DE919556C - Sewer grate device for bast fiber stalks - Google Patents

Sewer grate device for bast fiber stalks

Info

Publication number
DE919556C
DE919556C DEM9187A DEM0009187A DE919556C DE 919556 C DE919556 C DE 919556C DE M9187 A DEM9187 A DE M9187A DE M0009187 A DEM0009187 A DE M0009187A DE 919556 C DE919556 C DE 919556C
Authority
DE
Germany
Prior art keywords
channel
carrier
chains
stalks
bast fiber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEM9187A
Other languages
German (de)
Inventor
Kurt Lueck
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NELLI LUECK GEB SCHNEIDERS
Original Assignee
NELLI LUECK GEB SCHNEIDERS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NELLI LUECK GEB SCHNEIDERS filed Critical NELLI LUECK GEB SCHNEIDERS
Priority to DEM9187A priority Critical patent/DE919556C/en
Application granted granted Critical
Publication of DE919556C publication Critical patent/DE919556C/en
Expired legal-status Critical Current

Links

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01BMECHANICAL TREATMENT OF NATURAL FIBROUS OR FILAMENTARY MATERIAL TO OBTAIN FIBRES OF FILAMENTS, e.g. FOR SPINNING
    • D01B1/00Mechanical separation of fibres from plant material, e.g. seeds, leaves, stalks
    • D01B1/10Separating vegetable fibres from stalks or leaves
    • D01B1/48Drying retted fibres

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Catching Or Destruction (AREA)

Description

Kanalrösteinrichtung für Bastfaserstengel Es sind Einrichtungen zum Rösten von Bastfaserstengeln bekannt, bei denen die gepackten Stengel anstatt der stationären Anordnung durch Kanäle hindurchgeschwemmt oder unter Verwendung von Schienen hindurchgefahren werden. Zur Vereinfachung und Verbesserung einer solchen Anordnung und zum Einsparen von Arbeitskräften besteht die Kanalrösteinrichtung nach der Erfindung darin, daß die Führungsschienen für die Stengelträger nur oberhalb des Flüssigkeitsspiegels an den Längsseiten des Kanals angeordnet sind und vor dem Ende des Kanals enden und daß sich an diesen Führungsschienen zwei mit dem Träger am Kanalende selbsttätig lösbare Förderketten abstützen, deren Abstand voneinander größer ist als die Länge dar Träger.Sewer roasting facility for bast fiber stalks There are facilities for Roasting of bast fiber stalks known, in which the packed stalks instead of the stationary arrangement washed through channels or using Rails are driven through. To simplify and improve such The sewer roasting facility exists to arrange and save labor according to the invention in that the guide rails for the stem carriers only above of the liquid level are arranged on the longitudinal sides of the channel and in front of the End of the channel and that two of these guide rails with the carrier Support automatically detachable conveyor chains at the end of the channel, the distance between them is greater than the length of the beam.

Die Zeichnung bringt ein Ausführungsbeispiel der Erfindung, und zwar zeigt Fig. i einen Längsschnitt durch einen Röstkanal gemäß der Erfindung, Fig. 2 eine Draufsicht auf Fig. i, Fig. 3 in größerem Maßstab einen Schnitt gemäß der Linie 111-11I der Fig. 2, Fig. 4. in größerem Maßstab einen Teil der Fig. 3, Fig. 5 einen gefüllten Träger, Fig.6 die Seitenansicht eines Abschnittes der Förderkette, Fig. 7 eine Draufsicht auf Fig. 6.The drawing brings an embodiment of the invention, namely FIG. 1 shows a longitudinal section through a roasting channel according to the invention, FIG. 2 shows a plan view of FIG. 1, FIG. 3 shows, on a larger scale, a section according to FIG Line 111-11I of FIGS. 2, 4. Part of FIG. 3, FIG. 5 shows a filled carrier, FIG. 6 shows the side view of a section of the conveyor chain, FIG. 7 is a plan view of FIG. 6.

Die Röstflüssigkeit befindet sich in an sich bekanter Weise in- einem Kanal i, der zweckmäßig aus Beton hergestellt ist. Der Flüssigkeitsspiegel ist mit 2 bezeichnet. Der Kanal befindet sich in einer Halle 3. Über dem Kanal sind zwei endlose Förderbänder 4 angeordnet, die an beiden Längsseiten des Kanals liegen. Sie bestehen aus Ketten entsprechend den Fig. 6 und 7 und werden durch Rollen 5 geführt und angetrieben. Das linke Ende des Kanals i, das zum Beschicken dient, ist mit einer Rampe 6 versehen, über welcher das Förderband in entsprechender Steigung nach oben gezogen ist. Seitlich der Rampe befinden sich geländerartige Führungen 7, welche die einzuführenden Stengelträger halten und leiten, ehe sie vollständig in den Kanal eingebracht sind. Die rechte Umlenkrolle 5 des Förderbandes 4 ist so angeordnet, daß hinter ihr noch ein Abschnitt 8 des Kanals frei bleibt, der dazu dient, die Träger nach Durchlaufen des Kanals durch ein Hebezeug 9, das auf einer Kranfahrbahn io verschiebbar ist, aus dem Kanal auszuheben. Schließlich ist außerhalb des Kanals ein Spülbecken i i vorgesehen, in welches die gerösteten Stengel zum Spülen eingetaucht werden können.In a manner known per se, the roasting liquid is in one Channel i, which is expediently made of concrete. The liquid level is with 2 designated. The canal is in Hall 3. There are two above the canal endless conveyor belts 4 arranged, which lie on both longitudinal sides of the channel. They consist of chains according to FIGS. 6 and 7 and are driven by rollers 5 guided and driven. The left end of the channel i, which is used for loading, is provided with a ramp 6 over which the conveyor belt has a corresponding gradient is pulled up. To the side of the ramp are handrail-like guides 7, which hold and guide the stem-bearers to be introduced before they are complete are introduced into the canal. The right pulley 5 of the conveyor belt 4 is like this arranged that behind her a section 8 of the channel remains free, which is to serves, the carrier after passing through the channel by a hoist 9, which is on a Crane track io is slidable to dig out of the channel. Finally is outside of the channel a sink i i provided, in which the roasted stalks for Sinks can be immersed.

Die einzelnen Bastfaserstengelwerden in Träger 12 eingepackt, die, wie Fig. 5 zeigt, aus zwei seitlichen Rahmen 13 bestehen, welche an ihrem unteren Rand durch nicht dargestellte Ketten miteinander unlösbar verbunden sind,. während sie an ihrem oberen Rand durch lösbare Ketten 14 zusammengehalten werden. Am oberen Rand der Rahmen sind ferner Riegel 15 verschiebbar angeordnet, die mit Hilfe von Handknöpfen. 16 zurückgeschoben «erden können. Die Förderketten bestehen aus Gliedern 17, zwischen denen Glieder i8 in Abständern angeordnet sind, die dem Abstand der Träger 12 voneinander entsprechen. An den Gelenkpunkten je zweier Glieder 17 bzw. 18 befinden sich Rollen ig, die, wie Fig. 4 zeigt, an der Unterseite von Winkeleisen 2o laufen, die an jeder Längsseite des Kanals i angeordnet sind. Die Glieder 18 besitzen nach unten gerichtete Vorsprünge 21, welche so ausgebildet sind, daß sie die im vorgeschobenen Zustand befindlichen Riegel 15 mitnehmen können. An den Gliedern 18 sind ferner noch Laschen 22 angeordnet, welche auf entsprechenden Winkeleisen 23, 24 aufliegen, so daß die Führungskette nicht herabfallen kann. Zum Beschicken wird zunächst eine Rahmenseite 13 mit zurückgezogenen Riegeln 15 zwischen den Geländern 7 aufgestellt. Die andere Rahmenseite 13a ist während dieses Vorganges, wie Fig. i zeigt, nach unten umgelegt. Darauf wird der Raum zwischen dem Rahmen 13 und den unteren Ketten i4a mit Flachsstengeln od. dgl. angefüllt. Dann wird die Rahmenseite 13" hochgeklappt und mittels Ketten 14 mit der Rahmenseite 13 verbunden. Anschließend «erden. die Riegel 15 herausgeschoben. Beim Weiterrücken des Förderbandes 4 wird der Träger 12 über die Rampe 6 in den Kanal z eingeführt. Innerhalb des Kanals, der mit Flüssigkeit gefüllt ist, besitzen die beschickten Träger einen sehr starken Auftrieb, so da.ß die Rollen ig sich gegen die Flansche 2o von unten anlegen. Um den Transport außerhalb des Kanals und auf der Rampe 6, wo der Auftrieb noch gering ist, zu erleichtern, ist es zweckmäßig, hier eine Rollbahn 25 anzuordnen.The individual bast fiber stalks are packed in carriers 12 which, as FIG. 5 shows, consist of two lateral frames 13 which are inextricably linked to one another at their lower edge by chains (not shown). while they are held together at their upper edge by releasable chains 14. At the top of the frame latches 15 are also slidably arranged with the help of hand buttons. 16 pushed back. The conveyor chains consist of links 17, between which links i8 are arranged in spacings which correspond to the spacing of the carriers 12 from one another. At the hinge points of two links 17 and 18, respectively, there are rollers ig, which, as FIG. 4 shows, run on the underside of angle irons 2o which are arranged on each longitudinal side of the channel i. The members 18 have downwardly directed projections 21 which are designed so that they can take the bolt 15 in the advanced state with them. On the links 18 there are also tabs 22 which rest on corresponding angle irons 23, 24 so that the guide chain cannot fall off. For loading, a frame side 13 with retracted bolts 15 is first set up between the railings 7. The other side of the frame 13a is folded down during this process, as shown in FIG. Then the space between the frame 13 and the lower chains i4a is filled with flax stalks or the like. Then the frame side 13 ″ is folded up and connected to the frame side 13 by means of chains 14. Then earth. The bolt 15 is pushed out. As the conveyor belt 4 moves further, the carrier 12 is introduced via the ramp 6 into the channel z. Inside the channel, the is filled with liquid, the loaded carriers have a very strong buoyancy, so that the rollers ig rest against the flanges from below to allow the transport outside the channel and on the ramp 6, where the buoyancy is still low facilitate, it is useful to arrange a runway 25 here.

Die mit Stengeln gefüllten Träger wandern nun den Kanal entlang. Haben sie das Ende des Förderbandes 4 erreicht, so lösen sie sich selbsttätig von letzterem und können in dem Raum 8 von dem Hebezeug 9 erfaßt werden, welches sie anschließend in das Spülbecken i i eintaucht, von dort wieder herausnimmt und absetzt. Da es jedoch häufig vorkommt, daß der Inhalt einzelner Träger schneller reift, ist es notwendig, die Träger laufend zu überwachen und gegebenenfalls einzelne Träger vor Erreichung des Endes des Förderbandes 4 aus dem Kanal herauszunehmen. Dies wird in der Weise ermöglicht, daß bei einem solchen Träger die Riegel 15 von Hand zurückgeschoben werden, so daß die Verbindung der Träger mit den Förderbändern: gelöst ist. Nach Zurückziehen der Riegel 15 ist es möglich, den Träger auch vor Erreichung des Endes des Förderbandes 4 zwischen den beiden Förderbändern aus dem Kanal herauszuziehen. Ein besonderer Vorteil des Trägers nach der Erfindung besteht darin, daß er nicht starr ist. Bei Anheben an den oberen Ketten 14 pressen sich seine beiden Rahmen 13 zusammen und hängen die unteren Ketten 14 nach unten durch. Beim Eintauchen in das Spülwasser nimmt der Träger dann wieder die Form nach Fig.5 an. Durch das abwechselnde Zusammenpressen und Nachlassen wird die Spülwirkung verbessert.The girders filled with stems now wander along the canal. Have when they reach the end of the conveyor belt 4, they are automatically detached from the latter and can be detected in the space 8 by the hoist 9, which they then immersed in the sink i i, takes it out again from there and sets it down. Because it however, what often happens is that the contents of individual vehicles mature faster, it is It is necessary to monitor the carriers on an ongoing basis and, if necessary, to prepare individual carriers Reaching the end of the conveyor belt 4 to be removed from the channel. this will in such a way that the bolt 15 is pushed back by hand in such a carrier so that the connection of the carrier with the conveyor belts: is released. To Withdrawing the bolt 15, it is possible to open the carrier even before reaching the end of the conveyor belt 4 out of the channel between the two conveyor belts. A particular advantage of the carrier according to the invention is that it does not is rigid. When lifting on the upper chains 14, its two frames press against each other 13 together and hang the lower chains 14 downwards. When immersed in the rinsing water then resumes the shape according to FIG. By alternating Compression and slackening improves the flushing effect.

Claims (4)

PATENTANSPRÜCHE: i. Kanalrösteinrichtung für Bastfaserstengel, durch deren Kanal flüssigkeitsdurchlässige, die Stengel aufnehmende Träger an Schienen hindurchführbar sind, dadurch gekennzeichnet, daß die Führungsschienen für die Stengelträger nur oberhalb des Flüssigkeitsspiegels an den Längsseiten des Kanals angeordnet sind und vor dem Ende des Kanals enden und daß sich an diesen Führungsschienen zwei mit dem Träger am Kanalende selbsttätig lösbare Förderketten abstützen, deren Abstand voneinander größer ist als die Länge der Träger. PATENT CLAIMS: i. Sewer roasting device for bast fiber stalks through the channel of which is liquid-permeable and supports the stalks on rails can be passed through, characterized in that the guide rails for the stem carriers are only arranged above the liquid level on the long sides of the channel and end before the end of the channel and that there are two with these guide rails the carrier at the end of the channel support automatically releasable conveyor chains, the distance between them from each other is greater than the length of the beams. 2. Einrichtung nach Anspruch i, dadurch gekennzeichnet, da.ß jeder Träger aus zwei seitlichen Rahmen besteht, deren untere Ränder durch Ketten od. dgl. unlösbar miteinander verbunden sind, während die oberen Ränder ebenfalls durch Ketten od. dgl. lösbar miteinander verbunden sind, und daß die Riegel zur Kupplung der Träger mit den Förderketten am oberen Ende der Rahmen angeordnet sind. 2. Device according to claim i, characterized in that each carrier consists of two side frames whose Lower edges by chains or the like. Are inextricably linked while the upper edges are also releasably connected to one another by chains or the like, and that the latch for coupling the carrier with the conveyor chains at the upper end of the Frame are arranged. 3. Einrichtung nach Anspruch i und 2, dadurch gekennzeichnet, daß seitlich der Rampe je ein Führungsgeländer für die Träger vorgesehen ist. 3. Device according to claim i and 2, characterized in that that the side of the ramp is provided with a guardrail for the carrier. 4. Einrichtung mit Hebezeug für die Träger nach Anspruch i bis 3, dadurch gekennzeichnet, daß innerhalb des Aktionsbereiches des Hebezeuges in einer Flucht mit dem Kanal ein Spülbecken für die Stengel angeordnet ist. Angezogene Druckschriften: Deutsche Patentschriften Nr. 6g2 753, 657 iog, 661 243.4th Device with lifting gear for the girders according to Claims 1 to 3, characterized in that that within the range of action of the hoist in alignment with the channel a sink for the stems is arranged. Printed publications: German Patent documents 6g2 753, 657 iog, 661 243.
DEM9187A 1951-04-14 1951-04-14 Sewer grate device for bast fiber stalks Expired DE919556C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEM9187A DE919556C (en) 1951-04-14 1951-04-14 Sewer grate device for bast fiber stalks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEM9187A DE919556C (en) 1951-04-14 1951-04-14 Sewer grate device for bast fiber stalks

Publications (1)

Publication Number Publication Date
DE919556C true DE919556C (en) 1954-10-28

Family

ID=7294544

Family Applications (1)

Application Number Title Priority Date Filing Date
DEM9187A Expired DE919556C (en) 1951-04-14 1951-04-14 Sewer grate device for bast fiber stalks

Country Status (1)

Country Link
DE (1) DE919556C (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE652753C (en) * 1934-03-11 1937-11-08 Heinrich Blum Device for water rusting of bast fiber stalks
DE657109C (en) * 1934-11-21 1938-02-24 Heinrich Blum Device for water rusting of bast fiber stalks
DE661243C (en) * 1935-07-06 1938-06-14 Heinrich Blum Device for water rusting of bast fiber stalks

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE652753C (en) * 1934-03-11 1937-11-08 Heinrich Blum Device for water rusting of bast fiber stalks
DE657109C (en) * 1934-11-21 1938-02-24 Heinrich Blum Device for water rusting of bast fiber stalks
DE661243C (en) * 1935-07-06 1938-06-14 Heinrich Blum Device for water rusting of bast fiber stalks

Similar Documents

Publication Publication Date Title
DE3214044C2 (en)
DE3008380C2 (en) Method and device for conveying excavated material from an excavation
DE3318360C2 (en) Mining device for loosening, loading and transporting long-front underground mining of seam-like mineral
DE919556C (en) Sewer grate device for bast fiber stalks
DE2100932B2 (en) HINGE BELT CONVEYOR FOR METAL SPRINGS
DE2830679A1 (en) SYSTEM FOR THE TREATMENT OF GOODS AND WITH A LIFT DEVICE FOR THE TRANSPORTATION OF MAT-SHAPED STRUCTURES
DE2233835B2 (en) APPROACH FOR A CONTINUOUS CASTING MACHINE WITH AN ARC-SHAPED STRAND GUIDE
DE19533887C2 (en) Device for parking several vehicles or the like one above the other
DE929659C (en) Endless conveyor belt made of rubber or the like.
DE1080948B (en) Device for mechanical expansion of a route with route arches
CH678716A5 (en)
DE914478C (en) Apron conveyor
DE573486C (en) Conveyor device for chocolate mold cooling rooms
DE1246548B (en) Vertical circulating elevator
DE1556090A1 (en) Handling device, in particular for unloading bulk goods
DE2551675A1 (en) Insertion of die in pressure deformation machine - by means of carrier having rails for car suspending die and all carried by crane
DE919521C (en) Plant for mining coal or the like using a peeling extraction device
DD151288A1 (en) DEVICE FOR TRANSFERING MATERIAL
DE2532685C3 (en) Reversing station for overhead monorails, especially in underground operations
DE350305C (en) Peat cutting machine with power operation
DE401947C (en) Conveyor device on folding tile turret presses
DE1286478B (en) Coal extraction plant with a coal buffing side on the conveyor, drawn through at least one exposed chain, and a second extraction machine that can be moved on the conveyor side profiles
DE1506903C3 (en) Double-wing scraper for a chain scraper conveyor
AT252781B (en) Mold and system for pouring and transporting large lightweight concrete bodies
DE618951C (en) Device for feeding cigars