DE602007002702D1 - Verfahren zur optimierung der erzeugung einer bohrlochgruppe - Google Patents

Verfahren zur optimierung der erzeugung einer bohrlochgruppe

Info

Publication number
DE602007002702D1
DE602007002702D1 DE602007002702T DE602007002702T DE602007002702D1 DE 602007002702 D1 DE602007002702 D1 DE 602007002702D1 DE 602007002702 T DE602007002702 T DE 602007002702T DE 602007002702 T DE602007002702 T DE 602007002702T DE 602007002702 D1 DE602007002702 D1 DE 602007002702D1
Authority
DE
Germany
Prior art keywords
wells
production
cluster
optimizing
rolling group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
DE602007002702T
Other languages
English (en)
Inventor
Jan Jozef Maria Briers
Keat-Choon Goh
Charles Edward Moncur
Peter Overschee
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shell Internationale Research Maatschappij BV
Original Assignee
Shell Internationale Research Maatschappij BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shell Internationale Research Maatschappij BV filed Critical Shell Internationale Research Maatschappij BV
Publication of DE602007002702D1 publication Critical patent/DE602007002702D1/de
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B41/0092
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/08Obtaining fluid samples or testing fluids, in boreholes or wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Operations Research (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)
  • Feedback Control In General (AREA)
  • Steroid Compounds (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Heat Treatment Of Steel (AREA)
  • Forging (AREA)
  • Geophysics And Detection Of Objects (AREA)
DE602007002702T 2006-04-07 2007-04-05 Verfahren zur optimierung der erzeugung einer bohrlochgruppe Expired - Fee Related DE602007002702D1 (de)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP06112401 2006-04-07
EP06112440 2006-04-10
PCT/EP2007/053348 WO2007116008A1 (en) 2006-04-07 2007-04-05 Method for optimising the production of a cluster of wells

Publications (1)

Publication Number Publication Date
DE602007002702D1 true DE602007002702D1 (de) 2009-11-19

Family

ID=38110150

Family Applications (1)

Application Number Title Priority Date Filing Date
DE602007002702T Expired - Fee Related DE602007002702D1 (de) 2006-04-07 2007-04-05 Verfahren zur optimierung der erzeugung einer bohrlochgruppe

Country Status (10)

Country Link
EP (1) EP2004953B1 (de)
AT (1) ATE445083T1 (de)
AU (1) AU2007235959B2 (de)
BR (1) BRPI0708835B1 (de)
CA (1) CA2645902C (de)
DE (1) DE602007002702D1 (de)
EA (1) EA200802116A1 (de)
NO (1) NO341307B1 (de)
NZ (1) NZ571278A (de)
WO (1) WO2007116008A1 (de)

Families Citing this family (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2008290585B2 (en) 2007-08-17 2011-10-06 Shell Internationale Research Maatschappij B.V. Method for controlling production and downhole pressures of a well with multiple subsurface zones and/or branches
BRPI0815491B1 (pt) 2007-08-17 2018-10-16 Shell Int Research método para determinar vazões de fluido em um grupo de poços de injeção de fluido conectados a um conduto coletor de suprimento de fluido coletivo
CA2690992C (en) 2007-08-24 2014-07-29 Exxonmobil Upstream Research Company Method for predicting well reliability by computer simulation
US8423337B2 (en) 2007-08-24 2013-04-16 Exxonmobil Upstream Research Company Method for multi-scale geomechanical model analysis by computer simulation
US8548782B2 (en) 2007-08-24 2013-10-01 Exxonmobil Upstream Research Company Method for modeling deformation in subsurface strata
US8768672B2 (en) 2007-08-24 2014-07-01 ExxonMobil. Upstream Research Company Method for predicting time-lapse seismic timeshifts by computer simulation
CA2705319C (en) 2007-11-10 2019-01-15 Laurence Reid Systems and methods for workflow automation, adaptation and integration
CA2776764A1 (en) 2009-11-30 2011-06-03 Exxonmobil Upstream Research Company Adaptive newton's method for reservoir simulation
US9134454B2 (en) 2010-04-30 2015-09-15 Exxonmobil Upstream Research Company Method and system for finite volume simulation of flow
CA2801382C (en) 2010-06-29 2018-12-18 Exxonmobil Upstream Research Company Method and system for parallel simulation models
EP2599032A4 (de) 2010-07-29 2018-01-17 Exxonmobil Upstream Research Company Verfahren und system zur reservoirmodellierung
CA2803066A1 (en) 2010-07-29 2012-02-02 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
WO2012015518A2 (en) 2010-07-29 2012-02-02 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
CA2807300C (en) 2010-09-20 2017-01-03 Exxonmobil Upstream Research Company Flexible and adaptive formulations for complex reservoir simulations
RU2457320C1 (ru) * 2011-03-29 2012-07-27 Общество С Ограниченной Ответственностью "Дискрит" Способ эксплуатации скважины
WO2013039606A1 (en) 2011-09-15 2013-03-21 Exxonmobil Upstream Research Company Optimized matrix and vector operations in instruction limited algorithms that perform eos calculations
EP2901363A4 (de) 2012-09-28 2016-06-01 Exxonmobil Upstream Res Co Fehlerentfernung bei geologischen modellen
BR112015014651B1 (pt) * 2012-12-21 2021-11-09 Seabed Separation As Método para adaptar e fabricar um sistema separador
MX358404B (es) * 2013-06-28 2018-08-15 Sitepp Sist Y Tecnologia Para El Petroleo S A De C V Sistema y metodo para mejorar la produccion de los niveles de pozos.
US9702243B2 (en) 2013-10-04 2017-07-11 Baker Hughes Incorporated Systems and methods for monitoring temperature using a magnetostrictive probe
US9957781B2 (en) 2014-03-31 2018-05-01 Hitachi, Ltd. Oil and gas rig data aggregation and modeling system
EP3175265A1 (de) 2014-07-30 2017-06-07 ExxonMobil Upstream Research Company Verfahren zur erzeugung eines volumetrischen gitters in einem bereich mit heterogenen materialeigenschaften
US10012059B2 (en) 2014-08-21 2018-07-03 Exxonmobil Upstream Research Company Gas lift optimization employing data obtained from surface mounted sensors
BR112017006134B1 (pt) * 2014-09-25 2021-07-13 Total S.A. Produção de hidrocarbonetos com separador de teste
US10393561B2 (en) 2014-09-25 2019-08-27 Total S.A. Production of hydrocarbons with metric counter
AU2015339883B2 (en) 2014-10-31 2018-03-29 Exxonmobil Upstream Research Company Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
EP3213126A1 (de) 2014-10-31 2017-09-06 Exxonmobil Upstream Research Company Handhabung von domänendiskontinuität in einem unterirdischen gittermodell mithilfe von gitteroptimierungstechniken
US10101194B2 (en) 2015-12-31 2018-10-16 General Electric Company System and method for identifying and recovering from a temporary sensor failure
US10401207B2 (en) 2016-09-14 2019-09-03 GE Oil & Gas UK, Ltd. Method for assessing and managing sensor uncertainties in a virtual flow meter
US11940318B2 (en) 2016-09-27 2024-03-26 Baker Hughes Energy Technology UK Limited Method for detection and isolation of faulty sensors
CA3043231C (en) 2016-12-23 2022-06-14 Exxonmobil Upstream Research Company Method and system for stable and efficient reservoir simulation using stability proxies
US10364655B2 (en) 2017-01-20 2019-07-30 Saudi Arabian Oil Company Automatic control of production and injection wells in a hydrocarbon field
US11041976B2 (en) 2017-05-30 2021-06-22 Exxonmobil Upstream Research Company Method and system for creating and using a subsurface model in hydrocarbon operations
US20190093474A1 (en) * 2017-09-22 2019-03-28 General Electric Company System and method for determining production from a plurality of wells
EP3743783A4 (de) * 2018-01-26 2021-10-27 GE Inspection Technologies, LP Bestimmung virtueller prozessparameter
US11180976B2 (en) 2018-12-21 2021-11-23 Exxonmobil Upstream Research Company Method and system for unconventional gas lift optimization
WO2020154468A1 (en) * 2019-01-25 2020-07-30 Ge Inspection Technologies, Lp Flow network model analysis
US11591936B2 (en) 2019-09-04 2023-02-28 Saudi Arabian Oil Company Systems and methods for proactive operation of process facilities based on historical operations data
CN113898323B (zh) * 2020-06-22 2024-02-23 中国石油化工股份有限公司 海上油气田水下生产系统及其设计方法
CN112580851B (zh) * 2020-11-17 2024-06-18 西安中控天地科技开发有限公司 丛式井场抽油机井群错峰开井间抽运行调度方法
CN113153281A (zh) * 2021-03-29 2021-07-23 中国地质大学(北京) 一种实现海上平台油气井协同生产的优化模型
KR102599305B1 (ko) * 2021-09-15 2023-11-07 광성지엠(주) 유가스정 지중 생산 조건 및 장애 요소를 반영한 esp 및 튜빙 모니터링 시스템의 시험 방법(esp mapping and surging)
KR102599460B1 (ko) * 2021-09-15 2023-11-07 광성지엠(주) 유가스정 지중 생산 조건 및 장애 요소를 반영한 esp 및 튜빙 모니터링 시스템의 시험 방법(tubing leakage)
WO2023154808A1 (en) * 2022-02-09 2023-08-17 Schlumberger Technology Corporation Integrated asset modeling for energy consumption and emission

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6434435B1 (en) * 1997-02-21 2002-08-13 Baker Hughes Incorporated Application of adaptive object-oriented optimization software to an automatic optimization oilfield hydrocarbon production management system
RU2274747C2 (ru) * 2000-10-04 2006-04-20 Шлюмбергер Текнолоджи Б.В. Методика оптимизации добычи из многослойных смешанных пластов с использованием данных о динамике изменения дебита смешанных пластов и данных геофизических исследований в эксплуатационных скважинах

Also Published As

Publication number Publication date
EA200802116A1 (ru) 2009-04-28
AU2007235959A1 (en) 2007-10-18
WO2007116008A1 (en) 2007-10-18
BRPI0708835A2 (pt) 2011-06-14
EP2004953B1 (de) 2009-10-07
NZ571278A (en) 2011-08-26
CA2645902A1 (en) 2007-10-18
BRPI0708835B1 (pt) 2017-09-26
NO20084606L (no) 2008-10-30
CA2645902C (en) 2014-05-20
EP2004953A1 (de) 2008-12-24
NO341307B1 (no) 2017-10-02
ATE445083T1 (de) 2009-10-15
AU2007235959B2 (en) 2010-11-11

Similar Documents

Publication Publication Date Title
DE602007002702D1 (de) Verfahren zur optimierung der erzeugung einer bohrlochgruppe
ATE554261T1 (de) Stimulation durch spaltenbildung beim bohren
WO2008055188A3 (en) System and method for performing oilfield simulation operations
DE602006002489D1 (de) Verfahren zur erleichterung eines bohrlochbetriebes
GB2445305A (en) Method and system for integrated asset management utilizing multi-level modeling of oil field assets
NO20076611L (no) Fremgangsmater og anordninger for analysering og styring av forplantningen av bolger i et borehull, generert med vannhammer
MY146703A (en) Method of drilling and producing hydrocarbons from subsurface formations
WO2009126376A3 (en) System and method for drilling multilateral wells using magnetic ranging while drilling
EA201070207A1 (ru) Способ управления добычей из нефтегазоносного коллектора в режиме реального времени
WO2008157706A3 (en) System and method for performing oilfield simulation operations
EA200600517A1 (ru) Способ, система и программное запоминающее устройство для моделирования сдвига на поверхности раздела в программном обеспечении моделирования гидравлического разрыва
GB2478213A (en) Methods and apparatus for planning and dynamically updating sampling operations while drilling in a subterranean formation
MX2009006534A (es) Soporte de datos con ventana transparente y metodo para producirlo.
MX2010003218A (es) Metodo para completar depositos de petroleo y gas hermeticos.
GB2462227A (en) System and method for performing a drilling operation in an oilfield
ATE368167T1 (de) Verfahren zur modellierung der ölgewinnung aus einer unterirdischen formation
WO2007018858A3 (en) Well modeling associated with extraction of hydrocarbons from subsurface formations
NO20091092L (no) Fremgangsmate og system for planlegging hydrokarbonutvinning fra en hydrokarbonformasjon
NO20100886L (no) Evaluering av syefraktureringsbehandlinger i et oljefelt
ATE491768T1 (de) Bohrlochbehandlung
GB2464003B (en) System and method for performing oilfield simulation operations
MY183925A (en) Systems and methods for drilling and producing subsea fields
MX336600B (es) Composiciones y metodos para impedir el deposito de asfaltenos.
MX2010007103A (es) Metodo y sistema para transmitir datos de imagen de una perforación.
FI20065553A0 (fi) Menetelmä kallion poraamiseksi

Legal Events

Date Code Title Description
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee