DED0017703MA - - Google Patents
Info
- Publication number
- DED0017703MA DED0017703MA DED0017703MA DE D0017703M A DED0017703M A DE D0017703MA DE D0017703M A DED0017703M A DE D0017703MA
- Authority
- DE
- Germany
- Prior art keywords
- shaft
- road surface
- pile
- support
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004567 concrete Substances 0.000 claims description 15
- 239000003351 stiffener Substances 0.000 claims description 10
- 230000002787 reinforcement Effects 0.000 claims description 9
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 238000004519 manufacturing process Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 claims description 2
- 210000001503 Joints Anatomy 0.000 claims 1
- 210000003128 Head Anatomy 0.000 description 7
- 238000009415 formwork Methods 0.000 description 4
- 230000035882 stress Effects 0.000 description 3
- 210000001331 Nose Anatomy 0.000 description 2
- 235000021167 banquet Nutrition 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000036633 rest Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Description
BUNDESREPUBLIK DEUTSCHLANDFEDERAL REPUBLIC OF GERMANY
Tag der Anmeldung: 5. Mai 1954 Bekanntgemacht am 5. Juli 1956Registration date: May 5, 1954. Advertised on July 5, 1956
DEUTSCHES PATENTAMTGERMAN PATENT OFFICE
Fahrbahndecken aus Beton für Straßen, insbesondere Autobahnen, weisen in der heute allgemein üblichen und bekannten Ausführung Unzulänglichkeiten auf, die vor allem darin zu sehen sind, daß sie den Beanspruchungen, die durch die Belastungen des Verkehrs als Biegespannungen entstehen, sowie den Zug- und Druckspannungen, die in erster Linie aus Schwund und Temperaturänderungen resultieren, nicht in dem notwendigen ίο Umfang gewachsen sind.Concrete road pavements for roads, especially highways, are generally used today customary and well-known execution inadequacies, which can mainly be seen in it are that they withstand the stresses caused by the loads of traffic as bending stresses arise, as well as the tensile and compressive stresses, which primarily result from shrinkage and temperature changes result, have not grown to the necessary ίο extent.
Um die Anfertigung von Betonfahrbahndecken mit schlaffer, insbesondere aber auch mit Spannbewehrung wirtschaftlicher zu gestalten, wurde schon erwogen, die einzelnen Fahrbahnplatten auf netzwerkartig, gleichmäßig über die Fläche des Planums verteilte Lagerungen mit besonders ausgebildeten Lagerelementen aufzusetzen. Diese Lagerungen können z. B. aus gleichmäßig über das Planum verteilten Unterplatten aus Beton bestehen, wobei zwischen Fahrbahnplatte und Unter- platten besondere Lagerungsaggregate vorzusehen sind. Die Fahrbahnplatten können, statt auf netzwerkartig gleichmäßig über die gesamte Fläche der Fahrbahnplatte verteilte Lagerungen auch auf in Abständen voneinander angeordnete, leistenförmige Bankette aufgesetzt werden, wobei wiederum besonders gestaltete Lagerungsaggregate vorgesehen sind. Weiterhin hat man erwogen, dieAbout the production of concrete pavements with slack, but especially with prestressed reinforcement To make it more economical, the individual carriageway slabs have already been considered network-like, evenly distributed over the surface of the subgrade with specially designed bearings Put on bearing elements. These bearings can be, for. B. consist of concrete sub-slabs evenly distributed over the subgrade, with special storage units are to be provided. The pavement slabs can, instead of being network-like bearings evenly distributed over the entire surface of the deck strip-shaped banquets arranged at a distance from one another are placed, wherein In turn, specially designed storage units are provided. It has also been considered
6O9< 548/216O9 <548/21
D17703 V/19cD17703 V / 19c
Fahrbahndecke auf Stützpfählen aufruhen zu lassen, welche in Abständen, die in AbhängigkeitLet the road surface rest on supporting piles, which at intervals that depend on
..von der gewählten. Stärke.. und Bewehrung der..of the chosen one. Strength .. and reinforcement of the
Fahrbahnplatte stehen, gleichmäßig über dasStand the road slab evenly over the
; 5 Planum verteilt, niedergebracht werden.; 5 subgrade to be distributed, brought down.
Die Erfindung hat sich die Aufgabe gestellt, eine solche Auflagerung von Fahrbahndecken aus bewehrtem Beton auf Stützpfählen zu verbessern und zu verbilligen. Dabei werden sowohl durch die ίο Gestaltung der Stützpfähle und der Lagerungselemente als auch durch ein besonderes Verfahren der Niederbringung der Stützpfähle und der anschließenden Fertigung der Fahrbahndecke Vorteile erzielt.The invention has set itself the task of providing such a support from road pavements to improve reinforced concrete on support piles and to make it cheaper. Both the ίο Design of the support piles and the storage elements as well as by a special process the lowering of the supporting piles and the subsequent production of the road surface are advantages achieved.
Gemäß der Erfindung, können, gleichmäßig über die Fläche verteilt; über die sich später die Fahrbahndecke erstreckt, vorgefertigte Pfahlköpfe mit Hilfe einer Rammjungfer niedergebracht werden. Auf diese Pfahlköpfe werden, nachdem das Rammloch gegen nachrutschendes; Erdreich'·· durch ein vorübergehend eingebrachtes Mantelrohr gesichert ist, vorgefertigte Schaftmantelrohre aus Beton zentrisch aufgesetzt und mit Beton ausgeh gössen. Nach Anbringung einer Verschalung um .ag., das obere Ende des nunmehr ausgefüllten Schaftes wird das obere Schaftende, das zur Aufnahme des Gegenlagers der Lagerelemente dient, die eine gleitende Reibung zwischen Stützpfählen und Fahrbahndecke gewährleisten'•■sollen·;'-air-'Ort und Stelle gegossen. Anschließend können Längs-,,_._.steifen, _die. sich in Längsrichtung der Fahrbahn zwischen den oberen Enden der Pfahlschäfte erstrecken, in vorher angebrachten Schalungen ge-. gössen werden, so-daß: sie mit.den oberen Schaftenden eine monolithische Verbindung eingehen. Diese Längssteifen verhindern, daß die Stützpfähle durch die auf sie übertragenen Kräfte'b'ei Bewegungen der Fahrbahnplatte in der waagerechten Ebene, aus ihrer^senkrechten Lage heraus-, gedrückt werden. Nach Erhärten der Schaftfüllung, der oberen Schaftenden und der Längssteifen werden die Schalungen entfernt, worauf die Fahrbahndecke in bekannter Art und Weise gefertigt werden kann. - ■ According to the invention, can, evenly distributed over the area; over which later the road surface extends, prefabricated pile heads with Be brought down with the help of a Rammjungfer. After the Ram hole against slipping; Erdreich '·· through a temporarily inserted casing pipe is secured, prefabricated shaft casing pipes Concrete placed centrally and going out with concrete pour. After attaching a casing around .ag., The upper end of the now filled shaft is the upper end of the shaft, which is used to accommodate the counter bearing of the bearing elements, the one ensure sliding friction between support piles and road surface '• ■ should ·;' - air-'Ort and Body poured. Then longitudinal ,, _._. Stiffen, _the. extend in the longitudinal direction of the carriageway between the upper ends of the pile shafts, in previously attached formwork. are poured so-that: they with the upper shaft ends enter into a monolithic connection. These longitudinal stiffeners prevent the support piles through the forces transferred to them Movements of the deck slab in the horizontal plane, out of its ^ vertical position, be pressed. After the shaft filling, the upper shaft ends and the longitudinal stiffeners have hardened, the formwork is removed, whereupon the Road surface can be manufactured in a known manner. - ■
Die Längssteifen aus Beton, die zwischen den Auflagerenden der Stützpfahlschäfte eingezogen sind und die an Ort und Stelle in einer Verschalung gefertigt werden, um eine monolithische Verbindung mit den-.-Pfahlschaf.ten sicherzustellen, sind unbewehrt, liegen über dem Planum und können beliebigen, insonderheit aber quadratischen oder runden Querschnitt haben. Sie verhindern, wie schon gesagt, daß die Stützpfähle aus der lotrechten in eine schräge Lage gedruckt werden können, womit eine sehr nachteilige Vergrößerung der Reibung zwische'n dem oberen, in die Fahr-■ bahnplatte eingegossenen Teil des eigentlichen Lagerelementes und dessen unterem Teil im Auf-, lagerende des Stützpfahles verbunden wäre. Die Lagerelemente, zur Aufnahme der gleitenden Reibung zwischen Fahrbahndecke und Stützpfählen bestehen aus in die-Unterseite der Fahrbahndecke bündig eingelassenen Gleitplatten aus Stahl und in das obere Ende der Pfahlschäfte eingelassenen, bolzenförmigen Gegenlagern, ebenfalls aus Stahl, auf denen die Gleitplatten bei Bewegungen der Fahrbahndecke in der waagerechten Ebene gleiten. Um die Reibung möglichst gering zu halten, ist die obere Stirnfläche des bolzenförmigen1 Gegenlagers leicht gewölbt, so daß die Gleitplatte nicht auf der ganzen Fläche ...des Gegenlagers aufliegt, sondern nur auf ■ dem Scheitelpunkt dieser gewölbten Stirnfläche.The longitudinal stiffeners made of concrete, which are drawn in between the bearing ends of the support pile shafts and which are made on the spot in a formwork to ensure a monolithic connection with the -.- pile shafts, are unreinforced, lie above the subgrade and can be but in particular have a square or round cross-section. As already said, they prevent the support piles from being pushed out of the vertical position into an inclined position, which results in a very disadvantageous increase in the friction between the upper part of the actual bearing element, which is cast into the roadway slab, and its lower part in the Supporting end of the support pile would be connected. The bearing elements, for absorbing the sliding friction between the road surface and the support piles, consist of steel sliding plates set flush with the underside of the road surface and bolt-shaped counter bearings, also made of steel, on which the sliding plates move when the road surface moves slide on the horizontal plane. In order to keep the friction as low as possible, the upper face of the bolt-shaped 1 counter bearing is slightly curved so that the sliding plate does not rest on the entire surface ... of the counter bearing, but only on the apex of this curved face.
Die Stützpfähle bestehen aus einem vorgefertigten Pfahlkopf, auf den nach Niederbringung mit Hilfe von einem auf dem Pfahlkopf befindlichen Zentrierlöch und einer, dieses Loch ringförmig umgebenden Zentriernase, ein ebenfalls vorgefertigtes Mantelrohr aus Beton zentrisch aufgesetzt wird. Dieses Mantelrohr, das den Mantel des Schaftes der Stützpfähle bildet, vergrößert an seinen beiden Enden seinen lichten Durchmesser. Dadurch wird erreicht, daß das Mantelrohr nach Ausgießen mit Beton mit diesem eingegossenen Kern eine feste und nicht mehr trennbare Einheit bildet. Das zur Aufnahme des Gegenlagers dienende obere Ende des Schaftes erhält eine schraubenförmige Bewehrung. Der oberste Gang dieser schraubenförmigen Bewehrung umschließt, sich verengend, das bolzenförmige Gegenlager.The support piles consist of a prefabricated pile head which is placed on top after it has been lowered with the help of a centering hole located on the pile head and one, this hole in the shape of a ring surrounding centering nose, a likewise prefabricated casing pipe made of concrete placed centrically will. This jacket tube, which forms the jacket of the shaft of the support piles, is enlarged its inner diameter at both ends. This ensures that the jacket pipe after Pouring with concrete with this poured-in core creates a solid and no longer separable unit forms. The upper end of the shaft serving to accommodate the counter bearing receives a helical reinforcement. The top corridor of this helical reinforcement encloses narrowing, the bolt-shaped counter-bearing.
Weitere Merkmale der Erfindung und Einzelheiten der durch dieselben erzielten Vorteile ergeben sich aus der nachstehenden Beschreibung einer in der. Zeichnung dargestellten AusführungsmöglichkeitV""" ,..,.-..„.---.„..- ^Further features of the invention and details of the advantages achieved thereby result can be derived from the description below of one in the. Design shown in the drawing V "" " , .., .- .. ".---." ..- ^
Fig. ι zeigt einen Ausschnitt der erfindungsgemäßen Fahrbahndecke: im Längsschnitt; Fig. 2 zeigt dieselbe im Querschnitt, Fig. 3 im Grundriß;Fig. Ι shows a section of the invention Road surface: in longitudinal section; Fig. 2 shows the same in cross section, Fig. 3 in plan;
Fig. 4 stellt einen erfindungsgemäßen Stützpfahl mit Einzelheiten seines Aufbaues dar;Fig. 4 shows a support pile according to the invention with details of its construction;
Fig. 5 zeigt.diesen. Pfahl, im Schnitt V-V der Fig. 4/ 'Fig. 5 shows this. Pile, in section V-V of the Fig. 4 / '
Mit r ist die an sich bekannte Fahrbahndecke aus Beton mit vorzugsweise vorgespannter Bewehrung bezeichnet. Die Querbewehrungen 2 und die Längsbewehrungen 3 sind angedeutet. Die Fahrbahnplatte ι sitzt unter Zwischenschaltung der Lagerelemente 5 auf den Stützpfählen 4 auf. In Längsrichtung der Fahrbahn verlaufen zwischen den Auflagerenden der Schäfte der Stützpfähle 4 Längssteifen 6.With r is the known road surface made of concrete with preferably prestressed reinforcement designated. The transverse reinforcements 2 and the longitudinal reinforcements 3 are indicated. the Roadway plate ι sits on the support piles 4 with the interposition of the bearing elements 5. The support piles 4 run in the longitudinal direction of the roadway between the bearing ends of the shafts Longitudinal stiffeners 6.
Der in Fig. 4 in größerem Maßstab dargestellte Stützpfahl besteht aus einem vorgefertigten Pfahlkopf 7, der mit Hilfe einer Rammjungfer im Planum bis auf die vorgesehene Tiefe niedergebracht wird/. Nach Niederbringung des Pfahlkopfes 7 wird vorübergehend ein Mantelrohr 8 in das Rammloch eingebracht, um zu verhindern, daß das „Erdreich nachrutscht, solange das vorgefertigte Betonrohr 9, das den Mantel des Pfahlschaftes bildet, noch nicht versetzt ist. Dieses vorgefertigte Betonrohr 9 wird zentrisch auf den ■ Pfahlkopf 7 aufgesetzt, was mit Hilfe des Zentrierloches 10 und der Zentriernase 11, die an dem Pfahlkopf 7 angebracht sind, geschieht. Nach Auf-The one shown in Fig. 4 on a larger scale Support pile consists of a prefabricated pile head 7, which with the help of a Rammjungfer in the Subgrade is sunk to the intended depth /. After the pile head has been lowered 7 a casing pipe 8 is temporarily inserted into the ram hole to prevent the "earth slips as long as the prefabricated concrete pipe 9, which is the jacket of the pile shaft forms, has not yet been moved. This prefabricated concrete pipe 9 is centered on the ■ Pile head 7 placed what with the help of the centering hole 10 and the centering nose 11, which is attached to the Pile head 7 are attached, happens. After opening
548/21548/21
D17703 V/19cD17703 V / 19c
setzen des Mantelrohres 9 wird dieses mit Beton ausgegossen. Dieser Kern 12 des Pfahlschaftes füllt auch die Erweiterungen 13 des lichten Durchmessers des Mantelrohres an den beiden Enden aus, so daß nach Erhärten des Schaftkernes dieser eine untrennbare Einheit mit dem Schaftmantel bildet. Nach Anbringung einer Verschalung wird das z.ur Aufnahme des Gegenlagers des Lagerungselementes dienende obere Schaftende 14 des Schaftes gegossen. Das Schaftende 14 enthält eine schraubenfederförmige Bewehrung 15, dessen oberster Gang 16 sich, seinen Durchmesser verengend, um das bolzenförmige Gegenlager 17 des Lagerelementes legt. Auf diesem bolzenförmigen Gegenlager 17 gleitet die bündig in die Fahrbahndecke eingelassene Gleitplatte 18. Die Fläche des Gegenlagers 17, auf dem die Gleitplatte 18 aufruht, ist, um eine Verminderung der Reibung zu erreichen, leicht gewölbt ausgeführt.put the jacket pipe 9 this is poured with concrete. This core 12 of the stake shaft also fills the extensions 13 of the inside diameter of the jacket pipe at the two ends off, so that after hardening of the shaft core it becomes an inseparable unit with the shaft jacket forms. After a casing has been attached, the upper shaft end 14 of the Cast shaft. The shaft end 14 contains a helical spring-shaped reinforcement 15, the uppermost passage 16, narrowing its diameter, around the bolt-shaped counter bearing 17 of the Storage element sets. On this bolt-shaped counter-bearing 17, the slides flush into the road surface recessed sliding plate 18. The surface of the counter bearing 17 on which the sliding plate 18 rests, is slightly curved in order to reduce friction.
. Noch vor Erhärten des Gegenlagerendes der Stützpfähle werden in einer vorher angebrachten Verschalung die Längssteifen 6 gefertigt, die beliebigen, z. B. quadratischen Querschnitt haben können. Sie werden zusammen mit dem Gegenlagerende der Stützpfähle betoniert, so daß eine monolithische Verbindung zwischen Pfahlschäften und Längssteifen sichergestellt ist.. Before the end of the counter bearing has hardened, the support piles are attached in advance Formwork made of the longitudinal stiffeners 6, the arbitrary, z. B. have a square cross-section be able. They are concreted together with the opposite end of the support piles, so that one monolithic connection between pile shafts and longitudinal stiffeners is ensured.
Claims (9)
Family
ID=
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3441527A1 (en) | Shut-off device for preventing the passage of land vehicles | |
DE3215153A1 (en) | Retaining structure and method of producing a retaining structure | |
AT391506B (en) | DEVICE FOR EXHAUSTING HEAT IN THE GROUND FLOOR OR TO RECOVER HEAT FROM THE GROUND FLOOR | |
DE102007046249B4 (en) | Track with glued troughs | |
DE2649936C2 (en) | Reinforced concrete tanks and method of erecting the same | |
CH676015A5 (en) | ||
DE3335141C2 (en) | ||
DE3318050A1 (en) | METHOD FOR PRODUCING AN ARMED CONCRETE SUPPORT ELEMENT | |
AT380502B (en) | METHOD AND DEVICE FOR WIDING RUNWAY PANELS, BRIDGE ROADWAYS OR THE LIKE. | |
DE2233263A1 (en) | CONSTRUCTION PROCEDURES FOR UNDERPASSES (RAILWAYS, ROADS) IN PARTICULAR FOR CASES WHERE TRAFFIC MUST NOT BE INTERRUPTED ON THE ROUTE TO BE UNDERPASSED | |
DED0017703MA (en) | ||
AT360574B (en) | SUPPORT AND LINING WALL | |
DE975604C (en) | Road surface, bank reinforcement, etc. like | |
DE3131725C2 (en) | Noise barrier | |
DE3240331C2 (en) | Cornice cap for bridges or the like | |
AT385553B (en) | Foundation which is anchored in the ground and is intended for fastening structural parts, in particular uprights, masts or the like | |
EP0056422A1 (en) | Process and falsework for constructing bridges of reinforced concrete | |
DE1153048B (en) | Prefabricated concrete slab for making or repairing concrete roads | |
DE220530C (en) | ||
DE1459763A1 (en) | Mountable road and path support | |
DE3039080A1 (en) | RECOVERABLE REINFORCEMENT ELEMENT FOR A GROUND ANCHOR | |
DE2105432C3 (en) | Process for the production of a longitudinally prestressed composite pile | |
AT388406B (en) | Pile foundation structure and apparatus and concreting tank for producing the same | |
DE3415738C2 (en) | ||
AT357328B (en) | LOST FORMWORK FOR A FOUNDATION OF A SUPPORTING COMPONENT |