DE466153C DEK99533D DEK0099533D DE466153C DE 466153 C DE466153 C DE 466153C DE K99533 D DEK99533 D DE K99533D DE K0099533 D DEK0099533 D DE K0099533D DE 466153 C DE466153 C DE 466153C
Authority
DE
Germany
Prior art keywords
vertical
horizontal
wagons
platforms
conveyor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEK99533D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DEK99533D priority Critical patent/DE466153C/en
Application granted granted Critical
Publication of DE466153C publication Critical patent/DE466153C/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B9/00Kinds or types of lifts in, or associated with, buildings or other structures
    • B66B9/10Kinds or types of lifts in, or associated with, buildings or other structures paternoster type

Landscapes

  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Structural Engineering (AREA)
  • Intermediate Stations On Conveyors (AREA)

Description

Kettenbahn für wagerechte und senkrechte Förderung Die bisherigen Transportmittel, welche bei Schachtförderung im Braunkohlenbergbau verwendet wurden, -waren: Gestellförderung, Gefäßförderung oder Becherwerksanlagen. Chain conveyor for horizontal and vertical conveying The previous means of transport that were used for shaft conveyance in lignite mining were: rack conveyance, container conveyance or bucket elevator systems.

IniTagebau wurden entweder langeKettenbahnen, die bis zu einer bestimmten Neigung der Fahrbahn verwendbar sind, benutzt, oder es wurde das durch Bagger oder größere Abraummaschinen gewonnene Gut durch besondere Kleinbahnen fortgeschafft und beim Abgeben des Guts auf höher liegende Ablaufstellen Aufzüge benutzt, wo dann meistens eine Umladung zwecks Weiterbeförderung mittels Kettenbahn vor sich ging.IniTebau were either long chain tracks leading up to a certain Slope of the roadway are usable, used, or it was done by excavators or Goods extracted from larger clearing machines were carried away by special small railways and when delivering the goods to higher-lying drainage points, elevators are used, where then mostly a reloading for the purpose of onward transport by chain rail took place.

Im Steinkohlenbergbau, wo die Steinkohle von der Rasenhängebank auf höher gelegene Hängebänke, z. B. bei Wäschen, gebracht werden muß oder wo Berge und Kohlen auf hohe Halden abgeführt werden, benutzt man weitgespannte Förderbrücken mit $ettenbahnen, steile Seilbahnen, welche jeden einzelnen Wagen hochziehen, oder auch Aufzüge.In hard coal mining, where the hard coal is raised from the lawn hanging bank higher hanging benches, e.g. B. at washes, must be brought or where mountains and coal are carried off to high heaps, wide-span conveyor bridges are used with $ ettenbahnen, steep cable cars that pull up every single car, or also elevators.

Abgesehen von den Kettenbahnen und Kleinbahnen im Tagebau, welche eine senkrechte oder in starker Neigung liegende Förderung überhaupt nicht-zulassen, bedingen alle diese Förderarten, daß jeder Wagen durch ein- oder mehrmalige Umstellung von Hand dem Bestimmungsort zugeführt wird, so daß der auf der Grubensohle aufgegebene Wagen nur unter Aufwendung zahlreicher Bedienungsmannschaften, großen Zeitverlusten, umständliche, Platz erfordernde Anlagen sein Ziel erreicht und denselben Förderweg umgekehrt wieder zurücklegen muß. Ein direkter ununterbrochener Transport bei Schachtförderung oder tiefer liegenden senkrechten. Abbauorten im Tagebau ist nicht möglich, so, daß hier die obengenannten Hilfsvorrichtungen in Tätigkeit treten müs- sen, um nacheinander Transporte von @va4ge- rechtem bis senkrechtem Förderwege zu ermöglichen.Apart from the chain railways and small railways in open-cast mines, which do not allow vertical or steeply inclined conveyance at all, all these types of conveyance require that each wagon is brought to the destination by manual repositioning once or several times, so that the one on the bottom of the pit abandoned wagons can only reach their destination with the expenditure of numerous service teams, large losses of time, cumbersome, space-consuming systems and have to cover the same conveying path the other way round. A direct, uninterrupted transport in the case of shaft conveyance or deeper lying verticals. Mining sites in opencast mining is not possible, so that the above auxiliary devices must come into action here. to order transports from @ va4ge one after the other to enable right to vertical conveying paths.

Es sind nun bereits Vorrichtungen bekannt, die es ermöglichen, fortlaufende Beförderungen von. Gefäßen an Ketten vorzunehmen, deren Förderwege sowohl senkrecht wie walgerecht verlaufen. Es ist z. B. eine Förderanlage bekannt, bei der zwischen zwei Seilen das Fördergefäß frei schwebend hängt und bei der das Gefäß im senkrechten Schacht von Hand angehängt und auf den oberen Stockwerken ebenso abgehängt wird. Ein selbsttätiger Zulauf von wagerechter zu senkrechter Bahn im Schacht sowie ein selbsttätiger Ablauf auf waigerech- ter Bahn auf den oberen Stockwerken ist nicht möglich.There are now devices are already known that allow continuous transports of. To make vessels on chains, the conveying paths of which are both vertical run like a whale. It is Z. B. a conveyor system is known in which the bucket hangs freely between two ropes and in which the container is hung by hand in the vertical shaft and is also suspended on the upper floors. An automatic closing of horizontal to vertical path in the shaft as well as an automatic process on horizontal The train on the upper floors is not possible.

Bei einer weiteren derartigen Fördereinrichtung hängt eine Plattform zur Aufnahme der Fördergefäße zwischen zwei Seilen. Durch besondere, ziemlich verwickelte Zuführungseinrichtungen wird jeder einzelne Wagen der Plattform während des senkrechten Laufs übergeben. Ein ununterbrochener, gleichmäßiger Zulauf der Fördergefäße sowie ein solcher Ablauf auf den. oberen Etagen ist gleichfalls nicht möglich. Schließlich ist eine Anordnung bekannt, bei der ein Gefäß, das an zwei Ketten befestigt ist, sowohl bei walgerechten wie senkrechten Förderwegen dadurch in stets waldrechter Lage bleibt, daß verschiedene Hilfsketten zur Stützung des Gefäßes dienen, wobei letzteres zur Stützung von einer Hilfskette zur anderen wandert.In a further such conveying device, a platform for receiving the conveying vessels hangs between two ropes. Each individual carriage is transferred to the platform during the vertical run by means of special, rather intricate feed devices. An uninterrupted, even inflow of the conveying vessels and such a drain on the. upper floors is also not possible. Finally, an arrangement is known in which a vessel attached to two chains is, both for whale-sized as well as vertical ones This means that conveying paths are always more forest-oriented The situation remains that various auxiliary chains are used to support the vessel, the latter migrating from one auxiliary chain to the other for support.

Gegenstand der Erfindung ist nun, eine einfache Förderart zu schaffen, die @es ermöglicht, die Förderwagen mittels einer Kettenbahn von der Grubensohle über Tag zu fördern, ohne daß eine Umladung der Wagen vorgenommen zu werden braucht, wobei es ganz gleichgültig ist, ob der Förderweg nach- einander in wagerechter, senkrechter oder schräger Weise verläuft.The object of the invention is now to create a simple type of conveyance that allows the trolley to be conveyed by means of a chain conveyor from the bottom of the pit over the day without having to reload the trolleys, regardless of whether the conveying path is used after- each other in horizontal, vertical or runs obliquely.

Förderkorb, Kettenbahn, Aufzug, Aufgabe-und Abzugsstation vereinigen sich in dieser= Neuerung, da die Wagen, an der Aufg -bestelle auf der Grubensohle durch die Schlepper beliebig aneinandergereiht, selbsttätig in ruhiger, ununterbrochener Weise ihren 1iörderweg antreten, um auf Flur oder auf Hängebank selbsttätig abzurollen, ohne daß dazu irgendeine weitere Hilfskraft benötigt wird. -Bei der neuen Fördereinrichtung werden vier Ketten verwendet, zwischen welchen in regelmäßigen Abständen Plattformen. zur Aufnahme der Förderwagen hängen.Combine conveyor cage, chain conveyor, elevator, feed and discharge station in this = innovation, since the wagons, at the Aufg -bestelle on the pit floor Lined up randomly by the tractor, automatically in a quiet, uninterrupted manner Wise start their 1iörderweg to roll automatically on the corridor or on the hanging bench, without the need for any other assistants. -At the new conveyor system four chains are used, between which platforms at regular intervals. to hang the trolley.

Diese Plattformen bleiben infolge der nachstehend beschriebenen Anordnung in allen Stellungen, sei es bei senkrechtem oller wa#g@e- rechtem Kettenlauf, stets in wa gerechter Lage, solange sie mit Wagen .in Berührung sind.These platforms remain in all as a result of the arrangement described below Positions, be it with a vertical oller wa # g @ e- right chain run, always in a more horizontal position Location as long as they are in contact with the car.

Bei Schachtförderung wird das Führungsgerüst im senkrechten Schacht zweckmäßig weggelassen, so daß die Ketten mit den Wagen frei schweben. Dabei wird eine durchgehende Führungsleiste angebracht, um ein Schwanken der Last zu verhindern.In the case of shaft conveyance, the guide frame is in the vertical shaft expediently omitted so that the chains float freely with the car. It will A continuous guide rail is attached to prevent the load from swaying.

Im Tagebau erhält die senkrechte Führung ein: geschlossenes Gerüst, ähnlich dem der Lastenaufzüge.In the opencast mine, the vertical guide is given a: closed scaffolding, similar to that of freight elevators.

Abb. i zeigt die Gesamtanordnung einer solchen Anlage .im Tagebau.Fig. I shows the overall arrangement of such a system in an open-cast mine.

Abb. z zeigt einen Teil der Seitenansicht, welche je nach Menge der Förderung in mehreren nebeneinanderliegenden Gerüsten bestehen kann.Fig. Z shows part of the side view, which depends on the amount of Promotion in several adjacent scaffolds can exist.

Abb. 3 zeigt den Hauptantrieb der Ketten, Abb. q. die Plattform in der Ansicht von oben, Abb. 5 dieselbe in Seitenansicht.Fig. 3 shows the main drive of the chains, Fig. Q. the platform in the view from above, Fig. 5 the same in side view.

Die Greiferscheiben a für die beiden Lastketten II sitzen fest auf der Vorlegewelle c (Abb. i und 3).The gripper disks a for the two load chains II sit firmly on the countershaft c (Fig. i and 3).

Die Kettenräder b für die stets außenliegenden Ketten T sitzen lose auf der Welle 4: Sie -sind deshalb lose angeordnet, weil- die Ketten I und II gleiche Geschwindigkeit haben, die Kettenräder a und b aber verschiedene Durchmesser. Dies gilt jedoch nur bei kleineren Anlagen, z. B. nach Form der Patentzeichnung, wo die Haupttragkette II aus einer Gelenkkette, die Kette I aber aus einer einfachen Ankerkette besteht.The chain wheels b for the chains T that are always on the outside sit loosely on the shaft 4: They are loosely arranged because the chains I and II have the same speed, but the chain wheels a and b have different diameters. However, this only applies to smaller systems, e.g. B. in the form of the patent drawing, where the main support chain II consists of a link chain, but the chain I consists of a simple anchor chain.

Bei schweren Lasten und tiefen Schächten, wo beide Ketten I und II als langgliedrige Gelenkketten ausgebildet sind und beide die gleiche Lasst zu tragen haben, sind beide Greiferscheiben a und b feist mit der Motorwelle c verbunden.With heavy loads and deep shafts, where both chains I and II are designed as long-link articulated chains and both have to carry the same Lasst, both gripper disks a and b are firmly connected to the motor shaft c.

Die Ketten II sollen bei kleineren Anlagen etwa 2/3 der gesamten Last tragen, die Ketten I nur etwa 1-/3. Die Greiferscheiben a haben, also die Hauptlast des ganzen Betriebes zu bewältigen, während die Kettenräder b im wesentlichen nur als Kettenführungen dienen.The chains II should be around 2/3 of the total load for smaller systems wear the chains I only about 1/3. The gripper disks have a, so the main load to cope with the whole operation, while the sprockets b essentially only serve as chain guides.

Da die Plattformen d_ eine Verbindung zwischen den Ketten I und II bilden, werden hierbei die Ketten I durch die Ketten II in waagerechtem Förderwege mitgezogen. Die eine der beiden Greiferscheiben a ist für sich verstellbar und durch die Sperrklinke e festgestellt, so däß jederzeit eine Nachstellung erfolgen kann (Abb. 3).Since the platforms d_ form a connection between the chains I and II, the chains I are replaced by the chains II in dragged along the horizontal conveying path. One of the two gripper disks a is adjustable by itself and is fixed by the pawl e so that readjustment can take place at any time (Fig. 3).

Die Plättformen d laufen, wenn sie nicht frei schweben, mittels der Laufrollen f auf Leitschienen g (Abb. d. und 5).The platforms d run, when they are not floating freely, by means of the Rollers f on guard rails g (Fig. D. And 5).

Auf der Ablaufbrücke (Abb. i) läuft der abrollende Wagen auf die zum Bestimmungsort führende Schiene h und wird nach Entleerung wieder dem Schacht zugeführt.On the discharge bridge (Fig. I) the rolling trolley runs onto the to Rail h leading to the destination and is fed back to the shaft after emptying.

Die Plattformen d besitzen beiderseits Mitnehmer i, an welche sich die Wagen stützen (Abb. 3, q. und 5).The platforms d have drivers i on both sides, to which support the carriages (fig. 3, q. and 5).

Der Vorgang der Förderung ist folgender: Auf der Grubensohle werden die vollen Wagen angefahren und stützen sich an einem beweglichen Anschlag q (Abb. i).The process of extraction is as follows: Be on the bottom of the pit approached the full wagons and supported themselves on a movable stop q (Fig. i).

An den vier Kettenrollen k steigt die an- kommende Plattform d in wagerechter Lage auf Oberkante Grubensohle, der Anschlag q schaltet sich aus - selbsttätig oder von Hand -, der Wagen rollt ein Stück vor, wobei sich die Plattform unter den Wagen schiebt und der Mitnehmer i denselben festhält.On the four chain rollers k the increasing Coming platform d in a horizontal position on the upper edge of the bottom of the pit, the stop q switches itself off - automatically or by hand - the carriage rolls forward a bit, the platform sliding under the carriage and the driver i holding it in place.

Über Flur schiebt sich die Plattform d über die vier Leitrollen m, wobei der Wagen im Gefälle auf Schienen h läuft, -während die Plattform leer zwischen den Scheiben a und b schwenkt und bei Rückkehr zurr Schacht den in leichtem Gefälle zurückkehrenden Wagen aufnimmt. Die vier Leitrollen n führen die Plattformen und die Wagen gleichmäßig in -den- .Schacht zurück, während jeder Wagen nach @-,d.kn Vorbeigehen an den. vier Leitrollen o auf der Schachtsohle im Gefälle abläuft, die leere Plattform d um die vier größeren Umlenkrollen p schwenkt und bei Hervortreten unter Flur an den Leitrollen k den nächsten Wagen mitnimmt.The platform d slides across the floor over the four guide rollers m, with the carriage running on rails h on a slope, while the platform pivots empty between the panes a and b and on return to the shaft picks up the carriage returning on a slight slope. The four guide rollers n guide the platforms and carriages evenly back into -the- .schacht, while each carriage after @ -, i.e., passing the. four guide rollers o runs down the slope on the shaft bottom, the empty platform d swivels around the four larger deflection rollers p and when stepping out from under the floor on the guide rollers k takes the next car with it.

Die Geschwindigkeit der Ketten soll etwa o,2 m[sek. betragen, die Entfernung derPlattformen untereinander 3 bis 5 m, je nach Tiefe: des Schachtes.The speed of the chains should be about 0.2 m [sec. amount to the Distance between the platforms 3 to 5 m, depending on the depth: of the shaft.

Es wird mit Förderhöhen bis zu ioo m gerechnet.Heads of up to 100 m are expected.

Die Plattformen können auch zum Transport von schweren Gütern, von Lastwagen sowie von Last- und Personenkraftwagen benutzt werden, wobei von einem fortlaufenden Betriebe abgesehen würde, da die langen Plattformen eine Schwenkung nicht vornehmen können. Ein Kraftwagen z. B. würde auf der tiefer liegenden Stelle auf die unbewegliche Plattform auffahren und nach Erreichen der oberen Abladestelle von der haltenden Plattform abfahren, die auf demselben Wege zurückläuft, wie sie gekommen ist.The platforms can also be used to transport heavy goods, from Trucks as well as trucks and passenger cars are used, with one Continuous operations would be disregarded as the long platforms pivot can not make. A motor vehicle z. B. would be on the lower part drive onto the immovable platform and after reaching the upper unloading point depart from the holding platform, which is returning the same way as it has come.

Claims (1)

PATENTANSPRUCH: Endlose, über Rollen. geführte Kettenbahn zum Transport von Förderwagen. Bewegungen von wagerechtem bis senk-
rechtem Wege in beliebiger Reihenfolge zulassend, zum Zwecke, die auf feststehender Bahn auf Fördersohle angefahrenen Wagen in gleichmäßigem, ununterbrochenem Laufe durch den Schacht oder das senkrechte Fördergerüst auf höher lie--ende Stockwerke zu überführen, wo die Wagen auf feststehender wa'Agerech-
ter Bahn zum Weiterlauf selbsttätig abgesetzt werden, dadurch gekennzeichnet, daß Plattformen, die auf walgerechter
Bahn als Schiebebühnen dienen und beiderseits Schienen zum Auflaufen sowie Mitnehmer zum Festhalten der Wagen besitzen, mittels vier Aufhängezapfen an vier Lastketten, die auf wagerechter
Balin in gleicher Höhe nebeneittan-lerliegen und sich in senkrechter Bahn auseinanderspreizen, befestigt sind und mit den zu fördernden Wagen stets in waige-
rechter Lage in Berührung bleiben, sei es beim Übergang von dem wagerechten in den senkrechten Förderweg, wo die Plattformen als schwebende Tragewerke nach Art der Lastenaufzüge wirken, sei es beim Übergang vom senkrechten zum wagerechten Weg bis zum selbsttätigen
Ablauf der vollen Wagen auf den oberen Stockwerken und bis zum selbsttätigen Ablauf der leeren Wagen auf der Fördersohle.
PATENT CLAIM: Endless, over roles. guided chain conveyor for transporting trolleys. Movements from horizontal to vertical
allowing the right way in any order, for the purpose of transferring the wagons, which have been approached on a fixed track on the conveyor floor, in an even, uninterrupted course through the shaft or the vertical conveyor frame to higher floors, where the wagons on a fixed
the web are automatically set down to continue running, characterized in that that platforms that are more suitable for whales
Railway serve as transfer platforms and have rails on both sides for running on as well as drivers for holding the wagons, by means of four suspension pegs four load chains that are horizontal
Balin lie next to the side at the same height and spread apart in a vertical path, are fastened and with the wagon to be conveyed always in horizontal
right position remain in contact, be it at the transition from the horizontal to the vertical conveying path, where the platforms act as floating support structures in the manner of freight elevators, be it at the transition from the vertical to the vertical horizontal path to automatic
Process of full wagons on the upper floors and until the empty wagons run automatically on the conveyor floor.
DEK99533D 1926-06-20 1926-06-20 Chain conveyor for horizontal and vertical conveyance Expired DE466153C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEK99533D DE466153C (en) 1926-06-20 1926-06-20 Chain conveyor for horizontal and vertical conveyance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEK99533D DE466153C (en) 1926-06-20 1926-06-20 Chain conveyor for horizontal and vertical conveyance

Publications (1)

Publication Number Publication Date
DE466153C true DE466153C (en) 1928-09-29

Family

ID=7239178

Family Applications (1)

Application Number Title Priority Date Filing Date
DEK99533D Expired DE466153C (en) 1926-06-20 1926-06-20 Chain conveyor for horizontal and vertical conveyance

Country Status (1)

Country Link
DE (1) DE466153C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5088591A (en) * 1990-05-11 1992-02-18 W. Schlafhorst Ag & Co. Tube transport assembly for transporting yarn packages on a textile machine including a vertical transport component
WO1995034491A1 (en) * 1994-06-16 1995-12-21 Macgregor (Fin) Oy Four-chain paternoster cargo handling system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5088591A (en) * 1990-05-11 1992-02-18 W. Schlafhorst Ag & Co. Tube transport assembly for transporting yarn packages on a textile machine including a vertical transport component
WO1995034491A1 (en) * 1994-06-16 1995-12-21 Macgregor (Fin) Oy Four-chain paternoster cargo handling system

Similar Documents

Publication Publication Date Title
DE3228015C2 (en)
CH615969A5 (en) Movable machine arrangement for transporting bulk material
DE3234817C2 (en) High-bay warehouse
DE466153C (en) Chain conveyor for horizontal and vertical conveyance
DE3430642A1 (en) TRAVELABLE SLOPE LIFT
US3889826A (en) Reversible car plow feeder for stock pile recovery systems
DE4104877A1 (en) Bulk material rail wagon - is open upwards and has delivery device running longitudinally in its lower part
DE3303059C2 (en) Inclined elevator
DE431059C (en) Method for loading spoil depositors using a mobile ramp
DE1189507B (en) Material transport system for the transition from the so-called to the seigere production or vice versa in underground mining operations
DE459783C (en) Loading device for conveyor racks
DE493943C (en) Cable car with reversing station that can be moved in a semicircle and automatic operation in the reversing station and in the transit station
DE1189940B (en) Transfer station from the longwall to the line conveyance
DE1904683A1 (en) ? for railroad tracks, especially those of the daytime fall
US955884A (en) Feeder for car-hauls.
DE959922C (en) Method and device for carrying the carts ejected from a conveyor basket into the track
DE539577C (en) Bedding machine for track renewal taking place in flow work
DE470175C (en) Device for conveying and dropping bulk goods
DE613397C (en) Conveyor belt system for the conveyance of coal on overburden conveyor bridges
US1944993A (en) Mine car loading apparatus
DE327965C (en) Device to facilitate the restart of conveyor vessels running on rails after filling
DE1813955C3 (en) Return of the conveyor belt system with a loading trolley
DE586718C (en) Loading bridge for overloading piece goods in railway operations
DE402008C (en) Device for conveying and unloading bulk goods
DE162835C (en)