DE888161C - Tubular scaffolding made from individual frames made beforehand - Google Patents

Tubular scaffolding made from individual frames made beforehand

Info

Publication number
DE888161C
DE888161C DEP27497A DEP0027497A DE888161C DE 888161 C DE888161 C DE 888161C DE P27497 A DEP27497 A DE P27497A DE P0027497 A DEP0027497 A DE P0027497A DE 888161 C DE888161 C DE 888161C
Authority
DE
Germany
Prior art keywords
frame
trees
scaffolding
clamping
clamping devices
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEP27497A
Other languages
German (de)
Inventor
Albert Henry Hawes
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kwikform Ltd
Original Assignee
Kwikform Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kwikform Ltd filed Critical Kwikform Ltd
Application granted granted Critical
Publication of DE888161C publication Critical patent/DE888161C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/14Comprising essentially pre-assembled two-dimensional frame-like elements, e.g. of rods in L- or H-shape, with or without bracing

Description

Aus einzelnen vorher gefertigten Rahmen gebildetes Rohrbaugerüst Die Erfindung bezieht sich auf eine neue Ausbildurig von Baugerüsten unter Anwendung von Metallrohren, insbesondere- Stahlrohren, bei denen vorzugsweise durch das Gerüst eine Abstützung einer im wesentlichen horizontalen. Bühne oder Plattform für den Arbeiter geschaffen werden soll.Tubular scaffolding formed from individual frames made beforehand Invention relates to a new training of scaffolding using of metal pipes, especially steel pipes, where preferably through the framework a support of a substantially horizontal. Stage or platform for the Workers should be created.

Bisher ist es bei derartigen Gerüsten üblich, in geeigneten Abständen zwei Reihen von Standbäumen zu errichten, wobei ,die Standbäume jeder Reihe durch Streicher mit Hilfe von besonderen Klemmvorrichtungen verbunden werden und die Streicher wiederum durch Riegel überbrückt werden, die jeder für sich durch besondere Klemmvorrichtungen gesichert sind. Eine aus einer Mehrzahl von parallel liegenden Bohlen bestehende Plattform wird dann über die Riegel gelegt und bildet die Arbeitsbühne. Die einzelnen Gerüsteinheiten müssen hierbei in einem Abstand voneinander angeordnet werden, welcher von der Dicke der Bohlen abhängt, wobei sich eine verhältnismäßig dichte Anordnung der Gerüstteile in einem Gerüst ergibt, die eine außerordentlich große Anzahl von Einzelteilen. erfordert, .deren Stärke in keinem Verhältnis zu der tatsächlich aufgenommenen Last steht.So far it has been customary with such scaffolds at suitable intervals Erect two rows of booms, with the booms of each row through Strings are connected with the help of special clamping devices and the strings are in turn bridged by bolts, each of which has a special clamping device are secured. One consisting of a plurality of planks lying in parallel The platform is then placed over the ledgers and forms the working platform. The single ones Scaffolding units must be arranged at a distance from one another, which depends on the thickness of the planks, with a relatively dense arrangement the frame parts in a frame results in an extraordinarily large number of Individual parts. requires, whose strength is out of proportion to that actually absorbed Load stands.

Wenn darübeir hinaus die Riegel während des Aufbaues des Gerüstes nicht sehr sorgfältig angeordnet werden, bilden, die von ihnen aufgenommenen Bohlen keine ebene Plattform, und es ist häufig notwendig, die benachbarten Enden der Bohlen oder aneinanderstoßende Gerüstteile zu überlappen, mit dem Ergebnis, daß auf der Plattform Stufen entstehen, die bei der Begehung durch den Arbeiter Gefahren darstellen.If in addition, the latches during the construction of the scaffolding are not arranged very carefully, form the planks picked up by them no level platform, and it is often necessary to use the adjacent ends of the planks or to overlap adjoining parts of the framework, with the result that on the Platform steps are created which represent dangers when the worker walks through it.

Es sind fernerhin Rohrbaugerüste bekannt, bei denen je zwei Standbäume durch einen; oder mehrere Querstäbe zu einem festen Rahmen vereinigt waren. An die Rahmen wurden Anschlußstücke angeklemmt, welche mit einem hakenartigen Ansatz die Querstäbe von oben umfaßten und in deren Bohrungen Streichbäume zur Verbindung der einzelnen Rahmen untereinander eingefügt waren. Bei diesen bekannten Rohrbaugerüsten war die Verbindung zwischen den Rahmen und den Streichern außerordentlich unsicher, so daß noch ;Diagonalverstrebungen zwischen den Rahmen untereinander erforderlich waren, welche die Zugänglichkeit des Gerüstes beeinträchtigten. Ferner bildeten. die hakenartig die Querstäbe umfassenden Ansätze der Anschlußstücke eine Unebenheit, und es war allgemein nachteilig, daß bei diesem bekannten Gerüst nur die Querstäbe der Rahmen ohne die Einschaltung von Riegeln über den Streichern die Auflager für die Arbeitsbühne bildeten.There are also tubular scaffolding known in which two stand trees through a; or several cross bars were combined to form a solid frame. To the Frames became connectors clamped, which with a hook-like Approach the cross bars from above and in their holes string trees for connection the individual frames were inserted one below the other. With these known tubular scaffolding the connection between the frame and the strings was extremely uncertain, so that still; diagonal struts between the frames are required which impaired the accessibility of the scaffolding. Also formed. the hook-like approaches of the connecting pieces comprising the cross bars create an unevenness, and it was generally disadvantageous that in this known frame only the cross bars the frame without the inclusion of bolts over the strings the supports for formed the working platform.

Es ist bei aus Profileisen bestehenden Baugerüsten bekannt, den Winkel zwischen den Querstäben und den Standhäumen durch ein konsalenartiges Auflager für Streichbäume aus Holzbalken zu überbrücken. Die Streichbäume wurden, hierbei durch Holzklötze gesichert, welche auf ihnen beiderseits der Profileisengerüs,te angenagelt wurden. Die, Aufstellung und der Abbau derartiger Gerüste war daher außerordentlich umständlich und zeitraubend, und es war hierbei schwierig, die Streichbäume in die Auflager unterhalb der Querstäbe einzubringen, und die Verbindung der Streichbäume mit den Profileisengerüsten erfüllte namentlich bei schwerer Belastung nicht die notwendigen Anforderungen an Sicherheit und Festigkeit.It is known in the case of scaffolding made of profile iron, the angle between the cross bars and the stand spaces by a bracket-like support for Bridge string trees from wooden beams. The string trees were, by doing this Wooden blocks secured, which are nailed to them on both sides of the profile iron framework became. The erection and dismantling of such scaffolding was therefore extraordinary awkward and time consuming, and it was difficult to get the string trees into the To bring in supports below the cross bars, and the connection of the string trees with the profile iron framework, especially under heavy loads, the necessary safety and strength requirements.

Bei Gerüsten, welche lediglich aus einzelnen Rohren an Ort und Stelle zusammengesetzt werden, ist es fernerhin bekannt, mindestens zwei Felder durchlaufende Streichbäume zu verwenden.. Wegen, der Vielzahl der Einzelteile erforderten jedoch derartige Gerüste beim Aufbau und beim Abbau einen großen Zeitaufwand, und es machten sich die vielen Einzelteile bei Transport und Lagerhaltung nachteilig bemerkbar.For scaffolding that only consists of individual tubes in place are composed, it is also known to pass through at least two fields To use string trees .. Because of the large number of items required, however such scaffolding took a lot of time to assemble and dismantle, and it did the many individual parts have a negative impact on transport and storage.

Die Erfindung hat eine verbesserte Ausbildung eines Baugerüstes zur Aufnahme einer Arbeitsbühne zum Gegenstand, welche in ihrer Sicherheit und Widerstandsfähigkeit den bisher benutzten Bauarten überlegen ist und: darüber hinaus weitaus weniger Einzelteile benötigt und schneller und billiger aufgestellt werden: kann, wobei die, Anordnung einer Arbeitsbühne ermöglicht wird, welche von allen gefährlichen Stufen frei ist.The invention has an improved design for scaffolding Including a work platform as an object, which in its safety and resilience is superior to the designs previously used and: beyond that, far less Individual parts are required and can be set up faster and cheaper: can, where the, arrangement of a working platform is made possible, which of all dangerous Levels is free.

Die Erfindung geht dabei von der bekannten Ausbildung von Rohrbaugerüsten aus, welche aus einzelnen festen Rahmen " bestehen, die aus je zwei Standbäumen: und einem oder mehreren Querstäben gebildet sind und. setzt fernerhin voraus, daß es bekannt ist, mindestens über zwei Felder durchlaufende Streichbäume und Klemmvorrichtungen bei Rohrbaugerüsten zu verwenden. Die Erfindung besteht im wesentlichen in der Vereinigung durchlaufender Streichbäume mit in den inneren oberen Ecken jeder Rahmeneinheit am Rahmen ortsfest angebrachten Klemmvorrichtungen und mit über die Streichbäume gelegten rohrförmigen Riegeln, deren .Oberkante, mit den Oberkanten der Rahmenquerstäbe zur Aufnahme - einer Arbeitsbühne in einer Ebene liegen. Durch den Fortfall loser Klemmvorrichtungen wird bei der Erfindung eine bedeutende Ersparnis von Einzelteilen erreicht, was in der Handhabung derartiger Baugerüste beim Auf- und Abbau, beim Transport und beider Lagerhaltung von großem Vorteil ist. Beim Aufbau braucht beispielsweise nicht mehr jeweils die zugehörige Klemmvorrichtung herausgesucht und montiert zu werden, sondern der Rahmen ist infolge der fest an ihm angeordneten Klemmvorrichtungen nach der Aufstellung sofort für die Aufnahme der Streichbäume bereit. Gleichzeitig erhalten die Klemmvorrichtungen bei ihrer Anordnung unterhalb der Enden. der Querstäbe der Rahmen auch eine bevorzugte Lage, welche die Möglichkeit gibt, über mehr als zwei Rahmen durchgehende @Streichb@äume zu verwenden und die Rahmen unabhängig von der Länge der Streichbäume anzuordnen. Die den empfindlichsten Teil eines Rohrbaugerüstes. bildenden Klemmvorrichtungen befinden sich darüber hinaus infolge dieser Anordnung in einer geschütztem, Lage gegenüber den Beanspruchungen beim Transport und bei der Handhabung. Den Klemmvorrichtungen kann dabei eine Lage und Ausbildung gegeben werden, daß sie die Streichbäume von unten her angreifen und gegen die Querstäbe bzw. in den Winkel zwischen den Standbäumen und den Querstäben pressen.The invention is based on the known construction of tubular scaffolding which consist of individual fixed frames "each consisting of two boom trees: and one or more cross bars are formed and. furthermore assumes that it is known to have string trees and clamping devices running through at least two fields to be used with tubular scaffolding. Essentially, the invention consists in association continuous string trees with in the inner upper corners of each frame unit Stationarily attached clamping devices on the frame and with over the string trees laid tubular bars, their .Oberkante, with the upper edges of the frame cross bars for taking up - a working platform lying on one level. Looser due to the omission Clamping devices are a significant saving of individual parts with the invention achieved what in the handling of such scaffolding during construction and dismantling Transport and both warehousing is of great advantage. When building, for example the associated clamping device is no longer selected and assembled but the frame is due to the clamping devices fixed to it Immediately after installation ready for the acceptance of the string trees. Simultaneously receive the clamping devices when they are arranged below the ends. the cross bars the frame also has a privileged location, which gives the opportunity to go over more than two frames to use continuous strings and the frames independently of the length of the string trees. The most sensitive part of tubular scaffolding. forming clamps are also as a result of this arrangement in a protected position against the stresses during transport and during handling. The clamping devices can be given a position and training that they attack the string trees from below and against the cross bars or press into the angle between the booms and the cross bars.

Beispielsweise können die an den Rahmen. fest angeordneten Klemmvorrichtungen aus je einer in dem Anschlußwinkel zwischen Querstab und Standbäumen angeordneten Klammer bestehen, die mit ihren Schenkeln an Querstab. und Standbaum angeschlossen ist und eine Queröffnung zur Aufnahme eines Streichers besitzt, in deren Bereich eine Klemmschraube oder sonstige Spannvorrichtung angeordnet ist.For example, they can be attached to the frame. fixed clamping devices from one arranged in the connection angle between the crossbar and the standing trees Brackets are made with their thighs on the crossbar. and stand tree connected is and has a transverse opening for receiving a string, in the area a clamping screw or other clamping device is arranged.

Auf der anderen Seite sind auch Ausführungsformen der Erfindung möglich, nach denen. diese Klammern nach Art vonr offenen Haken ausgebildet sind, um die Einführung eines Streichbaumes von der Seite .her zu ermöglichen.On the other hand, embodiments of the invention are also possible, after them. these brackets are designed in the manner of open hooks around the To enable the introduction of a backing tree from the side.

Vorzugsweise erhalten die Klemmvorrichtungen eine derartige Breite, daß sie an den Seiten jeder Rahmeneinheit nicht über die Abmessungen, der Standbäume des Rahmeros hinausragen., so daß zwei Rahmeineinheiten in einer spitzen Winkelstellung Seite an Seite in überlappender Aufstellung angeordnet werden können und sich ein. Standbaum jedes Rahmens an den benachbarten Standbaum ,des arideren Rahmens anlegen kann und die beiden anderen äußeren Standbäume in einem geringen Zwischenraum voneinander angeordnet sind. Paare derartig angeordneter Einheiten können beispielsweise bei dem Aufbau von Gerüsten für die Aufführung kreisförmiger Türme, wie beispielsweise von I%ühltürmen benutzt werden, wobei die Paare derartiger Einheiten in gewissem Abstand rund um den Turm angeordnet werden -und die benachbarten Paare durch Streicher miteinander verbunden werden. - Weitere vorteilhafte Einzelheiten der Erfindung sind aus der Zeichnung ersichtlich, in welcher die Erfindung an einigen Ausführungsbeispielen: erläutert ist. Es zeigt Fig. i ein Ausführungsbeispiel eines Gelrüs.tes gemäß der Erfindung, insbesondere für die Aufführung von Mauern, in perspektivischer Darstellung, Fig. a eine perspektivische Ansicht eines Einzelteiles der in, Fig. i dargeistellten, Gerüstrahmen, Fig. 3 einen Querschnitt eines Einzelteiles, Fig.4 eine abgewandelte Ausführungsform der Fig. 3, Fig. 5 und 6 zwei weitere Ausführungsbeispiele in perspektivischer Darstellung, Fig. 7 im Querschnitt die Anwendung des Gerüstes gemäß der Erfindung für die Abstützung der Schalung einer Mauer aus Stampf- oder Gußbeton od. dgl., Fig. 8 im vergrößerten Maßstab einen Querschnitt des oberen; Gerüstteiles gemäß Fig. i, Fig. 9 ein. weiteres Ausführungsbeispiel der Erfindung in perspektivischer Darstellung, Fig. io eine Seitenansicht einer Einzelheit der Fig. 9 in vergrößertem Maßstab.The clamping devices are preferably given a width such that that they do not have the dimensions of the booms on the sides of each frame unit of the frame rose so that two frame units in an acute angular position Can be arranged side by side in an overlapping arrangement and become one. Place the stand tree of each frame on the neighboring stand tree of the other frame can and the other two outer trees in a small distance from each other are arranged. Pairs of units arranged in this way can, for example, be at the construction of scaffolding for the performance of circular towers such as are used by towers, with the pairs of such units in some Spacing can be arranged around the tower -and the neighboring pairs by strings be connected to each other. - Other advantageous details of the invention are apparent from the drawing, in which the invention at some Embodiments: is explained. It shows Fig. I an embodiment of a Gelrüs.tes according to the invention, especially for the execution of walls, in perspective Representation, Fig. A is a perspective view of an individual part of the in, Fig. i illustrated, scaffolding frame, Fig. 3 is a cross section of an individual part, Fig.4 a modified embodiment of FIGS. 3, 5 and 6, two further embodiments in a perspective view, FIG. 7 in cross section the application of the scaffolding according to the invention for supporting the formwork of a wall made of rammed or Cast concrete or the like, FIG. 8, on an enlarged scale, a cross-section of the upper one; Frame part according to FIG. 1, FIG. 9. another embodiment of the invention in a perspective view, Fig. IO a side view of a detail of the 9 on an enlarged scale.

In der in Fig. i bis 3 und 8 der Zeichnung dargestellten Ausführungsform der Erfindung bestehen die einzelnen Rahmeneinheiten 2o aus zwei rohrförmigen Standbäumen 2-i und 2a, die fest durch einen, Ö_uerstab 23 miteinander verbunden sind, welcher in dem dargestellten Ausführungsbeispiel erleichfalls als Rohrausgebildet ist. Dieser Querstab 23 kann ein Auflager für eine quer zu den: einzelnen Rahmeneinheiten angeordnete Arbeitsbühne bilden, welche in dem dargestellten Ausführungsbeispie'1 aus einer Anzahl von hölzernen Bohlen; 24 besteht. Die Querstäbe 23 sind in der Nähe des oberem Endes der. Standbäume 21, 22 angeordnet, wie aus Fig: i ersichtlich.In the embodiment shown in Fig. I to 3 and 8 of the drawing According to the invention, the individual frame units 2o consist of two tubular standing trees 2-i and 2a, which are firmly connected to one another by an Ö_uerstab 23, which is also designed as a tube in the illustrated embodiment. This Cross bar 23 can be a support for a transverse to the: individual frame units Form work platform, which in the illustrated Ausführungsbeispie'1 from a Number of wooden planks; 24 exists. The cross bars 23 are near the upper one End of the. Stand trees 21, 22 are arranged, as can be seen from FIG.

In jeder Rahmeneinheit sind fernerhin ein. Paar Klemmvorrichtungen, 225 vorgesehen, welche, an der Innenseite der- Standbäume 21, 212 und an der Unterseite des Querstabes 23 an den An.schluß-"stelleri dieser Gerüstteile angeordnet sind. Jede Klemmvorrichtung besteht aus einer Klammer 26 -in Zwickelform, wie im einzelnen aus Fig. 21 und 3 ersichtlich, und ist mit ihren Enden 27 in den Winkeln zwischen dem Querstab. und den Standbäumen fest mit diesen. beiden Gerüstteilen verbunden, so daß es deren Knotenpunkte verstärkt.In each frame unit there are also a. Pair of clamping devices, 225 provided which, on the inside of the boom trees 21, 212 and on the underside of the crossbar 23 are arranged on the connection "stelleri of these frame parts. Each clamping device consists of a clamp 26 -in gusset shape, as in detail can be seen from Fig. 21 and 3, and is with their ends 27 in the angles between the crossbar. and the booms firmly with these. both scaffolding parts connected, so that it reinforces their nodes.

Zwischen ihren Enden bildet die, Klammer eine Queröffnung 28 für die Aufnahme eines Streichbaumes 29, welcher mit seinem Ende der Länge nach horizontal durch die öffnung 28 eingeführt werden kann.Between its ends, the bracket forms a transverse opening 28 for the Recording of a backrest 29, which is horizontal with its end lengthways can be introduced through the opening 28.

Neben. der Öffnung zwischen den Enden bildet die Klammer einen Schraubensitz 30 für die, Aufnahrne einer Klemmschraube 3-i, an deren innerem Ende eine Druckplatte 3:2 mit einer dem rohrförmigen; Streicher arigepaßten Anlagefläche drehbar befestigt ist. An zwei gegenüberliegenden Seiten ,ist die Druckplatte, mit im Abstand voneinander 'angeardheten--Ansätzen.33 versehen, welche sich an jeder Seite der Klammer führen und so eine Drehung der Druckplatte bei dem Anziehen der Schraube verhindern. Die Betätigung der Klemmschraube kann dabei durch einen Knebel oder Dorn erfolgen, welcher in das Auge 34,der Schraube ein.-gesteckt werden kann, um durch diese Betätigung den Streicher gegen die Rahmeneinheit festzuklemmen.Next to. the opening between the ends, the clamp forms a screw seat 30 for receiving a clamping screw 3-i, at the inner end of which a pressure plate 3: 2 with one of the tubular; Strings arigepassten contact surface is rotatably attached. On two opposite sides, the pressure plate is provided with lugs.33 attached at a distance from one another, which guide each side of the clamp and thus prevent the pressure plate from rotating when the screw is tightened. The clamping screw can be actuated by means of a toggle or mandrel which can be inserted into the eye 34 of the screw in order to clamp the string against the frame unit by this actuation.

Infolge ihres festen Anschlusses an dem Querstab, und die Standbäume der Rahmeneinheit wird durch die Klammer und das Anziehen der Klemmschraube 3.1 diel Lage des Streichers zur Rahmeneinheit gesichert.As a result of their fixed connection to the crossbar, and the standing trees the frame unit is by the clamp and tightening the clamping screw 3.1 the position of the string to the frame unit secured.

An jeder Rahmeneinheit ist ferner ein. Paar von diagonalen Streben vorgesehen, welche sich von dem unteren Teil der Standbäume in der Nähe ihres unteren Endes schräg nach oben erstrecken und im Mittelteil des Querstabes 23 an dessen Unterseite zusammenstoßen, und in dieser Weise ist der Querstab 23 gegen eine Biegung in seiner Mitte verstärkt. Die Streben, 35 sind starr und dauerhaft sowohl mit dem Querstab 23 als auch den Standbäumen. 21, 22 verbunden.There is also a on each frame unit. Pair of diagonal struts provided which extends from the lower part of the standing trees near their lower Extend the end obliquely upwards and in the middle part of the cross bar 23 on it Bottom, and in this way the cross bar 23 is against a bend reinforced in its center. The struts, 35 are rigid and durable with both the Crossbar 23 as well as the booms. 21, 22 connected.

Für die praktische Anwendung derartiger Rahmeneinheiten- für die Unterstützung einer Arbeitsbühne, beispielsweise beim Hochziehen einer Mauer, wird eine Anzahl von. Rahmeneinheiten nebeneinander in horizontalen Abständen aufgestellt und untereinander durch die Streicher ä9 fest verbunden und hierauf die in den Klemmvorrichtungen 25 angezogen.For the practical application of such frame units - for support a working platform, for example when pulling up a wall, becomes a number from. Frame units placed next to each other at horizontal distances and one below the other firmly connected by the strings 9 and then those in the clamping devices 25 tightened.

Die durch die Bohlen 24 gebildete Arbeitsbühne kann; dann über die Querstäbe 23 der im unteren Teil .der Fig. i dargestellten - Rahmeneinheiten gelegt werden:, indem die Bohlen quer zu den erwähnten Querstäben angeordnet werden,.The working platform formed by the planks 24 can; then about the Cross bars 23 of the frame units shown in the lower part of FIG be: by arranging the planks across the mentioned cross bars.

Um es möglich zu machen, daß die Höhe des Gerüstes mit der wachsenden Höhe der Mauer anwächst, ist jede Rahmeneinheit mit einem verschieblichen Widerlager versehen, welches aus einem Paar senkrechter Schäfte von polygonalem Querschnitt besteht, die um ihre Achse verdreht sind und so eine mehrgängige Schraube mit einer im Verhältnis zu ihrem Durchmesser sehr starken Steigung bilden. Das untere Ende jedes Schraubenschaftes ruht auf seiner Auflageplatte 3.7 auf, die den Fuß gegenüber dem Erdboden bildet, und. jeder Schaft erstreckt sich in einem Standbaum jedes Rahmens.To make it possible that the height of the scaffolding increases with the growing As the wall increases, each frame unit has a movable abutment provided, which consists of a pair of vertical shafts of polygonal cross-section consists, which are twisted around their axis and so a multi-start screw with a form a very steep slope in relation to their diameter. The lower end each screw shaft rests on its support plate 3.7, which is opposite the foot forms the ground, and. each shaft extends in a stand tree of each frame.

Jeder Schaft ist fernerhin mit einem Paar von Spannhülsen 38 versehen, deren Bohrung seiner verdrillten Oberfläche entspricht und deren jede mit einer Sperrschraube 39 versehen ist, deren. inneres Ende an der Außenseite des Schaftes angreift.Each shaft is also provided with a pair of clamping sleeves 38, whose bore corresponds to its twisted surface and each of which with a Locking screw 39 is provided whose. inner end on the outside of the shaft attacks.

Die obere dieser beiden Spannhülsen 38 ist auf zwei gegenüberliegenden Seiten mit aufrecht stehenden, etwa halbkreisförmigen Flanschen versehen:, zwischen denen das untere Ende des betreffenden Standbaumes aufgenommen wird, und jede der oberen Spannhülsen 38 unterstützt das untere Ende des Standbaumes, so daß durch das Hochdrehen der Spannhülsen, 38 nach dem Lösen der Schrauben 39 das durch die Rahmeneinheit gebildete Gerüst in verschiedener Höhe, über dem Erdboden eingestellt werden, kann und der wachsenden Höhe der Mauer folgt.The upper of these two clamping sleeves 38 is on two opposite one another Sides with upright, roughly semicircular flanges :, between which the lower end of the stand tree in question is recorded, and each of the upper clamping sleeves 38 supports the lower end of the stand tree so that through turning up the clamping sleeves, 38 after loosening of the screws 39 the scaffolding formed by the frame unit at different heights, above the Can be set to the ground and follows the growing height of the wall.

Um es möglich zu machen, daß die .durch die Bohlen 24 gebildete Arbeitsbühne z. B. mit der wachsenden Höhe der Mauer erhöht werden kann, ist vorgesehen, daß weitere Rahmeneinheiten über der in Fig. i dargestellten Reihe von unteren Rahmeneinheiten angeordnet werden können. Zu diesem Zweck sind die oberen Enden der Standbäume 2i, 22 in ihrem Querschnitt eingezogen und bilden: hier einen Zapfen 41, welcher in die durch das untere Ende der Standbäume gebildeten; Hülse 42 eingeführt werden kann, so daß, wie aus FinG. 1 und 3 ersichtlich, die einzelnen Rahmeneinheiten in der dargestellten Weise in unmittelbarem Eingriff auseinan:dernehmbar übereinander angeordnet werden. können.In order to make it possible that the working platform formed by the planks 24 z. B. can be increased with the increasing height of the wall, it is provided that further frame units above the row of lower frame units shown in FIG can be arranged. For this purpose, the upper ends of the booms 2i, 22 retracted in their cross-section and form: here a pin 41, which in those formed by the lower end of the standing trees; Sleeve 42 are introduced can, so that, as from FinG. 1 and 3, the individual frame units in the manner shown in direct engagement auseinan: detachable one above the other to be ordered. can.

In dem in Fig.4 dargestellten abgewandelten Ausführungsbeispiel: ist die einen Teil der Klemmvorrichtung 25 bildende Klammer 26 nur ,an einem Standbaum der Rahmeneinheit dauerhaft befestigt, und zwar in der Nachbarschaft des Querstabes 23. Das freie Ende 43 der Klammer nimmt die Klemmschraube 31 auf, und: die auf dieser angeordnete Druckplatte 3e, läßt mit dem Arm 43 gegenüber dem Querstab 23 einen: genügend freien Raum offen, in den der Streichbaum 29 von der Seite her in die Klammer eingesetzt werden kann, so daß er nicht wie bei der vorgeschriebenen Bauart mit seinem Ende in der Längsrichtung eingesteckt zu werden braucht. Bei dieser Bauart sind die Vorsprünge 33 nur auf einer Seite der Druckplatte 32 angeordnet.In the modified embodiment shown in Figure 4: is the bracket 26 forming part of the clamping device 25 only, on a stand tree permanently attached to the frame unit in the vicinity of the cross bar 23. The free end 43 of the clamp receives the clamping screw 31, and: the one on this arranged pressure plate 3e, can with the arm 43 opposite the cross bar 23 a: enough free space open into which the backrest 29 from the side into the bracket can be used, so that it does not work with the prescribed type its end needs to be inserted in the longitudinal direction. With this type of construction the projections 33 are only arranged on one side of the pressure plate 32.

In jeder der vorstehend beschriebenen Ausführungsformen ist der Durchmesser des Querstabes 23 etwas geringer als der Durchmesser der Standträume 2i, 22 der Rahmeneinheit gewählt, welche die gleichen Durchmesser aufweisen wie die anderen " Gerüstteile. In denn in Fig. i bis 3 dargestellten Ausführungsbeispiel ist die Öffnung 28 im Verhältnis zu den benachbarten Standbäumen der Rahmeneinheit derart gestaltet, da3 ein: fest eingespannter Streichbaum 29 mit seiner Oberkante von der Oberkante des Querstabes. 212 in einem Abstand zu liegen, kommt, der dem Durchmesser eines Streichbaumes entspricht. In dieser Weise wird ein mit 44 bezeichneter schmaler Zwischenraum zwischen der Oberkante -des Streichbaumes 29 und der unteren Kante des Querstabes 23 offen gelassen.In each of the embodiments described above, the diameter is of the cross bar 23 is slightly smaller than the diameter of the standing spaces 2i, 22 of the Frame unit selected, which have the same diameter as the others "Scaffolding parts. In the exemplary embodiment shown in FIGS Opening 28 in relation to the adjacent booms of the frame unit in such a way designed, that a: firmly clamped backrest 29 with its upper edge from the Upper edge of the cross bar. 212 to lie at a distance, which comes to the diameter corresponds to a string tree. In this way, one indicated by 44 becomes narrower Space between the upper edge of the backrest 29 and the lower edge of the cross bar 23 left open.

Bei der in Fig. 4 dargestellten Ausführungsform. ist es infolgedessen notwendig, an der unteren Seite des Querstabes 23 eine Abstandsplatte anzuordnen, welche hier durch Schweißen befestigt werden kann und in ihrer Dicke dem erwähnten Zwischenraum entspricht.In the embodiment shown in FIG. it is as a result necessary to arrange a spacer plate on the lower side of the cross bar 23, which can be attached here by welding and the thickness mentioned Space corresponds.

In allen Fällen ist die Anordnung derart getroffen., daß die Streichbäume 2g von den Klemmvorrichtungen 25 in einer derartigen Lagegehalten werden, daß weitere ,Gerüstelemente, soggenannte Riegel, die quer über die Streichbäume gelegt werden und den gleichen Durchmesser wie die Streichbäume besitzen, mit ihren Oberkanten mit der Oberkante der Querstäbe 23 in gleicher Ebene liegende Unterstützungen für die Bohlen 24 bilden.In all cases the arrangement is made in such a way that the string trees 2g of the clamping devices 25 are held in such a position that further , Scaffolding elements, so-called bars, which are placed across the string trees and have the same diameter as the string trees, with their upper edges with the upper edge of the cross bars 23 in the same plane supports for the planks 24 form.

Dies ist aus der Darstellung der Fig. i und 8 der Zeichnung ersichtlich, in welcher die Riegel in Form von kurzen Stahlrohren und mit gleichem Durchmesser wie die Streicher mit 46 bezeichnet sind, in parallelen Zwischenräumen zwischen den Querstäben 23 angeordnet sind, wobei ihre Oberkanten in der gleichen Ebene mit den Oberkanten der Querstäbe 23 liegen (Fig. 8). Die Riegel sind gegenüber den Streichern, durch besondere Klemmschellen 47 gesichert, und. die Länge der Riegel ist gleich oder um ein geringes größer als die Länge der Querstäbe z3. Die vorbeschriebene Konstruktion, in der die Riegel mit den Oberkanten der Querstäbe 23 in einer Ebene liegen, gibt die Mög- lichkeit, daß die letzteren einen geringeren Durchmesser als die Riegel erhalten.This can be seen from the representation of FIGS lie on the same plane with the upper edges of the cross bars 23 (Fig. 8). The bolts are secured against the strings by special clamps 47, and. the length of the bars is equal to or slightly greater than the length of the cross bars z3. The above-described construction in which the bars with the upper edges of the transverse rods 23 lie in a plane, is the possibility that the latter has a smaller diameter than the bolt obtained.

Hierdurch wird. eine Ersparnis an Material und Kosten für jede Rahmeneinheit erzielt, welche insbesondere -dort von Bedeutung ist, wo, wie beispielsweise bei der Errichtung von Gerüsten, eine große Anzahl von Rahmeneinheiten angewendet werden muß. Auf der anderen Seite besitzt auch die an jeder Rahmeneinheit ermöglichte Ersparnis an Geweicht den Vorteil, daß die, Rahmeneinheiten leichter gehandhabt werden können.This will. a saving in material and costs for each frame unit achieved, which is particularly important there where, such as at the erection of scaffolding, a large number of frame units can be applied got to. On the other hand, it also has the savings made possible on each frame unit in terms of weight has the advantage that the frame units can be handled more easily.

In Fig. 5 ist eine etwas, abgeänderte Ausbildung der Rahmeneinheit veranschaulicht, in; welcher die diagonalen Streben 35 in Fortfall gekommen, sind und durch ein Paar in senkrechtem Abstand voneinander angeordneten Querstreben 48 ersetzt sind, die starr und dauerhaft mit ihren Enden' an den Standbäumen- 21, 222 befestigt sind.In Fig. 5 is a somewhat modified design of the frame unit illustrated in; which the diagonal struts 35 have come to an end and by a pair of perpendicularly spaced transverse struts 48 are replaced, the rigid and permanent with their ends' on the booms 21, 222 are attached.

Eine derartige Bauart ist insbesondere mit Vorteil als Gestell oder Bock beim Verputzen, Kalken und Anstreichen von Wänden und Decken in Geb-äuden zu verwenden, wo häufig eine beträchtliche Verstellung der Höhe der Plattform erforderlich ist.,Selbstverständlich kann diese Ausführungsform auch als Gerüst für alle anderen Zwecke verwendet werden, wo eineYeränderung der Höhenlage einer Bühne oder Plattform erforderlich ist.Such a design is particularly advantageous as a frame or Bock when plastering, liming and painting walls and ceilings in buildings use where a considerable adjustment of the height of the platform is often required is., Of course, this embodiment can also be used as a framework for all others Purposes where there is a change in the height of a stage or platform is required.

Die Veränderung der Höhenlage wird bei ,dieser Bauart mit Hilfe von schneckenförmig verdrillten Schäften 3b wie in den vorherigen Ausführungsformen erreicht, aber diese Schäfte sind im Vergleich zu der Bauart nach der Fig. i durch eine standfestere Unterlage unterstützt, die beispielsweise aus einem Paar von senkrechten Rohrstützen 49 bestehen kann, in denen die unteren Enden der Schäfte aufgenommen werden, so daß sie 'sich durch die ganze Länge dieser Rohre erstrecken, die mit Füßen 37 versehen sind und durch ein Paar horizontaler Streben 5o verbunden sind.The change in altitude is made with this type of construction with the help of helical twisted shafts 3b as in the previous embodiments achieved, but these shafts are compared to the type of Fig. i through a more stable base supports, for example from a pair of vertical Pipe supports 49 may exist in which the lower ends of the stems are received so that they 'extend the full length of these tubes which are connected to Feet 37 are provided and are connected by a pair of horizontal struts 5o.

In .dieser Bauart bilden die oberen Enden der Standbäume 21 jeder Rahmeneinheit wie in den vorher beschriebenen Bauarten Zapfen, und der innere Durchmesser der Zapfen ist geringer als der Durchmesser der verdrillten Schäfte 36, so daß die maximale Verstellbarkeit in .der Höhe nicht ,größer als die Länge der Standbäume der Rahmeneinheit sein kann.In .dieser design form the upper ends of the booms 21 each Frame unit as in the previously described types of tenons, and the inner diameter the pin is smaller than the diameter of the twisted shafts 36, so that the maximum adjustability in height not, greater than the length can be the boom of the frame unit.

Eine weitaus größere Verstellbarkeit in der Höhe wird bei der in Fig.6 veranschaulichten weiteren Ausführungsform der Erfindung erreicht. Hierin sind die oberen Zapfen der Standbäume in Fortfall gekommen, und es finden verdrillte Schäfte 36 von wesentlich größerer Länge als bei den vorhergehenden Bauarten Verwendung, die jeden der Standbäume 21, 22 in ihrer ganzen Länge durchdringen und auf denen; die Höhenlage der Rahmeneinheit in der bereits, beschriebenen Weise verändert werden kann. Bei dieser Bauart ist zusätzlich zu den Querstäben 23 in der Nähe der oberen Enden der Standbäume der Rahmeneinheit ein weiterer Querstab, 23 vorgesehen:, welcher eine Verstrebung bildet und starr und fest mit den beiden Standbäumen in der Nähe ihrer unteren Enden verbunden ist. Ein weiteres Paar von, Klemmvorrichtungen 25 ist an den Verbindungspunkten zu den Standbäumen angeordnet, um ein weiteres Lager zur Aufnahme von: Streichern 29 zu schaffen, die die einzelnen im Abstand voneinander angeordneten Rahmeneinheiten quer miteinander verbinden. Die verdrillten Schäfte sind wiederum mit Füßen 37 zur Auflage gegenüber dem Erdboden versehen.A much greater adjustability in height is shown in Fig. 6 Another embodiment of the invention illustrated is achieved. Here are those The upper tenons of the standing trees have ceased to exist, and twisted shafts are found 36 of much greater length than in the previous types of use, which penetrate each of the standing trees 21, 22 in their entire length and on which; the height of the frame unit can be changed in the manner already described can. In this design is in addition to the cross bars 23 in the vicinity of the upper At the ends of the booms of the frame unit, a further cross bar, 23 is provided: which forms a brace and is rigid and firm with the two standing trees nearby their lower ends is connected. Another pair of clamps 25 is arranged at the connection points to the booms to create another warehouse To accommodate: Strings 29 to create each spaced apart interconnect arranged frame units transversely. The twisted shafts are in turn provided with feet 37 to rest against the ground.

Die in Fig. 6 dargestellte Ausführungsform ist insbesondere auch zur Abstützung einer Schalung bei der Aufführung von Mauern cd. dgl. in Guß-oder Stampfbeton oder sonstigem Material, welches während des Einbringens durch bewegliche Schalungsplatten nach außen abgedichtet wird, geeignet. Der Beton oder das andere Material wird stufenweise gegossen, und die Schalungsplatten werden von Zeit zu Zeit einzeln höher gesetzt, so, daß ihre Oberkanten mit .der Oberfläche des Gußma,terials im wesentlichen immer in gleicher Höbe bleiben. Die Schalung wird jeweils in einer derartigen Höhe angewendet, daß das gegossene Material fortschreitend unbedeckt bleibt vom der unteren Kante der Schalungsp1atten, nachdem es abgebunden hat. Diese nach oben fortschreitende Anwendung von Schalungsplatten ermöglicht .die Anwendung einer Verschalung, deren Höhe nur einen Bruchteil der aufzuführenden Mauer ad. dgl. beträgt.The embodiment shown in Fig. 6 is in particular also for Supporting a formwork in the construction of walls cd. Like. In cast or stamped concrete or other material, which during the introduction by movable formwork panels is sealed to the outside, suitable. The concrete or other material becomes gradually poured, and the formwork panels are raised one by one from time to time, so that their upper edges essentially always with the surface of the cast material stay at the same level. The formwork is used at such a height that the cast material remains progressively uncovered from the lower edge the formwork panels after it has set. This progressing upwards The use of shuttering panels enables the application of shuttering, their Height only a fraction of the wall to be erected ad. Like. Is.

Die Anwendung der in Fig. 6 dargestellten Konstruktion bei der Aufführung derartiger Mauern ist in Fig. 7 veranschaulicht, worin die in Arbeit befindliche Man--r mit 51 bezeichnet ist und. die, verdrillten Schäfte 36 in zwei Reihen angeordnet sind, nämlich in einer innerem Reihe unmittelbar an der aufzuführenden ?lauer und einer äußeren Reihe in. einem gewissen Abstand davon, wobei die Standbäume 21, 22 jeder Rahmeneinheit in. der inneren und äußeren Reihe stehen. An den inneren Standbäumen 21 liegen, die Schalungsplatten 52 all, und diese Scha,lungsplatten sind an dem benachbarten Standbaum 2i mit Hilfe von Klemmvorrichtungen 53 befestigt, wobei Abstandsstücke zwischen: der Außenseite der Schalungsplatte und dem daneben stehenden Standbaum angeu@rdnet sind.The application of the construction shown in Fig. 6 to the performance of such walls is illustrated in Figure 7, wherein the work in progress Man - r is denoted by 51 and. the twisted shafts 36 arranged in two rows are, namely in an inner row immediately next to the? lauer and an outer row at a certain distance therefrom, the standing trees 21, 22 of each frame unit in the inner and outer rows. On the inner trees 21 lie, the formwork panels 52 all, and these formwork panels are on the adjacent stand tree 2i fixed with the aid of clamping devices 53, with spacers between: the outside of the formwork panel and the standing tree next to it are angeu @ rdnet.

Der obere Querstab oder, wenn erforderlich, der untere Querstab 23 des Rahmens trägt Bohlen 24, welche sich über- die ganze Länge der Mauer erstrecken und eine Arbeitsbühne für die Arbeiter während des Betonierens bilden. Die einzelnen Rahmen sind in gewissen Abständen längs der Mauer angeordnet und werden mit den, mit ihnen verbundenen Schalungsplatten mit fortschreitender Betonierung durch die, Verschiebung der Spannhülsen 38 in der Längsrichtung der Schäfte 36 in. der Höhe verstellt.The upper cross bar or, if necessary, the lower cross bar 23 of the frame carries planks 24 which extend over the entire length of the wall and provide a work platform for workers to use while pouring the concrete. The single ones Frames are arranged at certain intervals along the wall and are formwork panels connected to them as concreting progresses through the, Displacement of the clamping sleeves 38 in the longitudinal direction of the shafts 36 in height adjusted.

In der Darstellung der Fig. 7 ist dabei nur ein. Paar von Spannhülsen veranschaulicht.In the illustration of FIG. 7, there is only one. Pair of adapter sleeves illustrated.

In Fig. 9 ist eine Ausführungsform eines Gerüstaufbaue@s aus einzelnen Rahmen, 20 veranschaulicht, welche starrer als diebisher beschriebenen Bauarten ist. Eine: derartige Bauart ist dort anwendbar, wo die Unterstützung einer Arbeitsbühne in ihrer Höhenstellung verändert werden soll, und es sind bei dieser Ausführungsform die im Abstand voneinander angeordneten Rahmeneinheitent zusätzlich durch quer angeordnete Streichbäume 29 verbunden sowie durch Verbindungsrahmen 55 von ähnlicher Formgebung wie die Rahmen 20. Nur sind in. diesem Rahmen die Klemmvorrichtungen 25 in Fortfall kommen, jedoch können an Stelle der Verbindungsrahmen 55 auch Rahmeneinheiten 2o mit Klemmvorrichtungen, wenn erforderlich, zur Anwendung gebracht werden.In Fig. 9 is an embodiment of a frame structure @ s from individual Frame, 20 illustrates which are more rigid than the types previously described is. One: such a design is applicable where the support of a work platform should be changed in their height position, and there are in this embodiment the spaced apart frame units are additionally arranged by transversely arranged String trees 29 connected and by connecting frames 55 of a similar shape like the frame 20. Only the clamping devices 25 are omitted in this frame come, but instead of the connecting frame 55, frame units 2o be brought into use with clamping devices if necessary.

Diese Verbindungsrahmen bestehen: aus senkrechten Rohren 56, welche starr durch horizontale Rohre 57 verbunden und hiergegen mit diagonalen Streben 58 versteift sind, und zwar in gleicher Art wie in der Bauart nach Fig. i. Die senkrechten Rohre 56 sind mit den Standbäumen 2i, 22 der Rahmeneinheit mit Hilfe besonders ausgebildeter Klemmvorrichtungen 59 verbunden, die die Teile 56 und 21 oder 2-2 in: unmittelbarer paralleler Anordnung gegeneinander feststellen.These connecting frames consist: of vertical tubes 56, which rigidly connected by horizontal tubes 57 and against this with diagonal struts 58 are stiffened, in the same way as in the type of Fig. I. The vertical Pipes 56 are with the booms 2i, 22 of the frame unit with the help of specially trained Clamping devices 59 connected, which the parts 56 and 21 or 2-2 in: immediate determine parallel arrangement against each other.

Die oberen Enden der Gerüstteile 56 der Ve@rbindungsrahmen sind in ähnlicher Weise wie die oberen Enden der Standbäume 21, 22 als Zapfen ausgebildet und besitzen die gleiche Länge wie diese Gerüstte@ile, und die Klammern 59 sichern. gleichzeitig die Zapfen 41 der Gerüstteile 2 i, 22 und 56 gegen die hülsenförmigen unteren Enden 42 der unmittelbar anschließenden Gerüstteile, wie dies im einzelnen in Fig. io veranschaulicht ist. Insbesondere aus der Darstellung der F'ig. 8 ist ersichtlich, da,ß die Breite aller erwähntem Klammerformen immer derart bemessen ist, daß sie die Stärke der Standbäume der Rahmeneinheit oder sonstigen senkrechten Gerüstteile in der Breite nicht überschreiten, so da.ß zwei Rahmeneinheiten Seite an Seite in unmittelbarer Nachbarschaft zueinander angeordnet werden können, wie in Fig. 8 in, gestrichelten Linien dargestellt.The upper ends of the framework parts 56 of the connecting frames are shown in FIG In a similar manner to the upper ends of the standing trees 21, 22 designed as pegs and have the same length as these scaffolding parts, and the clamps 59 secure. at the same time the pin 41 of the frame parts 2 i, 22 and 56 against the sleeve-shaped lower ends 42 of the immediately adjoining frame parts, as described in detail is illustrated in Fig. io. In particular from the representation in Figs. 8 is It can be seen that the width of all the aforementioned bracket shapes is always measured in this way is that it is the strength of the booms of the frame unit or other vertical ones Do not exceed the width of the scaffolding parts, so that there are two frame units on each side can be arranged on side in close proximity to one another, such as shown in FIG. 8 in dashed lines.

Claims (7)

PATENTANSPRÜCHE: i. Aus. einzelnen vorher gefertigten Rahmen gebildetes Rohrbaugerüst, insbesondere zurAufnahme und Unterstützung von Arbeitsbühnen, bei dem die einzelnen aus je zwei Standbäumen und einem oder mehreren Querstäben gebildeten Rahmen mittels mindestens über zwei Felder durchlaufender Streichbäume und Klemmvorrichtungen miteinander verbunden werden, gekennzeichnet durch diel Vereinigung durchlaufender Streichbäume mit in: den inneren oberen Ecken. jeder Rahmeneinheit am Rahmen ortsfest angebrachten Klemmvorrichtungen und mit über die Streichbäume gelegten rohrförmigen Riegeln, deren Oberkanten mit den Oberkanten der Rahmenquerstäbe zur Aufnahme einer Arbeitsbühne in einer Ebene liegen. PATENT CLAIMS: i. The end. single frame made beforehand Tubular scaffolding, in particular for holding and supporting work platforms each of which is made up of two standing trees and one or more cross bars frame by means of string trees and clamping devices running through at least two fields connected with each other, characterized by the union of continuous String trees with in: the inner upper corners. each frame unit stationary on the frame attached clamping devices and with tubular ones placed over the stretcher trees Bars, the upper edges of which with the upper edges of the frame cross bars to accommodate a Working platform lie on one level. 2. Gerüst nach Anspruch i, dadurch-gekennzeichnet, daß die an den. Rahmen fest angeordneten Klemmvorrichtungen aus je einer in dem Anschlußwinkel zwischen Querstab und: Standbäumen angeordneten Klammer bestehen, die mit ihren Schenkeln an Querstab und Standbaum angeschlossen ist und eine Queröffnung zur Aufnahme eines Streichers besitzt, in deren Bereich eine Klemmschraube oder sonstige Spannvorrichtung angerdnet ist. 2. Scaffold according to claim i, characterized-characterized, that the. Frame fixed clamping devices each from one in the Connection bracket between crossbar and: brackets arranged which is connected with its legs to the crossbar and stand tree and a cross opening for receiving a string, in the area of which a clamping screw or other clamping device is attached. 3. Gerüst nach Anspruch i, dadurch gekennzeichnet, daß die an dem Rahmen angeordneten Klemmvorrichtungen aus je einer in den AnschluBwinkel zwischen Querstab und Standbäumen angeordneten Klammer bestehen, die mit einem Ende an den benachbarten Standbaum angeschlossen ist und mit dem anderen Ende einen offenen Haken zur Einführung eines Streichbaumes bildet, in dessen Bereich eine Klemmschraube oder sonstige Spannvorrichtung angeordnet ist. 3. Scaffold according to claim i, characterized in that that the clamping devices arranged on the frame each come from one in the connection bracket There are brackets arranged between the crossbar and the standing trees, with one end is connected to the neighboring stand tree and the other end is an open one Hook for the introduction of a backrest forms, in the area of which a clamping screw or other clamping device is arranged. 4. Gerüst nach Anspruch i bis 3, dadurch gekennzeichnet, daß die Klemmschraube mit einer drehbaren Druckplatte versehen ist, die mit Vorsprüngen einen oder beide Schenkel der Klammer umgreift. 4. scaffold according to claim i to 3, characterized in that the clamping screw is provided with a rotatable pressure plate is, which engages around one or both legs of the clamp with projections. 5. Gerüst nach Anspruch i bis 4, dadurch gekennzeichnet, daß die Breite der Klemmvorrichtungen die Abmessungen der Rahmen und insbesondere die ihrer Standbäume nach den Seiten. nicht überschreitet. 5. Scaffolding according to claims i to 4, characterized in that the width of the clamping devices the dimensions of the frames and especially those of their booms on the sides. does not exceed. 6. Gerüst nach Anspruch i bis 5, dadurch gekennzeichnet, daß der Querstab der Rahmen: aus einem Stahlrohr von geringerem Durchmesser als die Streicher besteht und die, Klemmvorrichtungenderart angeordnet sind, da.ß sie die Streicher in einer Lage sichern können, in der ihre Oberseite um einen, kleinem Zwischenraum unterhalb, der Unterseite der Querstäbe, angeordnet ist. 6. Scaffolding according to claim i to 5, characterized in that the crossbar of the frame: made of a steel tube of smaller diameter than that Streicher consists and the clamping devices are arranged such that they the Strings can be secured in a position in which their top around a, small Space below, the underside of the cross bars, is arranged. 7. Gerüst nach Anspruch i bis 6, dadurch gekennzeichnet, daß ,die festen Rahmen aus zwei durch einen einzigen Querstab verbundenen Standbäumen bestehen, der in der Nähe der oberen Enden der Standbäume angeordnet, in den Anschlußwinkeln zu den Standbäumen mit je einer Klemmvorrichtung für die Streicher versehen und gegen die Standbäume durch DiagonaIstreben versteift ist, die von der Mitte der Unterseite des Querstabes ausgehend; an die Standbäume in der Nähe ihrer unteren. Enden angeschlossen sind. Angezogene Druckschriften: USA.-Patentschriften Nr. 2 057 329, 2 125 9o6, 2 261 907, a 361 614, 2 379 446, -2 47.2 423; schwedische Patentschrift Nr. 96 611.7. Scaffolding according to claim i to 6, characterized in that the fixed frame consists of two a single cross bar connected standing trees, which is near the top Arranged ends of the stand trees, in the connection angles to the stand trees with each provided a clamping device for the strings and against the trees Diagonal braces are stiffened, starting from the center of the underside of the cross bar; to the booms near their lower ones. Ends are connected. Dressed References: U.S. Patent Nos. 2,057,329, 2,125,9o6, 2,261,907, a 361 614, 2,379,446, -2 47.2 423; Swedish Patent No. 96 611.
DEP27497A 1945-10-02 1948-12-28 Tubular scaffolding made from individual frames made beforehand Expired DE888161C (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB888161X 1945-10-02

Publications (1)

Publication Number Publication Date
DE888161C true DE888161C (en) 1953-08-31

Family

ID=10649465

Family Applications (1)

Application Number Title Priority Date Filing Date
DEP27497A Expired DE888161C (en) 1945-10-02 1948-12-28 Tubular scaffolding made from individual frames made beforehand

Country Status (1)

Country Link
DE (1) DE888161C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1066008B (en) * 1959-09-24
DE102017218929A1 (en) * 2017-10-24 2019-04-25 Peri Gmbh Scaffolding with climbing protection

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2057329A (en) * 1934-12-10 1936-10-13 Duff John Tubular scaffolding
US2195906A (en) * 1939-06-08 1940-04-02 Safway Steel Scaffolds Co Of W Scaffold
US2261907A (en) * 1939-06-23 1941-11-04 Safway Steel Scaffolds Co Of W Scaffold bracket
US2361614A (en) * 1943-07-15 1944-10-31 Nat Tube Co Scaffold
US2379446A (en) * 1942-10-05 1945-07-03 Flangelock Patents Corp Scaffolding
US2472423A (en) * 1945-10-02 1949-06-07 Kwikform Ltd Scaffolding

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2057329A (en) * 1934-12-10 1936-10-13 Duff John Tubular scaffolding
US2195906A (en) * 1939-06-08 1940-04-02 Safway Steel Scaffolds Co Of W Scaffold
US2261907A (en) * 1939-06-23 1941-11-04 Safway Steel Scaffolds Co Of W Scaffold bracket
US2379446A (en) * 1942-10-05 1945-07-03 Flangelock Patents Corp Scaffolding
US2361614A (en) * 1943-07-15 1944-10-31 Nat Tube Co Scaffold
US2472423A (en) * 1945-10-02 1949-06-07 Kwikform Ltd Scaffolding

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1066008B (en) * 1959-09-24
DE102017218929A1 (en) * 2017-10-24 2019-04-25 Peri Gmbh Scaffolding with climbing protection
EP3477017A1 (en) * 2017-10-24 2019-05-01 Peri Gmbh Scaffold frame with climbing aid

Similar Documents

Publication Publication Date Title
DE3641349C2 (en) Construction support
DE2742883A1 (en) FORMWORK DEVICE FOR PRODUCING CONCRETE WALLS
DE19511847A1 (en) Support structure arrangement for scaffolding
DE2142150A1 (en) Support structure for formwork and work and stabilization scaffolding for this
DE2217584A1 (en) CLIMBING FRAMEWORK FOR CONCRETE FORMWORK
EP0851075A1 (en) Elevated platform or staging, particularly for use as floorshuttering for concrete
DE888161C (en) Tubular scaffolding made from individual frames made beforehand
DE1803626A1 (en) Scaffolding
EP0346326B1 (en) Snow shed and avalanche-breaking structure made of at least two snow sheds
DE1810748A1 (en) Circuit element
DE2724398A1 (en) Anchoring bars for chimney stack foundation - are placed by gauge ring removed after concrete has harden
EP0736648A1 (en) Scaffold
WO1984000189A1 (en) Method for wall concreting and formwork to implement such method
DE510831C (en) Pull-up formwork
DE1804657A1 (en) Process for the production of concrete or reinforced concrete walls and concrete or reinforced concrete wall produced using this process
DE3048043A1 (en) Ceiling formwork support structure - has folding legs swinging and set at angle round telescopic upright
EP2273038A2 (en) Formwork and method for constructing same
EP0857834B1 (en) Method and frame for erecting concrete walls
AT400465B (en) FORMWORK AND METHOD FOR POURING A CONCRETE CONTAINER
DE3428095C2 (en)
DE6609201U (en) FORMWORK FOR CIRCULAR OR PARTIAL CIRCULAR CONCRETE BUILDINGS.
EP0281046B1 (en) Mould for the pouring of building parts
DE19536895A1 (en) Adjustable shuttering for square or rectangular-section columns
DE2934424C2 (en)
DE3811305A1 (en) Apparatus for erecting a platform which can be used in the building industry