|
US20020191102A1
(en)
*
|
2001-05-31 |
2002-12-19 |
Casio Computer Co., Ltd. |
Light emitting device, camera with light emitting device, and image pickup method
|
|
US7672818B2
(en)
*
|
2004-06-07 |
2010-03-02 |
Exxonmobil Upstream Research Company |
Method for solving implicit reservoir simulation matrix equation
|
|
EP1917619B1
(de)
*
|
2005-07-27 |
2016-08-17 |
Exxonmobil Upstream Research Company |
Mit der extraktion von kohlenwasserstoffen aus unteroberflächenformationen assoziierte bohrlochmodellierung
|
|
US8301425B2
(en)
*
|
2005-07-27 |
2012-10-30 |
Exxonmobil Upstream Research Company |
Well modeling associated with extraction of hydrocarbons from subsurface formations
|
|
EA015435B1
(ru)
*
|
2005-07-27 |
2011-08-30 |
Эксонмобил Апстрим Рисерч Компани |
Способ моделирования технологических показателей скважин
|
|
EP2038810A4
(de)
*
|
2006-07-07 |
2018-05-09 |
Exxonmobil Upstream Research Company |
Aufwärtsskalierung von reservoirmodellen durch wiederverwendung von strömungslösungen aus geologischen modellen
|
|
US8117016B2
(en)
*
|
2007-04-19 |
2012-02-14 |
Schlumberger Technology Corporation |
System and method for oilfield production operations
|
|
US9175547B2
(en)
*
|
2007-06-05 |
2015-11-03 |
Schlumberger Technology Corporation |
System and method for performing oilfield production operations
|
|
FR2919932B1
(fr)
*
|
2007-08-06 |
2009-12-04 |
Inst Francais Du Petrole |
Methode pour evaluer un schema de production d'un gissement souterrain en tenant compte des incertitudes
|
|
US8301676B2
(en)
|
2007-08-23 |
2012-10-30 |
Fisher-Rosemount Systems, Inc. |
Field device with capability of calculating digital filter coefficients
|
|
US8265915B2
(en)
*
|
2007-08-24 |
2012-09-11 |
Exxonmobil Upstream Research Company |
Method for predicting well reliability by computer simulation
|
|
US8423337B2
(en)
*
|
2007-08-24 |
2013-04-16 |
Exxonmobil Upstream Research Company |
Method for multi-scale geomechanical model analysis by computer simulation
|
|
US8548782B2
(en)
*
|
2007-08-24 |
2013-10-01 |
Exxonmobil Upstream Research Company |
Method for modeling deformation in subsurface strata
|
|
US8768672B2
(en)
*
|
2007-08-24 |
2014-07-01 |
ExxonMobil. Upstream Research Company |
Method for predicting time-lapse seismic timeshifts by computer simulation
|
|
US7702401B2
(en)
|
2007-09-05 |
2010-04-20 |
Fisher-Rosemount Systems, Inc. |
System for preserving and displaying process control data associated with an abnormal situation
|
|
FR2920816B1
(fr)
*
|
2007-09-06 |
2010-02-26 |
Inst Francais Du Petrole |
Methode pour mettre a jour un modele geologique a l'aide de donnees dynamiques et d'essais de puits
|
|
US20090093892A1
(en)
*
|
2007-10-05 |
2009-04-09 |
Fisher-Rosemount Systems, Inc. |
Automatic determination of the order of a polynomial regression model applied to abnormal situation prevention in a process plant
|
|
US8055479B2
(en)
|
2007-10-10 |
2011-11-08 |
Fisher-Rosemount Systems, Inc. |
Simplified algorithm for abnormal situation prevention in load following applications including plugged line diagnostics in a dynamic process
|
|
US8437996B2
(en)
*
|
2007-12-13 |
2013-05-07 |
Exxonmobil Upstream Research Company |
Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid
|
|
WO2009079570A2
(en)
|
2007-12-17 |
2009-06-25 |
Landmark Graphics Corporation, A Halliburton Company |
Systems and methods for optimization of real time production operations
|
|
CA2705277C
(en)
*
|
2007-12-18 |
2017-01-17 |
Exxonmobil Upstream Research Company |
Determining connectivity architecture in 2-d and 3-d heterogeneous data
|
|
CA2705340C
(en)
|
2007-12-21 |
2016-09-27 |
Exxonmobil Upstream Research Company |
Method and apparatus for analyzing three-dimensional data
|
|
WO2009085395A1
(en)
*
|
2007-12-31 |
2009-07-09 |
Exxonmobil Upstream Research Company |
Methods and systems for determining near-wellbore characteristics and reservoir properties
|
|
US8437997B2
(en)
*
|
2008-01-22 |
2013-05-07 |
Exxonmobil Upstream Research Company |
Dynamic connectivity analysis
|
|
EP2252903A4
(de)
|
2008-03-10 |
2018-01-03 |
Exxonmobil Upstream Research Company |
Verfahren zur bestimmung verschiedener alternativer pfade zwischen zwei objektsätzen in heterogenen 2d- und 3d-daten
|
|
WO2009117504A2
(en)
*
|
2008-03-20 |
2009-09-24 |
Bp Corporation North America Inc. |
Management of measurement data being applied to reservoir models
|
|
EP2288974A1
(de)
|
2008-04-17 |
2011-03-02 |
Exxonmobil Upstream Research Company |
Robustes entscheidungsunterstützungstool auf optimierungsbasis zur reservoirentwicklungsplanung
|
|
BRPI0909446A2
(pt)
*
|
2008-04-18 |
2015-12-22 |
Exxonmobil Upstream Res Co |
métodos para planejamento do desenvolvimento de reservatório, para suporte à decisão considerando o desenvolvimento de recurso petrolíferos, para otimização do planejamento de desenvolvimento, e para produção de hidrocarbonetos.
|
|
WO2009131761A2
(en)
|
2008-04-21 |
2009-10-29 |
Exxonmobile Upstream Research Company |
Stochastic programming-based decision support tool for reservoir development planning
|
|
AU2009244721B2
(en)
|
2008-05-05 |
2013-09-26 |
Exxonmobile Upstream Research Company |
Systems and methods for connectivity analysis using functional obejects
|
|
US20110011595A1
(en)
*
|
2008-05-13 |
2011-01-20 |
Hao Huang |
Modeling of Hydrocarbon Reservoirs Using Design of Experiments Methods
|
|
US20110067871A1
(en)
*
|
2008-05-22 |
2011-03-24 |
Burdette Jason A |
Methods For Regulating Flow In Multi-Zone Intervals
|
|
CN102138146A
(zh)
*
|
2008-09-30 |
2011-07-27 |
埃克森美孚上游研究公司 |
使用并行多级不完全因式分解求解储层模拟矩阵方程的方法
|
|
EP2350810A4
(de)
*
|
2008-09-30 |
2013-06-05 |
Exxonmobil Upstream Res Co |
Selbstanpassender iterlativer löser
|
|
WO2010071701A1
(en)
*
|
2008-12-16 |
2010-06-24 |
Exxonmobil Upstream Research Company |
Systems and methods for hydrocarbon reservoir development and management optimization
|
|
US8352228B2
(en)
*
|
2008-12-23 |
2013-01-08 |
Exxonmobil Upstream Research Company |
Method for predicting petroleum expulsion
|
|
US9552462B2
(en)
*
|
2008-12-23 |
2017-01-24 |
Exxonmobil Upstream Research Company |
Method for predicting composition of petroleum
|
|
EA201170931A1
(ru)
|
2009-01-13 |
2012-01-30 |
Эксонмобил Апстрим Рисерч Компани |
Оптимизация планов эксплуатации скважины
|
|
US8612195B2
(en)
|
2009-03-11 |
2013-12-17 |
Exxonmobil Upstream Research Company |
Gradient-based workflows for conditioning of process-based geologic models
|
|
AU2009341852B2
(en)
|
2009-03-11 |
2015-08-20 |
Exxonmobil Upstream Research Company |
Adjoint-based conditioning of process-based geologic models
|
|
US8793110B2
(en)
|
2009-03-13 |
2014-07-29 |
Exxonmobil Upstream Research Company |
Method for predicting fluid flow
|
|
US10060241B2
(en)
|
2009-06-05 |
2018-08-28 |
Schlumberger Technology Corporation |
Method for performing wellbore fracture operations using fluid temperature predictions
|
|
WO2011043862A1
(en)
|
2009-10-07 |
2011-04-14 |
Exxonmobil Upstream Research Company |
Discretized physics-based models and simulations of subterranean regions, and methods for creating and using the same
|
|
AU2010308495A1
(en)
|
2009-10-20 |
2012-05-10 |
Exxonmobil Upstream Research Company |
Method for quantitatively assessing connectivity for well pairs at varying frequencies
|
|
CA2783787A1
(en)
|
2010-02-12 |
2011-08-18 |
Exxonmobil Upstream Research Company |
Method and system for creating history-matched simulation models
|
|
US8775142B2
(en)
*
|
2010-05-14 |
2014-07-08 |
Conocophillips Company |
Stochastic downscaling algorithm and applications to geological model downscaling
|
|
WO2012109191A1
(en)
*
|
2011-02-09 |
2012-08-16 |
Conocophillips Company |
A quantitative method of determining safe steam injection pressure for enhanced oil recovery operations
|
|
US9618652B2
(en)
|
2011-11-04 |
2017-04-11 |
Schlumberger Technology Corporation |
Method of calibrating fracture geometry to microseismic events
|
|
CA2915625C
(en)
|
2011-03-11 |
2021-08-03 |
Schlumberger Canada Limited |
Method of calibrating fracture geometry to microseismic events
|
|
US10422208B2
(en)
|
2011-11-04 |
2019-09-24 |
Schlumberger Technology Corporation |
Stacked height growth fracture modeling
|
|
EP2774066B1
(de)
|
2011-11-04 |
2019-05-01 |
Services Petroliers Schlumberger |
Modellierung der interaktion von hydraulischen rissen in komplexen rissnetzwerken
|
|
US9677393B2
(en)
|
2013-08-28 |
2017-06-13 |
Schlumberger Technology Corporation |
Method for performing a stimulation operation with proppant placement at a wellsite
|
|
US10571604B2
(en)
|
2013-08-30 |
2020-02-25 |
Saudi Arabian Oil Company |
Two dimensional reservoir pressure estimation with integrated static bottom-hole pressure survey data and simulation modeling
|
|
US9896930B2
(en)
|
2013-08-30 |
2018-02-20 |
Saudi Arabian Oil Company |
Three-dimensional reservoir pressure determination using real time pressure data from downhole gauges
|
|
GB2533847B
(en)
*
|
2014-11-06 |
2017-04-05 |
Logined Bv |
Local layer geometry engine with work zone generated from buffer defined relative to a wellbore trajectory
|
|
WO2016122792A1
(en)
|
2015-01-28 |
2016-08-04 |
Schlumberger Canada Limited |
Method of performing wellsite fracture operations with statistical uncertainties
|
|
CN105095986B
(zh)
*
|
2015-06-23 |
2018-12-25 |
中国石油天然气股份有限公司 |
多层油藏整体产量预测的方法
|
|
US10920538B2
(en)
|
2015-08-07 |
2021-02-16 |
Schlumberger Technology Corporation |
Method integrating fracture and reservoir operations into geomechanical operations of a wellsite
|
|
US10787887B2
(en)
|
2015-08-07 |
2020-09-29 |
Schlumberger Technology Corporation |
Method of performing integrated fracture and reservoir operations for multiple wellbores at a wellsite
|
|
WO2017027068A1
(en)
|
2015-08-07 |
2017-02-16 |
Schlumberger Technology Corporation |
Well management on cloud computing system
|
|
WO2017027342A1
(en)
|
2015-08-07 |
2017-02-16 |
Schlumberger Technology Corporation |
Method of performing complex fracture operations at a wellsite having ledged fractures
|
|
WO2017041074A1
(en)
|
2015-09-03 |
2017-03-09 |
Schlumberger Technology Corporation |
Method of integrating fracture, production, and reservoir operations into geomechanical operations of a wellsite
|
|
US10619469B2
(en)
|
2016-06-23 |
2020-04-14 |
Saudi Arabian Oil Company |
Hydraulic fracturing in kerogen-rich unconventional formations
|
|
CN106501145A
(zh)
*
|
2016-09-18 |
2017-03-15 |
中国石油大学(北京) |
页岩气藏数值模拟器输入参数的校正方法及装置
|
|
WO2018204259A1
(en)
|
2017-05-02 |
2018-11-08 |
Saudi Arabian Oil Company |
Synthetic source rocks
|
|
US11041976B2
(en)
|
2017-05-30 |
2021-06-22 |
Exxonmobil Upstream Research Company |
Method and system for creating and using a subsurface model in hydrocarbon operations
|
|
US11573159B2
(en)
|
2019-01-08 |
2023-02-07 |
Saudi Arabian Oil Company |
Identifying fracture barriers for hydraulic fracturing
|
|
US11492541B2
(en)
|
2019-07-24 |
2022-11-08 |
Saudi Arabian Oil Company |
Organic salts of oxidizing anions as energetic materials
|
|
US11319478B2
(en)
|
2019-07-24 |
2022-05-03 |
Saudi Arabian Oil Company |
Oxidizing gasses for carbon dioxide-based fracturing fluids
|
|
US11339321B2
(en)
|
2019-12-31 |
2022-05-24 |
Saudi Arabian Oil Company |
Reactive hydraulic fracturing fluid
|
|
US11352548B2
(en)
|
2019-12-31 |
2022-06-07 |
Saudi Arabian Oil Company |
Viscoelastic-surfactant treatment fluids having oxidizer
|
|
WO2021138355A1
(en)
|
2019-12-31 |
2021-07-08 |
Saudi Arabian Oil Company |
Viscoelastic-surfactant fracturing fluids having oxidizer
|
|
US11473009B2
(en)
|
2020-01-17 |
2022-10-18 |
Saudi Arabian Oil Company |
Delivery of halogens to a subterranean formation
|
|
US11473001B2
(en)
|
2020-01-17 |
2022-10-18 |
Saudi Arabian Oil Company |
Delivery of halogens to a subterranean formation
|
|
US11365344B2
(en)
|
2020-01-17 |
2022-06-21 |
Saudi Arabian Oil Company |
Delivery of halogens to a subterranean formation
|
|
US11268373B2
(en)
|
2020-01-17 |
2022-03-08 |
Saudi Arabian Oil Company |
Estimating natural fracture properties based on production from hydraulically fractured wells
|
|
US11549894B2
(en)
|
2020-04-06 |
2023-01-10 |
Saudi Arabian Oil Company |
Determination of depositional environments
|
|
US11578263B2
(en)
|
2020-05-12 |
2023-02-14 |
Saudi Arabian Oil Company |
Ceramic-coated proppant
|
|
US11542815B2
(en)
|
2020-11-30 |
2023-01-03 |
Saudi Arabian Oil Company |
Determining effect of oxidative hydraulic fracturing
|
|
US12071589B2
(en)
|
2021-10-07 |
2024-08-27 |
Saudi Arabian Oil Company |
Water-soluble graphene oxide nanosheet assisted high temperature fracturing fluid
|
|
US12025589B2
(en)
|
2021-12-06 |
2024-07-02 |
Saudi Arabian Oil Company |
Indentation method to measure multiple rock properties
|
|
US12012550B2
(en)
|
2021-12-13 |
2024-06-18 |
Saudi Arabian Oil Company |
Attenuated acid formulations for acid stimulation
|
|
US11885790B2
(en)
|
2021-12-13 |
2024-01-30 |
Saudi Arabian Oil Company |
Source productivity assay integrating pyrolysis data and X-ray diffraction data
|