DE662486C - The open pit mining of brown coal or the like. Spanning conveyor bridge for overburden and coal - Google Patents

The open pit mining of brown coal or the like. Spanning conveyor bridge for overburden and coal

Info

Publication number
DE662486C
DE662486C DEL85226D DEL0085226D DE662486C DE 662486 C DE662486 C DE 662486C DE L85226 D DEL85226 D DE L85226D DE L0085226 D DEL0085226 D DE L0085226D DE 662486 C DE662486 C DE 662486C
Authority
DE
Germany
Prior art keywords
coal
overburden
conveyor
bridge
excavator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEL85226D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luebecker Maschinenbau GmbH
Original Assignee
Luebecker Maschinenbau GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luebecker Maschinenbau GmbH filed Critical Luebecker Maschinenbau GmbH
Priority to DEL85226D priority Critical patent/DE662486C/en
Application granted granted Critical
Publication of DE662486C publication Critical patent/DE662486C/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G65/00Loading or unloading
    • B65G65/28Piling or unpiling loose materials in bulk, e.g. coal, manure, timber, not otherwise provided for

Description

Den Tagebau von Braunkohle o. dgl. überspannende Förderbrücke für Abraum und Kohle Die Erfindung betrifft eine dien Tagebau von Braunkohle o. dgl. überspannende Förderbrücke, die nicht nur der Abfrörderung des gelösten Abraums zur Freilegung des Kohlenflözes, sondern auch der Abförderung der im Tagebau gewonnenen Kohle dient.The open pit mining of lignite or the like. Spanning conveyor bridge for Overburden and coal The invention relates to an opencast mine of lignite o. spanning conveyor bridge that not only removes the loosened overburden for the exposure of the coal seam, but also for the removal of the coal mined Coal is used.

Der Bewältigung dieser beiden Arbeitsvorgänge mittels einer zusammenhängenden Anlage stehen erhebliche, durch die bergbaulichen Verhältnisse bedingte Schwierigkeiten entgegen, die darin liegen, d,aß die Abraumgewinnung -und -ablagerung anderen Bedihgungen unterliegt als die Kohlenfbrderung. Der Bedarf ran Kohle ist in den Sommiermonatien gering, während @er in dien Wintermionaten groß ist, zu welcher Zeit jedoch die Abraumförderung wegen der Witterungsverhältnisse stillgelegt ist. Es muß also in dien Siommermonaten die Abraumfördrerung so weit vorgetrieben werden, daß eine gen:ügend,e Fläche freigelegter Kohle vorhanden ist, die genügt, dien Bedarf während der Wintermonate auch bei stillstehender Abraumfördierung zu decken.The management of these two work processes by means of a coherent one There are considerable difficulties caused by the mining conditions contrary to that, that is, the extraction and deposit of overburden other conditions subject to coal production. The need for coal is in the summer months low, while @er is great in the winter months, but at what time the Overburden mining has been shut down due to weather conditions. So it has to be in During the summer months, the overburden extraction is advanced so far that a sufficient, e There is an area of exposed coal that is sufficient for the needs during the winter months to be covered even when the overburden conveyance is at a standstill.

Weitere bergbauliche Schwierigkeiten in der Zusammenarbeit des Kohle- und Abraumbetriebes liegen darin, daß zufolge örtlicher Hindernisse und Besonderheiten der abzubauenden Böschungen die Arbeitsgeschwindigkeit .der beiden Betriebe verschieden groß ist.Further mining difficulties in the cooperation of the coal and overburden operations are based on local obstacles and peculiarities of the embankments to be removed, the working speed of the two companies is different is great.

Die erwähnten Schwierigkeiten führen dazu, ,daß sowohl der Abraum- als auch der Kohlenbagger von der Förderbrücke und beide Bagger gegeneinander eine gewisse Unabhängigkeit im Arbeiten, insbesondere in der Stellung zueinander, besitzen müssen.The difficulties mentioned lead to the fact that both the overburden as well as the coal excavator from the conveyor bridge and both excavators against one another have a certain degree of independence in their work, especially in relation to one another have to.

Es sind bereits Vorschläge gemacht worden, Kohle und Abraum durch-eine gemeinsiamie Anlage zu gewinnen. Ein Vorschlag geht dahin, den Kohlenbagger in die Stütze roder dien Brückenträger der Abraumförderbrücke einzubauen. Damit ist die geforderte Unabhängigkeit zwischen dem Abraum- und dem Kohlenbetrieb nicht behoben. Nach einem anderen Vorschlag wird zwar der Kohlenb,agger ran seiner üblichen Arbeitsstelle belassen, jedoch wird zur Abförderung der Kohle eine besondere Förderbrücke vorgesehen. Die Abraumförderbrücke und die Kohlenförderbrücke behindern sich gegenseitig, so daß eine besondere Berme mit besionderen Falugleisen für die Kohlenfördrerbrücke vorgesehen werden muß, um das unabhängige Arbeiten beider Betriebe zu gewährleisten.Proposals have already been made to cut coal and spoil in one to win a common plant. One suggestion is to put the coal excavator in the Support to build the bridge girder of the overburden conveyor bridge. So that is Required independence between the overburden and coal operations not remedied. According to another suggestion, the coal b, agger ran his usual job left, but a special conveyor bridge is provided to transport the coal. The overburden conveyor bridge and the coal conveyor bridge interfere with each other, so that a special berm with special Falugleisen for the coal conveyor bridge must be provided in order to ensure the independent operation of both companies.

Brei reinen Abraumförderbrücken ist es bereits bekanntgeworden, die Abraumförderbrücke mit einem gegen die Abraurnbflschung gerichteten Ausleger zu versehren, der als Fahrbahn für das einte Ende eines nach allen Raumrichtungen beweglichen Zwischenförderers dient, der mit seinem anderen Ende am @Abraumbagger gelagert ist und der die Fbrderverbindung zwischen Bagger und der Abraumförderbrücke herstellt. Hierdurch wird die biet der Abrawaförderung notwendige Unabhängigkeit zwischen dem Bagger und der Förderbrücke hergestellt. Diese Förderbrücke ist zur Kohleförderung nicht geeignet.It has already become known that pulp pure overburden conveyor bridges Overburden conveyor bridge with a boom directed against the debris flank damage, the roadway for the one end of a movable in all spatial directions The intermediate conveyor is used, the other end of which is mounted on the excavator and which establishes the conveyor connection between the excavator and the overburden conveyor bridge. This makes the area of Abrawa funding necessary independence between the excavator and the conveyor bridge. This conveyor bridge is for Coal extraction not suitable.

Bei der Kohlegewinnung und -fördlerung genügt es nicht, so wie beim vorgenannten Abraumbetrieb, den Bagger gegenüber der Brücke durch raumbewegliche Anordnung der Zwischenförderung so voreilen und zurückbleiben lassen zu können, daß etwaige gegenseitigie Abstandsänderungen der beiden Geräte voneinander ausgeglichen werden; denn der Kohlebagger muß außerdem noch bei stillstehendem Abraumbetrieb um das ganze Ausmaß der Kohlenreserve an das Deckgebirge Meranbewegt werden können bei dauernder fördertechnischer Verbindung mit der Abraumf örderbrücke.It is not enough for coal extraction and extraction, as it is for aforementioned overburden operation, the excavator opposite the bridge by space-movable Arranging the intermediate funding to be able to lead and lag behind, that any mutual changes in distance between the two devices compensated for each other will; because the coal excavator must also be stopped when the overburden operation is at a standstill can be moved to the Merano overburden by the full extent of the coal reserve with permanent conveyor connection with the overburden conveyor bridge.

Die Erfindung löst diese Aufgabe in einfacher Weise dadurch, daß .die Förderbrücke mit einem sich über die Abraumböschung erstreckenden Ausleget für die Kohlenförderung versehen ist, auf dem der die Verbindung mit dem Kohlenbagger herstellende, einen wesentlichen Teil der Kohlenreserve überbrückende Zubringerförderer raumbeweglich und waagerecht bis zu 9o oder mehr Grad seitlich zum Brückenträger schivenkb.ar und in seiner wirksamen Länge veränderbar ;auflagert.The invention solves this problem in a simple manner in that .die Conveyor bridge with a laying out for the overburden embankment Coal conveyor is provided, on which the connection with the coal excavator, A large part of the coal reserve bridging feeder conveyor can be moved in space and horizontally up to 9o or more degrees to the side of the bridge girder schivenkb.ar and changeable in its effective length; superimposed.

Hierdurch läßt sich die wirksame Förderlänge, also die quer zum Tagebaugraben gerichtete Förderkomponente zwischen dem Kohlenbagger und der Übergabestelle auf den Ausleger um das Ausmaß der ganzen Kohlenreservebreite verändern.This allows the effective conveying length, i.e. the length across the open pit directed conveyor component between the coal excavator and the transfer point change the boom by the extent of the entire width of the coal reserve.

Die Erfindung ist in der Zeichnung in einem Ausführungsbeispiel dargestellt.The invention is shown in the drawing in an exemplary embodiment.

Abb. r zeigt dien Querschnitt einer Tagebauanlage mit einer großen freigelegten Kohlenfläche und Abb. 2 im Grundriß dieselbe Anlage bei abgebauter Kohlenreserve.Fig. R shows the cross-section of an open pit mine with a large one exposed coal surface and Fig. 2 in plan the same system with dismantled Coal reserve.

Diie Abraumförderbrücke a dient in bekannter Weise zur unmittelbaren Förderung des von den nicht dargestellten Abraumbaggern gelösten Deckgebirges b zur Halde. Das freigelegte Kohlenflöz c wird von dem Kohlenbagger il abgebaut.The overburden conveyor bridge a is used in a known manner for immediate Promotion of the overburden loosened by the excavators (not shown) b to the heap. The exposed coal seam c is mined by the coal excavator il.

Um die von dem Kohlenbagger d gel7öste Kohle unmittelbar zur Fahrbahnebene der Abraumförderbrücke a. fördern zu können, ist die Abraumförderbrücke mit einem besondcren Ausleger e versehen, der der Träger der Kohlenförderbahn fist. Zwischen dem Kohlenbaggerld und dem Auslegere ist der Zwischenförderergeingeschaltet. Dieser ist in seiner wirksamen Länge derart veränderlich, daß er den wechselnden Abstand zwischen dem Kohlenbagger d und dem Auslegere so überbrückt, d.aß -die Kohlenförderung keine Unterbrechung erleidet. Raumbewegliche Lagerung mit Dreipunktstützung und Längsverschi:ebungsmöglichkeit auf dem Auslegere dienen in bekannter Weise zur Erreichung dieser Bedingungen.Around the coal released by the coal excavator d directly to the road level the overburden conveyor bridge a. to be able to promote is the overburden conveyor bridge with a special boom e provided, which fist the carrier of the coal conveyor. Between The intermediate conveyor is connected to the coal excavator and the boom. This is so variable in its effective length that it takes the changing distance so bridged between the coal excavator d and the boom, d.ass - the coal extraction does not suffer any interruption. Spatial mounting with three-point support and Longitudinal shifting options on the boom serve to achieve this in a known manner of these conditions.

Die Ausführung des Zwischenförderers g ist nicht an das dargestellte Beispiel gebunden. Der Zwischenförderer g kann sich auch aus zwei Förderern zusammensetzen, wovon der eine- an dem Ausleger e und der andere: an dem Kohlenbagger ,d waagerecht und senkrecht schwenkbar gelagert ist. Auch bei dieser Ausführung ist eine Änderung des Abstandes des Kohlenbaggers d von dem Auslegere üi jeder Stellung möglich.The execution of the intermediate conveyor g is not similar to that shown Example bound. The intermediate conveyor g can also consist of two conveyors, Of which one - on the boom e and the other: on the coal excavator, d horizontally and is pivoted vertically. There is also a change in this version the distance of the coal excavator d from the boom üi every position possible.

In Abb. z ist eine Stellung des Kohlenbaggers d dargestellt, in der der vorhandene Kohlenvorrat des Kohlenflözes c nahezu restlos aufgebraucht ist. Die im Hochschnitt ,anstehende Kohle wird ebenfalls von dem Kohlenbagger d gewonnen.In Fig. Z a position of the coal excavator d is shown in which the existing coal supply of the coal seam c is almost completely used up. The coal in the high cut is also extracted by the coal excavator d.

Claims (1)

PATENTANSPRUCH Den Tagebau -von Braunkohle o. dgl, überspannende Förderbrücke für Abraum und Kohle, der die Kohle mittels raumbeweglich gelagerter Zwischenförderung zur Förderung auf die höher gelegene gewinnungsseitige Fahrbahn der Förderbrücke vom Kohlebagger zugeführt wird, dadurch gekennzeichnet, daß die Förderbrücke (a) mit einem sich über die Abraumböschung erstreckenden Ausleger (e) für die Kohlenförderu.ng versehen ist, auf dem der die Verbindung mit dem Kohlenbagger (d) herstellende, einen wesentlichen Teil der Kohlenreserve überbrückende Zubringerförderer (g) raumbeweglich und waagerecht bis zu 9o oder mehr Grad seitlich zum Brückenträger schwenkbar und in seiner «irksam,en Länge veränderbar auflagert.PATENT CLAIM The open pit mining of lignite or the like, spanning conveyor bridge for overburden and coal, which the coal by means of spatially movable intermediate conveying for conveying to the higher-lying, extraction-side carriageway of the conveyor bridge is supplied by the coal excavator, characterized in that the conveyor bridge (a) with a boom (e) extending over the spoil embankment for the coal conveyance is provided on which the connection with the coal excavator (d), A feeder conveyor (g) bridging a substantial part of the coal reserve is spatially movable and can be swiveled horizontally up to 9o or more degrees to the side of the bridge girder and superimposed in its effective, changeable length.
DEL85226D 1934-01-30 1934-01-30 The open pit mining of brown coal or the like. Spanning conveyor bridge for overburden and coal Expired DE662486C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEL85226D DE662486C (en) 1934-01-30 1934-01-30 The open pit mining of brown coal or the like. Spanning conveyor bridge for overburden and coal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEL85226D DE662486C (en) 1934-01-30 1934-01-30 The open pit mining of brown coal or the like. Spanning conveyor bridge for overburden and coal

Publications (1)

Publication Number Publication Date
DE662486C true DE662486C (en) 1938-07-14

Family

ID=7285855

Family Applications (1)

Application Number Title Priority Date Filing Date
DEL85226D Expired DE662486C (en) 1934-01-30 1934-01-30 The open pit mining of brown coal or the like. Spanning conveyor bridge for overburden and coal

Country Status (1)

Country Link
DE (1) DE662486C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE968798C (en) * 1951-05-09 1958-03-27 Eisen & Stahlind Ag Open pit mine with an excavator, in particular a bucket wheel excavator, and with a loading system
EP2429928A4 (en) * 2009-05-14 2016-10-12 Smidth As F L Conveyor apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE968798C (en) * 1951-05-09 1958-03-27 Eisen & Stahlind Ag Open pit mine with an excavator, in particular a bucket wheel excavator, and with a loading system
EP2429928A4 (en) * 2009-05-14 2016-10-12 Smidth As F L Conveyor apparatus

Similar Documents

Publication Publication Date Title
DE662486C (en) The open pit mining of brown coal or the like. Spanning conveyor bridge for overburden and coal
DE3134642C2 (en)
DE429548C (en) Open pit mine for lignite
DE667084C (en) Endless conveyor belt carried by an overhead track intended for open-cast mining
DE102009035061A1 (en) Coal mining method for lignite open-cast, involves directly applying bulk goods to be moved on continuously operating conveying unit from working face by discontinuously operating mining device e.g. hydraulic dredger
DE428909C (en) Abraumfoerderbruecke
DE404753C (en) Excavator track and conveyor trackless excavator operation
DD154352A5 (en) BOESCHUNGSBRUECKE
DE2145076B2 (en) PROCEDURE FOR DRIVING DESTROYING WAYS AND DRIVING MACHINE FOR CARRYING OUT THE PROCEDURE
DE968419C (en) Method and device for the removal of dredged material in opencast mines
DE508161C (en) Process and system for the extraction of powerful or multilayered overburden by means of conveyor bridges
DE371594C (en) Device for loosening, loading and conveying waste material
DE719105C (en) Plant for the extraction and conveyance of overburden in opencast mines
DE591962C (en) Endless shackle chain
DE870678C (en) Schuerfuebelbagger for the separate extraction of different layers
DE348373C (en) Mining process for the extraction of lignite or the like in open-cast mining
DE437768C (en) Abraumfoerderbruecke
DD271932A1 (en) REMOVAL PROCEDURE AND ARRANGEMENT FOR TAGEBAUE WITH SHOVEL WHEELS AND FOERDERBRUECKE
AT115754B (en) Plant for the deposition of the overburden obtained from opencast mines on the overburden side.
DE548356C (en) Process for mining lignite in open-cast mines of varying width
DE611157C (en) Method for opening up opencast mines using a waste extraction and conveyor system
DE442133C (en) Process for the removal of overburden by means of an overburden conveyor bridge
DE555575C (en) Overburden recovery and conveyor system
DE944362C (en) Procedure for relocating the overburden, which has been extracted in stages, in open-cast lignite mining
DE474793C (en) Abraumfoerderbruecke with intermediate conveyors between the excavator and the main conveyor belt