GB2354276A - Method of forming cast-in-situ pile with enlarged base - Google Patents

Method of forming cast-in-situ pile with enlarged base Download PDF

Info

Publication number
GB2354276A
GB2354276A GB0006925A GB0006925A GB2354276A GB 2354276 A GB2354276 A GB 2354276A GB 0006925 A GB0006925 A GB 0006925A GB 0006925 A GB0006925 A GB 0006925A GB 2354276 A GB2354276 A GB 2354276A
Authority
GB
United Kingdom
Prior art keywords
tool
pile
tile
grout
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB0006925A
Other versions
GB2354276B (en
GB0006925D0 (en
Inventor
Melvin Gerrard England
Wilfred George Kenneth Fleming
Roger Martin Darke
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cementation Skanska Ltd
Original Assignee
Kvaerner Cementation Foundations Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from GBGB9724024.6A external-priority patent/GB9724024D0/en
Application filed by Kvaerner Cementation Foundations Ltd filed Critical Kvaerner Cementation Foundations Ltd
Priority to GB0006925A priority Critical patent/GB2354276B/en
Publication of GB0006925D0 publication Critical patent/GB0006925D0/en
Publication of GB2354276A publication Critical patent/GB2354276A/en
Application granted granted Critical
Publication of GB2354276B publication Critical patent/GB2354276B/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/44Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile

Abstract

A method of forming a cast-in-situ pile using a hollow pile-forming tool 21 with blades 22 attached to a lower end and apertures 24. The tool is pushed into the ground in non-percussive manner to a first depth and then rotated about its longitudinal axis so that the blades displace soil at or close to the base of the tool. Whilst the tool is rotating concrete or grout is pumped along the length of the tool and through apertures 24 to assist in the displacement of soil and to generate an enlarged base for the pile. Concrete or grout continues to be pumped whilst the tool is withdrawn. The pushing means may comprise a suspended weight, a hydraulic ram or a winch. A vibrator may be used to vibrate the tool about its longitudinal axis. The concrete or grout may be supplied via electronic flow control means and eg rotation of tool, withdrawal rate may be controlled by computer. The length of the base may be extended by partially withdrawing the tool or the withdrawal of the tool may be halted and the tool rotated to form an enlargement along the stem of the pile. A spiral base or a base with 'wings' may be formed.

Description

2354276 IMPROVED PILING METHOD The present invention relates to a method
and apparatus for installing a pile and/or a concrete or grout column in the ground, in particular by way of soil displacement.
It is known to install load-bearing piles or columns by various methods. A first method involves hammering a preformed pile into the ground iu a series of discrete steps. This method can be effective, but there is a risk of causing damage to the pile or to We ground due to the discontinuous hammering action. Furthermore, much noise and vibration is caused by hammering. An alternative method is to use a j,tck to install a pile or column made up of a number of is discrete sections. A first section is pushed into the ground by the jack, which is then reset, and a second section is then welded or bonded to the top of the first section. The jack is then activated again, and the process repeated until the required depth has been reached. This method is low in efficiency since the jack needs to be retracted after completing each single stroke so that the next element of the pile can be inserted, particularly since a typical stroke length is less than 50cm.
A second known method is continuous flight auger piling, in which an auger with a continuous flight is:
caused to enter the ground by way of rotation. soil is excavated by way of the auger flights before or during the time that the auger is withdrawn from the ground.
As the auger is being withdrawn, concrete is pumpeld through the stem of the auger to the Lip, thereby leading to the formation of a load-bearing pile or column. Such a method is described in the present applicant's U.K. patent application no. 9515652.7, Lhe (11-,closure of which is incorporated into the present application by reference.
Alternatively, as disclosed for example in WO 95/12050, it is possible to use an auger head which does not excavate soil, but instead displaces the soil and compacts it into the surrounding ground. This has the advantage that less spoil is generated, and can lead to better maintenance of ground integrity and greater density in the vicinity of the pile installation.
However, both these methods require that an auger or similar device be screwed into the ground, which takes a relatively long time and generally means that specific combinations of torque and thrust must be applied in accordance with the ground conditions in order to achieve penetration, and these can be is difficult to achieve. Another disadvantage with these screw piling methods is that the piling tool is subjected to a large degree of wear. Furthermore, we have found that there appears to be an inverse relationship between the rotational torque required to produce downward thrust by way of the pitch of the auger flights and the "crowd force" (i.e. the total force applied along the longitudinal axis of the auger during penetration) generated at the rig which can be used to achieve penetration into the ground. Indeed, the crowd force in itself is not sufficient to achieve the desired penetration, particularly when premature resistance to penetration, e.g. caused by the presence of a subterranean stratum of granular material such as gravel, is experienced.
According to a first aspect of the present invention, there is provided a method of installing a load-bearing pile or column in the ground, wherein:
i) a hole-forming tool or pile having a longitudinal axis is pushed into the ground, substantially in the direction of its longitudinal axis, in a substantially non-percussive manner to a first depth; and ii) the hole forming tool or pile is then pushed further into the ground, substantially in the direction of its longitudinal axis, in a substantially non percussive manner to a second depth while being rotated about its longitudinal axis.
The term "non-percussive" is to be understood as the application of a substantially continuous force over a relatively protracted period of time, e.g. over a number of seconds or even minutes. This is to be distinguished from percussive methods of piling, in which, for example, a weight is repeatedly dropped onto the top of a pile so as, in effect, to hammer the pile into the ground. In this case, most of the force is applied over a relatively short period of time, e.g.
fractions of a second. Furthermore, the rate of change of applied force with respect to time will, in practical terms, generally have a discontinuity, as opposed to non-percussively applied force, which will tend to have a rate of change with respect to time which is substantially continuous.
The present invention is of particular use when installing or forming piles in soft ground overlying a granular stratum, such as gravel or the like. The rotational motion of the hole-forming tool or pile helps to overcome premature resistance to penetration which may otherwise prevent the attainment of desired depths. Generally, the hole-forming tool or pile is pushed into the soft overlying soil until it reaches the granular stratum, at which point the hole-forming tool or pile is additionally rotated. Rotation combined with the pushing force is surprisingly effective in penetrating granular strata, especially with certain hole-forming tool or pile tip geometries, and enables the resulting pile to be well-founded.
The rotation may be continuous rotation in either direction; alternatively or in addition, back and forth rotation may be used, which rotation may be less than or more than one revolution. Where back and forth - rotation is used, it has been found that an oscillation frequency of around 1Hz is effective in aiding penetration of granular strata, although frequencies of an order of magnitude higher or lower, e.g. around 1OHz to O.lHz, are also envisaged. In some applications, even higher or lower frequencies, e.g. around 10OHz to O.OlHz, may be useful.
This method may be used either to install a pile, such as a r-teel or pre-cast concrete pile, directly into the ground, or may be used to insert a hole forming tool, such as a hollow cylindrical tube is provided with a sacrificial end plate, into the ground so as to allow a load-bearing concrete or grout column to be cast-in-situ prior to or during removal of the tool. The pile or tool dimensions and the force applied to the pile or tool are advantageously determined in accordance with the ground conditions.
Preferably, the hole-forming tool or pile is pushed in a continuous motion to a given depth of at least im into the ground, and in some applications, at least 2m or even 5m into the ground. once the given depth has been reached, the continuous fcrce may be reapplied one or more times so as to push the hole forming tool or pile to a greater given depth, such as the depth of a granular stratum.
In this way, we have found that it is possible in certain ground conditions to attain depths in excess of 5m in a time of around 16 seconds, as opposed to 4 minutes using a rotating auger.
According to a second aspect of the present invention, there is provided a method of boring into the ground, wherein:
i) a hole-forming tool having a longitudinal axis is pushed into the ground, substantially in the direction of its longitudinal axis, in a substantially non-percussive manner to a first depth; and ii) the hole-forming tool is then pushed further into the ground, substantially in the direction of its longitudinal axis, in a substantially non-percussive manner to a second depth while being rotated about its longitudinal axis.
The hole-forming tool is generally withdrawn from the ground after it has reached the required depth, although in some applications the tool may be cacrificed and left in the ground.
In some embodiments, the hole-forming tool has a generally pointed tip, since this can be effective in penetrating granular strata when pushed into the ground with concomitant rotation. However, a particularly preferred embodiment utilises a hole-forming tool with a generally flat base. We have found that upon pushing such a flat-based tool into the ground, soil under the flat base tends to be compressed into a cone of relatively higher density than the surrounding soil.
This cone of relatively high density soil substantially stays with the base of the hole-forming tool during penetration and rotation, and serves to disturb the underlying soil in the desired manner. In some applications, it is advantageous to spread a carpet of gravel or other granular material on the top of the ground prior to penetration of the hole-forming tool.
The flat-based hole-forming tool is then lowered onto the carpet of gravel or other granular material and pushed into the ground, thereby using the gravel or granular material to make up at least some of the resulting cone. Although a proportion of the soil and/or gravel or other granular material forming the cone of relatively high density may be lost to the surrounding soil, this proportion is usually relatively low, and in any case will generally be replaced by soil underlying the base of the hole-forming tool.
A pushing force is applied to the hole-forming tool in a similar manner to that described in relation to the other aspects of the present invention, as is the rotation. Advantageously, the magnitude and duration of the applied non-percussive force, as well as those of the torque applied to generate rotation, are monitored and controlled by electronic computer means.
According to a third aspect of the present invention, there is provided a riq for inserting a hole-forming tool or pile having a longitudinal axis into the ground, wherein the rig is provided with first is means for applying a substantially non-percussive force to the hole-forming tool or pile so as to push this into the ground, substantially in the direction of its longitudinal axis, to a first depth, and wherein the rig is further provided with second means for applying a rotation to the hole-forming tool or pile about its longitudinal axis, so as, in combination with said first means, to push the hole-forming tool or pile, substantially in the direction of its longitudinal axis, in a substantially non-percussive manner to a second depth.
Preferably, the rig is adapted to push the hole forming tool or pile in a continuous motion to a given depth of at least 1m, and in some applications, at least 2m or even 5m into the ground. Once the given depth has been reached, the continuous force may be reapplied one or more times so as to push the hole forming tool or pile to a greater given depth, e.g.
that of a granular stratum, before the hole-forming tool or pile is rotated.
one feature of the present invention is that the substantially non-percussive pushing force applied directly to the hole-forming tool or pile is greater than the downwards forces which may be generated by rotation of the hole-forming tool or pile. This is in complete contrast to screw piling methods, in which a substantial downwards force is generated due to the reaction between the helical rotating auger flight and the soil, especially in dense, cohesive soils.
Advantageously, the directly- applied force is at least two, and preferably at least five times greater in magnitude than the incidental downwards force which may be generated by rotation.
By way of the present invention, it is possible to make use of a good proportion of the weight of a typical piling rig, for example 70 tonnes, to help push a hole-forming tool or pile into the ground. Given no constraints on the piling rig abilities, we have found that it is relatively straightforward to generate substantially only a downward force to achieve penetration of the hole-forming tool or pile. The limitations to this process are determined by the forces presented as resistance to penetration, and several fundamental factors need to be considered:
i) The resistance to penetration into the ground is dependent on the specific ground conditions and soil type.
ii) The resistance is proportional to the cross sectional area of the element being inserted, and therefore the smaller the. cross section, the lower the downward force required.
iii) The maximum downward force cannot exceed that available from the piling rig used to install the hole forming tool or pile.
An advantage of the present invention is that once the skin friction is overcome upon penetration, the resistance experienced by the hole-forming tool or pile during motion is often less than the static resistance which may be encountered when the hole-forming tool or pile has been left undisturbed for a period during which soil "set-up" occurs.
It may sometimes be advantageous to apply vibration to the hole-forming tool or pile so as to reduce skin friction in the event that penetration is interrupted, but in any case the downward forces generated by such vibration will be significantly less than those required to insert the hole-forming tool or pile to a greater depth. Vibration may also be used as an aid to the expeller head should any obstructions impede it8 penetration into the ground.
The non-percussive force applied by the rig to the top of the hole-forming tool or pile may be provided by way of a weight adjustably suspended thereover.
Alternatively or in addition, the rig may he provided with a winch arrangement which is adapted to pull down the top of the hole-forming tool or pile.
In a particularly preferred embodiment, the rig is provided with a hydraulic ram with an extension of at least im, and preferably at least 2m or in some embodiments at least 5m. Such a ram may be used to apply a non-percussive downwards force to the top of the hole-forming tool or pile so as to achieve depths of, respectively, at least im, 2m or 5m in a single operation. The ram may then be reset and arranged to reapply the non-percussive force so as to achieve even greater depths. Additionally, the ram may be used in conjunction with a suspended weight and/or a winch arrangement and/or a vibrator.
Rotation may be applied by way of an electric, hydraulic or pneumatic motor, or by any other suitable means, including manual means.
Where a hole-forming tool is pushed into the ground, concrete or grout may be pumped from the surface so as to emerge at or near the tip of the tool as the tool is rotated and/or withdrawn. In this way, a cast-in-situ pile is formed. Advantageously, the volume of concrete or grout being pumped along the length of the hole-forming tool is monitored, for example by way of an electromagnetic flowmeter, and controlled by flow control means and electronic computer means. The electronic computer means additionally monitors and controls the rotation and/or the extraction of the hole-forming tool. In this way, it is possible to control the rate of rotation and/or withdrawal of the hole-forming tool as a function of concrete or grout f low, or vice versa, so as to help ensure that the resulting cast-in-situ pile is structurally sound.
is According to a fourth aspect of the present invention, there is provided a method of forming an underground cast-in-situ pile, wherein:
i) a hole-forming tool comprising a body having a longitudinal axis and a lower end to which is f itted at least one blade-like attachment which extends beyond the diameter of the body is pushed into the ground, substantially in the direction of its longitudinal axis, in a substantially non-percussive manner to a first depth; ii) at least the lower end of the hole-forming tool on which the at least one blade-like attachment is mounted is rotated in such a way that the at least one blade-like attachment displaces soil at or close to the base of the hole-forming tool while concrete or grout is concomitantly pumped along the length of the hole forming tool so as to assist the blade-like attachments in the displacement of soil and to generate a base for the resulting pile; and iii) the hole-forming tool is withdrawn while concrete or grout continues to be pumped along the length of the hole-forming tool.
Preferably, the hole-forming tool is pushed in a continuous motion to a given depth of at least 1m into the ground, and in some applications, at least 2m or even 5m into the ground. once the given depth has been reached, the continuous force may be reapplied one or more times so as to push the hole-forming tool to a greater given depth.
The hole-forming tool used in this aspect of the invention is particularly suited to soft ground conditions, such as soft clay overlying sands, silts overlying gravels and any generally soft material overlying granular material or suitable rock or bedrock, and is used to install a pile which can transfer load from ground level to stiffer soils at depth.
The hole-forming tool is pushed into the ground until its base reaches the required depth, which will typically be the top of a loose to medium dense sand or granular layer or rock or bedrock. A vibrator may be applied to the top of the hole-forming tool in order to aid penetration through any sand lenses or stiff layers or the like which may be encountered before the tip of the hole-forming tool reaches the required founding level. The vibrator power may be of the order of 15bhp, although any suitable power rating may be chosen in accordance with ground conditions. It is to be noted that the vibrator is not the key to penetration of the tool, but may be provided merely as a secondary means of achieving penetration into non-cohesive soils.
The vibrator may also be used to assist with the extraction of the hole-forming tool.
Alternatively or in addition, the hole-forming tool may be rotated about its longitudinal axis without concrete or grout being pumped, while being pushed into the ground in a substantially non-percussive manner.
The rotation may be continuous rotation in a given direction, or may be back and forth rotation as described with reference to the first aspect of the present invention. This rotational movement, when combined with a substantially non-percussive pushing force, allows the hole-forming tool to penetrate the layer or layers of sand or granular material. The rotational movement of the hole-forming tool results in the displacement of soil by the blade-like attachments.
As a result of this displacement, ground pressure around the base of the hole-forming tool is lowered, thereby allowing material under the base of the hole forming tool to move upwards, thereby causing the ultimate end bearing to fail at a much reduced loading.
Once at the required depth the hole-forming tool, or at least the section of the hole-forming tool on which the at least one blade-like attachment is mounted, is rotated in such a way that the at least one blade-like attachment displaces soil.at the base of the hole-forming tool.. advantageously aided by the pressure of the concrete or grout pumped to the base of the hole- forming tool. As the soil is displaced, it is concomitantly replaced by concrete or grout which may be pumped at positive pressure, for example up to 4 bar or even higher, through the body of 25 the hole-forming tool and emerge from at least one aperture provided behind the at least one blade-like attachment or from at least one aperture provided at or near the tip of the tool, thereby forming a subterranean bulb of concrete or grout of predictable 30 shape. It is to be noted that as the hole-forming tool is rotated, soil in front of each blade-like attachment is compressed, thereby increasing the local soil pressure relative to the surrounding soil pressure. correspondingly, soil behind each blade-like attachment 35 is allowed to expand, thereby decreasing the local soil pressure relative to the surrounding soil pressure.
r Alternatively, in embodiments where the body of the hole-forming tool is solid, concrete or grout may be pumped through a separate feed pipe or pipes. Once the bulb has been formed, the hole-forming tool is extracted, preferably without rotation and preferably in the same orientation as that used during insertion so as to keep resistance to extraction low. In some embodiments, the at least one blade-like attachment may be arranged in a helical configuration about the body of the hole-forming tool. This means that the hole forming tool may be withdrawn with rotation, provided that the rate of withdrawal is controlled as a function of the pitch of the helix and/or the change of depth and/or the rate of rotation. During extraction, further concrete or grout is delivered so as to form a continuous shaft up to a predetermined level. The delivery of concrete or grout during extraction must be sufficient to ensure that at least a predetermined minimum cross-section of shaft is cast. It is to be noted that with displacement piling tools such as the hole-forming tool hereinbefore described, the soil surrounding the tool will tend to plug any escape path for concrete or grout; consequently, the positive pressure of the concrete or grout can generally be maintained. If the tool is rotated while the concrete or grout pressure is maintained generally constant, then concrete or grout is absorbed into the area surrounding the fins and the original soil is displaced until eventually, after several rotations, substantially all of the original soil is successfully displaced and replaced with concrete or grout. This is readily signalled by a significant drop in the torque required to rotate the tool.
Advantageously, the volume of concrete or grout being pumped during formation of the base and shaft of the cast-in-situ pile is monitored, for example by way of an electromagnetic f lowmeter, and controlled by electronic computer means. The electronic computer means may also be adapted to monitor and control the insertion and/or rotation and/or extraction of the hole-forming tool. For example, given the area of the at least one blade-like attachment and the rate of rotation, it is possible to program the electronic computer means to calculate the rate at which the soil is displaced, and consequently to calculate the rate at which concrete or grout should be pumped so as to help ensure that the resulting load-bearing pile or column is structurally sound. The electronic computer means is advantageously adapted to control the rate at which concrete or grout is pumped and/or the rate of rotation of the hole-forming tool in accordance with these calculations. The electronic computer means may additionally be adapted to monitor and control withdrawal of the hole-forming tool and the flow of concrete or grout during extraction so as to ensure that sufficient concrete or grout is supplied.
By displacing the soil at the base of the hole forming tool and concomitantly injecting concrete or grout, the base of a cast-in-situ pile with enhanced bearing capacity is formed. The enhanced bearing capacity is a-result of the increased diameter of the base of the pile relative to the shaft of the pile.
The diameter of the base may be several times the diameter of the shaft.
The number of blade-like attachments mounted on the hole-forming tool is preferably two, for reasons of symmetry, but other numbers of attachments may be just as effective. The minimum number of rotations required to achieve the necessary soil displacement is 1/(number of attachments), provided that the attachments are equiangularly spaced about the circumference of the hole-forming tool, although depending on ground 14conditions, a greater number of rotations may be required so as to ensure that the soil is fully displaced. In some embodiments, the hole-forming tool is rotated first in one direction, and then in the other direction. The rate of rotation is advantageously controlled so that the volume of soil displaced is less than, or at least equal to, the volume of concrete concomitantly supplied.
In a particularly. preferred embodiment, the volume of soil displaced is between 50 and 500 litres (0.05 to 0.5m'), which is relatively efficient in terms of material usage. Additional rotations and additional concrete or grout delivery may also be used in order to increase the size of the bulb, but this may not be of great advantage since the final shape of the bulb may no longer be as predictable and the effective area of the bulb may not increase.
Conventional drive means, such as a motor or even manual means, may be employed to rotate the hole forming tool. Alternatively, one or more hydraulic rams may be used to rotate the hole-forming tool in a step-wise manner. The one or more hydraulic rams are adapted to engage with arms projecting axially from the body of the hole-forming tool, thereby providing step wise rotation with a force great enough to ensure that the blade-like attachments displace the soil surrounding the lower end of the hole-forming tool. In a hole-forming tool with two diametrically opposed blade-like attachments, rotation through at least 1800 is required, whereas in a hole-forming tool with four equally-spaced blade-like attachments, rotation need only be through at least 900.
The blade-like attachments are preferably sized and shaped so as not to deform excessively upon rotation. The blade-like attachments may be solid, or they may be provided with holes or apertures which enable the concrete or grout to be mixed in-situ with soil materials. Alternatively, each blade-like attachment may comprise several protruding elements separated by slits. The precise dimensions and shapes of the blade-like attachments may be selected in accordance with the ground conditions. In some embodiments, it is envisaged that the blade-like attachments may be disposed at an angle to the longitudinal axis of the hole-forming tool, thereby tending to displace soil upwards or downwards upon rotation.
The enlarged base-forming technique described above may be adapted so as to provide an extended enlarged base. This may be done by continuing to rotate the tool while extracting it slowly through the founding stratum and concomitantly supplying concrete or grout. Once the top of the founding stratum is reached, rotation of the tool is stopped, and withdrawal from the ground completed in the normal way.
This results in a pile having an elongate base of wider diameter than the main body of the pile, which may have enhanced skin friction as well as enhanced end bearing capacity.
It is also possible for the enlarged base formation technique to be repeated at several depths within the founding stratum, or even to continue rotation while extracting the tool at a rate which allows a continuous spiral base enlargement to be produced.
A further possibility is to apply a degree of back and forth rotation during extraction of the tool. In this way, a pile having a central body is provided with 11wings" defined by the width of the blade-like attachments, which may have enhanced skin effects due to the resulting pile having a greater circumferential surface area than that of a simple cylinder.
16- The cast-in-situ pile may be provided with an enlarged head at or below the surf ace of the ground by way of additional rotation of the tool and concomitant additional concrete or grout delivery once the hole forming tool has been withdrawn to a predetermined level. This enlarged head may be provided just below the ground surface or at greater depths if a reduction of ground level is expected. In some applications, the enlarged head may be f ormed in a carpet of gravel or other appropriate granular material which has been provided at the surface level.
Onc, the pile has been cast, a reinforcement may be inserted. This may take the form of a single or multiple steel bar arrangement which is pushed to a is prede term- ned'depth into the wet concrete or grout before this has set.
For a better understanding of the present invention, and to show how it may be carried into effect, reference will now be made, by way of example, to the accompanying drawings in which:
FIGURE 1 shows a hole-forming tool of the present invention after it has been pushed into the ground; FIGURE 2 shows in cross-section a first arrangement of blade-like attachments on the hole forming tool of Figure 1; FIGURE 3 shows in cross-section a second arrangement of blade-likeattachments on the hole forming tool of Figure 1; FIGURE 4 shows in cross-section a third arrangement of blade-like attachments on the hole forming tool of Figure 1; FIGURE 5 shows a rig fitted with a hole-forming tool and a suspended weight; FIGURE G shows a rig fitted with a hole-forming tool and a hydraulic ram; FIGURE 7 shows a hole-forming tool in schematic f orm; FIGURES 8 and 9 show the hole-forming tool of Figure 7 in use; FIGURE 10 shows an alternative embodiment of a hole-forming tool of the present invention; FIGURE 11 shows a pile formed by the tool of Figure 10; and FIGURES 12 to 16 show alternative piles formed by the tool of Figure 10.
The hole-forming tool 1 shown in Figure 1 comprises a body 2 provided with two blade-like attachments or fins 3 at or near its base. The diameter of the body 1 of the embodiment shown is 0.3m, and the maximum distance between the extremities of the f ins 3 is 0. 8m. The f ins 3 are shaped and sized so as to displace a volume of approximately 100 litres when the hole-forming tool 1 is rotated. Furthermore, the f ins 3 are provided with slanting edges so as to facilitate insertion and extraction of the hole-forming tool 1. The body 2 of the hole-forming tool 1 is hollow, and allows concrete or grout to be pumped from the top of the hole-forming tool 1 and out through a port 4 provided near the base of the hole-forming tool 1, although in other embodiments a separate grout or concrete feed pipe or pipes may be used.
In use, the hole-forming tool 1 is pushed into soft ground, such as clay 5, in a continuous motion until the base of the hole-forming tool 1 reaches the top of a layer of granular material, rock or bedrock 6.
A rotational motion is then applied to the tool, and it is pushed further into the ground. The rotational movement helps the tool to penetrate into the granular material by decreasing the ground pressure around the tip of the tool and allowing material beneath the tip of the tool to migrate upwards into the regions of decreased ground pressure. A vibrator 7 may be mounted 18- to the top of the hole-forming tool 1 in order to aid penetration through any intermediate sand lenses or stiff layers (not shown), as well as to reduce friction and to ensure entry of the base of the hole-forming tool 1 into the sand layer 6. Typically, the force required to insert the hole-forming tool of Figure I will be less than 100kN with an angle of friction of the soil, say of 30', for the basal sand.
once the hole-forming tool 1 has been inserted to the required depth, it is rotated so that the f ins 3 displace a volume of soil. At the same time, concrete or grout is pumped through the body 2 of the hole forming tool 1 and out through the port 4, thereby forming a subterranean bulb of concrete or grout. The hole-forming tool 1 is then withdrawn without rotation while concrete or grout continues to be pumped so as to form the shaft of a cast-in-situ pile.
The fins"3 may take various configurations, examples of which are shown in Figures 2, 3 and 4. The configurations of Figure 2 and 3 are designed for rotation in one direction only, whereas the configuration of Figure 4 may be rotated in both directions.
The fins 3 need only be thick enough so as not to deform excessively upon rotation. In the illustrated embodiment, no permanent deformation of the fins 3 will occur in clays of up to a clay shear strength typically of 50kN/mm' (undrained). In the arrangement shown, the fins 3 span a distance of 0.8m, thereby increasing the bearing surface area by seven times in relation to the diameter of the hole-forming tool 1, which is 0.3m.
Figure 5 shows a rig 7 on which is mounted a hole forming tool 8. At the top of the hole-forming tool 8, there is provided a drive unit 9 to rotate the tool, and a vibrator unit 10. A weight 11 is adjustably suspended over the top of the hole-forming tool 8 such that a downwards force can be applied to the top of the tool in order to push this into the ground in a continuous motion. Instead of or in addition to the weight 11, there may be provided a hydraulic ram 11' as shown in Figure 6, which has an extension of at least im, and typically at least 2m or even 5m. The ram 111 is used to push the hole-forming tool 8 to a given depth of at least lm in a single continuous operation.
The ram 111 can then be reset and used to push the hole-forming tool 8 to an even greater depth. There may also be providc-d a winch arrangement 20 which can be used to pull down the top of the hole-forming tool 8. A concrete or grout feed pipe 12 is located at the top of the hole-forming tool 8 so as to allow concrete or grout to be pumped through the body of the tool.
Figure 7 shows a hole-forming tool 8 similar to that shown in Figures 5 and 6. The hole-forming tool 8 has a head portion 13 and a body portion 14, which may be of variable length so as to be adaptable to different ground conditions. The head portion 13 and the body portion are connected by means of a standard connector 15. Two fins 16 are provided towards the lower end of the head portion 13. At the upper end of the body portion 14, where the hole-forming tool 8 is supported by the rig 7, there is provided a vibrator unit 10 and a drive unit 9. The drive unit 9 comprises a ram 17 attached to arms 18 in such a way that actuation of the ram 17 will cause the hole-forming tool 8 to rotate through approximately 90'. A weight 11 is lowered onto the top of the hole-forming tool 8 so as to provide the downwards force required to push the tool into the ground.
Figure 8 shows the head portion 13 of the hole forming tool 8 of Figure 7 which has been pushed through clay S until the tip of the tool has reached the top of a layer of medium dense sand 6. A concrete or grout delivery nozzle 18 is provided at the lower end of the hole-forming tool 8, the nozzle 18 being fitted with a reinforced bung 19 so as to prevent ingress of soil as the hole-forming tool 8 is pushed into the ground.
In order to form a pile or load-bearing column, concrete or grout is pumped through the body of the hole-forming tool 8, initially to push out the bung 19.
The hole-forming tool is then lifted by approximately 100mm and concrete or grout is pumped through the nozzle ',R at a controlled rate. The hole-forming 'k.ool 8 is then rotated through 180', as shown best in Figure 9, such that the f ins 16 displace a volume of soil, aided by the pumping of concrete or grout which is concomitantly pumped from the nozzle 18 at a controlled rate. Rotation is then stopped, and the hole-forming tool 8 is withdrawn as concrete or grout continues to be pumped at a rate determined by the rate of withdrawal of the hole-forming tool 8, thereby forming a load-bearing column with an enlarged base, and hence increased bearing capacity. Further enlarged portions may be formed at other points.along the length of the load-bearing column by interrupting the withdrawal of the hole-forming tool 8 with further periods of rotation.
An alternative design of hole-forming tool 21 is shown in Figure 10. The tool 21 is provided with two fins 22, and has a hollow stem 23 through which concrete or grout may be pumped. Ports 24 are provided behind the f ins 22 so as to allow concrete or grout to be output when required. The tool 21 is used in the same manner as the tool 8 of Figures 7 to 9, but instead of forming an enlarged pile base on top of a stratum of granular material, the tool 21 is pushed into such a stratum by way of the additional application of rotation- Once the tool 21 has reached 21- the desired depth, it is then rotated while concrete or grout is pumped through the hollow stem and the ports 4 as described above, before being extracted with no rotation, thereby forming a pile 2S with an enlarged S base 26 in a granular stratum 27 as shown in Figure 11.
Referring now to Figure 12, a pile 28 with an elongate cylindrical enlarged base 29 may be formed by continuing to rotate the tool 21 slowly during withdrawal from the granular stratum 27, while continuing to supply concrete or grout. Rotation is then ceased, and the tool 21 withdrawn as before so as to form the main shaft of the pile 28. The elongate cylindrical enlarged base 29 has improved skin friction compared to the simple enlarged base 26 of Figure 11.
It is also possible, as shown in Figure 13, to form a pile 30 with multiple enlargements 31. This is achieved by rotating the tool 21 at a base depth while supplying concrete or grout, then ceasing rotation and withdrawing the tool 21 to a higher level before repeating the rotation at that higher level and further levels thereabove. If the tool 21 is rotated continuously while being extracted at a relatively fast rate, or rotated relatively slowly during withdrawal, a pile 32 with a spiral enlargement 33 may be formed, as shown in Figure 14. The piles 30 and 32 of Figures 13 and 14 have increased skin friction and potentially increased end bearing capacity.
If the tool 21 is given a slight oscillatory rotation during withdrawal, a pile 34 with "wings" 35 may be formed, as shown in section in Figure 15. These "wings" 35 may extend for Lhe whole length of the pile 34, or may be formed only on sections of the pile length- The increased surface area of such a pile 34 may provide improved skin friction. Furthermore, a number of such piles 34 may be provided in a row so as to build a subterranean wall 36, as shown in Figure 16.

Claims (1)

  1. Claims
    I A method of' forming,III tinderground cast-in-situ pIlc, \vl(ll no extraction of' material, using a hollow plIC-1,01-111111,-, tool Comprising a body ll,]Vll)g a 1011gitUdInal axis and a lower end having attached Illerew blade lucalls which cxtcnd beyond tile diameter of (lie body and having aperture []]calls, the method comprising: I) pushing tile tool Into tile ground substantially III tile (III-eclioli oI' its longitudinal axis, In a substantially non-porcussive 111,11111cl, to a first dCp1lI1rotating the tool ill the direction, such that the Made means displace soil at or close to the base of (lie tool, and pumping concrete or grout along tile length of' tile tool and through (lie aper(twe ineans so as to assist tile bladc means III (lie displacement of soil and so that no vold is created and to gcncratc,ill cidargcd base for (lie resulting pile; and ill) Wltli(ll-;IWII]g tile tool While COIICI-C(C 01 gl'OLI( COIItIIIIIeS to be j)tIIIlpCd along (lie length ol'thc tool.
    2 A inelliod according to claim I wherein tile pushing Is 1)), means of' a wclgli( which is adJusuibly suspendible over (lie tool.
    3 A method according to claini 1, wherein tile plishing Is by Ilicalls of' a hydraulic 1'alli.
    It A method according to claim 1, wherein (lic. pushing is by nicans oI' I A method according to any previous claim, wherein the tool is rotated Ill a single (firectioll.
    6 A method according (o any previous claim, whercin (lie [oof Is rolawd Nick and lorth.
    7 A inctliod according to claim 6, wherein a vibrator Is used to v1hrate Ilic (ool '10out I(S longitudinal axis.
    8 A method according to any preceding claim, whercin (lie Corcc (firectly applied to tile top of'the tool is greater than any downwards f'Orce which inay result fi-olli rotation of tile tool.
    9 A method according io claim 8, wherein tile force dircaly applicd to 111C top of' tile tool is at least twice any downwal-ds force which may rcstill FFOM rotation of' (lie tool.
    A inethod according to any previous claim, wherciii file volunic of' Concrete or grout supplied is at least equal to tile volume of' soll displaced 1)y tile blade Ilicalls In step (il).
    I I A method according to any previous claim, wherein file Concrele or grout is supplied by way of all electronic flowmeter and floxv control illeans.
    12 A method according to ally previous claim, Wherein an additional rolation of' (lie tool and concomitant additional conci-cle or grout dcllvcry IS perl'ormed once tile tool has been withdrawn to a predetermined level to thereby provide the cast-iii-sitti pile with all enlarged head a( or below ground sill-fiace.
    13 A nictliod according to any preceding claim, wherelit tile pushing ol'llic tool, the rotation ol' the tool, the rate of withdrawal of' the tool, and/or Ilic Concrete or grout flow rate are monitored and controlled, individually ofcollectively, by.111 electronic Compuler.
    H A method according to any preculing clalm, Nvhcrclii, (ILII'Illg StCl) (III). (Ile (ool is parnally Withdrawn, So as (o emend tile length of' (Ile base.
    A method according to any of clainis I to 1-33, whereln, during step (111), withdrawal of' (lie tool is lialted and tile tool is rotated, so as to 1,61-111 111 Cillargement along (lie S(eni of file pile.
    A method according to any of'clalins I to 13, wherein, during step (11), tile tool is partially withdrawn at I rate, relative to [lie rate of' rotation. which gekicraws.1 sp ral base.
    A method according to any of claims I to 13, wherein, during step (11), the rotation is oscl atoly, such that a base With Wings formed.
    18 A method of' installing I load-bearing pile of- Column In (lie ground, substantially as herein described with rel'Crence to the drawl figs.
    19 A cast-In-situ pile formed substantially according to (lie method ol'any previous C1,11111.
    -Z S Amendments to the claims have been filed as follows I A method of forming an underground C11St-'J1-S't-LI Pile, \Vtll I)k) extraction of material, using a hollow pile-forn-ung tool con-iprisinn- a bod% having a longitudinal axis, aperture means in the region of its lo\, ver end, and. attached to its lower end, blade means which extend bevond the djaineteiof t1it body, the method comprising:
    0 pushing the tool non-rotatorily into the ground substantially III tlic direction of its longitudinal axis, in a substantially non-p(::-cussive manner to ii first depth; ii) rotating the tool such that the blade means displace soil at or close to the base of the tool, and concomitantly pumping concrete or grout along the lenoth of the tool and through the aperture means so as to assist the blade means III tile displacement of soil and generate an enlarged base for the resulting pile-, and iii) withdrawing the tool while concrete or grout continues to be PUIllped along the lenath of the tool.
    b A method according to claim I wherein the pushing is by means of a weight which is adjustably suspendible over the tool.
    A method according to claim 1, wherein the pushing is by ineans of a hvdraulic ram.
    4 A method according to claim 1, wherein the PLIshing is by means of a winch.
    A method accordm'g to any previous claim, wherein the tool 's rotated M a single direction.
    I 6 A method according to any previous claim, whei-eM the tool is rotited back and forth.
    7 A method according to claim 6, wherein a vibrator is used to vibrate the tool about its longitudinal axis.
    8 A method according to any preceding claim, whereiii the force directIv applied to the top of the tool is greater than any downwai-ds force which mm. result from rotation of the tool.
    9 A rnethod according to claim 8, wherein the force dii-ectly applied to the top of the tool is at least twice any downwards force which may result fi-om rotation of the tool.
    A method according to any previous claim, wherein the volume of concrete or grout supplied is at least equal to the volume of soil displaced b\, the blade means 'in step (11).
    I I A method according to any previous claim, wherein the concrete or Grout is supplied by way of an electronic flowmeter and flow control means.
    A method according to any previous claim, whereM an additional rotation of the tool and concomitant additional concrete or grout dell\!ei)/ is 0 performed once the tool has been substantially fully withdrawn to thereb\' ide the cast-iii-situ pile with an enlarged head at oi- close to the -Ioulld proVI l surface.
    1 A method according to any preceding claim, wherein the pushing of the Z! tool, the rotation of the tool, the rate of withdrawal of the tool, arid/or the 47 concrete or grout flow rate are monitored and controlled, Individually or collectively, by an electronic computer.
    14 A method according to any preceding claim, wherein, during step (11), the tool is partially withdrawn, so as to extend the length of the base.
    A method according to any of claims 1 to 13, wherein, during step (111), withdrawal of the tool is halted and the tool is rotated, so as to form ail enlargement along the stem of the pile.
    16 A method accordir.--y to any of claims I to B, wherein, during step (11), the tool is parfially withdrawn at a rate, relative to the rate of rotation, which generates a spiral base.
    17 A method according to any of claims I to 13, wherein, during step (11), the rotation is oscillatory, such that a base with wings is formed.
    18 A cast-in-situ pile formed according to the inethod of any previous claim.
GB0006925A 1997-11-13 1998-11-13 Improved methods and apparatus for boring and piling Expired - Fee Related GB2354276B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
GB0006925A GB2354276B (en) 1997-11-13 1998-11-13 Improved methods and apparatus for boring and piling

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
GBGB9724024.6A GB9724024D0 (en) 1997-11-13 1997-11-13 Improved piling method
GB9824983A GB2331318B (en) 1997-11-13 1998-11-13 Improved methods and apparatus for boring and piling
GB0006925A GB2354276B (en) 1997-11-13 1998-11-13 Improved methods and apparatus for boring and piling

Publications (3)

Publication Number Publication Date
GB0006925D0 GB0006925D0 (en) 2000-05-10
GB2354276A true GB2354276A (en) 2001-03-21
GB2354276B GB2354276B (en) 2001-05-09

Family

ID=26312597

Family Applications (1)

Application Number Title Priority Date Filing Date
GB0006925A Expired - Fee Related GB2354276B (en) 1997-11-13 1998-11-13 Improved methods and apparatus for boring and piling

Country Status (1)

Country Link
GB (1) GB2354276B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102051876A (en) * 2010-12-09 2011-05-11 河海大学 Novel tree root structure pile and construction process thereof
CN106087698A (en) * 2016-08-03 2016-11-09 宁波住宅建设集团股份有限公司 A kind of drilled pile movable type construction operation platform
CN106836204A (en) * 2017-03-15 2017-06-13 中铁六局集团路桥建设有限公司 The device and method of pouring pile bearing capacity under a kind of lifting Soft Soil

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0003063A2 (en) * 1978-01-06 1979-07-25 Ballast-Nedam Groep N.V. Method and device for inserting a pile into the ground
WO1990015904A1 (en) * 1989-06-21 1990-12-27 Roxbury Limited Improvements in or relating to in situ pile formation
WO1994002687A1 (en) * 1992-07-24 1994-02-03 Wagstaff Piling Pty. Ltd. Apparatus and method for forming piles
EP0758699A1 (en) * 1995-07-31 1997-02-19 Dipl.Ing. Helmut Hemmerlein GmbH & CO. Bau KG. Method for installing tapered piles, tapered piles, and foundation structures made with these piles

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0003063A2 (en) * 1978-01-06 1979-07-25 Ballast-Nedam Groep N.V. Method and device for inserting a pile into the ground
WO1990015904A1 (en) * 1989-06-21 1990-12-27 Roxbury Limited Improvements in or relating to in situ pile formation
WO1994002687A1 (en) * 1992-07-24 1994-02-03 Wagstaff Piling Pty. Ltd. Apparatus and method for forming piles
EP0758699A1 (en) * 1995-07-31 1997-02-19 Dipl.Ing. Helmut Hemmerlein GmbH & CO. Bau KG. Method for installing tapered piles, tapered piles, and foundation structures made with these piles

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102051876A (en) * 2010-12-09 2011-05-11 河海大学 Novel tree root structure pile and construction process thereof
CN102051876B (en) * 2010-12-09 2012-05-09 河海大学 Novel tree root structure pile and construction process thereof
CN106087698A (en) * 2016-08-03 2016-11-09 宁波住宅建设集团股份有限公司 A kind of drilled pile movable type construction operation platform
CN106087698B (en) * 2016-08-03 2019-12-27 宁波住宅建设集团股份有限公司 Portable construction operation platform of bored pile
CN106836204A (en) * 2017-03-15 2017-06-13 中铁六局集团路桥建设有限公司 The device and method of pouring pile bearing capacity under a kind of lifting Soft Soil
CN106836204B (en) * 2017-03-15 2019-03-08 中铁六局集团路桥建设有限公司 The device and method of pouring pile bearing capacity under a kind of promotion Soft Soil

Also Published As

Publication number Publication date
GB2354276B (en) 2001-05-09
GB0006925D0 (en) 2000-05-10

Similar Documents

Publication Publication Date Title
EP1030948B1 (en) method for boring and piling
JP5265500B2 (en) Pile digging method, foundation pile structure
US7748932B2 (en) Soil stabilization and anchorage system
US20060013656A1 (en) Full-displacement pressure grouted pile system and method
EP1277887B1 (en) Displacement drilling tool and equipment using said tool
EP2611968B1 (en) Method and apparatus for making an expanded base pier
Brown Practical considerations in the selection and use of continuous flight auger and drilled displacement piles
US3426538A (en) Method of making sand drains in situ
GB2354276A (en) Method of forming cast-in-situ pile with enlarged base
WO2001020083A1 (en) Drilling tool and method of installing a foundation pile
JP5950797B2 (en) Reinforcement method for embankment slope and drilling tool used therefor
KR101158048B1 (en) Pressurized grouting method using non-displacement self-drilled screw pile
JP5777424B2 (en) Ground excavation method
JP2005240395A (en) Rotary embedding method for pile
CN107268583A (en) Ball-upper plate-anchor rod foundation and its construction method
JP2004339917A (en) Rotary embedding method for pile
EP0664373A2 (en) A tool and method of boring and filling the borehole with concrete without removing soil therefrom
GB2345715A (en) Composite auger piling with enlarged base footing
Paniagua Construction of drilled displacement and auger cast in place piles
GB2363152A (en) Method and apparatus for forming enlarged pile heads
GB2221712A (en) Forming piles in situ
CN107268589A (en) One bulb-anchor pole-star member basis and its construction method
CN107268584A (en) One bulb-anchor pole-upper plate basis and its construction method
CN107268653A (en) Anchor pole-upper plate-ball basis and its construction method
CN107268586A (en) A kind of anchor pole-upper plate-ball basis and its construction method

Legal Events

Date Code Title Description
PCNP Patent ceased through non-payment of renewal fee

Effective date: 20111113