DE7405198U - DEVICE FOR ASSEMBLING STORY-HIGH BUILDING ELEMENTS - Google Patents

DEVICE FOR ASSEMBLING STORY-HIGH BUILDING ELEMENTS

Info

Publication number
DE7405198U
DE7405198U DE19747405198 DE7405198U DE7405198U DE 7405198 U DE7405198 U DE 7405198U DE 19747405198 DE19747405198 DE 19747405198 DE 7405198 U DE7405198 U DE 7405198U DE 7405198 U DE7405198 U DE 7405198U
Authority
DE
Germany
Prior art keywords
carriage
rollers
assembly
cantilever arms
aligned
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19747405198
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FORSCHUNGS und ENTWICKLUNGSGESELLSCHAFT DER BIMSINDUSTRI
Original Assignee
FORSCHUNGS und ENTWICKLUNGSGESELLSCHAFT DER BIMSINDUSTRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FORSCHUNGS und ENTWICKLUNGSGESELLSCHAFT DER BIMSINDUSTRI filed Critical FORSCHUNGS und ENTWICKLUNGSGESELLSCHAFT DER BIMSINDUSTRI
Priority to DE19747405198 priority Critical patent/DE7405198U/en
Publication of DE7405198U publication Critical patent/DE7405198U/en
Expired legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

MTINTANWALT , S-?MTINTANWALT, S-? Dlpl..|ng. E. HENTSCHEL #£" Sl Dlpl .. | ng. E. HENTSCHEL # £ " Sl

KOBLENZ KurfOrttwwU. S8 · Τ·Ι. U61-345»KOBLENZ KurfOrttwwU. S8 · Τ · Ι. U61-345 »

Go or .uchsmusteraninelriungGo or. Design aninelriung

jrr.ziYw.yz- :nd .-Intwiciclungsgesellschaft der Bimsindustrie jrr.ziYw.yz-: nd . -Intwiclungsgesellschaft der pumice industry

r;i.jii, ~,ΎΊ : ..nd'jrri ach, iiuchenstr. 1-7r; i.jii, ~, ΎΊ: ..nd'jrri ach , iiuchenstr. 1-7

ciifir.·] ;:υ:η ί-.οηfeieren von geschjünonen Bciuelefnenten"ciifir. ·];: υ: η ί-.οη celebrating young people "

Die :i--?uoruna oetrifft eine Vorrichtung zum Montieren von .-jescho.Vnoh-.-nThe: i - uoruna oetrifft a device for mounting-jescho.Vnoh. -.- n

Ls ist üblich, geschoßhohe Bauelemente an der Baustelle mit Hilfe von gleisgebundenen Turmdrehkränen zu versetzen. Zur Montage der Elemente ist eine größere Anzahl von Handwerkern und Helfern erforderlich, welche mit Hilfe von verstellbaren Montageschrägstützen die Wände sichern und ausrichten. Da es bisher nicht möglich war, die Elemente in einem Arbeitsgang mit dem Herabsenken durch den Kran fluchtgerecht aufzustellen, war stets ein mühevolles und langwieriges Nachrichten der Bauteile erforderlich. It is common practice to move storey-high construction elements on the construction site with the help of track-bound tower cranes. A large number of craftsmen and helpers are required to assemble the elements, who secure and align the walls with the help of adjustable mounting brackets. Since it was previously not possible to set up the elements in a flush manner in one work step with the lowering by the crane, laborious and lengthy reporting of the components was always necessary.

ι·ι · ·ι · ι · ·

I fi I fi ι I · · I ι I · · I

Aufgabe der Neuerung ist es, eine Vorrichtung zu schaffen, welche die Montage erleichtert und gleichzeitig das Ausrichten der Elemente sowohl in vertikaler als auch in horizontaler Richtung mit der notwendigen Genauigkeit und mit wenig Aufwand gestattet.The object of the innovation is to create a device that facilitates assembly and at the same time aligns the elements both in the vertical and in the horizontal direction with the necessary accuracy and permitted with little effort.

Diese Aufgabe wird neuerungsgemäß dadurch gelöst, daß die Vorrichtung als Montagewagen mit hochbeinigem Fahrgestell und aufgesetzter Montagebühne gestaltet ist, wobei das Fahrgestell des Wagens aus drei Stützen besteht, von denen zwei derselben Laufrollen zum Aufsetzen auf eine Kranschiene besitzen, wodurch der Wagen in einer Flucht ausrichtbär ist, während die dritte Stütze eine Lenkrolle mit Bereifung trägt und ein großgängiges Gewindezwischenglied zum Justieren in der Höhe besitzt, derart, daß der Wagen in vertikaler Richtung lotrecht ausrichtbar ist, und daß an der Montageseite des Wagens je zwei, jeweils in einer Höhe angeordnete Kragarme mit walzenförmigen Anschlagrollen für das zu montierende Bauelement vorgesehen sind, derart, daß die Laufrollen-Außenkanten untereinander in vertikaler Ebene in einer Flucht liegen.This object is achieved according to the invention in that the device is used as an assembly trolley with a high-legged chassis and mounted assembly platform is designed, wherein the chassis of the car consists of three supports, of which have two of the same rollers for placing on a crane rail, whereby the carriage can be aligned in an alignment, while the third support carries a swivel castor with tires and has a large threaded intermediate member for adjusting in height, such that the carriage can be vertically aligned vertically, and that on the Mounting side of the carriage two cantilever arms, each arranged at the same height, with roller-shaped stop rollers are provided for the component to be mounted in such a way that the outer edges of the rollers are vertically aligned with one another Level in one line.

Weitere vorteilhafte Ausgestaltungen der Neuerung sind den Ansprüchen zu entnehmen.Further advantageous refinements of the innovation can be found in the claims.

Die mit der Neuerung erzielten Vorteile bestehen insbesondere darin, daß die Vorrichtung,die Montage und dasThe advantages achieved with the innovation are in particular that the device, the assembly and the

Richten der Elemente mit nur drei Arbeltskräften ermöglicht, wobei nur ein Monteur auf dem Podest dns Wagens benötigt wird, während zwei andere sich unten am Wagen befinden. Gleichzeitig bietet das an der Bühne angebrachte Geländer dem oben stehenden Monteur, der das am Kranseil hängende Element in Empfang nimmt, einen sicheren Schutz.Alignment of the elements with only three workers enabled, with only one fitter on the pedestal of the trolley is needed, while two others are located on the bottom of the cart. At the same time, what is attached to the stage offers Guardrail the above fitter, who receives the element hanging on the crane rope, a safe protection.

Der besondere Vorteil des Gerätes liegt in d.r Anordnung von Anschlagrollen am Wagen, welche einen Anschlag far die frei am Seil pendelnden Einbauteile bildet. Die Elemente werden beim Einbau gegen die Anschlagrollen gedrückt und rollen so sicher geführt und geschützt vor Beschädigungen zum Standort ab. Außerdem wird durch das Vorsehen von Anschlagrollen die Beanspruchung der Konstruktionsteile des Montagewagens niedrig gehalten»The particular advantage of the device lies in the arrangement of stop rollers on the carriage, which form a stop for the built-in parts swinging freely on the rope. The Elements are pressed against the stop rollers during installation and are thus safely guided and protected from damage to the location. In addition, the provision of stop rollers reduces the stress on the structural parts of the Assembly trolley held low »

Durch vorher in der Flucht ausgerichtete Kranlauf-Schienen, auf denen der Montagewagen spurgebunden fährt, und durch eine in der Höhe justierbare Stütze, ist der Montagewagen in der waagerechten Richtung als auch in der lotrechten Ebene genau ausrichtbar. Damit erhalten die eingebauten Elemente automatisch den ihnen zugedachten lot- und fluchtgerechten Standort.By means of crane rails that have been aligned beforehand and on which the assembly trolley runs on a track-bound basis, and Thanks to a height-adjustable support, the assembly trolley can be precisely aligned in the horizontal direction as well as in the vertical plane. In this way, the built-in elements automatically receive their intended perpendicular and aligned location.

Dadurch, daß die Anschlagrollen einfahrbar gestaltet sind, ist es möglich, unmittelbar nach Aufstellen des Elementes dasselbe durch eine Montageschrägstütze, welch« durch Verankerung an der Schiene einen festen Halt erhält, zuBecause the stop rollers are designed to be retractable, it is possible immediately after setting up the element the same is done by means of a mounting brace, which is given a firm hold by being anchored to the rail

sichern und ein Verfahren des Montagewagens zu ermöglichen. secure and enable a movement of the assembly trolley.

Überdies hat der Montagewagen den Vorteil, daß er ein ge- \ ringes Gewichb besitzt, so daß er leicht von Hand verfahren werden kenn. Außerdem ist es möglich, dea Wagen mit Hilfe des Kranwagens leicht von Raum zu Raum bzw. von Geschoß zu Geschoß umzusetzen.Moreover, the assembly truck the advantage that it has a overall \ ring Gewichb so that it can be easily moved by hand mark. It is also possible to easily move the car from room to room or from floor to floor with the aid of the crane truck.

Die Neuerung ist anhand eines Ausführungsbeispieles in den Zeichnungen dargestellt. Es zeigt:The innovation is shown in the drawings using an exemplary embodiment. It shows:

Fig. l den Montagewagen in Seitenansicht mit ausgefahrenen Anschlagrollen und dem auf seinem Standort abgesetzten Element,Fig. L the assembly trolley in side view with extended Stop rollers and the element set down on its location,

Fig. 2 einen horizontalpchnitt aurch den Wagen gemäß der Linie A-A gemäß rig. I,Fig. 2 is a horizontal section through the carriage according to the line A-A according to rig. I,

Fig. 3 de. Wagen von der Hontageseite gesei.en mit Blick auf die Anschlagrollen,Fig. 3 de. Carriage from the honeydew side with View of the stop rollers,

Fig. 4 einen Horizontalschnitt durch den Wagen gemäß der Linie B-B j.n Fig. 3 undFig. 4 shows a horizontal section through the carriage according to the line B-B j.n Fig. 3 and

Fig, 5 den Montagewagen in Seitenansicht mit eingefahrenen Anschlagrollen und am Element und Kranschiene angesetzter Montagestütze mit Haltekorb für das Element.5 shows the assembly trolley in side view with retracted Stop rollers and mounting brackets attached to the element and crane rail Holding basket for the element.

Auf einer Kranschiene 1, welche in erforderlichem Abstand vom zu versetzenden Bauelement 2 fluchtgerecht befestigt ist, ist ein dreibeiniger, auf Rollen 3 und 4 gelagerter Kontagewagen 5 mit zwei seiner Rollen 3 aufge-On a crane rail 1, which is attached in the required distance from the component 2 to be relocated in a flush manner is, a three-legged, on rollers 3 and 4 mounted contact carriage 5 with two of its rollers 3

^etzt. Die Stützen 6 mit den Rollen 3 zum Aufsetzen auf die Kranschiene 1 sind in ihrer Länge unveränderbar ausgebildet, während c'i-2 dritte Stütze 7, welche eine bereifte Laufrolle 4 trägt und auf dem Boden 8 aufgesetzt ist, ein grobgängiges Gewindezwischenglied 9 zum Justieren derselben in der Höhe besitzt. Durch Verstellen der Höhe der Stütze 7 ist der Wagen 5 in lotrechter Richtung ausrichtbar.^ now. The length of the supports 6 with the rollers 3 for placing on the crane rail 1 is invariable, while the third support 7, which carries a tire roller 4 and is placed on the floor 8, has a coarse threaded intermediate member 9 for adjustment possesses the same in height. By adjusting the height of the support 7 , the carriage 5 can be aligned in the vertical direction.

Auf dem Fahrgestell des Wagens 5 ist eine mit einem Geländer versehene Montagebühns 10 aufgesetzt, welche über die beiden Stützen 6 hinaus auskragt. Zum Gewichtausgleich ist ein nach hinten über die Einzelstütze 7 hinaus auskragender Ballastbehälter 11 auf der Bühne 10 vorgesehen. Die Bühne ist über eine Steigleiter 12 erreichbar. On the chassis of the carriage 5, an assembly platform 10 provided with a handrail is placed, which protrudes beyond the two supports 6. A ballast container 11 protruding to the rear beyond the individual support 7 is provided on the platform 10 to compensate for the weight. The stage can be reached via a fixed ladder 12.

An der Montageseite des Wagens 5 sind oben und unten je zwei Kragarme 13 bzw. 14 mit walzenförmigen Anschlagrollen 15 bzw. 16 jeweils in einer Höhe derart angeordnet, daß die Laufrollenaußenkanten untereinander in vertikaler Ebene eine Flucht bilden. Die Rollen 15 und 16 dienen zum Anschlag, zur Führung und zum Ausrichten des Elementes 2 in lotrechter Richtung.On the assembly side of the carriage 5 are two cantilever arms 13 and 14 with roller-shaped stop rollers at the top and bottom 15 and 16 each arranged at a height such that the outer edges of the rollers are in a vertical plane make an escape. The rollers 15 and 16 are used to stop, guide and align the element 2 in perpendicular direction.

Die oberen Kragarme 13 mit Anschlagrollen 15 sind in Längsrichtung nach hinten verschiebbar unter dem Boden der Bühne 10 angeordnet» Die Kragarme 14 der beiden unteren RollenThe upper cantilever arms 13 with stop rollers 15 can be moved backwards in the longitudinal direction under the floor of the stage 10 arranged »The cantilever arms 14 of the two lower rollers

mimi mm

sind jeweils mit einer Hebelstange 17 versehen, derart, daß dia Kragarme 14 mit Rollen 16 nach oben hochklappbar sind.are each provided with a lever bar 17, such that dia cantilever arms 14 are provided with rollers 16 upwardly folded.

Die Arme mit den Anschlagrollen sind aus dem Grunde einfahrbar gestaltet, damit der Wagen 5 nach cer Montage des Elementes 2 und nach Anbringen einer Schrägstütze 18 im freien R^um zwischen dem Montagewagen 5 und der Elementwand-Innenkante 10 zum nächsten Standort verfahren werden kann.The arms with the stop rollers are designed to be retractable so that the carriage 5 can be moved to the next location after the assembly of the element 2 and after attaching an inclined support 18 in the free space between the assembly carriage 5 and the element wall inner edge 10.

Die Handhabung der neuerungsgemäßen Vorrichtung und die Montage des Bauelements geschieht folgendermaßen:The handling of the device according to the innovation and the assembly of the component takes place as follows:

Zunächst wird die Kranschiene 1, auf welcher der Montage wagen 5 später fahren soll, in erforderlichem Abstand von der Deckenaußenkante bzw. von dem zu versetzenden Element fluchtgerecht befestigt. Auf die Schiene 1 wird nun der Montagewagen 5 am Kran hängend aufgesetzt. Die oberen und unteren Anschlagrollen 15 und 16 sind in Montagestellung zu bringen, indem die Kragarme 13 und 14 (oben und unten), an dem die Rollen befestigt sind, voll ausgefahren werden. First, the crane rail 1, on which the assembly dare 5 is to travel later, attached at the required distance from the outer edge of the ceiling or from the element to be relocated in a flush manner. The assembly trolley 5 is now placed on the rail 1 while hanging from the crane. The upper and lower stop rollers 15 and 16 are to be brought into the assembly position by fully extending the cantilever arms 13 and 14 (top and bottom) to which the rollers are attached.

Der Montagewagen 5 wird in der lotrechten Ebene ausgerichtet, indem die hintere Stütze 7 in der Höhe anhand des grobgängigen Gewindezwischengliedes 9 ein- oder ausgefahren wird. In dein Moment, wo die obere und untere An-The assembly carriage 5 is aligned in the vertical plane by using the rear support 7 in terms of height of the coarse thread intermediate member 9 is retracted or extended. In your moment, where the upper and lower

-Jt?-Jt?

schlagrolle 15 bzw. 16 an ihrer Außenkante genau senkrecht uberexnanderstehen, ist der Montagewagen 5 ausgerichtet. Als Kontrolle dient eine an einer Stütze 6 oder 7 angebrachte Wasservaage.Impact roller 15 or 16 are exactly perpendicular to each other at their outer edge, the assembly carriage 5 is aligned. A water balance attached to a support 6 or 7 serves as a control.

Jetzt kann das anzubauende Fertigteil 2 eingefahren und an den Anschlagrollen 15 und 16 angeschlagen werden. An den Anschlagrollen 15,16 rollt das Element 2 zum zugedachten Standort ab. Nachdem das Element 2 seinen Standort eingenommen hat, wird es durch Montageschrägstützen 18 mit Haltekorb 21 gegen Kippen gesichert.Now the prefabricated part 2 to be built can be retracted and hit against the stop rollers 15 and 16. At the stop rollers 15, 16 roll the element 2 to the intended location. After the element 2 finds its location has taken, it is secured against tilting by mounting brackets 18 with holding basket 21.

Damit der Montagewagen 5 zum nächsten Montageort verfahren werden kam., wird die Montageschrägstütze 18 in dem freien Raum zwischen Montagewagen 5 und Elementwand-Innenkante 19 angebracht. Außerdem müssen die Anschlagroxlen 15 und 16 eingefahren werden, indem die unteren Rollenarme 14 an der Hebelstange 17 hochgeklappt und die oberen Rollenarme 13 nach innen geschoben werden. Nun ist der Weg frei zum Standortwechsel. Der Montagewagen wird von Hand zum nächsten Standort weitergeschoben. Die Vorbereitungen zur nächsten Elementmontaye können beginnen.In order for the assembly carriage 5 to be moved to the next assembly location, the assembly inclined support 18 is in the free Space between assembly carriage 5 and element wall inner edge 19 attached. In addition, the stop tubes 15 and 16 are retracted by the lower roller arms 14 being folded up on the lever rod 17 and the upper roller arms 13 be pushed inwards. Now the way is clear to change location. The assembly trolley is manually used for moved to the next location. The preparations for the next element assembly can begin.

Als ein weiterer Vorteil dieser Vorrichtung ist noch zu nennen, daß der auf der Bühne stehende Monteur in der Lage ist, die Stoßfugen mit Hilfe eines am Kran hängenden Betonkübels leicht und sicher auszugießen. Dies müßte sonst von einer Leiter aus oder einem anderen Gerät besorgt werden. Another advantage of this device is that the fitter standing on the stage is able to easily and safely pour the butt joints with the help of a concrete bucket hanging from the crane. Otherwise this would have to be done from a ladder or some other device.

Schiitzansprüche:Protection claims:

Claims (5)

Schutzansprüche;Protection claims; 1. Vorrichtung zum Montieren von geschoßhohen Bauelementen, dadurch gekennzeichnet, daß dieselbe als Montagewagen(5) mit hochbeinigem Fahrgestell und aufgesetzter Montagebünne (10) gestaltet ist, wobei das Fahrgestell des Wagens aus drei Stützen (6,7) besteht, von denen zwei derselben (6) Laufrollen (3) zum Aufsetzen auf eine Kranschiene/Besitzen, wodurch der Wagen (5) in einer Flucht ausrichtbar ist, während die dritte Stütze (7) eine Lenkrolle (4) mit Bereifung trägt und ein grobgängiges Gewindezwischenglied (9) zum Justieren in der Höhe besitzt, derart, daß der Wagen (5) in vertikaler Richtung lotrecht ausrichtber ist, und daß an der Montageseite des Wagens (5) je zwei, jeveils in einer Höhe paarweise angeordnete Kragarme (13 bzw. 14) mit walzenförmigen Anschlagrollen (15 bzw. 16) für das zu montierende Bauelement (2) vorgesehen sind, derart, daß die Laufrollen-Außenkanten untereinander in vertikaler Ebene in einer Flucht liegen.1. A device for assembling storey-high components, characterized in that the same is designed as an assembly trolley (5) with a high-legged chassis and a mounted assembly platform (10), the chassis of the car consists of three supports (6,7), two of which are of the same (6) Castors (3) for placing on a crane rail / owning, whereby the carriage (5) can be aligned in an alignment, while the third support (7) carries a swivel castor (4) with tires and a coarse threaded intermediate member (9) for Adjusting in height, such that the carriage (5) is aligned vertically in the vertical direction, and that on the mounting side of the carriage (5) there are two cantilever arms (13 or 14) with roller-shaped stop rollers, each paired at a height (15 or 16) are provided for the component to be mounted (2) in such a way that the outer edges of the rollers are aligned with one another in the vertical plane. 2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die oberen Kragarme (13) mit Anschlagrollen (iS) längsverschiebbar im Boden der Bühne (10) gelagert sind und daß an den unteren Kragarmen (14) mit Anschlagrollen (16)2. Device according to claim 1, characterized in that the upper cantilever arms (13) with stop rollers (iS) are mounted longitudinally displaceable in the floor of the stage (10) and that on the lower cantilever arms (14) with stop rollers (16) je cine Hebelstange (17) zum Hochklappen der Kragarme (14) angebracht ist· •there is a lever rod (17) for folding up the cantilever arms (14) · • 3. Vorrichtung nach Anspruch 1 und 2, dadurch gekennzeichnet, daß die Montagebühne (10) des Wagens (5) nach vorn über die Stützen (6) hinaus auskragt und zum Gewichtsausgleich ein nach unten auskragender Bailastbehälter (ll) auf dor Bühne (10) vorgesehen ist*3. Device according to claim 1 and 2, characterized in that that the assembly platform (10) of the carriage (5) protrudes forward beyond the supports (6) and for weight compensation a downward protruding bailast container (ll) on stage (10) is provided * 4. Vorrichtung nach Anspruch 1-3, dadurch gekennzeichnet, daß am Rand der Montagebühne (10) ein Schutzgeländer (20) angebracht irt und daß zum Besteigen der Bühne eine an sich bekannte Steigleiter (12) dient. / 4. Apparatus according to claim 1-3, characterized in that at the edge of the assembly platform (10) a protective railing (20) irt attached and that a ladder known per se (12) is used to climb the stage. / 5. Vorrichtung nach Anspruch 1-4, dadurch gekennzeichnet, daß "3Ur Kontrolle der lotrechten Stellung des Wagens (5) eine Wasserwaage an einer der Stützen des Wagens (5) angebracht ist. /5. Apparatus according to claim 1-4, characterized in that "3Ur control of the vertical position of the carriage (5) a spirit level attached to one of the supports of the carriage (5) is. /
DE19747405198 1974-02-15 1974-02-15 DEVICE FOR ASSEMBLING STORY-HIGH BUILDING ELEMENTS Expired DE7405198U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19747405198 DE7405198U (en) 1974-02-15 1974-02-15 DEVICE FOR ASSEMBLING STORY-HIGH BUILDING ELEMENTS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19747405198 DE7405198U (en) 1974-02-15 1974-02-15 DEVICE FOR ASSEMBLING STORY-HIGH BUILDING ELEMENTS

Publications (1)

Publication Number Publication Date
DE7405198U true DE7405198U (en) 1974-06-06

Family

ID=6643746

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19747405198 Expired DE7405198U (en) 1974-02-15 1974-02-15 DEVICE FOR ASSEMBLING STORY-HIGH BUILDING ELEMENTS

Country Status (1)

Country Link
DE (1) DE7405198U (en)

Similar Documents

Publication Publication Date Title
DE2622840A1 (en) CLIMBING SCAFFOLDING WITH APPROPRIATE FORMWORK
EP0670399B1 (en) Lifting scaffold platform
DE1580632B2 (en) WORK GEAR FOR WORK EQUIPMENT, IN PARTICULAR FOR EXCAVATORS, RAMMING, DRILLING EQUIPMENT OR DGL
DE8911634U1 (en) Amusement device that can be transported in parts for fairs or the like, especially a Ferris wheel
DE2050516A1 (en) Vertically adjustable platform for scaffolding
DE3238945C2 (en) Device for setting posts, stakes or snow poles
DE102008061334B4 (en) Device for handling heavy objects
DE3608511A1 (en) Wagon drill with magazine-mounting device
DE3341031A1 (en) Framework bracket for producing a bracket framework which can be adjusted in height and width and is fastened onto the rafters, purlins, cross members etc. forming part of a roof construction
DE2461251C3 (en) Device for pre-assembly, transport and installation of a route or tunnel extension
DE3153022C2 (en) Device used as an expansion aid for tunneling in mining and tunneling
DE7405198U (en) DEVICE FOR ASSEMBLING STORY-HIGH BUILDING ELEMENTS
DE19704967C2 (en) Gantry crane, in particular for the construction of buildings
DE19752708C2 (en) Assembly trolley
EP0874084A1 (en) Scaffolding for the renovation of concrete bridges
DE968874C (en) Mobile scaffolding
EP0159467B1 (en) Platform for lifting persons
DE8410066U1 (en) Mobile bridge structure
DE1531102C3 (en) Well equipment for an elevator
DE102020126730B4 (en) Elevator Device of a Building Scaffolding
DE19730932C1 (en) Trolley for positioning ceiling panels for building
DE889364C (en) Ironing for roofing work
DE3145270C2 (en) Device used as an expansion aid for tunneling in mining and tunneling
DE1528156C (en) Device for driving nail plates in wooden structures