 3 is abruptly eliminated. Then thepile 1 leaps upwards, setting off from theground 29, which is thus additionally consolidated. - In the method illustrated in Figure 12 the
ground 29 is first additionally consolidated with a constant pressure by asmall cylinder 143, to which fluid is fed from apump 139 through an openedvalve 140 and acentral feeding tube 145 passed through alarge cylinder 144. Thepiston 146 engages the steel,tubular pile 1 by way of a cap 147. The cap 147 is connected with thecylinder 143 by means ofslack tensile springs 148. Thesmall cylinder 143 is rigidly secured to thelarge cylinder 144, adifferential piston 149 of which around the feedingtube 145 also extends into thesmall cylinder 143. Thechamber 150 of thecylinder 144 communicates through arotary gland 152, aspacious feeding duct 151 and avalve 141 with apressure vessel 142, which is pressurized through a freelymovable piston 153 with fluid from apump 154. After theground 29 has first been consolidated by a given constant load resulting from pressure in thesmall cylinder 143 and after a predetermined pressure has been built up in thepressure vessel 142 and measured by amanometer 155, apawl 157 is removed by means of alever 156, as a result of which thevalve 141 is abruptly opened, since itsflap 158 is blown away by the air against theslack spring 159. Then thelarge cylinder 144 exerts a pressure shock via thepile 1 on theground 29, the pile setting again off from thesheath 3 screwed into the ground 4. Thecylinder 144 is welded to aring 57, which is fastened to ascrew wheel 66 by which the helical movement of thesheath 3 is obtained. Above the ground 4, around thesheath 3, afunnel 160 is arranged for receivingearth 161 when thesheath 3 is screwed into the ground 4 with a higher speed than is required for screwing thesheath 3 into the ground 4 in relation to the pitch of thehelix 12. Thehelix 12 then operates as a worm conveyor, which transports loose earth into thefunnel 160. When thesheath 3 is screwed out of the ground 4, the loose earth flows from thefunnel 160 back towards thehelix 12, which conveys it back into the ground 4. - Referring to Figures 13 to 23 the
piles 1 are inserted into the ground 4 at thelocations 30 with the aid of a screwingtool 31 provided with the Ieans shown in Figure 12. - From a pile store 32 a lifting implement 36 deposits each
pile 1 on a sequence ofrollers 33 of a pile inserting device 34. Asheath 3 being located in line onstationary supports 35 of the pile inserting device 34, thepile 1 is slipped in a lying state into thesheath 3 with the aid of a drivingcarriage 37, which by means of a control-member 38 sets control-slides 39 in a position in which thehydraulic cylinder 40 supporting each time aroller 33 is lowered for allowing a pile foot 2 integral with the-pile 1 to pass. When the pile foot 2 hits the lower end of thesheath 3, thepile 1 is clamped tight to thesheath 3 by means of theclamping device 41 of Figures 12, 16 and 17. The clampingdevice 41 comprises threewedges 42, each of which is drawn by means of ahydraulic cylinder 43 into a clamping position and pushed out of said clamping position bysprings 44, when thecylinders 43 are de-energized, each wedge being then conducted away from thepile 1 by means of anelongated member 46 fastened to the wedge along apin 45 of a slidingguide 47. Thesheath 3 with thepile 1 slipped into and clamped tight in it is deposited by means of the liftingcarriage 36 on a carriage-48, conveyed to thelocations 30 and lifted by means of hoistingcables 49 from the screwing implement 31 into a vertical position and disposed along astay frame 50 havingrails 51, thesheath 3 being inserted into asupport 52, which is passed byguide members 53 along therails 51. During the insertion lugs 54 of thesheath 3 are passed throughrecesses 56 of aring 57, which can be rotated by means of ahydraulic cylinder 55 and which is firmly held byclamps 58 on the above-mentionedhelical wheel 66 rotatable in abearing 162 Qf theannular support 52, whilst alower ring 60 of thesheath 3 bears on the helical -wheel 66. During the insertion of thesheath 3 into the ground 4 by screwing the vertical speed of thesheath 3 is related to the rotational speed thereof in accordance with the pitches y and z of thehelices sheath 3 and/or the pile foot 2 respectively (see Figure 24). - An
electric motor 59 drives agear wheel 61 with high power along a verticaltoothed rack 62, whilst a furtherelectric motor 63 actuates the rotation of saidhelical wheel 66 through ahelical wheel 64. The speed of theelectric motor 63 and hence the rotational speed of thesheath 3 is measured by means of aspeedometer 67, whereas the speed of themotor 59 and hence the vertical speed of thesheath 3 is measured by means of aspeedometer 68. Thespeedometers signal comparator common setting member 65 and each controlling a control-member electric motors motors sheath 3 overcomes the sum of the sheath friction and the resistance of the pile foot. By means of the screwing implement 31 described above thesheath 3 is screwed into the ground 4 in a continuous advancing movement. - The screwing implement 31 shown in Figures 25 to 27 comprises a
hydraulic worm device 76 having twoclamps 77T and 77R engaging thesheath 3, each of which is provided with ahydraulic cylinder 78T and 78R respectively for energizing the clamping jaws 79T and 79R respectively, which engage thesheath 3. Theclamps 77T and 77R are vertically displaceable with respect to aturntable 89 by means ofhydraulic cylinders electric motor 82 drives theidentical pumps common driving shaft 84. By way of ahydraulic motor 87 and apinion 88 thepump 86 drives theturntable 89, which is journalled in theframe 80 so as to be rotatable about a vertical axis 90. Furthermore anelectric motor 94 drives apump 93 for energizing thehydraulic cylinders 78T and 78R. Eachpump slide relays 101 to 114. - In Figures 29 and 30 the energization diagrams of the relays are plotted versus time t by shaded beams for screwing the
sheath 3 into the ground 4 and withdrawing the same respectively. The pumps, hydraulic cylinders,motor 87 andpinion 88 are proportioned so that the vertical rate of thesheath 3 hydraulically coupled with the rotational speed of thesheath 3 corresponds to the pitch y and/or z. - Figure 31 shows a
different clamp 77, eachhydraulic cylinder 81 being linked to achain 98, which is stretched by means of ahydraulic cylinder 78 setting off from the otherhydraulic cylinder 81. - The screwing implement 31 of Figure 32 differs from the screwing implements 31 described above in that it comprises a
boom 120 adapted to pivot upwards about a shaft 99 by means of a hoistingcable 100, said boom having twoclamps 121, each of which comprises astationary clamping jaw 122 and twopivotable clamping jaws 123. - Referring to Figure 33 the
empty sheath 3 is replaced by the pivotal movement of theclamps 121 in the direction of thearrow 124 about theboom 120 by asheath 3 filled with apile 1. When it is fixed in place in front of thestay frame 50 in the screwing device (not shown) of the screwing implement 31, thesheath 3 of Figure 34 is disengaged by the clampingjaw 123 pivoting in the direction of thearrow 125, after which, as shown in Figure 35, theboom 120 swings down in the direction of the arrow 126, whilst in addition theclamps 121 turn in the direction of thearrow 127. - Referring to Figure 36, the
empty sheath 3 is deposited on acarriage 128, whilst asheath 3 filled with apile 1 is removed therefrom by a pivotal movement of the clampingjaws 123 in the direction of thearrows boom 120 is again lifted in the direction of the arrow-131 and turned in the direction of thearrow 132 against anempty sheath 3 shown in Figure 37, when it is screwed out of the ground 4. Then the next cycle of Figure 33 starts. In this method the time of replacement of anempty sheath 3 by a filled one is very short. Thus the high power and the means required thereto for screwing thesheath 3 into and out of the ground 4 within a short time can be utilized effectively.
Claims (15)
1. A method of inserting a prefabricated pile into the ground, in which a shaft is formed in the ground by introducing a steel sheath into the ground, the prefabricated pile is slipped into the sheath and the sheath is removed from the shaft whilst leaving the pile in the ground, characterized in that the ground beneath the pile is consolidated by pressing down the pile, which sets off from the sheath to be held in the ground and in that not until has the consolidation been achieved the sheath is removed from the ground.
2. A method as claimed in claim 1, characterized in that during the consolidation of the ground, whilst the pile is setting off against the sheath, said sheath is loaded by weight.
3. A method as claimed in claim 1 or 2, characterized in that during the consolidation of the ground the pile is compressed, whilst its top end is setting off against the sheath screwed into the ground, up to a predetermined extent, at which setting off against the sheath is abruptly eliminated.
4. A method as claimed in claim 1, 2 or 3, characterized in that the pile foot is connected by means of an interruptible joint with the sheath and is introduced simultaneously with the sheath into the ground and in that the ground beneath the pile is consolidated by breaking said interruptible joint not until has the pile setting off against the sheath been compressed to a predetermined extent.
5. A method as claimed in claim 1 or 2, characterized in that during the consolidation of the ground the pile is set off from the sheath by pressing means producing a short pressure shock.
6. A method as claimed in anyone of the preceding claims, characterized in that the sheath is screwed into the ground.
7. A method as claimed in anyone of the preceding claims, characterized in that the pile with a pile foot rigidly connected herewith is inserted into the sheath above the ground surface and in that the sheath together with the pile held therein is introduced into the ground.
8. A method as claimed in claim 7, characterized in that the pile is inserted into the sheath held in a recumbent position-9. A method as claimed in anyone of claims 1 to 6, characterized in that with respect to the pile foot the pile is fixed in place without the interposition of concrete locally shed in the sheath by means of undeformable, interengaging contact surfaces between the pile foot and the pile.
10. A method as claimed in anyone of the preceding claims, characterized in that the sheath is screwed into the ground by a substantially continuously advancing movement.
11. A device for inserting a prefabricated pile into the ground by using a method as claimed in anyone of the preceding claims, said device comprising a tubular sheath and a displaceable guide frame having driving means for introducing the sheath into the ground, characterized by setting-off means to be arranged between the pile and the sheath and by means for energizing said setting-off means in order to press down the pile during consolidation of the ground by setting off the pile against the sheath to be held in the ground and by means separated from the setting-off means for withdrawing the sheath from the ground.
12. A device as claimed in claim 11, characterized by a pile inserting device for slipping a pile into a sheath being in a recumbent position.
13. A device as claimed in claim 11 or 12, characterized by driving means which drive the sheath in a continuously advancing movement.
14. A pile inserted into the ground by the method claimed in claim 9, characterized in that the pile is fixed in place with respect to the pile foot without the interposition of concrete locally shed in shaft by means of undeformable, interengaging contact surfaces between the pile foot and the pile.
15. A pile characterized by a pile foot with coupling means for a disengageable linkage to a sheath.
16. A pile as claimed in claim 15, characterized in that the coupling includes a connection which can be broken at a predetermined load.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NL7800182 | 1978-01-06 | ||
NL7800182A NL7800182A (en) | 1978-01-06 | 1978-01-06 | METHOD FOR INSTALLING A CONCRETE POST INTO THE GROUND. |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0003063A2 true EP0003063A2 (en) | 1979-07-25 |
EP0003063A3 EP0003063A3 (en) | 1979-08-22 |
Family
ID=19830103
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP78200092A Withdrawn EP0003063A3 (en) | 1978-01-06 | 1978-07-10 | Method and device for inserting a pile into the ground |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP0003063A3 (en) |
BE (1) | BE42T2 (en) |
NL (1) | NL7800182A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0337475A2 (en) * | 1988-04-15 | 1989-10-18 | V-Pile Technology (Luxembourg) S.A. | Pile driving apparatus |
US5161625A (en) * | 1988-04-15 | 1992-11-10 | V-Pile Technology Luxembourg | Pile driving apparatus |
EP0687777A1 (en) * | 1994-06-16 | 1995-12-20 | Heiwerken P. van 't Wout Waddinxveen B.V. | Method for arranging concrete piles in the ground |
USRE35165E (en) * | 1988-04-15 | 1996-03-05 | V-Pile Technology Luxembourg | Pile driving apparatus |
GB2331318A (en) * | 1997-11-13 | 1999-05-19 | Kvaerner Cementation Found Ltd | Improved methods and apparatus for boring and piling |
GB2354276A (en) * | 1997-11-13 | 2001-03-21 | Kvaerner Cementation Found Ltd | Method of forming cast-in-situ pile with enlarged base |
WO2017127572A1 (en) | 2016-01-21 | 2017-07-27 | 3M Innovative Properties Company | Additive processing of fluoropolymers |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE392038A (en) * | ||||
FR435154A (en) * | 1910-12-16 | 1912-02-23 | Armand Gabriel Considere | Method and apparatus for driving piles in soft ground |
US1778925A (en) * | 1927-10-27 | 1930-10-21 | Joseph H Thornley | Cast-in-place pile |
US2555951A (en) * | 1947-01-09 | 1951-06-05 | Allard Pierre Jean Ma Theodore | Method for constructing piles or piers for foundations |
GB706239A (en) * | 1951-05-02 | 1954-03-24 | Hattum En Blankevoort N V Van | A method of introducing piles into the ground as well as of ascertaining the carrying capacity of said piles |
-
1978
- 1978-01-06 NL NL7800182A patent/NL7800182A/en not_active Application Discontinuation
- 1978-07-10 EP EP78200092A patent/EP0003063A3/en not_active Withdrawn
- 1978-07-10 BE BE78200092A patent/BE42T2/en not_active IP Right Cessation
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE392038A (en) * | ||||
FR435154A (en) * | 1910-12-16 | 1912-02-23 | Armand Gabriel Considere | Method and apparatus for driving piles in soft ground |
US1778925A (en) * | 1927-10-27 | 1930-10-21 | Joseph H Thornley | Cast-in-place pile |
US2555951A (en) * | 1947-01-09 | 1951-06-05 | Allard Pierre Jean Ma Theodore | Method for constructing piles or piers for foundations |
GB706239A (en) * | 1951-05-02 | 1954-03-24 | Hattum En Blankevoort N V Van | A method of introducing piles into the ground as well as of ascertaining the carrying capacity of said piles |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0337475A2 (en) * | 1988-04-15 | 1989-10-18 | V-Pile Technology (Luxembourg) S.A. | Pile driving apparatus |
EP0337475A3 (en) * | 1988-04-15 | 1990-04-25 | Sawadi Exports Pte Ltd. | Pile driving apparatus |
US5161625A (en) * | 1988-04-15 | 1992-11-10 | V-Pile Technology Luxembourg | Pile driving apparatus |
USRE35165E (en) * | 1988-04-15 | 1996-03-05 | V-Pile Technology Luxembourg | Pile driving apparatus |
EP0687777A1 (en) * | 1994-06-16 | 1995-12-20 | Heiwerken P. van 't Wout Waddinxveen B.V. | Method for arranging concrete piles in the ground |
NL9400987A (en) * | 1994-06-16 | 1996-02-01 | Heiwerken P Van T Wout Waddinx | Method for installing concrete piles in the ground. |
GB2331318A (en) * | 1997-11-13 | 1999-05-19 | Kvaerner Cementation Found Ltd | Improved methods and apparatus for boring and piling |
GB2354276A (en) * | 1997-11-13 | 2001-03-21 | Kvaerner Cementation Found Ltd | Method of forming cast-in-situ pile with enlarged base |
GB2354276B (en) * | 1997-11-13 | 2001-05-09 | Kvaerner Cementation Found Ltd | Improved methods and apparatus for boring and piling |
GB2331318B (en) * | 1997-11-13 | 2001-05-16 | Kvaerner Cementation Found Ltd | Improved methods and apparatus for boring and piling |
US6402432B1 (en) | 1997-11-13 | 2002-06-11 | Kvaerner Cementation Foundations Limited | Method for installing load bearing piles utilizing a tool with blade means |
WO2017127572A1 (en) | 2016-01-21 | 2017-07-27 | 3M Innovative Properties Company | Additive processing of fluoropolymers |
US11148361B2 (en) | 2016-01-21 | 2021-10-19 | 3M Innovative Properties Company | Additive processing of fluoroelastomers |
US11179886B2 (en) | 2016-01-21 | 2021-11-23 | 3M Innovative Properties Company | Additive processing of fluoropolymers |
US11230053B2 (en) | 2016-01-21 | 2022-01-25 | 3M Innovative Properties Company | Additive processing of fluoropolymers |
Also Published As
Publication number | Publication date |
---|---|
NL7800182A (en) | 1979-07-10 |
EP0003063A3 (en) | 1979-08-22 |
BE42T2 (en) | 1980-02-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3303656A (en) | Method and apparatus for constructing columns of material in soil | |
EP0003063A2 (en) | Method and device for inserting a pile into the ground | |
CN112240159B (en) | Prefabricated pipe pile implanting device and pile implanting construction method | |
EP0539079A1 (en) | Apparatus and method for constructing compacted granular or stone columns in soil masses | |
CN112982408B (en) | Pile pulling device and pile pulling construction method | |
CN1637229B (en) | Boring device and method for introducing a boring element into the ground | |
EP0560867B1 (en) | Method for manufacturing a tubular foundation in the ground | |
US4311416A (en) | Pre-load jack system and method of driving element into the ground | |
DE19941302C2 (en) | Device and method for producing support columns sunk into the ground | |
CN208748647U (en) | The construction equipment of impact holing stake | |
DE3912728C1 (en) | ||
CN213297946U (en) | Soil sampling device suitable for vertical shaft | |
CN213476867U (en) | Device is implanted to precast tubular pile | |
CN2307976Y (en) | Horizontal directional drilling rig | |
JP4187908B2 (en) | Foundation pile rotary press-fitting machine | |
EP0777018A1 (en) | A method of producing a concrete encasing in the ground, an apparatus for producing a concrete encasing within a hole in the ground, and a concrete encasing provided within a hole in the ground | |
GB2248082A (en) | Pile driving | |
JP2005009170A (en) | Compaction pile formation method | |
CN111485548B (en) | Novel soil lifting equipment for manual hole digging pile construction and construction method thereof | |
NL1012370C2 (en) | Post and device for driving it into the ground. | |
CN219862785U (en) | Reinforcing and reinforcing equipment for concrete filling pile | |
CN209397585U (en) | A kind of reinforced soft soil ground compacting pile construction device | |
JPS6058335B2 (en) | Pile tip treatment method in pile foundation construction | |
CN215471979U (en) | Tubular pile production unloading auxiliary device | |
CN212452182U (en) | Tamping device for backfilling pavement core holes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Designated state(s): BE CH DE FR GB LU NL SE |
|
AK | Designated contracting states |
Designated state(s): BE CH DE FR GB LU NL SE |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
110E | Request filed for conversion into a national patent application [according to art. 135 epc] | ||
18D | Application deemed to be withdrawn | ||
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: WOLTERS, TJAKO AALDRIK Inventor name: DEN OUDEN, HENDRIK |