EA201200957A1 - Переоборудование атомной электростанции - Google Patents

Переоборудование атомной электростанции

Info

Publication number
EA201200957A1
EA201200957A1 EA201200957A EA201200957A EA201200957A1 EA 201200957 A1 EA201200957 A1 EA 201200957A1 EA 201200957 A EA201200957 A EA 201200957A EA 201200957 A EA201200957 A EA 201200957A EA 201200957 A1 EA201200957 A1 EA 201200957A1
Authority
EA
Eurasian Patent Office
Prior art keywords
steam
turbine
generator
power plant
nuclear power
Prior art date
Application number
EA201200957A
Other languages
English (en)
Russian (ru)
Original Assignee
Бабкок Борзих Штайнмюллер Гмбх
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Бабкок Борзих Штайнмюллер Гмбх filed Critical Бабкок Борзих Штайнмюллер Гмбх
Publication of EA201200957A1 publication Critical patent/EA201200957A1/ru

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K13/00General layout or general methods of operation of complete plants
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K23/00Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
    • F01K23/02Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
    • F01K23/06Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
    • F01K23/10Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
    • F01K23/106Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle with water evaporated or preheated at different pressures in exhaust boiler
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K7/00Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating
    • F01K7/16Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type
    • F01K7/22Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type the turbines having inter-stage steam heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B1/00Methods of steam generation characterised by form of heating method
    • F22B1/02Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers
    • F22B1/18Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers the heat carrier being a hot gas, e.g. waste gas such as exhaust gas of internal-combustion engines
    • F22B1/1807Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers the heat carrier being a hot gas, e.g. waste gas such as exhaust gas of internal-combustion engines using the exhaust gases of combustion engines
    • F22B1/1815Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers the heat carrier being a hot gas, e.g. waste gas such as exhaust gas of internal-combustion engines using the exhaust gases of combustion engines using the exhaust gases of gas-turbines

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)
EA201200957A 2011-07-28 2012-07-26 Переоборудование атомной электростанции EA201200957A1 (ru)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102011108711A DE102011108711A1 (de) 2011-07-28 2011-07-28 Umrüstung eines Kernkraftwerks

Publications (1)

Publication Number Publication Date
EA201200957A1 true EA201200957A1 (ru) 2013-03-29

Family

ID=46614274

Family Applications (1)

Application Number Title Priority Date Filing Date
EA201200957A EA201200957A1 (ru) 2011-07-28 2012-07-26 Переоборудование атомной электростанции

Country Status (3)

Country Link
EP (1) EP2551475A2 (de)
DE (1) DE102011108711A1 (de)
EA (1) EA201200957A1 (de)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102020201640A1 (de) * 2020-02-11 2021-08-12 Siemens Aktiengesellschaft Erneuerung von Dampfturbinenanlagen und Anlage

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3742876A1 (de) * 1987-12-17 1989-06-29 Siemens Ag Verfahren und anordnung zur erneuerung eines senkrecht angeordneten dampferzeugers, insbesondere in kernkraftwerken
CH678987A5 (de) * 1989-10-24 1991-11-29 Asea Brown Boveri
WO1997018386A1 (en) 1995-11-14 1997-05-22 Westinghouse Electric Corporation System and method for combustion turbine repowering of existing low superheat steam turbines
DE19805119A1 (de) * 1998-02-09 1999-08-12 Werner Foppe Verfahren zur alternativ-energietechnischen Weiternutzung von Dampfkraftwerkseinheiten nach Stillegung von Atommeilern oder Feuerungsanlagen von Brennstoffkraftwerken
DE19939141A1 (de) * 1999-07-21 2000-07-13 Heinz Berthold Verfahren zur Umwandlung von KKW in fossilbeheizte Normal-KW (reversibel)
DE19962403A1 (de) 1999-12-23 2001-06-28 Alstom Power Schweiz Ag Baden Verfahren zum Umrüsten eines Sattdampf erzeugenden Systems mit mindestens einer Dampfturbogruppe sowie nach dem Verfahren umgerüstetes Kraftwerk

Also Published As

Publication number Publication date
DE102011108711A1 (de) 2013-01-31
EP2551475A2 (de) 2013-01-30

Similar Documents

Publication Publication Date Title
EP2604858A3 (de) Integriertes Solarkombikraftwerk und integriertes Solarkombikraftwerkverfahren
BR112013005218A2 (pt) sistema de geração de energia para uso na operação de um mecanismo de calor, sistema para operar um ciclo de vapor alimentando uma turbina de vapor, usina para gerar eletricidade, método para uso na operação de um mecanismo de calor e método para uso na operação de um ciclo de vapor alimentando uma turbina de vapor.
IN2012DN02706A (de)
EP2541021A3 (de) System für Brennstoffgasbefeuchtung und -erwärmung
WO2012048135A3 (en) Utilization of process heat by-product
IN2012DN05179A (de)
EP2535542A3 (de) Systeme und Verfahren zur Verbesserung des Wirkungsgrades eines Kombikraftwerks
BR112012011720A2 (pt) método para gerar energia elétrica de biomassa renovável a partir de instalações de energia existentes, e , sistema para gerar eletricidade
WO2013038423A3 (en) Combined cooling/heating and power generation system utilizing sustainable energy
WO2013143827A3 (en) Method for operating a combined cycle power plant and combined cycle power plant for using such method
IN2014DE00595A (de)
WO2011148153A3 (en) Steam generator for combined cycle gas turbine plant
BR112015008506A2 (pt) instalações de vários poços e canal de conexão
IN2014KN00869A (de)
IN2014DN07621A (de)
IN2014DN07990A (de)
BR112014027147A2 (pt) método para gerar vapor usando os gases residuais de instalações para fabricação de ferro gusa e instalação para executar o método
EP2568127A3 (de) Verfahren zum Betrieb eines Kraftwerks
MX2014009894A (es) Planta y metodo para aumentar la eficiencia de produccion de energia electrica.
EA201200957A1 (ru) Переоборудование атомной электростанции
MX2013006582A (es) Central electrica con sistema de energia solar.
JP2013064328A5 (de)
WO2011080576A3 (en) Combined-cycle plant for the production of electric and thermal energy and method for operating said plant
MY178140A (en) Optimising the utilisation of renewable energy from biomass resources in the palm oil industry
Bartnik et al. Energy Efficiency of Repowering a Power Unit by Installing a Gas Turbogenerator in a Parallel System