DE767598C - Bucket wheel excavator - Google Patents
Bucket wheel excavatorInfo
- Publication number
- DE767598C DE767598C DEL85185D DEL0085185D DE767598C DE 767598 C DE767598 C DE 767598C DE L85185 D DEL85185 D DE L85185D DE L0085185 D DEL0085185 D DE L0085185D DE 767598 C DE767598 C DE 767598C
- Authority
- DE
- Germany
- Prior art keywords
- boom
- bucket wheel
- excavator
- rotation
- link
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 241000723347 Cinnamomum Species 0.000 description 1
- 241000196324 Embryophyta Species 0.000 description 1
- 235000017803 cinnamon Nutrition 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 210000001503 joint Anatomy 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C47/00—Machines for obtaining or the removal of materials in open-pit mines
- E21C47/02—Machines for obtaining or the removal of materials in open-pit mines for coal, brown coal, or the like
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Description
Schaufelradbagger Bei den bekannten Scbaufelradbaggern ist üblicherweise der an seinem freien Ende das Schaufelrad tragende Förderbandausleger im Baggergestell senkrecht schwenkbar und gegen den Stoß verschiebbar gelagert, und zwar befindet sich diese Drehachse ungefähr in mittlerer Höhe der abzubauenden Böschung. Es ergeben sich auf diese Weise die geringsten Neigungswinkel für das. Förderband beim Baggern am Böschungsfuß bzw. an der Böschungskrone. Inder Regel ist eine größere Neigung als ao°' gegenüber der Waagerechten fördertechnisch nicht mehr angängig, da das Baggergut sonst auf dem Förderband ins Rutschen gelangt. Wegen dieser unterhalb der Höhe der Böschungskrone gelegenen Drehachse des Förderbandauslegers bedarf jede Höhenverstellung des Schaufelrades eines gleichzeitigen Vorschubes gegen. den Stoß, da sonst eine zu steile oder sogar unterschnittene Böschung entstehen würde: Es ist also neben dem Antrieb für das Heben und Senken, der, wie üblich, durch einen Seilzug erfolgt, noch ein zweiter Antrieb für das Vorstoßwerk ständig zu betätigen. Ein genaues Einstellen ist dadurch schwierig und zeitraubend. Es ist zwar bereits vorgeschlagen worden, das hintere Lagergelenk des Förderbandauslegers höhenverstellbar anzuordnen, aber da der Förderbandausleger zufolge des begrenzten (2o0) Rutschwinkels des Fördergutes nur in einem begrenzten Schwenkausmaß ausnutzbar ist, so läßt sich für den Abtrag hoher Böschungen hierdurch ein Ge-,cinn nicht erzielen, vielmehr bedarf es beim Schwenken des Förderbandauslegers in senkrechter Richtung der ständigen Verstellung seiner Drehachse, so, daß also auch hier Mindestens zwei Antriebe gleichzeitig betätigt «-erden müssen.Bucket wheel excavators In the known bucket wheel excavators is usually the conveyor belt boom in the excavator frame carrying the bucket wheel at its free end vertically pivotable and mounted displaceably against the impact, namely located this axis of rotation is approximately in the middle of the embankment to be excavated. It surrendered In this way, the smallest angle of inclination for the. Conveyor belt when excavating at the foot of the slope or at the top of the slope. Usually there is a greater slope as ao ° 'in relation to the horizontal is no longer accessible from a conveying point of view, since the Otherwise dredged material could slip on the conveyor belt. Because of this below The axis of rotation of the conveyor belt boom located at the height of the embankment crest requires each Height adjustment of the paddle wheel against a simultaneous feed. the shock, otherwise the embankment would be too steep or even undercut: Es so is next to the drive for lifting and lowering, which, as usual, by one Cable pull takes place to continuously operate a second drive for the advance mechanism. Precise adjustment is therefore difficult and time-consuming. It has already been proposed, the rear bearing joint of the conveyor belt boom to be arranged adjustable in height, but since the conveyor belt boom according to the limited (2o0) The slip angle of the conveyed material can only be used to a limited extent is, it is not possible to achieve a cinnamon for the removal of high embankments, rather, it is necessary when pivoting the conveyor belt boom in the vertical direction the constant adjustment of its axis of rotation, so that also here at least two Drives operated at the same time «must be earthed.
Andererseits ist es bereits bei einer Abraumgewinnungsanlage bekanntgeworden, das Grabwerkzeug, das als kurze Eimerleiter ausgebildet und am freien Ende eines heb- und senkbaren sowie gegen den Stoß verschiebbaren Förderbandauslegers gelagert ist, durch einen besonderen, am Baggergestell cerfalirbar oder verschiebbar sowie senkrecht schwenkbar gelagerten Lenker zu führen. Die Drehachse dieses Lenkers befindet sich jedoch ebenfalls in ungefähr mittlerer Höhe der abzubauenden Böschung. Infolgedessen mini bei jeder Höhenverstellung des Baggerwerkzeuges dieses gleichzeitig gegen den Stoß verschoben werden, da sonst eine zu steile und im oberen Teil unterschnittene Böschung entstehen würde. Es sind also auch hier bei jeder Einstellung die beiden Antriebe zu betätigen. Trotz der getrennten Drehachsen befindet sich die Drehachse des besonderen Lenkers nur unerheblich höher als diejenige des Förderbandauslegers. Soweit die Drehachse des Lenkers vierfahrbar ist, geschieht diese -#v7erfahrbarkeit auf der üblichen waagerechten Bahn, so daß also mit dem Vorschieben gegen den Stoß keine Erhöhung der Lage verbunden ist.On the other hand, it has already become known in an overburden recovery plant, the digging tool, which is designed as a short bucket ladder and at the free end of one liftable and lowerable as well as against the impact displaceable conveyor belt boom mounted is, by a special, cerfalirbar or slidable on the excavator frame as well to guide vertically pivotable handlebars. The axis of rotation of this handlebar is located however, it is also approximately in the middle of the embankment to be excavated. Consequently mini with each height adjustment of the excavator tool this at the same time against the Butt joint, otherwise it will be too steep and undercut in the upper part Embankment would arise. So here, too, in every shot, it's the two Actuate drives. Despite the separate axes of rotation, the axis of rotation is located the special link is only slightly higher than that of the conveyor belt boom. As far as the axis of rotation of the handlebar is four-wheel drive, this happens - # v7erfahrbarkeit on the usual horizontal path, so that it is pushed against the impact no increase in the situation is associated.
Demgegenüber besteht die Erfindung darin. daß der Schaufelradausleger durch einen besonderen an einem Ausleger des Baggergestells angreifenden, in senkrechter Ebene schwenkbarenLenker mit hoch liegenderDrehachse zwangsläufig geführt ist. Infolgedessen ist. ohne daß es eines Verschiebens des Baggerwerkzeuges gegen den Stoß bedarf, eine unterschnittene Böschung vermieden, und es läßt sich bei entsprechender Höhenlage der Drehachse -ohne weiteres eine genügend flache -Neigung der Böschung erzielen. Es kann auch eine stets unter derselben N eigung. verlaufende Böschung gebaggert werden. Dabei wird also nur ein einziger Kraftantrieb für die Einstellung des Schaufelrades benötigt.In contrast, the invention consists in this. that the bucket wheel boom by a special one acting on a boom of the excavator frame, in a vertical position Level pivoting handlebar with a high-lying axis of rotation is inevitably guided. Consequently is. without the need to move the excavator tool against the impact, an undercut embankment avoided, and it can be with appropriate altitude the axis of rotation - without further ado a sufficiently flat slope - achieve the slope. It can also always have the same inclination. dredging embankment will. So there is only a single power drive for setting the paddle wheel needed.
Uni verschiedene Böschungsneigungen einstellen zu können, kann die Drehachse des Lenkers in dem Ausleger des Baggergestells der Höhe nach verstellbar angeordnet sein. Die Erfindung ist in der Zeichnung an zwei Ausführungsbeispielen dargestellt.Uni to be able to set different slope inclinations, the The axis of rotation of the link in the boom of the excavator frame is adjustable in height be arranged. The invention is shown in the drawing in two exemplary embodiments shown.
Abb. i zeigt einen Schaufelradbagger in Fahrtrichtung gesehen, Abb.2 einen Verbundbagger. ebenfalls in Fahrtrichtung gesehen.Fig. I shows a bucket wheel excavator seen in the direction of travel, Fig.2 a compound excavator. also seen in the direction of travel.
Da: beispielsweise auf Gleisketten a cerfahrbare Baggergestell _h besitzt einen Auslegere, an dem im Gelenkfein Lenker e in lotrechter Ebene schwenkbar befestigt ist. Der Lenker c trägt an seinem unteren freien Ende ein Schaufelrad ; und einen Förderbandausleger lr, dessen hinteres freies Ende mittels Rollenwagens 1z auf einer Führungsbahn i des Baggergestells 1) gleitet. Ferner greift am unteren freien Ende des Lenkers c ein Seilzug I an, durch den das durch den Lenker e geführte Schaufelrad- mit dem Förderbandausleger la der Höhe nach verstellbar wird, so daß die dargestellte Böschung geschnitten icerden kann. Das von dem Schaufelrad- gelöste Baggergut wird auf den Förderer des Förderbandauslegers Ir geleitet und am Abwurfende des letzteren entweder unmittelbar in den Schütttrichter fsr oder auf den Zwischenförderer ;r abgeworfen. der es dem Schütttrichter in zuführt. Von dem Schütttrichter m gelangt das Baggergut in bereitstehende Förderwagen o. Ein Gegengewicht p dient zum Gewichtsausgleich.Since: for example on crawlers a cerfahrbaren excavator frame _h has a boom to which a link e is pivotably attached in a vertical plane in the joint f. The handlebar c carries a paddle wheel at its lower free end; and a conveyor belt boom lr, the rear free end of which slides by means of roller carriage 1z on a guide track i of the excavator frame 1). Furthermore, a cable I engages at the lower free end of the link c, by means of which the bucket wheel guided by the link e is adjustable in height with the conveyor belt arm la so that the slope shown can be cut. The dredged material loosened by the bucket wheel is directed onto the conveyor of the conveyor belt boom Ir and, at the discharge end of the latter, is either thrown directly into the hopper fsr or onto the intermediate conveyor; r. who feeds it to the hopper. From the hopper m the dredged material arrives in waiting truck o. A counterweight p is used for weight compensation.
Soll ein flacherer Böschungs-,cinkel als der dargestellte mit dem Schaufelradbagger geschnitten werden, so kann zu diesem Zweck das Gelenk f des Lenkers e längs cerschieblich im Ausleger c gelagert sein. Es kann dann beispielsweise der Lenker e in die mittels strichpunktierte Linie e1 dargestellte Stellung gebracht icerden.Should a flatter slope angle than the one shown with the Bucket wheel excavators are cut, so the joint f of the link can for this purpose e be mounted in the boom c so that it can be slid lengthways. It can then, for example, be the Handlebars e brought into the position shown by the dash-dotted line e1 icerden.
In Abb.2 ist das Baggergestell 1) unter Vermittlung eines Schwenkkranzes q auf dem Baggeruntergestell r eines Tiefbaggers s in waagerechter Ebene schwenkbar gelagert. Statt des Schaufelrades ist hier eine kurze Eimerleiter g1 am Ende des Lenkers e einstellbar gelagert. Im übrigen ist die Ausbildung die gleiche wie bei dem Gerät nach Abb. i, jedoch ist der Ausleger c mittels eines Seilzuges t um das Gelenk tt in lotrechter Ebene schwenkbar am Baggerobergestell6 gelagert. Die strichpunktierte Linie cl zeigt eine Stellung des Auslegers c, hei der der Lenker e die in der strichpunktierten Linie ei dargestellte Lage einnehmen kann. Auch durch diese besondere Einstellbarkeit ist das Schneiden einer weniger steilen Böschung möglich.In Fig. 2, the excavator frame 1) is pivotably mounted in the horizontal plane on the excavator frame r of a deep excavator s by means of a slewing ring q. Instead of the paddle wheel, a short bucket ladder g1 is adjustably mounted at the end of the link e. Otherwise, the design is the same as in the device according to Fig. I, but the boom c is mounted on the excavator upper frame 6 by means of a cable t about the joint tt in a vertical plane so that it can be pivoted. The dash-dotted line cl shows a position of the boom c, in which the link e can assume the position shown in the dash-dotted line ei. This special adjustability also enables the cutting of a less steep slope.
Das von dem Grabwerkzeug g1 gelöste Baggergut wird von dem Förderer des Förderbandauslegers 1a oder von dem Z«-ichenförderband ;a in den Schütttrichter in gewGrfen, der dasselbe durch den Schwenkkranz q hindurch einem darunter befindlichen weiteren Hilfsförderband v zuführt. Das Hilfsförderband v fördert zusammen mit einem von der Eimerleiter s beschickten, Hilfsförderband w in einen Schütttrichter x, der das Baggergut den Förderwagen o zugeführt.The dissolved from the grave tool g1 dredged material is -ichenförderband from the conveyor of the conveyor boom 1a or from Z '; a in the hopper in gewGrfen, of the same through the pivot ring through q an underlying further auxiliary conveyor supplying v. The auxiliary conveyor belt v, together with an auxiliary conveyor belt w loaded by the bucket ladder s, conveys into a hopper x, which feeds the dredged material to the trolley o.
Die in Abb. z gezeigte Verschiebbarkeit des Anlenkpunktes f des Lenkers e kann auch bei dem in Abb. 2 dargestellten lotrecht schwenkbaren Ausleger c vorgesehen sein.The displaceability of the articulation point f of the link e shown in Fig. Z can also be provided in the vertically pivotable boom c shown in Fig. 2.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEL85185D DE767598C (en) | 1934-01-23 | 1934-01-23 | Bucket wheel excavator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEL85185D DE767598C (en) | 1934-01-23 | 1934-01-23 | Bucket wheel excavator |
Publications (1)
Publication Number | Publication Date |
---|---|
DE767598C true DE767598C (en) | 1953-03-16 |
Family
ID=7285848
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DEL85185D Expired DE767598C (en) | 1934-01-23 | 1934-01-23 | Bucket wheel excavator |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE767598C (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE972116C (en) * | 1936-05-26 | 1959-05-21 | Luebecker Maschb Ag | Bucket wheel excavator |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE362436C (en) * | 1921-05-15 | 1922-10-28 | Karl Gerber | Excavator |
DE502034C (en) * | 1928-10-03 | 1930-07-14 | Atg Allg Transportanlagen Ges | Equipment for the extraction, conveyance and relocation of overburden in opencast mines |
FR726823A (en) * | 1930-11-25 | 1932-06-03 | Lubecker Maschb Ges | Excavator system |
DE562878C (en) * | 1930-09-02 | 1932-10-29 | A T G Allg Transportanlagen Ge | Open pit mine for the extraction and relocation of mountain layers |
DE566200C (en) * | 1931-03-31 | 1932-12-12 | Mitteldeutsche Stahlwerke Akt | Bucket wheel excavators that can be raised and lowered in a vertical plane on an open pit mine |
DE568296C (en) * | 1930-05-29 | 1933-01-17 | Maschf Augsburg Nuernberg Ag | Overburden recovery and conveyor system |
DE568838C (en) * | 1930-09-02 | 1933-01-24 | Atg Allg Transportanlagen Ges | Bucket wheel excavator for high and low cut |
DE574718C (en) * | 1928-10-13 | 1933-04-19 | A T G Allg Transportanlagen Ge | Overburden conveyor bridge spanning the opencast mining of lignite or the like |
-
1934
- 1934-01-23 DE DEL85185D patent/DE767598C/en not_active Expired
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE362436C (en) * | 1921-05-15 | 1922-10-28 | Karl Gerber | Excavator |
DE502034C (en) * | 1928-10-03 | 1930-07-14 | Atg Allg Transportanlagen Ges | Equipment for the extraction, conveyance and relocation of overburden in opencast mines |
DE574718C (en) * | 1928-10-13 | 1933-04-19 | A T G Allg Transportanlagen Ge | Overburden conveyor bridge spanning the opencast mining of lignite or the like |
DE568296C (en) * | 1930-05-29 | 1933-01-17 | Maschf Augsburg Nuernberg Ag | Overburden recovery and conveyor system |
DE562878C (en) * | 1930-09-02 | 1932-10-29 | A T G Allg Transportanlagen Ge | Open pit mine for the extraction and relocation of mountain layers |
DE568838C (en) * | 1930-09-02 | 1933-01-24 | Atg Allg Transportanlagen Ges | Bucket wheel excavator for high and low cut |
FR726823A (en) * | 1930-11-25 | 1932-06-03 | Lubecker Maschb Ges | Excavator system |
DE566200C (en) * | 1931-03-31 | 1932-12-12 | Mitteldeutsche Stahlwerke Akt | Bucket wheel excavators that can be raised and lowered in a vertical plane on an open pit mine |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE972116C (en) * | 1936-05-26 | 1959-05-21 | Luebecker Maschb Ag | Bucket wheel excavator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2834987A1 (en) | Mobile crushing plant for open cast mine - has tiltable feed conveyor belt with hopper assembly on its inlet end and trough conveyor at discharge | |
DE1274543B (en) | Tunneling machine | |
DE606443C (en) | Bucket wheel excavator | |
DE767598C (en) | Bucket wheel excavator | |
DE3015319A1 (en) | Mine gallery face debris removal machine - has shovel and swivelling conveyor belt on tracks below working platform | |
DE642617C (en) | Excavator with a conveyor belt arm that carries the excavator at the free end and can be moved against the excavator shock | |
DE19737936B4 (en) | Dredging device for underground mining, especially for coal mining in longwall mining | |
DE568296C (en) | Overburden recovery and conveyor system | |
DE749047C (en) | Abraumfoerderbruecke for digestion and for the alternate extraction of overburden and coal or the like. | |
DE934880C (en) | Bucket wheel excavator | |
DE755273C (en) | Extraction system with several extraction devices arranged one above the other | |
DE2353230C2 (en) | Extraction device, in particular for floating mining in half or steep storage | |
DE562878C (en) | Open pit mine for the extraction and relocation of mountain layers | |
DE1484608A1 (en) | Open pit mining equipment | |
DE739690C (en) | Bucket wheel excavator | |
DE703493C (en) | Composite excavator | |
DE3402031C1 (en) | Machine for driving roadways and tunnels | |
DE870678C (en) | Schuerfuebelbagger for the separate extraction of different layers | |
DE974528C (en) | Bucket wheel excavator for the optional extraction of coal and overburden | |
DE966558C (en) | Extraction and conveying device for overburden or coal in open-cast mines | |
DE1484608C (en) | Open-cast mining device designed as a bucket wheel excavator and used to convey overburden | |
DE649990C (en) | Coal conveyor for open-pit mining | |
DE972116C (en) | Bucket wheel excavator | |
DE719105C (en) | Plant for the extraction and conveyance of overburden in opencast mines | |
DE668794C (en) | Loading machine pulling itself forwards by means of rope or chain with pressure shovel at the front |