DE466153C - Chain conveyor for horizontal and vertical conveyance - Google Patents
Chain conveyor for horizontal and vertical conveyanceInfo
- Publication number
- DE466153C DE466153C DEK99533D DEK0099533D DE466153C DE 466153 C DE466153 C DE 466153C DE K99533 D DEK99533 D DE K99533D DE K0099533 D DEK0099533 D DE K0099533D DE 466153 C DE466153 C DE 466153C
- Authority
- DE
- Germany
- Prior art keywords
- vertical
- horizontal
- wagons
- platforms
- conveyor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B9/00—Kinds or types of lifts in, or associated with, buildings or other structures
- B66B9/10—Kinds or types of lifts in, or associated with, buildings or other structures paternoster type
Landscapes
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Structural Engineering (AREA)
- Intermediate Stations On Conveyors (AREA)
Description
IniTagebau wurden entweder langeKettenbahnen, die bis zu einer bestimmten Neigung der Fahrbahn verwendbar sind, benutzt, oder es wurde das durch Bagger oder größere Abraummaschinen gewonnene Gut durch besondere Kleinbahnen fortgeschafft und beim Abgeben des Guts auf höher liegende Ablaufstellen Aufzüge benutzt, wo dann meistens eine Umladung zwecks Weiterbeförderung mittels Kettenbahn vor sich ging.IniTebau were either long chain tracks leading up to a certain Slope of the roadway are usable, used, or it was done by excavators or Goods extracted from larger clearing machines were carried away by special small railways and when delivering the goods to higher-lying drainage points, elevators are used, where then mostly a reloading for the purpose of onward transport by chain rail took place.
Im Steinkohlenbergbau, wo die Steinkohle von der Rasenhängebank auf höher gelegene Hängebänke, z. B. bei Wäschen, gebracht werden muß oder wo Berge und Kohlen auf hohe Halden abgeführt werden, benutzt man weitgespannte Förderbrücken mit $ettenbahnen, steile Seilbahnen, welche jeden einzelnen Wagen hochziehen, oder auch Aufzüge.In hard coal mining, where the hard coal is raised from the lawn hanging bank higher hanging benches, e.g. B. at washes, must be brought or where mountains and coal are carried off to high heaps, wide-span conveyor bridges are used with $ ettenbahnen, steep cable cars that pull up every single car, or also elevators.
Abgesehen von den Kettenbahnen und Kleinbahnen im Tagebau, welche
eine senkrechte oder in starker Neigung liegende Förderung überhaupt nicht-zulassen,
bedingen alle diese Förderarten, daß jeder Wagen durch ein- oder mehrmalige Umstellung
von Hand dem Bestimmungsort zugeführt wird, so daß der auf der Grubensohle aufgegebene
Wagen nur unter Aufwendung zahlreicher Bedienungsmannschaften, großen Zeitverlusten,
umständliche, Platz erfordernde Anlagen sein Ziel erreicht und denselben Förderweg
umgekehrt wieder zurücklegen muß. Ein direkter ununterbrochener Transport bei Schachtförderung
oder tiefer liegenden senkrechten. Abbauorten im Tagebau ist nicht möglich, so,
daß hier die obengenannten Hilfsvorrichtungen in Tätigkeit treten müs-
Es sind nun bereits Vorrichtungen bekannt, die es ermöglichen, fortlaufende
Beförderungen von. Gefäßen an Ketten vorzunehmen, deren Förderwege sowohl senkrecht
Bei einer weiteren derartigen Fördereinrichtung hängt eine Plattform
zur Aufnahme der Fördergefäße zwischen zwei Seilen. Durch besondere, ziemlich verwickelte
Zuführungseinrichtungen wird jeder einzelne Wagen der Plattform während des senkrechten
Laufs übergeben. Ein ununterbrochener, gleichmäßiger Zulauf der Fördergefäße sowie
ein solcher Ablauf auf den. oberen Etagen ist gleichfalls nicht möglich.
Schließlich
ist eine Anordnung bekannt, bei der ein Gefäß, das an zwei Ketten befestigt
Gegenstand der Erfindung ist nun, eine einfache Förderart zu schaffen,
die @es ermöglicht, die Förderwagen mittels einer Kettenbahn von der Grubensohle
über Tag zu fördern, ohne daß eine Umladung der Wagen vorgenommen zu werden braucht,
wobei es ganz gleichgültig ist, ob der Förderweg nach-
Förderkorb, Kettenbahn, Aufzug, Aufgabe-und Abzugsstation vereinigen sich in dieser= Neuerung, da die Wagen, an der Aufg -bestelle auf der Grubensohle durch die Schlepper beliebig aneinandergereiht, selbsttätig in ruhiger, ununterbrochener Weise ihren 1iörderweg antreten, um auf Flur oder auf Hängebank selbsttätig abzurollen, ohne daß dazu irgendeine weitere Hilfskraft benötigt wird. -Bei der neuen Fördereinrichtung werden vier Ketten verwendet, zwischen welchen in regelmäßigen Abständen Plattformen. zur Aufnahme der Förderwagen hängen.Combine conveyor cage, chain conveyor, elevator, feed and discharge station in this = innovation, since the wagons, at the Aufg -bestelle on the pit floor Lined up randomly by the tractor, automatically in a quiet, uninterrupted manner Wise start their 1iörderweg to roll automatically on the corridor or on the hanging bench, without the need for any other assistants. -At the new conveyor system four chains are used, between which platforms at regular intervals. to hang the trolley.
Diese Plattformen bleiben infolge der nachstehend beschriebenen Anordnung
in allen
Bei Schachtförderung wird das Führungsgerüst im senkrechten Schacht zweckmäßig weggelassen, so daß die Ketten mit den Wagen frei schweben. Dabei wird eine durchgehende Führungsleiste angebracht, um ein Schwanken der Last zu verhindern.In the case of shaft conveyance, the guide frame is in the vertical shaft expediently omitted so that the chains float freely with the car. It will A continuous guide rail is attached to prevent the load from swaying.
Im Tagebau erhält die senkrechte Führung ein: geschlossenes Gerüst, ähnlich dem der Lastenaufzüge.In the opencast mine, the vertical guide is given a: closed scaffolding, similar to that of freight elevators.
Abb. i zeigt die Gesamtanordnung einer solchen Anlage .im Tagebau.Fig. I shows the overall arrangement of such a system in an open-cast mine.
Abb. z zeigt einen Teil der Seitenansicht, welche je nach Menge der Förderung in mehreren nebeneinanderliegenden Gerüsten bestehen kann.Fig. Z shows part of the side view, which depends on the amount of Promotion in several adjacent scaffolds can exist.
Abb. 3 zeigt den Hauptantrieb der Ketten, Abb. q. die Plattform in der Ansicht von oben, Abb. 5 dieselbe in Seitenansicht.Fig. 3 shows the main drive of the chains, Fig. Q. the platform in the view from above, Fig. 5 the same in side view.
Die Greiferscheiben a für die beiden Lastketten II sitzen fest auf der Vorlegewelle c (Abb. i und 3).The gripper disks a for the two load chains II sit firmly on the countershaft c (Fig. i and 3).
Die Kettenräder b für die stets außenliegenden Ketten T sitzen lose auf der Welle 4: Sie -sind deshalb lose angeordnet, weil- die Ketten I und II gleiche Geschwindigkeit haben, die Kettenräder a und b aber verschiedene Durchmesser. Dies gilt jedoch nur bei kleineren Anlagen, z. B. nach Form der Patentzeichnung, wo die Haupttragkette II aus einer Gelenkkette, die Kette I aber aus einer einfachen Ankerkette besteht.The chain wheels b for the chains T that are always on the outside sit loosely on the shaft 4: They are loosely arranged because the chains I and II have the same speed, but the chain wheels a and b have different diameters. However, this only applies to smaller systems, e.g. B. in the form of the patent drawing, where the main support chain II consists of a link chain, but the chain I consists of a simple anchor chain.
Bei schweren Lasten und tiefen Schächten, wo beide Ketten I und II als langgliedrige Gelenkketten ausgebildet sind und beide die gleiche Lasst zu tragen haben, sind beide Greiferscheiben a und b feist mit der Motorwelle c verbunden.With heavy loads and deep shafts, where both chains I and II are designed as long-link articulated chains and both have to carry the same Lasst, both gripper disks a and b are firmly connected to the motor shaft c.
Die Ketten II sollen bei kleineren Anlagen etwa 2/3 der gesamten Last tragen, die Ketten I nur etwa 1-/3. Die Greiferscheiben a haben, also die Hauptlast des ganzen Betriebes zu bewältigen, während die Kettenräder b im wesentlichen nur als Kettenführungen dienen.The chains II should be around 2/3 of the total load for smaller systems wear the chains I only about 1/3. The gripper disks have a, so the main load to cope with the whole operation, while the sprockets b essentially only serve as chain guides.
Da die Plattformen d_ eine Verbindung zwischen den Ketten I und II
bilden, werden hierbei die Ketten I durch die Ketten II in
Die Plättformen d laufen, wenn sie nicht frei schweben, mittels der Laufrollen f auf Leitschienen g (Abb. d. und 5).The platforms d run, when they are not floating freely, by means of the Rollers f on guard rails g (Fig. D. And 5).
Auf der Ablaufbrücke (Abb. i) läuft der abrollende Wagen auf die zum Bestimmungsort führende Schiene h und wird nach Entleerung wieder dem Schacht zugeführt.On the discharge bridge (Fig. I) the rolling trolley runs onto the to Rail h leading to the destination and is fed back to the shaft after emptying.
Die Plattformen d besitzen beiderseits Mitnehmer i, an welche sich die Wagen stützen (Abb. 3, q. und 5).The platforms d have drivers i on both sides, to which support the carriages (fig. 3, q. and 5).
Der Vorgang der Förderung ist folgender: Auf der Grubensohle werden die vollen Wagen angefahren und stützen sich an einem beweglichen Anschlag q (Abb. i).The process of extraction is as follows: Be on the bottom of the pit approached the full wagons and supported themselves on a movable stop q (Fig. i).
An den vier Kettenrollen k steigt die an-
Über Flur schiebt sich die Plattform d über die vier Leitrollen m, wobei der Wagen im Gefälle auf Schienen h läuft, -während die Plattform leer zwischen den Scheiben a und b schwenkt und bei Rückkehr zurr Schacht den in leichtem Gefälle zurückkehrenden Wagen aufnimmt. Die vier Leitrollen n führen die Plattformen und die Wagen gleichmäßig in -den- .Schacht zurück, während jeder Wagen nach @-,d.kn Vorbeigehen an den. vier Leitrollen o auf der Schachtsohle im Gefälle abläuft, die leere Plattform d um die vier größeren Umlenkrollen p schwenkt und bei Hervortreten unter Flur an den Leitrollen k den nächsten Wagen mitnimmt.The platform d slides across the floor over the four guide rollers m, with the carriage running on rails h on a slope, while the platform pivots empty between the panes a and b and on return to the shaft picks up the carriage returning on a slight slope. The four guide rollers n guide the platforms and carriages evenly back into -the- .schacht, while each carriage after @ -, i.e., passing the. four guide rollers o runs down the slope on the shaft bottom, the empty platform d swivels around the four larger deflection rollers p and when stepping out from under the floor on the guide rollers k takes the next car with it.
Die Geschwindigkeit der Ketten soll etwa o,2 m[sek. betragen, die Entfernung derPlattformen untereinander 3 bis 5 m, je nach Tiefe: des Schachtes.The speed of the chains should be about 0.2 m [sec. amount to the Distance between the platforms 3 to 5 m, depending on the depth: of the shaft.
Es wird mit Förderhöhen bis zu ioo m gerechnet.Heads of up to 100 m are expected.
Die Plattformen können auch zum Transport von schweren Gütern, von Lastwagen sowie von Last- und Personenkraftwagen benutzt werden, wobei von einem fortlaufenden Betriebe abgesehen würde, da die langen Plattformen eine Schwenkung nicht vornehmen können. Ein Kraftwagen z. B. würde auf der tiefer liegenden Stelle auf die unbewegliche Plattform auffahren und nach Erreichen der oberen Abladestelle von der haltenden Plattform abfahren, die auf demselben Wege zurückläuft, wie sie gekommen ist.The platforms can also be used to transport heavy goods, from Trucks as well as trucks and passenger cars are used, with one Continuous operations would be disregarded as the long platforms pivot can not make. A motor vehicle z. B. would be on the lower part drive onto the immovable platform and after reaching the upper unloading point depart from the holding platform, which is returning the same way as it has come.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEK99533D DE466153C (en) | 1926-06-20 | 1926-06-20 | Chain conveyor for horizontal and vertical conveyance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEK99533D DE466153C (en) | 1926-06-20 | 1926-06-20 | Chain conveyor for horizontal and vertical conveyance |
Publications (1)
Publication Number | Publication Date |
---|---|
DE466153C true DE466153C (en) | 1928-09-29 |
Family
ID=7239178
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DEK99533D Expired DE466153C (en) | 1926-06-20 | 1926-06-20 | Chain conveyor for horizontal and vertical conveyance |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE466153C (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5088591A (en) * | 1990-05-11 | 1992-02-18 | W. Schlafhorst Ag & Co. | Tube transport assembly for transporting yarn packages on a textile machine including a vertical transport component |
WO1995034491A1 (en) * | 1994-06-16 | 1995-12-21 | Macgregor (Fin) Oy | Four-chain paternoster cargo handling system |
-
1926
- 1926-06-20 DE DEK99533D patent/DE466153C/en not_active Expired
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5088591A (en) * | 1990-05-11 | 1992-02-18 | W. Schlafhorst Ag & Co. | Tube transport assembly for transporting yarn packages on a textile machine including a vertical transport component |
WO1995034491A1 (en) * | 1994-06-16 | 1995-12-21 | Macgregor (Fin) Oy | Four-chain paternoster cargo handling system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE3228015C2 (en) | ||
CH615969A5 (en) | Movable machine arrangement for transporting bulk material | |
DE3234817C2 (en) | High-bay warehouse | |
DE466153C (en) | Chain conveyor for horizontal and vertical conveyance | |
DE3430642A1 (en) | TRAVELABLE SLOPE LIFT | |
US3889826A (en) | Reversible car plow feeder for stock pile recovery systems | |
DE4104877A1 (en) | Bulk material rail wagon - is open upwards and has delivery device running longitudinally in its lower part | |
DE3303059C2 (en) | Inclined elevator | |
DE431059C (en) | Method for loading spoil depositors using a mobile ramp | |
DE1189507B (en) | Material transport system for the transition from the so-called to the seigere production or vice versa in underground mining operations | |
DE459783C (en) | Loading device for conveyor racks | |
DE493943C (en) | Cable car with reversing station that can be moved in a semicircle and automatic operation in the reversing station and in the transit station | |
DE1189940B (en) | Transfer station from the longwall to the line conveyance | |
DE1904683A1 (en) | ? for railroad tracks, especially those of the daytime fall | |
US955884A (en) | Feeder for car-hauls. | |
DE959922C (en) | Method and device for carrying the carts ejected from a conveyor basket into the track | |
DE539577C (en) | Bedding machine for track renewal taking place in flow work | |
DE470175C (en) | Device for conveying and dropping bulk goods | |
DE613397C (en) | Conveyor belt system for the conveyance of coal on overburden conveyor bridges | |
US1944993A (en) | Mine car loading apparatus | |
DE327965C (en) | Device to facilitate the restart of conveyor vessels running on rails after filling | |
DE1813955C3 (en) | Return of the conveyor belt system with a loading trolley | |
DE586718C (en) | Loading bridge for overloading piece goods in railway operations | |
DE402008C (en) | Device for conveying and unloading bulk goods | |
DE162835C (en) |