DE625183C - Process for the production of dams from individual interlocking building blocks - Google Patents

Process for the production of dams from individual interlocking building blocks

Info

Publication number
DE625183C
DE625183C DEL74705D DEL0074705D DE625183C DE 625183 C DE625183 C DE 625183C DE L74705 D DEL74705 D DE L74705D DE L0074705 D DEL0074705 D DE L0074705D DE 625183 C DE625183 C DE 625183C
Authority
DE
Germany
Prior art keywords
stones
stone
quarry
building blocks
mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEL74705D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DEL74705D priority Critical patent/DE625183C/en
Application granted granted Critical
Publication of DE625183C publication Critical patent/DE625183C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/08Wall dams
    • E02B7/10Gravity dams, i.e. those in which the weight of the structure prevents overturning

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)

Description

Verfahren zur Herstellung von Talsperren aus einzelnen mit Verzahnung ineinandergreifenden Baublöcken Es sind Staumauern bekannt, die aus einzelnen verzahnten, ineinandergreifenden Baublöcken hergestellt sind. Als Baustoff für die Baublöcke kommt sowohl Beton als auch Bruchsteinmauerwerk zur Anwendung. Bei der Herstellung der Baublöcke werden entweder Steinblöcke in den Stampfbeton gedrückt oder es wird umgekehrt der Beton in die Fugen größerer Steine gestampft. Die Baublöcke aus Bruchsteinmauerwerk können auch in der Weise ausgeführt werden, daß die Steine auf der Lagerfläche annähernd eben bearbeitet und in ein Mörtelbett verlegt werden. - Alsdann werden die Fugen zwischen den Steinen mit Stampfbeton gefüllt und die Oberfläche mit Beton, in welchen möglichst viele kleine Steine eingedrückt werden, ausgeglichen. Darauf folgt wieder ein Mörtelbett für die Bruchsteine der nächsten aufzubringenden Schicht usw.Process for the production of dams from individual ones with interlocking interlocking building blocks Dams are known that consist of individual interlocked, interlocking building blocks are made. As a building material for the building blocks Both concrete and quarry stone masonry are used. In the preparation of of the building blocks either stone blocks are pressed into the rammed concrete or it is conversely, the concrete is tamped into the joints of larger stones. The blocks made of quarry stone masonry can also be carried out in such a way that the stones on the bearing surface approximate machined and laid in a bed of mortar. - Then the joints between the stones filled with stamped concrete and the surface with concrete in which as many small stones as possible are pressed in. That follows again a mortar bed for the rubble stones of the next layer to be applied, etc.

Die Wahl des Baustoffes für die Staumauer ist irn. allgemeinen davon abhängig, ob das an der Baustelle zur Verfügung stehende Gesteinsmaterial sich besser für die Bauweise aus Beton oder aus Bruchsteinmauerwerk eignet. Wesentlich ,mitbestimmend für die Wahl einer Staumauer aus Bruchsteinmauerwerk ist jedoch noch der Umstand, ob gelernte Maurer in ausreichender Anzahl bei wirtschaftlich tragbaren Tagelohnsätzen zur Verfügung stehen.The choice of building material for the dam is irn. general of it depending on whether the rock material available at the construction site is better Suitable for construction made of concrete or quarry stone masonry. Essential, co-determining for the choice of a dam wall made of quarry stone masonry, however, the fact whether trained bricklayers in sufficient numbers with economically viable daily wage rates be available.

Bei den Staumauern aus Beton ist mit erheblichen Schwindspannungen und Rißbildungen zu rechnen, wodurch die Wasserdichtigkeit der Staumauer ungünstig beeinflußt werden kann. An die Mehrzahl der Arbeitskräfte brauchen indessen im Hinblick auf die maschinenmäßige Herstellung des Betons keine hohen Anforderungen gestellt werden. Bei den' Ausführungen im Bruchsteinmauerwerk dagegen können in der Hauptsache nur gelernte Bruchsteinmaurer beschäftigt werden, da ungelernte Arbeitskräfte nicht in der Läge sind, ein wasserdichtes Mauerwerk ohne Hohlräume herzustellen. An diese Arbeitskräfte werden bei der Ausführung von Staumauern in Bruchsteinmauerwerk,. wie die Erfahrung zeigt, so höhe Ansprüche gestellt, däß sie frühzeitig altern und arbeitsunfähig werden. Außerdem sind bei weitem nicht alle im Bruch anfallenden Steine für das Bruchsteinmauerwerk verwendbar. Hierin liegt für den Ausfiihrenden ein großes geschäftliches Wagnis bei der Übernahme derartiger Arbeiten, da er zu diesem Zeitpunkt die Ergiebigkeit des auszubeutenden Bruches und den Wert des anfallenden Materials nicht beurteilen kann. Bei der Bauweise, Steinblöcke in nassen Beton zu drücken öder umgekehrt Beton in die Fugen größerer Steine zu stampfen, tritt die Erscheinung auf, daß die Verbindung zwischen dem Beton und den Steinen oft nicht innig genug ist; da die Bauelemente, nämlich größere Blöcke und nasser Beton, viel zu ungleich sind, wodurch wiederum die Wasserdichtigkeit des Mauerwerks erheblich leidet. Außerdem neigt diese Ausführungsart zur 12ißbildung, da der umhüllende Beton schwindet, wohingegen die Steinblöcke ihre alte Größe behalten.The concrete dam walls have considerable shrinkage stresses and cracking to be expected, which makes the water tightness of the dam unfavorable can be influenced. The majority of the workforce, however, need in view No high demands are placed on the machine-based production of the concrete will. In the case of the 'versions in the quarry stone masonry, on the other hand, in the main only trained quarry stone masons are employed, as unskilled workers are not are able to produce a watertight masonry without cavities. To this Workers are involved in the construction of dam walls in rubble masonry. As experience shows, demands are so high that they age prematurely and become incapacitated. In addition, not all of them are broken by a long way Stones can be used for the quarry stone masonry. Herein lies for the executor a great business venture in undertaking such work since he too at this point in time the productivity of the fraction to be exploited and the value of the resulting fraction Material can not judge. When building, stone blocks in wet concrete too press or, conversely, to stamp concrete into the joints of larger stones, the It appears that the connection between the concrete and the stones often fails is intimate enough; because the building elements, namely larger blocks and wet concrete, a lot are too unequal, which in turn significantly increases the water-tightness of the masonry suffers. In addition, this type of construction tends to crack because of the concrete surrounding it disappears, whereas the stone blocks retain their old size.

Durch das Verfahren gemäß der Erfindung soll ein Weg gewiesen werden, der es ermöglicht, einwandfreie Baublöcke, welche als Grundelemente für dex.,T4sperrenbau dienen, herzustellen: - 3-i. unter- Vermodugg-der- beim Mauern von Hand nicht zu verhütenden Mängel hinsichtlich der W_ asserdichtigkeit des Mauerwerks,.The method according to the invention is intended to show a way which makes it possible flawless building blocks, which as basic elements for dex., T4sperrenbau serve to produce: - 3-i. under- Vermodugg-der- at the wall Defects that cannot be prevented by hand with regard to the watertightness of the masonry.

2. unter Verwendung auch -ungelernter @Arbeiter und Schonung der Arbeitskräfte, 3. unter Ausnutzung aller im Steinbruch anfallenden- Steingrößen. _ Hiernach bringt also- das erfindungsgemäße Verfahren große technische,. soziale. und wirtschaftliche. Fortschritte mit sich.2. using unskilled @workers and protecting the workforce, 3. using all stone sizes occurring in the quarry. _ Hereafter brings also- the process according to the invention great technical ,. social. and economic. Progress with yourself.

Das Verfahren besteht im. besonderen darin, daß die Baublöcke unter Verwendung von Bruchsteinen und Mörtel in folgender Weise hergestellt werden: Die in den Steinbrüchen anfallenden größeren Bruchsteine werden innerhalb biegungsfester Rahmen auf einem dickplastischen, fast trockenen, mit dem -im Steinbruch anfallenden Steinmehl, Steingrus; Steinsplitt oder Feinschlag durchsetzten Mörtelbett. nebeneinander verlegt und durch Rammschläge in das-Bett eingeschlagen. Hierauf werden die -Lücken zwischen den Steinen ausgefüllt und ausgestampft und auf dieser unteren Schichtweitere Schichten nach demselben Verfahren hergestellt. - - -Das neue Verfahren ist auf. der Zeichnung veranschaulicht: : -Abb. = -zeigt einen nach dem neuen Verfahren hergestellten Baukörper, -,Abb. -2 zeigt im -Querschnitt eine mit diesem Baukörper aufgeführte,Talsperre; Abb: 3 zeigt in. größerem Maßstabe die äußere Qüäderverkleidung der Talsperre, Abb. 4 bzw. 5 - zeigen - einen - Fugenschnitt nach der Linie -A-B in Abb. 2 -bzw: eine Ausbildung der verzahnten Fuge A-B.The procedure consists in. special in that the building blocks under Use of rubble stones and mortar are made in the following way: The Larger quarry stones occurring in the quarries become more resistant to bending Frame on a thick plastic, almost dry, with the one occurring in the quarry Stone meal, stone gravel; Stone chippings or fine-grained mortar bed interspersed. side by side relocated and hammered into the bed. Thereupon the gaps filled and stamped out between the stones and further on this lower layer Layers made by the same process. - - -The new procedure is on. the drawing illustrates: - Fig. = -Shows one produced according to the new process Structure, -, Fig. -2 shows a cross-section of a dam with this structure; Fig: 3 shows the outer wall cladding of the dam on a larger scale, Fig. 4 and 5 - show - a - joint section along the line -A-B in Fig. 2 - or: one Formation of the toothed joint A-B.

Das Verfahren erfolgt in nachstehend geschilderter Weise: Nach sorgsamem Säubern und Vorrichten der gut angefeuchteten AuflagerHächen ,wird gemäß der Abb.-z in -den ersten -unteren Bauabschnitt a bzw. -indessen Schalungsrähmen eine Läge erdfeuchter Mörtelpaste eingebracht. Die Stärke und Zusammensetzung ,des Mörtelbettes richtet sich von tall-zu Fall nach der Größe der dem- Bruch -enffallenden Steine. Auf das- eingebrachte Mörtelbett- werden, mit Breitlage nach unten, Bruchsteine -b verlegt, welche kräftige Stöße' mit- Härtholzjungfern erhalten: Die oberen, sichtbaren Bruchsteinflächen werden wiederum leicht angenäßt;' und sodann wird in die zwischen den einzelnen Bruchsteinen -befindlichen, mehr oder weniger großen Zwischenräume, schaufelweise Mörtelpaste eingegeben-:- In diese Mörtelfüllstellen-c werden sodann Bruchsteine bl verlegt, die ebenfalls kurz gehaltene "Stöße mittels Hartholzjungfern erhalten. Nach Fertigstellung dieser Arbeiten wiederholt sich der Vorgang, wobei die jeweils aufgebrachte Mörtelausgleichsschicht als Auflager für die Lagerflächen der neuen ,Schicht Bruchsteine dient. Vor -dem Säubern ' und3Vorrichten neuer Arbeitsabschnitte müssen die sichtbaren, oberen Bruchsteinlagen abgeklopft und etwa lose klingende Steine aufgenommen lind beseitigt werden.The procedure is as described below: After careful Cleaning and preparation of the well-moistened support surfaces is carried out according to Fig.-z in the first lower construction section a or in its formwork frames a length earth-moist mortar paste introduced. The strength and composition of the mortar bed depends on the size of the falling stones from tall to fall. Quarry stones are placed on top of the mortar bed that has been introduced, with a wide position downwards -b relocated, which get strong bumps' with hardwood maids: the upper, visible ones Quarry stone surfaces are again slightly wetted; ' and then in the between the individual quarry stones - more or less large spaces, Mortar paste poured in shovel-wise -: - In these mortar filling points-c are then Rubble stones were laid, the "joints" also kept short by means of hardwood maids obtain. After this work has been completed, the process is repeated, whereby the mortar leveling layer applied in each case as a support for the bearing surfaces the new, layer of rubble is used. Before cleaning and preparing new work sections the visible, upper quarry stone layers must be knocked off and loosely sounding Stones picked up and removed.

Der zweite und dritte Absatz d, di entsteht also in ähnlicher Weise wie der im Vorstehenden bereits geschilderte untere Absatz.The second and third paragraph d, di are thus created in a similar way like the lower paragraph already described above.

Die Rahmenteile sind biegungsfest und werden mittels Flacheisenankern zusammengehalten. Die jeweiligen Längen der i,8o m hohen Baukörper sind mit 29 m angenommen; Lage und Verband sind aus der Grundrißzeichnung Abb. 4 ersichtlich. Sämtliche Längs- und Stirnseiten der Baukörper weisen an ihren Stoßstellen in bekannter Weise Verzahnungen e. auf (Abb. 2, ¢ und 5), welche durch ihr regelmäßiges Ineinaudergreifen einen innigen Verband sämtlicher Baukörper f gewährleisten. Das Einbringen der Bruchsteine erfolgt von Hand, dagegen wird das Einschlagen der Bruchsteine nicht mit dem -Mauerhammer, - sondern mittels Hartholzjungfern bewirkt, welche naturgemäß gegenüber dem Hammer -eine weit -intensivere Wirkung, insbesondere auch. - eine größere - Verdichtung der dickplastischen, fast trockenen Mörtelmasse innerhalb des steifen Rahmens herbeiführen.The frame parts are resistant to bending and are secured by means of flat iron anchors held together. The respective lengths of the i, 8o m high structures are 29 m accepted; The position and association can be seen in the floor plan in Fig. 4. All of the long and short sides of the structure have a familiar face at their joints Way gears e. (Fig. 2, ¢ and 5), which mesh through their regular intermeshing ensure an intimate association of all structures f. Bringing in the quarry stones is done by hand, on the other hand, the stone is not hammered in with a masonry hammer, - but by means of hardwood maids, which naturally compared to the hammer -a far more -intensive effect, especially too. - a greater - compression the thick, plastic, almost dry mortar mass within the rigid frame.

Durch das neue Verfahren wird also auch das Schwinden der einzelnen Baukörper wesentlich herabgemindert und dadurch die Festigkeit und Dichte der Sperrmauern -erhöht.The new process also reduces the individual The structure is significantly reduced, and thereby the strength and density of the barrier walls -elevated.

Claims (1)

PATENTANSPRLTCFI: Verfahren zur Herstellung von77Ta.lsperren aus einzelnen mit Verzahnung ineinandergreifenden Baublöcken, dadurch gekennzeichnet, daß die Baublöcke unter Verwendung von Bruchsteinen und Mörtel in folgender Weise hergestellt werden: Die in den Steinbrüchen anfallenderi-größeren Bruchsteine werden innerhalb biegungsfester Rahmen .auf einem dickplastischen, fast trockenen, mit dem im Steinbruch anfallenden Steinmehl, Steingrus; -Steinsplitt oder Feinschlag durchsetzten -Mörtelbett nebeneir@ander verlegt und. durch Rammschläge in das Bett eingerammt. Hierauf werden die Lücken zwischen den -Steinen unter Zugabe weiterer Füllmasse mit kleineren- Steinen ausgefüllt und- ausgestampft und auf dieser -unteren - --Schicht weitere Schichten nach demselben Verfahren hergestellt:PATENTANSPRLTCFI: Process for the production of 77Ta.lsperren from individual with interlocking interlocking blocks, characterized in that the Building blocks made using rubble and mortar in the following way are: The i-larger quarry stones occurring in the quarries are inside rigid frame. on a thick plastic, almost dry, with the one in the quarry accruing stone powder, stone gravel; -Stone chippings or fine impact interspersed -Mortar bed besides @ other relocated and. rammed into the bed by ramming. Be on it the gaps between the -stones with the addition of further filling compound with smaller- Stones filled in and stamped out and on this lower layer more Layers made by the same process:
DEL74705D 1929-04-04 1929-04-04 Process for the production of dams from individual interlocking building blocks Expired DE625183C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEL74705D DE625183C (en) 1929-04-04 1929-04-04 Process for the production of dams from individual interlocking building blocks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEL74705D DE625183C (en) 1929-04-04 1929-04-04 Process for the production of dams from individual interlocking building blocks

Publications (1)

Publication Number Publication Date
DE625183C true DE625183C (en) 1936-02-22

Family

ID=7283530

Family Applications (1)

Application Number Title Priority Date Filing Date
DEL74705D Expired DE625183C (en) 1929-04-04 1929-04-04 Process for the production of dams from individual interlocking building blocks

Country Status (1)

Country Link
DE (1) DE625183C (en)

Similar Documents

Publication Publication Date Title
DE2225302A1 (en) Walls without connecting material
DE625183C (en) Process for the production of dams from individual interlocking building blocks
AT505253B1 (en) NATURAL STONE ELEMENT AND METHOD OF MANUFACTURING THE SAME
AT203705B (en) Process for the production of plastering on walls in cast concrete or brickwork
DE812828C (en) Process for the production of a masonry using hollow bodies
DE801229C (en) Scarf stone
DE1659106A1 (en) Building structure and method of manufacturing the same
DE644586C (en) Process for the production of hollow stone ceilings
DE1195214B (en) Process for the production of prefabricated masonry stone panels and system for carrying out the process
DE323030C (en) Process for the production of larger surface structures, such as house fronts, from artificial stone
DE511365C (en) Process for lining concrete masonry with acid-resistant panels
DE802539C (en) Process for the production of walls for buildings of all kinds
DE933226C (en) Reinforced hollow-core ceiling and method of manufacturing the ribs used for the ceiling
DE870600C (en) Building board and building board wall and procedures for their construction
DE832669C (en) Shaped stone for the production of walls
DE827709C (en) Method and device for erecting walls for buildings
DE365625C (en) Hollow stone
AT162181B (en) Method and device for the production of supporting and intermediate walls from brick-like concrete blocks.
DE804034C (en) Method for producing masonry using construction panels as permanent formwork
DE806160C (en) Quick construction for the erection of building walls
DE953911C (en) Reinforced concrete hollow stone ceiling with hollow stones widened like a flange on the long sides
AT166301B (en)
DE334158C (en) Angular building block
DE1972239U (en) HOLLOW FORMWORK FOR CASING CONCRETE CONSTRUCTION.
AT339561B (en) CONCRETE BLOCK