DE740665C - Mine support - Google Patents

Mine support

Info

Publication number
DE740665C
DE740665C DEG104761D DEG0104761D DE740665C DE 740665 C DE740665 C DE 740665C DE G104761 D DEG104761 D DE G104761D DE G0104761 D DEG0104761 D DE G0104761D DE 740665 C DE740665 C DE 740665C
Authority
DE
Germany
Prior art keywords
punch head
delay elements
supported
sliding wedge
pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEG104761D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gutehoffnungshutte Oberhausen AG
Original Assignee
Gutehoffnungshutte Oberhausen AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gutehoffnungshutte Oberhausen AG filed Critical Gutehoffnungshutte Oberhausen AG
Priority to DEG104761D priority Critical patent/DE740665C/en
Application granted granted Critical
Publication of DE740665C publication Critical patent/DE740665C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D17/00Caps for supporting mine roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

Grubenausbau Die Erfindung betrifft einen Grubenausbau, insbesondre für Strecken und Pfeilerbetriebe, mittels Kappenverzuges (Schalhölzer, Schaleisen o. dgl.), der-an einem oder beiden Enden durch Tragstempel, Pfeiler oder dergleichen unterstützt wird. Diese Abstützung des Kappenverzuges bringt es mit sich, daß die Koppen infolge oder Belastung durch das Hangende auf Biegung und Ausknickung beansprucht werden. Um der großen Beanspruchung beim eintretenden Gebirgsdruck widerstehen zu können, ist man genötigt, einen entsprechend biegungsfesten Kappenverzug für den Ausbau zu -wählen, der die Verwendung von kräftigen und schweren Schalhölzern bzw. Schaleisen bedingt. Ein derartiger Grubenausbau erfordert einen verhältnismäßig hohenWerkstoffaufwand und ist mithin sehr kostspielig.Pit lining The invention relates to a pit lining, in particular for lines and pillar operations, by means of cap distortion (shuttering timber, shell iron o. The like.), the-at one or both ends by support stamps, pillars or the like is supported. This support of the cap delay brings with it that the Kopping stressed by bending and buckling as a result of or loading from the hanging wall will. To withstand the great stress caused by the incoming rock pressure can, it is necessary to have a correspondingly bend-resistant cap distortion for the To choose an expansion that allows for the use of strong and heavy formwork timbers or Shell iron conditional. Such a pit construction requires a relative high material expenditure and is therefore very expensive.

Um die Tragkraft des Kappenverzuges zu erhöhen, ist es bekannt, die Verzugselemente zwischen den Tragstempeln mit Hilfe von Seilen zu unterfangen, deren Enden in .geeigneter Weise an den Tragstempeln festgemacht sind. f Abgesehen hiervon ist ferner die Verwendung von gebogenen Kappen für den Streckenausbau bekannt, deren Enden zwecks Erhöhung der Tragfähigkeit durch eine Sehne aus Flacheisen verbunden 'sind. Demgegenüber wird gemäß der Erfindung ein neuer Weg zur Schaffung eines besonders leichten Grubenausbaues mittels Kappenverzuges großer Tragfähigkeit und hoher Widerstandskraft vorgeschlagen. Das Wesen der Erfindung besteht darin, daß die durch Tragstempel o. dgl. unterstützten Verzugselemente mittels einer an ihren Enden wirkenden und durch den Gebirgsdruck beeinflußten Spannvorrichtung in Gestalt eines am Stempelkopf frei beweglich angeordneten Verschiebekeils, selbsttätig in Zugspannung versetzt werden, die bei zunehmendem Gebirgsdruck wächst. Bei diesem Grubenausbau wird entgegen allen früheren und bekannten Einrichtungen dem Gebirgsdruck durch Erzeugung einer ausreichenden Zugspannung in den Verzugselementen der erforderliche Widerstand entgegengesetzt. Infolge Vermeidung einer sonst üblichen Verstärkung der Verzugselemente wird erheblich an Werkstoff für den Kappenverzug gespart, indem es möglich ist, zum Ausbau einfache Elemente, wie Seile, Stangen, Rohre u. dgl., zu verwenden. Dadurch, daß beim Erfiridungsgegenstand die Zugspannung mit zunehmenden Gebirgsdruck selbsttätig wächst, wird dem unerwünschten Durchbiegen des Hangenden und damit der Bildung und dem Klaffen von Rissen im Gebirge weitgehend entgegengewirkt.In order to increase the load-bearing capacity of the cap delay, it is known that the To undertake warping elements between the supporting rams with the help of ropes, their Ends are fastened to the supporting rams in a suitable manner. f Apart from that is also known the use of curved caps for the route expansion, their Ends connected by a string made of flat iron to increase the load-bearing capacity 'are. On the other hand, according to the invention, a new way of creating a special easy pit construction by means of cap distortion, great load-bearing capacity and high resistance suggested. The essence of the invention is that the through support stamp o. The like. Supported delay elements by means of an acting at their ends and Clamping device influenced by the rock pressure in the form of one on the punch head Freely movable sliding wedge, automatically placed in tension that grows with increasing mountain pressure. This pit expansion is countered all earlier and known facilities the mountain pressure by generating a sufficient tensile stress in the drafting elements opposes the required resistance. As a result of avoiding an otherwise customary reinforcement of the distortion elements becomes considerable Saved on material for the cap distortion by making it easy to remove Elements such as ropes, rods, pipes and the like. To be used. Because the subject of the invention the tensile stress grows automatically with increasing rock pressure, becomes undesirable Bending of the hanging wall and thus the formation and the Gape largely counteracted by cracks in the mountains.

Auf der Zeichnung sind zwei Ausführungsbeispiele des Erfindungsgegenstandes dargestellt, und zwar zeigen A.bb. i einen Grubenausbau mit zweiteiligen, eisernen Grubenstempeln im Außriß, Abb. 2 eine andersgeartete Ausführung des Grubenausbaues ebenfalls im Aufriß, Abb. 3 und ,4 j e eine Einzelheit des Erfindungsgegenstandes.The drawing shows two exemplary embodiments of the subject matter of the invention shown, namely show A.bb. i a pit support with two-part, iron Pit punches in outline, Fig. 2 a different type of construction of the pit lining also in elevation, Fig. 3 and, 4 j e a detail of the subject of the invention.

Es bezeichnen i das Hangende und 2 das Liegende. Das Hangende i wird durch Grubenstempel bekannter Bauart, die im gewissen Abstand voneinander angeordnet sind, unterstützt. Zum Abfangen des Hangenden zwischen den Grubenstempeln 3 dienen die sogenannten Kappenverzüge4, die im vorliegenden Falle z. B. aus Rohren, Seilen, Schaleisen o. dgl. bestehen. Erfindungsgemäß sind diese Verzugsmittel an einem oder beiden Enden an einem Keilkörper 5 befestigt, der am Kopf des Grubenstempels 3 auf einer entsprechenden Schrägfläche 6 ähnlich der bekannten Sprungstempel oder den Auslösevorrichtungen bei den Wanderpfeilern entgegen den Enden der Verzugsmittel 4 verschiebbar gelagert ist. Die Keilkörper 5 stehen unter der Last des Gebirgsdruckes, so daß sie infolge ihrer Verschiebung das zugehörige Verzugsmittel 4 in ständige Zugspannung versetzen. Um diese Zugspannung gegebenenfalls zu begrenzen, können Anschläge o. dgl. am Stempelkopf angeordnet sein, die als Anschlag für den verschiebbaren Keilkörper 5 dienen und zwecks Regelung der Größe des Verschiebeweges verstellbar eingerichtet sein können.I denote the hanging wall and 2 the horizontal wall. The hanging wall i becomes by pit punches of known design, which are arranged at a certain distance from each other are supported. Serve to intercept the hanging wall between the pit punches 3 the so-called Kappenverzüge4, which in the present case z. B. from pipes, ropes, Shell irons or the like exist. According to the invention, these delay means are at one or both ends attached to a wedge body 5, which on the head of the pit punch 3 on a corresponding inclined surface 6 similar to the known jump stamp or the Release devices at the hiking piers against the ends of the delay means 4 is slidably mounted. The wedge bodies 5 are under the load of the rock pressure, so that, as a result of their displacement, the associated delay means 4 in constant Relocate tensile stress. In order to limit this tensile stress if necessary, you can Stops o. The like. Be arranged on the punch head, which act as a stop for the displaceable Wedge body 5 are used and adjustable for the purpose of regulating the size of the displacement path can be set up.

Damit bei Belastung der Keilkörper 5 eines Verzugsmittels 4 durch das Gebirge die zugehörigen Stempel 3 nicht infolge der auftretenden Zugkräfte umgezogen werden, sind besondere Einrichtungen am Stempel vorgesehen, die ein Wegziehen der Stempel aus ihrer Stützlage verhüten und damit den erforderlichen Stempelabstand sichern. In Abb. i ist z. B. der Stempelkopf mit einer Schneide 7 versehen, die sich in das Hangende eindrückt. Zweckmäßig wird in diesem Zusammenhang ferner .der Stempelfuß mit einer Zentrierspitze 13 versehen.So that when the wedge body 5 of a delay means 4 is loaded by the mountains, the associated punches 3 are not moved as a result of the tensile forces occurring, special devices are provided on the punch that prevent the punches from being pulled out of their support position and thus ensure the required punch spacing. In Fig. I z. B. provided the punch head with a cutting edge 7, which is pressed into the hanging wall. In this context, the stamp foot is also expediently provided with a centering point 13 .

In Abb. 2 ist ein im wesentlichen gleicher Grubenausbau dargestellt, der sich von der Ausführung in Abb. i nur dadurch unterscheidet, daß das Verzugmittel4 nur an einem Ende mit einer Spannvorrichtung (Verschiebekeil 5) ausgerüstet ist, während das andere Ende mittels eines Ankers 8 in einem Bohrloch des Kohlenstoßes 9 befestigt ist. Die Wirkungsweise dieses Grubenausbaues ist im sonstigen die gleiche wie bei der Ausführung in Abb. i.In Fig. 2 an essentially identical pit lining is shown, which differs from the version in Fig. i only in that the delay means4 is only equipped with a clamping device (sliding wedge 5) at one end, while the other end by means of an anchor 8 in a borehole of the coal face 9 is attached. The way this pit construction works is otherwise the same as with the execution in Fig. i.

In Abb. 3 ist die beispielsweise Ausbildung des Stempelkopfes gezeigt, in welchem ein tiefer Schlitz io zur Aufnahme des Verzugsmittels 4 vorgesehen ist, in dem das Verzugsmittel -i der Bewegung des -Verschiebekeils 5 folgen kann.In Fig. 3 the example of the design of the punch head is shown, in which a deep slot io is provided for receiving the delay means 4, in which the delay means -i can follow the movement of the sliding wedge 5.

An Stelle eines Schlitzes io im Stempelkopf kann gemäß Abb.4 auch ein um den Stempelkopf greifender Bügel z i verwendet werden, an dem einerseits das Verzugsmittel 4 und andererseits der Verschiebekeil befestigt sind. Beim Verschieben des Keilkörpers 5 wird der Bügel i i zwangsläufig mitgenommen.Instead of a slot io in the punch head, as shown in Fig a bracket z i reaching around the punch head can be used on the one hand the delay means 4 and on the other hand the sliding wedge are attached. When moving of the wedge body 5, the bracket i i is inevitably taken along.

An Stelle des Verschiebekeils 5 kann auch ein Exzenter oder eine andere geeignete Einrichtung verwendet werden.Instead of the sliding wedge 5, an eccentric or another can also be used suitable facility can be used.

Claims (4)

PATENTANSPRÜCHE: i. Grubenausbau, insbesondere für Strecken, Pfeilerbetriebe u. dgl. mehr, mittels Kappenv erzuges, der an einem oder beiden Enden durch Tragstempel o. dgl. unterstützt wird, gekennzeichnet durch eine an den Enden der Verzugselemente (4) wirkende Spannvorrichtung in Gestalt eines am Stempelkopf abgestützten, freibeweglichen Verschiebekeils (5) oder Exzenters, durch den die Verzugselemente (4) unter zier Einwirkung des Gebirgsdruckes selbsttätig in Zugspannung versetzt werden, die bei zunehmendem Gebirgsdruck wächst. PATENT CLAIMS: i. Pit lining, in particular for routes, pier operations and the like o. The like. Is supported, characterized by one at the ends of the delay elements (4) acting clamping device in the form of a freely movable one supported on the punch head Sliding wedge (5) or eccentric, through which the delay elements (4) under ornamental The effect of the rock pressure are automatically put into tensile stress, which at increasing mountain pressure grows. 2. Einrichtung nach Anspruch i, dadurch gekennzeichnet, daß der Verschiebekeil (5) in seiner Bewegung durch einen Anschlag .begrenzbar ist, der zweckmäßig verstellbar eingerichtet ist. 2. Device according to claim i, characterized in that that the movement of the sliding wedge (5) can be limited by a stop, which is appropriately set up adjustable. 3. Einrichtung nach Anspruch i und a, dadurch gekennzeichnet, daß die bauseitigen Enden der Verzugselemente (.4) in Schlitzen (io) o..dgl. des Stempelkopfes geführt und mit Hilfe von verschiebbaren Anschlägen (5) an der Rückseite des Stempelkopfes abgestützt sind. 3. Device according to claim i and a, characterized in that the on-site ends of the delay elements (.4) in Slitting (io) or the like of the punch head out and with the help of movable Stops (5) are supported on the back of the punch head. 4. Einrichtung nach Anspruch i und 2. dadurch gekennzeichnet, daß die Verzugselemente (.4) an einem den Stempelkopf lose umfassenden Bügel (ii) befestigt sind, der mit dem Verschiebekeil (5) vereinigt ist (Abb.4). ZurAbgrenzung desAnmeldungsgegenstandes vom Stand der Technik sind im Erteilungsverfahren in Betracht gezogen worden: amerikanische Patentschrift. . Nr. 8;5 182; deutsche Patentschrift Nr.593256,595 30i.4. Establishment according to claim i and 2. characterized in that the delay elements (.4) on one the punch head loosely encompassing bracket (ii) are attached to the sliding wedge (5) is united (Fig.4). To distinguish the subject of the registration from the status of Techniques have been considered in the grant proceedings: American patent specification. . No. 8; 5 182; German Patent No. 593 256,595 30i.
DEG104761D 1942-01-27 1942-01-27 Mine support Expired DE740665C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEG104761D DE740665C (en) 1942-01-27 1942-01-27 Mine support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEG104761D DE740665C (en) 1942-01-27 1942-01-27 Mine support

Publications (1)

Publication Number Publication Date
DE740665C true DE740665C (en) 1943-10-26

Family

ID=7141867

Family Applications (1)

Application Number Title Priority Date Filing Date
DEG104761D Expired DE740665C (en) 1942-01-27 1942-01-27 Mine support

Country Status (1)

Country Link
DE (1) DE740665C (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE913404C (en) * 1951-02-27 1954-06-14 Carbo Strebbau Ges Dr Ing Von Method for the expansion of struts using extraction elements
DE944061C (en) * 1953-02-07 1956-06-07 F W Moll Soehne Maschinenfabri Route expansion
DE1014507B (en) * 1952-12-20 1957-08-29 Ewald Wiemann Maschf Anchor buttress cap in mines
DE974103C (en) * 1942-03-12 1960-09-29 F W Moll Soehne Polygonal or arched, iron pit lining

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US875182A (en) * 1907-10-16 1907-12-31 Frederick C Keighley Mine-roof support.
DE593256C (en) * 1934-02-23 Elisabeth Schuetz Curved caps and stretch bows with tendons
DE595301C (en) * 1934-04-07 Elisabeth Schuetz Process for the production of curved caps with tendons for the extension of the line

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE593256C (en) * 1934-02-23 Elisabeth Schuetz Curved caps and stretch bows with tendons
DE595301C (en) * 1934-04-07 Elisabeth Schuetz Process for the production of curved caps with tendons for the extension of the line
US875182A (en) * 1907-10-16 1907-12-31 Frederick C Keighley Mine-roof support.

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE974103C (en) * 1942-03-12 1960-09-29 F W Moll Soehne Polygonal or arched, iron pit lining
DE913404C (en) * 1951-02-27 1954-06-14 Carbo Strebbau Ges Dr Ing Von Method for the expansion of struts using extraction elements
DE1014507B (en) * 1952-12-20 1957-08-29 Ewald Wiemann Maschf Anchor buttress cap in mines
DE944061C (en) * 1953-02-07 1956-06-07 F W Moll Soehne Maschinenfabri Route expansion

Similar Documents

Publication Publication Date Title
DE740665C (en) Mine support
DE916286C (en) Multi-part rock anchor for underground use in mining
DE1075518B (en) Migrating metallic lining for mining operations in mines
AT221133B (en) Device for concreting long components
DE2337218A1 (en) Mine shield unit of three shields - flat iron as link with square staves, aligning cylinder fitted
DE2747975C3 (en) Device for building routes, especially in mining
DE1238420B (en) Wooden stamps for the expansion of underground spaces, especially for the expansion of routes
DE513752C (en) Resilient iron pit stamp
DE19537399C1 (en) Anchor for concrete cap on superstructure of building
DE1104471B (en) Rope anchor
DE3016057C2 (en) Method for erecting a bridge arch consisting of two arch halves
DE976890C (en) Longwall construction for steep storage by means of flexible rams tensioned between the hanging wall and the lying surface before the mining impact
DE1112480B (en) Frame-like extension element for longwall construction
DE687632C (en) Support pillars made up of parts arranged crosswise, especially for excavation work
DE924204C (en) Multi-part pit punch made of steel or light metal
DE1176085B (en) Temporary expansion of the route
DE851787C (en) Metal pit punches
DE925707C (en) Multi-part pit punch with shear elements provided between the upper and lower punch
DE1215633B (en) Hiking pillar extension for strut in inclined storage
DE749219C (en) Device for securing the pillar stamps to be used in angled front construction or the like
DE896182C (en) Polygon route expansion
DE973606C (en) Longwall construction with caps and stamps
DE744175C (en) Trestle for the hanging wall in mining
DE972057C (en) Iron pit stamp
DE969594C (en) Flat reinforced concrete arch bridge