DEF0014566MA - - Google Patents
Info
- Publication number
- DEF0014566MA DEF0014566MA DEF0014566MA DE F0014566M A DEF0014566M A DE F0014566MA DE F0014566M A DEF0014566M A DE F0014566MA
- Authority
- DE
- Germany
- Prior art keywords
- aggregates
- concrete
- hole
- pile
- mortar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004567 concrete Substances 0.000 claims description 37
- 230000002787 reinforcement Effects 0.000 claims description 16
- 239000004568 cement Substances 0.000 claims description 10
- 239000004570 mortar (masonry) Substances 0.000 claims description 10
- 210000004080 Milk Anatomy 0.000 claims description 9
- 238000004519 manufacturing process Methods 0.000 claims description 9
- 238000000034 method Methods 0.000 claims description 9
- 239000008267 milk Substances 0.000 claims description 9
- 235000013336 milk Nutrition 0.000 claims description 9
- 239000011083 cement mortar Substances 0.000 claims description 8
- 239000002689 soil Substances 0.000 claims description 6
- 238000007906 compression Methods 0.000 claims description 5
- 239000011150 reinforced concrete Substances 0.000 claims description 5
- 229910000831 Steel Inorganic materials 0.000 claims 1
- 150000001875 compounds Chemical class 0.000 claims 1
- 239000010959 steel Substances 0.000 claims 1
- 238000003825 pressing Methods 0.000 description 4
- 230000015572 biosynthetic process Effects 0.000 description 3
- 238000005755 formation reaction Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 239000003673 groundwater Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 210000003491 Skin Anatomy 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 230000001070 adhesive Effects 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000000875 corresponding Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 235000000396 iron Nutrition 0.000 description 1
- 230000000149 penetrating Effects 0.000 description 1
- 230000000750 progressive Effects 0.000 description 1
- 230000003014 reinforcing Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 238000010408 sweeping Methods 0.000 description 1
Description
BUNDESREPUBLIK DEUTSCHLANDFEDERAL REPUBLIC OF GERMANY
Tag der Anmeldung: 27. April 1954 Bekanntgemacht am 30. Mai 1956Registration date: April 27, 1954. Advertised on May 30, 1956
DEUTSCHES PATENTAMTGERMAN PATENT OFFICE
Die Erfindung betrifft ein Verfahren; zur Herstellung von; Betonpfählen im Erdreich, bei dem eine abgeteufte Bohrung mit Zuschlagstoffen gefüllt und diese Schüttung mit Zementmörtel oder Zementmilch mittels eines schrittweise nach oben aus den Zuschlagstoffen zurückziehbaren Preßrohres unter Druck ausgepreßt wird,The invention relates to a method; for the production from; Concrete piles in the ground, in which a sunk hole is filled with aggregates and this pouring with cement mortar or cement milk by means of a gradual upward is squeezed out of the aggregate retractable compression tube under pressure,
Bei der Durchführung von Gründungen, im Erdreich bei der Errichtung von. Hoch- oder Wasserbauten (Ufermauern, Kaimauern, Speichermauern, Industriebauten, u, dgl.) tritt oft: das Bedürfnis ein, das Erdreich durch Abteufen von Bohrungen und darin gebildete ortsfeste Betonpfähle zu befestigen,.When carrying out foundations, in the ground when building. Structural or hydraulic structures (Embankment walls, quay walls, storage walls, industrial buildings, etc.) often occurs: the need occurs to fix the soil by sinking bores and fixed concrete piles formed therein.
Es sind hierfür verschiedene Verfahren, entwickelt worden. ■Various methods have been developed for this purpose. ■
So ist es bekannt, nach Abteufen des Bohrloches das Bohrrohr oben mit einem Deckel luftdicht: zu verschließen, in dem, mit Absperrventilen, versehene Rohrleitungen und Entlüftungsstutzen angeordnet sind. Durch die verschieden tief reichenden Rohrleitungen wird einerseits Druckluft, andererseits Mörtel zugeführt. Die tiefste Rohrleitung dient dazu, bei, Beginn der Arbeit mit Hilfe der eingeführten Druckluft das Grundwasser1 aus dem Bohrloch zu. entfernen. Es besteht dabei die Möglichkeit, innerhalb des Bohrrohres eine Bewehrung vorIt is known, after the borehole has been sunk, to close the drill pipe airtight at the top with a cover in which pipelines and venting nozzles provided with shut-off valves are arranged. The pipes, which reach different depths, supply compressed air on the one hand and mortar on the other. The deepest pipeline serves to remove the groundwater 1 from the borehole with the help of the compressed air introduced at the beginning of the work. remove. There is the possibility of reinforcement in front of the drill pipe
609 528/109609 528/109
F 14566 V/84c F 14566 V / 84c
Anbringung des Deckels einzuführen und schließlich auch, den Inhalt des Bohrrohres teilweise oder ganz mit Zuschlagstoffen, wie Kies u. dgl., zur Einsparung von Zement auszufüllen. Während dieses Vorganges soll nun das Bohrrohr selbst mit diesen Zuleitungen schrittweise nach oben aus der Bohrung zurückgezogen werden.' Auf diese Weise läßt sich zwar der Innenraum beim Auspressen der Schüttung mit Mörtel unter so hohen Druck setzen,Attachment of the cover to introduce and finally, the contents of the drill pipe partially or To be filled entirely with aggregates such as gravel and the like to save cement. While this process should now gradually move the drill pipe itself with these leads upwards out of the Bore to be withdrawn. ' In this way the interior can be put under such high pressure when the bed is pressed out with mortar,
ίο daß dieser auch bestimmungsgemäß an die Wandung unterhalb des schrittweise nach oben entfernten Bohrröhres eingedrückt werden kann, Die Durchführung des Verfahrens ist jedoch deswegen besonders umständlich, weil· dias ganze Bohrrohr mit den Rohrarmaturen über dem Bohrloch nach oben, gehoben, werden, muß. Sofern man nicht das Bohrloch jeweils teilweise abbaut: und jedesmal wieder diese Deckelarmaitur anbringt, müssen: hohe Zugtürme errichtet werden, Trotzdem ist diesesίο that this should also be attached to the wall as intended can be pressed in underneath the drill tube, which is gradually removed upwards However, carrying out the method is particularly laborious because the entire drill pipe with the pipe fittings above the borehole to the top, must be lifted. Unless you do that Borehole partially dismantles: and every time this lid fitting attaches again, must: high Train towers are erected, anyway this is
ao Verfahren in der Güte seiner Durchführung nicht kontrollierbar, da die Betonmischmaschine das Füllgut nur in Abständen erzeugen, kann, und daher Unterbrechungen entstehen, Infolgedessen kann es vorkommen, daß das aufwärts, bewegte Bohrrohr durch Rohr- und! Mantelreibung eine obere Schicht der Ausfüllung, die sich schon, hinreichend; verdichtet bzw. abgebunden hat, nach, oben hin mitnimmt. Infolgedessen können, auf diese Weise im Pfahl Zwischenräume entstehen, in denen, lediglich die Bewehrung steht. Ein solcher Pfahl ist fehlerhaft: und erfüllt daher nicht: die an ihn, gestellten Ansprüche an Sicherheit. Infolgedessen bedarf die Errichtung eines Pfahles in, dieser Weise besomderer Aufmerksamkeit unid Zuverlässigkeit der Bau-.the quality of its implementation cannot be controlled as the concrete mixer does the Filling material can only produce at intervals, and therefore interruptions occur, as a result it can it can happen that the upward, moving drill pipe through pipe and! Skin friction an upper layer the filling, which is already sufficient; condensed or has tied up, takes it with him upwards. As a result, this way im Pile spaces are created in which only the reinforcement is. Such a stake is flawed: and therefore does not meet: the demands placed on him in terms of security. As a result, the Erection of a stake in a more special way Attention unid reliability of construction.
arbeiter. Ein vorhandener Fehler ist aber voii außen her überhaupt nicht erkennbar.workers. An existing error is voii not at all recognizable from the outside.
Es ist auch bekanntgeworden, nach Abteufen des Bohrloches einen, außerhalb hergestellten Fertiigbetonpfahl ganzer Länge in dieses einzusetzen und; in der Längsrichtung desselben Rohre einzuformen, die in verschiedener Höhe über dem unteren Ende Austritte, aufweisen, Durch diese Rohre wird nach. Einlassen, des Pfahles Beton bzw. Mörtel eingepreßt. Eine derartige Maßnahme, die mit den außerordentlich hohen Gewichtein, des fertigen Pfahles zu hantieren verlangt, kann für geringe1 Bohrlochtiefen, noch durchgeführt werden. Je' größer aber die Tiefe ist, um so größer ist der Aufwand an, Mitteln und, Zeit, um diese durchzuführen. Bei diesem Herstellungsverfahren, ist es auch bereits bekanntgeworden, zunächst: durch das Rohr mit der am höchsten fegendem Austritts öffnung Beton austreten zu lassen und dann, etappenweise , nach, unten schrittweise vorzurücken. Daher können, bei der Auspressung nun auch hohe Drücke angewendet werden, und man erreicht auch ein tiefes Eindringen von Mörtel in die Wandung der Bohrung in weniger festen Bereichen.It has also become known to insert a full-length prefabricated concrete pile into it after the borehole has been sunk and; in the longitudinal direction of the same tubes, which have outlets at different heights above the lower end, through these tubes is after. Settling in, the pile is pressed in with concrete or mortar. Such a measure, which requires to be handled with extremely high Gewichtein, of the finished pile, can be used for low borehole depths 1, still be carried out. But the greater the depth, the greater the expenditure, resources and time to carry it out. In this manufacturing process, it has already become known, first: to let concrete escape through the pipe with the highest sweeping outlet opening and then, step by step, to advance downwards step by step. For this reason, high pressures can now also be used during the extrusion process, and mortar can also penetrate deeply into the wall of the bore in less solid areas.
Gegenstand, der Erfindung ist: demgegenüber ein Verfahren, zur Herstellung von, Betonpfählen im Erdreich innerhalb einer abgeteuften, mit Zuschlagstoffen, gefüllten Bohrung, bei der die Schüttung mit Zementmörtel' ader Zementmilch unter Druck und unter schrittweiser Zurückziehung des Preßrohres ausgepreßt wird, in, der Weise, daß die Bohrung gegebenenfalls unter gleichzeitigem Ziethen eines zu ihrer Herstellung verwendeten Vortreibrohres bis nahezu zum oberen Rand mit den Zuschlagstoffen, unter Einrütteln derselben, ausgefüllt wird und dann, im oberen, noch, freien Teil der Bohrung ein an, die Erdwandung derselben dicht anschließender Betonpfropfen, als vorzugsweise in eine in die Zuschlagstoffe eingebettete Bewehrung eingebundener druckdichter Abschluß hergestellt wird, und in diesen absperrbare Stutzen, für den Ein- und Auslaß von Druckluft fest einbetoniert sowie das Zuführumgsrohr für Mörtel, Zementmilch od. dgl. höhenverschiebbar' eingesetzt werden,The subject matter of the invention is: on the other hand, a method for the production of concrete piles in the Soil within a sunk, aggregate-filled borehole, in which the fill with cement mortar 'or cement milk under pressure and with the gradual withdrawal of the Press tube is pressed out, in such a way that the hole optionally with simultaneous Ziethen a propulsion pipe used for their manufacture Filled almost to the upper edge with the aggregates while shaking them in and then, in the upper, still, free part of the hole, the earth wall of the same becomes tight subsequent concrete plug, as preferably in a reinforcement embedded in the aggregate integrated pressure-tight closure is made, and in this lockable nozzle for the Inlet and outlet of compressed air firmly embedded in concrete as well as the supply pipe for mortar, cement milk or the like can be adjusted in height ',
Durch diese Maßnahme tritt eine außerordentliche Verbilligung des Verfahrens ein, weil zunächst das Bohrrohr unbehindert entfernt, darauf das abgeteufte Bohrloch unmittelbar in der gewünschten Weise ausgebaut und der Betonpfropfen als oberer druckdichter Abschluß bequem hergestellt werden kann. Insoweit, kann an, Baugerüsten und Arbeitslöhnen, bereits wesentlich gespart werden. Außerdem aber kamin nach einem so einfachen Verschließen des Bohrloches mit: starken Drücken in diesem selbst gearbeitet werden, um das Grundwasser in das Erdreich zurückzudrängen, so daß die Zuschlagstoffe vor dem Eindringen, der Zementmilch bzw. des Zementmörtels soweit: als möglich wasserfrei gemacht sind. Der Preßdruck kann innerhalb dieser Verfahrensstufe auch weitgehend gesteigert werden, um zu erreichen, daß ringsum über die ganze Ausdehnung des zu. bildenden Betonpfahles alle Klüfte bzw. Spalten in der Wandung des Erdloches ebenfalls mit Mörtel unter Druck ausgefüllt werden, so daß die Widerstandskraft, des Betonpfahles nur noch weiter erhöht wird.This measure makes the procedure extremely cheaper, because initially the drill pipe removed unhindered, then the drilled hole immediately in the desired Wise expanded and the concrete plug can be easily produced as an upper pressure-tight seal. As far as can, scaffolding and wages, can already be saved significantly. But also chimney for such a simple one Sealing the borehole with: strong pressures are worked in this itself to the groundwater to push back into the ground, so that the aggregates from penetrating, the cement milk or the cement mortar as far as: are made anhydrous as possible. The pressure can can also be largely increased within this process stage in order to achieve that all around over the whole expanse of the to. forming concrete pile all crevices or crevices in the wall of the earth hole also with mortar Pressure to be filled, so that the resistance force of the concrete pile is only further increased.
Dort wo- es sich um die Füllung von, Hohlräumen besonderer Tiefe handelt, z. B. bei der Gründung von Ufermauern, im, Wasser bzw. bei der Herstellung von Docksohlen. unter Verwendung von hohlen Säulenkörpern, kann, in gleicher Weise vorteilhaft verfahren werden.There it is about the filling of cavities special depth acts, z. B. in the foundation of sea walls, in, water or in the production of dock soles. using hollow column bodies, can, in the same way, be advantageous be proceeded.
Wo· in, den, tieferen, mittleren oder höheren Schichteini des Erdreiches besonders aggressive Wasser bei Bodenuntersuchungen festgestellt werden, verfährt man erfindungsgemäß vorteilhaft so, daß vor dem Einbringen der Zuschlagstoffe in an sich bekannter Weise ein vorgefertigter, außen, isolierter Stahlbetonpfahl von einer durch die Bodenverhältnisse bedingten Länge und von geringerem Durchmesser bis auf den Grund, der Bohrung in diese eingelassen wird,, der mit: nach oben herausragenden Enden seiner Bewehrung eine Verbindung mit dem anschließend, aus den Zuschlagstoffen und dem eingepreßten. Zementmörtel gebildeten Pfahlteil eingeht.Where in, the deeper, middle or higher layers of the soil are particularly aggressive Water are found in soil examinations, according to the invention it is advantageous to proceed as follows: that before the addition of the additives in a known manner a prefabricated, outside, insulated Reinforced concrete pile of a length determined by the soil conditions and of less Diameter down to the bottom, the hole is let into this, with: protruding upwards Ends of its reinforcement a connection with that subsequently, from the aggregates and the pressed in. Cement mortar formed part of the pile enters.
Das Verfahren der Erfindung kann, auch insofern eine Abänderung erfahren, als die Bohrung zunächst nur auf einem Teil ihrer Höhe mit: Zuschlagstoffen; unter Einrütteln derselben, ausgefüllt und dann ein an, seinem Unteren Ende mit einem eingeschnürten mittleren. Ansatz versehener vor-The method of the invention can, too, in so far experienced a change, as the drilling initially only on part of its height with: aggregates; while shaking it in, filled in and then an at, its bottom end with a constricted middle. Approach provided pre-
609-528/109609-528 / 109
F 14566 V/84cF 14566 V / 84c
gefertigter Pfahlabschnitt, vorzugsweise aus Stahlbeton, auf die Schüttung aus Zuschlagstoffen abgelassen und schließlich als Abschluß der Bohrung der Betonpfropfen in erörterter Weise hergestellt wird;.manufactured pile section, preferably made of reinforced concrete, drained onto the bed of aggregates and finally as the completion of the drilling the concrete plug is manufactured in the manner discussed ;.
Ein derartiger1 vorgefertigter Pfahlabschnitt zur Durchführung dieses Verfahrens wird erfindungsgemäß in. seinem oberen Bereich am Rande derart eingeschnürt ausgebildet, daß beim Betonieren, des die Bohrung nach oben, abschließenden Betonpfropfen, ein, ringförmiger Abschlußpfropfen entsteht. Such a 1 prefabricated pile section for carrying out this method is designed according to the invention in. Its upper area at the edge so constricted that when concreting the upwardly closing concrete plug, an annular plug is formed.
In, der Zeichnung ist die Erfindung an, mehreren Ausführungsbeispielen erläutert.In the drawing, the invention is explained using several exemplary embodiments.
Abb. ι zeigt einen aufrechten Schnitt durch einen im Aufbau, befindlichen Stahlbetonpfahl,
Abb. ι a eine Draufsicht bzw. einen Grundriß';
Abb. 2 zeigt den fertigen Pfahl vor der Veirpressung
im aufrechten Schnitt undFig. Ι shows an upright section through a reinforced concrete pile under construction,
Fig. Ι a a plan view or a plan ';
Fig. 2 shows the finished pile before grouting in an upright section and
Abb1. 3 die; Durchführung des Verpressungsvorganges; Fig 1 . 3 the; Execution of the pressing process;
Abb. 4 bis 6 zeigen, ein anderes Ausführungsbeispiel, und, zwar unter Verwendung eines unteren Betonfertigpfahles,Fig. 4 to 6 show another embodiment, using a lower prefabricated concrete pile,
Abb. 7 bis 9 ein drittes Ausführüngsbeispiel unter Verwendung eines oberen. Beton fertigpfahles. Fig. 7 to 9 a third embodiment using an upper one. Prefabricated concrete pile.
Mit den aus Einzellängen bestehenden Bohrrohren 1 entsprechenden Durchmessers wird zunächst ein Loch 2 bis auf den tragfähigen Baugrund abgeteuft. In das fertige Loch 2 wird zunächst elin Rohr 3 eingeführt; an dessen unterem Ende hinreichend, fest, aber doch, lösbar ein Drahtring od.. dgl. 4 befestigt: ist, welcher dafür sorgt, daß auch, das untere Ende des oft sehr langen Rohres 3 im, der Mitte verläuft. Das obere Ende dieses mehrteiligen Rohres 3 ragt; hinreichend; weit .über den Erdboden hinaus. Im Bedarfs falle wird nun ein Bewehrungsgeflecht S ganz oder1 in. Teilen übergeischoben, so· daß die ganze Länge des Pfahles mit einer Bewehrung in der ringförmigen, Randzone ausgerüstet ist. Auf diese Weise ist, zwischen, dem Rohr 3 und, dem Bohrrohr 1 genügend Raum für ein von oben her eingeschobenes Schüttrohr 6, durch das nach Einführung der Bewehrung 5 die Bohrung mit etwas groben, von. Feinsand freien Zuschlagstoffen, ausgefüllt wird. Dabei verbleibt das Preß rohr 3 noch immer in, seiner Lage. Ist; die Auffüllung mit Zuschlagstoffen, bis zu einem Zustände nach, Abb. 2 gediehen, nachdem während dies Füllvorganges das Bohrrohr 1 in Etappen hochgezogen und entfernt worden ist, so wird das Schüttrohr 6 entfernt und der obere Bereich in z. B. 80 cm Dicke mit einem Betonpfropfen 7 abgeschilossen, in den auch, der obere Teil der Bewehrung 5 eingebunden ist. Während der obere Teil des Rohres 3 durch. Umhüllung mit einer Isolierschicht, im Betonpfropfen 7 beweglich, geführt und daher während des späteren. Verfahrens nach, oben restlos herausgezogen wird;, werden, noch zwei mit Absperrventilen, versehene! Rohre 8,9 einbetoniert, Durch, das eine wird Druckluft zugeführt und durch das andere Luft abgeblasen. Abb. 3 läßt bereits an den Konturen des Pfahles P erkennen, daß beim Zuführen von, Feinmörtel bzw. Betonmiilch vom Bodengrund, aus unter allmählichem Ziehen, des Preßrohres 3 eine Verpressung des so gebildeten; Betonpfahles gegen, die Bodenwand erfolgt. Das Preßrohr 3 ist an ein druckdichtes Preßgerät 10 angeschlossen, in dem der Beton gemischt und; von einem Kompressor 11 über einen Windkessel 12 unter Druck gesetzt wird, Ist der Preß Vorgang allmählich nach oben, fortschreitend; beendlet, der also zonenweise durchgeführt wird, so· ragen aus dem Betonpfropfen 7 noch die senkrechten Anschlußeisen der Bewehrung S und die Rohrstutzen, 8 und, 9 nach Entfernung der Absperrorgamie heraus, so daß das Bauwerk unter ihrer Mitbenutzung errichtet werden kann. Der Anschluß des Stutzens 8, der mit; einem Druckluftförderer 13 in, Verbindung steht, kann, dazu, benutzt werden, um zunächst das Wasser aus der durch den. Pfropfen abgeschlossenen und mit den, Zuschlagstoffen gefüllten Bohrung zu entfernen, bevor der Zementmörtel eingeführt und unter Druck gesetzt wird.With the drill pipes 1 consisting of individual lengths of the corresponding diameter, a hole 2 is first sunk down to the load-bearing subsoil. A tube 3 is first inserted into the completed hole 2; at its lower end sufficiently, firmly, but releasably, a wire ring od .. like. 4 is attached, which ensures that the lower end of the often very long tube 3 runs in the middle. The upper end of this multi-part tube 3 protrudes; sufficient; far .above the ground. If necessary, a reinforcement mesh S is pushed over in its entirety or 1 in parts, so that the entire length of the pile is equipped with reinforcement in the ring-shaped edge zone. In this way, there is enough space between the pipe 3 and the drill pipe 1 for a pouring pipe 6 pushed in from above, through which, after the reinforcement 5 has been introduced, the bore is somewhat coarse from. Fine sand-free aggregates, is filled. The press tube 3 still remains in its position. Is; the filling with aggregates, up to a state according to Fig. B. 80 cm thick with a concrete plug 7, in which also, the upper part of the reinforcement 5 is involved. While the upper part of the tube 3 through. Covering with an insulating layer, movable in the concrete plug 7, guided and therefore during the later. Procedure after, is pulled out completely; two more with shut-off valves are provided! Pipes 8,9 set in concrete, through one of which compressed air is supplied and through the other air is blown off. Fig. 3 can already be seen from the contours of the pile P that when feeding, fine mortar or concrete milk from the ground, with gradual pulling, the compression pipe 3 a compression of the so formed; Concrete pile against, the bottom wall is made. The compression pipe 3 is connected to a pressure-tight pressing device 10, in which the concrete is mixed and; is pressurized by a compressor 11 via an air chamber 12, the pressing process is gradually upwards, progressive; endlet, which is carried out in zones, the vertical connecting irons of the reinforcement S and the pipe sockets 8 and 9 protrude from the concrete plug 7 after the shut-off device has been removed, so that the structure can be erected with their joint use. The connection of the nozzle 8, which with; a compressed air conveyor 13 is connected, can be used to initially remove the water from the through the. Remove the plugged hole filled with the aggregate before the cement mortar is introduced and pressurized.
Die Herstellung eines Gründungspfahles nach Abb1. 4 bis 6 unterscheidet sich von dem vorigen Beispiel nur dadurch, daß hier zwei bis drei P reißrohre 3 eingeführt werden, die in achsparalleilen Nuten eines fertigen Stahlbetonpfahlteiles am Umfang desselben Platz finden.. Oberhalb' dieses in, die Bohrung hinein versenkten fertigen Pfahlteiles P'', ■ aus dem oben Bewehrungsteile heransstehen, die mit der weiteren, Bewehrung' 5 sich, übergreifen, wird, in der vorher beschriebenen Weise der weitere Betonpfahl P nach, Einschüttung von Zuschlagstoffen in den gesamten Zwischenraum, also' auch den Raum, um den fertigen, Betonpfahl P' herum gebildet, so> daß schließlich ein einheitlicher Pfahl P', P entsteht. Die Bildung des Betonpfropfens 7, ebenso· wie das Vorpressen, der Füllung, erfolgt;.im übrigen wie bei dem erläuterten Beispiel.The production of a foundation pile according to Fig 1 . 4 to 6 differs from the previous example only in that two to three P tubes 3 are inserted here, which are placed in axially parallel grooves of a finished reinforced concrete pile part on the circumference of the same. Above 'this finished pile part P' sunk into the hole ', ■ from the above reinforcement parts, which overlap with the further' reinforcement '5, will, in the manner described above, the further concrete pile P after, pouring aggregates into the entire space, so' also the space around the finished, concrete pile P ' formed around, so that finally a uniform pile P', P is created. The formation of the concrete plug 7, as well as the pre-pressing, the filling, takes place; otherwise as in the example explained.
Bei dem Ausführungsbeispiel nach Abb. 7 bis 9 wird zunächst in gleicher Weise wie bei dem nach Abb. ι bis 3 vorgegangen, allerdings mit dem Unterschied, daß hier zwei bis drei Preß rohre 3 am Umfang bis zur Sohle der Bohrung reichen und nun die Bewehrung 5 herabgelassen wird. Zuschlagstoffe werden, unter Rüttlung eingebracht, und, zwar so1, daß noch ein Abstand, von etwa 80 cm (sogenannte Haftlänge) unterhalb der Bewehrungsoberfläche verbleibt. Nun, wird ein Betonfertigpfahl P' niedergelassen,, der wiederum am Umfang Führungsrinnen, zur Aufnahme der Preß rohre 3 aufweist und mit einem mittleren, unteren, verjüngten Fortsatz in den Hohlraum der Bewehrung 5 eindringt und dort auf dem Füllgut; aufsitzt. Aus der Unterfläche ragen, ringsherum senkrechte freie Bewehrungsstäbe heraus, die andererseits auch oben, aus der1 Oberfläche herausstehen, Der Betonklotz P' hat hier auch an, seinem oberen Rande einen, Rücksprung zur Bildung des Betonpfropfens 7, der in diesem Falle Ringform aufweist. Auch hier sind wiederum die Rohrstutzen. 8 und 9 einbetoniert. Nach, Bildung des Pfropfens 7 wird die durch diesen. Körper abgeschlossene Bohrung mit Zement-In the embodiment of Fig. 7 to 9, the procedure is initially in the same way as in Fig. Ι to 3, but with the difference that here two to three press tubes 3 extend on the circumference to the bottom of the hole and now the reinforcement 5 is lowered. Aggregates are introduced under Rüttlung, and, in such a manner 1 that there is still a distance of about 80 cm (so-called adhesive length) remains below the reinforcement surface. Now, a prefabricated concrete pile P 'is settled, which in turn has guide channels on the circumference, for receiving the press tubes 3 and penetrates with a middle, lower, tapered extension into the cavity of the reinforcement 5 and there on the filling material; sits on. From the lower surface, vertical free reinforcing bars protrude all around, which on the other hand also protrude above, from the 1 surface, the concrete block P ' here also has, at its upper edge, a recess for the formation of the concrete plug 7, which in this case has a ring shape. Here, too, are the pipe sockets. 8 and 9 set in concrete. After, the formation of the plug 7 is due to this. Body closed hole with cement
609 528/109609 528/109
F 14566 V/84 aF 14566 V / 84 a
mörtel gefüllt und dieser dann wie bei obigem Beispielen unter Druck gesetzt, d. h. verpreßt, nachdem der freie Raum um dein. Fertigpfahl mit; Filterkies ausgefüllt wurde.filled with mortar and then as in the examples above pressurized, d. H. compresses after the free space around your. Prefabricated pile with; Filter gravel has been filled out.
Claims (4)
Deutsche Patentschriften Nr. 286 333, 683 407.Referred publications:
German patent specifications No. 286 333, 683 407.
Family
ID=
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2318842A1 (en) | DEVICE AND METHOD FOR THE FORMATION OF PILLARS IN THE SOIL | |
EP3628782B1 (en) | Method for producing a foundation element free of peak pressure | |
EP2108744B1 (en) | Method for reinforcing supporting walls | |
DE3416679C2 (en) | ||
CH650542A5 (en) | METHOD FOR PRODUCING A SECONDED WALL FROM CONCRETE Piles, AND SECONDED WALL PRODUCED BY THE PROCESS. | |
DE4005032A1 (en) | Foundation pile supporting load in loose soil - has device to apply force between baseplate and pile | |
EP0788572B1 (en) | Building underpinning process | |
DE2544834C3 (en) | Device for sinking shafts in unstable rock | |
DE69938438T2 (en) | A CONCRETE ELEMENTS AND PILLAR METHOD EMBEDDED IN CONCRETE | |
DE970760C (en) | Process for the production of concrete piles in the ground by pressing the sunk borehole filled with aggregate with cement milk or the like while gradually withdrawing the press pipe | |
DE102005008679A1 (en) | Pile driving by head-, internal-, or vibration driving of pile tube, employs double-walled pile tube with filling of sand in annulus between walls | |
DEF0014566MA (en) | ||
DE19721361C2 (en) | Method of making piles and piles made in this way | |
DE102012214338B4 (en) | Method for producing an injection pile below a water surface | |
EP0333639B1 (en) | Method of constructing a sheet pile wall | |
DE19960023A1 (en) | Active foundation | |
DE10258300B4 (en) | Method and device for stabilizing abandoned mine shafts | |
EP1342852B1 (en) | Method for retaining and sealing of soil | |
EP3656926B1 (en) | Method for stabilizing and lifting building structures | |
DE2335378A1 (en) | METHOD AND DEVICE FOR DRIVING SHAFTS | |
EP0381665B1 (en) | Process and apparatus for forming a strand of single elements under water | |
EP1553230B1 (en) | Method for rehabilitating retaining walls | |
DE3716750A1 (en) | Method of constructing and sinking foundation structures | |
DE3543059A1 (en) | Method of stabilising soil sections | |
DE2521712A1 (en) | Corner stakes with widened lower ends - are compacted inside jacket column which is raised from ground |