DE964850C - Bucket wheel excavator that can work in deep and / or high cut, and working methods for such an excavator - Google Patents

Bucket wheel excavator that can work in deep and / or high cut, and working methods for such an excavator

Info

Publication number
DE964850C
DE964850C DEA17045A DEA0017045A DE964850C DE 964850 C DE964850 C DE 964850C DE A17045 A DEA17045 A DE A17045A DE A0017045 A DEA0017045 A DE A0017045A DE 964850 C DE964850 C DE 964850C
Authority
DE
Germany
Prior art keywords
excavator
bucket wheel
wheel
boom
paddle wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEA17045A
Other languages
German (de)
Inventor
Dipl-Ing Urban Hummel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aktiengesellschaft fuer Unternehmungen der Eisen und Stahlindustrie
Original Assignee
Aktiengesellschaft fuer Unternehmungen der Eisen und Stahlindustrie
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aktiengesellschaft fuer Unternehmungen der Eisen und Stahlindustrie filed Critical Aktiengesellschaft fuer Unternehmungen der Eisen und Stahlindustrie
Priority to DEA17045A priority Critical patent/DE964850C/en
Application granted granted Critical
Publication of DE964850C publication Critical patent/DE964850C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/18Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels
    • E02F3/183Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels with digging unit shiftable relative to the frame
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/18Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Description

Schaufelradbagger, der im Tief- und/oder im Hochschnitt arbeiten kann, und Arbeitsverfahren für einen solchen Bagger Die Erfindung bezieht sich auf Schaufelradbagger, die im Tief- und/oder im Hochschnitt arbeiten können und deren Schaufelrad einen sich über die Böschung erstreckenden Ausleger umschließt und auf diesem verfahrbar ist, wobei die Drehachse des Schaufelrades in einer lotrechten Ebene parallel zur Längsachse des Auslegers liegt. Bucket wheel excavators that work in deep and / or high cut can, and working procedures for such an excavator The invention relates to Bucket wheel excavators that can work in deep and / or high cut and their Bucket wheel encloses a boom extending over the slope and on this is movable, the axis of rotation of the paddle wheel in a perpendicular Plane is parallel to the longitudinal axis of the boom.

Die Erfindung bezweckt, den Schaufelradausleger, längs dessen das Schaufelrad über die Böschung verfahren wird, in der Weise an dem Baggergerüst zu befestigen, daß auch bei großen Auslegerlängen ein einwandfreies Arbeiten des Schaufelrades sowohl im Tiefschnitt als auch im Hochschnitt gewährleistet ist. Dies wird gemäß der Erfindung in erster Linie dadurch erreicht, daß das äußere Ende des Schanfelradauslegers mittels eines Zuggliedes an einem Träger in einem solchen Abstand aufgehängt ist, daß das Schaufelrad beim Arbeiten an dilesem Ende des Schaufelradauslegers durch den Träger nicht behindert wird, wobei der Träger am Baggergerüst in der Höhen richtung schwenkbar gelagert ist und sich bis in den Bereich oberhalb des äußeren Endes des SchaufelraÇdauslegers erstreckt, während das andere Ende des Schaufelradauslegers an dem Baggergerüst in einem Gelenk befestigt ist, welches so angeordnet ist, daß es dann, wenn das Schaufelrad im Tiefschnitt an der Böschungskante arbeitet, oberhalb des Schaufelrades im Bereich seiner Mittelebene liegt. Ein solcher Bagger arbeitet gemäß einem weiteren Schritt der Erfindung mit einer Spanhöhe, wie sie im Blockbetrieb üblich ist (z. B. mit einer Spanhöhe, die gleich o,7mal dem Schaufelraddurchmesser ist), in der Weise, daß sich die Füllung der Schaufeln während der Bewegung des Schaufelrades längs des Schaufelradauslegers die Böschung herauf oder hinunter vollzieht und der Bagger längs der Strosse nur nach Maßgabe der Spanstärke fortschreitet.The invention aims, the bucket wheel boom, along which the Bucket wheel is moved over the embankment in the manner on the excavator frame ensure that the paddle wheel works properly even with large boom lengths is guaranteed both in the low cut and in the high cut. This is done according to the invention primarily achieved in that the outer end of the Schanfelradauslegers is suspended from a beam at such a distance by means of a tension member, that the paddle wheel through when working at dilesem end of the paddle wheel arm the carrier is not obstructed, the carrier on the excavator frame in the vertical direction is pivotably mounted and extends to the area above the outer end of the Bucket wheel boom extends, while the other end of the bucket wheel boom is attached to the excavator frame in a joint which is arranged so that it when the paddle wheel is deep-cut at the edge of the slope works, is above the paddle wheel in the area of its median plane. Such a Excavator works according to a further step of the invention with a chip height, such as it is common in block operation (e.g. with a chip height equal to 0.7 times the Impeller diameter is), in such a way that the filling of the blades during the movement of the bucket wheel along the bucket wheel boom up the slope or down and the excavator along the bench only according to the chip thickness progresses.

In der Zeichnung ist ein Ausführungsbeispiel des Erfindungsgegenstandes dargestellt, und zwar zeigt Fig. 1 eine Ansicht eines Schaufelradbaggers nach der Erfindung, in Richtung der Strosse gesehen, und Fig. 2 in größerem Maßstab einen Querschnitt durch den Schaufelradausleger mit einer Ansicht des Schaufelrades. The drawing shows an embodiment of the subject matter of the invention shown, namely Fig. 1 is a view of a bucket wheel excavator according to the Invention, seen in the direction of the stope, and FIG. 2 on a larger scale Cross section through the bucket wheel boom with a view of the bucket wheel.

Das Schaufelrad I ist auf einem sich über die Böschung hinweg erstreckenden Ausleger 2 die Böschung herauf oder hinunter verfahrbar, wobei es in der Weise angeordnet- ist, daß seine Drehachse parallel zu der Verschiebungsrichtung liegt. The paddle wheel I is on one that extends over the slope Boom 2 can be moved up or down the embankment, being arranged in the manner is that its axis of rotation is parallel to the direction of displacement.

Die Mittelebene des Schaufelrades steht also senkrecht auf der Ebene des Böschungsprofilschnittes.The center plane of the paddle wheel is therefore perpendicular to the plane of the slope profile section.

Die Aufhängung des Schaufelradauslegers am Baggergerüst ergibt sich aus dem Nachstehenden.The suspension of the bucket wheel arm on the excavator frame results from the following.

Der Baggeroberban ist auf dem auf Raupen verfahrbaren Unterbau 3 z. B. mittels eines Kugelkranzes um eine lotrechte Achse schwenkbar gelagert. An dem Turm 4 des Baggeroberbaues sitzt einerseits ein Gegengewichts ausleger 5, der über den seitlich schwenkbaren Verladeausleger 6 hinweggrei ft, und andererseits ein nach der Böschung hin gerichteter Kragarm 7. An dessen Ende befindet sich ein Gelenk 8 mit waagerechter Achse, in dem ein Fachwerkträger 9 sowie ein Mast 10 gelagert sind. Die spitze des Mastes 10 ist durch Zugmittel II, z. B. Seile, mit dem Träger 9 verbunden. An der Mastspitze greift ferner ein Seilzug I2 an, der von dem Baggeroberbau 4 ausgeht und dessen Winde I3 im Gegengewichtsausleger 5 liegt. An dem freien Ende des Trägers 9 ist das äußere Ende des Schaufelradauslegers 2 mittels eines Zuggliedes 14 aufgehängt, das vorzugsweise so ausgebildet ist, daß es auch Seitenkräfte, d. h. The upper deck of the excavator is on the base 3, which can be moved on caterpillars z. B. mounted pivotably about a vertical axis by means of a ball ring. At the tower 4 of the excavator superstructure sits on the one hand a counterweight boom 5, the over the laterally pivotable loading arm 6 weggrei ft, and on the other hand a cantilever arm 7 directed towards the embankment. At its end there is a Joint 8 with a horizontal axis in which a truss 9 and a mast 10 are mounted are. The top of the mast 10 is by traction means II, z. B. ropes, with the carrier 9 connected. A cable I2 from the excavator superstructure also engages at the top of the mast 4 goes out and the winch I3 is in the counterweight boom 5. At the free end of the carrier 9 is the outer end of the bucket wheel arm 2 by means of a tension member 14, which is preferably designed so that there are also side forces, i. H.

Kräfte in Strossenrichtung, aufzunehmen vermag.Forces in the direction of the stop, able to absorb.

Unterhalb des Gelenkes 8 befindet sich an dem Kragarm 7 ein weiteres Gelenk I5, in dem das der Baggerfahrbahn zugewandte Ende des Schaufelradauslegers 2 befestigt ist. Dies geschieht mittels eines an diesem Ende des Schaufelradauslegers befindlichen Anfbanes 16 mit einem sich nach der Böschung hin erstreckenden Arm I7, dessen Ende in dem Gelenk 15 gelagert ist. Durch diese U-förmige Konstruktion wird erreicht, daß das Schaufelrad 1 bis zum Ende des Schaufelradauslegers 2 an der Böschungskante (18 bei Tiefschnitt) bzw. am Böschungsfuiß (bei Hochschnitt) verfahren werden kann, wie es in Fig. 1 für den Fall des Tiefschnittes mit gestrichelten Linien dargestellt ist.Below the joint 8 there is another on the cantilever arm 7 Joint I5, in which the end of the bucket wheel arm facing the excavator track 2 is attached. This is done by means of one at this end of the bucket wheel arm located Anfbanes 16 with an arm extending towards the embankment I7, the end of which is mounted in the joint 15. Because of this U-shaped construction it is achieved that the bucket wheel 1 up to the end of the bucket wheel arm 2 the slope edge (18 for low cut) or at the base of the slope (for high cut) can be proceeded as in Fig. 1 for the case of the deep section with dashed lines Lines is shown.

Mittels des Seilzuges 12 kann der Träger 9 so eingestellt werden, daß der Schaufelradausleger 2 sowohl im Tiefschnitt (Darstellung mit ausgezogenen Linien in Fig. I) als auch im Hochschnitt (Darstellung in gestrichelten Linien) parallel zu der Böschungsprofillinie liegt. Dabei ist zwischen dem Träger 9 und dem Schaufelradausleger 2 stets auf der ganzen Länge des Auslegers ein genügend großer freier Raum vorhanden, so daß das Schaufelrad I ungehindert von einem Ende des Schaufelradauslegers bis zum anderen verfahren werden kann. By means of the cable 12, the carrier 9 can be adjusted so that that the bucket wheel arm 2 both in deep section (representation with extended Lines in Fig. I) as well as in vertical section (shown in dashed lines) lies parallel to the embankment profile line. It is between the carrier 9 and the bucket wheel boom 2 is always sufficient over the entire length of the boom large free space available so that the paddle wheel I unhindered from one end the bucket wheel arm can be moved to the other.

Würden die von dem Mast 10 ausgehenden Zugglieder 11 statt an dem Träger 9 an dem äußeren Ende des Schaufelradauslegers 2 angreifen, so würde dieser durch erhebliche, in seiner Längsrichtung parallel wirkende Druckkräfte beansprucht werden, die um so größer wären, je länger der Ausleger ist und die als Knickkräfte wirken. Dadurch, daß die Zugmittel II nicht an dem Schaufelradausleger 2, sondlern an dem Träger g angreifen, werden die von diesen Zugmitteln ausgehenden, parallel zum Schaufelradausleger wirkenden Kräfte von diesem ferngehalten. Da andererseits der Träger g nicht als Fahrbahn für das Schaufelrad dient, bereitet es keine Schwierigkeiten, ihn so kräftig auszubilden, daß er allen Beanspruchungen gewachsen ist. Would the outgoing from the mast 10 tension members 11 instead of the Attack carrier 9 on the outer end of the bucket wheel arm 2, so this would stressed by considerable compressive forces acting in parallel in its longitudinal direction which would be the greater the longer the boom and the buckling forces works. Due to the fact that the traction mechanism II does not detract from the bucket wheel arm 2 attack on the carrier g, the outgoing from these traction means are parallel Forces acting on the bucket wheel arm are kept away from this. There on the other hand the carrier g does not serve as a roadway for the paddle wheel, it does not cause any difficulties, to train it so vigorously that it can cope with all demands.

Das Gelenk 15, in dem der Schaufelradausleger 2 mit seinem der Baggerfahrbahn zugewandten Ende an dem Baggeroberbau gelagert ist, ist so angeordnet, daß es dann, wenn das Schaufelrad I bei Tiefschnitt an der Böschungskante 18 arbeitet (vgl. in Fig. 1 die Darstellung des Schaufelrades in gestrichelten Linien), in der Nähe der Mittelebene des Schaufelrades liegt. Hierdurch wird erreicht, daß das Schaufelrad im Hochschnitt die Böschung bis zum Planum der Baggerfahrbahn hinunter bearbeiten kann. The joint 15, in which the bucket wheel arm 2 with its the excavator track facing end is mounted on the excavator superstructure is arranged so that it is then if the bucket wheel I works at the slope edge 18 during deep cut (cf. in Fig. 1 shows the impeller in dashed lines), in the vicinity of the The center plane of the paddle wheel is located. This ensures that the paddle wheel Work the embankment down to the level of the excavator track in a vertical section can.

Das Schaufelrad ist in an sich bekannter Weise so angeordnet, daß es den Schaufeiradausleger 2 umschließt. Wie Fig. 2 zeigt, ist der die Schaufeln I8 tragende Ring 19 auf Rollen 20 des Schaufelradkörpers 21 gelagert. Dieser hat eine rechteckige Öffnung, durch welche der Schaufelradausleger 2 hindurchgeführt ist. Der Schaufelradkörper 21 hängt an dem Schaufelradausleger 2 unter Vermittlung von Rollen 22, die auf Schienen 23 auf dem Obergurt des Schaufelradauslegers laufen. The paddle wheel is arranged in a manner known per se so that it encloses the paddle boom 2. As Figure 2 shows, this is the blades I8 bearing ring 19 is mounted on rollers 20 of the impeller body 21. This one has a rectangular opening through which the bucket wheel arm 2 is passed is. The bucket wheel body 21 is suspended from the bucket wheel arm 2 through intermediation of rollers 22 that run on rails 23 on the top belt of the bucket wheel boom.

Auch an dem Untergurt des Auslegers 2 sind Schienen 24 befestigt, gegen dile sich von unten her an dem Schaufelradkörper 21 sitzende Rollen 25 legen, welche ein Abheben der oberen Rollen 22 von den Schienen 23 verhindern. Zur seitlichen Führung des Schaufelradkörpers 21 dienen weitere in dem Schaufelradkörper 21 gelagerte Rollen 26, die sich von den Seiten her gegen die beiden oberen und die beiden unteren Schienen 23 bzw. 24 legen.Rails 24 are also attached to the lower chord of boom 2, against which rollers 25 are placed from below on the paddle wheel body 21, which prevent the upper rollers 22 from lifting off the rails 23. To the side The impeller body 21 is guided by additional ones mounted in the impeller body 21 Rollers 26 that extend from the sides against the top two and the bottom two Lay rails 23 or 24.

Die Schaufeln I8 werden in bekannter Weise, wenn sie sich dem Scheitel des Rades nähern, in einen im Schaufelradkörper 21 sitzenden Schütt- trichter 27 entleert, aus dem das Gut auf ein im Schaufelradausleger 2 verlegtes Förderband 28 fällt. The blades I8 are in a known manner when they reach the apex approach the wheel, in a seated in the paddle wheel body 21 pouring funnel 27 emptied, from which the material is transferred to a conveyor belt installed in the bucket wheel arm 2 28 falls.

Von dem Schaufelradauslegerförderband 28 gelangt das Gut über zwei hintereinandergeschaltete Zwischenbänder 29, 30 in den Bereich der Schlwenkachse des Gerätes, wo es über ein zweites Zwischenband 3I auf das Verladehand 32 abgegeben wird. From the bucket wheel boom conveyor belt 28, the material arrives via two Intermediate belts 29, 30 connected in series in the area of the Schlwenkachse of the device, where it is delivered to the loading hand 32 via a second intermediate belt 3I will.

Das Gut kann aber auch abweichend von der Darstellung in Fig. I in der Schwenkmitte des Gerätes durch Schurren nach unten auf eine dort verlegte Bandstrosse aufgegeben werden.However, the good can also deviate from the representation in FIG the swivel center of the device by purring downwards onto a belt rope laid there to be abandoned.

Das Zwischenband 29 wird in der Weise beweglich gelagert, daß es einerseits bei allen vorkommenden Neigungen des Schaufelradauslegers 2 im Tiefschnitt sowie im Hochschmtt unterhalb des Abwurfendes des Schaufel radauslegerbandes 28 liegt und andererseits stets noch das Gut auf das ihm nachgeschaltete Zwischenband 30 abwirft. The intermediate belt 29 is movably mounted in such a way that it on the one hand with all inclinations of the bucket wheel boom 2 in the deep section as well as in the Hochschmtt below the discharge end of the bucket wheel boom belt 28 and on the other hand still the goods on the intermediate belt connected downstream 30 drops.

Der Bagger arbeitet wie folgt. Das Schaufelrad I wird an der Böschung mit einer Spanstärke, wie sie in Fig. 2 mit s bezeichnet ist, und mit einer Spanhöhe k angesetzt. Die letztere wird so groß gewählt, wie es bei Hochbaggern im Blockbetrieb üblich ist, z. B. ist die Spannhöhe gleich 0,7mal dem Schaufel raddurchmesser, Das Schaufelrad wird bei stillstehendem Bagger auf dem Schaufelradausleger 2 die Böschung hinunter oder die Böschung herauf verfahren, wobei die Schaufeln gefüllt werden. Wenn das Schaufelrad I am unteren oder am oberen Ende des Schaufelradauslegers 2 angelangt ist, schreitet der Bagger um eine Strecke fort, die gleich der Spanstärke s ist. Durch diese Arbeitsweise wird eine große Leistung erzielt, wobei das Gerät nur geringe Wege zurückzulegen braucht, so daß die Fahrwerke geschont werden. The excavator works as follows. The paddle wheel I is on the embankment with a chip thickness as denoted by s in FIG. 2, and with a chip height k applied. The latter is chosen to be as large as it is for high excavators in block operation is common, e.g. B. the clamping height is equal to 0.7 times the blade wheel diameter, Das When the excavator is at a standstill, the bucket wheel becomes the embankment on the bucket wheel arm 2 go down or up the embankment filling the buckets. If the bucket wheel I at the lower or at the upper end of the bucket wheel boom 2 is reached, the excavator advances a distance equal to the chip thickness s is. This mode of operation achieves great performance, with the device only needs to cover short distances, so that the undercarriages are spared.

Wenn im Tiefschnitt das Schaufelrad in die in Fig. I dargestellte Lage am Böschungsfuß 33 angelangt ist, ist zunächst noch eine dem Dreieck 33, 34, 35 entsprechende Rippe auf dem unteren Planum stehengeblieben. Dilese Rippie kann man dadurch wegnehmen, daß man durch Betätigung des Seilzuges 12 den Schaufelradausleger 2 anhebt und gleichzeitig das Schaufelrad 1 nach dem äußeren Ende des Auslegers 2 hin verfährt, und zwar in der Weise, daß sich das Schaufelrad mit seinem untersten Punkt in Höhe des Planums bewegt. If in the deep section the paddle wheel is in the one shown in FIG Position has reached the embankment foot 33, is initially still a triangle 33, 34, 35 corresponding rib remained on the lower subgrade. Dilese Rippie can you take away by operating the cable 12, the bucket wheel boom 2 lifts and at the same time the paddle wheel 1 to the outer end of the boom 2 moves out, in such a way that the paddle wheel with its lowest Point moved at the level of the subgrade.

Das Schaufelrad kann auch auf einem auf dem Schaufelradausleger verfahrbaren Fahrgestell in der Weise gelagert sein, daß es um eine waagerechte, senkrecht zum Ausleger 2 liegende Achse innerhalb gewisser Grenzen geschwenkt werden kann. The paddle wheel can also be moved on a paddle wheel arm Chassis be mounted in such a way that it is horizontal, perpendicular to the Cantilever 2 lying axis can be pivoted within certain limits.

Abweichend von der dargestellten Bauart kann auch der Kragarm 7 weggelassen werden; der Träger 9 und der Schaufelradausleger 2 werden dann unmitbelbar an dem Baggeroberbau gelagert. In a departure from the type shown, the cantilever arm 7 can also be omitted will; the carrier 9 and the bucket wheel arm 2 are then inevitable on the Excavator superstructure stored.

Die Gelenke 8 und I5, in denen der Träger g und der Schaufelradausleger 2 an dem Baggeroberban befestigt sind, können auch quer zur Strossenrichtung verschiebbar angeordnet werden, wobei ein Vorschubwerk vorgesehen wird.The joints 8 and I5, in which the carrier g and the bucket wheel boom 2 are attached to the excavator upper rail, can also be displaced transversely to the bench direction be arranged, wherein a feed mechanism is provided.

Claims (4)

PATENTANSPRÜCHE: I. Schaufelradbagger, der ilm Tief- und/oder im Hochschnitt arbeiten kann und dessen Schaufelrad einen sich über die Böschung erstreckenden Ausleger umschließt und auf diesem verfahrbar ist, wobei die Drehachse des Schaufelrades einer lotrechten Ebene parallel zur Längsachse des Auslegers liegt, dadurch gekennzeichnet, daß das äußere Ende des Schaufelradauslegers (2) mittels eines Zuggliedes (I4) an einem Träger (g) in einem solchen Abstand aufgehängt ist, daß das Schaufelrad (I) beim Arbeiten an diesem Ende des Schaufelradauslegers (2) durch den Träger (g) nicht behindert wird, wobei der Träger (g) am Baggergerüst (4) in der Höhenrichtung schwenkbar gelagert ist und sich bis in den Bereich oberhalb des äußeren Endes des Schaufelradauslegers (2) erstreckt, während das andere Ende des Schaufel radauslegers (2) an dem Baggergerüst (7) in einem Gelenk (I5) befestigt ist, welches so angeordnet ist, daß es dann, wenn das Schaufelrad im Tiefschnitt an der Böschungskante (I8) arbeitet, oberhalb des Schaufelrades im Bereich seiner Mittelebene liegt. PATENT CLAIMS: I. Bucket wheel excavators, the ilm deep and / or im High cut can work and its paddle wheel extends over the slope The boom encloses and can be moved on this, the axis of rotation of the paddle wheel a perpendicular plane parallel to the longitudinal axis of the boom, characterized in that that the outer end of the bucket wheel arm (2) by means of a tension member (I4) a carrier (g) is suspended at such a distance that the paddle wheel (I) when working on this end of the bucket wheel arm (2) through the carrier (g) not is hindered, the carrier (g) on the excavator frame (4) being pivotable in the vertical direction is mounted and extends to the area above the outer end of the bucket wheel arm (2) extends while the other end of the bucket wheel arm (2) on the excavator frame (7) is fastened in a joint (I5) which is arranged so that it then if the paddle wheel works in deep cut on the slope edge (I8), above of the paddle wheel lies in the area of its median plane. 2. Schaufelradbagger nach Anspruch I, dadurch gekennzeichnet, daß der Schaufelradiausleger (2) an seinem der Baggerfahrbalin zugewanten Ende einen Aufbau (I6) mit einem pach der Böschung hinweisenden Kragarm (I7) trägt, mittels dessen der Schaufelradausleger an dem Baggergerüst (7) aufgehängt ist. 2. Bucket wheel excavator according to claim I, characterized in that the bucket radius boom (2) at its end facing the excavator chassis Structure (I6) with a cantilever arm (I7) pointing towards the slope, by means of whose bucket wheel boom is suspended from the excavator frame (7). 3. Schaufelradbagger nach Anspruch I, dadurch gekennzeichnet, daß die Gelenke (8, 15), in denen der Schaufelrad, ausleger (2) und der diesen tragende Träger (9) an dem Bagger gerüst (4, 7) befestigt sind, quer zur Strossenrichtung unter Vermittlung eines Vorschubwerkes verschiebbar gelagert sind. 3. Bucket wheel excavator according to claim I, characterized in that the joints (8, 15), in which the paddle wheel, boom (2) and this supporting Carrier (9) on the excavator frame (4, 7) are attached transversely to the bench direction are mounted displaceably by means of a feed mechanism. 4. Arbeitsverfahren für einen Bagger nach Anspruch I, dadurch gekennzeichnet, daß das Schaufelrad (I) mit einer Spannhöhe (h), wie sie im Blockbetrieb üblich ist, z. B. mit einer Spanhöhe, die etwa gleich o,7mal dem Schaufelraddurchmesser ist, in der Weise arbeitet, daß sich die Füllung der Schaufeln während der Bewegung des Schaufelrades (I) längs des Schaufelradauslgegers (2) die Böschung herauf oder hinunter vollzieht und der Bagger längs der Strosse nur nach Maßgabe der Spanstärke (s) fortschreitet. 4. Working method for an excavator according to claim I, characterized in that that the paddle wheel (I) with a clamping height (h), as is usual in block operation is e.g. B. with a chip height that is approximately equal to 0.7 times the impeller diameter is, works in such a way that the filling of the blades during the movement of the paddle wheel (I) along the paddle wheel extension (2) up the slope or down and the excavator along the bench only according to the chip thickness (s) progresses. In Betracht gezogene Druckschriften: Deutsche Patentschriften Nr. 232 3Io, 362 436, 404753, 589504, 625171, 709 21,0 7I6 958, 727 439, 745 620, 746 106, 747 954, 749 55I ; deutsche Patentanmeldung L 7998 V/84d. Publications considered: German Patent Specifications No. 232 3Io, 362 436, 404753, 589504, 625171, 709 21.0 7I6 958, 727 439, 745 620, 746 106, 747 954, 749 55I; German patent application L 7998 V / 84d.
DEA17045A 1952-12-07 1952-12-07 Bucket wheel excavator that can work in deep and / or high cut, and working methods for such an excavator Expired DE964850C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEA17045A DE964850C (en) 1952-12-07 1952-12-07 Bucket wheel excavator that can work in deep and / or high cut, and working methods for such an excavator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEA17045A DE964850C (en) 1952-12-07 1952-12-07 Bucket wheel excavator that can work in deep and / or high cut, and working methods for such an excavator

Publications (1)

Publication Number Publication Date
DE964850C true DE964850C (en) 1957-05-29

Family

ID=6923799

Family Applications (1)

Application Number Title Priority Date Filing Date
DEA17045A Expired DE964850C (en) 1952-12-07 1952-12-07 Bucket wheel excavator that can work in deep and / or high cut, and working methods for such an excavator

Country Status (1)

Country Link
DE (1) DE964850C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3062392A (en) * 1960-10-13 1962-11-06 Clyde M Eppard Rotary unloader
DE2807355A1 (en) * 1977-03-16 1978-09-28 Voest Ag REMOVAL DEVICE FOR HOPES

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE232310C (en) *
DE362436C (en) * 1921-05-15 1922-10-28 Karl Gerber Excavator
DE404753C (en) * 1924-10-22 Karl Gerber Excavator track and conveyor trackless excavator operation
DE589504C (en) * 1933-12-08
DE625171C (en) * 1932-05-08 1936-02-05 Erwin Ratajczyk Excavator with a conveyor that is mounted on the chassis so that it can rotate 360 °, on which the excavator frame is also mounted so that it can rotate 360 °
DE709210C (en) * 1939-11-21 1941-08-09 Mitteldeutsche Stahlwerke Akt Trolley without self-propulsion for paddle wheel arm
DE716958C (en) * 1936-03-21 1942-02-02 Luebecker Maschb Ges Bucket wheel swing excavator for the alternate removal of embankments in high and low cut on opposite sides of the device
DE727439C (en) * 1936-12-01 1942-11-03 Luebecker Maschb Ges Bucket wheel excavator for optional work in high and low cut
DE745620C (en) * 1936-06-19 1944-03-16 Mitteldeutsche Stahlwerke Ag Bucket wheel excavator with a height-adjustable bucket wheel that can be moved against the excavation impact
DE746106C (en) * 1936-02-12 1944-08-05 Luebecker Maschb Ges Bucket wheel excavator
DE747954C (en) * 1936-11-21 1944-10-23 Bucket wheel excavators
DE749551C (en) * 1940-01-19 1944-11-24 The conveyor bridge spanning the excavation shock, supported above and below in a spatially movable manner on the chassis

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE232310C (en) *
DE404753C (en) * 1924-10-22 Karl Gerber Excavator track and conveyor trackless excavator operation
DE589504C (en) * 1933-12-08
DE362436C (en) * 1921-05-15 1922-10-28 Karl Gerber Excavator
DE625171C (en) * 1932-05-08 1936-02-05 Erwin Ratajczyk Excavator with a conveyor that is mounted on the chassis so that it can rotate 360 °, on which the excavator frame is also mounted so that it can rotate 360 °
DE746106C (en) * 1936-02-12 1944-08-05 Luebecker Maschb Ges Bucket wheel excavator
DE716958C (en) * 1936-03-21 1942-02-02 Luebecker Maschb Ges Bucket wheel swing excavator for the alternate removal of embankments in high and low cut on opposite sides of the device
DE745620C (en) * 1936-06-19 1944-03-16 Mitteldeutsche Stahlwerke Ag Bucket wheel excavator with a height-adjustable bucket wheel that can be moved against the excavation impact
DE747954C (en) * 1936-11-21 1944-10-23 Bucket wheel excavators
DE727439C (en) * 1936-12-01 1942-11-03 Luebecker Maschb Ges Bucket wheel excavator for optional work in high and low cut
DE709210C (en) * 1939-11-21 1941-08-09 Mitteldeutsche Stahlwerke Akt Trolley without self-propulsion for paddle wheel arm
DE749551C (en) * 1940-01-19 1944-11-24 The conveyor bridge spanning the excavation shock, supported above and below in a spatially movable manner on the chassis

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3062392A (en) * 1960-10-13 1962-11-06 Clyde M Eppard Rotary unloader
DE2807355A1 (en) * 1977-03-16 1978-09-28 Voest Ag REMOVAL DEVICE FOR HOPES

Similar Documents

Publication Publication Date Title
DE3032559A1 (en) MOVABLE BAND CONVEYOR, IN PARTICULAR PLATE BAND CONVEYOR FOR CRUSHING PLANTS
EP0037807B1 (en) Temporary roof supporting device for galleries or tunnels
DE1219399B (en) Device for picking up and removing bulk goods from a storage location
EP1809556B1 (en) Device for the offshore loading and unloading of ships
DE964850C (en) Bucket wheel excavator that can work in deep and / or high cut, and working methods for such an excavator
DE2231268A1 (en) RECOVERY DEVICE FOR ROUND, PREFERABLY CONE-SHAPED BUMPER STACKS
DE3430642A1 (en) TRAVELABLE SLOPE LIFT
DE3303059C2 (en) Inclined elevator
DE1293053B (en) Ship's own conveyor system
DE739690C (en) Bucket wheel excavator
DE605187C (en) Mobile depositing device intended for tipping up and down goods
DE971210C (en) Bucket wheel excavator
DE813374C (en) Storage arrangement with loading and unloading system
DE966558C (en) Extraction and conveying device for overburden or coal in open-cast mines
DE853276C (en) Device for unloading bulk goods in vehicles, in particular railroad cars
DE968659C (en) Bucket wheel excavator
DE1531002A1 (en) Portal scraper for bulk goods
DE526949C (en) Road tunneling machine with scrapers
DE745216C (en) The conveyor bridge spanning the excavation shock, supported above and below in a spatially movable manner on the chassis
DE691314C (en) Bucket chain excavator for opening up and expanding open-cast mining by means of a bucket ladder, the lower end of which is mounted on an independently movable support car, vertically and horizontally
DE1179861B (en) Mobile back device for beltways and tracks with a back roller head
DE1919980U (en) DEPOSITION SCRATCHES.
AT343551B (en) LARGE EXCAVATOR TRAINED AS A BUCKET CHAIN EXCAVATOR
DE894979C (en) Bucket wheel excavator with a driver's cab attached to the rigid or pivoting excavator frame
DE968420C (en) Driver's cab arrangement for a bucket wheel excavator